1. VIJAY PRAKASH 1671B, Govindpuri Extn.
DOB. 05/04/1985 Kalkaji
Email: er.vijaypk@gmail.com New delhi-110019
Ph: +91- 8800499248 India
Passport No. G7081705 Skype id. Vijay.prakash2
Summary:
• B.tech in Chemical Engineering from National Institute of Technology Tiruchirapalli, INDIA
passed in year 2010.
• Five and half years of core working experience in Petrochemical, Oil & Gas, Waste
management and Waste water treatment as process Maintenance engineer and project
engineer.
Domains of Skills & Experience:
1) Project Management :- MS Excel & Office, Purchase planning, procurement, BOQ,
Invoice, PO, Daily Project Progress Report, Planning & Scheduling, Tender Documentation,
Site Management, Site survey, Process Engineering, PMP, Safety Management, Structural
Engineer, Joint Inspection, Hot Tapping, AUTO CAD, PAD, P&ID, PFD, Heat & Mass Transfer
calculation,Waste water Treatment and Manage a technical team, Pipe joint Inspection (RT, pipe
Pressure test like hydrostatic test, Pneumatic test, forms)
2) Plant Maintenance:- Plant Operation, HAZOP, Preventive maintenance, Mechanical,
Electrical, Commissioning, Repair, Analytical thinking, Trouble Shooting
Facilities Maintenance and TPM, Online Chemical Cleaning of Heat Exchanger, Boilers and
Process pipe line.
3) Laboratory :- Lube Oil Testing – TAN,TBN, Viscosity test, Flash Point
Waste water testing – BOD, COD, TOC, O&G, TSS.
Educational Knowledge: CDU (Crude distillation unit), SRU (Sulphur recovery unit), chemical
process industry, Heat Transfer and mass transfer, Distillation column, project engineering,
petroleum petrochemical engineering, waste water treatment and environmental pollution control
engineering.
WORK EXPERIENCE:- 5+ years
CURRENT CTC : 4.2 LPA EXPECTED CTC : 4.8 LPA +
Project Manager, Shimi Research Center PVT.LTD Sept. 2015- Till Dated
Job Responsibilities:-
Project Management, Planning & monitoring, Procurement, Installation and commissioning incharge for
STP, ETP, Cooling Tower, Pollution Control Device, CO2 Recovery Scrubber, Cyclone Separator and
Scrubbers.
Project Coordinator, Smaa Al-Sherqiya Industrial Factory Dec. 2014- July 2015
Job Responsibilities:-
2. Oil Recycling Unit (2000 LPH), Process Design, Project Management, Planning & monitoring, process
piping, Procurement, Installation, commissioning and plant Start-up.
Write the MSDS of Chemicals used in the plant.
Project Engineer, Savair Energy Ltd May 2013 – November 2014
1) Installation of centrifugal compressor with piping (4000 meter) in ONGC Uran to fulfill the
requirement of plant air and instrument air across the plant units.
2) Installation of centrifugal compressor with piping in ONGC Ratnagiri.
3) Piping engineer for the fabrication of pipe, fittings and valves.
4) Supervise the hot tapping of valves in Utility pipelines.
• Read Detail plan, tender and monitor the activities based on contract/ client requirements.
• Undertake technical review of construction documents, contractor submittals, work plans and as-
built drawings.
• Prepare: Bill of quantity, Bill of materials, schedule of activities, Daily progress report,
progress billing, quantity reconciliation, Protocols, Planning & Scheduling, installation
methodology and sub-contract agreements between the company and labor contractors.
• Quality Assurance - Ensure that adequate evaluations of the project are performed with the
participation of qualified personnel during the sessions. Also ensure that all resulting actions are
pursued and resolved, and documents are updated.
• Manage detailed engineering design involve in finalization of plant layout, piping layout to
release final design of PFD, PAD and P&ID’s.
• Build, maintain customer relation and also resolve customer operational conflicts in a
professional way.
• Develop/train the newly hired Process Engineers.
• Maintain the record as required by the project and ensure Quality System implementation
Project Engineer, SpanChem Technologies, Mumbai April 2012 – May 2013
• Develops project objectives by reviewing project proposals and plans; conferring with
management.
• Determines project schedule by studying project plan and specifications; calculating time
requirements; sequencing project elements..
• Prepare Daily project status reports and submit it to the project manager.
• Maintains safe and clean working environment by enforcing procedures, rules, and regulations.
• During chemical cleaning of equipment (for example in HPCL,VVF, Reliance petrochemical ,etc)
like heat exchanger, boiler, pipe line, air fin cooler, ect.. I have to read out PID diagram. And
explain client how my team is going to work or do online chemical cleaning of equipment. And
how much chemical and time is required to complete whole process.
• Analyze, conduct test and present test report as per norms on paper in-front of Clint.
• Supervise the chemical cleaning of heat exchange (HPCL Vizag and chembur,mumbai) by
decontamination process.
• Improve manpower utilization within existing departments and processes. Schedule stability that
allows for maximum return on efficiencies.
• Identify engineering problems and ensure solutions are implemented.
• Prepare power point presentation for the chemical cleaning of all equipments like heat
3. exchanger, boiler, air fin cooler, vessel and column used in oil & gas and petrochemical
companies.
• Following up new business opportunities and setting up meetings with New Clint.
• Identify Clint needs and suggest the relevant process technically to get the business.
• Travel to customer sites and tradeshows to promote company’s products and services.
Process Engineer, SMS Water Grace BMW Pvt. Ltd. Delhi February 2011 to 31st
march 2012
• Design domestic or industrial water or wastewater treatment plants, including advanced
facilities with sequencing batch reactors (SBR), membranes, lift stations, headwork’s, surge
overflow basins, ultraviolet disinfection systems, aerobic digesters, sludge lagoons, or control
buildings.
• Provide technical direction, engineering or computer-aided design (AutoCAD) to technicians, or
other technical personnel.
• Check mechanical, biological, and chemical processes involved in the operation of a wastewater
treatment plant.
• Prepare MIS reports, analyzes data, and make recommendation for improving plant operations
and solving maintenance-related problems.
• Monitor operation of plant equipment and systems.
• Daily rutting inspection of all process equipments like incinator, incinator burner, pump’s,
crusher, Autoclave and waste water treatment plant.
• Lineup for the plant inspection and manage the pollution control board inspection team.
• Explain whole process in front of CPCB or DPCB.
Internship/Project:
1. Project title: Absorption of CO2 using ammonia as a solvent in a packed bed tower.
Institution:- National Institute of Technology , Trichy
Guide: Dr. K.M Meera Shariffa Begam.
2. Project title: Gasoline production in CCU, CDU, DCU unit and waste water
Treatment plant.
Industry: IOCL, Bongaigaon Refinery.
Computer Skills:
• Packages : MS Office, AUTO CAD, SAP ,PMP
Personal Information:
Name : VIJAY PRAKASH
Father’s Name : HRIDAYA NAND SETH
Languages Known : English, Hindi, Garo, and Tamil
Marital Status : Married
Nationality : INDIAN
Hobbies : Listening to music, watching Scientific Documentaries
4. Declaration: I hereby declare that the above-mentioned information is correct up to my knowledge and
I bear the responsibility for the correctness of the above-mentioned particulars.
Place:
Date: Vijay Prakash