Which of the following is not something commonly found in lean systems? (I) Waste reduction (II) Output match to a detailed forecast (III) Visual controls (IV) Quick changeovers (V) Long production runsa)both I and Vb)both II and Vc)both II and IVd)both IV and Ve)both III and V Solution b) both II and V.