SlideShare a Scribd company logo
1 of 34
Download to read offline
Business Benefits of Mobilizing
Maximo with the Innovative Interloc
Mobile Informer
•
•




•
ATK Aerospace: What we do
2/14/2013 www.interlocsolutions.com 2
ATK Aerospace
Continue as the world's top producer of solid rocket
propulsion systems and a leading supplier of military
and commercial aircraft structures
Provide technicians with the ability to perform their
work, safely and consistently, from any of our plant
locations
2/14/2013 3www.interlocsolutions.com
•




•






•
ATK Aerospace operations
2/14/2013 www.interlocsolutions.com 4
•


•


•





Why mobilize IBM Maximo?
2/14/2013 www.interlocsolutions.com 5
•
•
•
•
•
ATK mobile requirements
2/14/2013 www.interlocsolutions.com 6
•
•
•
How ATK streamlined the processes
2/14/2013 www.interlocsolutions.com 7
•



•


ATK’s mobile selection criteria
2/14/2013 www.interlocsolutions.com 8
Work
Order
Informati
on
Safety
Information
Work Order
Information
Labor
Information
ATK mobile application does it all
Using Attach
Docs to manage
all paperwork,
including
approvals, safety
requirements,
and more
WO
Safety
Labor
2/14/2013 9www.interlocsolutions.com
ATK Mobile Work Management
Your
Maximo
Login
Tap on the
application
and log on
using your
Maximo
login
2/14/2013 www.interlocsolutions.com 10
Select Work Order
Selecting
Work
Orders
brings you
to a screen
showing
Work
Orders
assigned to
you
2/14/2013 www.interlocsolutions.com 11
Work Order review
Scroll Up for Attached
Documents
Owner, Bldg
000-000-1234
2/14/2013 www.interlocsolutions.com 12
Review attached documents
Bldg Owner
000-000-2345
2/14/2013 www.interlocsolutions.com 13
Review building / asset attached documents
2/14/2013 www.interlocsolutions.com 14
Open selected Work Order
Flintstone, Fred
000-000-1234
2/14/2013 www.interlocsolutions.com 15
Safety pre-work checklist and approval to start
Bldg Owner 000-000-2345
2/14/2013 16www.interlocsolutions.com
Approval to start work
Bldg Owner
000-000-2345
Owner.Bldg@email.com
2/14/2013 www.interlocsolutions.com 17
Safety pre-work checklist
2/14/2013 www.interlocsolutions.com 18
Change Work Order status to INPRG
2/14/2013 www.interlocsolutions.com 19
Work Order in progress
PMs with Multiple Steps or
Meter Readings to
Complete
2/14/2013 www.interlocsolutions.com 20
Completion and comments
Hand type or select
Canned comments
2/14/2013 www.interlocsolutions.com 21
Meters and measure points
2/14/2013 www.interlocsolutions.com 22
Close and complete Work Order
Bldg Owner
000-000-2345
Owner.Bldg@email.com
Bldg Owner
2/14/2013 23www.interlocsolutions.com
Building map locations
(GPS locations being added)
2/14/2013 www.interlocsolutions.com 24
Recap: Work Management
1
2
3
4
5
6
7
8
9
10
Startup Approvals / Checklist Complete / Signoff
2/14/2013 25www.interlocsolutions.com
•




•
•
•
•
ATK Results
2/14/2013 www.interlocsolutions.com 26
A continuing mobile journey
2011
Project
piloted
Mid 2012
Project
went live
2013
Expanded size
of
implementation
over 100% in
Maintenance
Including
GPS
locations for
buildings
iOS and
Android
platforms
2/14/2013 27www.interlocsolutions.com
2012 IBM Tivoli Award Winner
Best of Show
AAA
•
•
•
•
Truly Successful Mobility for Maximo
2/14/2013 www.interlocsolutions.com
Mobile Informer attributes
2/14/2013 www.interlocsolutions.com
Mobile Informer uses
proven methodology
2/14/2013 www.interlocsolutions.com
Coming together for client success!
2/14/2013 www.interlocsolutions.com
Business
functionality
addressed
Access all
smart device
capabilities
Leverage
Maximo
infrastructure
Client
ROI
With Mobile
Informer, ATK:
• Expanded
mobile footprint
by over 100%
in 2013
• Realized >20%
increase in
productivity
• Experienced
100% user
acceptance
Come see Interloc and ATK at Pulse 2013!
2/14/2013 www.interlocsolutions.com
Sign up for a 1 on 1
consultation session
Visit us in Booth S221
Come to one of the Interloc-
Client led sessions
Learn more at:
www.interlocsolutions.com/Interloc-Solutions-is-at-IBM-Pulse/
Eddy.Larson@ATK.com
Jason.VenHuizen@interlocsolutions.com
2/14/2013 www.interlocsolutions.com
Questions

More Related Content

Similar to ATK Discusses the Business Benefits of Mobilizing Maximo

Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Shbeeb
 
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)Comit Projects Ltd
 
Tablet Based Time Management System
Tablet Based Time Management SystemTablet Based Time Management System
Tablet Based Time Management SystemMike Taylor
 
DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)Daniel J Fernandez II
 
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPCOMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPIRJET Journal
 
Converge, the Remote Build Phase I (Complete)
Converge, the Remote Build Phase I (Complete)Converge, the Remote Build Phase I (Complete)
Converge, the Remote Build Phase I (Complete)Brij Consulting, LLC
 
The Future of Access Hardware Technology in Off-Highway Equipment Design
The Future of Access Hardware Technology in Off-Highway Equipment DesignThe Future of Access Hardware Technology in Off-Highway Equipment Design
The Future of Access Hardware Technology in Off-Highway Equipment DesignSouthco, Inc.
 
Site%20 installation %20final_20070219
Site%20 installation %20final_20070219Site%20 installation %20final_20070219
Site%20 installation %20final_20070219Quang Nguyễn
 
ECMDay2015 - Kenny Buntinx - Tim De Keukelaere - Armoring your mobile workfor...
ECMDay2015 - Kenny Buntinx - Tim De Keukelaere - Armoring your mobile workfor...ECMDay2015 - Kenny Buntinx - Tim De Keukelaere - Armoring your mobile workfor...
ECMDay2015 - Kenny Buntinx - Tim De Keukelaere - Armoring your mobile workfor...Kenny Buntinx
 
Mohamad F. Chaaban Resume
Mohamad F. Chaaban ResumeMohamad F. Chaaban Resume
Mohamad F. Chaaban ResumeMohamad Chaaban
 
Airheads main conference slideshare v1.0
Airheads main conference slideshare v1.0Airheads main conference slideshare v1.0
Airheads main conference slideshare v1.0Jason Boud
 
Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohd Suliman
 
Project Portfolio Francois Bourcier
Project Portfolio Francois BourcierProject Portfolio Francois Bourcier
Project Portfolio Francois BourcierFrancois Bourcier
 
TESTED PDF REPORT.pdf
TESTED PDF REPORT.pdfTESTED PDF REPORT.pdf
TESTED PDF REPORT.pdfBharatGoyal55
 

Similar to ATK Discusses the Business Benefits of Mobilizing Maximo (20)

Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)Mohallab Ali Shbeeb CV (1)
Mohallab Ali Shbeeb CV (1)
 
AWS IoT - Mobiquest presentation
AWS IoT - Mobiquest presentationAWS IoT - Mobiquest presentation
AWS IoT - Mobiquest presentation
 
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
CD Winter 2015 - Rapid Site Deployment (Westbase Technology)
 
S M Ali CV - BMS Service Engr
S M Ali CV - BMS Service EngrS M Ali CV - BMS Service Engr
S M Ali CV - BMS Service Engr
 
Rizwan Ahmad (f)
Rizwan Ahmad (f)Rizwan Ahmad (f)
Rizwan Ahmad (f)
 
Tablet Based Time Management System
Tablet Based Time Management SystemTablet Based Time Management System
Tablet Based Time Management System
 
DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)DJ's Corporate Experience & Performance Package (Complete-2014)
DJ's Corporate Experience & Performance Package (Complete-2014)
 
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSPCOMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
COMPARATIVE STUDY OF ACTUAL AND CRASHED SCHEDULE OF BUILDING USING MSP
 
5.12.15
5.12.155.12.15
5.12.15
 
Curiculum Vittae april 2016
Curiculum Vittae april 2016Curiculum Vittae april 2016
Curiculum Vittae april 2016
 
Converge, the Remote Build Phase I (Complete)
Converge, the Remote Build Phase I (Complete)Converge, the Remote Build Phase I (Complete)
Converge, the Remote Build Phase I (Complete)
 
The Future of Access Hardware Technology in Off-Highway Equipment Design
The Future of Access Hardware Technology in Off-Highway Equipment DesignThe Future of Access Hardware Technology in Off-Highway Equipment Design
The Future of Access Hardware Technology in Off-Highway Equipment Design
 
Site%20 installation %20final_20070219
Site%20 installation %20final_20070219Site%20 installation %20final_20070219
Site%20 installation %20final_20070219
 
ECMDay2015 - Kenny Buntinx - Tim De Keukelaere - Armoring your mobile workfor...
ECMDay2015 - Kenny Buntinx - Tim De Keukelaere - Armoring your mobile workfor...ECMDay2015 - Kenny Buntinx - Tim De Keukelaere - Armoring your mobile workfor...
ECMDay2015 - Kenny Buntinx - Tim De Keukelaere - Armoring your mobile workfor...
 
Mohamad F. Chaaban Resume
Mohamad F. Chaaban ResumeMohamad F. Chaaban Resume
Mohamad F. Chaaban Resume
 
WSO2 Conf JaggeryJS
WSO2 Conf JaggeryJSWSO2 Conf JaggeryJS
WSO2 Conf JaggeryJS
 
Airheads main conference slideshare v1.0
Airheads main conference slideshare v1.0Airheads main conference slideshare v1.0
Airheads main conference slideshare v1.0
 
Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1Mohammed Suliman CV Intensive Version 1
Mohammed Suliman CV Intensive Version 1
 
Project Portfolio Francois Bourcier
Project Portfolio Francois BourcierProject Portfolio Francois Bourcier
Project Portfolio Francois Bourcier
 
TESTED PDF REPORT.pdf
TESTED PDF REPORT.pdfTESTED PDF REPORT.pdf
TESTED PDF REPORT.pdf
 

ATK Discusses the Business Benefits of Mobilizing Maximo