3. Quick to connect
It only takes a few minutesIt only takes a few minutes
to connect the piles.to connect the piles.
4. Using the strong joint,
the pile’s capacity can
be maximized efficiently.
5. The transportation and
installation of piles
becomes easier:
Thanks to the ABB PLUS
pile joints, piles can be
transported and installed
in the length required.
6. The ABB joint technology
is well-known and used
worldwide for pile
extension.
7. After the launch of ABB
pile joints, Leimet has
gone on to develop the
technology further.
With its optimized
structure ABB Plus is
more user friendly, but
it guarantees a strong
and solid connection
for your piles!