WOMEN’S SAFETY APP
Under the Guidance of:
Dr. A. Vijaya
Assistant professor
Student Name:
R. Haripriya
II MCA
Outline
OBJECTIVE
PROBLEM STATEMENT
EXISTING SYSTEM
PROPOSED SYSTEM
MODULES
ARCHITECTURE DIAGRAM
IMPLEMENTATION SCREENSHOT
CONCLUSION
FUTURE ENHANCEMENT
OBJECTIVE
• The Women Safety application is designed to provide immediate assistance and security to
women in distress. It enables users to share their real-time location with guardians.
• Additionally, the app features an SOS alert system that notifies nearby users, ensuring a quick
response and community support in emergencies.
• By integrating these safety measures, the application aims to enhance women's security and
provide a reliable emergency response system.
PROBLEM STATEMENT
• Traditional safety measures are often ineffective during emergencies.
• Manual methods like calling or messaging may not be practical in distress
situations.
• Fear, restricted movement, and lack of emergency access hinder quick
assistance.
• Absence of a structured safety system increases risks in critical situations.
EXISTING SYSTEM
• In the present scenario filing an FIR/complaint is a hectic task since
one must go through a very huge process for justice.
• In Kavalan App, the Alert send to police controller section which
take somewhile to take action.
PROPOSED SYSTEM
• This proposed application for the women safety modules app can share the
location for guardian
• User can register complaint online about any harassment by a single click.
• Use GPS Module present in the Mobile phones and Track the Location of
the user.
MODULES
Emergency Contact List: Users can manage emergency contacts by adding and
updating numbers.
Settings: Allows customization of contact categories and emergency services.
Emergency Services: A GPS location tracking system enables real-time location
sharing and emergency SMS alerts.
1. SOS Alert System: Users can generate a distress signal by shaking their phones,
which triggers a location-based emergency message to registered contacts.
DFD
Level 1
Level 2
SCREENSHOTS
CONCLUSION
FUTURE ENHANCEMENT
Future integrations include:
• AI-driven predictive analytics for high-risk areas.
• Voice Alerting
• Collaboration with local law enforcement agencies.

Women safety application using machine learning

  • 1.
    WOMEN’S SAFETY APP Underthe Guidance of: Dr. A. Vijaya Assistant professor Student Name: R. Haripriya II MCA
  • 2.
    Outline OBJECTIVE PROBLEM STATEMENT EXISTING SYSTEM PROPOSEDSYSTEM MODULES ARCHITECTURE DIAGRAM IMPLEMENTATION SCREENSHOT CONCLUSION FUTURE ENHANCEMENT
  • 3.
    OBJECTIVE • The WomenSafety application is designed to provide immediate assistance and security to women in distress. It enables users to share their real-time location with guardians. • Additionally, the app features an SOS alert system that notifies nearby users, ensuring a quick response and community support in emergencies. • By integrating these safety measures, the application aims to enhance women's security and provide a reliable emergency response system.
  • 4.
    PROBLEM STATEMENT • Traditionalsafety measures are often ineffective during emergencies. • Manual methods like calling or messaging may not be practical in distress situations. • Fear, restricted movement, and lack of emergency access hinder quick assistance. • Absence of a structured safety system increases risks in critical situations.
  • 5.
    EXISTING SYSTEM • Inthe present scenario filing an FIR/complaint is a hectic task since one must go through a very huge process for justice. • In Kavalan App, the Alert send to police controller section which take somewhile to take action.
  • 6.
    PROPOSED SYSTEM • Thisproposed application for the women safety modules app can share the location for guardian • User can register complaint online about any harassment by a single click. • Use GPS Module present in the Mobile phones and Track the Location of the user.
  • 7.
    MODULES Emergency Contact List:Users can manage emergency contacts by adding and updating numbers. Settings: Allows customization of contact categories and emergency services. Emergency Services: A GPS location tracking system enables real-time location sharing and emergency SMS alerts. 1. SOS Alert System: Users can generate a distress signal by shaking their phones, which triggers a location-based emergency message to registered contacts.
  • 8.
  • 9.
  • 12.
  • 13.
    FUTURE ENHANCEMENT Future integrationsinclude: • AI-driven predictive analytics for high-risk areas. • Voice Alerting • Collaboration with local law enforcement agencies.