1. Antenna should be fixed by double nuts
1. Antenna should be fixed
vertically
Connectors should be sealed well by
scotch and 3M
Fix the Sealing using black tie wraps at top at
bottom of sealing
No obstacles blocking RF antenna
radiation
1. Mechanical ,electrical tilts and height must
applied as the design sheet delivered
RF antenna azimuth should be typically as
per design
1. Antenna should be installed as per
design sheet height
1. CPRI cables must be installed
separately from cabinet Roxtec.
2. CPRI cables must be installed through
flexible tubes under BTS to protect them.
Connectors between feeders and
jumpers must isolated well
1. All cables must install in good
arrangement till reaching the BTS cabinet
entrance.
2. install the cables inside flexible tubes
under the BTS to protect fiber , power , E1 and
alarm cables.
3. Use black wide plastic tie wraps to arrange
the cables and avoid any crossing.
4. Fill the flexible outlets with silicon.
5. fabricate the cable tray according to each
case dimensions.
6. close the cable tray after finishing your
work.
1. Feeder clamps stage should be installed
every two meters.
2. Feeders to be installed vertically in sharp
straight way.
1. Earth kits installation every 15-20 m
2. Earth kits sealing with high quality sealing
3. Earth kits connected to buss bar with tight bolts
1. Every Earth kit Cable to be connected in
one Buss bar bolts.
2. Earth kit cables to be routed downward
to Buss bar.
3.In case of Buss bar congested, Approved
to connect two cables in the same bolt.
Feeders should be installed
parallel and in clamps every 2
meters and tray should be not
congested and closed properly
Tray size should be 60*10
Sweep test (VSWR, DTF & Return Loss) should be pass
* ** 1 < VSWR < 1.4
*** 1 < DTF < 1.05
*** RL > 15.60 dB
Jumpers should be installed in S-
shape without any sharp pending
or extra tension and without any
crosses
1. Install RRUs always on brackets , don’t
install directly on tower leg.
2. RRU should be installed vertically.
RRU must be fixed
well on the
Bracket
1. Don’t install RRU on the ground to
avoid losses in signal.
2. In case of facing special site “Palm,
Mono pole,…Etc” need to install RRU
on the ground; you have to request
approval from Client as the design may
be changed. And sweep test results
should be in approved range
Earth cable
1. Connect earth cable of RRU to nearest
earth bar on tower.
2. Earth cable of RRU must be fixed well using
the two bolts.
Earth Cable of
RRU
Tie Wraps on the
Bottom
Tie Wraps on
the Top
Connectors should be sealed well by
scotch and 3M
Fix the Sealing using black tie wraps at top at
bottom of sealing
Fixation clamps
1. Install the fiber cables on tower using
fixation clamps as shown, one stage every
feeder clamps stage
2. Installation of the cables must be in good
arrangement and parallel to avoid any crossing.
3. spacing between clamps is 1.5m.
1. Install fiber cables through macaroni flexible in
BBU.
2. Install fiber cables inside thermal flexible tube from
RRU port to the 1st clamp on the tower.
3. Arrange Power and fiber cables using double
clamps on the tower till cable tray entrance by 50
cm.
4. Use flexible tube before cable tray entrance and
after entrance till cabinet entrance by 50 cm.
5. Arrange Power and fiber cables using double
clamps in the cable tray till entrance of cabinet.
Fiber extra length should be arranged and
routed in cable tray in circles and without
sharp pending, every cable has separate
extra length circle
need photo for indoor solution
Printed labels
Fiber cables should be labeled correctly
and in case of plastic labels have wrong
description, it is allowed to use printed
label in this way
1. For OD we Connect the RRUs either to the C.Bs of
APM for DBS3900 (20 A or 25 A according to the
Version of the APM) or through New DC BOX
which Contain (10* 30 A) Fuse.
2. For ID, we deliver DC BOX with the ID Site in order
to connect the RRUs to the Rectifier.
3. The 30A is designed to meet the requirement of
higher power consumption of BBU/RRU in the
future.
4. DC grounding as shown
MW antenna should be mounted and
well fixed to (…..meters) bracket
MW bracket should be well fixed to
the tower and vertically installed
1- ODU must be fixed properly
2- Verify the below with the link design:
• Antenna/side arm height
• Antenna azimuth
• Antenna diameter
• Polarization
ODU should be connected to the nearest
bar with maximum length of 1.5 meters
1st : 1 layer of tape 2nd : layers or waterproof
insulation tape
3rd: 3 layers of tape
Finally, secure the sealing
by top and bottom black tie-
wraps
If cable should be arranged in clamps all
over the tower, one stage every feeder
clamps stage
If cable should be installed in cable tray
parallel to the feeders using clamps
In case of congested cable tray it can be
systemized by wide black tie warp
IF cable to be routed in one of cable
tray sides , to be fixed properly by
wide plastic tie wraps or clamps
1- IF cable earth kit should be installed
every 20 meters
2- Sealing of the earth kit should be done
carefully in 3 steps:
1. 1layers of 3M
2. 3 layers of water proof
3. 3 Layers of 3M again
Outdoor wide black tie-
wraps should be used at
top and bottom of the
sealing to protect it
If cable earth kit to be connected
downwards to nearest bar as per
standard .
Grounding wire is going
down, never goes up
OD site layout
should be according
to this model
ID site layout should
be according to this
model
APM should be installed vertically and fixed well
1. Install CPRI cables and data cable from right side (2).
2. Install power cables from left side (1).
3. Install EMUA board below the BBU directly.
4. Connect power cable of EMUA board from TP cabinet
with circuit breaker 6 Amp.
5. All alarm cables of EMUA board must install into
macaroni flexible.
6. Add printed labels to each alarm cable of EMUA to
clarify the alarm name.
7. Connect earth cable of BBU , EMUA to the earth point
at the cabinet.
Need discussion
EMUA location
1 2
19’’ rack should be
earthed separately
using 16 mm2 earth
cable
RTN LEDs should
not indicate any
alarms
ID DDF should be
separately earthed
to shelter earth
OD DDF should be
separately earthed
to cabinet earthing
point
Need print screen
clarifying logging
and all parameters
1- MW link should
be managed
2- Need print screen
clarifying managed
link or confirmed on
site with NOC TX
1- For IF cable and
card written “IF DIR
TO XXXX (facing)”
2- For ODU written
“ODU DIR TO
XXXX(facing)”
3- ON MW antenna
write by marker “DIR
TO XXXX (facing)”
Supporting arm should be
installed if dish is
>=1.2meter And with
angle 90 degree (±20º)
and 2arms for 2.4 dish or
higher
1- Two PXC cards
should be installed
for RNT 620 one is
master and other is
standby.
1- DDF should by
labeled by printed
label
2- Label to be “2G
E1 CH xx” for 2G
E1s
3- Label to be “3G
E1 CH xx” for 3G
E1s
DDF cables should
be well arranged
without cross, well
installed and pinned
DDF should be well
fixed to cabinet or
rack
19’’ rack should be
fixed well and
vertically leveled
19’’ rack should be
fixed well and
vertically leveled
Terminals to be
installed in All DC
cables connection
with DC input
• Not delivered with
Equipments
1. Install the BTS 3900 and make sure that cabinet
bolts are fixed well to the shelter ground .
2. Install the L angels of BTS 3900 cabinet and fix
them well to the wall.
3. Cabinet to be earthed
4. BTS to be labeled.
Need OD cabinet photo
Cabinet bolts
L-Angle
Water leveling
1. Make sure of cabinet leveling during
installation by using water leveling.
Alarm
ID
Alarm Name Boolean Number
65033 AC1 1
65034 AC2 2
65045 Main Power Failure 13-14-15-16
65049 Water 17
65050 Temp 18
65051 Smoke 19
65052 Door 20
65056 Humidity 24
Terminals to be
installed in All DC
cables connection
with DC input (need
clear photos)
1. AC cables installed with
terminals
1. leave spacing of 4 cm between cabinet and
shelter wall.
2. At indoor sites install all cables : power , E1 ,
earth and alarm cables as shown on the shelter
wall using plastic clips.
3. Spacing between the plastic clips is 10 cm
between each other.
4. Install power and earth cables at left side .
5. Install E1 , fiber and alarm cables at right side.
6. Make sure that all cables are in good
arrangement and avoid any crossing.
10
cm
E1 & alarm cable
installed on the last
hole
Jumper installed in u
shape over ladder
Power cables installed on
hole 7& 8 over ladder
1. Jumper installed in u shape over ladder.
2. E1 & alarm cable installed on the last hole
near shelter wall.
3. Power cables installed on hole (7)& (8) over
ladder.
1. Install all cables into good arrangement using white tie
wraps.
2. Install fiber cables from right side and install them into
macaroni flexible (need to discuss).
3. Install the power and earth cables from left side.
4. All cables must have printed labels.
Macaroni Flexible
Fiber and alarm cables
from right side
Power cable from left side
Roxtec should be closed well not to allow
any dust or liquid to enter the cabinet. All
non used holes should be closed.
In reused cabinet cases, roxtec place
should be sealed using scotch
1. BTS configuration as the delivered design sheet
2. E1 performance Check and alarm test done for
cabinet ,IBBS and mini shelter
3. BTS is integrated
4. BTS is clear from alarms
1. Noted that this Print Screen got from
DC_HEOT (NOC Back Office) –Need
Etisalat Acceptance Team support to
get it
2. Can be checked during acceptance visit
by phone
1. Don’t leave any unused dummy in the site.
2. Missing Dummy may affect negatively on cabinet
cooling system.
1. All cables inside RFC cabinet must installed in good
arrangement : jumpers , power cables and CPRI cables.
2. Jumpers under cabinet must arranged well to avoid any
crossing.
3G cards should be installed
as per design.
All cards should be working
properly
All cables should be
connected in right ports
Roxtec should be closed well not to allow
any dust or liquid to enter the cabinet. All
non used holes should be closed.
In reused cabinet cases, roxtec place
should be sealed using scotch
• 1. Make sure of cabinet leveling during
installation by using water leveling.
Water leveling
Installation of Mini Shelter Cabinet –
Outdoor Scenario :
1. All the cables between the mini shelter and TP cabinet
must installed inside PVC tubes or cable tray,
2. PVC tubes must fixed well to ground using metal clips.
3. Install the batteries inside the mini shelter into good
arrangement.
4. All the cables from Mini Shelter must installed into
flexible tubes then PVC tubes till reaching the TP cabinet
Y3ni eh TP???
5. Install cables into flexible tubes at bending areas and
into PVC in straight areas.
6. All tubes connections and outlets must be sealed with
silicon.
All the cables between mini
shelter and other
cabinets must installed
inside PVC tubes.
1. All sensors must be installed
Temperature and humidity sensor
Smoke sensor
Water sensor
• Batteries connectors
should be tightened
using…..
• Batteries internal cover should
be installed as per photos
1. Power design must be checked and the
power distribution for the backup batteries of
the site and it confirmed with NOC ..
• Power cabinet should be
fixed and leveled. Leveling
should be tested using water
leveling
1. Don’t install cables between cabinets side to side
Battery cabinets and others” as shown in the
photo because steel cage will be installed in this
place and this might damage the cables.
2. Install the cables inside the flexible tubes under
the cabinets or in cable tray behind the cabinets.
• AC Power Cable
4*16mm2
• Batteries should not be damaged
by visual inspection
• Batteries should be connected
as per power planning
connectivity mail
• Batteries should pass battery
test
• Battery test results should be
recorded completely even if test
fails
Batteries should be connected as per
power planning connectivity mail
Batteries should pass battery test
Battery test results should be recorded
completely even if test fails
Thanks

More Related Content

Similar to EtisalatTelecom Model 2016 modified.pptx

Microwave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom SiteMicrowave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom Siteibrahimnabil17
 
Annex 4 part 1-fdh (i) installation guide
Annex 4 part 1-fdh (i) installation guideAnnex 4 part 1-fdh (i) installation guide
Annex 4 part 1-fdh (i) installation guideIgors Cardoso
 
Industrial training in telecom
Industrial training in telecomIndustrial training in telecom
Industrial training in telecom123sudha
 
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdfluckychandel2
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-AThorne & Derrick International
 
QRP 7-10-14MHz antenna-mbef_antenna_assy_021422=9pages-.pdf
QRP 7-10-14MHz antenna-mbef_antenna_assy_021422=9pages-.pdfQRP 7-10-14MHz antenna-mbef_antenna_assy_021422=9pages-.pdf
QRP 7-10-14MHz antenna-mbef_antenna_assy_021422=9pages-.pdfivan ion
 
KL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdfKL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdfSysteDesig
 
Electrical layout of
Electrical layout ofElectrical layout of
Electrical layout ofBhakti Stm
 
unit4domesticwiringandinstruments-220608154915-ac268fee.pdf
unit4domesticwiringandinstruments-220608154915-ac268fee.pdfunit4domesticwiringandinstruments-220608154915-ac268fee.pdf
unit4domesticwiringandinstruments-220608154915-ac268fee.pdfraghuRAGHU56
 
unit 4 domestic wiring and instruments.pptx
unit 4 domestic wiring and instruments.pptxunit 4 domestic wiring and instruments.pptx
unit 4 domestic wiring and instruments.pptxDinesh Peter
 
UNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONUNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONPremanandDesai
 
Simple regenerative receiver
Simple regenerative receiverSimple regenerative receiver
Simple regenerative receiverSudhir Kumar
 
Epp 0275-12 02 - 1xcore term.(2) RAYCHEM
Epp 0275-12 02 - 1xcore term.(2) RAYCHEM Epp 0275-12 02 - 1xcore term.(2) RAYCHEM
Epp 0275-12 02 - 1xcore term.(2) RAYCHEM AKBAR TRADING
 
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Thorne & Derrick International
 
Dish4You System Grounding
Dish4You System GroundingDish4You System Grounding
Dish4You System Groundingspicherheidi
 
cisco-air-ant2566p4w-r-datasheet.pdf
cisco-air-ant2566p4w-r-datasheet.pdfcisco-air-ant2566p4w-r-datasheet.pdf
cisco-air-ant2566p4w-r-datasheet.pdfHi-Network.com
 
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易AKBAR TRADING
 

Similar to EtisalatTelecom Model 2016 modified.pptx (20)

Microwave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom SiteMicrowave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom Site
 
Annex 4 part 1-fdh (i) installation guide
Annex 4 part 1-fdh (i) installation guideAnnex 4 part 1-fdh (i) installation guide
Annex 4 part 1-fdh (i) installation guide
 
Industrial training in telecom
Industrial training in telecomIndustrial training in telecom
Industrial training in telecom
 
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
519710952-6366-MW-HOP-Installation-Guidelines-Bhartij.pdf
 
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
11kV Cable Termination Heat Shrink Kits 3 Core 16-25sqmm SPS 3TIS-12X-A
 
QRP 7-10-14MHz antenna-mbef_antenna_assy_021422=9pages-.pdf
QRP 7-10-14MHz antenna-mbef_antenna_assy_021422=9pages-.pdfQRP 7-10-14MHz antenna-mbef_antenna_assy_021422=9pages-.pdf
QRP 7-10-14MHz antenna-mbef_antenna_assy_021422=9pages-.pdf
 
Safety for wiring methods
Safety for wiring methodsSafety for wiring methods
Safety for wiring methods
 
KL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdfKL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdf
 
Electrical layout of
Electrical layout ofElectrical layout of
Electrical layout of
 
unit4domesticwiringandinstruments-220608154915-ac268fee.pdf
unit4domesticwiringandinstruments-220608154915-ac268fee.pdfunit4domesticwiringandinstruments-220608154915-ac268fee.pdf
unit4domesticwiringandinstruments-220608154915-ac268fee.pdf
 
unit 4 domestic wiring and instruments.pptx
unit 4 domestic wiring and instruments.pptxunit 4 domestic wiring and instruments.pptx
unit 4 domestic wiring and instruments.pptx
 
zte mobilink bts swap
zte mobilink bts swapzte mobilink bts swap
zte mobilink bts swap
 
UNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATIONUNIT - 03 LIGHTING INSTALLATION
UNIT - 03 LIGHTING INSTALLATION
 
Distribution system 2
Distribution system  2Distribution system  2
Distribution system 2
 
Simple regenerative receiver
Simple regenerative receiverSimple regenerative receiver
Simple regenerative receiver
 
Epp 0275-12 02 - 1xcore term.(2) RAYCHEM
Epp 0275-12 02 - 1xcore term.(2) RAYCHEM Epp 0275-12 02 - 1xcore term.(2) RAYCHEM
Epp 0275-12 02 - 1xcore term.(2) RAYCHEM
 
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
Resin Cable Joints, Multicore Power Cables XLPE PILC - Branch Joints - Cable ...
 
Dish4You System Grounding
Dish4You System GroundingDish4You System Grounding
Dish4You System Grounding
 
cisco-air-ant2566p4w-r-datasheet.pdf
cisco-air-ant2566p4w-r-datasheet.pdfcisco-air-ant2566p4w-r-datasheet.pdf
cisco-air-ant2566p4w-r-datasheet.pdf
 
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
RAYCHEM TERMINATION KIT-TYCO TERMINATION-케이블 종단-거-瑞侃工具包电缆终端-阿克巴交易
 

Recently uploaded

Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMKumar Satyam
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAnitaRaj43
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard37
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamUiPathCommunity
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Less Is More: Utilizing Ballerina to Architect a Cloud Data Platform
Less Is More: Utilizing Ballerina to Architect a Cloud Data PlatformLess Is More: Utilizing Ballerina to Architect a Cloud Data Platform
Less Is More: Utilizing Ballerina to Architect a Cloud Data PlatformWSO2
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...caitlingebhard1
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Bhuvaneswari Subramani
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 

Recently uploaded (20)

Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
AI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by AnitarajAI in Action: Real World Use Cases by Anitaraj
AI in Action: Real World Use Cases by Anitaraj
 
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
WSO2 Micro Integrator for Enterprise Integration in a Decentralized, Microser...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
JohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptxJohnPollard-hybrid-app-RailsConf2024.pptx
JohnPollard-hybrid-app-RailsConf2024.pptx
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Less Is More: Utilizing Ballerina to Architect a Cloud Data Platform
Less Is More: Utilizing Ballerina to Architect a Cloud Data PlatformLess Is More: Utilizing Ballerina to Architect a Cloud Data Platform
Less Is More: Utilizing Ballerina to Architect a Cloud Data Platform
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...Stronger Together: Developing an Organizational Strategy for Accessible Desig...
Stronger Together: Developing an Organizational Strategy for Accessible Desig...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​Elevate Developer Efficiency & build GenAI Application with Amazon Q​
Elevate Developer Efficiency & build GenAI Application with Amazon Q​
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 

EtisalatTelecom Model 2016 modified.pptx

  • 1. 0 2 4 6 8 10 12 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Series 1 Series 1 2016 Acceptance 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
  • 2.
  • 3. 1. Antenna should be fixed by double nuts
  • 4. 1. Antenna should be fixed vertically
  • 5. Connectors should be sealed well by scotch and 3M Fix the Sealing using black tie wraps at top at bottom of sealing
  • 6. No obstacles blocking RF antenna radiation
  • 7. 1. Mechanical ,electrical tilts and height must applied as the design sheet delivered
  • 8. RF antenna azimuth should be typically as per design
  • 9. 1. Antenna should be installed as per design sheet height
  • 10. 1. CPRI cables must be installed separately from cabinet Roxtec. 2. CPRI cables must be installed through flexible tubes under BTS to protect them.
  • 11.
  • 12. Connectors between feeders and jumpers must isolated well 1. All cables must install in good arrangement till reaching the BTS cabinet entrance. 2. install the cables inside flexible tubes under the BTS to protect fiber , power , E1 and alarm cables. 3. Use black wide plastic tie wraps to arrange the cables and avoid any crossing. 4. Fill the flexible outlets with silicon. 5. fabricate the cable tray according to each case dimensions. 6. close the cable tray after finishing your work.
  • 13. 1. Feeder clamps stage should be installed every two meters. 2. Feeders to be installed vertically in sharp straight way.
  • 14.
  • 15.
  • 16. 1. Earth kits installation every 15-20 m 2. Earth kits sealing with high quality sealing 3. Earth kits connected to buss bar with tight bolts
  • 17.
  • 18. 1. Every Earth kit Cable to be connected in one Buss bar bolts. 2. Earth kit cables to be routed downward to Buss bar. 3.In case of Buss bar congested, Approved to connect two cables in the same bolt.
  • 19. Feeders should be installed parallel and in clamps every 2 meters and tray should be not congested and closed properly
  • 20. Tray size should be 60*10
  • 21. Sweep test (VSWR, DTF & Return Loss) should be pass * ** 1 < VSWR < 1.4 *** 1 < DTF < 1.05 *** RL > 15.60 dB
  • 22.
  • 23. Jumpers should be installed in S- shape without any sharp pending or extra tension and without any crosses
  • 24.
  • 25. 1. Install RRUs always on brackets , don’t install directly on tower leg. 2. RRU should be installed vertically. RRU must be fixed well on the Bracket
  • 26. 1. Don’t install RRU on the ground to avoid losses in signal. 2. In case of facing special site “Palm, Mono pole,…Etc” need to install RRU on the ground; you have to request approval from Client as the design may be changed. And sweep test results should be in approved range
  • 27. Earth cable 1. Connect earth cable of RRU to nearest earth bar on tower. 2. Earth cable of RRU must be fixed well using the two bolts. Earth Cable of RRU
  • 28. Tie Wraps on the Bottom Tie Wraps on the Top Connectors should be sealed well by scotch and 3M Fix the Sealing using black tie wraps at top at bottom of sealing
  • 29. Fixation clamps 1. Install the fiber cables on tower using fixation clamps as shown, one stage every feeder clamps stage 2. Installation of the cables must be in good arrangement and parallel to avoid any crossing. 3. spacing between clamps is 1.5m.
  • 30. 1. Install fiber cables through macaroni flexible in BBU. 2. Install fiber cables inside thermal flexible tube from RRU port to the 1st clamp on the tower. 3. Arrange Power and fiber cables using double clamps on the tower till cable tray entrance by 50 cm. 4. Use flexible tube before cable tray entrance and after entrance till cabinet entrance by 50 cm. 5. Arrange Power and fiber cables using double clamps in the cable tray till entrance of cabinet.
  • 31. Fiber extra length should be arranged and routed in cable tray in circles and without sharp pending, every cable has separate extra length circle need photo for indoor solution
  • 32. Printed labels Fiber cables should be labeled correctly and in case of plastic labels have wrong description, it is allowed to use printed label in this way
  • 33. 1. For OD we Connect the RRUs either to the C.Bs of APM for DBS3900 (20 A or 25 A according to the Version of the APM) or through New DC BOX which Contain (10* 30 A) Fuse. 2. For ID, we deliver DC BOX with the ID Site in order to connect the RRUs to the Rectifier. 3. The 30A is designed to meet the requirement of higher power consumption of BBU/RRU in the future. 4. DC grounding as shown
  • 34.
  • 35. MW antenna should be mounted and well fixed to (…..meters) bracket MW bracket should be well fixed to the tower and vertically installed
  • 36. 1- ODU must be fixed properly 2- Verify the below with the link design: • Antenna/side arm height • Antenna azimuth • Antenna diameter • Polarization
  • 37. ODU should be connected to the nearest bar with maximum length of 1.5 meters
  • 38. 1st : 1 layer of tape 2nd : layers or waterproof insulation tape 3rd: 3 layers of tape Finally, secure the sealing by top and bottom black tie- wraps
  • 39. If cable should be arranged in clamps all over the tower, one stage every feeder clamps stage
  • 40.
  • 41. If cable should be installed in cable tray parallel to the feeders using clamps In case of congested cable tray it can be systemized by wide black tie warp IF cable to be routed in one of cable tray sides , to be fixed properly by wide plastic tie wraps or clamps
  • 42. 1- IF cable earth kit should be installed every 20 meters 2- Sealing of the earth kit should be done carefully in 3 steps: 1. 1layers of 3M 2. 3 layers of water proof 3. 3 Layers of 3M again Outdoor wide black tie- wraps should be used at top and bottom of the sealing to protect it
  • 43. If cable earth kit to be connected downwards to nearest bar as per standard . Grounding wire is going down, never goes up
  • 44. OD site layout should be according to this model ID site layout should be according to this model
  • 45. APM should be installed vertically and fixed well 1. Install CPRI cables and data cable from right side (2). 2. Install power cables from left side (1). 3. Install EMUA board below the BBU directly. 4. Connect power cable of EMUA board from TP cabinet with circuit breaker 6 Amp. 5. All alarm cables of EMUA board must install into macaroni flexible. 6. Add printed labels to each alarm cable of EMUA to clarify the alarm name. 7. Connect earth cable of BBU , EMUA to the earth point at the cabinet. Need discussion EMUA location 1 2
  • 46. 19’’ rack should be earthed separately using 16 mm2 earth cable
  • 47. RTN LEDs should not indicate any alarms
  • 48. ID DDF should be separately earthed to shelter earth OD DDF should be separately earthed to cabinet earthing point
  • 49. Need print screen clarifying logging and all parameters
  • 50. 1- MW link should be managed 2- Need print screen clarifying managed link or confirmed on site with NOC TX
  • 51. 1- For IF cable and card written “IF DIR TO XXXX (facing)” 2- For ODU written “ODU DIR TO XXXX(facing)” 3- ON MW antenna write by marker “DIR TO XXXX (facing)”
  • 52. Supporting arm should be installed if dish is >=1.2meter And with angle 90 degree (±20º) and 2arms for 2.4 dish or higher
  • 53. 1- Two PXC cards should be installed for RNT 620 one is master and other is standby.
  • 54.
  • 55. 1- DDF should by labeled by printed label 2- Label to be “2G E1 CH xx” for 2G E1s 3- Label to be “3G E1 CH xx” for 3G E1s
  • 56. DDF cables should be well arranged without cross, well installed and pinned
  • 57. DDF should be well fixed to cabinet or rack
  • 58. 19’’ rack should be fixed well and vertically leveled
  • 59. 19’’ rack should be fixed well and vertically leveled
  • 60.
  • 61. Terminals to be installed in All DC cables connection with DC input
  • 62. • Not delivered with Equipments
  • 63.
  • 64. 1. Install the BTS 3900 and make sure that cabinet bolts are fixed well to the shelter ground . 2. Install the L angels of BTS 3900 cabinet and fix them well to the wall. 3. Cabinet to be earthed 4. BTS to be labeled. Need OD cabinet photo Cabinet bolts L-Angle
  • 65. Water leveling 1. Make sure of cabinet leveling during installation by using water leveling.
  • 66.
  • 67. Alarm ID Alarm Name Boolean Number 65033 AC1 1 65034 AC2 2 65045 Main Power Failure 13-14-15-16 65049 Water 17 65050 Temp 18 65051 Smoke 19 65052 Door 20 65056 Humidity 24
  • 68. Terminals to be installed in All DC cables connection with DC input (need clear photos)
  • 69.
  • 70. 1. AC cables installed with terminals
  • 71. 1. leave spacing of 4 cm between cabinet and shelter wall. 2. At indoor sites install all cables : power , E1 , earth and alarm cables as shown on the shelter wall using plastic clips. 3. Spacing between the plastic clips is 10 cm between each other. 4. Install power and earth cables at left side . 5. Install E1 , fiber and alarm cables at right side. 6. Make sure that all cables are in good arrangement and avoid any crossing. 10 cm
  • 72. E1 & alarm cable installed on the last hole Jumper installed in u shape over ladder Power cables installed on hole 7& 8 over ladder 1. Jumper installed in u shape over ladder. 2. E1 & alarm cable installed on the last hole near shelter wall. 3. Power cables installed on hole (7)& (8) over ladder.
  • 73. 1. Install all cables into good arrangement using white tie wraps. 2. Install fiber cables from right side and install them into macaroni flexible (need to discuss). 3. Install the power and earth cables from left side. 4. All cables must have printed labels. Macaroni Flexible Fiber and alarm cables from right side Power cable from left side
  • 74. Roxtec should be closed well not to allow any dust or liquid to enter the cabinet. All non used holes should be closed. In reused cabinet cases, roxtec place should be sealed using scotch
  • 75. 1. BTS configuration as the delivered design sheet 2. E1 performance Check and alarm test done for cabinet ,IBBS and mini shelter 3. BTS is integrated 4. BTS is clear from alarms
  • 76.
  • 77. 1. Noted that this Print Screen got from DC_HEOT (NOC Back Office) –Need Etisalat Acceptance Team support to get it 2. Can be checked during acceptance visit by phone
  • 78. 1. Don’t leave any unused dummy in the site. 2. Missing Dummy may affect negatively on cabinet cooling system.
  • 79.
  • 80. 1. All cables inside RFC cabinet must installed in good arrangement : jumpers , power cables and CPRI cables. 2. Jumpers under cabinet must arranged well to avoid any crossing.
  • 81. 3G cards should be installed as per design. All cards should be working properly All cables should be connected in right ports
  • 82.
  • 83.
  • 84.
  • 85. Roxtec should be closed well not to allow any dust or liquid to enter the cabinet. All non used holes should be closed. In reused cabinet cases, roxtec place should be sealed using scotch
  • 86.
  • 87. • 1. Make sure of cabinet leveling during installation by using water leveling. Water leveling
  • 88.
  • 89.
  • 90.
  • 91.
  • 92.
  • 93. Installation of Mini Shelter Cabinet – Outdoor Scenario : 1. All the cables between the mini shelter and TP cabinet must installed inside PVC tubes or cable tray, 2. PVC tubes must fixed well to ground using metal clips. 3. Install the batteries inside the mini shelter into good arrangement. 4. All the cables from Mini Shelter must installed into flexible tubes then PVC tubes till reaching the TP cabinet Y3ni eh TP??? 5. Install cables into flexible tubes at bending areas and into PVC in straight areas. 6. All tubes connections and outlets must be sealed with silicon. All the cables between mini shelter and other cabinets must installed inside PVC tubes.
  • 94.
  • 95. 1. All sensors must be installed Temperature and humidity sensor Smoke sensor Water sensor
  • 96. • Batteries connectors should be tightened using…..
  • 97. • Batteries internal cover should be installed as per photos
  • 98. 1. Power design must be checked and the power distribution for the backup batteries of the site and it confirmed with NOC ..
  • 99.
  • 100.
  • 101. • Power cabinet should be fixed and leveled. Leveling should be tested using water leveling
  • 102. 1. Don’t install cables between cabinets side to side Battery cabinets and others” as shown in the photo because steel cage will be installed in this place and this might damage the cables. 2. Install the cables inside the flexible tubes under the cabinets or in cable tray behind the cabinets.
  • 103. • AC Power Cable 4*16mm2
  • 104. • Batteries should not be damaged by visual inspection • Batteries should be connected as per power planning connectivity mail • Batteries should pass battery test • Battery test results should be recorded completely even if test fails
  • 105.
  • 106.
  • 107.
  • 108. Batteries should be connected as per power planning connectivity mail
  • 109. Batteries should pass battery test Battery test results should be recorded completely even if test fails
  • 110. Thanks