AIPMM Webinar Series

               http://www.aipmm.com

© AIPMM 2013       @AIPMM             www.aipmm.com
© AIPMM 2013   @AIPMM   http://www.aipmm.com
                                   www.aipmm.com
Founded 1998
          Largest Product Management professional group
          Provides professional development and
            certification
               • Certified Product Manager
               • Certified Product Marketing Manager
               • Agile Certified Product Manager

               • Certified Innovation Leader

© AIPMM 2013                      @AIPMM               www.aipmm.com
Today’s Speakers
   Moderator:
       Cindy F. Solomon, CPM, CPMM
       Founder, Global Product Management Talk
       Producer, Startup Product Summit http://startupproduct.com
       @cindyfsolomon @ProdMgmtTalk @startupproduct


   Presenter:
      Hector Del Castillo, PMP, CPM, CPMM
       http://www.linkedin.com/in/hectordelcastillo
       @hmdelcastillo




© AIPMM 2013             @AIPMM #prodmgmt
                                     @AIPMM                     http://www.aipmm.com
                                                                              www.aipmm.com
Tweet!


        Hector:          @hmdelcastillo
        AIPMM:           @AIPMM
        ProdMgmtTalk:    @ProdMgmtTalk
        Hashtag          #prodmgmt




© AIPMM 2013             @AIPMM           www.aipmm.com
The Hub Of All Things Product Management




© AIPMM 2013                   @AIPMM                     www.aipmm.com
AIPMM Certifications
  AIPMM offers globally recognized certifications:
  • Certified Product Manager (CPM®)
  • Certified Product Marketing Manager (CPMM®)
  • Agile Certified Product Manager (ACPM®)
  • Certified Innovation Leader (CIL®)
  • Certified Brand Manager (CBM®)

© AIPMM 2013             @AIPMM              www.aipmm.com
FEATURED PRESENTATION


© AIPMM 2013       @AIPMM     www.aipmm.com
Hector Del Castillo
   • Senior consultant with over 15 years of experience transforming
     products to profit for technology-based companies
   • AIPMM Body of Knowledge (ProdBOK®) Contributor
   • Established companies
        – Jet Propulsion Laboratory, Lucent Technologies, MEI Technologies
   • Small companies and startups
        – Nextone Communications, Smith Micro Software
   • Launched 27+ Products for global deployment
        – HW/SW, Telecom, Enterprise Mobility, Information Security
          Services, Professional Development
   • Certified PMP®, CPM® and CPMM®
   • University of California at Santa Barbara, MS EE
   • University of Texas at El Paso, MS EE, BS EE



© AIPMM 2013                                 @AIPMM                          www.aipmm.com14
What We Will Discuss

   1. Common challenges
   2. Common responsibilities
   3. Key differences
   4. Framework comparison
   5. Key takeaways


© AIPMM 2013            @AIPMM        www.aipmm.com
Common Challenges
   • Few people understand the role
   • Roles and responsibilities can be very unclear
        – Get drawn into too much tactical coordination
   • Lack the authority to carry out their
     responsibilities
        – Little influence on corporate branding, channel
          selection, or advertising

         Source: Rajesh K. Tyagi, Mohanbir S. Sawhney, “High-Performance Product Management: The Impact of
         Structure, Process, Competencies, and Role Definition,” Journal of Product Innovation Management, Vol. 27, Issue
         1, January 2010

© AIPMM 2013                                              @AIPMM                                              www.aipmm.com16
Both roles align activities performed by
       cross-functional teams with strategic
       objectives.

© AIPMM 2013             @AIPMM             www.aipmm.com
Both roles require strong influential and
   collaborative skills to guide critical decisions.
© AIPMM 2013             @AIPMM              www.aipmm.com
Both roles orchestrate
    key activities and
    manage key deliverables.




© AIPMM 2013          @AIPMM   www.aipmm.com
Fortune’s Most Admired Companies
  Rank      Company                           Industry   Industry
                                              Rank
      1     Apple                                 1      Computers
      2     Google                                1      Internet Services & Retailing
      3     Amazon.com                            2      Internet Services & Retailing
      4     Coca-Cola                             1      Beverages
      5     IBM                                   1      IT Services
      6     FedEx                                 1      Delivery
      7     Berkshire Hathaway                    1      Property & Casualty
      8     Starbucks                             2      Food Services
      9     Procter & Gamble                      1      Soaps & Cosmetics
     10     Southwest Airlines                    1      Airlines
     Source: Fortune Magazine, Mar 19, 2012


© AIPMM 2013                                   @AIPMM                          www.aipmm.com
What is Project Management?
                   • Organizational function of planning,
               1     organizing, securing and managing
                     resources


               2   • Applies processes and knowledge
                     over time



               3   • Aligns cross-functional teams to
                     complete projects


© AIPMM 2013                   @AIPMM                   www.aipmm.com
What is the most important task for a
   Project Manager?
   A. Maximize revenue.
   B. Lead product development activities.
   C. Reduce development cost.
   D. Maximize profit.
   E. Deliver high quality.



© AIPMM 2013          @AIPMM               www.aipmm.com
What is Product Management?

               1   • Organizational function
                     throughout product lifecycle


               2   • Proactive planning of products

                   • Aligns cross-functional teams to
               3     create and support a product


© AIPMM 2013                  @AIPMM                  www.aipmm.com
What is the most important task for a
   Product Manager?
   A. Maximize revenue.
   B. Lead product development activities.
   C. Reduce development cost.
   D. Maximize profit.
   E. Deliver high quality.



© AIPMM 2013          @AIPMM               www.aipmm.com
ROLES & RESPONSIBILITIES


© AIPMM 2013        @AIPMM       www.aipmm.com
Project Management
  triple constraint focuses on
  maximizing quality.              Scope



                                   Quality



                            Cost             Schedule



© AIPMM 2013           @AIPMM                    www.aipmm.com
Source: H. Del Castillo, AIPMM, © 1998-2013, All Rights Reserved.
  Product Management
  triple constraint focuses on
  maximizing value.                  Customer


                                     Product
                                      (Value)


                          Business              Market



© AIPMM 2013           @AIPMM                      www.aipmm.com
Work Environment
                                   Externally
                                    Focused




                                   Functional
               Tactical                         Strategic
                                    Manager




                                   Internally
                                    Focused


© AIPMM 2013              @AIPMM                www.aipmm.com
Both roles get drawn into tactical
activities.
                                   Externally
                                    Focused




                                   Functional
               Tactical             Manager
                                                Strategic




                                   Internally
                                    Focused


© AIPMM 2013              @AIPMM                www.aipmm.com
Both roles need to stay focused on
strategic objectives.
                                   Externally
                                    Focused




                                   Functional
               Tactical
                                    Manager     Strategic



                                   Internally
                                    Focused


© AIPMM 2013              @AIPMM                 www.aipmm.com
Project Managers are mostly internally
focused.
                                   Externally
                                    Focused




                                   Functional
               Tactical                         Strategic
                                    Manager




                              Internally
                               Focused
© AIPMM 2013              @AIPMM                www.aipmm.com
Product Managers are mostly externally
focused.
                              Externally
                               Focused



                                   Functional
               Tactical                         Strategic
                                    Manager




                                   Internally
                                    Focused


© AIPMM 2013              @AIPMM                www.aipmm.com
Both roles bring different                                               perspectives.
  Project Management                                                   Product Management




  Source: S.T.O.P. The Project Management Survival Plan© by            Source: Take Charge Product Management© by Greg
  Steven Starke. All rights reserved.                                  Geracie. All rights reserved.


© AIPMM 2013                                                  @AIPMM                                      www.aipmm.com
Project Managers guide key
    decisions to maximize
    quality and minimize risk.




© AIPMM 2013          @AIPMM     www.aipmm.com
Product Managers guide key
 decisions to maximize
 value and create new
 revenue streams.




© AIPMM 2013        @AIPMM    www.aipmm.com
FRAMEWORK COMPARISON


© AIPMM 2013     @AIPMM      www.aipmm.com
Typical Project Life Cycle




                                                                         Source: PMI PMBOK v5
        These are stages that projects go through from initiation
        to closing

© AIPMM 2013                    @AIPMM                   www.aipmm.com
Project Management Framework
                                                     Monitor/
                     Initiate   Plan     Execute                Close
                                                     Control
                                        Integrate
                                          Scope
   Knowledge Areas




                                          Time
                                          Cost




                                                                                    Source: PMI PMBOK v5
                                         Quality
                                           HR
                                       Communicate
                                          Risk
                                         Procure

© AIPMM 2013                              @AIPMM                    www.aipmm.com
Typical Product Life Cycle




        These are stages that products go through from
        introduction to withdrawal from the market

© AIPMM 2013                  @AIPMM                     www.aipmm.com
Seven Phase Product Life Cycle




                     Source: AIPMM ProdBOK, © 1998-2011, All Rights Reserved.


© AIPMM 2013         @AIPMM                                 www.aipmm.com
Product Management Framework

                   Conceive   Plan   Develop      Qualify      Launch       Deliver       Retire



                                          Organization
 Knowledge Areas




                                             Market
                                            Business
                                           Customer
                                            Product

                                               Source: AIPMM ProdBOK, © 1998-2011, All Rights Reserved.


© AIPMM 2013                                   @AIPMM                                 www.aipmm.com
Framework Comparison
   Product Management

       Conceive     Plan          Develop    Qualify     Launch   Deliver      Retire




   Project Management

                                                       Monitor/
         Initiate          Plan         Execute                    Close
                                                       Control



© AIPMM 2013                                @AIPMM                          www.aipmm.com
Framework Integration




               Initiate

                Plan

                  Execute

                    Monitor

                       Close

                                  Source: AIPMM ProdBOK, © 1998-2013, All Rights Reserved.

© AIPMM 2013                       @AIPMM                                www.aipmm.com
Framework Integration




                   Initiate

                    Plan

                      Execute

                        Monitor

                           Close

                                   Source: AIPMM ProdBOK, © 1998-2013, All Rights Reserved.

© AIPMM 2013                       @AIPMM                                 www.aipmm.com
Framework Integration




                        Source: AIPMM ProdBOK, © 1998-2011, All Rights Reserved.

© AIPMM 2013            @AIPMM                                 www.aipmm.com
Framework Integration




                                              Initiate

                                               Plan

                                                 Execute

                                                   Monitor

                                                      Close

                       Source: AIPMM ProdBOK, © 1998-2013, All Rights Reserved.

© AIPMM 2013            @AIPMM                                www.aipmm.com
Framework Integration




                                                            Initiate

                                                             Plan

                                                               Execute

                                                                 Monitor

                                                                    Close

                       Source: AIPMM ProdBOK, © 1998-2013, All Rights Reserved.

© AIPMM 2013            @AIPMM                                 www.aipmm.com
Comparison of Key Deliverables
   Project Management                      Product Management

     •   Project Knowledge Base                •   Product Knowledge Base
     •   Project Portfolio Analysis            •   Competitive Analysis
     •   Project Charter                       •   Product Portfolio Analysis
     •   Project Management Plan               •   Market Strategy Plan
     •   Work Breakdown Structure              •   Market Requirements Document
     •   Earned Value Analysis                 •   Product Requirements Document
     •   Feasibility Study                     •   Product Business Case
     •   Communications Plan                   •   Product Roadmap
     •   Procurement Plan                      •   Technology Roadmap
     •   Quality Assurance Plan                •   Beta Plan
     •   Risk Management Plan                  •   Launch Plan
     •   Status Reports                        •   Marketing Plan
     •   Lessons Learned                       •   End Of Life Plan



© AIPMM 2013                          @AIPMM                            www.aipmm.com
Key Takeaways
        1      • Both roles guide key activities and decisions


        2      • Both roles impact profit and loss


        3      • Project Managers minimize loss and risk


        4      • Product Managers maximize value and profit


        5      • Both roles collaborate to deliver quality & value


© AIPMM 2013                    @AIPMM                      www.aipmm.com
Upcoming Courses
  Course & Location                        Dates              Days    Time
  ACPM® Certification Prep Course & Exam
  McLean, VA                               Feb 25, 2013       M       8:30 am – 5 pm
  Seattle, WA                              Mar 11, 2013
  CPM® Certification Prep Course & Exam
  McLean, VA                               Feb 26-27, 2013    T, W    8:30 am – 5 pm
  Seattle, WA                              Mar 12-13, 2013
  CPMM® Certification Prep Course & Exam
  McLean, VA                               Feb 28-Mar 1, 2013 Th, F   8:30 am – 5 pm
  Seattle, WA                              Mar 14-15, 2013
  CIL® Certification Prep Course & Exam
  McLean, VA                               May 22-23, 2013    W, Th 8:30 am – 5 pm



© AIPMM 2013                          @AIPMM                            www.aipmm.com
For More Information About
   • AIPMM membership benefits
   • Certification courses in your area
   • How to prepare to take a certification exam
   • Defining the right product strategy & process
     to grow your business
   • Aligning your business model with your
     product strategy

© AIPMM 2013              @AIPMM             www.aipmm.com
Hector Del Castillo, PMP, CPM, CPMM
               Transforming products to profit for technology-based organizations.TM
               Product Marketing Director
                  Connect: linkd.in/hdelcastillo
                   Follow:       @hmdelcastillo
                   Contact: hmdelcastillo [at] aipmm.com


© AIPMM 2013                          @AIPMM                           www.aipmm.com
Please Join Us Again!
                       AIPMM Webinar Series: Friday Feb   22
               Pricing For A More Profitable Product Portfolio
                         http://aipmm.com/aipmm_webinars/

                    Global Product Management Talk: Monday Feb 25
      Lean Product Development Methodologies with Poornima Vijayashanker,
                      Founder Of BizeeBee And Femgineer
                      http://www.blogtalkradio.com/prodmgmttalk


   Stay Informed!
   Newsletter:       http://www.aipmm.com/subscribe
   LinkedIn:         http://www.linkedin.com/company/aipmm
   Membership:       http://www.aipmm.com/join.php
   Certification:    http://aipmm.com/html/certification/

© AIPMM 2013                           @AIPMM                       www.aipmm.com

Webcast: Differences Between Project Management & Product Management

  • 1.
    AIPMM Webinar Series http://www.aipmm.com © AIPMM 2013 @AIPMM www.aipmm.com
  • 2.
    © AIPMM 2013 @AIPMM http://www.aipmm.com www.aipmm.com
  • 3.
    Founded 1998 Largest Product Management professional group Provides professional development and certification • Certified Product Manager • Certified Product Marketing Manager • Agile Certified Product Manager • Certified Innovation Leader © AIPMM 2013 @AIPMM www.aipmm.com
  • 4.
    Today’s Speakers Moderator: Cindy F. Solomon, CPM, CPMM Founder, Global Product Management Talk Producer, Startup Product Summit http://startupproduct.com @cindyfsolomon @ProdMgmtTalk @startupproduct Presenter: Hector Del Castillo, PMP, CPM, CPMM http://www.linkedin.com/in/hectordelcastillo @hmdelcastillo © AIPMM 2013 @AIPMM #prodmgmt @AIPMM http://www.aipmm.com www.aipmm.com
  • 5.
    Tweet! Hector: @hmdelcastillo AIPMM: @AIPMM ProdMgmtTalk: @ProdMgmtTalk Hashtag #prodmgmt © AIPMM 2013 @AIPMM www.aipmm.com
  • 6.
    The Hub OfAll Things Product Management © AIPMM 2013 @AIPMM www.aipmm.com
  • 7.
    AIPMM Certifications AIPMM offers globally recognized certifications: • Certified Product Manager (CPM®) • Certified Product Marketing Manager (CPMM®) • Agile Certified Product Manager (ACPM®) • Certified Innovation Leader (CIL®) • Certified Brand Manager (CBM®) © AIPMM 2013 @AIPMM www.aipmm.com
  • 8.
    FEATURED PRESENTATION © AIPMM2013 @AIPMM www.aipmm.com
  • 9.
    Hector Del Castillo • Senior consultant with over 15 years of experience transforming products to profit for technology-based companies • AIPMM Body of Knowledge (ProdBOK®) Contributor • Established companies – Jet Propulsion Laboratory, Lucent Technologies, MEI Technologies • Small companies and startups – Nextone Communications, Smith Micro Software • Launched 27+ Products for global deployment – HW/SW, Telecom, Enterprise Mobility, Information Security Services, Professional Development • Certified PMP®, CPM® and CPMM® • University of California at Santa Barbara, MS EE • University of Texas at El Paso, MS EE, BS EE © AIPMM 2013 @AIPMM www.aipmm.com14
  • 10.
    What We WillDiscuss 1. Common challenges 2. Common responsibilities 3. Key differences 4. Framework comparison 5. Key takeaways © AIPMM 2013 @AIPMM www.aipmm.com
  • 11.
    Common Challenges • Few people understand the role • Roles and responsibilities can be very unclear – Get drawn into too much tactical coordination • Lack the authority to carry out their responsibilities – Little influence on corporate branding, channel selection, or advertising Source: Rajesh K. Tyagi, Mohanbir S. Sawhney, “High-Performance Product Management: The Impact of Structure, Process, Competencies, and Role Definition,” Journal of Product Innovation Management, Vol. 27, Issue 1, January 2010 © AIPMM 2013 @AIPMM www.aipmm.com16
  • 12.
    Both roles alignactivities performed by cross-functional teams with strategic objectives. © AIPMM 2013 @AIPMM www.aipmm.com
  • 13.
    Both roles requirestrong influential and collaborative skills to guide critical decisions. © AIPMM 2013 @AIPMM www.aipmm.com
  • 14.
    Both roles orchestrate key activities and manage key deliverables. © AIPMM 2013 @AIPMM www.aipmm.com
  • 15.
    Fortune’s Most AdmiredCompanies Rank Company Industry Industry Rank 1 Apple 1 Computers 2 Google 1 Internet Services & Retailing 3 Amazon.com 2 Internet Services & Retailing 4 Coca-Cola 1 Beverages 5 IBM 1 IT Services 6 FedEx 1 Delivery 7 Berkshire Hathaway 1 Property & Casualty 8 Starbucks 2 Food Services 9 Procter & Gamble 1 Soaps & Cosmetics 10 Southwest Airlines 1 Airlines Source: Fortune Magazine, Mar 19, 2012 © AIPMM 2013 @AIPMM www.aipmm.com
  • 16.
    What is ProjectManagement? • Organizational function of planning, 1 organizing, securing and managing resources 2 • Applies processes and knowledge over time 3 • Aligns cross-functional teams to complete projects © AIPMM 2013 @AIPMM www.aipmm.com
  • 17.
    What is themost important task for a Project Manager? A. Maximize revenue. B. Lead product development activities. C. Reduce development cost. D. Maximize profit. E. Deliver high quality. © AIPMM 2013 @AIPMM www.aipmm.com
  • 18.
    What is ProductManagement? 1 • Organizational function throughout product lifecycle 2 • Proactive planning of products • Aligns cross-functional teams to 3 create and support a product © AIPMM 2013 @AIPMM www.aipmm.com
  • 19.
    What is themost important task for a Product Manager? A. Maximize revenue. B. Lead product development activities. C. Reduce development cost. D. Maximize profit. E. Deliver high quality. © AIPMM 2013 @AIPMM www.aipmm.com
  • 20.
    ROLES & RESPONSIBILITIES ©AIPMM 2013 @AIPMM www.aipmm.com
  • 21.
    Project Management triple constraint focuses on maximizing quality. Scope Quality Cost Schedule © AIPMM 2013 @AIPMM www.aipmm.com
  • 22.
    Source: H. DelCastillo, AIPMM, © 1998-2013, All Rights Reserved. Product Management triple constraint focuses on maximizing value. Customer Product (Value) Business Market © AIPMM 2013 @AIPMM www.aipmm.com
  • 23.
    Work Environment Externally Focused Functional Tactical Strategic Manager Internally Focused © AIPMM 2013 @AIPMM www.aipmm.com
  • 24.
    Both roles getdrawn into tactical activities. Externally Focused Functional Tactical Manager Strategic Internally Focused © AIPMM 2013 @AIPMM www.aipmm.com
  • 25.
    Both roles needto stay focused on strategic objectives. Externally Focused Functional Tactical Manager Strategic Internally Focused © AIPMM 2013 @AIPMM www.aipmm.com
  • 26.
    Project Managers aremostly internally focused. Externally Focused Functional Tactical Strategic Manager Internally Focused © AIPMM 2013 @AIPMM www.aipmm.com
  • 27.
    Product Managers aremostly externally focused. Externally Focused Functional Tactical Strategic Manager Internally Focused © AIPMM 2013 @AIPMM www.aipmm.com
  • 28.
    Both roles bringdifferent perspectives. Project Management Product Management Source: S.T.O.P. The Project Management Survival Plan© by Source: Take Charge Product Management© by Greg Steven Starke. All rights reserved. Geracie. All rights reserved. © AIPMM 2013 @AIPMM www.aipmm.com
  • 29.
    Project Managers guidekey decisions to maximize quality and minimize risk. © AIPMM 2013 @AIPMM www.aipmm.com
  • 30.
    Product Managers guidekey decisions to maximize value and create new revenue streams. © AIPMM 2013 @AIPMM www.aipmm.com
  • 31.
    FRAMEWORK COMPARISON © AIPMM2013 @AIPMM www.aipmm.com
  • 32.
    Typical Project LifeCycle Source: PMI PMBOK v5 These are stages that projects go through from initiation to closing © AIPMM 2013 @AIPMM www.aipmm.com
  • 33.
    Project Management Framework Monitor/ Initiate Plan Execute Close Control Integrate Scope Knowledge Areas Time Cost Source: PMI PMBOK v5 Quality HR Communicate Risk Procure © AIPMM 2013 @AIPMM www.aipmm.com
  • 34.
    Typical Product LifeCycle These are stages that products go through from introduction to withdrawal from the market © AIPMM 2013 @AIPMM www.aipmm.com
  • 35.
    Seven Phase ProductLife Cycle Source: AIPMM ProdBOK, © 1998-2011, All Rights Reserved. © AIPMM 2013 @AIPMM www.aipmm.com
  • 36.
    Product Management Framework Conceive Plan Develop Qualify Launch Deliver Retire Organization Knowledge Areas Market Business Customer Product Source: AIPMM ProdBOK, © 1998-2011, All Rights Reserved. © AIPMM 2013 @AIPMM www.aipmm.com
  • 37.
    Framework Comparison Product Management Conceive Plan Develop Qualify Launch Deliver Retire Project Management Monitor/ Initiate Plan Execute Close Control © AIPMM 2013 @AIPMM www.aipmm.com
  • 38.
    Framework Integration Initiate Plan Execute Monitor Close Source: AIPMM ProdBOK, © 1998-2013, All Rights Reserved. © AIPMM 2013 @AIPMM www.aipmm.com
  • 39.
    Framework Integration Initiate Plan Execute Monitor Close Source: AIPMM ProdBOK, © 1998-2013, All Rights Reserved. © AIPMM 2013 @AIPMM www.aipmm.com
  • 40.
    Framework Integration Source: AIPMM ProdBOK, © 1998-2011, All Rights Reserved. © AIPMM 2013 @AIPMM www.aipmm.com
  • 41.
    Framework Integration Initiate Plan Execute Monitor Close Source: AIPMM ProdBOK, © 1998-2013, All Rights Reserved. © AIPMM 2013 @AIPMM www.aipmm.com
  • 42.
    Framework Integration Initiate Plan Execute Monitor Close Source: AIPMM ProdBOK, © 1998-2013, All Rights Reserved. © AIPMM 2013 @AIPMM www.aipmm.com
  • 43.
    Comparison of KeyDeliverables Project Management Product Management • Project Knowledge Base • Product Knowledge Base • Project Portfolio Analysis • Competitive Analysis • Project Charter • Product Portfolio Analysis • Project Management Plan • Market Strategy Plan • Work Breakdown Structure • Market Requirements Document • Earned Value Analysis • Product Requirements Document • Feasibility Study • Product Business Case • Communications Plan • Product Roadmap • Procurement Plan • Technology Roadmap • Quality Assurance Plan • Beta Plan • Risk Management Plan • Launch Plan • Status Reports • Marketing Plan • Lessons Learned • End Of Life Plan © AIPMM 2013 @AIPMM www.aipmm.com
  • 44.
    Key Takeaways 1 • Both roles guide key activities and decisions 2 • Both roles impact profit and loss 3 • Project Managers minimize loss and risk 4 • Product Managers maximize value and profit 5 • Both roles collaborate to deliver quality & value © AIPMM 2013 @AIPMM www.aipmm.com
  • 45.
    Upcoming Courses Course & Location Dates Days Time ACPM® Certification Prep Course & Exam McLean, VA Feb 25, 2013 M 8:30 am – 5 pm Seattle, WA Mar 11, 2013 CPM® Certification Prep Course & Exam McLean, VA Feb 26-27, 2013 T, W 8:30 am – 5 pm Seattle, WA Mar 12-13, 2013 CPMM® Certification Prep Course & Exam McLean, VA Feb 28-Mar 1, 2013 Th, F 8:30 am – 5 pm Seattle, WA Mar 14-15, 2013 CIL® Certification Prep Course & Exam McLean, VA May 22-23, 2013 W, Th 8:30 am – 5 pm © AIPMM 2013 @AIPMM www.aipmm.com
  • 46.
    For More InformationAbout • AIPMM membership benefits • Certification courses in your area • How to prepare to take a certification exam • Defining the right product strategy & process to grow your business • Aligning your business model with your product strategy © AIPMM 2013 @AIPMM www.aipmm.com
  • 47.
    Hector Del Castillo,PMP, CPM, CPMM Transforming products to profit for technology-based organizations.TM Product Marketing Director Connect: linkd.in/hdelcastillo Follow: @hmdelcastillo Contact: hmdelcastillo [at] aipmm.com © AIPMM 2013 @AIPMM www.aipmm.com
  • 48.
    Please Join UsAgain! AIPMM Webinar Series: Friday Feb 22 Pricing For A More Profitable Product Portfolio http://aipmm.com/aipmm_webinars/ Global Product Management Talk: Monday Feb 25 Lean Product Development Methodologies with Poornima Vijayashanker, Founder Of BizeeBee And Femgineer http://www.blogtalkradio.com/prodmgmttalk Stay Informed! Newsletter: http://www.aipmm.com/subscribe LinkedIn: http://www.linkedin.com/company/aipmm Membership: http://www.aipmm.com/join.php Certification: http://aipmm.com/html/certification/ © AIPMM 2013 @AIPMM www.aipmm.com

Editor's Notes

  • #4 The Certified Innovation Leader body of knowledge and credential is aligned with The Association of International Product Marketing and Management. AIPMM was founded in 1998. It provides professional development, training, and certification to those involved in product management, such as product managers and developers, marketing managers, brand managers, project managers, and many more. The certified innovation leader credential is one of four certifications provided by AIPMM. The others include: certified product manager, certified product marketing manager, and agile certified product manager.
  • #6 Contact me for any of the following:Obtain information about upcoming certification courses in your area.Let me know how I can help your business grow by defining and implementing the right product strategy.Obtain the answer worksheet.Obtain copies of these slides.
  • #7 With members in 65 countries, AIPMM is the world’s largest association focused on connecting product team professionals with each other and providing educational opportunities and tools to boost your productivity.
  • #13 AIPMM offers globally recognized certifications for product managers, product marketing managers and brand managers.Certified Product Manager (CPM), Certified Product Marketing Management (CPMM) and Agile Certified Product Manager (ACPM). Certification requires obtaining a college degree, minimum one year of experience, and passing a certification examination.
  • #16 IntroductionAre you currently looking for a new job? Are you a contractor or consultant in between engagements? This presentation is for current job seekers, independent contractors and independent consultants. It is for those of you who are looking for new job, contract, or consulting opportunities. It is also for those of you who are frustrated in your current job.I’ll discuss how to accelerate your job search using LinkedIn, Twitter and other social media.
  • #18 Recommended Reading:Harvard Business Review April 2004The Ambidextrous Organizationby Charles A. O’Reilly III and Michael L. TushmanThe Roman god Janus had two sets of eyes—one pair focusing on what lay behind, the other on what lay ahead. General managers and corporate executives should be able to relate. They, too, must constantly look backward, attending to the products and processes of the past, while also gazing forward, preparing for the innovations that will define the future.
  • #21 In their March 19, 2012 issue, FORTUNE magazine named the 50 most admired companies overall. FORTUNE's survey asked businesspeople to vote for the most innovative companies, from any industry.Results showed that each of the top 10 most innovative companies are ranked #1 or #2 within their own respective industrial segments.The Kellogg study concludes that high-performance firms have a clearly-defined process for product launch, escalations, and need identification.
  • #22 Project Management is an organizational function within a company dealing with planning, organizing, securing and managing resourcesthroughout all stages of a project. It applies processes and knowledge over time. It also aligns cross-functional teams to complete projects on time and under budget.
  • #24 Product Management is the organizational function within a company dealing with the thoughtful and proactive management of a product or group of products (product portfolio) throughout all stages of the product lifecycle. It is process that aligns internal cross-functional teams for conceiving, planning, developing, testing, launching, selling, and withdrawing products in the market.
  • #39 Inception – Gather ideas. Gathering market information about industry, market segments, value and supply chain.Incubation – Capture insights.Introduction – Validation, Verification, & ConfirmationIntegrate to the product management & marketing process.
  • #41 Here we show AIPMM’s Product Management Framework. It depicts the typical phases for products throughout their life cycle from cradle to grave.
  • #42 Inception – Gather ideas. Gathering market information about industry, market segments, value and supply chain.Incubation – Capture insights.Introduction – Validation, Verification, & ConfirmationIntegrate to the product management & marketing process.
  • #44 Here we show AIPMM’s Product Management Framework. It depicts the typical phases for products throughout their life cycle from cradle to grave.
  • #45 Here we show AIPMM’s Product Management Framework. It depicts the typical phases for products throughout their life cycle from cradle to grave.
  • #46 Here we show AIPMM’s Product Management Framework. It depicts the typical phases for products throughout their life cycle from cradle to grave.
  • #47 Here we show AIPMM’s Product Management Framework. It depicts the typical phases for products throughout their life cycle from cradle to grave.
  • #48 Here we show AIPMM’s Product Management Framework. It depicts the typical phases for products throughout their life cycle from cradle to grave.
  • #52 Contact me for any of the following:Obtain information about upcoming certification courses in your area.Let me know how I can help your business grow by defining and implementing the right product strategy.Obtain the answer worksheet.Obtain copies of these slides.