Zero Emission School in Valsamoggia (Bologna, Italy)
This is the extended version. Please have a look at the abstract presentation here:
https://www.slideshare.net/DavideBedogni/elementary-school-in-valsamoggia-bo-zero-emission-school
Structures: reinforced concrete - antiseismic
Infill wall: thermal brick, 30cm
Exterior insulation system:
- walls: EPS 24cm
- floors: XPS 25cm
- roof: XPS 25cm
Windows: wood/alluminium frame, glasses 4.4/14 Argon /Ks4/15 Argon/4.4 BE
Heating and cooling system: heat pumps, 140 kW, NO GAS. Radiant ceiling panels
Ventilating system with high efficiency heat recovery >90%
Lightning: LED lamps, dimming
Photovoltaic system: 40 kWp
Special system: building automation and supervision
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Elementary School in Valsamoggia (BO) - Zero Emission School
1. Elementary school for 15 classes
Zero emission school
Municipality of Valsamoggia (BO)
2. Location:
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION:
North
Bazzano
Monteveglio
Bologna
School
Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
3. Appearance:
North
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
5. Fronts:
West
East
Courtyard
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
6. Views:
rendering - west
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
7. Views:
Photo - WEST
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
8. LOCATION
latitude, longitude: 44°28’34 N, 11°05’58 E
Altitude: 108 m (slm)
DIMENSIONS
Total Net Area (heated):
m² 2.756
Gross Floor Area (heated):
m² 3.115
Total Net Volume (heated):
m³ 15.231
Building envelope (S):
m² 8.275
Surface area to volume (S/V) ratio: 1/m 0,54
KEY DATA:
N
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
9. Structures : REINFORCED CONCRETE – ANTI-SEISMIC
Infill wall: thermal brick, sp. 30 cm
Exterior insulation and finishing system (EIFS)
walls: EPS with graphite, 24 cm (thikness)
floors: XPS, 25 cm
roof: XPS, 25 cm
Windows: wood / aluminium frame
glasses 4.4/14Argon/Ks4/14Argon/44.1BE
Systems:
Heating and cooling system: heat and cooling pumps: power 140 kW – NO GAS
radiant ceiling panel
Ventilating system: energy recovery ventilation (ERV) efficency > 90%
Lighting: LED Lamps
Photovoltaic system: 40 kWp [coverage of electricity needs = 100%]
Special system: Building automation (BACS)
CONSTRUCTION FEATURES and PLANTS:
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
10. THERMAL TRANSMITTANCE, DETAILS:
SEZIONE
A B
WALL: U = 0,12 W/m² K
Nodo attacco a terra
muro perimetrale/fondazione
Sezione verticale Nodo attacco a terra
parete divisoria/pavimento
Sezione verticale
FLOOR: U = 0,15 W/m² K
B
A
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
11. Insulation of Foundation Structure (12 cm XPS)
Nodo attacco a terra
muro perimetrale/fondazione
Sezione verticale
A
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
12. Floor insulation (25 cm XPS)
Nodo attacco a terra
muro perimetrale/fondazione
Sezione verticale
A
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
13. Thermal brick (30 cm)
Nodo attacco a terra
muro perimetrale/fondazione
Sezione verticale
A
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
14. 24 cm EPS
Nodo attacco a terra
muro perimetrale/fondazione
Sezione verticale
A
Wall: U = 0,12 W/m² K
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
15. 24 cm EPS
Nodo attacco a terra
muro perimetrale/fondazione
Sezione verticale
A
Wall: U = 0,12 W/m² K
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
16. 24 cm EPS
Nodo attacco a terra
muro perimetrale/fondazione
Sezione verticale
A
Wall: U = 0,12 W/m² K
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
17. SEZIONE
C
D
Attacco Muro/solaio/sporto copertura
Sezione verticale
Roof: U = 0,11 W/m² K
DC
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
18. Attacco Muro/solaio/sporto copertura
Sezione verticale
Roof: U = 0,11 W/m² K
D
Intrados insulation: 12 cm EPS
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
19. Attacco Muro/solaio/sporto copertura
Sezione verticale
Roof: U = 0,11 W/m² K
D
Extrados insulation: 25 cm EPS
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
20. Attacco Muro/solaio/sporto copertura
Sezione verticale
Roof: U = 0,11 W/m² K
D
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Extrados insulation: 25 cm EPS
21. Attacco Muro/solaio/sporto copertura
Sezione verticale
Roof: U = 0,11 W/m² K
D
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
Extrados insulation: 25 cm EPS
22. SEZIONE
E
Attacco a terra, serramento
Sezione verticale
Windows:
UW = 0,80 W/m² K
Ug= 0,6 W/m2
K
E
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
23. Attacco a terra, serramento
Sezione verticale
UW = 0,80 W/m² K
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
24. Wooden Counterframes, polyurethane foam sealing
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
25. Windproof tape
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
26. Remooved thermal bridge
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
THERMAL TRANSMITTANCE, DETAILS:
27. Systems:
Heat and cooling pumps:
Power:
140 KW
NO GAS!
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
28. Heat and Cooling:
Radiant ceiling panel
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
Systems:
29. Ventilating system (Energy recovery ventilation (ERV) efficency >90%):
UTA 1: 5.050 mc/h
UTA 2: 6.050 mc/h
UTA 3: 6.500 mc/h
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
Systems:
30. Photovoltaic system: 40 kWp (annual production > 42.000 kWh)
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
Systems:
31. BUILDING AUTOMATION and Control System
BACS
perfomance: Class II (Advanced)
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
Systems:
32. Energy performance (Emilia Romagna system):
Architectural Shell + Systems
EPtot
= 1,175 kWh/m3
a
(energy performance index)
1,17
kWh/m3
/anno
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
33. Energy saving:
EPtot
= 1,175 kWh/m3
a
(energy performance index)
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
34. CO2 Emission:
Rispetto alle prestazioni limite minime che lo stesso fabbricato
avrebbe dovuto rispettare secondo la normativa Regionale vigente,
può essere calcolata la riduzione delle emissioni di anidride
carbonica determinata dal raggiungimento della classe energetica
ottenuta:
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
35. Zero emission:
La produzione di
energia elettrica annua
da conversione
fotovoltaica compensa
il consumo elettrico
annuo per
riscaldamento e per
illuminazione.
La scuola, dal punto di
vista energetico, può
essere definito un
intervento a impatto
e emissione zero.
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
36. Energy Performance KlimaHaus:
Architectural Shell Performance
8,57 kWh/m2
a
(Energy performance index KlimaHaus)
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures
37. Construction cost: 3.816.460,35 €
Impact of cost:
(Gross area): 1.225 €/ m²
(Net area): 1.385 €/ m²
Construction cost:
Elementary school for 15 classes
Municipality of Valsamoggia (BO)
PROJECT-CONSTRUCTION SUPERVISION: Arch. Enrico Termanini - Project manager
Ing. Davide Bedogni - Installations
Ing. Enrico Rombi - Structures