SlideShare a Scribd company logo
1 of 8
Santh Dnyaneshwar Shikshan sansths
Annasaheb Dange College of Engineering &
           Technology,Ashta.

                         A
                DESIGN REPORT
                        ON


                “Project Name”


                  Submitted by
               1. ______________
               2. ______________
               3. ______________


           Under the guidance of
                 Mr. Patil S.P.
               LOGO HERE
 Department Of Information Technology
              Year 2012-2013




                                              i
Santh Dnyaneshwar Shikshan sansths
          Annasaheb Dange College of Engineering &
                     Technology,Ashta.

                                  LOGO HERE


                                CERTIFICATE


This is to certify that, the design report entitled
                     “         Project name                     ”
Submitted by following students in the partial fulfilment of Bachelor of
Engineering in Information Technology of “Shivaji University, Kolhapur”
during academic year 2012-2013.


Team Members:
1. _______________
2. _______________
3. _______________




           Guide                                                    HOD IT




          External                                                  Principal




                                                                                ii
Acknowledgement

           We express our sincere thanks to Mr. Patil S.P. whose supervision,
inspiration and valuable discussion has helped us tremendously to complete our
project. His guidance proved to be the most valuable to overcome all the hurdles in
the fulfilment of this mini project on “_______________.”
          We grateful to Prof. S.V. Phakade, Head of IT Dept. for direct or indirect
help in the completion of this mini project.
        Last but not least, this acknowledgement would be incomplete without
rendering my sincere gratitude to all those who have helped us in the completion of
this project.


                                                       Yours Sincerely,
                                                   1
                                                   2
                                                   3




                                                                                  iii
List of Tables
Table 1.1 Records of System....................................................................................................02
Table 1.2 Data Flow Parameters...............................................................................................03




                                                                                                                                    iv
List of Figures
Fig 1.1 Architecture of System..........................................................................................02
Fig 1.2 Data Flow Diagram...............................................................................................03




                                                                                                                             v
Table of Content


     Acknowledgement................................................................................................iii
     List of Tables.........................................................................................................iv
     List of Figures........................................................................................................v


1. Introduction.......................................................................................................01

     1.1 Requirement Analysis

     1.2 Problem Definition

     1.3 Existing System

     1.4 Proposed System

2. System Design..................................................................................................06

     2.1 Architecture of System

     2.2 High Level Design

     2.3 Low Level Design

     2.4 UML Diagrams

     2.5 Database Design (If Any)

3. Implementation Methodology.........................................................................14

     3.1 Algorithm1

     3.2 Algorithm 2

4. Experimental Set-up and Data Collection....................................................................17

     4.1Dataset, H/W and S/W Resources




                                                                                                                                 vi
5. Result Analysis..............................................................................................19

   6. Limitation.......................................................................................................20

   7. Conclusion......................................................................................................21

  8.     Future Scope.................................................................................................21



  9. References ................................................................................................25

        9.1 Paper References

        9.2 Web References

                   htpp://www.sun.java.com/javaapi/servlet/sample.html

        9.3 Book References

                   Core Servlet and JSP,Marty Hall,TMI Publication




At the end attach corrected synopsis and reference paper of your project-soft
copy




                                                                                                                            vii
viii

More Related Content

What's hot

N(I)2 FaQs (V4)
N(I)2 FaQs (V4)N(I)2 FaQs (V4)
N(I)2 FaQs (V4)kvz
 
Digital Interventions for Health Systems Strengthening
Digital Interventions for Health Systems Strengthening Digital Interventions for Health Systems Strengthening
Digital Interventions for Health Systems Strengthening Prof. Rajendra Pratap Gupta
 
Example requirements specification
Example requirements specificationExample requirements specification
Example requirements specificationindrisrozas
 
Microsoft project server 2010 project managers guide for project web app
Microsoft project server 2010 project managers guide for project web appMicrosoft project server 2010 project managers guide for project web app
Microsoft project server 2010 project managers guide for project web appApimuk Siripitupum
 
OfficeCentral User Manual (English) - Accounting and Finance
OfficeCentral User Manual (English) - Accounting and FinanceOfficeCentral User Manual (English) - Accounting and Finance
OfficeCentral User Manual (English) - Accounting and FinanceKhairun Nisa Aziz
 
WebIT2 Consultants Proposal
WebIT2 Consultants ProposalWebIT2 Consultants Proposal
WebIT2 Consultants ProposalSarah Killey
 
Global Information Technology Report Latin America
Global Information Technology Report Latin AmericaGlobal Information Technology Report Latin America
Global Information Technology Report Latin AmericaFelipe Lamus
 
TCS In Tally Erp 9
TCS In Tally Erp 9TCS In Tally Erp 9
TCS In Tally Erp 9ravi78
 
Implementation Of CST - Tally ERP
Implementation Of CST - Tally ERPImplementation Of CST - Tally ERP
Implementation Of CST - Tally ERPravi78
 
TDS in Tally ERP 9
TDS in Tally ERP 9 TDS in Tally ERP 9
TDS in Tally ERP 9 Manoj Sain
 
Standards, Legal and Privacy aspects for IoT
Standards, Legal and Privacy aspects for IoTStandards, Legal and Privacy aspects for IoT
Standards, Legal and Privacy aspects for IoTIET India
 
iGUARD: An Intelligent Way To Secure - Report
iGUARD: An Intelligent Way To Secure - ReportiGUARD: An Intelligent Way To Secure - Report
iGUARD: An Intelligent Way To Secure - ReportNandu B Rajan
 
School library management system software
School library management system softwareSchool library management system software
School library management system softwareRanganath Shivaram
 
QBD_1464843125535 - Copy
QBD_1464843125535 - CopyQBD_1464843125535 - Copy
QBD_1464843125535 - CopyBhavesh Jangale
 

What's hot (18)

Bullet Physic Engine SDK
Bullet Physic Engine SDKBullet Physic Engine SDK
Bullet Physic Engine SDK
 
N(I)2 FaQs (V4)
N(I)2 FaQs (V4)N(I)2 FaQs (V4)
N(I)2 FaQs (V4)
 
Digital Interventions for Health Systems Strengthening
Digital Interventions for Health Systems Strengthening Digital Interventions for Health Systems Strengthening
Digital Interventions for Health Systems Strengthening
 
Example requirements specification
Example requirements specificationExample requirements specification
Example requirements specification
 
Microsoft project server 2010 project managers guide for project web app
Microsoft project server 2010 project managers guide for project web appMicrosoft project server 2010 project managers guide for project web app
Microsoft project server 2010 project managers guide for project web app
 
OfficeCentral User Manual (English) - Accounting and Finance
OfficeCentral User Manual (English) - Accounting and FinanceOfficeCentral User Manual (English) - Accounting and Finance
OfficeCentral User Manual (English) - Accounting and Finance
 
WebIT2 Consultants Proposal
WebIT2 Consultants ProposalWebIT2 Consultants Proposal
WebIT2 Consultants Proposal
 
Global Information Technology Report Latin America
Global Information Technology Report Latin AmericaGlobal Information Technology Report Latin America
Global Information Technology Report Latin America
 
Tesi v.d.cuccaro
Tesi v.d.cuccaroTesi v.d.cuccaro
Tesi v.d.cuccaro
 
TCS In Tally Erp 9
TCS In Tally Erp 9TCS In Tally Erp 9
TCS In Tally Erp 9
 
Implementation Of CST - Tally ERP
Implementation Of CST - Tally ERPImplementation Of CST - Tally ERP
Implementation Of CST - Tally ERP
 
TDS in Tally ERP 9
TDS in Tally ERP 9 TDS in Tally ERP 9
TDS in Tally ERP 9
 
A Product Requirements Document (PRD) Sample
A Product Requirements Document (PRD) SampleA Product Requirements Document (PRD) Sample
A Product Requirements Document (PRD) Sample
 
Standards, Legal and Privacy aspects for IoT
Standards, Legal and Privacy aspects for IoTStandards, Legal and Privacy aspects for IoT
Standards, Legal and Privacy aspects for IoT
 
VAT
VATVAT
VAT
 
iGUARD: An Intelligent Way To Secure - Report
iGUARD: An Intelligent Way To Secure - ReportiGUARD: An Intelligent Way To Secure - Report
iGUARD: An Intelligent Way To Secure - Report
 
School library management system software
School library management system softwareSchool library management system software
School library management system software
 
QBD_1464843125535 - Copy
QBD_1464843125535 - CopyQBD_1464843125535 - Copy
QBD_1464843125535 - Copy
 

Viewers also liked

Fired Earth The White Collection Black(4) Copy
Fired Earth The White Collection Black(4) CopyFired Earth The White Collection Black(4) Copy
Fired Earth The White Collection Black(4) CopyFiredEarth
 
12850113673269367326 gssseptembrie
12850113673269367326 gssseptembrie 12850113673269367326 gssseptembrie
12850113673269367326 gssseptembrie Dr. Tanase Tasente
 
Sondaj CCSB - 14 noiembrie 2009
Sondaj CCSB - 14 noiembrie 2009Sondaj CCSB - 14 noiembrie 2009
Sondaj CCSB - 14 noiembrie 2009Dr. Tanase Tasente
 
Janice and Andrew Proud
Janice and Andrew Proud Janice and Andrew Proud
Janice and Andrew Proud egacheru
 

Viewers also liked (7)

Fired Earth The White Collection Black(4) Copy
Fired Earth The White Collection Black(4) CopyFired Earth The White Collection Black(4) Copy
Fired Earth The White Collection Black(4) Copy
 
Date Provizorii P
Date Provizorii PDate Provizorii P
Date Provizorii P
 
128039116357581243575 raport
128039116357581243575 raport128039116357581243575 raport
128039116357581243575 raport
 
12850113673269367326 gssseptembrie
12850113673269367326 gssseptembrie 12850113673269367326 gssseptembrie
12850113673269367326 gssseptembrie
 
Sondaj CCSB - 14 noiembrie 2009
Sondaj CCSB - 14 noiembrie 2009Sondaj CCSB - 14 noiembrie 2009
Sondaj CCSB - 14 noiembrie 2009
 
Janice and Andrew Proud
Janice and Andrew Proud Janice and Andrew Proud
Janice and Andrew Proud
 
Cons esc2016 17-01
Cons esc2016 17-01Cons esc2016 17-01
Cons esc2016 17-01
 

Similar to Be project report format2012 13

IO_Report_Template (Readonly)
IO_Report_Template (Readonly)IO_Report_Template (Readonly)
IO_Report_Template (Readonly)guestf8327e
 
Chat Application [Full Documentation]
Chat Application [Full Documentation]Chat Application [Full Documentation]
Chat Application [Full Documentation]Rajon
 
online examination management system
online examination management systemonline examination management system
online examination management systemPraveen Patel
 
Work Measurement Application - Ghent Internship Report - Adel Belasker
Work Measurement Application - Ghent Internship Report - Adel BelaskerWork Measurement Application - Ghent Internship Report - Adel Belasker
Work Measurement Application - Ghent Internship Report - Adel BelaskerAdel Belasker
 
Project final report
Project final reportProject final report
Project final reportALIN BABU
 
A.R.C. Usability Evaluation
A.R.C. Usability EvaluationA.R.C. Usability Evaluation
A.R.C. Usability EvaluationJPC Hanson
 
Report on e-Notice App (An Android Application)
Report on e-Notice App (An Android Application)Report on e-Notice App (An Android Application)
Report on e-Notice App (An Android Application)Priyanka Kapoor
 
Speech recognition project report
Speech recognition project reportSpeech recognition project report
Speech recognition project reportSarang Afle
 
Capstone Report - Industrial Attachment Program (IAP) Evaluation Portal
Capstone Report - Industrial Attachment Program (IAP) Evaluation PortalCapstone Report - Industrial Attachment Program (IAP) Evaluation Portal
Capstone Report - Industrial Attachment Program (IAP) Evaluation PortalAkshit Arora
 
Factors Impacting the Acheivement of Chilled Water Setpoint...
Factors Impacting the Acheivement of Chilled Water Setpoint...Factors Impacting the Acheivement of Chilled Water Setpoint...
Factors Impacting the Acheivement of Chilled Water Setpoint...Jonathan Isaacs
 
Bim deployment plan_final
Bim deployment plan_finalBim deployment plan_final
Bim deployment plan_finalHuytraining
 
Energy assessment guide for commercial buildings
Energy assessment guide for commercial buildingsEnergy assessment guide for commercial buildings
Energy assessment guide for commercial buildingsRamji Vemulapalli
 

Similar to Be project report format2012 13 (20)

IO_Report_Template (Readonly)
IO_Report_Template (Readonly)IO_Report_Template (Readonly)
IO_Report_Template (Readonly)
 
Chat Application [Full Documentation]
Chat Application [Full Documentation]Chat Application [Full Documentation]
Chat Application [Full Documentation]
 
online examination management system
online examination management systemonline examination management system
online examination management system
 
Work Measurement Application - Ghent Internship Report - Adel Belasker
Work Measurement Application - Ghent Internship Report - Adel BelaskerWork Measurement Application - Ghent Internship Report - Adel Belasker
Work Measurement Application - Ghent Internship Report - Adel Belasker
 
Uml (grasp)
Uml (grasp)Uml (grasp)
Uml (grasp)
 
Project final report
Project final reportProject final report
Project final report
 
Hung_thesis
Hung_thesisHung_thesis
Hung_thesis
 
Montero thesis-project
Montero thesis-projectMontero thesis-project
Montero thesis-project
 
Digital Reader
Digital Reader Digital Reader
Digital Reader
 
A.R.C. Usability Evaluation
A.R.C. Usability EvaluationA.R.C. Usability Evaluation
A.R.C. Usability Evaluation
 
Report on e-Notice App (An Android Application)
Report on e-Notice App (An Android Application)Report on e-Notice App (An Android Application)
Report on e-Notice App (An Android Application)
 
Home automation
Home automationHome automation
Home automation
 
Speech recognition project report
Speech recognition project reportSpeech recognition project report
Speech recognition project report
 
Capstone Report - Industrial Attachment Program (IAP) Evaluation Portal
Capstone Report - Industrial Attachment Program (IAP) Evaluation PortalCapstone Report - Industrial Attachment Program (IAP) Evaluation Portal
Capstone Report - Industrial Attachment Program (IAP) Evaluation Portal
 
Notes econometricswithr
Notes econometricswithrNotes econometricswithr
Notes econometricswithr
 
Factors Impacting the Acheivement of Chilled Water Setpoint...
Factors Impacting the Acheivement of Chilled Water Setpoint...Factors Impacting the Acheivement of Chilled Water Setpoint...
Factors Impacting the Acheivement of Chilled Water Setpoint...
 
Bim deployment plan_final
Bim deployment plan_finalBim deployment plan_final
Bim deployment plan_final
 
iPDC Report Nitesh
iPDC Report NiteshiPDC Report Nitesh
iPDC Report Nitesh
 
Energy assessment guide for commercial buildings
Energy assessment guide for commercial buildingsEnergy assessment guide for commercial buildings
Energy assessment guide for commercial buildings
 
Book bucket
Book bucketBook bucket
Book bucket
 

Be project report format2012 13

  • 1. Santh Dnyaneshwar Shikshan sansths Annasaheb Dange College of Engineering & Technology,Ashta. A DESIGN REPORT ON “Project Name” Submitted by 1. ______________ 2. ______________ 3. ______________ Under the guidance of Mr. Patil S.P. LOGO HERE Department Of Information Technology Year 2012-2013 i
  • 2. Santh Dnyaneshwar Shikshan sansths Annasaheb Dange College of Engineering & Technology,Ashta. LOGO HERE CERTIFICATE This is to certify that, the design report entitled “ Project name ” Submitted by following students in the partial fulfilment of Bachelor of Engineering in Information Technology of “Shivaji University, Kolhapur” during academic year 2012-2013. Team Members: 1. _______________ 2. _______________ 3. _______________ Guide HOD IT External Principal ii
  • 3. Acknowledgement We express our sincere thanks to Mr. Patil S.P. whose supervision, inspiration and valuable discussion has helped us tremendously to complete our project. His guidance proved to be the most valuable to overcome all the hurdles in the fulfilment of this mini project on “_______________.” We grateful to Prof. S.V. Phakade, Head of IT Dept. for direct or indirect help in the completion of this mini project. Last but not least, this acknowledgement would be incomplete without rendering my sincere gratitude to all those who have helped us in the completion of this project. Yours Sincerely, 1 2 3 iii
  • 4. List of Tables Table 1.1 Records of System....................................................................................................02 Table 1.2 Data Flow Parameters...............................................................................................03 iv
  • 5. List of Figures Fig 1.1 Architecture of System..........................................................................................02 Fig 1.2 Data Flow Diagram...............................................................................................03 v
  • 6. Table of Content Acknowledgement................................................................................................iii List of Tables.........................................................................................................iv List of Figures........................................................................................................v 1. Introduction.......................................................................................................01 1.1 Requirement Analysis 1.2 Problem Definition 1.3 Existing System 1.4 Proposed System 2. System Design..................................................................................................06 2.1 Architecture of System 2.2 High Level Design 2.3 Low Level Design 2.4 UML Diagrams 2.5 Database Design (If Any) 3. Implementation Methodology.........................................................................14 3.1 Algorithm1 3.2 Algorithm 2 4. Experimental Set-up and Data Collection....................................................................17 4.1Dataset, H/W and S/W Resources vi
  • 7. 5. Result Analysis..............................................................................................19 6. Limitation.......................................................................................................20 7. Conclusion......................................................................................................21 8. Future Scope.................................................................................................21 9. References ................................................................................................25 9.1 Paper References 9.2 Web References htpp://www.sun.java.com/javaapi/servlet/sample.html 9.3 Book References Core Servlet and JSP,Marty Hall,TMI Publication At the end attach corrected synopsis and reference paper of your project-soft copy vii