SlideShare a Scribd company logo
1 of 9
Download to read offline
FPSO
Bulletin
 www.fpsoasia.com                                   Volume 1
12 years of connecting the global FPSO community -
Maximizing field returns with innovations in FPSO technology


STOP PRESS... STOP PRESS...

 New Dynami  cs Forge Strong
 Growth Tren ds for the FPSO
 Market in 2011/2012 and West African
                    sian        water Brazilian, A
  Con tinued demand from deep                         by new dynamics in
                           pm ents will be determined
  projects, but key develo
                            .
  the global FPSO market..
                                                     50 vessel
  ...read inside for more                                      ow
                                                    and oil co ners
                                                               mpanies
                                                    confirm t
                                                              heir
                                                   participa
                                                             tion
                                                   at the FPS
                                                              O
                                                   Congress
                                                             2011
                                                  read more
                                                            inside...
FPSO Bulletin presents
www.fpsoasia.com                                                                     Volume 1
Maximizing field returns with innovations
in FPSO technology                                                                                                                        Venue: Grand Hyatt Hotel, Singapore

                                 Jason Waldie,                                                David Boggs,                                               Jerry Joynson,
                                 Douglas Westwood                                             Managing Director                                          Corporate Director,
                                 gives his thoughts                                           of Energy Maritime                                         Concept Development,
                                 on why FPSOs                                                 Associates explains                                        SBM Offshore outlines
                                 will return to pre                                           why FPSO’s will only                                       some of the challenges
                                 2008 levels on the                                           increase in popularity                                     to achieving successful
                                 upswing                                                      going forward.                                             FPSO delivery
                                 >>> more on page 2                                           >>> more on page 7                                         >>> more on page 2



News in Brief
Key Industry Figures Shape
the 2011 FPSO Congress
In its 12th year, the congress addresses key
industry dynamics with advisors including;
• David Cannon,
  General Manager, North Sea Production
  Company Limited, Maersk FPSO UK Ltd
• Rashim Berry
  Director, Projects, Tanker Pacific
  Management Pte Ltd
• Kelvin Sam,
  Senior Market Analyst, ODS-Petrodata
• David Boggs,
  Managing Director, Energy Maritime
  Associates Pte Ltd
• Eng Yew Chan, CFO, EOC
• Julian Callanan, Analyst, Infield Systems
>> more on page 2

Premier Oil Vietnam
Offshore BV commences
charter of the Lewek                                    The 12th Annual FPSO Congress goes global
EMAS
- (18 April 2011) Offshore Energy Today                 bringing together key experts from Petrobras,
The FPSO will process oil from Chim Sao
field on Block 12W in the Nam Con Son
basin, about 350 km off southern Vietnam.
                                                        ENI Australia, ConocoPhillips and
The field development involves producing
oil and associated gas to an unmanned,                  ExxonMobil 20 - 21 Sept 2011, Singapore
minimum facility wellhead platform in 100m
of water and then to the FPSO.
                                                      New dynamics forge strong growth                                 The five year forecast shows that
Eni secures Angola FPSO -                             trends for the FPSO market                                       capital expenditures thrown off by
(15 April 2011) - Upstream Online
Monaco-based SBM Offshore’s new deal                  In just over three decades, floating production systems          floater orders are expected to total
with Eni Angola for the use of its Xikomba            have evolved from relatively simple units producing from a
floating production storage and offloading            single well to massive facilities capable of handling 250,000    between $80 billion and $115 billion
vessel will be part of a 12 year lease                barrels of oil per day. Today, as deep water oil reserves        Quoting a recent report from the International Maritimes
agreement after a letter of intent was signed         remain mostly undiscovered, a continued optimistic long-         Associates (IMA), expected orders for production floaters
today, the company has announced.                     term outlook for floating production systems is expected.        will be between 24 and 35 units annually over the next five
                                                                                                                       years, or between 120 to 175 FPS systems in total. Some 80
Petrobras Receives                                    Deepwater pays, but don’t leave                                  percent of these units are expected to be FPSOs.

BOEMRE Nod for First                                  out opportunities in marginal field                               Challenges moving ahead
FPSO in GOM                                           exploitation                                                     In an inherently capital and asset-intensive industry, the
(17 March 2011) - Rigzone                             Growth in the FPSO market through to 2014 will be driven         reevaluation of risk exposure levels by major lenders has
The Bureau of Ocean Energy Management,                by continued demand from deepwater Brazilian and West            led to a prolonged period of FPSO project implementation.
Regulation and Enforcement (BOEMRE)                   African projects. Key developments will be determined by         Attention has also been turned to the nature of the contract
provided the final approval necessary for             new dynamics in the global FPSO market including demand          between the operator and FPSO vessel owners, where a
Petrobras America to begin oil and natural            growth in Asia, the greater role of smaller independent oil      more balanced contracting regime is the subject of heated
gas production at its Chinook-Cascade                 companies and the increased importance of smaller offshore       discussion.
project using a Floating Production Storage           oil fields.                                                      >>more on page 3
Offloading (FPSO) facility. This will be the
first time this technology is used in the U.S.
Gulf of Mexico.                                         Log on to www.fpsoasia.com for updates on the 12th Annual FPSO Congress
FPSO Congress Bulletin 2011

350+ attendees expected                                         FPSO market set to                                                                                                                    Jason Waldie, Douglas
at the 12th Annual FPSO
Congress                                                        reach US$16 billion                                                                                                                      Westwood gives his
                                                                                                                                                                                                     thoughts on why FPSOs
                                                                                                                                                                                                      will return to pre 2008
Oil and Gas IQ announces their 2011 event
- don’t miss the longest running FPSO
                                                                by 2014                                                                                                                                levels on the upswing

congress. This annual platform brings you
global insights from major hotspots such as                     Until 2008, there were many new speculative players                                                         drilling and subsea processing emerging from
Brazil, Gulf of Mexico, West Africa, North                      planning to enter the FPSO market. By the time 2009 came                                                    increased exploration will result in a little more
Sea, Baring Sea, West of Australia and the                      around it all rather fell apart.                                                                            than US$74.6 billion during the same period.
South China Sea.
253 attendees joined the global congress in                     Small-time operations were financing from external debt                                                     As a result of the 2008 downturn and subsequent turn of
2010 and attendance numbers are expected                        providers simply because credit markets were the tightest                                                   fortunes in 2009 and 2010 we have seen a slight increase
to increase in 2012 inline with rapid growth                    that they had been in years. This all led to many of the new                                                in scrutiny on the part of the private equity sector with
in the market this year.                                        start-up and smaller players exiting the market shortly into                                                respect to the FPSO market, this seems to be the right level
                                                                2009.                                                                                                       of scrutiny.

50 vessel owners and oil                                        Those that remained and could weather the crisis are still                                                  Consequently, the market is now seeing balanced
companies confirm their                                          active and are enjoying the resurgent economic upswing.                                                     contracting regimes, which was in some way forced by the
                                                                Globally, monetary policy is loosening and we have seen                                                     new entrants to the market from the private equity side.
participation at the FPSO                                       activity expanding globally from East to West. This has                                                     Numerous interviews with dominant players in the industry
Congress 2011                                                   changed the entire scope of the sector as it is now not
                                                                uncommon to see projects in Brazil financed from Japan or
                                                                                                                                                                            seem to confirm this feeling and continue to reassure us
                                                                                                                                                                            that, on the whole, FPSO projects are returning to pre-2008
To date, the programme committee together                       projects in West Africa being financed from China.                                                          level and a turn of fortunes for the sector is imminent.
with its advisors have confirmed over 50
industry experts to share field case studies.                                                                                                                               There was a material decrease in orders since 2009 but
                                                                                          70
Operators and owners confirmed include                                                                Drilling
                                                                                                      Floating Platforms                                                    it seems that market has bottomed last year and there is
• Exxonmobil • OMV • Petrobras • Teekay                                                   60          Pipelines
                                                                                                                                                                            an increasing share of the market which is being leased to
Petrojarl • ENI Australia • BTL • Modec                                                               Subsea Production
                                                                Expenditure ($billions)




                                                                                          50          Subsea Processing                                                     FPSOs.
• Husky Mudara • Chevron • Maersk Oil                                                                 SURF
• BP Migas • SBM • Tanker Pacific • EOC                                                   40
                                                                                                                                                                            The deepwater horizon disaster is unlikely to impact the
• Premuda • Aker Floating Production                                                      30                                                                                FPSO sector as the Gulf of Mexico accounts for a small
• ConocoPhillips                                                                                                                                                            part of the market and in the long term it seems as though
                                                                                          20
For details on how to register, log-on to                                                                                                                                   growth will return as the FPSO market is set to reach US$16
www.fpsoasia.com or email                                                                 10                                                                                billion by 2014.
enquiry@fpso.com.sg                                                                        0
                                                                                               2006     2007    2008       2009   2010   2011   2012   2013   2014   2015
                                                                                                                                                                             Jason Waldie will be speaking at the 12th Annual FPSO
                                                                                                                                                                             Congress at 10.00 on day 1.
Supporting the talent-                                          Deepwater production is set to double and capex is                                                           Log on to www.fpsoasia.com for a full version
stretched FPSO industry;                                        expected to increase by as much as 179% by the year
                                                                2015, to a decent $205 billion. On the other hand,
                                                                                                                                                                             of this report.

the FPSO Congress
committee has launched
the Young Engineers                                             Deepwater will remain                                                                                                            Jerry Joynson, Corporate
                                                                                                                                                                                                          Director, Concept
Support Programme in
2011                                                            the most significant                                                                                                                    Development, SBM
                                                                                                                                                                                                  Offshore outlines some of
How will this benefit the industry? Aimed
at developing young talent, this fund will
                                                                activity in the oil industry                                                                                                    the challenges to achieving
                                                                                                                                                                                                  successful FPSO delivery
entitle you to a travel grant* of up SGD1000
if you are a young engineer 35 and below**,                     Bryan Camoens: Could you please outline the current                                                         Bryan Camoens: What are some of the challenges faced
from an oil and gas operator or vessel owner                    position of FPSO’s in today’s field development                                                             from evaluation to the final phase of construction?
company.                                                        strategy?
                                                                                                                                                                            Jerry Joynson: The challenges in achieving successful
For further details on the programme, email                     Jerry Joynson: The major discoveries are taking place in                                                    FPSO delivery are manifold, and are often client or regional
enquiry@fpso.com.sg                                             deep water and look to continue to do so in the foreseeable                                                 specific. Local content requirements can be challenging to
                                                                future, and hence FPSO’s will clearly be central to                                                         comply with, such as the 65% Brazilian content recently
*  Travel grant of up to SGD1000 will be rendered upon
   time of registration as a rebate off the conference          developing these deep water fields. The use of steel catenary                                               achieved on P57; bidding rules and a need for competitive
   registration fee                                             risers connected to FPSOs, as demonstrated on the turret                                                    tendering can hamper clients’ ability to carry out effective
** Supporting documents will be required for proof of age
                                                                moored Espirito Santo in 2008, will extend their range                                                      development in collaboration with FPSO suppliers; and
                                                                beyond the current flexible riser limit of around 2,000m.                                                   resources will become tighter including the demand for
                                                                Extraction of the massive arctic oil and gas reserves will                                                  experienced personnel as we pull out of the global recession.
                                                                require means to cope with the winter ice shelf, and
Visit our knowledge library at                                  disconnectable FPSOs will prove to be invaluable in this
                                                                                                                                                                             Jerry Joynson will be speaking at the 12th Annual FPSO
                                                                                                                                                                             Congress at 16.30 on day 1.
www.fpsoasia.com for the                                        respect. The enormous flexibility of the FPSO will ensure                                                    Log on to www.fpsoasia.com for more details on
latest news on FPSO 2011                                        its leading position in regions where there is no offshore oil                                               the congress.
                                                                export pipeline infrastructure.



                                                    FPSO Congress 2011 sponsors & exhibitors
                                                  Gold Sponsors                                                                                                                              Silver Sponsors




            Exhibitors
                                                            IHC Hytop
FPSO Congress Bulletin 2011

  >>continued from page 1                                                                                                                                Wheels and Deals
                                                                                                                                                         Nexus is in talks with SBM for
Full steam ahead but not all smooth sailing                                                                                                              the supply and operation of an
Despite immense growth it’s not all smooth sailing for          Also, the lifting cost is on average very low once the field is                          FPSO for Crux
the FPSO sector, as it continues to be out of favour with       on stream and the majority of costs are sunk. The main risk
                                                                                                                                                         24 January 2011, Rigzone
liquidity. Stocks of some of the largest names in the sector    to option periods is that the reservoir is not performing, i.e.
                                                                                                                                                         Nexus advises that it is in discussions with
were down by as much as half over the past couple of years,     production is too low to justify further commencement.
                                                                                                                                                         a contractor to provide an FPSO and act
due to poor project execution in 2008 and 2009.
                                                                     Contract Duration FPSOs                                                             as a project financier and potential joint
                                                                16                                                                                       venture partners for the Crux liquids project.
Kristian Diesen, a research analyst for Parerto believes that
                                                                                                                                                         Negotiations are ongoing.
the reason for this was primarily cost overruns and delays      14

but the risk of these is now significantly reduced. “Whereas    12
taking on new projects have been a negative thing over          10       7.0              4.6                                                            ENI to lease FPSO for
the past couple of years, this should now increasingly be a
positive. The FPSO companies are currently in a position to
                                                                 8                                          6.3
                                                                                                                             5.2                   3.6
                                                                                                                                                         exploration of oil block in
                                                                                                                                                         Angola
                                                                 6
take on new projects at attractive terms with competition
                                                                 4                        8.1
on many projects being limited, overall capital expenditure              6.7
                                                                                                            5.5              5.3
                                                                                                                                                   6.6
                                                                                                                                                         15 Apr 2011, Oil Field Daily News
                                                                 2
risk reduced through improved contract terms with sub-
                                                                                                                                                         Italian oil group ENI has signed a letter
suppliers and a supply chain that has a significantly lower      0
                                                                     Fred. Olsen        SBM              Prosafe           Sevan          BW Offshore    of intent with SBM Offshore to lease the
pressure than in the 2006 - 2008 period,” he said in a note.         Production        Offshore         Production         Marine
                                                                                                                                                         Xikomba FPSO vessel to explore the deep
                                                                      Firm Years    Optional Years                 *Sevan includes drilling rigs
                                                                                                                                                         water 15/06 oil block in the Angolan sea.
Kristian also mentions that the likelihood of contract
extensions for a unit in the FPSO market is far larger than     Source: Pareto Research
for instance in the rig market, as the units are tailor-made                                                                                             OMV Scoops Up License
for each specific field. Hence, he views the risk on the
optional period as low for most contracts, so long as the
                                                                Reported by Bryan Camoens, FPSO Correspondent, FPSO
                                                                Congress.
                                                                                                                                                         Offshore New Zealand
field continues to produce at economical levels.                                                                                                         24 March 2011, Rigzone
                                                                                                                                                         OMV New Zealand announced that it
                                                                  Download the full report from the knowledge library
The alternative cost for the oil company in contracting                                                                                                  will farm into PEP 51906 currently held
                                                                  at www.fpsoasia.com
another unit is generally high with a significant lead time.                                                                                             by Octanex N.L. Subject to government
                                                                                                                                                         approval, the farm-in arrangement will see
                                                                                                                                                         OMV New Zealand take on a 65% share and
                                                                                                                                                         become the operator of the license. Octanex

FPSO growth set to                                                                              David Boggs, Managing Director
                                                                                                                                                         NL retains a 35% share and will be free
                                                                                                                                                         carried through certain agreed phases of

increase as deeper                                                                                   of Energy Maritime Associates
                                                                                                                                                         exploration.
                                                                                                     explains why FPSO’s will only
                                                                                                                                                         PTSC and Lam Son JOC
fields are developed
                                                                                                       increase in popularity going
                                                                                                                          forward.
                                                                                                                                                         LSJOC endorse the Head
Bryan Camoens: Could you please outline the current             Bryan Camoens: What are some of the challenges faced
                                                                                                                                                         of Agreement (HOA)
position of FPSO’s in today’s field development                 from evaluation to the final phase of construction?                                      for the provision of
strategy?
                                                                David Boggs: The period between evaluations to delivery is                               FPSO chartering for the
                                                                typically many years, so the challenges include changes in
David Boggs: FPSOs are the most popular floating
production development option. FPSOs are proven                 foreign exchange rates, price of steel and fuel, and changes                             development of Thang Long
technology and have oil storage facilities. Almost two          in law and regulations.                                                                  4 March 2011, PTSC
- thirds of Floating production vessels are FPSOs. The                                                                                                   According to the HOA, PTSC and LSJOC
deepest floating production system in the world is the            David Boggs will be speaking at the 12th Annual FPSO                                   commit to general terms & conditions for
recently installed BW Pioneer FPSO on the Cascade /               Congress. Log on to www.fpsoasia.com for a full                                        one contract for the provision of the Floating
Chinook field in 2600m of water. As deeper and deeper             version of this interview.                                                             Production Storage Offloading vessel (FPSO)
fields are developed, FPSOs will be increasingly popular.                                                                                                for LSJOC for the defined period of 07 years
                                                                                                                                                         with extension of 03 years. Total contract
                                                                                                                                                         value is estimated to reach 500M USD. PTSC
                                                                                                                                                         shall perform the operation the FPSO during
                                                                                                                                                         7 years plus 3 years extension, participate
                                                                                                                                                         in manufacturing/conversion as well as
                                                                                                                                                         installation/commissioning of the vessel.
                                                                                                                                                         The vessel shall receive first oil at year end of
                                                                                                                                                         2013 tentatively.

                                                                                                                                                         The Deepwater Horizon
    Log on to                                                                                                                                            One Year On
                                                                                                                                                         Though the oil spill in the GOM has

    www.fpsoasia.com                                                                                                                                     been plugged, the aftermath of the
                                                                                                                                                         incident remains today. Aside from the
                                                                                                                                                         environmental, fishing and tourism impact,
    today!                                                                                                                                               tougher requirements in all areas from:
                                                                                                                                                         well design and cementing practices, to
                                                                                                                                                         blowout preventers and employee training
                                                                                       Watch exclusive online                                            have been imposed on offshore exploration
                                                                                       videos including:                                                 and production activities. Today, major

    Centering Global                                                           • Key players in the industry discuss the position
                                                                                 of FPSO to fuel today’s energy sector.
                                                                                                                                                         FPSO projects have seen more stringent
                                                                                                                                                         compliance requirements from countries
                                                                                                                                                         like Australia and the USA. The Bureau of

    Knowledge                                                                  • Carl Arnet, CEO of BW Offshore speaks
                                                                                 exclusively to Oil & Gas IQ on the energy
                                                                                 demand in the future and the potential issues
                                                                                                                                                         Ocean Energy Management, Regulation
                                                                                                                                                         and Enforcement (BOEMRE) announced
                                                                                                                                                         on March 17 2011 that it has granted final
    Log on to the FPSO knowledge universe at                                     and challenges currently facing the FPSO sector.                        approval for Brazil’s Petrobras to begin
    www.fpsoasia.com and receive exclusive industry interviews                 • C-level Vessel Owners talk about mergers and                            oil and gas production at the deepwater
    and news. Keep in touch with leading influencers in the                      acquisitions, issues outlook and trends in the                          Cascade-Chinook project using an FPSO.
                                                                                 Global FPSO sector.
    industry at our annual event.                                                                                                                        Visit www.fpsoasia.com for more on this
                                                                                                                                                         subject.
Highlighted                       Main Congress Day One: Tuesday, 20 September 2011
speakers for 2011:
                                  0815 Congress Registration
         Ketil Hox
                                  0850 Chairperson’s Opening
         Manager Project
         Engineering              0900 Exploring the Changing Role of FPSO in Today’s Field Development Strategy
         Teekay Petrojarl              • Case history of the Kitan project                  • Implementation of solutions to overcome challenges
                                       • Challenges faced from evaluation to final phase      from project design to construction
         Jose M Layung JR                construction
         Undersecretary                Francesco Piasentin, Project Manager, ENI Australia
         Department of Energy     0920 Developments in Compliance and Regulation For FPSO Projects In Australia
         Philippines                   FPSOs are challenging in the way that they represent a combination of maritime and offshore regulatory regimes,
                                       technologies and practices. This session will define the technical and regulatory aspects of floating production in
         Arne Hyen                     Australian waters.
         Tornkvist                     Simon Schubach, Regulatory Operations GM, National Offshore Petroleum Safety Authority
         CEO                      0940 An Operator’s Perspective on Taking Deepwater Development to the Next Level with FPSO Technology
         Aker Floating                 • Evaluating the benefits of      • Developing a contracting and       • Legal considerations
         Production ASA                  conversion versus new build       execution strategy                 • Interface management challenges
                                       Per Aae Staunstrup, Head of Engineering, Maersk Oil
         Maarten Van Aller
                                  1000 Regional Hotspot Market Trends in the FPSO Business
         COO                           • Market Trends in the FPSO         • Macroeconomic analysis for the FPSO                • Market drivers; current market analysis;
         Petrofac                        Business: energy demand growth      sector: an Asian perspective on global               what happened in 2011? Brazil presalt
                                       • Short-term outlook; longer-         developments                                         activity; lessons from Macondo; insight
         Daniel C.S Ahn                  term outlook                                                                             and opportunities for the 2011 recovery
         Distinguished                 Jason Waldie, Associate Director, Douglas-Westwood
         Professor of Practice    1020 Morning Refreshments and Networking
         KAIST
                                  1050 Offshore Investment Opportunities in the Philippines and Implications for the FPSO Contracting Sector
         Simon Schubach                • Understanding offshore regulations and opportunities • Maritime flag laws and varying local practices
                                         in the Philippines                                   • Regulatory compliance
         Regulatory Operations
         GM                               Jose M Layug JR, Undersecretary, Department of Energy Philippines
         National Offshore        1110    Forging New Frontiers: Responding to the Evolving Dynamics in the FPSO Industry
         Petroleum Safety                 • Developing a more balanced contracting regime: project • The economics of FPSO projects as a
         Authority                          risk, responsibilities and cost management               cost-effective field development solution
                                          • Evolving safety standards and their effect on project
         Andrew Jefferies                   advancements
         Manager Operations               Panellists:         Arne Hyen Tornkvist, CEO, Aker Floating Production ASA
         and Engineering                                      Maarten Van Aller, COO, Petrofac
         OMV NZ                                               Jon Dunstan, COO, EOC Limited
                                  1140    Evolving to a Unified Control Environment to Improve Vessel Safety and Productivity
         Michael Surkein                  ABB
         Senior Materials and
                                  1210    Lunch and Visit to the FPSO Consultation Hall
         Corrosion Consultant
         ExxonMobil
         Development               Technical Stream                                                        Commercial Stream
         Company
                                        Innovations in FPSO Design, Construction and                            FPSO Financing to Support the Rapid Growth
         Richard Cai                    Conversion                                                              of Vessel Demand
                                   1310 PRE-FEED and FEED Studies to Define a Solid                        1310 FPSO: Sources of Financing - a Perspective From
         Senior Structural
                                        Scope Definition for On-Time and On-Budget                              a Multilateral Financing Institution
         Engineer
                                        Project Delivery                                                        Karsten Fuelster, Senior Investment Officer,
         Modec
                                        GL Noble Denton                                                         International Finance Corporation
         Kevin Judkins             1340 FPSO Topside Modules: Structural Interface                         1340 Developments in the China Oil and Gas Market
         Offshore Installation          Design Considerations                                                   and Opportunities in the Offshore Sector
         Manager                          Richard Cao, Senior Structural Engineer, Modec                        Bradley Way, Head of Asia Energy, BNP Paribas
         Crystal Ocean FPSO               Xiao Ming Tan, Lead Structural Engineer, Modec                   1410 Panel: Understanding Lending Requirements for
                                   1410 Advances in New Build FPSO Hull and Marine                              FPSO Developments
         Karsten Fuelster               Systems                                                                 Moderator: David Boggs, Managing Director, Energy
         Senior Investment              Hardy Augustin, Lead Instrument / Electrical                            Maritime Associates
         Officer                        Engineer, Peregrino FPSO                                                Panelists: Chan Eng Yew, CFO, EOC Limited
         International                                                                                          Simon Davies, Director, Oil & Gas, Structured Asset
                                   1440 Innovations in Design
         Finance                                                                                                and Export Finance, ANZ
                                        New generation Turret, Mooring and Fluid
         Corporation                                                                                            Birgit Marquart, Head of Offshore, UniCredit Bank AG
                                        Transfer System
                                                                                                                Tony Nguyen, Managing Director, EP Legal
                                        Per Skiftesvik, Framo Engineering
         Per Ae Staunstrup                                                                                 1440 Understanding the Critical Factors to Create a
         Head of Engineering       1510 Afternoon Refreshments and Networking                                   Bankable Project
         Maersk Oil                     New Technologies in Deepwater Developments                              Simon Davies, Director, Oil & Gas, Structured Asset
                                   1540 Driving the New Age of FPSOs With Innovative                            and Export Finance, ANZ
                                        Power Solutions                                                    1510 Afternoon Refreshments and Networking
                                        Stig Bøtker, Sales Director, Offshore, Wartsila
Connecting Globally and                                                                                    1540 Executive Table Discussions
                                   1610 Compact And Efficient Solutions For Sea                                 Table 1: Exploring Islamic Finance Options for FPSO Projects
Locally on the Largest                  Water Injection Applications
FPSO network                                                                                                    Table 2: Analyst Insight: Equity Fund Raising - Dead or Alive?
                                        Jarle Nilsen, Senior Manager Sales & Marketing of
                                                                                                                Table 3: Debt Financing for FPSO Developments
                                        Offshore Production Solutions, Siemens Oil & Gas
                                                                                                                Table 4: Alternative Project Funding Structures - Leveraging
With over 2000 members             1640 Advanced Multi-phase Separation Technology                              on Export Credit to Drive FPSO Project Developments
on LinkedIn, the FPSO                   John Eow, Senior Research Engineer, Keppel                              Table 5: Lender’s Insight: Stock Take on Leasing Rate
                                        Offshore & Marine                                                       Formulation for Improved Project Profitability
Network is the largest global
FPSO community connecting          1700 Creating the “Safety vs. Profitability” Case for                        Legal & Contractual Issues To Balance & Minimize
                                        FPSO Operations                                                         the Risk of Contracting & Contractor Parties
professionals in this dynamic           Alvin Chin, Sales Director, HIMA                                   1610 Arbitration to Protect Relevant Parties in Disputes
field. Find out why so many of                                                                                  Marcus Gordon, Partner,Watson, Farley & Williams LLP
                                   1715   Panel: Energy Efficient Solutions for Powering
your peers are connecting up by           FPSO Vessels                                                     1640 Developing a Clear Structure for Risk Allocation
joining us today.                         Moderator: Jerry Joynson, Corporate Director,                         and Mitigation Between the Contracting Parties
                                          Concept Development, SBM
                                                                                                                Giovanni Cobau, General Manager for Offshore
Join the FPSO network to                  Panellists: KC Gupta, Chief Facilities Manager,
                                                                                                                Division, Premuda
                                          Tanker Pacific
participate in discussions with                                                                            1715   An Update on New Indonesia Cabotage Laws
                                          Per Aae Staunstrup, Head of Engineering, Maersk Oil
your peers online.                        Stig Bøtker, Sales Director, Offshore, Wartsila                         Affecting FPSO
To be a member, email              1740 Chairman’s Summary                                                        Effendi Karim, Senior Legal Counsel, BP Migas
enquiry@fpso.com.sg                1800 12th Annual FPSO Congress Cocktail Reception                       1740 Chairman’s Summary & Cocktail Reception
Main Congress Day Two: Wednesday, 21 September 2011                                                                                          Be a Part of
0815 Congress Registration                                                                                                                   the Longest
                                                                                                                                             Running
0850 Chairperson’s Opening
0900 The Economics of FPSO as a Solution to Maximize Field Productivity

                                                                                                                                             and Largest
     FPSOs are often used on marginal or quick developments. Understanding the range and drivers of future uncertainty is critical to get
     the “right” development in place. FPSO technology can maximise the recovery of the development
     • Front end loading                                                  • Appraisal techniques to address uncertainties
     • What size storage is the right size?                               • Subsurface uncertainties and impact on topsides design
     Andrew Jefferies, Manager of Operations and Engineering, OMV New Zealand Limited
                                                                                                                                             Global FPSO
0930 FPSO Demand Forecast: Realistic Projections of Vessel Delivery and Project Schedules
     • New orders in 2012: A tale of two • FPSO capacity conundrum: Too       • Equipment supply risk: lead time and
                                                                                                                                             Congress
       scenarios                           much or too little?                  backlog trends
     Kelvin Sam, Senior Market Analyst, ODS-Petrodata                                                                                        Present your products for project
0950 What Lies Ahead: Trends in FPSO Capital Expenditure and Cost Management To Maximize Your Project Returns
                                                                                                                                             tenders to oil companies and
                                                                                                                                             vessel owners with a booth at the
     Julian Callanan, Business Manager, Infield Systems
                                                                                                                                             FPSO Consultation Hall
1010   Key Capabilities of Shipyards, and Technology Innovations to Support FPSO Developments
       Reviewing the Landscape of FPSO fabrication
       • Who are the main fabricators today?                       • Who are the key technology companies?
       • Will be there be new players?                             • What does the industry expect from new FPSOs?
       Moderator: Matthew Flynn, Managing Director, Worldyards
       Panellists: Zahar Mohd Hashim Zainuddin, CEO, GMOS        Daniel C.S Anh, Distinguished Professor of Practice, KAIST
1030 Morning Refreshments and Networking

 Technical Stream I                                                     Technical Stream II

      Standards and Norms in Design for FPSO                                 Maximizing Field Productivity through Latest
      Systems: Now and in the Future                                         Technology Innovations
 1100 The Impact of Macondo And Montara On FPSO
      Safety Cases
                                                                        1100 Evaluating FPSO Technology to Maximize Field
                                                                             Productivity
                                                                                                                                             Only 3 booths left!
                                                                                                                                             See page 7 for the floorplan.
      Brendan Fitzgerald, Director, Vanguard                                 Ketil Hox, Manager Project Engineering, Teekay Petrojarl
      Solutions
                                                                        1130 Ensuring Subsurface Safety Valve Reliability in                 Contact us today on:
 1130 Developing an Optimum Safety Case to Ensure                            Deepwater, High pressure Gas Wells                              +65 6722 9388 or
      that Productivity is Not Sacrificed                                    Mr. Tony Globe, Business Development Manager,                   enquiry@fpso.com.sg
      Gangahar S, Department Head, Engineering, Modec                        Castrol Offshore
      Excellence in Field Operations                                         Local Compliance and Regulations
 1200 Leveraging on FPSO to Optimise Operations in                      1200 Understanding Ownership and Flagging Laws In
      Small Field Developments                                               Malaysian Waters                                               Driving key
      Maarten Van Aller, COO, Petrofac                                         Abdul Samad Bin Shaik Osman, Principal Assistant
                                                                               Director, Ship Accreditation Unit, Maritime Industry
                                                                                                                                            developments
 1230 Ensuring Maximum Reliability of Your FPSO
      Operations Whilst Optimizing Cost
                                                                               Control Division, Marine Department of Malaysia              forward as an FPSO
      Kevin Judkins, Offshore Installation Manager,                     1230 Early Phase Identification of Key Commercial and
                                                                             Technical Risks to Reduce Costs
                                                                                                                                            community; the
      Crystal Ocean FPSO
 1300 Lunch and Visit of FPSO Consultation Hall                         1300 Lunch and Visit of FPSO Consultation Hall                      FPSO Congress
      Asset Integrity Management                                                                                                            committee
 1400 An Alternative Class Approach For Minimizing
      FPSOs Downtime - From “Calendar Based”
                                                                        Commercial Stream
                                                                                                                                            has launched
                                                                             Procurement and Cost Management
      To “Condition Based” Through a Risk
      Management Approach
                                                                        1400 Contract Negotiation And Management To                         the Operator
        Alexandre Imperial, Regional Offshore Class
                                                                             Protect And Ensure A Win-Win Situation For All
                                                                             Contracting Partners                                           Development
        Director, DNV - South East Asia & Pacific                              Joe Patrick, Director, Hunter Oil                            Programme in 2011
 1430 Case Study on Corrosion Management in the                         1430 Accurate FPSO Cost Planning and Control to
      North Sea                                                                                                                             Aimed at creating a cohesive
                                                                             Protect Project Bottom line
                                                                                                                                            environment for evaluating FPSO
        Abdel Kader Mekki, Senior Corrosion Engineer,                          David Boggs, Managing Director, Energy Maritime
        ConocoPhillips                                                         Associates                                                   technology as a cost effective field
                                                                                                                                            development solution, the congress
 1500 Innovative Coatings for FPSO Conversion:                               FPSO Project Management to Ensure On Time
      Improved Predictability and Lower Costs                                and On Target Delivery
                                                                                                                                            will sponsor passes for directors of
        Joao Azevedo, Global Business Development                       1500 Optimum EPCIC Contracting Strategies for                       FPSO projects from oil companies
        Manager - Offshore, Sherwin-Williams                                 Various Types of FPSO
                                                                                                                                            Only a limited number of
                                                                               Daniel C.S Ahn, Distinguished Professor of Practice,         passes are available. Email us
 1530 FPSO Corrosion Control Design to Ensure a Long
                                                                               KAIST
      Reliable Life                                                                                                                         at enquiry@fpso.com.sg or call
        Michael Surkein, Senior Materials and Corrosion                 1530 Table 1: Offshore Tax Management: Managing Tax                 +65 6722 9388 now to find out
                                                                                  and Risk Exposure in Asia for Offshore Projects
        Consultant, ExxonMobil Development Company                     Executive                                                            how you can obtain a VIP pass as
                                                                         Table    Table 2: Local Content Management to Overcome
 1600 Chairman’s Summary
                                                                      Discussions
                                                                                  Resource Shortages in a Talent-Stretched Industry
                                                                                                                                            part of the FPSO Congress operator
                                                                                  Table 3: FPSO Risk Management and Allocation:             development programme.
                                                                                  Examining Insurance Possibilities to Mitigate Risk
                                                                        1600 Chairman’s Summary


1610    Afternoon Refreshments and Networking
1630    Critical Technical Evaluation for the Successful Redeployment of FPSO Vessels
        Jerry Joynson, Corporate Director, Concept Development, SBM
1700    FPSO Turret Design Approach: An Operator’s Perspective On How To Pursue Extended Lifetime
        Carlos Mastrangelo, WR - Facilities Manager, Petrobras America
1730    Chairman’s Summary




                                                             log on to www.fpsoasia.com
                                                             for the full agenda, speaker Q&As and industry insights
                                                             or email us at enquiry@fpso.com.sg
FPSO Congress Bulletin 2011

Pre-Congress Technical Briefings                                                                                           Post-Congress
                                                                                                                           Technical Briefing
A: 19 September 2011                                         B: 19 September 2011                                          C: 22 September 2011
   0830 - 1130                                                  1300 - 1600                                                   0830 - 1130

 Evaluating FPSO Technology                                   Optimum Design, Conversion                                    Asset Integrity, Repair and
 To Maximize The Efficiency Of                                 And Construction For Safe And                                 Maintenance
 Your Field Development Plans                                 On Target Delivery                                           As many floating production systems are now
                                                                                                                           approaching the middle or end of their design lives,
• How can you increase future revenues and the               In a business where traditionally the time of vessel          this technical briefing session is created for operators
  profitability of FPSOs and FSOs worldwide?                 delivery has been prioritized over all, how can you           and owners to seek assurance on the ongoing integrity
• How well can FPSO technology maximize your                 ensure that you set things straight right from the            of assets from the processing equipment to the
  production capacity and minimize cost?                     design stage to ensure a quick delivery time yet comply       risers, subsea architecture, hull, marine systems and
                                                             with safety standards to minimize breakdowns in
• What is the quickest way to evaluate the suitability                                                                     moorings.
                                                             operations? This technical briefing is designed for
  of your field for FPSO developments? Attend the
                                                             FPSO project managers, heads of engineering, naval
  field development and evaluation technical briefing                                                                      Examine critical factors on:
                                                             architects and stakeholders involved in the design,
  created for E&P companies to benchmark, and fast                                                                         • Rationale and implementation strategy for fpso asset
                                                             construction and conversion phase of projects to drive
  track your evaluation processes and understand how                                                                         integrity management
                                                             greater efficiency and safety in this process.
  to fully exploit FPSOs to maximize field returns.                                                                        • Key assessment criteria for vessel condition in harsh
                                                             Attend this technical briefing to find out how you can:         water conditions
This focus day will give you an in-depth review of the
following:                                                   • Improve Project Delivery And Profitability through          • Realignment strategies of maintenance programmes
                                                               modular construction                                          to the dynamic conditions of your field and vessel
• Understanding key field characteristics suitable for
                                                             • Examine innovations in design including a                     conditions
  development with FPSO technology
                                                               comparison between round shaped FPSOs vs ship
• Investigating the cost and benefits of development                                                                        0815 Workshop Registration
                                                               shaped FPSOs
  with FPSO
                                                             • Understanding advancements in turret, mooring                0830 Workshop Leader’s Opening and Introduction
• Major factors to ensure value optimisation of your
                                                               and swivel technologies to combat dynamic offshore           0840 Rationale and Implementation Strategy for
  field with FPSO technology
                                                               conditions                                                        FPSO Asset Integrity Management
• Understanding the size selection of FPSO vessels                                                                          0940 Assessment of Vessel Condition in Asset
  given prospective reserves
                                                              1245 Technical Briefing Registration                               Integrity Management and Identifying
                                                              1300 Technical Briefing Leader’s Opening and                       Challenges in Harsh Water Environment
 0815 Technical Briefing Registration
                                                                   Introduction                                             1000 Morning Refreshments
 0830 Technical Briefing Leader’s Opening and
      Introduction                                            1310 Modular Construction To Improve Project                  1050 Realignment of FPSO Maintenance Programs
                                                                   Delivery And Profitability                                    for Asset Integrity Management, and
 0840 Identifying The Key Characteristics of Fields                                                                              Techniques To Mitigate Vessel Breakdowns
      For Which FPSO Is An Optimum Solution                   1340 Innovations In FPSO Design Concepts To Gain
                                                                   Carpet Returns                                                and Loss of Production Lead Time
 0950 Investigating The Costs And Benefits Of
                                                              1420 Afternoon Refreshments                                   1130 Summary
      Development With FPSO
 1010 Morning Refreshments                                    1440 Advancement In Turret, Mooring And Swivel
                                                                                                                             Your Technical Briefing Leader:
                                                                   Technologies To Combat Dynamic Offshore
 1110 Ensuring Value Optimisation Of Your Field                                                                              Zahar Mohd Hashim Zainuddin, CEO, GMOS
                                                                   Conditions
      With FPSO Technology
                                                              1510 Improved FPSO Design To Facilitate Future
 1130 Summary
                                                                   Inspections and Extend Operational Life                   Find out more about our
                                                              1540 Conversion and Relocation of Existing FPSOs
  Your Technical Briefing Leader:
  Joe Patrick, Director, Hunter Oil Pty Ltd                   1600 Summary
                                                                                                                             Technical Briefing leaders
                                                                                                                             and read the full agenda by
                                                              Your Technical Briefing Leaders:
  Don’t forget to visit our                                   Cedric Moriandini, Head of Naval Architecture,
                                                                                                                             visiting:
  download centre at                                          SBM Malaysia Sendirian Berhad                                  www.fpsoasia.com
                                                              JC Hueber, Technical Development & Marketing
  www.fpsoasia.com                                            Manager, SSP Offshore INC




FPSO demand likely to double
With FPSOs being the best and perhaps the only valid     Do you have a credible solution to offer that
option for many discovered oil fields going forward,     help global operators and vessel owners
growth for the sector will likely soar. Oil companies    achieve their needs? If so, join us now at the 12th
and vessel owners are looking to                                              Annual FPSO Congress, 20
capitalize on innovations in FPSO
technology to maximize their field
                                              “Of the 196 projects            - 21 September 2011, Grand
                                                                              Hyatt Hotel Singapore. Email
returns.                                      in the pipeline                 us at enquiry@fpso. com.sg,
                                                                              to find out how you can get
                                                                                                                       Who Should Attend
Support Key Developments of the               worldwide, FPSOs                involved.                                •
                                                                                                                       •
                                                                                                                         Oil Companies
                                                                                                                         FPSO Vessel Owners
                                                                                                                                                    • Design, Engineering
                                                                                                                                                      & Build Consultants
FPSO Community at the Largest
and Longest Running Global                    will be the preferred                 Interesting update of              • Shipyards                  • Repair and maintenance
                                                                                                                       • Topside Engineering          solution providers
FPSO Congress
In a sector where timelines are of
                                              solution for over 100                 FPSO activities and useful
                                                                                    networking opportunity             • Classification Societies   • Banks/Financing Firms
                                                                                                                       • Hull Specialists           • Ship Equipment e.g
upmost importance, though proving to          of those”                             - Mark Wood, Business
                                                                                                                       • Offshore Support             Compressors
not always be optimal, going back to                                                Development manager,
                                             Stig Hoffmeyer, CEO, Maersk FPSO                                            Solutions                  • Offshore Project
providers who they have worked with                                                 Telleborg Offshore
before seems like the easiest choice.                                                                                  • Fabrication Yards            Insurance Firms
That’s why for the past 11 years, operators and owners     We fulfilled our expectations because we met 80% of         • Offshore Communication     • Hotwork Enclosures,
have chosen the Annual FPSO Congress as the place          our targeted customers and have confirmed official            Solutions                    Turbines & Pipings
to evaluate the best partners for such time-critical       meetings with 2 already - Sose Frias, Key Account           • Ship/Fleet Management
projects                                                   Manager, Camfil Farr Power System AB                          Software Providers
FPSO Congress Bulletin 2011

Why the 12th Annual FPSO                                                                 What’s so different about the
Congress is the best value for                                                           FPSO Congress in 2011?
your marketing spend                                                                     Revamped! FPSO consultation hall consolidating key solution partners
                                                                                         you need all in one place. You will meet solution partners in from these key
                                                                                         categories:
Extensive face-to-face interaction opportunities                                         • Design, Engineering and Safety Companies
with global operators and owners                                                         • Classification Societies
                                                                                         • Ship Equipment Providers
You’ll notice our congress is very different from other conferences, our partners        • Repair and Maintenance Solutions
recognize the value of participating at the congress to network with key industry        • Topside Engineering Companies
experts and to select the best partners. If you have a credible solution which can       • Ship Communication and Navigation Solutions
help them achieve improved project management, operations and efficiency of their        • Law Firms
FPSO projects, make sure they meet you onsite.                                           • Banks/ Financiers
Areas of Involvement:
• Be part of our FPSO Consultation Hall where operators and owners take further          350+ expected attendees in 2011!
  discussions with technology and commercial experts on how to improve FPSO              • The largest and longest running FPSO conference globally, with
  operations, production and field development                                             technical and commercial streams
• Spotlight Innovations! Get your solution evaluated (from a technical and               • Content shaped by FPSO community opinion has asked for
  commercial perspective) by key decision makers from operator and owner                   The FPSO community has asked for more targeted content this year and
  companies in our technology spotlight sessions                                           so we have focused each stream into 5 main themes
• Augment your position as an industry leader by joining as a session sponsor            Technical: Benchmark your                Commercial: benchmark your
• Create awareness of your organization through sponsoring the cocktail and              experienceas in key areas including:     experiences in key areas including:
  networking evening *for the first time ever, a golf and whisky tasting evening with
                                                                                         1 Innovations in FPSO Design,            1 FPSO Financing
  your peers to forge continuing bonds in the industry
                                                                                           Construction and Conversion            2 Legal and Contractual Issues
• Increase your visibility by sponsoring lanyards/goodie bags                            2 New Technologies for Deepwater         3 Procurement and Cost
• Join us as a delegate                                                                    Developments                             Management
                                                                                         3 Standards And Norms In Design          4 FPSO Risk Management and
Email us at enquiry@fpso.com.sg or call +65 6722 9388 to explore further areas             For FPSO Systems: Now And In             Allocation
of involvement or clarify your questions.                                                  The Future                             5 FPSO Project Management to
                                                                                         4 Excellence in Field Operations           Ensure On Time and On Target
                                                                                         5 Asset Integrity Management               Delivery
                  FPSO Congress 2011 sponsors
                                                                                         • Global innovation sharing: 15 unique regions represented this year!
                                       Gold Sponsors
                                                                                         • Congress support programmes to connect and drive the industry forward
                                                                                           * Young Engineer support Programme
                                                                                           * Operator Development Programme
                                                                                         Email enquiry@fpso.com.sg for further details
                                                                                         • Connect with your peers on a personal level after a long day of
                                                                                           benchmarking best practice! Don’t miss the golf and whisky tasting
                                                                                           evening with your peers to forge continuing bonds in the industry
                                      Silver Sponsors
                                                                                         Do you have a vessel you want to showcase to the FPSO community through
                                                                                         a site tour? Email us at enquiry@fpso.com.sg to find out how you can
                                                                                         arrange this in conjunction with the congress.


                                                                                         A big thank you to our partners for their support
                                                                                                                       Supporting Partners




  Exhibition area
  Limited spaces now available... ...don’t miss out on the opportunity
  to speak directly to your customers.
  Contact us now on:
  Phone: +65 6722 9388 or email: sponsorship@iqpc.com.sg
    Available         Booked              Reserved



             1         2        3         4         5        6

                              BUFFET LINE
                                                                 7
             18

                     COFFEE




                                                   COFFEE
                      / TEA




                                                    / TEA




                                                             8
             17




                                                                                               Media Partners               Official Newspaper            Mobile Apps Partner
                                                                     9
             16




                              BUFFET LINE



            15      14          13       12         11       10          EXIT            Official TV               Official                    Supported               Held
                                                                                          Station                Newswire                       By                    In


            Illustration is not to scale and is to be used for guidance purposes only.




  Log on to www.fpsoasia.com for updates on the 12th Annual FPSO Congress
FPSO Bulletin

More Related Content

Similar to FPSO Bulletin

TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation Altera Infrastructure
 
Hdbs tanjung offshore 20060613 initiate
Hdbs tanjung offshore 20060613 initiateHdbs tanjung offshore 20060613 initiate
Hdbs tanjung offshore 20060613 initiaternoordin
 
Lease In The Middle East Aircaft & Engine Leasing
Lease In The Middle East Aircaft & Engine LeasingLease In The Middle East Aircaft & Engine Leasing
Lease In The Middle East Aircaft & Engine LeasingMonis Hasan
 
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014Altera Infrastructure
 
GoM Decommissioning Report Brochure
GoM Decommissioning Report BrochureGoM Decommissioning Report Brochure
GoM Decommissioning Report BrochureDean Murphy
 
FPSOs in 2011. Double dip or capacity crunch
FPSOs in 2011. Double dip or capacity crunchFPSOs in 2011. Double dip or capacity crunch
FPSOs in 2011. Double dip or capacity crunchIQPC
 
FPSOs in 2011: Double dip or capacity crunch?
FPSOs in 2011: Double dip or capacity crunch?FPSOs in 2011: Double dip or capacity crunch?
FPSOs in 2011: Double dip or capacity crunch?FPSO Network
 
Decommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of MexicoDecommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of Mexicopiersfrench
 
MEMC (WFR) Initiation
MEMC (WFR) InitiationMEMC (WFR) Initiation
MEMC (WFR) Initiationzacsadow
 
Fact Sheet Petrobras - 1H11 - English
Fact Sheet Petrobras - 1H11 - EnglishFact Sheet Petrobras - 1H11 - English
Fact Sheet Petrobras - 1H11 - EnglishPetrobras
 
dokumen.tips_sbm-offshore-nv.pdf
dokumen.tips_sbm-offshore-nv.pdfdokumen.tips_sbm-offshore-nv.pdf
dokumen.tips_sbm-offshore-nv.pdfXolaniRadebeRadebe
 
Fact Sheet Petrobras - 2010 - English
Fact Sheet Petrobras - 2010 - EnglishFact Sheet Petrobras - 2010 - English
Fact Sheet Petrobras - 2010 - EnglishPetrobras
 
2nd Thin Film Summit US Brochure
2nd Thin Film Summit US Brochure2nd Thin Film Summit US Brochure
2nd Thin Film Summit US BrochureCSP Today
 

Similar to FPSO Bulletin (20)

FPSO Bulletin-PDFW-6
FPSO Bulletin-PDFW-6FPSO Bulletin-PDFW-6
FPSO Bulletin-PDFW-6
 
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
TOO Q4 2011: Teekay Offshore Partners Fourth Quarter 2011 Earnings Presentation
 
Hdbs tanjung offshore 20060613 initiate
Hdbs tanjung offshore 20060613 initiateHdbs tanjung offshore 20060613 initiate
Hdbs tanjung offshore 20060613 initiate
 
Lease In The Middle East Aircaft & Engine Leasing
Lease In The Middle East Aircaft & Engine LeasingLease In The Middle East Aircaft & Engine Leasing
Lease In The Middle East Aircaft & Engine Leasing
 
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014Teekay Offshore (NYSE: TOO)  Investor Day Presentation September 30 2014
Teekay Offshore (NYSE: TOO) Investor Day Presentation September 30 2014
 
GoM Decommissioning Report Brochure
GoM Decommissioning Report BrochureGoM Decommissioning Report Brochure
GoM Decommissioning Report Brochure
 
FPSOs in 2011. Double dip or capacity crunch
FPSOs in 2011. Double dip or capacity crunchFPSOs in 2011. Double dip or capacity crunch
FPSOs in 2011. Double dip or capacity crunch
 
FPSOs in 2011: Double dip or capacity crunch?
FPSOs in 2011: Double dip or capacity crunch?FPSOs in 2011: Double dip or capacity crunch?
FPSOs in 2011: Double dip or capacity crunch?
 
Decommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of MexicoDecommissioning Report, 2012-13, Gulf of Mexico
Decommissioning Report, 2012-13, Gulf of Mexico
 
MEMC (WFR) Initiation
MEMC (WFR) InitiationMEMC (WFR) Initiation
MEMC (WFR) Initiation
 
Aban
AbanAban
Aban
 
FPSO Bulletin-PDFW-3 14 July
FPSO Bulletin-PDFW-3 14 JulyFPSO Bulletin-PDFW-3 14 July
FPSO Bulletin-PDFW-3 14 July
 
Fact Sheet Petrobras - 1H11 - English
Fact Sheet Petrobras - 1H11 - EnglishFact Sheet Petrobras - 1H11 - English
Fact Sheet Petrobras - 1H11 - English
 
Spicejet IC -030510
Spicejet IC -030510Spicejet IC -030510
Spicejet IC -030510
 
Eyb+2011+i pad
Eyb+2011+i padEyb+2011+i pad
Eyb+2011+i pad
 
dokumen.tips_sbm-offshore-nv.pdf
dokumen.tips_sbm-offshore-nv.pdfdokumen.tips_sbm-offshore-nv.pdf
dokumen.tips_sbm-offshore-nv.pdf
 
Newsletter: BDPA New York (Jun 2010)
Newsletter: BDPA New York (Jun 2010)Newsletter: BDPA New York (Jun 2010)
Newsletter: BDPA New York (Jun 2010)
 
Fact Sheet Petrobras - 2010 - English
Fact Sheet Petrobras - 2010 - EnglishFact Sheet Petrobras - 2010 - English
Fact Sheet Petrobras - 2010 - English
 
Ezion analysis report
Ezion analysis reportEzion analysis report
Ezion analysis report
 
2nd Thin Film Summit US Brochure
2nd Thin Film Summit US Brochure2nd Thin Film Summit US Brochure
2nd Thin Film Summit US Brochure
 

More from IQPC

Case Study:Field Proven Innovations for Impact Protection and Life Extension
Case Study:Field Proven Innovations for Impact Protection and Life ExtensionCase Study:Field Proven Innovations for Impact Protection and Life Extension
Case Study:Field Proven Innovations for Impact Protection and Life ExtensionIQPC
 
FPSO-sector: Perspectives from the equity
FPSO-sector: Perspectives from the equityFPSO-sector: Perspectives from the equity
FPSO-sector: Perspectives from the equityIQPC
 
DNV suggestions for changes to the US safety regime
DNV suggestions for changes to the US safety regimeDNV suggestions for changes to the US safety regime
DNV suggestions for changes to the US safety regimeIQPC
 
Cost Effective Outcomes from FPSO Safety Case
Cost Effective Outcomes from FPSO Safety CaseCost Effective Outcomes from FPSO Safety Case
Cost Effective Outcomes from FPSO Safety CaseIQPC
 
Energy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsEnergy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsIQPC
 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls IQPC
 
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...IQPC
 
Harnessing Available Fuel in the Most Efficient Way for Greener Powering Solu...
Harnessing Available Fuel in the Most Efficient Way for Greener Powering Solu...Harnessing Available Fuel in the Most Efficient Way for Greener Powering Solu...
Harnessing Available Fuel in the Most Efficient Way for Greener Powering Solu...IQPC
 

More from IQPC (8)

Case Study:Field Proven Innovations for Impact Protection and Life Extension
Case Study:Field Proven Innovations for Impact Protection and Life ExtensionCase Study:Field Proven Innovations for Impact Protection and Life Extension
Case Study:Field Proven Innovations for Impact Protection and Life Extension
 
FPSO-sector: Perspectives from the equity
FPSO-sector: Perspectives from the equityFPSO-sector: Perspectives from the equity
FPSO-sector: Perspectives from the equity
 
DNV suggestions for changes to the US safety regime
DNV suggestions for changes to the US safety regimeDNV suggestions for changes to the US safety regime
DNV suggestions for changes to the US safety regime
 
Cost Effective Outcomes from FPSO Safety Case
Cost Effective Outcomes from FPSO Safety CaseCost Effective Outcomes from FPSO Safety Case
Cost Effective Outcomes from FPSO Safety Case
 
Energy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsEnergy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO Applications
 
Rational Design of FPSO Hulls
Rational Design of FPSO Hulls Rational Design of FPSO Hulls
Rational Design of FPSO Hulls
 
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...Classification and Regulatory Standards used in Novel Design Concepts for Dee...
Classification and Regulatory Standards used in Novel Design Concepts for Dee...
 
Harnessing Available Fuel in the Most Efficient Way for Greener Powering Solu...
Harnessing Available Fuel in the Most Efficient Way for Greener Powering Solu...Harnessing Available Fuel in the Most Efficient Way for Greener Powering Solu...
Harnessing Available Fuel in the Most Efficient Way for Greener Powering Solu...
 

FPSO Bulletin

  • 1. FPSO Bulletin www.fpsoasia.com Volume 1 12 years of connecting the global FPSO community - Maximizing field returns with innovations in FPSO technology STOP PRESS... STOP PRESS... New Dynami cs Forge Strong Growth Tren ds for the FPSO Market in 2011/2012 and West African sian water Brazilian, A Con tinued demand from deep by new dynamics in pm ents will be determined projects, but key develo . the global FPSO market.. 50 vessel ...read inside for more ow and oil co ners mpanies confirm t heir participa tion at the FPS O Congress 2011 read more inside...
  • 2. FPSO Bulletin presents www.fpsoasia.com Volume 1 Maximizing field returns with innovations in FPSO technology Venue: Grand Hyatt Hotel, Singapore Jason Waldie, David Boggs, Jerry Joynson, Douglas Westwood Managing Director Corporate Director, gives his thoughts of Energy Maritime Concept Development, on why FPSOs Associates explains SBM Offshore outlines will return to pre why FPSO’s will only some of the challenges 2008 levels on the increase in popularity to achieving successful upswing going forward. FPSO delivery >>> more on page 2 >>> more on page 7 >>> more on page 2 News in Brief Key Industry Figures Shape the 2011 FPSO Congress In its 12th year, the congress addresses key industry dynamics with advisors including; • David Cannon, General Manager, North Sea Production Company Limited, Maersk FPSO UK Ltd • Rashim Berry Director, Projects, Tanker Pacific Management Pte Ltd • Kelvin Sam, Senior Market Analyst, ODS-Petrodata • David Boggs, Managing Director, Energy Maritime Associates Pte Ltd • Eng Yew Chan, CFO, EOC • Julian Callanan, Analyst, Infield Systems >> more on page 2 Premier Oil Vietnam Offshore BV commences charter of the Lewek The 12th Annual FPSO Congress goes global EMAS - (18 April 2011) Offshore Energy Today bringing together key experts from Petrobras, The FPSO will process oil from Chim Sao field on Block 12W in the Nam Con Son basin, about 350 km off southern Vietnam. ENI Australia, ConocoPhillips and The field development involves producing oil and associated gas to an unmanned, ExxonMobil 20 - 21 Sept 2011, Singapore minimum facility wellhead platform in 100m of water and then to the FPSO. New dynamics forge strong growth The five year forecast shows that Eni secures Angola FPSO - trends for the FPSO market capital expenditures thrown off by (15 April 2011) - Upstream Online Monaco-based SBM Offshore’s new deal In just over three decades, floating production systems floater orders are expected to total with Eni Angola for the use of its Xikomba have evolved from relatively simple units producing from a floating production storage and offloading single well to massive facilities capable of handling 250,000 between $80 billion and $115 billion vessel will be part of a 12 year lease barrels of oil per day. Today, as deep water oil reserves Quoting a recent report from the International Maritimes agreement after a letter of intent was signed remain mostly undiscovered, a continued optimistic long- Associates (IMA), expected orders for production floaters today, the company has announced. term outlook for floating production systems is expected. will be between 24 and 35 units annually over the next five years, or between 120 to 175 FPS systems in total. Some 80 Petrobras Receives Deepwater pays, but don’t leave percent of these units are expected to be FPSOs. BOEMRE Nod for First out opportunities in marginal field Challenges moving ahead FPSO in GOM exploitation In an inherently capital and asset-intensive industry, the (17 March 2011) - Rigzone Growth in the FPSO market through to 2014 will be driven reevaluation of risk exposure levels by major lenders has The Bureau of Ocean Energy Management, by continued demand from deepwater Brazilian and West led to a prolonged period of FPSO project implementation. Regulation and Enforcement (BOEMRE) African projects. Key developments will be determined by Attention has also been turned to the nature of the contract provided the final approval necessary for new dynamics in the global FPSO market including demand between the operator and FPSO vessel owners, where a Petrobras America to begin oil and natural growth in Asia, the greater role of smaller independent oil more balanced contracting regime is the subject of heated gas production at its Chinook-Cascade companies and the increased importance of smaller offshore discussion. project using a Floating Production Storage oil fields. >>more on page 3 Offloading (FPSO) facility. This will be the first time this technology is used in the U.S. Gulf of Mexico. Log on to www.fpsoasia.com for updates on the 12th Annual FPSO Congress
  • 3. FPSO Congress Bulletin 2011 350+ attendees expected FPSO market set to Jason Waldie, Douglas at the 12th Annual FPSO Congress reach US$16 billion Westwood gives his thoughts on why FPSOs will return to pre 2008 Oil and Gas IQ announces their 2011 event - don’t miss the longest running FPSO by 2014 levels on the upswing congress. This annual platform brings you global insights from major hotspots such as Until 2008, there were many new speculative players drilling and subsea processing emerging from Brazil, Gulf of Mexico, West Africa, North planning to enter the FPSO market. By the time 2009 came increased exploration will result in a little more Sea, Baring Sea, West of Australia and the around it all rather fell apart. than US$74.6 billion during the same period. South China Sea. 253 attendees joined the global congress in Small-time operations were financing from external debt As a result of the 2008 downturn and subsequent turn of 2010 and attendance numbers are expected providers simply because credit markets were the tightest fortunes in 2009 and 2010 we have seen a slight increase to increase in 2012 inline with rapid growth that they had been in years. This all led to many of the new in scrutiny on the part of the private equity sector with in the market this year. start-up and smaller players exiting the market shortly into respect to the FPSO market, this seems to be the right level 2009. of scrutiny. 50 vessel owners and oil Those that remained and could weather the crisis are still Consequently, the market is now seeing balanced companies confirm their active and are enjoying the resurgent economic upswing. contracting regimes, which was in some way forced by the Globally, monetary policy is loosening and we have seen new entrants to the market from the private equity side. participation at the FPSO activity expanding globally from East to West. This has Numerous interviews with dominant players in the industry Congress 2011 changed the entire scope of the sector as it is now not uncommon to see projects in Brazil financed from Japan or seem to confirm this feeling and continue to reassure us that, on the whole, FPSO projects are returning to pre-2008 To date, the programme committee together projects in West Africa being financed from China. level and a turn of fortunes for the sector is imminent. with its advisors have confirmed over 50 industry experts to share field case studies. There was a material decrease in orders since 2009 but 70 Operators and owners confirmed include Drilling Floating Platforms it seems that market has bottomed last year and there is • Exxonmobil • OMV • Petrobras • Teekay 60 Pipelines an increasing share of the market which is being leased to Petrojarl • ENI Australia • BTL • Modec Subsea Production Expenditure ($billions) 50 Subsea Processing FPSOs. • Husky Mudara • Chevron • Maersk Oil SURF • BP Migas • SBM • Tanker Pacific • EOC 40 The deepwater horizon disaster is unlikely to impact the • Premuda • Aker Floating Production 30 FPSO sector as the Gulf of Mexico accounts for a small • ConocoPhillips part of the market and in the long term it seems as though 20 For details on how to register, log-on to growth will return as the FPSO market is set to reach US$16 www.fpsoasia.com or email 10 billion by 2014. enquiry@fpso.com.sg 0 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Jason Waldie will be speaking at the 12th Annual FPSO Congress at 10.00 on day 1. Supporting the talent- Deepwater production is set to double and capex is Log on to www.fpsoasia.com for a full version stretched FPSO industry; expected to increase by as much as 179% by the year 2015, to a decent $205 billion. On the other hand, of this report. the FPSO Congress committee has launched the Young Engineers Deepwater will remain Jerry Joynson, Corporate Director, Concept Support Programme in 2011 the most significant Development, SBM Offshore outlines some of How will this benefit the industry? Aimed at developing young talent, this fund will activity in the oil industry the challenges to achieving successful FPSO delivery entitle you to a travel grant* of up SGD1000 if you are a young engineer 35 and below**, Bryan Camoens: Could you please outline the current Bryan Camoens: What are some of the challenges faced from an oil and gas operator or vessel owner position of FPSO’s in today’s field development from evaluation to the final phase of construction? company. strategy? Jerry Joynson: The challenges in achieving successful For further details on the programme, email Jerry Joynson: The major discoveries are taking place in FPSO delivery are manifold, and are often client or regional enquiry@fpso.com.sg deep water and look to continue to do so in the foreseeable specific. Local content requirements can be challenging to future, and hence FPSO’s will clearly be central to comply with, such as the 65% Brazilian content recently * Travel grant of up to SGD1000 will be rendered upon time of registration as a rebate off the conference developing these deep water fields. The use of steel catenary achieved on P57; bidding rules and a need for competitive registration fee risers connected to FPSOs, as demonstrated on the turret tendering can hamper clients’ ability to carry out effective ** Supporting documents will be required for proof of age moored Espirito Santo in 2008, will extend their range development in collaboration with FPSO suppliers; and beyond the current flexible riser limit of around 2,000m. resources will become tighter including the demand for Extraction of the massive arctic oil and gas reserves will experienced personnel as we pull out of the global recession. require means to cope with the winter ice shelf, and Visit our knowledge library at disconnectable FPSOs will prove to be invaluable in this Jerry Joynson will be speaking at the 12th Annual FPSO Congress at 16.30 on day 1. www.fpsoasia.com for the respect. The enormous flexibility of the FPSO will ensure Log on to www.fpsoasia.com for more details on latest news on FPSO 2011 its leading position in regions where there is no offshore oil the congress. export pipeline infrastructure. FPSO Congress 2011 sponsors & exhibitors Gold Sponsors Silver Sponsors Exhibitors IHC Hytop
  • 4. FPSO Congress Bulletin 2011 >>continued from page 1 Wheels and Deals Nexus is in talks with SBM for Full steam ahead but not all smooth sailing the supply and operation of an Despite immense growth it’s not all smooth sailing for Also, the lifting cost is on average very low once the field is FPSO for Crux the FPSO sector, as it continues to be out of favour with on stream and the majority of costs are sunk. The main risk 24 January 2011, Rigzone liquidity. Stocks of some of the largest names in the sector to option periods is that the reservoir is not performing, i.e. Nexus advises that it is in discussions with were down by as much as half over the past couple of years, production is too low to justify further commencement. a contractor to provide an FPSO and act due to poor project execution in 2008 and 2009. Contract Duration FPSOs as a project financier and potential joint 16 venture partners for the Crux liquids project. Kristian Diesen, a research analyst for Parerto believes that Negotiations are ongoing. the reason for this was primarily cost overruns and delays 14 but the risk of these is now significantly reduced. “Whereas 12 taking on new projects have been a negative thing over 10 7.0 4.6 ENI to lease FPSO for the past couple of years, this should now increasingly be a positive. The FPSO companies are currently in a position to 8 6.3 5.2 3.6 exploration of oil block in Angola 6 take on new projects at attractive terms with competition 4 8.1 on many projects being limited, overall capital expenditure 6.7 5.5 5.3 6.6 15 Apr 2011, Oil Field Daily News 2 risk reduced through improved contract terms with sub- Italian oil group ENI has signed a letter suppliers and a supply chain that has a significantly lower 0 Fred. Olsen SBM Prosafe Sevan BW Offshore of intent with SBM Offshore to lease the pressure than in the 2006 - 2008 period,” he said in a note. Production Offshore Production Marine Xikomba FPSO vessel to explore the deep Firm Years Optional Years *Sevan includes drilling rigs water 15/06 oil block in the Angolan sea. Kristian also mentions that the likelihood of contract extensions for a unit in the FPSO market is far larger than Source: Pareto Research for instance in the rig market, as the units are tailor-made OMV Scoops Up License for each specific field. Hence, he views the risk on the optional period as low for most contracts, so long as the Reported by Bryan Camoens, FPSO Correspondent, FPSO Congress. Offshore New Zealand field continues to produce at economical levels. 24 March 2011, Rigzone OMV New Zealand announced that it Download the full report from the knowledge library The alternative cost for the oil company in contracting will farm into PEP 51906 currently held at www.fpsoasia.com another unit is generally high with a significant lead time. by Octanex N.L. Subject to government approval, the farm-in arrangement will see OMV New Zealand take on a 65% share and become the operator of the license. Octanex FPSO growth set to David Boggs, Managing Director NL retains a 35% share and will be free carried through certain agreed phases of increase as deeper of Energy Maritime Associates exploration. explains why FPSO’s will only PTSC and Lam Son JOC fields are developed increase in popularity going forward. LSJOC endorse the Head Bryan Camoens: Could you please outline the current Bryan Camoens: What are some of the challenges faced of Agreement (HOA) position of FPSO’s in today’s field development from evaluation to the final phase of construction? for the provision of strategy? David Boggs: The period between evaluations to delivery is FPSO chartering for the typically many years, so the challenges include changes in David Boggs: FPSOs are the most popular floating production development option. FPSOs are proven foreign exchange rates, price of steel and fuel, and changes development of Thang Long technology and have oil storage facilities. Almost two in law and regulations. 4 March 2011, PTSC - thirds of Floating production vessels are FPSOs. The According to the HOA, PTSC and LSJOC deepest floating production system in the world is the David Boggs will be speaking at the 12th Annual FPSO commit to general terms & conditions for recently installed BW Pioneer FPSO on the Cascade / Congress. Log on to www.fpsoasia.com for a full one contract for the provision of the Floating Chinook field in 2600m of water. As deeper and deeper version of this interview. Production Storage Offloading vessel (FPSO) fields are developed, FPSOs will be increasingly popular. for LSJOC for the defined period of 07 years with extension of 03 years. Total contract value is estimated to reach 500M USD. PTSC shall perform the operation the FPSO during 7 years plus 3 years extension, participate in manufacturing/conversion as well as installation/commissioning of the vessel. The vessel shall receive first oil at year end of 2013 tentatively. The Deepwater Horizon Log on to One Year On Though the oil spill in the GOM has www.fpsoasia.com been plugged, the aftermath of the incident remains today. Aside from the environmental, fishing and tourism impact, today! tougher requirements in all areas from: well design and cementing practices, to blowout preventers and employee training Watch exclusive online have been imposed on offshore exploration videos including: and production activities. Today, major Centering Global • Key players in the industry discuss the position of FPSO to fuel today’s energy sector. FPSO projects have seen more stringent compliance requirements from countries like Australia and the USA. The Bureau of Knowledge • Carl Arnet, CEO of BW Offshore speaks exclusively to Oil & Gas IQ on the energy demand in the future and the potential issues Ocean Energy Management, Regulation and Enforcement (BOEMRE) announced on March 17 2011 that it has granted final Log on to the FPSO knowledge universe at and challenges currently facing the FPSO sector. approval for Brazil’s Petrobras to begin www.fpsoasia.com and receive exclusive industry interviews • C-level Vessel Owners talk about mergers and oil and gas production at the deepwater and news. Keep in touch with leading influencers in the acquisitions, issues outlook and trends in the Cascade-Chinook project using an FPSO. Global FPSO sector. industry at our annual event. Visit www.fpsoasia.com for more on this subject.
  • 5. Highlighted Main Congress Day One: Tuesday, 20 September 2011 speakers for 2011: 0815 Congress Registration Ketil Hox 0850 Chairperson’s Opening Manager Project Engineering 0900 Exploring the Changing Role of FPSO in Today’s Field Development Strategy Teekay Petrojarl • Case history of the Kitan project • Implementation of solutions to overcome challenges • Challenges faced from evaluation to final phase from project design to construction Jose M Layung JR construction Undersecretary Francesco Piasentin, Project Manager, ENI Australia Department of Energy 0920 Developments in Compliance and Regulation For FPSO Projects In Australia Philippines FPSOs are challenging in the way that they represent a combination of maritime and offshore regulatory regimes, technologies and practices. This session will define the technical and regulatory aspects of floating production in Arne Hyen Australian waters. Tornkvist Simon Schubach, Regulatory Operations GM, National Offshore Petroleum Safety Authority CEO 0940 An Operator’s Perspective on Taking Deepwater Development to the Next Level with FPSO Technology Aker Floating • Evaluating the benefits of • Developing a contracting and • Legal considerations Production ASA conversion versus new build execution strategy • Interface management challenges Per Aae Staunstrup, Head of Engineering, Maersk Oil Maarten Van Aller 1000 Regional Hotspot Market Trends in the FPSO Business COO • Market Trends in the FPSO • Macroeconomic analysis for the FPSO • Market drivers; current market analysis; Petrofac Business: energy demand growth sector: an Asian perspective on global what happened in 2011? Brazil presalt • Short-term outlook; longer- developments activity; lessons from Macondo; insight Daniel C.S Ahn term outlook and opportunities for the 2011 recovery Distinguished Jason Waldie, Associate Director, Douglas-Westwood Professor of Practice 1020 Morning Refreshments and Networking KAIST 1050 Offshore Investment Opportunities in the Philippines and Implications for the FPSO Contracting Sector Simon Schubach • Understanding offshore regulations and opportunities • Maritime flag laws and varying local practices in the Philippines • Regulatory compliance Regulatory Operations GM Jose M Layug JR, Undersecretary, Department of Energy Philippines National Offshore 1110 Forging New Frontiers: Responding to the Evolving Dynamics in the FPSO Industry Petroleum Safety • Developing a more balanced contracting regime: project • The economics of FPSO projects as a Authority risk, responsibilities and cost management cost-effective field development solution • Evolving safety standards and their effect on project Andrew Jefferies advancements Manager Operations Panellists: Arne Hyen Tornkvist, CEO, Aker Floating Production ASA and Engineering Maarten Van Aller, COO, Petrofac OMV NZ Jon Dunstan, COO, EOC Limited 1140 Evolving to a Unified Control Environment to Improve Vessel Safety and Productivity Michael Surkein ABB Senior Materials and 1210 Lunch and Visit to the FPSO Consultation Hall Corrosion Consultant ExxonMobil Development Technical Stream Commercial Stream Company Innovations in FPSO Design, Construction and FPSO Financing to Support the Rapid Growth Richard Cai Conversion of Vessel Demand 1310 PRE-FEED and FEED Studies to Define a Solid 1310 FPSO: Sources of Financing - a Perspective From Senior Structural Scope Definition for On-Time and On-Budget a Multilateral Financing Institution Engineer Project Delivery Karsten Fuelster, Senior Investment Officer, Modec GL Noble Denton International Finance Corporation Kevin Judkins 1340 FPSO Topside Modules: Structural Interface 1340 Developments in the China Oil and Gas Market Offshore Installation Design Considerations and Opportunities in the Offshore Sector Manager Richard Cao, Senior Structural Engineer, Modec Bradley Way, Head of Asia Energy, BNP Paribas Crystal Ocean FPSO Xiao Ming Tan, Lead Structural Engineer, Modec 1410 Panel: Understanding Lending Requirements for 1410 Advances in New Build FPSO Hull and Marine FPSO Developments Karsten Fuelster Systems Moderator: David Boggs, Managing Director, Energy Senior Investment Hardy Augustin, Lead Instrument / Electrical Maritime Associates Officer Engineer, Peregrino FPSO Panelists: Chan Eng Yew, CFO, EOC Limited International Simon Davies, Director, Oil & Gas, Structured Asset 1440 Innovations in Design Finance and Export Finance, ANZ New generation Turret, Mooring and Fluid Corporation Birgit Marquart, Head of Offshore, UniCredit Bank AG Transfer System Tony Nguyen, Managing Director, EP Legal Per Skiftesvik, Framo Engineering Per Ae Staunstrup 1440 Understanding the Critical Factors to Create a Head of Engineering 1510 Afternoon Refreshments and Networking Bankable Project Maersk Oil New Technologies in Deepwater Developments Simon Davies, Director, Oil & Gas, Structured Asset 1540 Driving the New Age of FPSOs With Innovative and Export Finance, ANZ Power Solutions 1510 Afternoon Refreshments and Networking Stig Bøtker, Sales Director, Offshore, Wartsila Connecting Globally and 1540 Executive Table Discussions 1610 Compact And Efficient Solutions For Sea Table 1: Exploring Islamic Finance Options for FPSO Projects Locally on the Largest Water Injection Applications FPSO network Table 2: Analyst Insight: Equity Fund Raising - Dead or Alive? Jarle Nilsen, Senior Manager Sales & Marketing of Table 3: Debt Financing for FPSO Developments Offshore Production Solutions, Siemens Oil & Gas Table 4: Alternative Project Funding Structures - Leveraging With over 2000 members 1640 Advanced Multi-phase Separation Technology on Export Credit to Drive FPSO Project Developments on LinkedIn, the FPSO John Eow, Senior Research Engineer, Keppel Table 5: Lender’s Insight: Stock Take on Leasing Rate Offshore & Marine Formulation for Improved Project Profitability Network is the largest global FPSO community connecting 1700 Creating the “Safety vs. Profitability” Case for Legal & Contractual Issues To Balance & Minimize FPSO Operations the Risk of Contracting & Contractor Parties professionals in this dynamic Alvin Chin, Sales Director, HIMA 1610 Arbitration to Protect Relevant Parties in Disputes field. Find out why so many of Marcus Gordon, Partner,Watson, Farley & Williams LLP 1715 Panel: Energy Efficient Solutions for Powering your peers are connecting up by FPSO Vessels 1640 Developing a Clear Structure for Risk Allocation joining us today. Moderator: Jerry Joynson, Corporate Director, and Mitigation Between the Contracting Parties Concept Development, SBM Giovanni Cobau, General Manager for Offshore Join the FPSO network to Panellists: KC Gupta, Chief Facilities Manager, Division, Premuda Tanker Pacific participate in discussions with 1715 An Update on New Indonesia Cabotage Laws Per Aae Staunstrup, Head of Engineering, Maersk Oil your peers online. Stig Bøtker, Sales Director, Offshore, Wartsila Affecting FPSO To be a member, email 1740 Chairman’s Summary Effendi Karim, Senior Legal Counsel, BP Migas enquiry@fpso.com.sg 1800 12th Annual FPSO Congress Cocktail Reception 1740 Chairman’s Summary & Cocktail Reception
  • 6. Main Congress Day Two: Wednesday, 21 September 2011 Be a Part of 0815 Congress Registration the Longest Running 0850 Chairperson’s Opening 0900 The Economics of FPSO as a Solution to Maximize Field Productivity and Largest FPSOs are often used on marginal or quick developments. Understanding the range and drivers of future uncertainty is critical to get the “right” development in place. FPSO technology can maximise the recovery of the development • Front end loading • Appraisal techniques to address uncertainties • What size storage is the right size? • Subsurface uncertainties and impact on topsides design Andrew Jefferies, Manager of Operations and Engineering, OMV New Zealand Limited Global FPSO 0930 FPSO Demand Forecast: Realistic Projections of Vessel Delivery and Project Schedules • New orders in 2012: A tale of two • FPSO capacity conundrum: Too • Equipment supply risk: lead time and Congress scenarios much or too little? backlog trends Kelvin Sam, Senior Market Analyst, ODS-Petrodata Present your products for project 0950 What Lies Ahead: Trends in FPSO Capital Expenditure and Cost Management To Maximize Your Project Returns tenders to oil companies and vessel owners with a booth at the Julian Callanan, Business Manager, Infield Systems FPSO Consultation Hall 1010 Key Capabilities of Shipyards, and Technology Innovations to Support FPSO Developments Reviewing the Landscape of FPSO fabrication • Who are the main fabricators today? • Who are the key technology companies? • Will be there be new players? • What does the industry expect from new FPSOs? Moderator: Matthew Flynn, Managing Director, Worldyards Panellists: Zahar Mohd Hashim Zainuddin, CEO, GMOS Daniel C.S Anh, Distinguished Professor of Practice, KAIST 1030 Morning Refreshments and Networking Technical Stream I Technical Stream II Standards and Norms in Design for FPSO Maximizing Field Productivity through Latest Systems: Now and in the Future Technology Innovations 1100 The Impact of Macondo And Montara On FPSO Safety Cases 1100 Evaluating FPSO Technology to Maximize Field Productivity Only 3 booths left! See page 7 for the floorplan. Brendan Fitzgerald, Director, Vanguard Ketil Hox, Manager Project Engineering, Teekay Petrojarl Solutions 1130 Ensuring Subsurface Safety Valve Reliability in Contact us today on: 1130 Developing an Optimum Safety Case to Ensure Deepwater, High pressure Gas Wells +65 6722 9388 or that Productivity is Not Sacrificed Mr. Tony Globe, Business Development Manager, enquiry@fpso.com.sg Gangahar S, Department Head, Engineering, Modec Castrol Offshore Excellence in Field Operations Local Compliance and Regulations 1200 Leveraging on FPSO to Optimise Operations in 1200 Understanding Ownership and Flagging Laws In Small Field Developments Malaysian Waters Driving key Maarten Van Aller, COO, Petrofac Abdul Samad Bin Shaik Osman, Principal Assistant Director, Ship Accreditation Unit, Maritime Industry developments 1230 Ensuring Maximum Reliability of Your FPSO Operations Whilst Optimizing Cost Control Division, Marine Department of Malaysia forward as an FPSO Kevin Judkins, Offshore Installation Manager, 1230 Early Phase Identification of Key Commercial and Technical Risks to Reduce Costs community; the Crystal Ocean FPSO 1300 Lunch and Visit of FPSO Consultation Hall 1300 Lunch and Visit of FPSO Consultation Hall FPSO Congress Asset Integrity Management committee 1400 An Alternative Class Approach For Minimizing FPSOs Downtime - From “Calendar Based” Commercial Stream has launched Procurement and Cost Management To “Condition Based” Through a Risk Management Approach 1400 Contract Negotiation And Management To the Operator Alexandre Imperial, Regional Offshore Class Protect And Ensure A Win-Win Situation For All Contracting Partners Development Director, DNV - South East Asia & Pacific Joe Patrick, Director, Hunter Oil Programme in 2011 1430 Case Study on Corrosion Management in the 1430 Accurate FPSO Cost Planning and Control to North Sea Aimed at creating a cohesive Protect Project Bottom line environment for evaluating FPSO Abdel Kader Mekki, Senior Corrosion Engineer, David Boggs, Managing Director, Energy Maritime ConocoPhillips Associates technology as a cost effective field development solution, the congress 1500 Innovative Coatings for FPSO Conversion: FPSO Project Management to Ensure On Time Improved Predictability and Lower Costs and On Target Delivery will sponsor passes for directors of Joao Azevedo, Global Business Development 1500 Optimum EPCIC Contracting Strategies for FPSO projects from oil companies Manager - Offshore, Sherwin-Williams Various Types of FPSO Only a limited number of Daniel C.S Ahn, Distinguished Professor of Practice, passes are available. Email us 1530 FPSO Corrosion Control Design to Ensure a Long KAIST Reliable Life at enquiry@fpso.com.sg or call Michael Surkein, Senior Materials and Corrosion 1530 Table 1: Offshore Tax Management: Managing Tax +65 6722 9388 now to find out and Risk Exposure in Asia for Offshore Projects Consultant, ExxonMobil Development Company Executive how you can obtain a VIP pass as Table Table 2: Local Content Management to Overcome 1600 Chairman’s Summary Discussions Resource Shortages in a Talent-Stretched Industry part of the FPSO Congress operator Table 3: FPSO Risk Management and Allocation: development programme. Examining Insurance Possibilities to Mitigate Risk 1600 Chairman’s Summary 1610 Afternoon Refreshments and Networking 1630 Critical Technical Evaluation for the Successful Redeployment of FPSO Vessels Jerry Joynson, Corporate Director, Concept Development, SBM 1700 FPSO Turret Design Approach: An Operator’s Perspective On How To Pursue Extended Lifetime Carlos Mastrangelo, WR - Facilities Manager, Petrobras America 1730 Chairman’s Summary log on to www.fpsoasia.com for the full agenda, speaker Q&As and industry insights or email us at enquiry@fpso.com.sg
  • 7. FPSO Congress Bulletin 2011 Pre-Congress Technical Briefings Post-Congress Technical Briefing A: 19 September 2011 B: 19 September 2011 C: 22 September 2011 0830 - 1130 1300 - 1600 0830 - 1130 Evaluating FPSO Technology Optimum Design, Conversion Asset Integrity, Repair and To Maximize The Efficiency Of And Construction For Safe And Maintenance Your Field Development Plans On Target Delivery As many floating production systems are now approaching the middle or end of their design lives, • How can you increase future revenues and the In a business where traditionally the time of vessel this technical briefing session is created for operators profitability of FPSOs and FSOs worldwide? delivery has been prioritized over all, how can you and owners to seek assurance on the ongoing integrity • How well can FPSO technology maximize your ensure that you set things straight right from the of assets from the processing equipment to the production capacity and minimize cost? design stage to ensure a quick delivery time yet comply risers, subsea architecture, hull, marine systems and with safety standards to minimize breakdowns in • What is the quickest way to evaluate the suitability moorings. operations? This technical briefing is designed for of your field for FPSO developments? Attend the FPSO project managers, heads of engineering, naval field development and evaluation technical briefing Examine critical factors on: architects and stakeholders involved in the design, created for E&P companies to benchmark, and fast • Rationale and implementation strategy for fpso asset construction and conversion phase of projects to drive track your evaluation processes and understand how integrity management greater efficiency and safety in this process. to fully exploit FPSOs to maximize field returns. • Key assessment criteria for vessel condition in harsh Attend this technical briefing to find out how you can: water conditions This focus day will give you an in-depth review of the following: • Improve Project Delivery And Profitability through • Realignment strategies of maintenance programmes modular construction to the dynamic conditions of your field and vessel • Understanding key field characteristics suitable for • Examine innovations in design including a conditions development with FPSO technology comparison between round shaped FPSOs vs ship • Investigating the cost and benefits of development 0815 Workshop Registration shaped FPSOs with FPSO • Understanding advancements in turret, mooring 0830 Workshop Leader’s Opening and Introduction • Major factors to ensure value optimisation of your and swivel technologies to combat dynamic offshore 0840 Rationale and Implementation Strategy for field with FPSO technology conditions FPSO Asset Integrity Management • Understanding the size selection of FPSO vessels 0940 Assessment of Vessel Condition in Asset given prospective reserves 1245 Technical Briefing Registration Integrity Management and Identifying 1300 Technical Briefing Leader’s Opening and Challenges in Harsh Water Environment 0815 Technical Briefing Registration Introduction 1000 Morning Refreshments 0830 Technical Briefing Leader’s Opening and Introduction 1310 Modular Construction To Improve Project 1050 Realignment of FPSO Maintenance Programs Delivery And Profitability for Asset Integrity Management, and 0840 Identifying The Key Characteristics of Fields Techniques To Mitigate Vessel Breakdowns For Which FPSO Is An Optimum Solution 1340 Innovations In FPSO Design Concepts To Gain Carpet Returns and Loss of Production Lead Time 0950 Investigating The Costs And Benefits Of 1420 Afternoon Refreshments 1130 Summary Development With FPSO 1010 Morning Refreshments 1440 Advancement In Turret, Mooring And Swivel Your Technical Briefing Leader: Technologies To Combat Dynamic Offshore 1110 Ensuring Value Optimisation Of Your Field Zahar Mohd Hashim Zainuddin, CEO, GMOS Conditions With FPSO Technology 1510 Improved FPSO Design To Facilitate Future 1130 Summary Inspections and Extend Operational Life Find out more about our 1540 Conversion and Relocation of Existing FPSOs Your Technical Briefing Leader: Joe Patrick, Director, Hunter Oil Pty Ltd 1600 Summary Technical Briefing leaders and read the full agenda by Your Technical Briefing Leaders: Don’t forget to visit our Cedric Moriandini, Head of Naval Architecture, visiting: download centre at SBM Malaysia Sendirian Berhad www.fpsoasia.com JC Hueber, Technical Development & Marketing www.fpsoasia.com Manager, SSP Offshore INC FPSO demand likely to double With FPSOs being the best and perhaps the only valid Do you have a credible solution to offer that option for many discovered oil fields going forward, help global operators and vessel owners growth for the sector will likely soar. Oil companies achieve their needs? If so, join us now at the 12th and vessel owners are looking to Annual FPSO Congress, 20 capitalize on innovations in FPSO technology to maximize their field “Of the 196 projects - 21 September 2011, Grand Hyatt Hotel Singapore. Email returns. in the pipeline us at enquiry@fpso. com.sg, to find out how you can get Who Should Attend Support Key Developments of the worldwide, FPSOs involved. • • Oil Companies FPSO Vessel Owners • Design, Engineering & Build Consultants FPSO Community at the Largest and Longest Running Global will be the preferred Interesting update of • Shipyards • Repair and maintenance • Topside Engineering solution providers FPSO Congress In a sector where timelines are of solution for over 100 FPSO activities and useful networking opportunity • Classification Societies • Banks/Financing Firms • Hull Specialists • Ship Equipment e.g upmost importance, though proving to of those” - Mark Wood, Business • Offshore Support Compressors not always be optimal, going back to Development manager, Stig Hoffmeyer, CEO, Maersk FPSO Solutions • Offshore Project providers who they have worked with Telleborg Offshore before seems like the easiest choice. • Fabrication Yards Insurance Firms That’s why for the past 11 years, operators and owners We fulfilled our expectations because we met 80% of • Offshore Communication • Hotwork Enclosures, have chosen the Annual FPSO Congress as the place our targeted customers and have confirmed official Solutions Turbines & Pipings to evaluate the best partners for such time-critical meetings with 2 already - Sose Frias, Key Account • Ship/Fleet Management projects Manager, Camfil Farr Power System AB Software Providers
  • 8. FPSO Congress Bulletin 2011 Why the 12th Annual FPSO What’s so different about the Congress is the best value for FPSO Congress in 2011? your marketing spend Revamped! FPSO consultation hall consolidating key solution partners you need all in one place. You will meet solution partners in from these key categories: Extensive face-to-face interaction opportunities • Design, Engineering and Safety Companies with global operators and owners • Classification Societies • Ship Equipment Providers You’ll notice our congress is very different from other conferences, our partners • Repair and Maintenance Solutions recognize the value of participating at the congress to network with key industry • Topside Engineering Companies experts and to select the best partners. If you have a credible solution which can • Ship Communication and Navigation Solutions help them achieve improved project management, operations and efficiency of their • Law Firms FPSO projects, make sure they meet you onsite. • Banks/ Financiers Areas of Involvement: • Be part of our FPSO Consultation Hall where operators and owners take further 350+ expected attendees in 2011! discussions with technology and commercial experts on how to improve FPSO • The largest and longest running FPSO conference globally, with operations, production and field development technical and commercial streams • Spotlight Innovations! Get your solution evaluated (from a technical and • Content shaped by FPSO community opinion has asked for commercial perspective) by key decision makers from operator and owner The FPSO community has asked for more targeted content this year and companies in our technology spotlight sessions so we have focused each stream into 5 main themes • Augment your position as an industry leader by joining as a session sponsor Technical: Benchmark your Commercial: benchmark your • Create awareness of your organization through sponsoring the cocktail and experienceas in key areas including: experiences in key areas including: networking evening *for the first time ever, a golf and whisky tasting evening with 1 Innovations in FPSO Design, 1 FPSO Financing your peers to forge continuing bonds in the industry Construction and Conversion 2 Legal and Contractual Issues • Increase your visibility by sponsoring lanyards/goodie bags 2 New Technologies for Deepwater 3 Procurement and Cost • Join us as a delegate Developments Management 3 Standards And Norms In Design 4 FPSO Risk Management and Email us at enquiry@fpso.com.sg or call +65 6722 9388 to explore further areas For FPSO Systems: Now And In Allocation of involvement or clarify your questions. The Future 5 FPSO Project Management to 4 Excellence in Field Operations Ensure On Time and On Target 5 Asset Integrity Management Delivery FPSO Congress 2011 sponsors • Global innovation sharing: 15 unique regions represented this year! Gold Sponsors • Congress support programmes to connect and drive the industry forward * Young Engineer support Programme * Operator Development Programme Email enquiry@fpso.com.sg for further details • Connect with your peers on a personal level after a long day of benchmarking best practice! Don’t miss the golf and whisky tasting evening with your peers to forge continuing bonds in the industry Silver Sponsors Do you have a vessel you want to showcase to the FPSO community through a site tour? Email us at enquiry@fpso.com.sg to find out how you can arrange this in conjunction with the congress. A big thank you to our partners for their support Supporting Partners Exhibition area Limited spaces now available... ...don’t miss out on the opportunity to speak directly to your customers. Contact us now on: Phone: +65 6722 9388 or email: sponsorship@iqpc.com.sg Available Booked Reserved 1 2 3 4 5 6 BUFFET LINE 7 18 COFFEE COFFEE / TEA / TEA 8 17 Media Partners Official Newspaper Mobile Apps Partner 9 16 BUFFET LINE 15 14 13 12 11 10 EXIT Official TV Official Supported Held Station Newswire By In Illustration is not to scale and is to be used for guidance purposes only. Log on to www.fpsoasia.com for updates on the 12th Annual FPSO Congress