PM Process Groups
Initiating
Planning
Executing
Closing
Monitoring and Controlling
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 2PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
• Define initial scope.
• Commit initial financial resources.
• Identify internal and external
stakeholders.
• Appoint Project manager.
What does Initiating consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 3PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
• Establish the total scope of the
effort.
• Define and refine the objectives.
• Develop the course of action
required to attain those objectives.
What does Planning consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 4PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
• Coordinate resources.
• Manage stakeholder expectations.
• Integrate and perform the activities
of the project in accordance with
the project management plan
(base line).
What does Executing consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 5PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
• Track and review the progress and
performance of the project.
• Control changes & recommend
corrective or preventive action.
• Monitoring the ongoing project
activities against the project
management plan (base line).
What does Monitoring and Controlling consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 6PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
• Conduct post-project or phase-end
review.
• Finalise lessons learned.
• Archive project documents.
• Close out procurement.
• Release project resources.
What does Closing consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 7PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Managing the interdependencies
among the project management
Knowledge Areas.
What does Integration Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 8PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Ensuring that the project includes all
the work required, and only the work
required, to complete the project
successfully.
What does Scope Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 9PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Managing the timely completion of
the project.
What does Time Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 10PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Managing costs so that the project
can be completed within the
approved budget.
What does Cost Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 11PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Ensuring that the project & product
requirements are met so that the
project will satisfy the needs for
which it was undertaken.
What does Quality Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 12PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Organizing, managing, and leading
the project team.
What does HR Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 13PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Managing the flow of project
information.
What does Communication Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 14PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Managing the impact of uncertainty
on the project's objectives.
What does Risk Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 15PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Managing contractual obligations
placed on the project team by the
contract whether the project is the
buyer or the seller.
What does Procurement Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 16PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
Procurement
Stakeholder
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
Managing stakeholder satisfaction.
What does Stakeholder Management consist of?
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 17PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
I See The Cat Quickly Hissing
Commands Real Panic Stricken
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
The 47 Project Management Processes
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 18PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
4.1 Develop Project Charter
The processes of the initiating process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 19PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
13.1 Identify stakeholders
The processes of the initiating process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 20PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
4.2 Develop project management
plan
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 21PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
5.1 Plan scope management
5.2 Collect requirements
5.3 Define scope
5.4 Create WBS
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 22PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
6.1 Plan schedule management
6.2 Define activities
6.3 Sequence activities
6.4 Estimate activity resources
6.5 Estimate activity durations
6.6 Develop schedule
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 23PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
7.1 Plan cost management
7.2 Estimate costs
7.3 Determine budget
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 24PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
8.1 Plan quality management
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 25PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
9.1 Plan HR management
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 26PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
10.1 Plan communication
management
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 27PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
11.1 Plan risk management
11.2 Identify risks
11.3 Perform qualitative risk analysis
11.4 Perform quantitative risk
analysis
11.5 Plan risk responses
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 28PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
12.1 Plan procurement management
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 29PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
13.1 Plan stakeholder management
The processes of the Planning process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 30PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
4.3 Direct and manage project work
The processes of the Executing process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 31PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
8.2 Perform quality assurance
The processes of the Executing process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 32PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
9.2 Acquire project team
9.3 Develop project team
9.4 Manage project team
The processes of the Executing process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 33PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
10.2 Manage communications
The processes of the Executing process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 34PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
12.2 Conduct procurements
The processes of the Executing process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 35PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
13.3 Manage stakeholder
engagement
The processes of the Executing process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 36PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
4.4 Monitor and control project work
4.5 Perform integrated change
control
The processes of the Monitoring & Control process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 37PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
5.5 Validate scope
5.6 Control scope
The processes of the Monitoring & Control process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 38PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
6.7 Control schedule
The processes of the Monitoring & Control process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 39PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
7.3 Control costs
The processes of the Monitoring & Control process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 40PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
8.3 Control quality
The processes of the Monitoring & Control process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 41PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
10.3 Control communication
The processes of the Monitoring & Control process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 42PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
11.6 Control risk
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 43PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
12.3 Control procurement
The processes of the Monitoring & Control process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 44PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
13.4 Control stakeholder
engagement
The processes of the Monitoring & Control process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 45PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
12.4 Close procurements
The processes of the Closing process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 46PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
4.6 Close project or phase
The processes of the Closing process group
PMTA
Project
Management
Training
Africapmta.co.za
V-1.1 47PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc.
Copyright © PMTA. All rights reserved.
Initiating
Planning
Executing
Mon & Contr.
Closing
Integration
Scope
Time
Cost
Quality
HumanResources
Communication
Risk
1
Procurement
2
4
2
6
1
3
1
1
1
1
1
3
1
1
1
5
1
1
1
1
1
Stakeholder
1
1
1
1
Knowledge Areas
Groups
Initiation
Planning
Execution
Close-out
Phases
1
1
1
2
24
8
11
2
6 6 7 4 3 4 3 6 4 4 47
To meet the project’s
requirements while supporting
the organizational strategy and
objectives.
Why do we follow this framework?

More Related Content

Viewers also liked

How to repurpose your webinar content
How to repurpose your webinar contentHow to repurpose your webinar content
How to repurpose your webinar contentBeaconLive Webinars
 
Micro elements powerpoint (2)
Micro elements powerpoint (2)Micro elements powerpoint (2)
Micro elements powerpoint (2)AlessiaAva97
 
Wild Flam-Ingos Year 1 chapter 2
Wild Flam-Ingos Year 1 chapter 2Wild Flam-Ingos Year 1 chapter 2
Wild Flam-Ingos Year 1 chapter 2shannonagins
 
SEJARAH BAB 8 KERTAS 3
SEJARAH BAB 8 KERTAS 3SEJARAH BAB 8 KERTAS 3
SEJARAH BAB 8 KERTAS 3warisasyikin
 
The Wild Flam-Ingos OWBC. Year 1 Chapter 1
The Wild Flam-Ingos OWBC. Year 1 Chapter 1The Wild Flam-Ingos OWBC. Year 1 Chapter 1
The Wild Flam-Ingos OWBC. Year 1 Chapter 1shannonagins
 
robotica Educativa
robotica Educativarobotica Educativa
robotica Educativaandreaulcue
 
Endangered animals
Endangered animalsEndangered animals
Endangered animalsmarcus410
 
Chapter 1(indian economy)
Chapter 1(indian economy)Chapter 1(indian economy)
Chapter 1(indian economy)Mukesh Kumar
 

Viewers also liked (12)

How to repurpose your webinar content
How to repurpose your webinar contentHow to repurpose your webinar content
How to repurpose your webinar content
 
Micro elements powerpoint (2)
Micro elements powerpoint (2)Micro elements powerpoint (2)
Micro elements powerpoint (2)
 
Evaluation five
Evaluation fiveEvaluation five
Evaluation five
 
Wild Flam-Ingos Year 1 chapter 2
Wild Flam-Ingos Year 1 chapter 2Wild Flam-Ingos Year 1 chapter 2
Wild Flam-Ingos Year 1 chapter 2
 
Adisnonino 2pianos-101007232150-phpapp01
Adisnonino 2pianos-101007232150-phpapp01Adisnonino 2pianos-101007232150-phpapp01
Adisnonino 2pianos-101007232150-phpapp01
 
SEJARAH BAB 8 KERTAS 3
SEJARAH BAB 8 KERTAS 3SEJARAH BAB 8 KERTAS 3
SEJARAH BAB 8 KERTAS 3
 
The Wild Flam-Ingos OWBC. Year 1 Chapter 1
The Wild Flam-Ingos OWBC. Year 1 Chapter 1The Wild Flam-Ingos OWBC. Year 1 Chapter 1
The Wild Flam-Ingos OWBC. Year 1 Chapter 1
 
Evaluation 6
Evaluation 6Evaluation 6
Evaluation 6
 
Summer project pratap pdf
Summer project  pratap pdfSummer project  pratap pdf
Summer project pratap pdf
 
robotica Educativa
robotica Educativarobotica Educativa
robotica Educativa
 
Endangered animals
Endangered animalsEndangered animals
Endangered animals
 
Chapter 1(indian economy)
Chapter 1(indian economy)Chapter 1(indian economy)
Chapter 1(indian economy)
 

Similar to Pm process matrix v 1.1

Introduce the processes of project management pmbok6 by mm rahman stm-skill ...
Introduce the processes of project management  pmbok6 by mm rahman stm-skill ...Introduce the processes of project management  pmbok6 by mm rahman stm-skill ...
Introduce the processes of project management pmbok6 by mm rahman stm-skill ...STM-Skill That Matters
 
Project Management Acronym Minefield
Project Management Acronym MinefieldProject Management Acronym Minefield
Project Management Acronym MinefieldPM-Partners group
 
DMPEF Revision _2016 March _PEF
DMPEF Revision _2016 March _PEF  DMPEF Revision _2016 March _PEF
DMPEF Revision _2016 March _PEF Peter Zhou
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pmbhashem007
 
Krishna moorthy pmi template pmi presentation final
Krishna moorthy   pmi  template pmi presentation finalKrishna moorthy   pmi  template pmi presentation final
Krishna moorthy pmi template pmi presentation finalPMInstituteIndia
 
Project Development Routemap - Infrastructure Foundation Masterclass
Project Development Routemap - Infrastructure Foundation  MasterclassProject Development Routemap - Infrastructure Foundation  Masterclass
Project Development Routemap - Infrastructure Foundation MasterclassCaribbean Development Bank
 
Capm Free Seminar Presentation
Capm Free Seminar PresentationCapm Free Seminar Presentation
Capm Free Seminar PresentationRavindra Kamthe
 
Discussion Paper PMO And Merger Projects
Discussion Paper   PMO And Merger ProjectsDiscussion Paper   PMO And Merger Projects
Discussion Paper PMO And Merger Projectstheteflonpm
 
P3O Overview
P3O OverviewP3O Overview
P3O OverviewJeff Ball
 
Inpac Dev Co V011809 V2
Inpac Dev Co V011809 V2Inpac Dev Co V011809 V2
Inpac Dev Co V011809 V2Paul Allen
 
Project management basics
Project management basicsProject management basics
Project management basicsPlanning School
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedCTE Solutions Inc.
 
FuturePMO 2017 - Marisa Silva, Wellingtone - Maturing Your PMO Through its Te...
FuturePMO 2017 - Marisa Silva, Wellingtone - Maturing Your PMO Through its Te...FuturePMO 2017 - Marisa Silva, Wellingtone - Maturing Your PMO Through its Te...
FuturePMO 2017 - Marisa Silva, Wellingtone - Maturing Your PMO Through its Te...Wellingtone
 
Project Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University FinalProject Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University FinalТранслируем.бел
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...JustAcademy
 
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...JustAcademy
 

Similar to Pm process matrix v 1.1 (20)

Introduce the processes of project management pmbok6 by mm rahman stm-skill ...
Introduce the processes of project management  pmbok6 by mm rahman stm-skill ...Introduce the processes of project management  pmbok6 by mm rahman stm-skill ...
Introduce the processes of project management pmbok6 by mm rahman stm-skill ...
 
Project Management Acronym Minefield
Project Management Acronym MinefieldProject Management Acronym Minefield
Project Management Acronym Minefield
 
Spm lecture-1
Spm lecture-1Spm lecture-1
Spm lecture-1
 
DMPEF Revision _2016 March _PEF
DMPEF Revision _2016 March _PEF  DMPEF Revision _2016 March _PEF
DMPEF Revision _2016 March _PEF
 
60 minutes to pm
60 minutes to pm60 minutes to pm
60 minutes to pm
 
1_Project Management Foundation
1_Project Management Foundation1_Project Management Foundation
1_Project Management Foundation
 
Spm lecture 1
Spm lecture 1Spm lecture 1
Spm lecture 1
 
P3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management FrameworkP3M - Project, Program, Portfolio Management Framework
P3M - Project, Program, Portfolio Management Framework
 
Krishna moorthy pmi template pmi presentation final
Krishna moorthy   pmi  template pmi presentation finalKrishna moorthy   pmi  template pmi presentation final
Krishna moorthy pmi template pmi presentation final
 
Project Development Routemap - Infrastructure Foundation Masterclass
Project Development Routemap - Infrastructure Foundation  MasterclassProject Development Routemap - Infrastructure Foundation  Masterclass
Project Development Routemap - Infrastructure Foundation Masterclass
 
Capm Free Seminar Presentation
Capm Free Seminar PresentationCapm Free Seminar Presentation
Capm Free Seminar Presentation
 
Discussion Paper PMO And Merger Projects
Discussion Paper   PMO And Merger ProjectsDiscussion Paper   PMO And Merger Projects
Discussion Paper PMO And Merger Projects
 
P3O Overview
P3O OverviewP3O Overview
P3O Overview
 
Inpac Dev Co V011809 V2
Inpac Dev Co V011809 V2Inpac Dev Co V011809 V2
Inpac Dev Co V011809 V2
 
Project management basics
Project management basicsProject management basics
Project management basics
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison Demystified
 
FuturePMO 2017 - Marisa Silva, Wellingtone - Maturing Your PMO Through its Te...
FuturePMO 2017 - Marisa Silva, Wellingtone - Maturing Your PMO Through its Te...FuturePMO 2017 - Marisa Silva, Wellingtone - Maturing Your PMO Through its Te...
FuturePMO 2017 - Marisa Silva, Wellingtone - Maturing Your PMO Through its Te...
 
Project Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University FinalProject Mng Basics Belarusian State University Final
Project Mng Basics Belarusian State University Final
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
 
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
 

Recently uploaded

HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxEsquimalt MFRC
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxannathomasp01
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Pooja Bhuva
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxCeline George
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxPooja Bhuva
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024Elizabeth Walsh
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...Amil baba
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentationcamerronhm
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxDr. Sarita Anand
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 

Recently uploaded (20)

HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptxHMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
HMCS Max Bernays Pre-Deployment Brief (May 2024).pptx
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
Beyond_Borders_Understanding_Anime_and_Manga_Fandom_A_Comprehensive_Audience_...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 

Pm process matrix v 1.1

  • 1. PMTA Project Management Training Africapmta.co.za V-1.1 1PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. PM Process Groups Initiating Planning Executing Closing Monitoring and Controlling
  • 2. PMTA Project Management Training Africapmta.co.za V-1.1 2PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases • Define initial scope. • Commit initial financial resources. • Identify internal and external stakeholders. • Appoint Project manager. What does Initiating consist of?
  • 3. PMTA Project Management Training Africapmta.co.za V-1.1 3PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases • Establish the total scope of the effort. • Define and refine the objectives. • Develop the course of action required to attain those objectives. What does Planning consist of?
  • 4. PMTA Project Management Training Africapmta.co.za V-1.1 4PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases • Coordinate resources. • Manage stakeholder expectations. • Integrate and perform the activities of the project in accordance with the project management plan (base line). What does Executing consist of?
  • 5. PMTA Project Management Training Africapmta.co.za V-1.1 5PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases • Track and review the progress and performance of the project. • Control changes & recommend corrective or preventive action. • Monitoring the ongoing project activities against the project management plan (base line). What does Monitoring and Controlling consist of?
  • 6. PMTA Project Management Training Africapmta.co.za V-1.1 6PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases • Conduct post-project or phase-end review. • Finalise lessons learned. • Archive project documents. • Close out procurement. • Release project resources. What does Closing consist of?
  • 7. PMTA Project Management Training Africapmta.co.za V-1.1 7PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Managing the interdependencies among the project management Knowledge Areas. What does Integration Management consist of?
  • 8. PMTA Project Management Training Africapmta.co.za V-1.1 8PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Ensuring that the project includes all the work required, and only the work required, to complete the project successfully. What does Scope Management consist of?
  • 9. PMTA Project Management Training Africapmta.co.za V-1.1 9PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Managing the timely completion of the project. What does Time Management consist of?
  • 10. PMTA Project Management Training Africapmta.co.za V-1.1 10PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Managing costs so that the project can be completed within the approved budget. What does Cost Management consist of?
  • 11. PMTA Project Management Training Africapmta.co.za V-1.1 11PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Ensuring that the project & product requirements are met so that the project will satisfy the needs for which it was undertaken. What does Quality Management consist of?
  • 12. PMTA Project Management Training Africapmta.co.za V-1.1 12PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Organizing, managing, and leading the project team. What does HR Management consist of?
  • 13. PMTA Project Management Training Africapmta.co.za V-1.1 13PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Managing the flow of project information. What does Communication Management consist of?
  • 14. PMTA Project Management Training Africapmta.co.za V-1.1 14PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Managing the impact of uncertainty on the project's objectives. What does Risk Management consist of?
  • 15. PMTA Project Management Training Africapmta.co.za V-1.1 15PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Managing contractual obligations placed on the project team by the contract whether the project is the buyer or the seller. What does Procurement Management consist of?
  • 16. PMTA Project Management Training Africapmta.co.za V-1.1 16PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk Procurement Stakeholder Knowledge Areas Groups Initiation Planning Execution Close-out Phases Managing stakeholder satisfaction. What does Stakeholder Management consist of?
  • 17. PMTA Project Management Training Africapmta.co.za V-1.1 17PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 I See The Cat Quickly Hissing Commands Real Panic Stricken 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 The 47 Project Management Processes
  • 18. PMTA Project Management Training Africapmta.co.za V-1.1 18PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 4.1 Develop Project Charter The processes of the initiating process group
  • 19. PMTA Project Management Training Africapmta.co.za V-1.1 19PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 13.1 Identify stakeholders The processes of the initiating process group
  • 20. PMTA Project Management Training Africapmta.co.za V-1.1 20PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 4.2 Develop project management plan The processes of the Planning process group
  • 21. PMTA Project Management Training Africapmta.co.za V-1.1 21PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 5.1 Plan scope management 5.2 Collect requirements 5.3 Define scope 5.4 Create WBS The processes of the Planning process group
  • 22. PMTA Project Management Training Africapmta.co.za V-1.1 22PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 6.1 Plan schedule management 6.2 Define activities 6.3 Sequence activities 6.4 Estimate activity resources 6.5 Estimate activity durations 6.6 Develop schedule The processes of the Planning process group
  • 23. PMTA Project Management Training Africapmta.co.za V-1.1 23PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 7.1 Plan cost management 7.2 Estimate costs 7.3 Determine budget The processes of the Planning process group
  • 24. PMTA Project Management Training Africapmta.co.za V-1.1 24PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 8.1 Plan quality management The processes of the Planning process group
  • 25. PMTA Project Management Training Africapmta.co.za V-1.1 25PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 9.1 Plan HR management The processes of the Planning process group
  • 26. PMTA Project Management Training Africapmta.co.za V-1.1 26PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 10.1 Plan communication management The processes of the Planning process group
  • 27. PMTA Project Management Training Africapmta.co.za V-1.1 27PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 11.1 Plan risk management 11.2 Identify risks 11.3 Perform qualitative risk analysis 11.4 Perform quantitative risk analysis 11.5 Plan risk responses The processes of the Planning process group
  • 28. PMTA Project Management Training Africapmta.co.za V-1.1 28PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 12.1 Plan procurement management The processes of the Planning process group
  • 29. PMTA Project Management Training Africapmta.co.za V-1.1 29PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 13.1 Plan stakeholder management The processes of the Planning process group
  • 30. PMTA Project Management Training Africapmta.co.za V-1.1 30PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 4.3 Direct and manage project work The processes of the Executing process group
  • 31. PMTA Project Management Training Africapmta.co.za V-1.1 31PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 8.2 Perform quality assurance The processes of the Executing process group
  • 32. PMTA Project Management Training Africapmta.co.za V-1.1 32PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 9.2 Acquire project team 9.3 Develop project team 9.4 Manage project team The processes of the Executing process group
  • 33. PMTA Project Management Training Africapmta.co.za V-1.1 33PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 10.2 Manage communications The processes of the Executing process group
  • 34. PMTA Project Management Training Africapmta.co.za V-1.1 34PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 12.2 Conduct procurements The processes of the Executing process group
  • 35. PMTA Project Management Training Africapmta.co.za V-1.1 35PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 13.3 Manage stakeholder engagement The processes of the Executing process group
  • 36. PMTA Project Management Training Africapmta.co.za V-1.1 36PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 4.4 Monitor and control project work 4.5 Perform integrated change control The processes of the Monitoring & Control process group
  • 37. PMTA Project Management Training Africapmta.co.za V-1.1 37PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 5.5 Validate scope 5.6 Control scope The processes of the Monitoring & Control process group
  • 38. PMTA Project Management Training Africapmta.co.za V-1.1 38PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 6.7 Control schedule The processes of the Monitoring & Control process group
  • 39. PMTA Project Management Training Africapmta.co.za V-1.1 39PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 7.3 Control costs The processes of the Monitoring & Control process group
  • 40. PMTA Project Management Training Africapmta.co.za V-1.1 40PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 8.3 Control quality The processes of the Monitoring & Control process group
  • 41. PMTA Project Management Training Africapmta.co.za V-1.1 41PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 10.3 Control communication The processes of the Monitoring & Control process group
  • 42. PMTA Project Management Training Africapmta.co.za V-1.1 42PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 11.6 Control risk
  • 43. PMTA Project Management Training Africapmta.co.za V-1.1 43PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 12.3 Control procurement The processes of the Monitoring & Control process group
  • 44. PMTA Project Management Training Africapmta.co.za V-1.1 44PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 13.4 Control stakeholder engagement The processes of the Monitoring & Control process group
  • 45. PMTA Project Management Training Africapmta.co.za V-1.1 45PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 12.4 Close procurements The processes of the Closing process group
  • 46. PMTA Project Management Training Africapmta.co.za V-1.1 46PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 4.6 Close project or phase The processes of the Closing process group
  • 47. PMTA Project Management Training Africapmta.co.za V-1.1 47PMI, PMP and PMBOK are registered marks of the Project Management Institute, Inc. Copyright © PMTA. All rights reserved. Initiating Planning Executing Mon & Contr. Closing Integration Scope Time Cost Quality HumanResources Communication Risk 1 Procurement 2 4 2 6 1 3 1 1 1 1 1 3 1 1 1 5 1 1 1 1 1 Stakeholder 1 1 1 1 Knowledge Areas Groups Initiation Planning Execution Close-out Phases 1 1 1 2 24 8 11 2 6 6 7 4 3 4 3 6 4 4 47 To meet the project’s requirements while supporting the organizational strategy and objectives. Why do we follow this framework?