The BeClean. five pillars are the foundation of our reliable, hardworking, honest and happy team. We value and support our team’s skill sets, dedication, work ethic, empathy, trust, diversification and shared knowledge. It is for those reasons we’re able to maintain a motivated team & deliver high quality cleans everyday.
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Construction cleaning-checklist
1. 100% 0 0
Construction Cleaning Checklist
Construction Cleaning Checklist
Complete
Score Failed items Actions
Audit Title
Inspection of site 1
Document No. 000001
Client / Site
MKJ Construction Industries
Conducted on 8th Dec, 2020 10:54 AM AEDT
Prepared by Cleaning Technician Inspection
Location 277 Burns Bay Rd, Lane Cove West
NSW 2066, Australia
(-33.8192719, 151.1510983)
Personnel
Frank Mophead
Private & Confidential 1/4
2. Audit 100%
Audit- 100%
Pre Work Inspection 100%
Pre Work Inspection- 100%
Verify any special item with Site Superintendent. N/A
Purchase order has been received. Yes
Unit is clean with no trash and debris. Yes
Faceplates are in place on all switches and receptacles. Yes
Cabinets are complete with hardware, shelves, etc. Yes
Appliances are installed. Yes
Drywall and Painting are complete. Yes
All trim is installed. Yes
Vinyl is installed. Yes
Carpet is installed. Yes
Doors are installled. Yes
All hardware is installed. Yes
Site superintendent:
Joe Hammer
8th Dec, 2020 10:56 AM AEDT
Trade Contractor: Company Name: (printed)
MKJ - Mike Bolt
8th Dec, 2020 10:57 AM AEDT
Final Inspection: (to be completed before Trade
Contractor leaves job site)
Final Inspection: (to be completed before Trade Contractor leaves job site)
NOTE: All area to "dusted" must be free of dust or grit when a hand is brushed across the surface.
Private & Confidential 2/4
3. All walls are dusted with no smudge marks. Yes
Vinyl, hardwood, parquet is mopped and cleaned with no black marks or
adhesive.
Yes
All windowsills and trim are dusted with no smudges. Yes
Mirrors are clean and shiny with no drywall dust on tops or sides or
scratches.
Yes
Sinks, showers, tubs and toilets are clean and shiny with no drywall dust
on top ledges and no scratches.
Yes
Faucets, shower heads, and other such fixtures are clean and shiny with
no scratches.
Yes
Ductwork and return air grilles are vacuumed. Yes
Windows are clean and shiny with no scratches. Yes
All hardware is clean and shiny (towel bars, toilet paper holders, etc. Yes
Cabinets are clean inside and out. Yes
Countertops are clean and shiny and no scratches. Yes
Appliances are clean inside and out. Yes
Light fixtures are clean and shiny with no fingerprints, dust, or smudges. Yes
Shelving is dusted and clean. Yes
Carpet is vacuumed with no spots. Yes
Thresholds are clean, free of dirt, mud, etc. Yes
Trash is removed to correct location. Yes
Unit is in "move-in" condition. Yes
Summary
Summary
Project superintendent
Joe Hammer
8th Dec, 2020 10:57 AM AEDT
Private & Confidential 3/4
4. Trade Contractor: Company Name (printed):
MKJ - Mike Bolt
8th Dec, 2020 10:58 AM AEDT
Project manager
Oliver O'Malley
8th Dec, 2020 10:58 AM AEDT
Private & Confidential 4/4