SlideShare a Scribd company logo
1 of 16
Download to read offline
Case studies
Commercial
water heating
Rinnai is constantly improving its products, and as such,
information and specifications are subject to change
without notice.
For more information contact 0800 RINNAI
(0800 746 624).
Rinnai New Zealand Limited
105 Pavilion Drive, Mangere, Auckland
PO Box 53177, Auckland Airport, Auckland 2150
Phone:	 (09) 257 3800
Email: 		 info@rinnai.co.nz
Web:		 www.rinnai.co.nz
		www.youtube.com/rinnainz
		www.facebook.com/rinnainz
Important
Rinnai has a specification service, which provides advice
on plans for positioning and requirements for hot
water and space heating for residential and commercial
projects. Contact our customer services team or email
info@rinnai.co.nz with 'Request for specification' in the
subject line, along with a set of plans if you have them.
Specification service
Help is here
contents:Demand Direct
Mt Smart Stadium - Auckland.......................... 4
NZ Army marae - Waiouru................................ 5
Vector Wero Whitewater Park - Auckland........ 6
Sports clubs...................................................... 7
Pitango Soup plant relocation - Auckland.......... 8
Plant & Food Research - Auckland.................... 9
Demand Duo
Bishop Julius Hall - Canterbury........................ 10
Shieling Laboratories - Auckland..................... 11
Sports clubs - Les Mills Howick Auckland........ 12
Nga Taiohi youth forensic unit - Porirua............. 13
Continuous flow with storage backup
Queens Residences - Auckland........................ 14
Demand Rapid
Oxford Court Lifecare Village - Dunedin ......... 15
4 | Rinnai commercial case studies 01-16
Mt Smart Stadium - Auckland
Demand Direct internal manifold system
Change facility upgrade
Solution summary
•	 2 x Demand Direct HDi600 pre-assembled
manifold systems
•	 Rinnai commercial natural draft common flue
Hot water requirement
Hot water on demand producing 72 litres per minute at 42 °C
for male and female changing rooms.
Solution needed to be cost effective with minimal visual
disturbance to the roof line.
The Mt Smart Stadium upgrade
was part of an initiative to
develop a larger sports stadium
with an aim to create a facility to
accommodate community sport,
athletics, rugby league, football,
and NZ Police training as well as
sports competitions.
The change facility upgrade
included two changing rooms
large enough for 35 players,
expanded public toilets, first aid,
and drug testing facilities.
Rinnai solution
Two pre-assembled systems, enabling easy installation, with
three Rinnai INFINITY HDi200 internal units manifolded
together. A common natural draft flue system, venting air
through a common header was used to eliminate the need
to flue each unit separately, and to reduce the number of
penetrations through the roof.
Installation details
•	 Date of installation	 November 2015
•	 Installer			 W Mattson Plumbing Ltd
•	 Specifier			 Burr Mechanical Consulting Limited
Quick and easy installation with
pre-assembled systems and
common flue.
Rinnai commercial case studies 01-16 | 5
NZ Army marae - Waiouru
Demand Direct external manifold system
New hot water system
Solution summary
•	 1 x Demand Direct HD600 pre-assembled manifold system
Hot water requirement
Hot water system for simultaneous use of the following:
•	 6 x showers and sinks
•	 2 x washing machines
Peak usage hours with high demand—low use in other periods.NZ Army marae based in Waiouru.
The complex comprises of a
wharenui (meeting house),
wharehoroi (ablutions), and
wharekai (dining hall). It will
cater for more than one hundred
people.
Rinnai solution
Demand Direct HD600, comprised of three Rinnai INFINITY
HD200 external units. The HD units are mounted and fully
assembled to pre-engineered frames with foam insulated
pipes. This system comes with manifold electronic control
staging, so only the required number of water heaters start to
match the demand for hot water. The sequence is rotated so
there is even use of each water heater.
Installation details
•	 Date of installation	 March 2015
•	 Installer			 New Zealand Defence Force
•	 Specifier			 Rinnai NZ Ltd
Pre-engineered, fully assembled
and insulated, all ready to be
plumbed in.
6 | Rinnai commercial case studies 01-16
Vector Wero Whitewater Park - Auckland
Demand Direct internal condensing manifold system
Lower operating cost hot water solution
Solution summary
•	 1 x Demand Direct EFi630 internal condensing manifold
system
•	 1 x EF250 external
Hot water requirement
•	 Hot water for changing rooms
•	 Hot water for kitchen and hand wash station
As the site operated on LPG bottles there was a requirement for
the units to be as efficient as possible, as well as having a small
installation foot print.
Vector Wero Whitewater Park,
located next to the Vodfone
Events Centre in Manukau.
The park is New Zealand's first
purpose-built whitewater facility.
It has two rivers to suit different
skill levels, and offers rafting,
stand-up paddleboarding, and
kayaking activities.
Rinnai solution
As efficiency was the main driver EF250 models were used.
These models, with condensing technology, have a thermal
efficiency of 95% as compared to 83% for the standard HD
models. The Demand Direct systems can also have a small
foot print. Removing the base skid the system can be installed
directly on a wall.
Installation details
•	 Date of installation	 May 2016
•	 Installer			 DH Wright Plumbing Ltd
•	 Specifier			 eCube Building Workshop Ltd
EFi250 condensing manifolded
units operate more efficiently
than standard HDi200 units,
saving on operational and life
cycle costs.
Rinnai commercial case studies 01-16 | 7
Sports clubs
Demand Direct 'on-demand' manifold systems
Only heating water as it is needed
Solution summary
•	 Demand Direct pre-assembled manifold system
Rinnai has on-demand systems for sports facilities that
provides hot water without the need to continally store and
heat water in cylinders. The Demand Direct system uses the
intelligence contained within the Rinnai INFINITY and the
manifold (MECS) system to control energy input and hot
water output. The MECS system will control up to five Rinnai
INFINITY water heaters, and banks of up to five can be installed
in parallel.
Running out of hot water on busy
days is a common problem for
sports clubs. Hot water usage
for most sports clubs center
around game or training times,
and for gyms, peak periods in the
morning and evening.
Recent Demand Direct
installations:
•	 Sumner Surf Club -
Christchurch
•	 Taieri Rugby Football Club -
Mosgiel
•	 Seddon Domain Rugby
changing room - Blenheim
•	 UOW High Performance Sports
Center - Tauranga
•	 Invercargill Rugby Club
•	 Victoria Park Rugby Club -
Palmerston North
Once the Demand Direct system is installed clubs can look
forward to an endless supply of hot water when they need
it. The system's compact design makes it simple to install
and operates only when needed, saving energy and ongoing
running costs.
The manifold electronic control
system will turn on each unit
as required to meet demand,
efficiently controlling energy
use.
8 | Rinnai commercial case studies 01-16
Pitango Soup plant relocation - Auckland
Demand Direct internal manifold system
New hot water solution
Solution summary
•	 1 x Demand Direct HD1000 pre-assembled manifold system
•	 1 x Demand Direct HD400 pre-assembled manifold system
Hot water requirement
•	 1000 litres every 15 minutes at 60 °C
•	 40 litres per minute at 45 °C
As a new development the engineer had a requirement for a
heavy duty efficient system to be installed in a roof space.
Pitango started 15 years ago
selling fresh homemade soup
from the back of a van. Using
the freshest of ingredients and
making all their stocks from
scratch, it's hard to miss their
colourful soups and meals in
supermarket chillers.
Rinnai solution
Two separate pre-assembled skid systems were designed to be
easily installed into the roof space. One system was dedicated
to provide hot water for food processing and the other for
washing down equipment.
Installation details
•	 Date of installation	 May 2015
•	 Installer			 Ariel Plumbing & Gasfitting
•	 Specifier			 TEG Pty Australia
Rinnai INFINITY HDi200
units can be installed almost
anywhere. These units were
installed in a roof space and
flued through the roof.
Rinnai commercial case studies 01-16 | 9
Plant & Food Research - Auckland
Demand Direct internal condensing manifold system
New hot water system
Solution summary
•	 1 x Demand Direct EF420 internal condensing manifold
system
•	 2 x Demand Direct EF620 internal condensing manifold
system
•	 BMS error indication switch
Hot water requirement
Three hot water systems, two supplying domestic hot water for
the Hamilton and Cunningham buildings, and one hot water
system dedicated to the laboratory.
Plant & Food Research decided
to re-purpose two major
buildings at their Mt Albert
campus. The largest building
is the seven storey Hamilton
building, which is undergoing
significant remediation work,
and the Cunningham Building
that converted office and storage
space into new social and formal
meeting areas.
Rinnai solution
Pre-assembled system with a 315 L storage cylinder and Rinnai
INFINITY EFi250 internal condensing units (DD420 - 2 x EFi250,
DD620 - 3 x EFi250). The EF units were flued individually—
terminating horizontally. The systems were also specified with
a built-in BMS error indicator switch.
Installation details
•	 Date of installation	 March 2016
•	 Installer			Hanlon Plumbing
•	 Specifier			 eCubed Building Workshop Ltd
Systems can be easily scaled
to cater for different hot water
demands.
10 | Rinnai commercial case studies 01-16
Bishop Julius Hall - Canterbury
Demand Duo internal
Halls of residence
Solution summary
A Demand Duo continuous flow with storage backup system
comprised of:
•	 1 x 315 L storage cylinder
•	 4 x Rinnai INFINITY HDi200 internal water heaters
Hot water requirement
Hot water system to meet peak hour demand for a sixty bed
accommodation block equipped with high performance
showers and basins.
Bishop Julius Hall has been
serving the University of
Canterbury students for almost
one hundred years. The new
sixty bed block building has been
engineered by Cosgroves based
in Christchurch.
Rinnai solution
A Demand Duo system that uses a combination of four Rinnai
INFINITY HDi200 internal units, a 315 L storage backup cylinder,
and individual flueing terminating horizontally through a wall.
This type of system is used where the total water demand
during the day's peak hot water period is known, but the rate
of use varies.
Installation details
•	 Date of installation	 December 2015
•	 Installer			HPPS Ltd
•	 Specifier			Cosgroves Limited
The system offers the flexibility
of sizing the appropriate
number of Rinnai INFINITY
water heaters and different
hot water storage capacities
to supply specific hot water
volumes.
Rinnai commercial case studies 01-16 | 11
Shieling Laboratories - Auckland
Customised Demand Duo
Hot water system upgrade
Solution summary
•	 1 x Demand Direct HD750 manifold system set at 85 °C
•	 1 x 2000 L stainless steel tank (not supplied by Rinnai)
•	 1 x DDSTAT hot water system controller
•	 2 x pumps (for duty and standby)
Hot water requirement
According to Oliver Hoffman (MD), the old system was
impractical, inefficient and needed an upgrade. Rinnai was
requested to design a centralised hot water system capable of
delivering 150 L/min. at 70 °C per batch, or deliver 1200-1600
litres of 70 °C water during peak hour demand. The system also
needed to be located outside.
Shieling Laboratories are New
Zealand's leading contract
manufacturer of skincare
cosmetics, toiletries and personal
care products, providing
innovation, and quality products
to New Zealand's leading brands
and retailers.
Rinnai solution
Three Rinnai INFINITY HD250 external units manifolded, set at
85 °C, were combined with a 2000 L stainless steel buffer tank,
which was set at 75 °C. The HD250 units provided the total hot
water requirements, with the tank allowing for peak demand.
The hot water system is capable of delivering approximately
4000 L at 75 °C in the first hour, then 2400 L every hour after
that.
Installation details
•	 Date of installation	 December 2015
•	 Installer			 PBJ Industries Ltd
•	 Specifier			 Rinnai NZ Ltd
Flexible system that can
integrate easily with other hot
water system components.
12 | Rinnai commercial case studies 01-16
Sports clubs - Les Mills Howick Auckland
Customised Demand Duo
New hot water ring main system
Solution summary
•	 1 x Demand Direct DD1000 pre-assembled 50 mm manifold
system
•	 Commercial XL buffer cylinder
•	 1 x DDTSTAT controller
Hot water requirement
Centralised hot water plant to serve shower blocks, a laundry,
and dish washing sinks. The expected hot water demand of
8240 L/hr at 40 °C occurs during the peak 1-2 hour period in
the mornings and evenings.
First opening in 1968, Les Mills
gyms now have 12 New Zealand
owned and operated clubs
throughout the country.
Rinnai has also developed hot
water systems for the Takapuna
and Newmarket gyms.
Rinnai solution
Demand Duo system with a combination of four Rinnai
INFINITY HD250 external continuous flow gas water heaters
with a large XL storage cylinder. The storage cylinder is
available to accommodate high peak flow rates for short
periods of time. The system delivers 8880 L/hr at 40 °C in the
first hour, then 7650 L/hr at 40 °C every hour after that.
Installation details
•	 Date of installation	 April 2016
•	 Installer			 Southern Cross Plumbing,
				 Amazon Plumbing & Gas,
				Quix Plumbing Ltd
•	 Specifier			 Rinnai NZ Ltd
Customised system allows the
water heaters to be mounted
externally on a roof, 10 m away
from the tank and pump, which
are installed in a small plant room.
Rinnai commercial case studies 01-16 | 13
Nga Taiohi youth forensic unit - Porirua
Customised Demand Duo internal hot water system
New customised hot water system
Solution summary
•	 1 x HD800 pre-assembled manifold system
•	 1 x 1000 L XL cylinder
•	 1 x BMS error indication switch
•	 1 x DDSTAT hot water system controller
Hot water requirement
Due to site restrictions the main criteria, aside from hot water
supply, was to develop a BMS system, which could be operated
remotely. The Rinnai error indication switch will advise the
status of the system and report any fault issues associated
within each unit, and provide a signal to the building
management system.
Nga Taiohi youth inpatient mental
health service is a new purpose
built specialist ten bed unit for
the treatment of youth offenders
with mental health and drug and
alcohol issues.
Rinnai solution
The HD800 is made up of four Rinnai INFINITY HDi200 internal
units, each individually flued with a horizontal flue termination.
The units are manifolded and connected to a Rinnai BMS error
indication switch. The HD800 system is connected to a 1000 L
XL cylinder with a DDSTAT thermostat/controller.
Installation details
•	 Date of installation	 March 2016
•	 Installer			 John Leen Plumbing Ltd
•	 Specifier			Pacific Consultants
BMS error indication switch can
be connected to a BMS system
to trigger an alarm when an
error has occurred with the hot
water system.
14 | Rinnai commercial case studies 01-16
Queens Residences - Auckland
Continuous flow with storage backup
Queen Street apartments
Solution summary
•	 1 x internal back-to-back pre-assembled manifold system
•	 Rinnai commercial fan assisted common flue system
•	 6 x 350 L cylinders (not supplied by Rinnai)
Hot water requirement
Hot water system to serve 250 apartments.
The initial design comprised of two boilers, common flue, and
storage tanks, however inability by the manufacturer to supply
a flue system meant an alternate design with a small footprint
was required.
The Queens Residences is
an iconic landmark building
welcoming you home to a
vertical village. Designed by
award winning Leuschke Group
architects, Queens Residences
comprises a $150 million planned
new residential and retail
development located on Queen
Street.
Rinnai solution
A pre-assembled back-to-back skid containing two banks
of four Rinnai INFINITY HDi200 internal units manifolded
together. The restricted space and enclosed area required
the units to be flued with a Rinnai commercial fan assisted
common flue system.
Installation details
•	 Date of installation	 May 2016
•	 Installer			 Hanlon Plumbing Ltd
•	 Specifier			 Hydraulic Services Consultants
				NZ Limited
Hydraulic engineer likes the
small footprint that the back-
to-back system offers and is
considering using this type
of system again for another
apartment project.
Rinnai commercial case studies 01-16 | 15
Oxford Court Lifecare village - Dunedin
Demand Rapid and Demand Duo
Two separate hot water systems
Solution summary
•	 1 x Demand Rapid (DD1200E315L) system
•	 1 x Demand Duo 600 external pre-assembled manifold
system
Hot water requirement
The design requirement was to provide hot water to the 48
room care facility, and a separate system for the kitchen and
laundry area. Only 8-10 residents shower at one time, so hot
water demand has been calculated on this simultaneous use as
opposed to the full 48 room capacity.
Oxford Court Lifecare is a
purpose built facility providing
rest home and hospital care. Their
existing 1997 hot water system
was undersized and in need of an
upgrade to cope with increased
demand.
Rinnai solution
A DD600 external system was specified for the care facility to
meet peak hour demand. The DD600 will provide 2379 L/hr at
60 °C, incoming water temperature calculated for worst case
scenario in winter of 5 °C. A dedicated Rinnai Demand Rapid
system was specified for the commercial kitchen and laundry
facility where a large volume of water is needed quickly, with
recovery time before being used again.
Installation details
•	 Date of installation	 April 2016
•	 Installer			 Gas & Water Ltd - Dunedin
•	 Specifier			 Rinnai NZ Ltd
Cater for smaller hot water
requirements with a separate
Rinnai Demand Rapid system,
shown on the far right of the
photo.
Rinnai.co.nz
Experience our innovation
0800 746 624
http://www.youtube.com/rinnainz
http://www.facebook.com/rinnainz

More Related Content

What's hot

DEGRÉMONT FOOD AND BEVERAGE BROCHURE
 DEGRÉMONT FOOD AND BEVERAGE BROCHURE DEGRÉMONT FOOD AND BEVERAGE BROCHURE
DEGRÉMONT FOOD AND BEVERAGE BROCHURERick Nabett
 
Arkos _ Compressor Maintenance
Arkos _ Compressor MaintenanceArkos _ Compressor Maintenance
Arkos _ Compressor MaintenanceMatt Koshinski
 
Consolidated power srvc_valves_brochure_0512
Consolidated power srvc_valves_brochure_0512Consolidated power srvc_valves_brochure_0512
Consolidated power srvc_valves_brochure_0512Juan Carlos Elías
 
Supplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsSupplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsDustin Powell, MBA
 
Commercial Building Services
Commercial Building ServicesCommercial Building Services
Commercial Building ServicesGraeme Simmers
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONStigmena
 
Culligan Hi-Flo3 water softener
Culligan Hi-Flo3 water softenerCulligan Hi-Flo3 water softener
Culligan Hi-Flo3 water softenerMichael Beckermann
 
Air handlings units catalogue
Air handlings units catalogueAir handlings units catalogue
Air handlings units cataloguenuairedigital
 
Single Use System 2008 Interphex
Single Use System  2008 InterphexSingle Use System  2008 Interphex
Single Use System 2008 Interphexmadhmad
 
Elgin Water Solutions Presentation
Elgin Water Solutions PresentationElgin Water Solutions Presentation
Elgin Water Solutions PresentationJohn McNeill
 
CIP article from food engineering magazine Jan 2015
CIP article from food engineering magazine Jan 2015CIP article from food engineering magazine Jan 2015
CIP article from food engineering magazine Jan 2015ola wesstrom
 
Burton progress in water conservation 2010 2013-final
Burton progress in water conservation 2010 2013-finalBurton progress in water conservation 2010 2013-final
Burton progress in water conservation 2010 2013-finalAaron Burton
 
VEOLIA WATER TECHNOLOGIES ITALIA Solutions Division Company profile
VEOLIA WATER TECHNOLOGIES ITALIA Solutions Division Company profile VEOLIA WATER TECHNOLOGIES ITALIA Solutions Division Company profile
VEOLIA WATER TECHNOLOGIES ITALIA Solutions Division Company profile Erika Favero
 
Upgrading A Cosmetic Industry Water System to Meet
Upgrading A Cosmetic Industry Water System to MeetUpgrading A Cosmetic Industry Water System to Meet
Upgrading A Cosmetic Industry Water System to MeetChris Gallagher
 
Aspen Final Presentation Master
Aspen Final Presentation MasterAspen Final Presentation Master
Aspen Final Presentation MasterMichael Fedorenko
 
Carbonated Softdrinks and ECA technology (CIP)
Carbonated Softdrinks and ECA technology (CIP)Carbonated Softdrinks and ECA technology (CIP)
Carbonated Softdrinks and ECA technology (CIP)Radical Waters
 
Hindustan coca cola-beverages_private_limited_goblej
Hindustan coca cola-beverages_private_limited_goblejHindustan coca cola-beverages_private_limited_goblej
Hindustan coca cola-beverages_private_limited_goblejharsh patel
 

What's hot (20)

DEGRÉMONT FOOD AND BEVERAGE BROCHURE
 DEGRÉMONT FOOD AND BEVERAGE BROCHURE DEGRÉMONT FOOD AND BEVERAGE BROCHURE
DEGRÉMONT FOOD AND BEVERAGE BROCHURE
 
Arkos _ Compressor Maintenance
Arkos _ Compressor MaintenanceArkos _ Compressor Maintenance
Arkos _ Compressor Maintenance
 
Consolidated power srvc_valves_brochure_0512
Consolidated power srvc_valves_brochure_0512Consolidated power srvc_valves_brochure_0512
Consolidated power srvc_valves_brochure_0512
 
Supplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsSupplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment Needs
 
Commercial Building Services
Commercial Building ServicesCommercial Building Services
Commercial Building Services
 
TIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONSTIG GROUP | TOTAL SITE SOLUTIONS
TIG GROUP | TOTAL SITE SOLUTIONS
 
Veolia Industrial Capabilities Brochure
Veolia Industrial Capabilities BrochureVeolia Industrial Capabilities Brochure
Veolia Industrial Capabilities Brochure
 
Culligan Hi-Flo3 water softener
Culligan Hi-Flo3 water softenerCulligan Hi-Flo3 water softener
Culligan Hi-Flo3 water softener
 
Air handlings units catalogue
Air handlings units catalogueAir handlings units catalogue
Air handlings units catalogue
 
Single Use System 2008 Interphex
Single Use System  2008 InterphexSingle Use System  2008 Interphex
Single Use System 2008 Interphex
 
Elgin Water Solutions Presentation
Elgin Water Solutions PresentationElgin Water Solutions Presentation
Elgin Water Solutions Presentation
 
Mita Water Technologies
Mita Water TechnologiesMita Water Technologies
Mita Water Technologies
 
CIP article from food engineering magazine Jan 2015
CIP article from food engineering magazine Jan 2015CIP article from food engineering magazine Jan 2015
CIP article from food engineering magazine Jan 2015
 
Michael Thompson, RARE Technologies
Michael Thompson, RARE TechnologiesMichael Thompson, RARE Technologies
Michael Thompson, RARE Technologies
 
Burton progress in water conservation 2010 2013-final
Burton progress in water conservation 2010 2013-finalBurton progress in water conservation 2010 2013-final
Burton progress in water conservation 2010 2013-final
 
VEOLIA WATER TECHNOLOGIES ITALIA Solutions Division Company profile
VEOLIA WATER TECHNOLOGIES ITALIA Solutions Division Company profile VEOLIA WATER TECHNOLOGIES ITALIA Solutions Division Company profile
VEOLIA WATER TECHNOLOGIES ITALIA Solutions Division Company profile
 
Upgrading A Cosmetic Industry Water System to Meet
Upgrading A Cosmetic Industry Water System to MeetUpgrading A Cosmetic Industry Water System to Meet
Upgrading A Cosmetic Industry Water System to Meet
 
Aspen Final Presentation Master
Aspen Final Presentation MasterAspen Final Presentation Master
Aspen Final Presentation Master
 
Carbonated Softdrinks and ECA technology (CIP)
Carbonated Softdrinks and ECA technology (CIP)Carbonated Softdrinks and ECA technology (CIP)
Carbonated Softdrinks and ECA technology (CIP)
 
Hindustan coca cola-beverages_private_limited_goblej
Hindustan coca cola-beverages_private_limited_goblejHindustan coca cola-beverages_private_limited_goblej
Hindustan coca cola-beverages_private_limited_goblej
 

Similar to Commercial water heating case studies

PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)Matt Kirkbride
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetDeanDallwitz
 
New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USKristopher Vardell
 
IHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant OptimisationIHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant OptimisationHydroChem
 
Green Warmth's 10 minute Presentation for BNi January 15
Green Warmth's 10 minute Presentation for BNi January 15 Green Warmth's 10 minute Presentation for BNi January 15
Green Warmth's 10 minute Presentation for BNi January 15 BNi Pembrokeshire
 
TECHNICAL REPORT (Autosaved)
TECHNICAL REPORT (Autosaved)TECHNICAL REPORT (Autosaved)
TECHNICAL REPORT (Autosaved)Divya Haridas
 
ICS Heat Pump Technology Product Guide Feb 2011
ICS Heat Pump Technology Product Guide Feb 2011ICS Heat Pump Technology Product Guide Feb 2011
ICS Heat Pump Technology Product Guide Feb 2011markpartridge
 
Recoup WWHRS: Products overview: New-build and retrofit options
Recoup WWHRS: Products overview: New-build and retrofit optionsRecoup WWHRS: Products overview: New-build and retrofit options
Recoup WWHRS: Products overview: New-build and retrofit optionsRecoup WWHRS
 
Equilibrium-Air-Conditioning Macquarie Centre
Equilibrium-Air-Conditioning Macquarie CentreEquilibrium-Air-Conditioning Macquarie Centre
Equilibrium-Air-Conditioning Macquarie CentreRobert Pham
 
PROSPECT WATER FILTRATION PLANT (NSW)
PROSPECT WATER FILTRATION PLANT (NSW)PROSPECT WATER FILTRATION PLANT (NSW)
PROSPECT WATER FILTRATION PLANT (NSW)Rick Nabett
 
Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing hrl:
 
Airius in Manufacturing & Engineering
Airius in Manufacturing & EngineeringAirius in Manufacturing & Engineering
Airius in Manufacturing & EngineeringAirius Europe Ltd
 
Hydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdfHydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdfDaniel Donatelli
 
Airius and Local Authorities
Airius and Local AuthoritiesAirius and Local Authorities
Airius and Local AuthoritiesAirius Europe Ltd
 
Kitchen Design Workshop - Brian Lennox
Kitchen Design Workshop - Brian LennoxKitchen Design Workshop - Brian Lennox
Kitchen Design Workshop - Brian LennoxProfitable Hospitality
 
Nidec asi corporate energy efficient power solutions
Nidec asi corporate energy   efficient power solutionsNidec asi corporate energy   efficient power solutions
Nidec asi corporate energy efficient power solutionsNidec Corporation
 

Similar to Commercial water heating case studies (20)

R-PRWH-E-14
R-PRWH-E-14R-PRWH-E-14
R-PRWH-E-14
 
PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)
 
Barangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact SheetBarangaroo South District Cooling Plant (DCP) Fact Sheet
Barangaroo South District Cooling Plant (DCP) Fact Sheet
 
New Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 USNew Wave Energy Services Ltd. Presentation 2016 US
New Wave Energy Services Ltd. Presentation 2016 US
 
IPS_EngVersion
IPS_EngVersionIPS_EngVersion
IPS_EngVersion
 
IHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant OptimisationIHEA Robina Hospital Chiller Plant Optimisation
IHEA Robina Hospital Chiller Plant Optimisation
 
Green Warmth's 10 minute Presentation for BNi January 15
Green Warmth's 10 minute Presentation for BNi January 15 Green Warmth's 10 minute Presentation for BNi January 15
Green Warmth's 10 minute Presentation for BNi January 15
 
TECHNICAL REPORT (Autosaved)
TECHNICAL REPORT (Autosaved)TECHNICAL REPORT (Autosaved)
TECHNICAL REPORT (Autosaved)
 
ICS Heat Pump Technology Product Guide Feb 2011
ICS Heat Pump Technology Product Guide Feb 2011ICS Heat Pump Technology Product Guide Feb 2011
ICS Heat Pump Technology Product Guide Feb 2011
 
Recoup WWHRS: Products overview: New-build and retrofit options
Recoup WWHRS: Products overview: New-build and retrofit optionsRecoup WWHRS: Products overview: New-build and retrofit options
Recoup WWHRS: Products overview: New-build and retrofit options
 
Equilibrium-Air-Conditioning Macquarie Centre
Equilibrium-Air-Conditioning Macquarie CentreEquilibrium-Air-Conditioning Macquarie Centre
Equilibrium-Air-Conditioning Macquarie Centre
 
Ice esc online version
Ice esc online versionIce esc online version
Ice esc online version
 
PROSPECT WATER FILTRATION PLANT (NSW)
PROSPECT WATER FILTRATION PLANT (NSW)PROSPECT WATER FILTRATION PLANT (NSW)
PROSPECT WATER FILTRATION PLANT (NSW)
 
Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing Energy cost reduction offering industrial manufacturing
Energy cost reduction offering industrial manufacturing
 
Airius in Manufacturing & Engineering
Airius in Manufacturing & EngineeringAirius in Manufacturing & Engineering
Airius in Manufacturing & Engineering
 
Dermarkar
DermarkarDermarkar
Dermarkar
 
Hydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdfHydrogen Heat to Power.pdf
Hydrogen Heat to Power.pdf
 
Airius and Local Authorities
Airius and Local AuthoritiesAirius and Local Authorities
Airius and Local Authorities
 
Kitchen Design Workshop - Brian Lennox
Kitchen Design Workshop - Brian LennoxKitchen Design Workshop - Brian Lennox
Kitchen Design Workshop - Brian Lennox
 
Nidec asi corporate energy efficient power solutions
Nidec asi corporate energy   efficient power solutionsNidec asi corporate energy   efficient power solutions
Nidec asi corporate energy efficient power solutions
 

Commercial water heating case studies

  • 2. Rinnai is constantly improving its products, and as such, information and specifications are subject to change without notice. For more information contact 0800 RINNAI (0800 746 624). Rinnai New Zealand Limited 105 Pavilion Drive, Mangere, Auckland PO Box 53177, Auckland Airport, Auckland 2150 Phone: (09) 257 3800 Email: info@rinnai.co.nz Web: www.rinnai.co.nz www.youtube.com/rinnainz www.facebook.com/rinnainz Important Rinnai has a specification service, which provides advice on plans for positioning and requirements for hot water and space heating for residential and commercial projects. Contact our customer services team or email info@rinnai.co.nz with 'Request for specification' in the subject line, along with a set of plans if you have them. Specification service Help is here
  • 3. contents:Demand Direct Mt Smart Stadium - Auckland.......................... 4 NZ Army marae - Waiouru................................ 5 Vector Wero Whitewater Park - Auckland........ 6 Sports clubs...................................................... 7 Pitango Soup plant relocation - Auckland.......... 8 Plant & Food Research - Auckland.................... 9 Demand Duo Bishop Julius Hall - Canterbury........................ 10 Shieling Laboratories - Auckland..................... 11 Sports clubs - Les Mills Howick Auckland........ 12 Nga Taiohi youth forensic unit - Porirua............. 13 Continuous flow with storage backup Queens Residences - Auckland........................ 14 Demand Rapid Oxford Court Lifecare Village - Dunedin ......... 15
  • 4. 4 | Rinnai commercial case studies 01-16 Mt Smart Stadium - Auckland Demand Direct internal manifold system Change facility upgrade Solution summary • 2 x Demand Direct HDi600 pre-assembled manifold systems • Rinnai commercial natural draft common flue Hot water requirement Hot water on demand producing 72 litres per minute at 42 °C for male and female changing rooms. Solution needed to be cost effective with minimal visual disturbance to the roof line. The Mt Smart Stadium upgrade was part of an initiative to develop a larger sports stadium with an aim to create a facility to accommodate community sport, athletics, rugby league, football, and NZ Police training as well as sports competitions. The change facility upgrade included two changing rooms large enough for 35 players, expanded public toilets, first aid, and drug testing facilities. Rinnai solution Two pre-assembled systems, enabling easy installation, with three Rinnai INFINITY HDi200 internal units manifolded together. A common natural draft flue system, venting air through a common header was used to eliminate the need to flue each unit separately, and to reduce the number of penetrations through the roof. Installation details • Date of installation November 2015 • Installer W Mattson Plumbing Ltd • Specifier Burr Mechanical Consulting Limited Quick and easy installation with pre-assembled systems and common flue.
  • 5. Rinnai commercial case studies 01-16 | 5 NZ Army marae - Waiouru Demand Direct external manifold system New hot water system Solution summary • 1 x Demand Direct HD600 pre-assembled manifold system Hot water requirement Hot water system for simultaneous use of the following: • 6 x showers and sinks • 2 x washing machines Peak usage hours with high demand—low use in other periods.NZ Army marae based in Waiouru. The complex comprises of a wharenui (meeting house), wharehoroi (ablutions), and wharekai (dining hall). It will cater for more than one hundred people. Rinnai solution Demand Direct HD600, comprised of three Rinnai INFINITY HD200 external units. The HD units are mounted and fully assembled to pre-engineered frames with foam insulated pipes. This system comes with manifold electronic control staging, so only the required number of water heaters start to match the demand for hot water. The sequence is rotated so there is even use of each water heater. Installation details • Date of installation March 2015 • Installer New Zealand Defence Force • Specifier Rinnai NZ Ltd Pre-engineered, fully assembled and insulated, all ready to be plumbed in.
  • 6. 6 | Rinnai commercial case studies 01-16 Vector Wero Whitewater Park - Auckland Demand Direct internal condensing manifold system Lower operating cost hot water solution Solution summary • 1 x Demand Direct EFi630 internal condensing manifold system • 1 x EF250 external Hot water requirement • Hot water for changing rooms • Hot water for kitchen and hand wash station As the site operated on LPG bottles there was a requirement for the units to be as efficient as possible, as well as having a small installation foot print. Vector Wero Whitewater Park, located next to the Vodfone Events Centre in Manukau. The park is New Zealand's first purpose-built whitewater facility. It has two rivers to suit different skill levels, and offers rafting, stand-up paddleboarding, and kayaking activities. Rinnai solution As efficiency was the main driver EF250 models were used. These models, with condensing technology, have a thermal efficiency of 95% as compared to 83% for the standard HD models. The Demand Direct systems can also have a small foot print. Removing the base skid the system can be installed directly on a wall. Installation details • Date of installation May 2016 • Installer DH Wright Plumbing Ltd • Specifier eCube Building Workshop Ltd EFi250 condensing manifolded units operate more efficiently than standard HDi200 units, saving on operational and life cycle costs.
  • 7. Rinnai commercial case studies 01-16 | 7 Sports clubs Demand Direct 'on-demand' manifold systems Only heating water as it is needed Solution summary • Demand Direct pre-assembled manifold system Rinnai has on-demand systems for sports facilities that provides hot water without the need to continally store and heat water in cylinders. The Demand Direct system uses the intelligence contained within the Rinnai INFINITY and the manifold (MECS) system to control energy input and hot water output. The MECS system will control up to five Rinnai INFINITY water heaters, and banks of up to five can be installed in parallel. Running out of hot water on busy days is a common problem for sports clubs. Hot water usage for most sports clubs center around game or training times, and for gyms, peak periods in the morning and evening. Recent Demand Direct installations: • Sumner Surf Club - Christchurch • Taieri Rugby Football Club - Mosgiel • Seddon Domain Rugby changing room - Blenheim • UOW High Performance Sports Center - Tauranga • Invercargill Rugby Club • Victoria Park Rugby Club - Palmerston North Once the Demand Direct system is installed clubs can look forward to an endless supply of hot water when they need it. The system's compact design makes it simple to install and operates only when needed, saving energy and ongoing running costs. The manifold electronic control system will turn on each unit as required to meet demand, efficiently controlling energy use.
  • 8. 8 | Rinnai commercial case studies 01-16 Pitango Soup plant relocation - Auckland Demand Direct internal manifold system New hot water solution Solution summary • 1 x Demand Direct HD1000 pre-assembled manifold system • 1 x Demand Direct HD400 pre-assembled manifold system Hot water requirement • 1000 litres every 15 minutes at 60 °C • 40 litres per minute at 45 °C As a new development the engineer had a requirement for a heavy duty efficient system to be installed in a roof space. Pitango started 15 years ago selling fresh homemade soup from the back of a van. Using the freshest of ingredients and making all their stocks from scratch, it's hard to miss their colourful soups and meals in supermarket chillers. Rinnai solution Two separate pre-assembled skid systems were designed to be easily installed into the roof space. One system was dedicated to provide hot water for food processing and the other for washing down equipment. Installation details • Date of installation May 2015 • Installer Ariel Plumbing & Gasfitting • Specifier TEG Pty Australia Rinnai INFINITY HDi200 units can be installed almost anywhere. These units were installed in a roof space and flued through the roof.
  • 9. Rinnai commercial case studies 01-16 | 9 Plant & Food Research - Auckland Demand Direct internal condensing manifold system New hot water system Solution summary • 1 x Demand Direct EF420 internal condensing manifold system • 2 x Demand Direct EF620 internal condensing manifold system • BMS error indication switch Hot water requirement Three hot water systems, two supplying domestic hot water for the Hamilton and Cunningham buildings, and one hot water system dedicated to the laboratory. Plant & Food Research decided to re-purpose two major buildings at their Mt Albert campus. The largest building is the seven storey Hamilton building, which is undergoing significant remediation work, and the Cunningham Building that converted office and storage space into new social and formal meeting areas. Rinnai solution Pre-assembled system with a 315 L storage cylinder and Rinnai INFINITY EFi250 internal condensing units (DD420 - 2 x EFi250, DD620 - 3 x EFi250). The EF units were flued individually— terminating horizontally. The systems were also specified with a built-in BMS error indicator switch. Installation details • Date of installation March 2016 • Installer Hanlon Plumbing • Specifier eCubed Building Workshop Ltd Systems can be easily scaled to cater for different hot water demands.
  • 10. 10 | Rinnai commercial case studies 01-16 Bishop Julius Hall - Canterbury Demand Duo internal Halls of residence Solution summary A Demand Duo continuous flow with storage backup system comprised of: • 1 x 315 L storage cylinder • 4 x Rinnai INFINITY HDi200 internal water heaters Hot water requirement Hot water system to meet peak hour demand for a sixty bed accommodation block equipped with high performance showers and basins. Bishop Julius Hall has been serving the University of Canterbury students for almost one hundred years. The new sixty bed block building has been engineered by Cosgroves based in Christchurch. Rinnai solution A Demand Duo system that uses a combination of four Rinnai INFINITY HDi200 internal units, a 315 L storage backup cylinder, and individual flueing terminating horizontally through a wall. This type of system is used where the total water demand during the day's peak hot water period is known, but the rate of use varies. Installation details • Date of installation December 2015 • Installer HPPS Ltd • Specifier Cosgroves Limited The system offers the flexibility of sizing the appropriate number of Rinnai INFINITY water heaters and different hot water storage capacities to supply specific hot water volumes.
  • 11. Rinnai commercial case studies 01-16 | 11 Shieling Laboratories - Auckland Customised Demand Duo Hot water system upgrade Solution summary • 1 x Demand Direct HD750 manifold system set at 85 °C • 1 x 2000 L stainless steel tank (not supplied by Rinnai) • 1 x DDSTAT hot water system controller • 2 x pumps (for duty and standby) Hot water requirement According to Oliver Hoffman (MD), the old system was impractical, inefficient and needed an upgrade. Rinnai was requested to design a centralised hot water system capable of delivering 150 L/min. at 70 °C per batch, or deliver 1200-1600 litres of 70 °C water during peak hour demand. The system also needed to be located outside. Shieling Laboratories are New Zealand's leading contract manufacturer of skincare cosmetics, toiletries and personal care products, providing innovation, and quality products to New Zealand's leading brands and retailers. Rinnai solution Three Rinnai INFINITY HD250 external units manifolded, set at 85 °C, were combined with a 2000 L stainless steel buffer tank, which was set at 75 °C. The HD250 units provided the total hot water requirements, with the tank allowing for peak demand. The hot water system is capable of delivering approximately 4000 L at 75 °C in the first hour, then 2400 L every hour after that. Installation details • Date of installation December 2015 • Installer PBJ Industries Ltd • Specifier Rinnai NZ Ltd Flexible system that can integrate easily with other hot water system components.
  • 12. 12 | Rinnai commercial case studies 01-16 Sports clubs - Les Mills Howick Auckland Customised Demand Duo New hot water ring main system Solution summary • 1 x Demand Direct DD1000 pre-assembled 50 mm manifold system • Commercial XL buffer cylinder • 1 x DDTSTAT controller Hot water requirement Centralised hot water plant to serve shower blocks, a laundry, and dish washing sinks. The expected hot water demand of 8240 L/hr at 40 °C occurs during the peak 1-2 hour period in the mornings and evenings. First opening in 1968, Les Mills gyms now have 12 New Zealand owned and operated clubs throughout the country. Rinnai has also developed hot water systems for the Takapuna and Newmarket gyms. Rinnai solution Demand Duo system with a combination of four Rinnai INFINITY HD250 external continuous flow gas water heaters with a large XL storage cylinder. The storage cylinder is available to accommodate high peak flow rates for short periods of time. The system delivers 8880 L/hr at 40 °C in the first hour, then 7650 L/hr at 40 °C every hour after that. Installation details • Date of installation April 2016 • Installer Southern Cross Plumbing, Amazon Plumbing & Gas, Quix Plumbing Ltd • Specifier Rinnai NZ Ltd Customised system allows the water heaters to be mounted externally on a roof, 10 m away from the tank and pump, which are installed in a small plant room.
  • 13. Rinnai commercial case studies 01-16 | 13 Nga Taiohi youth forensic unit - Porirua Customised Demand Duo internal hot water system New customised hot water system Solution summary • 1 x HD800 pre-assembled manifold system • 1 x 1000 L XL cylinder • 1 x BMS error indication switch • 1 x DDSTAT hot water system controller Hot water requirement Due to site restrictions the main criteria, aside from hot water supply, was to develop a BMS system, which could be operated remotely. The Rinnai error indication switch will advise the status of the system and report any fault issues associated within each unit, and provide a signal to the building management system. Nga Taiohi youth inpatient mental health service is a new purpose built specialist ten bed unit for the treatment of youth offenders with mental health and drug and alcohol issues. Rinnai solution The HD800 is made up of four Rinnai INFINITY HDi200 internal units, each individually flued with a horizontal flue termination. The units are manifolded and connected to a Rinnai BMS error indication switch. The HD800 system is connected to a 1000 L XL cylinder with a DDSTAT thermostat/controller. Installation details • Date of installation March 2016 • Installer John Leen Plumbing Ltd • Specifier Pacific Consultants BMS error indication switch can be connected to a BMS system to trigger an alarm when an error has occurred with the hot water system.
  • 14. 14 | Rinnai commercial case studies 01-16 Queens Residences - Auckland Continuous flow with storage backup Queen Street apartments Solution summary • 1 x internal back-to-back pre-assembled manifold system • Rinnai commercial fan assisted common flue system • 6 x 350 L cylinders (not supplied by Rinnai) Hot water requirement Hot water system to serve 250 apartments. The initial design comprised of two boilers, common flue, and storage tanks, however inability by the manufacturer to supply a flue system meant an alternate design with a small footprint was required. The Queens Residences is an iconic landmark building welcoming you home to a vertical village. Designed by award winning Leuschke Group architects, Queens Residences comprises a $150 million planned new residential and retail development located on Queen Street. Rinnai solution A pre-assembled back-to-back skid containing two banks of four Rinnai INFINITY HDi200 internal units manifolded together. The restricted space and enclosed area required the units to be flued with a Rinnai commercial fan assisted common flue system. Installation details • Date of installation May 2016 • Installer Hanlon Plumbing Ltd • Specifier Hydraulic Services Consultants NZ Limited Hydraulic engineer likes the small footprint that the back- to-back system offers and is considering using this type of system again for another apartment project.
  • 15. Rinnai commercial case studies 01-16 | 15 Oxford Court Lifecare village - Dunedin Demand Rapid and Demand Duo Two separate hot water systems Solution summary • 1 x Demand Rapid (DD1200E315L) system • 1 x Demand Duo 600 external pre-assembled manifold system Hot water requirement The design requirement was to provide hot water to the 48 room care facility, and a separate system for the kitchen and laundry area. Only 8-10 residents shower at one time, so hot water demand has been calculated on this simultaneous use as opposed to the full 48 room capacity. Oxford Court Lifecare is a purpose built facility providing rest home and hospital care. Their existing 1997 hot water system was undersized and in need of an upgrade to cope with increased demand. Rinnai solution A DD600 external system was specified for the care facility to meet peak hour demand. The DD600 will provide 2379 L/hr at 60 °C, incoming water temperature calculated for worst case scenario in winter of 5 °C. A dedicated Rinnai Demand Rapid system was specified for the commercial kitchen and laundry facility where a large volume of water is needed quickly, with recovery time before being used again. Installation details • Date of installation April 2016 • Installer Gas & Water Ltd - Dunedin • Specifier Rinnai NZ Ltd Cater for smaller hot water requirements with a separate Rinnai Demand Rapid system, shown on the far right of the photo.
  • 16. Rinnai.co.nz Experience our innovation 0800 746 624 http://www.youtube.com/rinnainz http://www.facebook.com/rinnainz