Timeline 1
Entry-Level Engineer Project Timeline
Project Manager vs. Instructional Designer
“T”heresa Cline
EDU 433
Kandi Wojtysiak
07/08/2013
Timeline 2
Entry-Level Engineer Project Timeline
Project Manager vs. Instructional Designer
This client has explained his need for all “entry level engineers” to have a clear
understanding of the requirements and need to follow OSHA (Occupational Safety and Health
Administration) rules, need of the use of PPE’s (Personal Protective Equipment), and the proper
usage of PPE’s that he and/or she uses in their daily job within the first seven days of
employment. The client also wants a deliverable that can be used by the engineer team to
immediately answer questions, do refresher training, and acquire knowledge of the new
information concerning OSHA and PPE.
After the “needs assessment,” I assigned both Mark (instructional designer) and John
(web-developer) to research current OSHA and PPE that engineers use on a daily basis. OSHA is
a federally regulated organization.
Under the OSH Act, employers are responsible for providing a safe and healthful
workplace. I assigned this task because, as a project manager, I cannot assume
that the client is up-to-date on the current regulations concerning PPE for
engineers in their workplace. Any found related updates will be included in the
deliverables (United States Department Of Labor, (2013, para. 2).
Timeline 3
As the project manager I have chosen for Mark to use the learner analysis of Smaldino,
Lowther, and Russell approach (2009, as cited in Brown & Green, 2011). The Smaldino,
Lowther, and Russell approach (2009, as cited in Brown & Green, 2011) states, “They suggest
that the learner analysis should focus on three aspects of the target audience: general
characteristics, specific entry competencies, and learning styles,” (p. 78).
Mark was selected as a team member because I need an expert instructional designer to
develop and execute the directed learning environment. I chose John (web-development expert)
for a team member to meet the secondary deliverable. The “project sponsor”, accountant,
procurement agent, technical specialist, and the engineer trainer were selected by the client.
In conclusion, the details of the project plan can be found in the timeline I created. You
can link to it by clicking on the following link http://timeglider.com/timeline/10918d73ff0dbb42.
The evidence required from the text is in the descriptions on my timeline.
Timeline 4
References
Brown, A., & Green, T. (2011). The essentials of instructional designer: Connecting
fundamental principles with process and practice. Boston, MA: Pearson.
United States Department of Labor. (2013). Occupational Safety & Health Administration.
Retrieved from https://www.osha.gov/law-regs.html.
Westland, J. (2007). The project management life cycle: A complete step-by-step methodology
for initiating, planning, executing & closing a project successfully. Philadelphia, PA:
Kogan Page, Ltd.

More Related Content

Similar to Entry Level Engineer Timeline Document

The Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in IndiaThe Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in IndiaIRJET Journal
 
Technical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfTechnical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfSaqib Imran
 
Lessons learned report
Lessons learned reportLessons learned report
Lessons learned reportMarsha Cooper
 
IT-625 The Charter should be based on the attached document. The .docx
IT-625 The Charter should be based on the attached document. The .docxIT-625 The Charter should be based on the attached document. The .docx
IT-625 The Charter should be based on the attached document. The .docxADDY50
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docx
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docxRunning head INSERT TITLE HERE1INSERT TITLE HERE17.docx
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docxjeanettehully
 
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docx
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docxRunning head INSERT TITLE HERE1INSERT TITLE HERE17.docx
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docxwlynn1
 
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...IAEME Publication
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxAASTHA76
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxbraycarissa250
 
1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docx1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docxaulasnilda
 
Pm0013 managing human resources in projects
Pm0013   managing human resources in projectsPm0013   managing human resources in projects
Pm0013 managing human resources in projectssmumbahelp
 
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docxAssignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docxtrippettjettie
 
Pm assignment -5111570030
Pm assignment -5111570030Pm assignment -5111570030
Pm assignment -5111570030adzoyi
 
Software Project Management: Project Initiation
Software Project Management: Project InitiationSoftware Project Management: Project Initiation
Software Project Management: Project InitiationMinhas Kamal
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
 
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
IRJET-  	  Decision Making in Construction Management using AHP and Expert Ch...IRJET-  	  Decision Making in Construction Management using AHP and Expert Ch...
IRJET- Decision Making in Construction Management using AHP and Expert Ch...IRJET Journal
 
WORK BREAKDOWN STRUCTURE .docx
WORK BREAKDOWN STRUCTURE                                          .docxWORK BREAKDOWN STRUCTURE                                          .docx
WORK BREAKDOWN STRUCTURE .docxericbrooks84875
 
PurposeThis course project is intended to assess your abilit
PurposeThis course project is intended to assess your abilitPurposeThis course project is intended to assess your abilit
PurposeThis course project is intended to assess your abilitTakishaPeck109
 

Similar to Entry Level Engineer Timeline Document (20)

The Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in IndiaThe Impact of Skilled and Unskilled Labour in Construction Industry in India
The Impact of Skilled and Unskilled Labour in Construction Industry in India
 
Technical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdfTechnical report writing skills for civil engineers pdf
Technical report writing skills for civil engineers pdf
 
Lessons learned report
Lessons learned reportLessons learned report
Lessons learned report
 
IT-625 The Charter should be based on the attached document. The .docx
IT-625 The Charter should be based on the attached document. The .docxIT-625 The Charter should be based on the attached document. The .docx
IT-625 The Charter should be based on the attached document. The .docx
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docx
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docxRunning head INSERT TITLE HERE1INSERT TITLE HERE17.docx
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docx
 
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docx
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docxRunning head INSERT TITLE HERE1INSERT TITLE HERE17.docx
Running head INSERT TITLE HERE1INSERT TITLE HERE17.docx
 
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
IDENTIFICATION AND MITIGATION OF FACTORS AFFECTING HUMAN RESOURCE PRODUCTIVIT...
 
MBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docxMBA 6951, Managing Complex Projects 1 Course Learning.docx
MBA 6951, Managing Complex Projects 1 Course Learning.docx
 
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docxAssignment 3 Project PerformanceDue Week 8 and worth 150 .docx
Assignment 3 Project PerformanceDue Week 8 and worth 150 .docx
 
1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docx1092019 New Transcript Templatemedia.capella.educoursem.docx
1092019 New Transcript Templatemedia.capella.educoursem.docx
 
Pm0013 managing human resources in projects
Pm0013   managing human resources in projectsPm0013   managing human resources in projects
Pm0013 managing human resources in projects
 
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docxAssignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
Assignment 1AgileProjectCharterTemplateExample.pdfC Examp.docx
 
Pm assignment -5111570030
Pm assignment -5111570030Pm assignment -5111570030
Pm assignment -5111570030
 
Software Project Management: Project Initiation
Software Project Management: Project InitiationSoftware Project Management: Project Initiation
Software Project Management: Project Initiation
 
Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
IRJET-  	  Decision Making in Construction Management using AHP and Expert Ch...IRJET-  	  Decision Making in Construction Management using AHP and Expert Ch...
IRJET- Decision Making in Construction Management using AHP and Expert Ch...
 
WORK BREAKDOWN STRUCTURE .docx
WORK BREAKDOWN STRUCTURE                                          .docxWORK BREAKDOWN STRUCTURE                                          .docx
WORK BREAKDOWN STRUCTURE .docx
 
PurposeThis course project is intended to assess your abilit
PurposeThis course project is intended to assess your abilitPurposeThis course project is intended to assess your abilit
PurposeThis course project is intended to assess your abilit
 

More from Theresa Cline

Templar Knights Not Guilty Final Draft
Templar Knights Not Guilty Final DraftTemplar Knights Not Guilty Final Draft
Templar Knights Not Guilty Final DraftTheresa Cline
 
Templar Knight Crusaders Final Draft
Templar Knight Crusaders Final DraftTemplar Knight Crusaders Final Draft
Templar Knight Crusaders Final DraftTheresa Cline
 
Evidences Necessary to Authenticate a Divine Revelation Lesson Plan
Evidences Necessary to Authenticate a Divine Revelation Lesson PlanEvidences Necessary to Authenticate a Divine Revelation Lesson Plan
Evidences Necessary to Authenticate a Divine Revelation Lesson PlanTheresa Cline
 
Executive Summary and Design Document
Executive Summary and Design DocumentExecutive Summary and Design Document
Executive Summary and Design DocumentTheresa Cline
 
Instructional Strategies
Instructional StrategiesInstructional Strategies
Instructional StrategiesTheresa Cline
 
Week 4 Presentation (2)
Week 4 Presentation (2)Week 4 Presentation (2)
Week 4 Presentation (2)Theresa Cline
 

More from Theresa Cline (8)

Templar Knights Not Guilty Final Draft
Templar Knights Not Guilty Final DraftTemplar Knights Not Guilty Final Draft
Templar Knights Not Guilty Final Draft
 
Templar Knight Crusaders Final Draft
Templar Knight Crusaders Final DraftTemplar Knight Crusaders Final Draft
Templar Knight Crusaders Final Draft
 
Celly Lesson Plan
Celly Lesson PlanCelly Lesson Plan
Celly Lesson Plan
 
Evidences Necessary to Authenticate a Divine Revelation Lesson Plan
Evidences Necessary to Authenticate a Divine Revelation Lesson PlanEvidences Necessary to Authenticate a Divine Revelation Lesson Plan
Evidences Necessary to Authenticate a Divine Revelation Lesson Plan
 
Executive Summary and Design Document
Executive Summary and Design DocumentExecutive Summary and Design Document
Executive Summary and Design Document
 
Instructional Strategies
Instructional StrategiesInstructional Strategies
Instructional Strategies
 
Week 4 Presentation (2)
Week 4 Presentation (2)Week 4 Presentation (2)
Week 4 Presentation (2)
 
Celly in Education
Celly in EducationCelly in Education
Celly in Education
 

Entry Level Engineer Timeline Document

  • 1. Timeline 1 Entry-Level Engineer Project Timeline Project Manager vs. Instructional Designer “T”heresa Cline EDU 433 Kandi Wojtysiak 07/08/2013
  • 2. Timeline 2 Entry-Level Engineer Project Timeline Project Manager vs. Instructional Designer This client has explained his need for all “entry level engineers” to have a clear understanding of the requirements and need to follow OSHA (Occupational Safety and Health Administration) rules, need of the use of PPE’s (Personal Protective Equipment), and the proper usage of PPE’s that he and/or she uses in their daily job within the first seven days of employment. The client also wants a deliverable that can be used by the engineer team to immediately answer questions, do refresher training, and acquire knowledge of the new information concerning OSHA and PPE. After the “needs assessment,” I assigned both Mark (instructional designer) and John (web-developer) to research current OSHA and PPE that engineers use on a daily basis. OSHA is a federally regulated organization. Under the OSH Act, employers are responsible for providing a safe and healthful workplace. I assigned this task because, as a project manager, I cannot assume that the client is up-to-date on the current regulations concerning PPE for engineers in their workplace. Any found related updates will be included in the deliverables (United States Department Of Labor, (2013, para. 2).
  • 3. Timeline 3 As the project manager I have chosen for Mark to use the learner analysis of Smaldino, Lowther, and Russell approach (2009, as cited in Brown & Green, 2011). The Smaldino, Lowther, and Russell approach (2009, as cited in Brown & Green, 2011) states, “They suggest that the learner analysis should focus on three aspects of the target audience: general characteristics, specific entry competencies, and learning styles,” (p. 78). Mark was selected as a team member because I need an expert instructional designer to develop and execute the directed learning environment. I chose John (web-development expert) for a team member to meet the secondary deliverable. The “project sponsor”, accountant, procurement agent, technical specialist, and the engineer trainer were selected by the client. In conclusion, the details of the project plan can be found in the timeline I created. You can link to it by clicking on the following link http://timeglider.com/timeline/10918d73ff0dbb42. The evidence required from the text is in the descriptions on my timeline.
  • 4. Timeline 4 References Brown, A., & Green, T. (2011). The essentials of instructional designer: Connecting fundamental principles with process and practice. Boston, MA: Pearson. United States Department of Labor. (2013). Occupational Safety & Health Administration. Retrieved from https://www.osha.gov/law-regs.html. Westland, J. (2007). The project management life cycle: A complete step-by-step methodology for initiating, planning, executing & closing a project successfully. Philadelphia, PA: Kogan Page, Ltd.