Wassup
Issue 7   January 2012
Wassup
The cultural trends magazine from
Ogilvy & Mather Asia Pacific

Edited & designed by Kunal Sinha
Editorial assistant: Lara Farrar

Correspondents:

Astrid Savitri (Jakarta)
Elaine Dai (Beijing)
Timothy Sarker (Dhaka)
Naima Hamid (Dhaka)
Neha Punjabi (Mumbai)
Donnah Alcoseba (Makati City)
Wine Chua-Leonardo (Makati City)
Tania Chan (Singapore)
Naoko Ito (Tokyo)
Azusa Fukai (Tokyo)
Natalie Gruis (Ho Chi Minh City)
Siddharth Roy (Colombo)
Mei Wu (Taipei)
Caryl Heah (Kuala Lumpur)
Beatrice Yong (Kuala Lumpur)
Josephine Phang (Kuala Lumpur)
Scheherezade Saadat (Lahore)
Serena Park (Seoul)




© Ogilvy & Mather Asia Pacific, 2012
Move over Greeks. The Big Fat Wedding is happening now, and in Asia. If there is one
event in a lifetime when families let go of their wallets and inhibitions, it is at the
wedding. The heady mix of traditional rituals with what they see on the big screen tells
us something about a cultural melting pot. Why is the seating arrangement at Chinese
weddings in the Western banquet style, while the food is always typically local? Why are
some families choosing to forego inviting everyone they know, rather fly a smaller
number of guests to an intimate seaside resort for the big day? To find answers, we
turned to wedding planners. Get a sense of the color and flamboyance in the first issue
of this year.
We then get up close and personal with village folks. Even as the wave of migration from
rural to urban areas continues unabated, the majority of Asia’s inhabitants live in
villages. But they are no longer isolated: mobile phones, television and better
transportation means they are well connected with the city. That has changed
everything: their expectations, what they want their children to be.

The discontent with politics and national leadership is a recurring theme. It is making
people angry and tense. India’s Outlook magazine brought out a special issue called ‘The
Age of Rage’ this month. Should businesses be wary of the angry customer? They should,
because he or she is no longer going to accept shoddy products or broken promises.
Wassup is an early warning system of consumer sentiment, so be mindful of what we
report.
Plunge right in. At eighty-two pages, this is our meatiest issue ever.
14 countries.

20 correspondents deeply immersed in
popular and leading edge culture bring you
Cultural Insights that will make a world of
difference to your business




                                                                                                   SOUTH KOREA
  BANGLADESH




                                                                         PHILIPPINES

                                                                                       SINGAPORE
                               INDONESIA




                                                                                                                 SRI LANKA



                                                                                                                                      THAILAND
                                                   MALAYSIA

                                                              PAKISTAN




                                                                                                                                                 VIETNAM
                                                                                                                             TAIWAN
                                           JAPAN
               CHINA

                       INDIA
contents
       Look who’s talking:
Meet the Wedding Planners

Knowing me, Knowing you:
             Village folks

         Movie of the Year

              Rage against

               Waiting list

              Tense about

    Favorite Green Brands
Look who’s talking
 Look who’s talking




  Meet the Wedding Planners
Look who’s talking …

PAKISTAN

When it comes to weddings in Pakistan, there is one thing that is
guaranteed: Couples will go all out to make their fairytale wedding
mixed with tradition come true!

According to Jalal, a renowned Pakistani wedding planner who
works for the famous J&S event management company (the
company has planned weddings for the rich and famous as well as
concerts for international celebrities such as Edward Maya and
Bryan Adams) a good floor plan, event manager and location are
crucial to making a wedding one that is memorable. Weddings in
Pakistan usually last for four days and are one of the most important
events for families.

All eyes will be on the bride, which means a lot of money is spent on
wedding attire that is decorated with traditional and very intricate
embroidery and beading from top to bottom to ensure she looks
nothing short of a royal Mughal princess. The father of the bride is
responsible for the cuisine, which typically consists of elaborate
spreads of scrumptious desi dishes ranging from biryani and korma
to modern fusion and Mediterranean fare. Each event has up to six
main course dishes. While Pakistani weddings typically have three
main functions, they now also include bachelor and bachelorette
parties as well as qawwali night and a post-wedding brunch.

Throughout the lengthy affair, the mother of the bride plays a
pivotal role. She is tasked with adorning her daughter in up to four
expensive and exclusive jewelry sets. Jewels are also exchanged
between the families at each of the five wedding events. The groom
also takes part in the glamour with his wedding attire costing around
$2,300. The bride’s wedding clothes usually run between $3,000
and $5,000.

With so many decisions to be made about decorations, location and
activities, more Pakistani families are investing in wedding planners
for help. To save money, more Pakistani newlyweds are opting to go
to the Far East on honeymoons.
Look who’s talking …
SINGAPORE

An interview with Deirdre Foo

THOUGHTS ON MODERN WEDDINGS
For many young Singaporeans, their notion of a wedding is a lot
more Westernized, but we are often held back due to Chinese
customs.

For us, the 100 table banquet is unnecessary. Our wedding should
be about the people who truly matter. But it’s a tough battle
because being Asian, we will always try and respect our parents’
wishes.

MUST HAVES
Your own personal touch. Weddings tend to be rather cookie-
cutter and commercialized so it was important for me to inject my
own style into the wedding. From personalized, hand-written
place cards to the bonnataires that don’t have flowers.

LOCATION
In terms of locations, I’d say the more unique the better. But
most importantly, pick a place that means something to you as a
couple and that feels instinctively right – not by the availability of
a hotel ballroom.

WHAT’S IN
The releasing of balloons/lanterns is quite a big thing, as are
photo booths. The general trend is to involve your guests in a
meaningful way.

HONEYMOONS
Many couples these days are into short honeymoons – possibly
because of work constraints. It really works out though! I have a
friend who did her honeymoon over 2 years but she got to go to 3
different countries and kept her post-marital bliss for a lot longer.




COST
In Singapore, it ranges from $50,000
- $80,000 – depending on the
number of tables at the banquet.
                                                                         8
Look who’s talking …
MALAYSIA

Meet      Ratna   Rashidi     of     Perfect   Day     Planner                 Ratna Rashidi
(http://perfectdayplanner.blogspot.com/); a wedding planner
with eight years under her belt in the industry. She typically
plans weddings for Malay couples, and her clientele can be
divided into three groups: yuppies, or young urban
professionals who lead busy lives leaving them with little time
to plan; motherless grooms, who need a feminine hand; and
families for which this is the first wedding, and require her
expertise.
                                                                   Akad Nikah; the solemnization ceremony in a
                                                                   Malay wedding.
Her clients usually engage her services for one or more of
three ceremonies important in Malay marriages: the
engagement ceremony; the akad nikah, or solemnization
ceremony; and the wedding reception that follows the akad
nikah. On average, her clients will spend only about 20,000
MYR (about $6,300) on their weddings, preferring to splurge
on their honeymoons instead. Typically, the cost of the
wedding is split between the bridal couple and their parents,
with the couple footing the bill for smaller items such as
invitation cards and wedding favors, and their parents
covering the bigger costs, like the ballroom and catering.

According Ratna, there are two trends influencing Malaysian
wedding customs today. One is the influence of Western
wedding culture – while the traditional customs are still
important and included, Malaysian weddings are increasingly
incorporating Western touches into traditional customs. For
example, despite Malaysia’s hot, humid and capricious
weather, garden themed weddings are extremely popular
among couples. Western influence is also evident in the
brides’ gowns. Increasingly, some Malay brides will forgo the
traditional Malay dress for a Western wedding dress, or they
will incorporate Western bridal styles, such as the color white
and more risqué designs, into the traditional Malay dress.        Traditional Malay dress in the style of a wedding gown
                                                                  and a Western style wedding gown.
The second trend Ratna noticed is the increasing desire for
couples to create weddings that reflect their personalities.
One example involves a groom and a drum instructor giving a
drum performance during his reception. In the past, weddings
were almost solely dictated by what the couple’s parents
wanted. However, now couples are asserting more say in
creating the kind of wedding they want – they feel that they
have a right to since they are also financially contributing.
Ratna believes this desire for a more personalized wedding is
born out of a desire to stand out from the rest – by creating a
wedding that is memorable and better than others’. “There’s
an ‘I want to do better than the Jones’ mentality,’” Ratna
explained.
                                                                                                  9
                                                                        Garden themed wedding decorations.
Look who’s talking …


                       SRI LANKA

                       Nelunika Wejeshijnghe (aka Nels) has always been into party
                       planning with her cousins and friends for fun. For every occasion -
                       Christmas, New Years, birthdays - Nels and her gang were busy
                       planning parties. That soon took a back seat when she started
                       working.

                       During her account management sting at Ogilvy Sir Lanka, Nels
                       got a real taste of events, thanks largely to her client Ceylon
                       Tobacco Company. At the same time, her cousin began managing
                       a wedding magazine business. He wanted to expand his business
                       to include wedding planning and other wedding-related events.
                       Nels leaped at the opportunity. Over the next 18 months, Nels
                       ended up planning around 15 weddings.

                       “Wedding planners have been around for some time. We’re the
                       latest entrants,” said Nels. According to her her busy schedule as
                       a wedding planner, such professionals are becoming must-haves
                       at weddings in Sri Lanka. “Of course, its still skewed towards the
                       urban affluent class,” she said. Not surprisingly, considering the
                       average budget range is between $10,000 and $20,000.

                       According to Nels, the important aspects of a wedding are the
                       venue, the designer of wedding clothes and wedding brands.
                       What brands couples use at their weddings indicate social status.
                       “Hosting a daughter’s wedding at the Hilton says a lot about the
                       father of the bride. Attending a reception at such a venue also
                       helps the invitee make an impression among his or her social
                       circle,” she said. Plus there are added benefits such as great
                       service, food and accessibility in terms of transportation.




                                                                     10
Look who’s talking …




“Local clients always play it safe when it comes to venues. They’d prefer an enclosed space to avoid risks
of bad weather and also other associated benefits, which you get from a hotel. Whereas expat clients are
far more adventurous. That’s also because they bring foreign friends in town to attend the wedding, so
they would much rather prefer a beach wedding than a wedding in a hotel.”

“Who dressed the bride, who did her make-up… are the most discussed topics among the women invitees
at a wedding,” Nels said. With many weddings being covered by popular media, these elements become
extremely important.

Similar to weddings in other cultures, Sri Lankan weddings today are less about tradition and more about
celebration. “Gone are the days of unending Poruwa ceremonies,” Nels said. “People just want to have a
ball.”

Honeymoon planning is not as important for wedding planners. “Honeymoon destinations are often given
as a surprise gift to the newlyweds by friends and relatives so they decide themselves,” she said.

On a more philosophical note, Nels says that being a wedding planner can be a thankless job and
frustrating at times. “There are clients who have already decided what they want. They just want the
planners to execute. And then there are those who simply treat you as their secretary, only wanting you
to coordinate meetings and negotiate rates. No input on anything else. But there are clients who come
with an absolutely open brief. They just give you a budget and ask you to organize something that people
will talk about and remember. These are also the people who print the names of the wedding planner on
the invitations. What better way to advertise ourselves! And when they start the wedding celebration,
they first thank the wedding planners. It’s icing on the cake,” she said.                  11
Look who’s talking …
                       VIETNAM

                       This is Thuy, a busy professional and the official wedding planner of her own wedding
                       this year in Vietnam. Her wedding was held in Vietnamese tradition: a ceremony at
                       home with family followed by a reception at a local well-loved restaurant. Both families
                       were heavily involved in the day’s preparations. The traditional ceremony invites the
                       groom’s family to bring several gifts to the bride’s family covered in a red cloth to
                       express their desire for the bride: a roast pig, ao dai, gold rings, gold jewelry, money,
                       wine, tea and fruit. Both parents invite their guests to a dinner and celebration in the
                       evening to toast the new couple.

 The Traditional Ceremony




                                                The Banquet


  However, like many modern brides in
  Vietnam , Thuy wanted to do
  something less formal and in her own
  taste and style, deciding to have a
  separate party just for friends after her
  wedding day with family.

  This took her over the usual $10,000
  budget for a wedding, but with
  memories she can look back on worth
  so much more.

                                                                                              12
Look who’s talking …

                                              TAIWAN

                                              Wedding planners, also called a bride secretary in Taiwan,
                                              have to know both the traditional customs and what's trendy
                                              so they can make the bride’s dream come true and satisfy
                                              the needs of the parents.

                                              Lucy has been a wedding planner for about 4 years. She says
                                              that the job is not as fancy as it may look: “Most people think
                                              all we do is have parties all the time, but they do not see the
                                              preparation and trivial aspects behind the job.”

                                              A wedding costs about NT$1 million~NT$2million, the price
                                              includes the process of getting married, the wedding
                                              banquet, and wedding photos. The expenditure can usually
                                              be balanced out by receiving the traditional red envelope,
                                              which contains monetary gifts from wedding guests.
                                              However, if a couple wants a dream wedding, they have to
                                              shoulder more of the cost. For example, some brides like to
                                              plan their weddings Western style at a manor during the fall
                                              season to get the look of weddings seen in the movies.




“Brides of this generation take more control than
before; they will tell us what their ideas are, or even the
details of the execution, so sometimes you will see that
the invitation is designed by the bride,” Lucy said.

However, in order to increase the value of a wedding
planner, Lucy likes to plan some activities during the
wedding, such as inviting male guests to come on stage,
but not to throw and catch the bridal bouquet but
cauliflower. Of course the man that catches the
cauliflower is terribly sad as he’s the next in line.

Except the funny parts, Lucy says wedding planners also
edit a video for others to share the memories of the
bride and groom. “It usually touches everyone because
you can see the bride and grooms family and friends”.



                                                                                                13
Snapshots from a Taiwanese wedding


There are usually wedding photos and a guest book to share their happiness.




                                                                          Photos by Lucy
                                                                        14
It’s popular now to have the wedding ceremony outdoors, especially in fall.




                                                            15
Snapshots from a Taiwanese wedding


Brides in Taiwan often have the 3 different looks through the wedding day: the
invitation,the show up, and escorting the visitor out, while the groom will have
only one look because men are not the point (as we know).




                                                                       16
Photos by Lucy
Also, it’s common to invite friends to sing a song or play music in Taiwan because
people think it is a way to express their blessing.




                                                                       17
A Chinese groom is picking up the bride at her family home




                                                                          Chinese wedding cake with the “double
                                                                          happiness” symbol on the top

                                                 The new couple’s friends are “disturbing the bridal room” by
Chinese wedding photography                        Friends at the new couples house to “disturbing the bridal
                                                 requesting the new couple and playing games
                                                   room”




A Chinese wedding in hotel




                                                                                            18
Wedding reception in a five star hotel                           The tea ceremony
Look who’s talking …
CHINA

Vivian Lee is a 29-year-old independent wedding planner in Shanghai. She has been trained at Weddings
Beautiful, an American association of professional wedding planners that provides quality education to aspiring
wedding planners worldwide as well as issues professional certification to qualified wedding planners. Vivian has
been working in the industry for 3 years, she is very happy to share some of her knowledge about modern
Chinese weddings with us:

A wedding is one of the most important and significant ceremonies in Chinese culture. Average Chinese couples
are willing to spend more on weddings compare to their Western counterparts. More importantly, an affluent
Chinese middle class is growing in big cities such as Shanghai, Beijing and Shenzhen, therefore, the
cost of weddings is increasing steadily in those cities. According to Vivian’s previous experience, the average
wedding budget in Shanghai is between 150,000 yuan to 250,000 RMB. Some couples who are from wealthy
families or make decent incomes even spend up to 400,000 RMB because their families want to show status
through wedding.

Modern Chinese weddings in big cities, such as Shanghai, are combinations of Eastern and Western cultures.
Chinese traditional weddings are rich with symbols, traditions and rituals. However, many of them have been lost
over time. They are practiced in family beliefs and respect to committed marriage relationship. For instance, the
choice of the wedding date is very important, some couples or their parents will ask astrologists to study their
birth date and birth time to choose a date that is considered lucky. For example, a date with even numbers is
considered luckier. In China, there is an old saying that “good things come in pairs.” Chinese wedding ceremonies
are usually scheduled to begin on the half hour because it is believed that time is on the upswing then.

There are also many cultural symbols that appear with weddings. The symbol of “double happiness” may be used
on invitations, decorations and cakes. Tea ceremonies are also popular. The original way of the tea ceremony
was conducted for the bride to privately serve her own family before the wedding ceremony and for the
newlyweds to serve the groom’s family together following the marriage vows. However, many Chinese couples
who adopt this custom in modern weddings only have one tea ceremony with both ceremonies present, which
usually takes place after the end of the marriage ceremony.


Modern wedding receptions usually take place in four or five star hotels. A wedding host will lead the ceremony
with activities including introducing the couple, having the couple’s families give a speech, creating games for a
new couple to play in front of all guests, announcing marriage and the tea ceremony etc. This is followed by a
banquet that serves Chinese food and alcohol. New couples have to go to each table to toast their guests. At
most modern Chinese weddings, the bride wears three different dresses during the ceremony. The first is the
Western style white wedding dress during the wedding ceremony. The second dress is a traditional Chinese
wedding dress that is used at the banquet. The last dress is called the bride’s going away dress. At night, the
couple’s friends will visit the new couples house to “disturb the bridal room” by asking the new couple to play
games, which ends the wedding day.

A large percentage of Chinese couples prefer using wedding planning companies or wedding planners because
they are able to come up with more ideas. They save time and make sure everything goes smoothly on the
special day. Must-haves for Chinese weddings include engagement rings and wedding bands, wedding
photography, wedding cars, ceremony and banquet, wedding host and wedding gifts.

Today more and more Chinese couples want personalized weddings in China and abroad. One emerging trend
are destination weddings since a large number of Chinese female celebrities who recently married had
destination weddings, such as Barbie Hsu. Popular honeymoon destinations are Sanya, the Maldives, Bali, Spain
                                                                                          19
and Thailand.
Look who’s talking …
INDONESIA

TJAN ING ING,THE MOTHER WHO PLANNED HER DAUGHTER’S WEDDING

“Finally comes the day when my daughter is getting married. It’s a mixed feeling between excitement and
worry. The biggest worry that comes to mind is about the new life she will have.”

An Indonesian with a Chinese background, Tjan’s planning starts with choosing a good date for the wedding.
Traditionally, the good date will impact the life the couple will have in the future. It was decided to have it after
Chinese New Year since it’s considered bad to have it before. Tjan then planned to leave other decisions to the
couple, but, being a mom, she was actually involved in everything from deciding the gown, the color theme,
invitation, decoration and the cuisine.




Required activities are Sangjit and Tea Pay. “These are
the Chinese traditions that we should keep,” she said.
Sangjit acts as a traditional proposal between the two
families. The groom’s family comes over to exchange
gifts with the bride’s family. The gifts are traditional
clothing from top to bottom, and for the groom, they
have to bring two red envelops of money called “Uang
Susu” or in English, “Milk fee”.

The bride’s family is supposed to receive both envelops
and return the bigger one to the groom at the end of
Sangjit event to show that “you don’t buy my daughter,
you just pay a respect to me for raising her.”

The Tea Pay is when the couple pays respect to the elders, and when the family wishes them a happy
marriage by giving the red envelop “Angpao”. “I did it when I got married too,” said the mother of three.

For the reception, “She [the bride] wants the color theme to be black and gold, and I’m trying to be more
modern and agree to that, but I think there should have been at least a little bit of red [Chinese traditional
color for marriage] or pink,” said the mother who eventually ordered peach-colored flowers on every dining
table at the reception.
They are having the reception at the Ritz
Carlton Hotel in Jakarta, with 60 dining tables.
Sit down receptions are becoming common in
Jakarta. People are trying to invite fewer
guests, making the ceremony more and more
personal instead of having a standing buffet
with a thousand people.




                                                                                                   20
Look who’s talking …




The reception starts with a jazzy orchestra, which finally welcomes the two families and the couple. These
families are the celebrities of the night and sit at a special dining table on the stage, facing the guest tables.
“It’s a little awkward when you’re put under the spotlight and people are observing you, what you wear top
down, but I can still enjoy the dinner and champagne.”

On the menu, there must be shark fin soup and bird’s nest. These are the traditional celebration cuisines for
Chinese. “So out of all the 10 cuisine we have, we have shark fin soup as one of the appetizer, then we mix it
with Indonesian foods like Bangka noodles because the groom’s family comes from Bangka, and we also have
pasta and steak because the couple loves it, then we ended it with bird’s nest and chocolate cake as dessert.”

As always, there are toasts, the wedding cake cutting and a little bit of
video showing the morning church ceremony and Sangjit. For the couple
and their friends, they have the after party with hard liquor and live
music. “My husband also had drinks with his business partners. He said
there is this guy who got drunk and slept on the table for a bit and they
have to bring him to the room. They also took a photo booth picture
together,” she said as she shows the picture.
                                     “We planned on the budget to be
                                     under 2 BILLION RUPIAH in total for
                                     the reception - Sangjit, gowns and
                                     all. But it ended up to be 2.5 billion
                                     Rupiah at the end. It’s very costly
                                     we thought, all that money for just
                                     2 days, it’s a waste of money. But at
                                     the end, I think it’s worthwhile. It’s
                                     a once in a life time event for them,
                                     and I don’t want people to
                                     remember that “Han’s and Lilie’s
                                     wedding was the one that the food
                                     doesn’t taste good or the event is
                                     very unorganized.’ It has to leave a
                                     good memory in other’s minds as
                                     well,” says Tjan.


                                                                                                   21
                                     The father of the bride on the top left, accompanied by his business partners
                                     from China at the after party.
Look who’s talking …




JAPAN

March 2011, the month of the devastating tsunami and earthquake in Japan. The cataclysm changed people’s
view towards their lives, and to many, it provided them areason to seriously think about their future. Many
realized the true importance of their partner. Many realized that there is more to life, choosing to move on by
themselves.

Either way, one big key word that has come up in 2011 was “KIZUNA” (bond) between family and friends.
KIZUNA was chosen as the word of the year for 2011.

KIZUNA Wedding is now the big trend in the wedding industry, says Kei Yamamoto, a wedding planner in Tokyo.
Many couples who come to plan their wedding often mention that they have decided to have the wedding
because they want to express their gratitude to their parents. According to Zexy, the biggest wedding planning
cooperation in Japan, the top three reasons why people have wedding parties are 1) To express their appreciation
to their parents, 2) To make their parents happy 3) To express their appreciation to their friends and relatives. This
tendency seems to have increased post 3.11.

Kei says that activities which involve parents to participate in the wedding has increased. In addition, so has the
tradition of the father of the bride escorting the bride into the church (venue). Activities such as mother of the
bride placing the bridal veil and parents or siblings escorting the couple out of the wedding venue is becoming
popular. Another activity is the candle relay where all the participants relay the candle light to the person sitting
next to them. Once all the candles are lit, they blow the candles, making a wish.

The average expenditure per wedding has increased in 2011 (it has been constantly increasing in the past 5 years)
and this trend is predicted to increase.

Despite the recession and despite the disaster, or because of the recession and the disaster, people acknowledge
and treasure the importance of bonding with people.




                                                                                                  22
Look who’s talking …


                                                             “Being a wedding planner requires me to wear
                                                             several hats. You have to be part-psychologist, life
                                                             coach, personal assistant and friend.” – Pat
                                                             Pastelero


                                                           According to Pat, the challenge lies in helping the bride
                                                           always see things in perspective. The term “bride-zilla”
                                                           is often the norm than it is the exception. Years of
PHILIPPINES                                                working with brides has been instrumental in managing
                                                           last-minute glitches and coming up with solutions on
In the business of weddings, the Philippines is a prime    the spot.
market for designer dresses, elaborate flower
arrangements and professional videography. Gaining         Being a wedding planner in the Philippines is a lucrative
clients has less to do with marketing and more to do       business, especially since women nowadays get married
with referrals from people within the business.            mid-career, which makes it difficult for them to be very
                                                           hands-on with their weddings.
Pat Pastelero started off as a florist in 2008, catering
to offices, luncheons, and events. Her business            However, success depends on the network you’ve built.
Spruce Floral Designs, enabled her to grow a network       Brides are not convinced by advertising, but the
of happy brides, designers and wedding suppliers           recommendations of people they know and trust. For
willing to refer her. Not too long ago, she decided to     now, she is working on weddings of close friends.
branch out to wedding planning, at the request of
some of her clients who appreciated her impeccable
taste, keen attention to detail, and professionalism.
                                                                                                       BANGLADESH

                                 In Bangladesh, more people are turning to wedding planners to help organize
                                 their special day. So much so that it could be considered the next big trend in the
                                 country’s wedding industry. What should wedding planners offer to their clients
                                 here? There are key components, including special “Dala” decorations, stage
                                 decorations and “Rasam” functions.

                                 Must-have trends for brides include an elongated Rakhi ceremony, which is the
                                 entrance of the bride in a Palki or some other extravagant vehicle to showcase
                                 her beauty. Massive, glamorous centerpieces at dinner tables are also popular.
                                 Couples prefer to have an open location rather than a community center. Such
                                 open locations enable the bride and the groom to have more luxurious
                                 ceremonies. Activities at the wedding include small plays where the bride and the
                                 groom along with their families act out the story of how they met each other.
                                 Weddings are done with a carnival theme with many stalls offering food and
                                 other activities. The themes are very flamboyant, some are more Mughal
                                 focused, often with very bright colors.

                                 People don’t usually have traditional biryani cuisine but rather different types of
                                 food. More attention is given to the clothing worn by the bride than the groom.
                                 People prefer more gaudy dresses with heavy embellishment work. Popular
                                                                                                23
                                 honeymoon destinations include Thailand and Bali.
Look who’s talking …
                                                                                                       SOUTH KOREA

                                             Eunkyung Chang, Director of Design Wedding (www.designwedding.net),
                                             is a veteran wedding consultant with more than 15 years of experience
                                             working as a wedding planner. She is now focusing more on new
                                             business development, training and recruiting staff. This veteran
                                             wedding consultant said the current Korean wedding market is
                                             undergoing big changes from many perspectives. Let’s hear some major
                                             trends and interesting points of latest Korean wedding culture from her.




How does a much wedding cost?

Per couple, it costs approximately 70 to 100 US grand
including all wedding ceremonies, furniture,
honeymoon and other related expenses (this excludes
housing). One interesting old Korean traditional
wedding culture in Korea is money gift for the
ceremony, which can cover a guest’s meal for wedding.

What are the most popular locations?

The majority of Korean couples are married in a
wedding hall, which is a wedding exclusive venue. Some
very devout Christians or Catholics will not use such     What kind of food is served?
facilities. More recently, the convention halls of
renowned hotels have become one of the popular            After wedding ceremony, guests are guided to a
wedding venues. And the wedding hall interior style is    banquet hall where different types of cuisine awaits
under transition, from Baroque elegant style into more    them. There are three main types of wedding cuisine.
modern and simpler one.                                   One is Korean cuisine, the second is more Western and
                                                          the third is a typical buffet style. One interesting meal in
Among some very high society people, very luxurious       Korean weddings is a warm noodle traditionally
house weddings for a very small number of guests (less    believed to imbue the newlyweds with a long and happy
than 100 ) are preferred as being very private and more   marriage. This dish is still one mainstays of Korean
flexible time management.                                 weddings.
                                                                                                  24
                                                                                                  27
What do the bride and groom wear?
                                                                     Look who’s talking …
Generally Korean couples have a Western-style wedding
ceremony. No wonder the core of the ceremony is a dress!
Every bride has a fantasy over her own dress for one single
special day for entire of one’s life. That’s why the wedding dress
is worth more than fuss about.

One big change for wedding dresses over the last decade is that
Ewha Women’s Street, a once popular place to buy wedding
dresses, is not as popular among couples anymore. Now, the
previously up-market dress shop street Cheongdam has become
the most popular shopping area now for wedding attire.

Preferences for wedding dress have also changed. After one top
Korean celebrity wore a dress from Vera Wang, many Korean
women started to shop for imported designers. Another change
is that Korean males are now more involved in the decision
making processes. Men’s clothing is also more important than
before. More grooms prefer custom-made tuxedos with
luxurious materials from designer brands rather than ready-
made ones.
                                            Where do they go for their honeymoon?

                                              Interestingly, the top priority of Korean couple in selecting a
                                              honeymoon destination is a location where there are not many
                                              Koreans. However, due to their time limit (average Koreans have
                                              maximum only 7 to 9 days off for a honeymoon), long flights and
                                              high costs, the majority of couples choose to go to South East Asian
                                              countries.

                                              If the couple has enough time and money, Cancun, Tahiti and Bora
                                              Bora are also preferable destinations. More couples are also aware
                                              of branded resorts, such as Banyan Tree or the Four Seasons, for
                                              example. Sometimes these resorts matter more than the
                                              destination itself.

                                              Any other trends?

                                              A decade ago, it was not difficult to see a wedding reception where
                                              the friends of the bride and groom party with each other after the
                                              wedding. Now, as couples become more economically conscious.
                                              they are having fewer extravagant banquets. Friends also do not
                                              want to burden the couple as they know they will have to
                                              reciprocate in the future.

                                              In short, young Korean couples tend to be more individualistic and
                                              also Western in terms of the style of their weddings. They do not
                                              want to place too much burden on others. It is likely the worldwide
                                              economic downturn is one of the key influencers of this trend -
                                                                                                25
                                                                                                27
                                                                                                28
                                              weddings are becoming more realistic and mature rather than
                                              overly romantic and expensive.
Look who’s talking …




INDIA

Meet Varun Raj and Smriti Chabbra. They are a               Smriti’s wedding was originally budgeted at INR 8lakhs
newlywed Indian couple who planned their own                but they ended up spending INR 12-15 lakhs. This
wedding with necessary approvals and requests from          spillover was mainly due to accommodation of guests
family and friends. Like many other young couples,          at the venue. “We selected a destination wedding,
Smriti and her beau wanted their wedding to be              which shot the budget by 30%,” the couple said.
different. Different today means how the wedding is
                                                            Must-haves
done and/or where it is done.
                                                            Food : Most important. That’s what most people
Though Varun is from Mumbai, his family is settled in
                                                            attend weddings for. Good food. Offering 3-4 different
Dubai. Smriti’s family is in Chandigarh. Usually, couples
                                                            kind of cuisines is the norm. Indian and Chinese used
opt to plan their wedding in the same or one of their
                                                            to be must. Italian and continental are the new must
hometowns.
                                                            haves. Besides these, many people choose to also
However, they chose to have a destination wedding in        keep some dishes that are popular from the
Goa, which is a seaside destination in southern India.      community they belong to.
They said they chose Goa because there is a beach, and
                                                            Venue : The grander the venue, the better the image
its closer to Mumbai than Chandigarh and Dubai. It’s
                                                            of the financial stability of the families involved.
also cheaper than Mumbai and has a certain romantic
                                                            Second to that is the convenience of the venue in
nostalgia for them since they frequently vacationed
                                                            terms of proximity to the main roads, facilities and
there. They also wanted more friends to attend their
                                                            residence of both the families.
wedding rather than only old relatives!

“Destination weddings are popular. And most of them
are planned on beaches or palaces,” says Divya Tejuja
who works with the wedding planning team at a
company called Percept. Besides Goa, Jaipur is a
popular destination for those who seek grandeur in
their wedding.                                                                                 26
                                                                                               27
                                                                                               28
                                                                                               29
                                                                                               30
Look who’s talking …

Activities

Mehendi : Earlier both families would have a separate
Mehendi party for their respective relatives. But now to
save costs, many functions and puja ceremonies, like
Mehendi, are combined functions.

Before and after party : The party before the wedding is
usually termed as a cocktail party where rings are
exchanged. The after party is more of a youngsters party
where the couple can now celebrate the wedding without
any ceremonies involved.

Music : A good DJ and dance music is an integral part of
every wedding. Everybody tries to get into clothes that
allow easy maneuvering and bold dance moves.

Performance : A group from both sides of the families
performs a skit about how the couple met, eccentricities of
each – the bride and groom, the crazy families coming
together. It is supposed to be humorous at the expense of
both the families and creates an entertaining spectacle for
the entertainment of the outsiders. The two groups practice
this performance for a few months before the wedding with
the help of a choreographer.

Décor

Drapes instead of traditional heavy flowers. Earlier the
seating arrangement would be like in a theatre, with a stage
and everyone facing it. Now , the preference is for round
table setting. The hanging out area is separate from the
eating area.

Favorite honeymoon destinations

West India: Goa

South India : Kerala

North India : Shimla/Nainital

Overseas: Thailand, Singapore, Malaysia and SriLanka are
popular destinations because they are affordable and
adventurous. Plus it is not too difficult to acquire a visa.
                                                                           27
                                                                           28
                                                                           29
                                                                           30
                                                                           31
                                                                           32
Knowing me,
Knowing you




 Village Folks
Knowing me, knowing you
Rural Pakistan is an emerging market that comprises
67.5 percent of the country’s total population. Small
villages exist in clusters where the main source of
income is derived from farming and raising cattle for
dairy products. Key challenges faced in rural areas
include sanitation, education and health facilities.
Sewage systems usually consist of small wells that are
built outside of houses. Few villages have
government-funded schools, which means parents
interested in educating their children have to send
them to cities that are often far away. Males tend to
be sent away for high school while females only
complete primary school. Villages have few
government or private hospitals, which means health
services and information is mostly spread through so-
called Lady Health workers who go from door-to-door
in selected communities.

Strained finances, security of elders and strong values of sharing have nurtured a tradition of joint household
living in villages. This sometimes leads to family disputes over distribution of wealth and disputes between
women living in one household. Religion dominates the lives of villagers and religious festivals are of vital
importance. The most popular festivals include the birthdays of Sufi saints that are commemorated through
exciting, colorful festivals called melas. During these festivals, everyone comes together to showcase their
individual flair for creativity via folklore, folk music, traditional food as well as crafts such as embroidery, stitching
and pottery. Numerous vendors sell different wares. Young men take part in activities such as the wrestling sport
called kabbadi.

Behind the colorful lives of rural villagers, are strong undercurrents of conservatism. Arranged marriages are
ubiquitous. Women are restricted from going out in public alone. There is shocking gender discrimination and
limited educational opportunities for females. Yet those living in rural Pakistan continually hope for a better
future. They want access to clean drinking water and other basic infrastructure. That the health risks they face on
a daily basis go away with better hospitals and more doctors. They seek empowerment - empowerment in
education, entertainment, vocation, freedom of expression, finances or simply access to basic utilities. In the face
of continual hardships, Pakistan’s rural population is inspirational. They are genuinely warm and hospitable
people who are always smiling and forever hopeful.


                             Diana’s approach to life is simple. Why fuss about things when you can just “be
                             happy”? She strongly believes in taking things easy and bearing no ill will towards
                             others. Despite the rising cost of living in Singapore, she appreciates the
                             governments small effort in trying to ease the burden on the lower economic strata
                             but feels it is barely enough to make a difference. At home, she often prefers to veg
                             out on her sofa and watch her favorite Tamil cartoons, instead of using her computer.
                             “When you go online, you have to read this, read that, click here, click there. I rather
                             just watch cartoons on TV – it’s so enjoyable and always puts a smile on my face.
                             When you watch movies, sometimes you get sad also – what’s the point?” Her love of
                             the telly has Diana lusting for her next home furnishing purchase – an L-shaped couch
                             with a reclining back rest!
Knowing me, knowing you

                                             Her son Adam, in the
                                             living room




      Safida and her dad


Safida, who is 31, lives with her parents and her four-         Safida’s biggest challenge is having to travel around on
year-old adopted son in a hilly Malay village in Kuala          her wheelchair. She contracted a fever when young and
Lumpur called Kampung Palimbayan. The village is                gradually lost control over her motor abilities. The
situated close to the city centre and, as a result, many        limited infrastructure and facilities available for the
developers flock to the village to set up retreats for          physically disabled makes it hard to earn a living.
people looking for a quick escape from the city.                Currently, when she needs to travel, her parents have
                                                                no choice but to carry her down the steep stairs of her
The village isn’t your typical village scene as community       home. Their health is her biggest worry, especially with
ties are not very strong, perhaps due to the close              the strain of transporting her to work and back
proximity to Kuala Lumpur. Safida commutes to the city          everyday. However, thanks to technology and her good
to work. She works from 8 in the morning until around 6         command of English, she has found a solution - an
at night as a secretary/ receptionist at an oil and gas         online English tutoring job which will give her the
company situated 45 minutes away. She earns RM1500              freedom to work from home.
(US$476) every month. Her parents sell nasi lemak (rice
cooked with coconut) every morning at the local market          She hopes the government will be more supportive of
and run a small catering business. On a good day, they          their community and provide more job placements and
make RM200 (US$63). They have a comfortable life with           facilities for the disabled. Despite her challenges, she
their combined household income. Her home is simple             has never given up and plans to set up a school after
with all the basic amenities. She has a car, two televisions    she moves back to her dad’s hometown in Perak where
and subscribes to cable TV and wireless internet. The           there is a stronger knit of family and community to
family loves to watch Masterchef Malaysia together as           support her.
her parents love to cook.

Safida isn’t the typical village folk either. She’s more tech
savvy than most and uses an Asus laptop to update her
blog (www.girlonchairblog.blogspot.com), a Blackberry
phone to connect with her friends and also teaches her
son to type and use the internet using an Android Tablet.
She says, “There is no limit when it comes to education
these days” and hopes that she can prepare him to
become someone useful like a doctor or a pilot who is
able to take care of the family. Her son speaks English
and Malay and goes to an established English medium                                                 30
Smart Reader Kid preschool.
Sumanapala                                            Knowing me, knowing you
 Paddy field worker
 Anuradhapura
                                                            He is also happy that the road to the village is now
                                                            paved and wider and that the government is giving
                                                            fertilizer to farmers at cheaper prices. But there are
                                                            still problems. It is hard to get good prices for paddy
                                                            harvests, for example. Yet, overall, the eldest son says
                                                            he believes the future of his children will be brighter
                                                            and better than his - better socially as well as
                                                            economically.


Sumanapala is a rice paddy cultivator from
Anuradhapura, in Sri Lanka. Rice paddy cultivation is
the staple of this economy in addition to Chena, or
vegetable, cultivation. He works nearly 16 hours a day,
his time divided between paddy fields and the Chena.
He rarely travels outside the village, but when he does,
he takes a bus.

Sumanapala has a large family with four children. His
parents’ generation had families with as many as 10
children. The smallest son is in grade six and studies at
a local primary school run by the government. He has a
sister who just completed her O/Ls and his currently
hoping to enroll in a computer class in their town. This
will likely place a strain on the family’s budget, but
they have decided it is necessary for the child.            Akira Wakabayashi moved to Kagoshima prefecture
Sumanapala has never touched a computer, but his            (southern tip of Kyushu, Japan) in 2007. He was
younger daughter will need the knowledge to find            working in Fukuoka city (a big city in Kyushu) as a
success in the future. His eldest daughter and eldest       computer engineer for 10 years and decided to move
son never learned how to use a computer. Now the            to a rural place with his family to lead a self-
eldest daughter works in a garment factor. The son is       sustainable, simple life. He now manipulates an ax
in the army.                                                instead of a computer. He built a house and cultivates
                                                            vegetables.
Sumanapala’s home is sparse. It has a few old, wooden
arm chairs and a table with a few chairs where the          He has a mobile phone for an emergency, but does not
family gathers for meals. He has an old black and white     have TV anymore. If you live in Japan whether rural or
television and a radio, which is youngest son wants to      urban, things you can get, watch or hear are not so
replace with a model that has color. Sumanpala says         different. Same national TV shows are available,
he could find a better use for the money, hoping to         nationally standardized education systems are equally
buy a small tractor that he could use to plough other       available, Any fashion items or gourmet dishes are all
fields and earn extra income.                               one click away.

He says there is really no use for a better TV as he only   However, there is an increasing number of people who
uses it to watch the news and a few random drama            wish to lead a simple life. They choose to live in the
programs. His youngest son likes to watch cartoons.         scarcity of things. Mr. Wakabayashi believes that rural
They have no landline but instead a mobile phone,           living can give a rich experience not only to him and his
which functions as the home phone. It was purchased         wife, but also to his children. He says “now we
by the eldest son who says he is relieved the war is        appreciate every single thing around us that we used
                                                                                                      31
over.                                                       to take for granted. It is a joy of life”
Wang Dong and her daughter




Samsung desk computer mixed with parts of
other brands

Unknown brand air conditioner




                                                        32
                                            Skin care and laundry products
Knowing me, knowing you



                                                             Wang watches TV and uses her computer after work at
                                                             home for an hour or two. National news and local news
                                                             are her favorite content. Wang’s most often watched
                                                             channels are CCTV 13, the Liaoning provincial channel
                                                             and Liaoning local channels. The motivation of watching
                                                             TV is she wants to know government’s policies and what
Wang Dong is a 34-year-old rural doctor who lives in         happened around her
Linhai, a county level city in China’s Liaoning Province.
Inspired by her friend’s parents, Wang decided to study      She also likes reading her friends’ diary at their QQ
medicine at Linghai Hygiene School when she was young        spaces. It is the main way for her to understand what’s
and has received her professional certificate. Wang’s        going on with them, what do they worry about and
husband runs his own shipping business, and they have        what are the things they are happy about. She also
a 12-year-old daughter. Both Wang’s parents and her          reads newspapers at work and especially focuses on
parents-in-law are from and now still live in the            recruitment information.
countryside.
                                                             Wang and her husband make around 2,500 yuan per
Wang’s family used to live in a one-story house that is      month. She thinks their income is not high enough and
made of red bricks. They had to sell it since the land was   the “comfortable life” has not yet arrived. “If I see a bag
needed by developers two years ago, and their old            that I like, I cannot buy it because I cannot afford,” she
house has since been knocked down. They bought a             said. Wang also dreams of traveling. But she doesn’t
new apartment by using the money from selling the old        have the money. The only place that she has travelled to
one. Wang’s family moved into the new apartment two          is Qianshan mountain in Anshan, the same province that
years ago. It is in a newly built brick blocks on the edge   she currently lives in. Wang is not a sophisticated
of the city. People living in the neighborhood are also      consumer for fashion and beauty products. She mainly
from rural families. There are very few cars parked in       purchases low-end Chinese skincare brands such as Da
the neighborhood, and those cars that are there are          Bao. However, she desires to go to a beauty salon since
entry models. Some families with ground floor flats          her girlfriends who are able to afford to go are using
even keep the habit of rural lifestyle, growing their own    direct-sale cosmetics and skin care products bought at
vegetables on the first floor.                               that salon such as Chedoven.

Wang’s apartment has 2 bedrooms and 2 living rooms.          Wang worries about inflation. She thinks the inflation in
The overall feeling of the living space is simple and        the past few years is making things more and more
minimal, but bright. The dining room, kitchen and            unaffordable for average people like her. When I asked
bathroom are decorated in a green color. All big ticket      her how she deals with inflation, she replies that they
items in Wang’s apartment were mostly purchased from         “eat less meat”. “I only make 33 yuan per day, but the
local private shops through friend’s recommendations.        meat (pork) price is now 17 RMB per half kilogram, so I
They are currently using home appliances, including a        have to look for discounted meat from supermarket
Samsung desk computer mixed with parts of other              everyday,” Wang said.
brands, a Panasonic TV, a Royal Star refrigerator and an
unknown domestic brand air conditioner. Wang prefers         However, Wang still feels optimistic about the future of
joint venture brands because Chinese brands are still in     her family. She thinks the government will launch better
the process of learning advanced technology from             policies that are going to benefit more people. She also
foreign brands, but most of the time she can only afford     believes her family will be able to have a “comfortable
domestic brands. She also uses Nokia cell phone.             life” because they will work more and work harder.
                                                                                                   33
Knowing me, knowing you




It is not an easy job to be an over-60 year old female      “I don’t agree that this is good for kids, but it’s true if
farmer in Taiwan, but Mrs. Chen does not take the           you study in the city, you have more chances to study
cultivation as a dirty job. Instead, she is thankful that   at a better college and get a better job,” she said.
nature can give her and her family such a beautiful life
without the pressure form an urban lifestyle.               Although she can only see her grandsons about 3 to 5
                                                            times a year, she keeps in contact with them through
“Although there are no such fancy entertainment as in       the use of a mobile phone, and recently her son
the big city, we still have lots of fun on any normal       recommend that she should have a computer so they
day,” Mrs. Chen said.                                       can visit more frequently via webcam.

Mrs. Chen likes to sing with her relatives and friend.      “I have learn some computer skills through the
They will have a gathering twice a week at a local KTV.     Township Office, but computers are not practical to
Recently she likes to invite people to her place            me. However, I recently have wanted a smartphone,
because her husband bought her a karaoke stereo set.        especially since the Elder Farmer allowance has been
“Of course I am very happy, and I look forward to           raised to NT$ 7,000 per month in 2012,” she said.
singing with my sons and grandsons in the coming
Chinese New Year,” she said.                                Generally, Mrs. Chen is satisfied with her life, and
                                                            welcomed the youth back to the rural life. “Maybe you
Just like the rural people go to city to pursue a better    can’t get wealthy, but you can enrich your life here.”
life, Mrs. Chen’s son also as a job in Taipei where his
child can attend a better school, which means the
students have to study 10 hours per day.
                                                                                                  34
Knowing me, knowing you

                                                Maria is a 32-year-old living in Deli Serdang, a second-tier city near
                                                Medan, North Sumatra in Indonesia. She is the mother of a 7-year-
                                                old son. Maria is optimistic and tough. Even with rising prices for
                                                food and other basic goods, she still manages her family’s needs by
                                                working as a high school teacher in the morning and as a private
                                                teacher twice a week in the afternoon. Her husband works for a
                                                manufacturer in Medan. While life seems slow in her small city,
                                                things continually move faster with technology - TV, internet, mobile
                                                phones. Family drama, music shows and infotainment are her
                                                favorite TV programs, but her attention is frequently diverted to her
                                                mobile while she watches television. She constantly chats on
                                                Facebook, updating her status and posting photos.

                                                “The government is busy with their own concerns. They don’t think
                                                of us, their citizens,” she says. “Politicians are busy creating their
                                                good images. Political parties race to get our hearts by doing social
                                                activities. I only care about my family life - how to run it well, make
                                                sure my child gets a better education. I hope we can buy our own
                                                house next year and no longer live in my parents’ home.”




Taju Sarker, who is also called Tajuddin, is a painter who lives in
rural Bangladesh. He also works as an electrician and earns a salary
that is slightly higher compared to others in his village. His income
has increased recently as more people in his community are
building their own homes, which means they need to hire a
painter.
In his home, he has a television, a transistor and other home appliances. He has no clear idea of any major
purchases he would like to make in the future, adding that he would rather save his money than spend it on any
one particular item.

Tajuddin has two sons: One is 7 and the other is only two. His eldest son attends a school located at the end of
their street. The family watches mainly Bangla movies on TV as well as dance shows - apparently Hindi TV dance
shows are a big hit in the villages. None of the family members have ever used a computer. But there is a mobile
phone repair store that just opened right next to their home. They have gone to this store to watch its owner
work on a computer. When asked whether the government is doing enough to help the nation’s poor, Taju said:
“I do not care as long as I live well and my children grow up well, I am more than happy. I do not care what the
government does.”

He owns two mobile phones, which his children use to talk to their relatives.

Tajuddin said he did not want any photos taken of him or his family. He insisted it was better not to take any
                                                                                             35
photos because his house was being renovated and his wife was not present. He said he did not want to send
out an “unfinished” photo of his life for the world to see.
Knowing me, knowing you
                                                                                        Eugenio, who lives of
                                                                                        North Luzon in the
                                                                                        Philippines,        learned
                                                                                        farming from his father
                                                                                        who learned farming from
                                                                                        his. He spends everyday
                                                                                        tending to his vegetables
                                                                                        as it is the main source of
                                                                                        income for his family.
                                                                                        Everyday starts early at
                                                                                        430am and the rest of the
                                                                                        day is spent instructing his
                                                                                        employed workers hands-
                                                                                        on or conversing with
                                                                                        agricultural specialist on
                                                                                        different crop issues.
Eugenio seeks to improve his farming practice to remain competitive in the market. He makes sure to establish
close relationships with his buyers and sees to it that they get the consistent quality that they have come to
expect from his produce. His years in farming taught him that reputation of his produce is valuable in gaining and
maintaining buyers. He knows that his chosen livelihood requires daily personal attention. Because of this, he
rarely goes on holidays. In fact, the first time ever he rode a plane out of his province was last December 2011
(which was partly also for his business). He takes pride in his respected vocation but does not wish his children to
inherit it. Under his management he strived to grow their family’s farming livelihood so that, unlike generations
before them, his children can go to college. This way, they can have a more prosperous life without having to toil
under the sun.

                                                  Phuong is a Vietnamese housewife with 2 children under 10
                                                  years old who both go to public school. Her life is non-stop work
                                                  with both her weekdays and weekends being filled work in the
                                                  fields or chores in the house. Her husband works as a building
                                                  assistant and lives away so that they can earn more money for
                                                  the family.

                                                  Her life is becoming more difficult with the increasing price of
                                                  necessities such as fuel, water, and electricity, hoping that the
                                                  government will have new policies to support their lives and
                                                  control price fluctuations. Her reputation is important to her and
                                                  while money may be tight, she doesn’t want her family to ‘lose
                                                  face’ so she still has goods in her home such as a TV, motorbike,
                                                  CD/VCD player and electric fan. Phuong’s main form of
                                                  entertainment is chatting with friends or watching TV for
                                                  normally 1-2 hours/day during lunch, dinner, or relaxing at the
                                                  end of the day. Computers aren’t something she feels she needs
                                                  to buy or have in her home yet: she believes that because she
                                                  has never needed one before, her money will be better spent on
                                                  other products more essential to her family’s lifestyle like her
                                                  mobile phone that she uses to keep in contact with her husband
                                                  living away.                                    36
Knowing me, knowing you




Ram Naresh Yadav is a 32-year-old commerce graduate employed with a local bank called the Regional Rural
Bank, in the outskirts of New Delhi. He is married and has two kids. Ram stays with his parents and younger
brother who is single. His father is a farmer who owns 1 hectare of semi irrigated land. Ram is the first person in
the family to break out of the farming occupation. He wants his kids to study in New Delhi and then become civil
servants (as they call collectors), or go abroad.

Has life got better or worse for them recently? He says that mobile connectivity, a media explosion, improved
infrastructure and government funded rural development schemes have made a difference to his and his peer
group’s life. He also says the quality of health care has improved over the last ten years.

What's in their homes? He has white goods, including a TV, refrigerator, washing machine, water heater, fan, etc.
He drives a motor bike and has a small sofa set, a few chairs and a double bed. He has a bone china tea set. Food
is consumed using steel utensils.

What are they planning to buy next? He wants to buy a big screen TV and a DVD player.

Where do the kids go to school - what kind of school? Ram’s daughter goes to a government primary school and
and his son to a local English medium school, which they call a convent school.

What TV programs do they like to watch? Mostly Bollywood movies, the quiz show Kaun Banega Crorepati,,
laughter shows and news on Aaj Tak or India TV (instead of saying news he mentioned channel names).

Have they ever used a computer? Yes. Ram says that most of the youngsters in his village want to learn how to
use a computer because that is perceived as the key to success. This belief has aided in mushrooming of computer
centers all over around the community.

Is the government doing a good job? He and most of his peer group feel that the schemes proposed by different
governments don’t reach them and middlemen siphons it all off. Also, they think that the caste factor plays a
major role in getting government support in rural areas.

Do they use a mobile phone? Yes he uses mobile phone. There are two phones in his house, one he carries with
him and the other used by everyone at home. The second phone is never carried out of home, it has replaced the
landline!                                                                                 37
                                                                                          45
Movie of the Year
PAKISTAN : BOL

'Bol‘ is a renowned Pakistani film director Shoaib Mansoor’s
second dramatic film that reveals the country’s rigid social, cultural
and right-win religious complexities.

The film takes place in Lahore in a household with a number of
daughters. Their life is, on the surface, vibrant. However they have
severe restrictions on freedom of expression. ‘Bol’ takes audiences
on a journey into the life of this family, illuminating their sufferings
and triumphs. As the women try to solve their problems, they face
even deeper challenges. The complexity of their circumstances
becomes a struggle between life and death.

The movie was nothing short of controversial. The name itself
means “speak” and is a simple and symbolic comment on the lack
of free expression in Pakistan. Never before have issues such as
homosexuality, the stigmatization of female use of contraception,
the freedom to choose one’s partner and public demonstration of
singing and dancing been addressed so directly in Pakistani
cinema.

‘Bol” is undoubtedly the most provocative and most talked about
movie of the year in Pakistan.


SINGAPORE: ALREADY FAMOUS

Following ‘The Noose’s’ Emmy Nomination for Best
International Comedy, Michelle Chong has shifted gears for
her directorial debut, ‘Already Famous.’

The movie was extremely well-received by Singaporeans. Its
performance matched Hollywood movies released the same
weekend and raked in S$1.04 million in just 11 days.

Beyond just a good directorial debut, this movie symbolises
an increasing appreciation of our country’s local talent, both
amongst Singaporeans and international audiences.

Storyline: Lim Ka Kiao sells TVs but she wants to be on TV!
The young Malaysian girl heads off to Singapore to fulfill her
dream of becoming a famous TV star. In her journey to
superstardom, she meets a shy coffee shop assistant named
Ah Seng who helps her achieve her dream. Seemingly light-
hearted but not without moments of vulnerability and
emotion, ‘Already Famous’ is touted as "not just about the
trials and tribulations of making it in showbiz, but also a
message of truth and heart to anyone who's ever wished
upon a star".
Movie of the Year




                                                          Malaysia’s Movie of the Year goes to controversial
                                                          local film ‘Nasi Lemak 2.0.’ The comedy, named after
                                                          Malaysia’s national dish, takes an unflinching look at
                                                          racial stereotypes that persist among the locals. ‘Nasi
                                                          Lemak 2.0’ tells a story of a Malaysian Chinese chef
                                                          who, ignorant of the other cultures that comprise
TAIWAN: YOU ARE THE APPLE OF MY EYE
                                                          Malaysia, discovers the meaning of being Malaysian on
                                                          his journey to learn about local cuisine.
The blockbuster ‘You Are the Apple of My Eye’ has
become the highest-grossing Chinese-language movie
                                                          One of the reasons for the popularity of ‘Nasi Lemak
in Taiwan. The film has grossed NT$410 million
                                                          2.0’ is the fact that it originated from Namewee, a
(US$13.54 million) at the box office in Taiwan since
                                                          Chinese Malaysian who shot to fame after he released
its release in August.
                                                          a controversial song fused with Malaysia’s national
                                                          anthem that aired his views of Malaysia and its
The romantic comedy adapted from one of Ko's
                                                          leadership. In a country where media is highly
novels, which opened in Hong Kong theaters on Oct.
                                                          controlled, his bravery and transparency won him
20, depicts the life of a troubled high-school boy who
                                                          many supporters.
falls in love with a girl who is adored by almost every
boy in her class.
                                                          While Hollywood movies dominate screen time in
                                                          Malaysia, ‘Nasi Lemak 2.0’ is one of the few locally-
Taiwan movie critics have said the film's ability to
                                                          made movies that has captured the attention of
arouse the "collective memory" of audiences in
                                                          Malaysians. Many look to ‘Nasi Lemak 2.0’ as an
reliving their high-school years is what has made the
                                                          honest portrayal of life in Malaysia, in a society where
film so popular.
                                                          media tend to gloss over sensitive issues, such as race.
                                                          The style of acting, script and characters is uniquely
After ‘You Are the Apple of My Eye’ was released to
                                                          Malaysian, and local references to typical Malaysian
audiences in Taiwan and Hong Kong, some large-scale
                                                          problems, such as the well-known poor quality of
plots have triggered intense discussion between
                                                          Malaysian made cars, is also included.
moviegoers. Therefore, the movie successfully passed
the Chinese mainland film censorship board, the
                                                          This theme of finding a Malaysian identity clearly
production company behind the film immediately
                                                          reflects a cultural shift. In the past, we were less aware
announced that the film is set to hit theaters on
                                                          of racial divides, but these days, there is a
January 6, 2012 in China.
                                                          hyperawareness towards racial lines.

                                                          The trailer:
                                                          http://www.youtube.com/watch?v=3QyRzSKuwkY&fe
                                                          ature=related
Movie of the Year
                                    SRI LANKA : VIDHU

                                    Directed by Asoka Handagama, the film features an adolescent
                                    boy called Vidhu, presumably, an offspring of a politician. With
                                    no birth certificate, he is denied access to free education. His
                                    mother, a prostitute and pickpocket, educates him and pushes
                                    him up the socioeconomic ladder. With his inborn skill of
                                    speaking, he overwhelms the whole country and achieves his
                                    dreams. A politician, thought to be his father, tries to
                                    maneuver Vidhu to attract audiences to his superior’s election
                                    rallies. The catalyst of the film revolves around the politician’s
                                    arduous attempt at manipulating the child into speaking on the
                                    political stage, and the child’s resistance to speaking on the
                                    school stage at the same time. The story entails a layer of
                                    fantasy, and achieves a closure similar to that of Slumdog
                                    Millionaire.

                                    ‘Vidhu’ presents a criticism of the contemporary economic and
                                    socio-political issues of Sri Lanka. Vidhu’s mother has to sin to
                                    keep the son alive. As she says to the son, her value vacillates
                                    by the day, and when it has no value, she cannot help but pick
                                    pockets. The politician, a former lover of hers, typifies a Sri
                                    Lankan politician entrapped in the impenetrable mire of
                                    corruption and misuse of power.



JAPAN: KOKIRUKO – ZAKA KARA
(From Up on Poppy Hill)

‘Kokuriko-Zaka Kara’ is the
second film from director Goro
Miyazaki, the son of Ghibli
founder Hayao Miyazaki. It
adapts Chizuru Takahashi and
Tetsuro     Sayama's     original
manga about the coming of age
of a high school girl named Umi.

Bunkatsushin.com       reported
‘From up on Poppy Hill’ had
grossed over 587,337,400 yen
at the box office. During these
three days, over 445,000
people watched this film.

http://www.youtube.com/watc
h?v=c2hBnA-R4uw
Movie of the Year
                    CHINA: LOVE IS NOT BLIND

                    The movie ‘Love Is Not Blind’ is about a 27-year-old woman
                    breaking up and dealing with the challenges of being single
                    before she eventually finds a new boyfriend. The movie was
                    released on November 8 to coincide with a holiday in China
                    called Singles Day. The low- budget film swept the national box
                    office chart after raking in 160 million RMB (US$25.2 million) in
                    five days during its first week of screening, according to a
                    Mtime.com report. It was one of the most successful releases
                    ever for a Chinese film. Slogans of the film are also becoming
                    very popular among young Chinese. For example: “When you’re
                    in love, be crazy; when you lose love, be independent!’” and
                    “Breaking up can be a chance to love yourself again.”

                    The movie reflects a current cultural phenomenon that an
                    increasing number of young Chinese women and men are
                    staying single. Today they have more freedom to achieve
                    independent success and explore exciting urban lifestyles. At the
                    same time, their expectations of potential partners are
                    becoming higher. Meanwhile, many young men are unable to
                    buy property that most women and their parents consider
                    necessary for marriage. As time goes, aging singles feeling bad
                    about themselves and trying to find a partner as quickly as
                    possible.

                    The movie has delivered a positive message that single women
                    and men should embrace independent values, at the same time
                    searching for successful single lifestyles to match. Life can still be
                    awesome without a partner. The mass movement feeling helps
                    create a communal experience of banding together with other
                    singles for comfort and support.



                    PHILIPPINES: NO OTHER WOMAN

                    The film revolves on a man’s journey on becoming a
                    successful working husband whose perfect marriage becomes
                    complicated when he commits into an adulterous affair that
                    changes his life.

                    Released: September 28, 2011
                    Box Office Sales: Php 278.39M
                    It is the 2nd highest grossing Filipino film of all time
                    The movie was loved by audiences for its numerous quotable
                    lines.
Movie of the Year
INDONESIA: ARISAN! 2


Nia Dinata, the famous Indonesian director, released the
movie in December. It is a continuance of ‘Arisan!’, which was
8 years ago.

The movie created a buzz on Kaskus, the biggest online
community in Indonesia, and is much loved for showing an
ugly truth about Indonesian socialites which no other movies
dare to speak. It also shows a lot about the social pressure to
fit in in Indonesia. Tora Sudiro plays a famous gay architect
and Cut Mini played as a successful career woman coming
from a well off family.

The second ‘Arisan!’ shows a life progress among a small group
of socialites who, in the first movie, realized that life should
never be superficial, and, in this second movie, embark on a
new discovery that life is not all about working hard and
playing hard. It’s about appreciating the time that God has
given by stepping back, relaxing and seeing the world with
clear eyes, listening with opened ears and embracing
friendship and love.

The movie depicts the change in Indonesian culture where
people start accepting differences like homosexuality, and the
young generation are becoming more and more educated,                Watch the trailer:
hence more open minded, creative and expressive. The movie           http://www.youtube.com/watch?v=MBIpmmW
is an example of the creative industry in Indonesia that is          AayE,
growing and accounted for 6.3% of the total GDP. More and            http://ekonomi.kompasiana.com/bisnis/2011/1
more Indonesian movies are liked not only by people living in        1/24/ekonomi-kreatif-berbasis-budaya-lokal/
suburbs, but by the educated young generation in big cities
  .


 SOUTH KOREA: SUNNY

 The 1980s retro drama ‘Sunny’ is about seven junior high
 friends reuniting 25 years later and has been noted for its vivid
 portrayal of the 1980s, consequently evoking the nostalgia of
 retro pop culture and the wonders of youth. The film captures
 the restlessness of youth as much as it evokes the nostalgic
 pangs of middle age, appealing to teenagers and older viewers
 alike. The coming-of-age drama sees a timely release for Family
 Month here, but its universal themes aptly pave possibilities of
 a wider exposure. It was not uncommon to see mothers and
 daughters go to the movie theater hand in hand.
Movie of the Year
                                                        INDIA & BANGLADESH : THE DIRTY PICTURE

                                                        ‘The Dirty Picture’ not only thrives on these traits but
                                                        literally celebrates them like never before in its 144
                                                        minutes of unabashed, in-your-face entertainment,
                                                        entertainment and entertainment. It has been hot not
                                                        only in India but also in Bangladesh.

                                                        Reshma (played by Vidya Balan) is a non-conformist who
                                                        leaves her home to become a star in the big bad world
                                                        of Bollywood. The character she plays in the movie is
                                                        called Silk. She has no qualms about her sexuality. She is
                                                        brazen enough to put her neighbors to sleep with her
                                                        fake moans. She is well aware that everything comes at
                                                        a price, especially the much-vaunted fame. But soon she
                                                        realizes that success without honor is an unseasoned
                                                        dish; it will satisfy your hunger, but it won't taste good.
                                                        And Silk learns this bitter truth the hard way.

                                                        Overall it is a great movie. Vidya carries her role as a
                                                        professional. This movie has taught the viewers how an
                                                        actress in the film industry grows. How they have to
                                                        control their emotions and how they are working as
                                                        team to change the minds of the people who do not
                                                        know how things are done in this industry.

It’s one of the in-your-face movie which does not care for any critics view but to uplift the scene behind a
career in the film industry. With ‘The Dirty Picture’ director, Milan Luthria tries to explore the dirty underbelly
of the Indian cinema and excavates a gem in the form of Vidya Balan. You can’t help but appreciate the effort
she puts in to make her Silk look authentic. In the age where majority of leading ladies won’t dare to look ugly
or overweight, Vidya carries her ample love-handles and haggard looks with aplomb. It’s the role which is
bound to earn her some of the most prestigious awards in town.
                                                                                                        VIETNAM

                                  Long Ruoi is the first Vietnamese film to become the highest grossing film of
                                  the year against the increasing number of international movies screening in
                                  Vietnam.

                                  This comedy captures not only Vietnamese humor, but the dream of many
                                  that come to the city for a better life. The movie follows the story of Teo,
                                  who started his journey moving from the countryside to Saigon. After
                                  arriving in the city determined to become rich, he soon discovers that he is
                                  the spitting image of a local ring leader named Long Ruoi.

                                  A recent ambush has left Long Ruoi in a comatose condition, forcing his
                                  henchmen to enlist the hapless Teo to masquerade as the ring leader to
                                  prevent an all-out gang war. Teo must transform into the stereotypical ‘ city
                                  slicker’ to survive, playing out well known rural and city references which
                                  comes together as a comedic performance for all audiences.
What’s making people really angry,
            and why?
Rage against




                                                   After a decade and a half of hysteria about how the web
                                                   would obliterate conventional advertising with its raging
                                                   tsunami of digitally empowered consumers, the results
                                                   have been somewhat…flaccid. Yes, there have been
                                                   occasional steamy successes, but those have been the
                                                   exceptions rather than the rule. (I bet half a donut
                                                   you’re thinking about Old Spice, the T-mobile flash mob
                                                   or BMW’s ‘The Hire’.) Even those had extensive ATL
                                                   support before they went viral.

                                                   Ask any web pundit for an example of digital advertising
                                                   success in more digitized countries, and they will likely
                                                   parrot the same three tired campaigns back to you. For
                                                   all the promises made by the Digerati, the web has
“Are we donkeys?” the graffiti asks. The           proven to be a stubborn advertising nut to crack. Now
vandal hit a public taxi signboard shortly after   we’re told social media is where it’s at, and
Comfort (Singapore’s largest taxi provider)        ‘conversations’ are the aphrodisiac that will transform
announced price hikes in its taxi fares. While     your business into an irresistible hurricane of brand
several fare items were discounted, many           potency.
more were raised, leading many
Singaporeans to question if price fixing had       Now personally, and I have been advertising profession
occurred.                                          for some time now, I've never had a social media
                                                   ‘conversation’ about the laundry detergent I use or
Disgruntled citizens protested not just with       which butter I buy. And if I had friends who did have
vandalism but also with a boycott of taxis.        conversations like that, I’d de-friend them immediately.
Cabbies are reported to have experienced           But for all I know, I’m in a minority. I might brag about
lower numbers of passengers since the fares        making an expensive purchase, but that usually happens
were raised.                                       after the fact, and it’s more about me showing off
                                                   generally to annoy other people.
Will this trend continue? Or will most
Singaporeans, as some would predict, “adapt        So, to my Digerati friends residing in other parts of the
to it” and continue to help our local taxi         world, who claim divine knowledge, insight, and
business flourish?                                 prophecy into the future of advertising, this heretic asks
                                                   you but one ignorant question: When was the last time
                                                   you purchased a product after participating in a social
                                                   media campaign / conversation?

                                                   Omair Ahmed, Creative Manager, Ogilvy Lahore
Rage against




Malaysia’s Prime Minister Najib recently announced plans to review or abolish
laws inconsistent with the constitutional right to freedom of speech, assembly
and association. The Peaceful Assembly Bill 2011 was passed in December.
The bill was part of Najib’s promise to grant more freedom of assembly to the
citizens.
 Malaysia’s Prime Minister Najib recently announced                India’s Lokpal: To be passed, or not to be
However, when the contents inconsistent with the                  passed
 plans to review or abolish laws of the bill were revealed, local commentators such
as the Bar Councilto freedom of speech, assembly
 constitutional right and netizens were enraged that the new law was, in many
ways, more restrictive than the previous laws in place. The bill placesmuch Anna Hazare’s middle-class
 and association. The Peaceful Assembly Bill 2011 was             However more
restrictions on the freedom was part of Najib’s does nothing tofans in Indiapotential
 passed in December. The bill    to assemble and                   curtail the want to paint the entire political
                                                                  class as unscrupulous, political India remains
for arbitrary exercise of police of assemblyrecent example is the police refusal to
 promise to grant more freedom powers. A to the
                                                                  passionately involved with the art of political
allow Seksuality Merdeka (“Sexuality Independence”), an annual sexuality
 citizens.
rights festival, to be held as certain religious groups lodged complaints against rooted big leaders. Give
                                                                  play and the craft of
the gathering. the contents of the bill were revealed,
 However, when                                                    Team Anna credit. But for its two Delhi
 local commentators such as the Bar Council and                   protests, the political class, especially the
Enragedwere enraged that the new law was, in awareness and UPA, would not have woken up to its
 netizens netizens used Facebook to spread many                    gather momentum
for themore restrictivethe bill which culminatedplace.protest by growing public anger against corruption and
 ways,   opposition of than the previous laws in in a              hundreds of
                                                                  acted on the Lokpal Bill. From being
Malaysians in more restrictions on the freedom to lawyers marched to the
 The bill places the KLCC Park. Some six hundred
                                                                  projected as an apolitical, anti-corruption
Parliament to does nothing Bill, vowing that they would “continue knocking on the
 assemble and oppose the to curtail the potential for
doors of Parliamentpolice the bill was removed."
 arbitrary exercise of   until powers. A recent example           movement, it has turned into an unabashed
 is the police refusal to allow Seksuality Merdeka                anti-Congress bandwagon, with little scope
Even though the bill has beenannual sexuality rights and protestshide its politicaltill and RSS link-up.
 (“Sexuality Independence”), an passed, the debate                to still continue bias
today. to be held as certain religious groups lodged
 festival,                                                        Anna tested the UPA in 2011, and, in the
 complaints against the gathering.                                New Year, he, himself, will be tested.While
                                                                  everyday news updates us about the details
 Enraged netizens used Facebook to spread awareness               of the journey of the Lokpal bill, everyone’s
 and gather momentum for the opposition of the bill               attitude towards it has gone from inspired to
 which culminated in a protest by hundreds of                     angered to, with the recent events, resigned.
 Malaysians in the KLCC Park. Some six hundred                    The fate of the bill seems shaken, but behind
 lawyers marched to the Parliament to oppose the Bill,            the rage against the political system is a little
 vowing that they would “continue knocking on the                 ray of hope that wants this one baton in the
 doors of Parliament until the bill was removed."                 form of a bill to correct the corruption in the
                                                                  country.
Even though the bill has been passed, the debate and
protests still continue till today.
                                                                                                  47
Rage against




  Sri Lanka's parliament passed controversial legislation
  recently that will allow the government to acquire enterprises
  or assets it deems underperforming or underutilized, despite
  concerns the bill could hit investment in the country.

  The new law will pave the way for the state to acquire 37
  properties, including from two listed companies it has said are
  underperforming. Leases on the assets, mainly land, were
Sri Lanka's or sold at a discount years ago legislation
  given awayparliament passed controversialeither as an recently that will allow the government to
  incentive for investment or with the aim that loss-making
acquire enterprises or assets it deems underperforming or underutilized, despite concerns the bill
  state-owned enterprises could be turned around.
could hit investment in the country.
The new law will pave the way for the state to acquire 37 properties, including from two listed
   President Mahinda Rajapaksa's ruling party has been strongly
companies it has said are underperforming. Leases on the assets, mainly land, were given away
   criticized by opposition parties and leading business chambers
orfor seeking discount years ago either as an incentive for investment or with the aim that loss-
    sold at a to expedite the bill without public discussion and
making state-owned enterprises could be turned around.
   without any opportunity for the properties' holders to argue
President Mahinda Rajapaksa's ruling the owners been strongly criticized by opposition parties and
   against their listing.The government says party has will be
leading business chambers forwhat criteria expedite the bill without public discussion and without
   compensated, but it is not clear seeking to compensation
any opportunity on. the properties' holders to argue against their listing.The government says the
   would be based for
owners will be compensated, but it is not clear what criteriaEnraged residents of San Juan Cityon. the
                                                                   compensation would be based in
The main opposition UnitedNational Party said during the the debate that the a would damage
   The main opposition United National Party said during          Philippines threwbill homemade grenade at
                                                                  the government demolition team who arrived
investor that the bill would damage investor investment
   debate sentiment and discourage foreignsentiment andin the $50 billion economy, hindering Sri
                                                                  to tear down the shanties.
Lanka's post-war development. the $50 billion economy,
   discourage foreign investment in
The asset Sri Lanka's post-war development.
   hindering acquisition bill allows the government to appoint authorities to manage "in the interests
                                                                  Homes of some 300 people were torn down
of the national economy”. The opposition argued that the bill violates 2011country's constitution to
                                                                  in January the as people were forced
   The asset acquisition bill allows the government to appoint
and should not be debated while a rulingof thefundamental evacuate the against it is pending. given
   authorities to manage "in the interests
                                                   on a national   rights case area. Settlers had been
Though Rajapaksa has said the bill will be a violates the acquire the specified properties, demolition,
   economy”. The opposition argued that the bill 'one-off' to     notices by the government on the
economists, investors, state officials be debated whilepoliticians few heeded heeded the notice.
   country's constitution and should not      and opposition a    but have warned it amounts to
nationalization and couldrights casebusiness confidence.
   ruling on a fundamental damage against it is pending.
"ItThough Rajapaksa has said the bill will be a investorsto large scale will be worried," Frontier out
    will impact larger projects and potentially 'one-off' of      Residents, homeless and hapless, lashed
Research economistproperties, economists,told Reuters.
   acquire the specified Amal Sandarathne investors, state        to the government for not giving them
A officials bank economist speaking on condition of anonymity said the way in About 50 people were
   senior and opposition politicians have warned it amounts to    enough support . which the bill had
   nationalization and could damage business confidence.          injured , due to the onslaught of bottles and
been introduced risked discouraging investors.
                                                                       mini-grenades being fired at the demolition
  "It will impact larger projects and potentially investors of large   team.
  scale will be worried," Frontier Research economist Amal
  Sandarathne told Reuters.A senior bank economist speaking            According to local officials, the clearing
  on condition of anonymity said the way in which the bill had         operations will pave the way for the
  been introduced risked discouraging investors.                       construction of the San Juan 48 hall.
                                                                                                    City
Rage against

Overloaded School Van Killed 18 Children in China

On November 18, 2011, a severe car accident
occurred in Yulin County, Qingyang City, Gansu
Province. A dump truck carrying coal smashed into a
kindergarten school bus in a head-on collision. The
accident caused 20 deaths. The bus driver and four
kindergarteners were killed immediately and 15
others died in the hospital.

                                                           The revised Land Expropriation Act
                                                           Amendments hurt farmer groups

                                                         Several civic groups lashed out Taiwan’s president,
                                                         making claims that his administration had been
                                                         working to reform laws governing land use and
                                                         housing “lies.”

                                                         “The government has made the changes in favor of
                                                         developers and big corporations. The revised Land
                                                         Expropriation Act should be a protection for
                                                         disadvantaged people. However, it is now a weapon
                                                         against them," Liao said.
The so-called school bus is actually just a small van
which was supposed to carry maximum of 9                 In the revised law, the government promised to
people. According to Gansu Province emergency            grant landowners compensation for expropriated
team, this school van was carrying a total of 64         land based on the market value of the land —
people at the time of the accident, including one bus    instead of the published value, which is usually
driver, one kindergarten teacher and 62                  much lower.
kindergarteners. The school bus driver and four
children were killed at the scene, 14 children and the   Maybe some people do not realize this policy, but
teacher already died in the hospital. The remaining      they all notice the 84-year-old farmer Hsieh, who
44 children were injured, 13 seriously.                  faces forced expropriation of his farmland. The
                                                         amended Land Expropriation Act focuses too much
Badly maintained school transport has been the focus     on compensation, and fails to pay attention to the
of public anger for months after a series of accidents   rights of those who do not want to sell their land.
in which children were killed on their way to and
from school. In December, China's safety regulator       “The government always said that they would
demanded immediate action to improve safety              protect designated agricultural zones, but that was
aboard frequently overloaded and badly maintained        a lie,” Hsieh said. “I don’t want to give up my land,
school buses. The demand from the State                  no matter how much they pay me.
Administration of Work Safety came and followed by
a high-profile pledge from Premier Wen Jiabao that       Countries all over the world are trying to boost their
new rules to ensure school bus safety would be           food self-sufficiency rate, but our government is still
drafted soon. Road safety is also a serious problem in   seizing farmland. How can we guarantee food -
China, with many accidents caused by poorly              security for generations to come if we don’t protect
maintained roads and bad driving habits.                 farmland?                            49
Rage against                                                New Years is the biggest holiday event in Japan, just
                                                            like Christmas in Western countries. The countdown
                                                            to the beginning of a new year is a big event as it is
                                                            anywhere in the world. The count down to the
In Indonesia, it is reported that there are 700 to 1,000    beginning of the New Year is a big event just like
cases of disputes between palm oil developers and           anywhere in the world.
local communities each year. The latest one under
scrutiny is Mesuji land dispute in South Sumatra. The
case has always been in the grey area between state
law and customary law. The companies who have
bought the land and have been using it as crude palm
oil plantations feel that they have the right to do so
based on the state law where they already bought the
land and have permission for exploitation. Local
communities feel like they own the land because they
have been living there generation for generations.



                                                            In recent years, Shibuya Tokyo has been a popular
                                                            venue for young people and foreigners to unite for
                                                            a big count down event. But it has perhaps become
                                                            a little too popular.




  Local representatives seeks justice, reporting human
 rights violation to the National Commission of Human
                                        Rights in Jakarta



The land dispute in Mesuji has already involved three
different companies: PT. Barat Selatan Makmur
Investindo, PT. Sumber Wangi Alam, and PT Silva
Inhutani. The dispute itself has been going on since        “It’s really scary” was the first impression to many.
April 2011 and has previous records of clashes. The         Scramble Intersection right in front of the Shibuya
recent one has been rumored to have taken the lives         station was packed with young people and
of some locals with the involvement of local police.        foreigners. Once the lights turned green, a flood of
The local police reportedly supported the companies         people flowed into the middle of the intersection,
instead of the locals, which heated the situation.          most of them drunk. Empty beer cans and bottles
                                                            were thrown everywhere. The sound of crackers
There have been angry debates about who is actually         were heard everywhere along with the sound of
responsible for the clashes, but people are debating        roaring. Many who had taken off their shirts were
on two different bases: One is on the customary law         piggy back riding on their friends’ shoulders and
for the locals, and others are on the state law for the     screaming. A man was transferred to a hospital
companies. As a collective community, Indonesians           because his hand was smashed in the crowd,
tend to stand for the community but the government          breaking his finger. Over a hundred policemen tried
tends to side with the businessmen due to a long diet       to stop the chaos but failed.
of Holland colonization and way of governing back
then.                                                       Where did they leave behind their morals?
Waiting list
PAKISTAN

With the coming of winter, we once again
are seeing snakelike lines at petrol
stations as motorcyclists and cars await
their turn. Sometimes they wait patiently
and sometimes they wait not so patiently
for their CNG fill. There has been a
shortage of compressed natural gas in
Pakistan over the past several years.

With the recent price hikes for petrol, a number of motorists have converted their engines into ones
that run on CNG. Little did they know this would not solve their problems but rather add to them. The
recent decision to keep CNG filling stations closed in Karachi is fueling unemployment and poverty. The
gas reserves in Pakistan are enough to meet demand and it was ensured in the constitution that the
people had the first right to use the country’s resources. Lengthy lines of motorcycles and cars can be
hence seen at the CNG pumps due to a low pressure of gas that is alarming. Pakistan has much
reservoirs of compressed natural gas but there is a dire need to think over how to use these reservoirs
effectively


SRI LANKA

Colombo’s busy streets were
invaded by mean machines on Dec.
16 and 17, 2011 when the city
experienced its first-ever Colombia
Night Races. The races took place in
the middle of the country’s capital.
Cars and motorbikes lined up on a
racecourse at night. Ten car events
and seven bike events took place.
The main race took place on Dec.
17. It included those who qualified
for it based upon their performance
in races on Dec. 16.

Streets were mapped out for the racecourse. Different races were allotted to different car brands. One race, for
example, was for Ford cars while another for Mazdas and Honda Civis. The main event was a race for GT3 and
GT4 cars with top international drivers taking part. Sri Lankan fans had the opportunity to see Aston Martins,
Porsches, BMWs, Moslers, Lamborghinis and other racing cars competing on home soil. They also got to see Sri
Lanka’s only international driver, Dilantha Malagamuwa, drive his new Lamborghini.

Pulsating beats from the bands Basement Jaxx and Chicane accompanied the races as part of the Electric
Peacock Festiva, the country’s annual electronic and house music event. Countless Sri Lankans in Colombo
sought much coveted passes to attend the two events.
Waiting list                                                                   Waiting list




 SINGAPORE

 Moshi Monsters Nintendo is a game that was on every child’s wish list this Christmas. The Nintendo version of
 the wildly popular Moshi Monsters was sold out across all toy stores a week before Christmas in Singapore.
 What is it?

 It’s Tamagotchi meets Facebook meets Sesame Street. Kids adopt pets, take educational quizzes in order to
 earn rox (currency) to purchase items for their monster, grow their brood and eventually trade/sell monsters
 for more rox. Kids compete with one another within their community and chat with other kids who are playing.
 With monster names like Dustbin Beaver and Lady Googoo, who can resist?

 TAIWAN

 Currently, only two department stores in Taiwan have reported
 annual revenue of more than NT$10 billion: Pacific Sogo
 Department Stores Co's Fu-xing and Zhongxiao outlets in Taipei City.
 But these department stores are far for those consumers with the
 buying power in Taiwan’s tier two cities. These populations are
 waiting for the new “Mega City” mall, which is run by the Far
 Eastern Group.

 After opening two huge new shopping malls - one in the Greater
 Tai-chung area, and the Banchiao District, New Taipei City - Far
 Eastern Department Stores Ltd said it expected the malls to make a
 combined revenue of NT$14 billion (US$426 million) in the first
 year.

 A Far Eastern's manager surnamed Cheng said, “The residents there
 like to try out new things and many purchases were made at our
 mall, we were taken aback by the spending power in Greater
 Taichung and New Taipei City.”
                                                                                             53
Waiting list:
 Waiting list
Food- crazy Malaysians queue for popcorn




                                  Picture credit:
                                  www.dropsofcontentment.blogsp
                                  ot.com
 MALAYSIA

 Malaysia is a nation obsessed with food fads. We’ve seen many
 fads come and go: from donuts, to cupcakes, to macaroons, to
 bubble tea. And while the latest craze for bubble tea has died
 down, a new craze has taken over. Malaysians have been
 queuing for flavored gourmet popcorn. While popcorn has
 always been a favorite movie snack among Malaysians, there
 aren’t many flavors to choose from and freshly made popcorn
 isn’t easy to find.
 Thus, when Garrett’s premium popcorn from Chicago launched
 in Kuala Lumpur late last year, Malaysians queued up to 30
 minutes just to try their gourmet variety of freshly made popcorn
 despite hefty price tags. Their popcorn is well-known for their
 crunchy and caramelized nutty exteriors.
 Another chain named Planet Popcorn from Taiwan has sprung up
 with flavors such as seaweed, curry, cheese, chocolate and coffee
 to cater to those with more eclectic tastes. These two brands
 have stood out for their quality, variety and re-sealable
 packaging, which has helped to transform popcorn into a
 versatile snack that can be eaten anytime, anywhere, not just in a
 cinema.                                                                                             INDONESIA

                                             Indonesian teenage girls have been eagerly awaiting the news as to
                                             whether the next Mnet Global Awards (MOA) will be held in Jakarta
                                             in 2012. The rumor has been making itself a twitter trend in
                                             Indonesia, and recently it just made more buzz since there is more
                                             and more proof of MOA coming to Jakarta.

                                             As K-Pop is growing vastly among Indonesian teenage girls, they are
                                             waiting for the announcement in suspense, hoping they can watch
                                             the MOA and see Super Junior in February 2012. Based on their
                                             tweets, it seems that many of them have been saving money to buy
                                                                                            54
                                             MOA tickets.
Waiting list                                                                          Waiting list




                                                                  BANGLADESH

                                                                  Everyone in this cricket-loving nation is eagerly
                                                                  awaiting the chance to see foreign and domestic
CHINA                                                             players battling it out at home for dominance in the
                                                                  sport. They will have their chance on Feb. 9, 2012
The release of Air Jordan XI Retro “Concord” sneaker has          when the Bangladesh Premier League launches in
caused a frenzy among Chinese sneaker fans. It is officially      the country. The 20-day tournament will include six
launched in China on the morning of Dec. 23, 2011.                teams playing each other twice in a round-robin
However, in big cities such as Shanghai and Beijing, lines        format with the final matches held on Feb. 29.
were already forming outside of Nike shops the night              Games will be played in Chittagong and Dhaka.
before its release since people who had hoped to buy a
pair have been told stores are receiving as little as 12 pairs.   Teams will be allowed to field five foreign players as
Plus they’ll likely be snatched up by Nike employees. On          opposed to the four foreign players allowed in IPL.
China’s largest e-commerce website, Taobao.com, prices            Adam Gilchrist, Matthew Hayden, Kieron Pollard,
of the sneaker are already jump from 1,429 RMB to 2,000           Dwayne Bravo and Kamran Akmal are among the at
RMB, and it is still hard to get one pair competing with          least 25 non-Bangladeshi players taking part in the
other Jordan fans.                                                tournament.

Bringing back the old days, the Original Air Jordan 11 (XI)       The BPL will be televised on a new sports channel in
Concords was worn by Michael Jordan back in 1995 in the           Bangladesh and the organizers are believed to be in
NBA semi finals. Sadly, each game Jordan wore the Original        discussions with Ten Sports to broadcast the
Air Jordan 11 (XI) Concords he was fined $5,000 because           tournament in India. However, India's domestic 50-
the OG Air Jordan 11 (XI) Concords was a black and white          over tournament begins on February 20 and
shoe, and the whole Chicago Bulls team only wore black            therefore could restrict Indian participation. "India
sneakers. Even though, he continued to wear the Original          is a problem," Lal said. "In the first six or eight
Air Jordan 11 (XI) Concords for two more games, then              games, they [India players] could play.“The
switched shoes.                                                   organizers are also hoping that the winner of the
                                                                  BPL will be given a place in the Champions League
Since 1995, the “Concords” have only been retro’d twice.          Twenty20 next year.Game on Sports paid US$44.3
And fans last opportunity to buy a pair came all the way          million for the rights to the BPL for six years.
back in 2006. The new retro “Concord” has no doubt
being expected by Jordan fans and sneaker collectors for          BANGLADESH is very eager to get55 show on the
                                                                                                 this
years.                                                            road.
Waiting list
Waiting list
JAPAN

Fukubukuro – Happy & surprise bag
In Japan, the New Year is celebrated on a much
bigger scale than Christmas. All stores are closed on
New Year’s Day. On January 2, it is quite common
for department stores and other large retail stores
to open and many people flock to a "fukubukuro”.

Fukubukuro is one of the most typical features of
the Japanese New Year. As the name indicates, they
are bags (usually paper) that contain several items
inside. The items are usually much more valuable
than the price of each fukubukuro (ex: 10,000 yen
fukubukuro may contain items that are worth
30,000 yen), so, fukubukuro are considered to be a
"good deal.”




                                                        The most popular ones are the fukubukuro of trendy
                                                        fashion brands, with the price around 5,000-20,000 yen.
                                                        At Shibuya 109, the most famous fashion complex in
                                                        Japan, about 40,000 people formed a line in order to
                                                        get fukubukuro. Department stores also sell special
                                                        fukubukuro that are super-expensive or very unique.

                                                        Fukubukuro are usually sealed firmly so you cannot see
                                                        what's inside until you buy one as it is considered as a
                                                        "good deal," but also something that people try their
                                                        luck on. If you find something good in the bag, it can be
                                                        a good start for the New Year. If you find something you
                                                        don't like or you don't need, some people exchange
                                                        their goods in front of shops.
                                                                                               56
Tense about …
Tense about




SRI LANKA

The recent murder of Bharatha Lakshman Premachandra by Dumina Silva during the keenly contested
Colombo Municipal Election has set off a series of events and intense criticism of the ruling regime. The
response of the Rajapakse government has surprised even the most hardened critics of the regime.
Despite eyewitness testimony as to the identity of the murderer, no action has been taken to arrest
him, and to add insult to injury, Gotabhaya Rajapkse, the president’s brother & the nation’s defense
secretary, has allegedly pressurized the police to not include the name of the prime accused in the B
report. Cries from the public to rein in the politicos who hire their own security details (who are mostly
made up of thugs and criminals) are gaining volume, and, in typical fashion, some of them have used
the situation to cause problems for their opponents. What is highly amusing in this is that the
`opponents` involved in this incident are from the same political party.


SINGAPORE

Singapore is well-known for its methodical efficiency. So
when trains started to breakdown, Singaporeans were
understandably shocked and enraged, with some even
calling for SMRT Chief, Saw Phaik Hwa, to step down.
Passengers affected by the breakdown described scenes
of confusion and panic across the 2 breakdowns, which
happened over 2 days. Commuters continuously banged
on train doors during the hours of their entrapment,
with one even using a fire extinguisher to break the
windows of the underground train due to lack of
ventilation. In the end, thousands were left stranded as
shuttle bus services and taxis could not cope with the
excessive demand. Hmmm. I think I’ll take the bus for
now.
Tense about
                                                                                                          PAKISTAN

                                                                                The New Year is here and people
                                                                                worrying about new resolutions.
                                                                                They are thinking about the ones
                                                                                they failed at sticking to and are
                                                                                making numerous plans: getting
                                                                                married, being single. Yet the
                                                                                biggest tension on New Year’s Eve
                                                                                was where to find a party in
                                                                                Pakistan.

Even with movements to become more liberal when it comes to celebrating, partying in Pakistan is still largely an
underground phenomenon. So for those of us who want to dance and drink the night away, the planning must
start at least a week or two before the actual date. How many parties are happening? Who is throwing them?
Where are they being arranged? And how will we even get in? People start using their social circle, asking
around for details (social networks like Facebook are crucial tools for communication) to find those in the know
about New Year’s Eve soirees. It is not easy to find a party. Then there are further challenges - what clothes to
wear, how to find a date, who will be a designated driver? After finding solutions to those questions, there is still
the challenge of surviving the actual party itself. Fun will be had, music will be danced to, women will be flirted
with and there will be a guaranteed hangover the next day. But the key element is always how to secure a
graceful exit. In Pakistan, New Year’s Eve is a heavily policed event. One wrong move, and partygoers could have
a lot of explaining to do to the plethora of law enforcement friends policing the streets. As all of us underground
party people know, it’s good to have a wild night of fun and craziness as long as you don’t get caught.

MALAYSIA

There has been intense scrutiny and debate as to how the ruling party, the
National Front, will perform in the run up to the 13th General Elections, which are
due to be called sometime this year. The National Front has been in power since
Malaysia’s independence in 1957. However, their popularity has slowly declined
over time, especially in the past year. 2011 has been a particularly challenging
year for Malaysia, with increasing racial and religious tension between the three
primary races in Malaysia (Malays, Chinese, Indians) and a fast rising cost of living.
Political youth movements, previously been suppressed by the government, have
started to gain ground through technology and social media. Young people have
led campaigns to spread awareness amongst Malaysia’s largely apathetic youth
community, urging them to stand up and vote for their rights. Netizens are also
taking the Malaysian cyberspace by storm with a movement called “Anything But
UMNO” (The ‘United Malays National Organisation- Malaysia’s largest political
party and a founding member of the National Front coalition), which supports
anyone at the helm of the nation so long as it is not the UMNO party. While there
is great discussion and speculation, many are also apprehensive and uncertain
about what the future holds after the 13th General Elections. Ultimately, the
upcoming elections will reveal if the ruling party, which has been in power for the
past 54 years, has any chance left at securing the administration of the federal
government. This long-awaited moment, deemed the “Mother of All Battles,” will
definitely be an unprecedented moment in Malaysian history.
Tense about
Tense about
                                                                INDONESIA

                                                                Indonesia has started the switching process from
                                                                card ID to electronic ID called e-KTP, however the
                                                                process have been far too slow. Jakarta’s
                                                                administration has asked the Home Ministry to
                                                                push back its deadline for the registration period
                                                                for electronic ID cards (e-KTP) for Jakarta
                                                                residents from December 2011 to April 2012.

                                                                Based on calculations, only 40 percent of people
                                                                in Jakarta will have had their e-KTP made by
                                                                November 2011 given that each set of equipment
 CHINA                                                          can serve only up to 150 people per day.

Young Compensated Dating Girls in Shanghai

Enkō means "compensated dating” and is a practice
which originated in Japan where older men give money
or luxury gifts to attractive young women for their
companionship and, possibly, for sexual favors. The
female participants range from primarily school-aged girls
to housewives.

The first week of November 2011, Shanghai prosecutors
disclosed a case which involved more than 20 middle and
high school girls in compensated dating. In this case, most
of the female students are under 18. The youngest is less
than 14. This case caused public uproar that rippled            In Praya, a small area in Jakarta, out of 93,000
through the entire country. Shanghai Zhabei                     people, so far e-KTP has only been made for
Procuratorate also published a signed article in local          3,500 people while the deadline is December
media that said these female high school students               2011. Everyday, the authorities in the area can
“organized prostitution, referred clients and formed a          only make e-KTP for 250 people and if you divide
fixed circle, kind of like the so-called enkō in the Japanese   it up, it will take around 300 days to complete all
society.” They blame the influence of Japanese and              93,000.
Taiwanese culture for the phenomenon of young women
accompanying men in return for money. After the
Shanghai “compensated dating” phenomenon, more
groups of “compensated dating” were revealed
nationwide.

However, according to the confession of one
"compensated dating" girl in Shanghai, it is a way to make
some extra money which for them is not considered
equivalent to prostitution. The practice does not
necessarily mean having sex with a customer (though it
may) but often refers to escorting or accompanying a
man in return for payment. Others see the trend as a
reflection of the materialism that rapid economic and                                            60
social change has brought to China.
Tense about                                                                    Tense about




JAPAN

“Shohi-zei” – Consumption tax

Fifty-eight percent of respondents in a nationwide
survey in Japan are opposed to the government's
policy of doubling the consumption tax rate in
stages by the mid-2010s.

Most of Japanese are against the consumption tax
hike because of the added burden on the public,      People in Bangladesh are tense about rising fuel prices,
especially those with low incomes, at a time when    which have gone up four times now.
there are growing concerns about Japan's
economic outlook in the wake of the rising yen and   The most recent hike was BDT 5 per liter of fuel. This has
the debt crisis in Europe.                           become a major concern for commuters in the country as
                                                     it becomes more expensive to travel and take public
The survey also found that 72 percent are in favor   transportation.
of a general election before laws on the planned
sales tax hike are enacted.                          In Bangladesh, once fuel prices go up, they never come
                                                     down. Additionally the price of everyday consumer goods
Japanese prime minister Noda has said he may go      is also increasing. Economists blame inflation; locals say
to the people but not until after the relevant       they are worried about putting food on the table. Price
legislation has been passed by parliament.           hikes are becoming unbearable in the country and public
                                                     sentiment is starting to boil over.
Source : Tokyo Shimbun (January 1, 2012)




                                                                                              61
Tense about
Tense about
PHILIPPINES

A week before Christmas, Cagayan de Oro province in
Mindanao, Philippines was struck by the typhoon
“Sendong” that sent a flash flood rushing through
sleeping towns and villages killing close to 1500
people. An area that is not normally visited by
typhoons, the province was shocked not only by the
weather pattern change but also the amount of
destruction it created.




                                                          INDIA

                                                          Indian Rupee is under attack.

                                                          At the end of December, the Indian rupee nearly
                                                          breached the Rs 50 per dollar mark, closing at 49.90, its
                                                          weakest rate against the greenback since May 2009. As
                                                          the concerns mount, the Reserve Bank had to intervene
As evidenced by images of the devastation, massive        in the market by selling part of its $300 billion reserves
illegal logging was thought to be the culprit. National   to curb the volatility as well as clamp down on traders.
and local government officials, even Catholic Church      From an investors’ perspective, the movement of rupee
officials, have started finger pointing given that the    may not matter much as only a few can figure out that
president has declared a total log ban since February     unlike Sensex, the rupee going up is not positive news.
2011.                                                     On the contrary, it actually means rupee is becoming
                                                          weaker. Many wrongly think that if rupee goes up it is
                                                          something good for them not realizing when the Indian
                                                          currency depreciates against any foreign currency it has
                                                          many negative impacts from the economic point of
                                                          view. When a currency loses its value it creates many
                                                          problems for the economy. It leads to inflation. As India
                                                          imports around 70 per cent of its crude oil requirement,
                                                          the government will have to pay more for it in rupee
                                                          terms. Due to the control on oil prices, the government
                                                          may not easily pass the increased prices to the
                                                          consumers. Further, this higher import bill will lead to a
                                                          rise in fiscal deficit for the government and will push the
                                                          inflation, which is already hovering around the double-
                                                          digit mark.
Two weeks later, a landslide due to heavy rains killed
31 people in an illegal gold mining area in Compostela
Valley, also in Mindanao. The people await the
government’s investigation and action toward the
obvious cause of these tragedies.                                                                62
Tense about                                                                            Tense about
On the other hand, India Inc will also have to pay more in
rupee terms for procuring their raw materials, despite
drop in global commodity prices, only because of a
depreciating rupee against dollar. Already, oil companies
cited the fall in the rupee value to the dollar to increase
petrol prices recently. For oil marketing companies, with
every fall in the rupee, the under-recovery on account of
petroleum products goes up by Rs 9,500 crore per year on
the price-controlled items, said an HPCL official. Just like
oil, all products and commodities are more expensive to
import now. Corporations, who have foreign currency
loans on their books, also take a view that despite a
depreciating rupee, keeping the benign interest rates in
                                                                   VIETNAM
developed markets would be lot better to hold on to
foreign currency debt as one gets 0-2 percent interest on
                                                                   Inflation is one the biggest concerns for Vietnamese
dollar debt compared with 12-14 percent on rupee debt.
                                                                   for 2012. With continued fluctuations in prices
Individually, traveling abroad becomes more expensive as           across all goods, both high income and low income
travel costs can go up by at least 10 percent. Students            consumers are becoming more conscientious about
studying abroad too will be hit as more rupee will go out          their spending and investment.
to pay for tuition. Depreciation of rupee also affects the
money flow in the Indian stock markets. FIIs, the main             A lowering confidence in the dong brought on the
investors in the Indian equity markets, also start                 rise of buying gold as the most secure method of
withdrawing their investments from the markets fearing             saving for Vietnamese, making gold almost a
loss of value. In terms of portfolios, if you hold stocks in oil   currency.     More recently, banks have been
and gas, infrastructure, fertilizer or tyre business, your         aggressively drawing in Vietnamese with attractive
returns will take a hit as the shares of these companies           interest rates, encouraging saving accounts to
will fall when the rupee falls as they procure their raw           become more acceptable, and often more affordable
materials from abroad. On the other hand stocks of                 as gold prices rose. However, as worries about the
Information Technology (IT) companies and export-                  economy and financial security will continue into
oriented units should do better.                                   2012, turning the dong into gold is still believed to be
                                                                   the safest way to spend money.




                                                                                                       63
Everyone’s talking
      about
Brands & campaigns generating buzz
Everyone’s talking about


                                                                          IINDIA

                                                                          Mumbai Mirror Newspaper


                                                                          Now, people of Mumbai will wake up
                                                                          every morning to nothing but the truth as
                                                                          the tabloid newspaper, the Mumbai
                                                                          Mirror, the second largest read English
                                                                          daily in Mumbai from The Times of India
PAKISTAN                                                                  Group, pledges to reach out to its readers
                                                                          with real voices daily. The hard-hitting
After decades of political stagnation, Pakistan’s politics have a new     campaign based on four real stories
underdog, the extremely popular Imran Khan. He has rocked the             broken by Mumbai Mirror in the recent
boat and has done something very few politicians have managed,            past is the brain child of TOI’s creative
in any country. He has excited young people about politics, hope
                                                                          agency, TapRoot India. The central idea
and change.
                                                                          was to create a fictionalized account of
What is really interesting, however, is that he is the first Pakistani    how affected citizens from all walks of
politician to craft a smart, sustained political campaign that            life found a strong and powerful voice in
specifically targets the youth. He has stormed social media;              the paper.
Facebook, Twitter and YouTube are buzzing with messages, videos
and pictures from his enormously successful rallies.                      Shot in black & white, the television
                                                                          commercial shows the resentment and
His rallies themselves feature performances by the country’s              the fury expressed by the central
biggest pop stars and rock stars, (and by extension, their                protagonists of each of the stories, which
endorsement of Khan’s party). His party’s website features
                                                                          includes a writer protesting over his
pictures, videos and blogs.
                                                                          burnt books, a mother raging over the
Imran Khan is a politician who                                            use of sewage water in milk fed to her
knows how to talk to the young                                            children, street urchins screaming about
people in their own language. And                                         their inhuman living conditions, and a
wow, have they responded. His                                             young lad dissenting about the political
campaign has basically turned a                                           parties’ posters pasted on the city walls.
nation of apathetic youngsters into
active, enthusiastic voters.
                                                                         Watch it here:
He made democracy cool again.
                                                                         http://www.youtube.com/watch?v=y
Now that’s a campaign.
                                                                         vLIjemSIs4&feature=related
Everyone’s talking about
                    Everyone’s talking about




SINGAPORE                                  and MALAYSIA …

Everyone from my sister to my              And boy, did their launch set tongues wagging in Malaysia! Leading up
grandmother wanted a piece of that!        to the opening of the store, A&F employed about 40 male models to get
                                           Singaporeans excited about the opening. These men, sourced from
Some 425 shoppers queued before the        international A&F locations throughout the world, were positioned
opening      of   Singapore’s   first      outside the store daily wearing nothing but red A&F sweatpants and
Abercombie & Fitch, with the earliest      sandals. According to Singaporean newspaper Straits Times, response
fan arriving around 5 in the morning       was tepid at first, with onlookers taking pictures from afar. But the
on opening day.                            passers-by quickly overcame their shyness and within half an hour, the
                                           men were swarmed.
Once the doors opened, the first few
in line rushed enthusiastically to enter   The hype surrounding the A&F models quickly spread to Malaysia
the 2,000 square-meter flagship at         through Facebook. For about two weeks, the models were a hot
Knightsbridge, along the famed             conversation topic and photos of these shirtless men dominated
Orchard Road. For almost a week, A&F       Facebook news feeds. What’s more, the A&F models even became a
had been on our sunny island’s Twitter     tourist attraction – Malaysian women who travelled down to Singapore
trending topics with the public lapping    made it a point to journey to the A&F store to snap a few photos with
up the bevy of shirtless hunks             the chiseled men. The Malaysian men’s reaction, on the other hand, was
stationed outside the store.               to scoff at the hype over the models, but even they joined into the fun
                                           by sharing spoofs about the hype over the models’ built bodies.
                                                                                               66
Everyone’s talking about
                                                        SRI LANKA

                                                        The idea behind Mobitel’s M Tunes capmapign was to
                                                        promote the ring-in Tones based on individualism. The
                                                        commercial features different animals and their
                                                        favorite tunes. The commercials received a lot of
                                                        attention for the below reasons:
                                                        - Different in execution to the other commercials that
                                                        are on-air currently
                                                        - Has Famous / Popular songs appealing across age
                                                        groups
                                                        - Each song gels extremely well with the animals
                                                        featured
                                                        - Humorous

                                                        The commercials also got more air plays to create
                                                        buzz, especially during cricket matches.




Watch them here:
http://www.youtube.com/watch?v=W1yyXkVd-vA&feature=related
http://www.youtube.com/watch?v=xpakHAWDnR8&feature=related
http://www.youtube.com/watch?v=vFxWIgwUZ9Q&feature=related
http://www.youtube.com/watch?v=AodEZxxbt3c&feature=related
http://www.youtube.com/watch?v=mYpZZIT6Ox0&feature=related
http://www.youtube.com/watch?v=3OdJNqZa--k&feature=related




                                                     “One Seal,
                                                One Legendary Y Chi”
 VIETNAM

 On November 11, SAB Miller Vietnam unveiled the highly-anticipated first brew of its premium Czech beer
 Gambrinus into the Vietnam market. The launch campaign developed by Ogilvy & Mather Vietnam brings to
 life the Gambrinus spirit of Y Chi: the strength, vision and determination that drives real success.

 The fully integrated campaign captures the aspiration and respect of Vietnamese men who believe that real
 success comes from overcoming challenges with the spirit of Y Chi. This spirit of authenticity and commitment
 to quality is translated into the Gambrinus brew itself – guaranteeing Vietnamese beer lovers that every
 premium Gambrinus bottle is brewed longer with 100% Czech barley and aromatic hops – recognized by the
 distinctive gold Gambrinus seal.                                                                67
Everyone’s talking about
Everyone’s talking about




Sponsored jointly by Guylian and Lindt, the Chocolate
Wonderland in Shanghai is drawing in the crowds. If you
thought that chocolates had to be brown or white, if you
believed that they could be shaped like the Alps (Toblerone) or
seashells (Guylian) , the artisans here will blow your mind. Over
two acres of exhibition space, they’ve created dragons, the
Pudong cityscape, toy poodles and fancy hats, scooters and
robots, in the wildest of colors and shapes. Visitors can pause in
between the tours to take in educational programs and tasting
sessions. No, you can’t taste any of the magnificent creations,
but you can take pictures. Dress warm, for the whole show – on
until late February 2012, is kept at a constant 4 degrees Celsius.

At the Jumeirah Himalayas Center, Shanghai .
Everyone’s talking about
                    Everyone’s talking about


                                                              TAIWAN

                                                              One Bike One
                                                              http://www.onebikeone.tw/

                                                              The last day of the Republic of China’s (ROC)
CHINA                                                         100th year was celebrated in elaborate fashion as
                                                              a record--breaking cycling event drew more than
                                                              110,000 cyclists across the country to ride at the
During September, 2011, Johnson & Jonson launched a           same time, which truly rocks the brand “Taiwan”.
new advertising campaign featuring a diary purportedly
written by “Little V” (V indicating vagina, “小V日记” in         The event “One Bike One” heralds the arrival of
Chinese). The video commercial has been viewed over           the next century in Taiwan, event organizers said,
1,180,000 times on video sharing sites such as                adding that the rolling wheels symbolizes the
Tudou.com within three months. Viewers note that              energy of the Taiwanese.
there is barely a product image or brand name shown in
the advertisement until you search it online. If people       “This is the most significant event I have ever
search “The Little V’s Dairy”, they will find a small         participated in in my life because we needed to
booklet published by Johnson & Johnson to share               work together to set a new world record,” said
knowledge about gynecological health. The book is             Chen, who started from the National Chiang Kai-
thirty pages long and covers sexual health in a friendly      shek Memorial Hall, one of the event's major
way with articles covering friendship, fashion, traveling,    points in Taipei.
fitness, love and sex. It is free and available both on and
offline.                                                      The previous world record for the most cyclists
                                                              riding at once was set in Italy in 2000, with
With the rapid development of China’s economy,                48,615 people cycling at the same time. Taiwan’s
Chinese consumers are becoming more experienced               success in setting a new record was confirmed
and mature. They are able to handle more honest               after the event by Guinness World Records
conversations, more daring innovations as well as more        authorities.
quirky flavors. The campaign is an interesting step by a
brand to add information to a topic that is mostly
ignored for fear of embarrassment. While young people
today are certainly engaging in sex, formal education is
still minimal. Even though some pilot sex education
programs are being launched in schools, young people’s
primary resources are still word of mouth from friends
and online.

Mini site of the campaign:
http://www.xiaov.tudou.com/#/diary/




                                                                                              70
Everyone’s talking about




INDONESIA

After teasing Indonesians for weeks by a big red Blackberry
ad on billboards around Jakarta, BlackBerry placed a full-
page ad on the day of its launch on Kompas, the most read
newspaper in Indonesia.

The strategy comes to a too fruitful result where thousands
of Indonesians jammed into Pacific Place mall on November
25 to get hold of the BlackBerry Bold 9790s, which will be
                                                                   JAPAN
the first in the world launched in Indonesia.

With a 50 percent discount on the $540 phone for the first
1,000 buyers, lines started forming in front of the mall on
Thursday night. By daybreak, impatient shoppers started
rattling the gates. Fearing a riot, hundreds of police were
deployed outside, tying up traffic in the heart of the capital
for hours. And when rumors spread that the new                   What's going to emerge next when social media
BlackBerry, called Bellagio, had already sold out, the crowd     comes to an end? Key persons who lead the
of 3,000 went crazy. Several people fainted in the crush.        cultural context in Japan got together at the
                                                                 "Social Lab 0.0" to achieve an ambitious objective
Source: http://www.seattlepi.com/news/article/Thousands-
                                                                 of finding out what's beyond social and seeking a
queue-in-Indonesia-to-buy-new-Blackberry-
                                                                 rich future. The social network can become vicious
2291906.php#ixzz1hEJxNhRU
                                                                 or, at other times, become an innocent baby.
                                                                 What kind of future will it let us see?
                                                                  http://www.youtube.com/watch?v=j_enzFZW1dw
                                                                  http://www.youtube.com/watch?v=iMcmhXVYRH0

                                              The ‘Blind’ film is set in post-nuclear Tokyo in a dimension not
                                              so distant from ours. Young salary-man's morning commute
                                              takes a surreal turn.
                                              http://www.blind-film.net
                                              http://vimeo.com/28533174
                                              http://www.youtube.com/watch?v=E2SgonaD4U0
Everyone’s talking about
                     Everyone’s talking about




                                                              BANGLADESH

                                                              One of Bangladesh’s most popular daily
                                                              newspapers Prothom Alo recently launched a
                                                              campaign called “Ut Pakhi,” or “Ostrich.” The
                                                              campaign centers on raising public awareness
PHILIPPINES
                                                              against indecencies in the country, encouraging
                                                              people to not ignore bad things happening in
Social media in the Philippines were abuzz with activity as
                                                              society.
the Department of Tourism’s advertising campaign was
unveiled. Filipinos were quick to jump on the bandwagon
                                                              The campaign has garnered much appeal as
and     create      different    variations    of      why
                                                              countless people use repeat the phrase in
#It’smorefuninthePhilippines.
                                                              reference to unsavory activities they see in public.
                                                              The advertisement, featured both in print and
The campaign initially drew flak from some quarters,
                                                              electronic media, encourages people to take a
crying plagiarism because the words had been used
                                                              stand against violence, indecency and corruption.
before in an old Swiss tourism ad with the headline “It’s
                                                              Its core message: “Do not live the life of an “ut
more fun in Switzerland”. This allegation fueled a wave
                                                              pakhi,” lift your head up and raise your voice.”
of backlash from supporters who responded by saying
the only way to create a truly unique advertising slogan
                                                              http://www.youtube.com/watch?v=XmEdKZzyVC4
“with words that have never been used before” is to
develop our own language. For a few days, pundits have
been posting their own versions of the ads with
trademarked gibberish talk, signing off with “It’s more
fun in the Philippines!” Complaints have died down, as
more citizens have been rallying Filipinos to support
rather than criticize our own campaign. After all, it’s not
a DOT campaign, it’s every Filipino’s campaign.

                                                                                                72
Favorite green brands / movements




When it comes to eco-friendly brands in
Pakistan, you may have to think hard to come
up with a few names. However, there are
such brands that are taking initiative to
spread awareness and promote a green
movement.                                        In Malaysia, the one environmentally-friendly initiative that
                                                 really took off iin 2011 wa the “No Plastic Bag Day.” Beginning
One such name is Espresso, a renowned            January 1, 2011, “No Plastic Bag Saturdays” was placed into
coffee house in Lahore, which has initiated      effect in hypermarkets, supermarkets, department stores,
the change from within first and then spread     convenience stores and retail stores all over the nation. Those
it to its customers. The practice of recycled    who require plastic bags are charged 20 cents for each bag.
napkins, eco-friendly reusable bags, recycled
paper towels and energy saving light bulbs is    This campaign initially appealed only to a niche – the more
common at Espresso. A step further into the      environmentally conscious – and was not without its complaints
green initiative, the brand team has not only    in its infancy. For the average Malaysian, the plastic bag was
planted trees around the city but also           indispensable in the shopping routine; annoyed shoppers
observes Earth Hour religiously. Yet observing   derided the plastic bag ban as inconvenient and ultimately
the green movement is still a niche market in    having little impact on the environment.
Pakistan and has a long way to go as not
many people pay much heed to it.                 However since its introduction a year ago, Malaysian shoppers
Nevertheless, at Espresso you will never find    have slowly adjusted their shopping habits to bringing reusable
anything packed in a plastic bag.                bags on their trips. Furthermore, the “No Plastic Bag Day” has
                                                 been expanded in some Malaysian cities – in Penang, for
                                                 example, everyday is a “No Plastic Bag Day!”




                                                 The Green
                                                 Corridor
                                                 movement
Favorite green brands / movements

In a historic land swap between
Singapore and its immediate neighbor
Malaysia, what remains unknown is the
fate of the 26km tract from Woodlands
to Tanjong Pagar. Will it too, fall victim to
the rapid urbanisation that has overtaken
this Little Red Dot? The Nature Society
Singapore backed by over 8,000 pledges,
submitted a proposal called the The
Green Corridor: A Proposal to Keep the
Railway Lands as a Continuous Green
Corridor, to the Singapore government
late last year. A readymade nature trail,
recreational space and eco-friendly
transport route all rolled into one – the
NSS argued that the Green Corridor is a
valuable piece of ecological and historical
heritage that should be preserved for
future generations of Singaporeans. In
the end, our society will be defined not
only by what we create, but by what we
refuse to destroy. – John C. Sawhill
                                                Recently, the “eco-friendly” concept has been
                                                introduced by mainstream Chinese fashion brand
                                                Me & City. The brand is from Metersbonwe Group,
                                                the largest domestic apparel retailer in China. Me &
                                                City has been compared to Zara of Spain and H&M
                                                of Sweden. It emphasizes quality, style and
                                                personality. Metersbonwe introduced the brand to
                                                capture the market of consumers aged 25 to 35 - a
                                                group that has strong purchasing power but not yet
                                                received much attention from other domestic
                                                brands.

                                                The eco-friendly line of Me & City claims to be made
                                                from recyclable material right down to the label. In
                                                order to educate target consumers, the brand is
                                                also using social media channels such as twitter-like
                                                service Sina Weibo to promote the line by
                                                explaining its eco-friendly features. A few weeks
                                                after it launched, the line has received great
                                                attention from fashion conscious young people
                                                online and offline. One of their followers on Sina
                                                Weibo commented: “The design and colors of the
                                                new eco-friendly line look great, the price is also
                                                similar compared to non eco-friendly products of its
                                                type. I will definitely check it out in the store and
                                                give it a try.”
Favorite green brands / movements


Your text here




 According to scientific studies, many cleansing products contain toxic ingredients, such as surfactants,
 fluorescent agents, and other artificial materials that can be bad for our health and the planet. In order to
 prevent the environment from deteriorating and bring a better living environment to our offspring, finally the
 Taiwanese company Yuen Foong Yu created “Orange House”, a natural cleansing brand. They have adopted a
 100% natural cold-pressed orange oil as the main ingredient to replace all the chemicals. The orange oil
 consisting of 90% d-Limonene has an amazing cleansing effect. And unlike the chemical materials used in most
 commercial brands, the non-toxic orange oil does no harm to both human bodies and the environment.
 According to their core belief, Orange House would like to leave behind a cleaner earth for the coming
 generations.

 Bike To Work started with a small
 group of people who love to bike and
 got themselves into Jalur Pipa Gas
 Community with the goal to create
 clearer air in Indonesia’s cities. From
 there they created the Bike To Work
 Community, which started their first
 campaign on August 6, 2004. The
 Bike to Work center was officially
 opened by program manager Toto
 Sugito, head of the National Council
 on Climate Change Rachmat Witoelar
 and Deputy Minister of Environment,
 Hendri Gustaman.
 There are now 9,320 members on their website and more than
 30,000 bikers in total. These are the people who commit to
 bike to work for greener Indonesia. Their concept is as simple
 as car-pooling. They meet at one point and go together to the
 area where they work. There are many sub-groups in the
 community, depending on where members bike from or
 where they go to. People going to the same destination can
 meet at some assigned meeting points, bike together and
 separate when they reach. They have some resource centers
 often called “homes” that also serve as a meeting point for the
 nation’s biking enthusiasts. B2W has also announced corporate
 sponsorship deals with state flag carrier PT Garuda Indonesia                                 76
 and Sodexo Pass Indonesia.
Favorite green brands / movements
                                                                  Panasonic create the icon “ECO NAVI” for
                                                                  environment friendly product.
Your text here



                                                                                             Suntory’s corporate slogan
                                                                                             “Live together with water”


                                                                      Toyota
                                                                        Prius




                                  Portable “my chop-sticks”
                                  with box to carry



  The environmentally friendly movement in Japan ranges widely from corporate activity, personal activity to
  government policy. The Toyota Prius is Japan’s most famous environmentally friendly product. Panasonic
  succeeded in enhancing its brand value through environmentally friendly products. It has more eco-friendly
  electrical appliances, selling the products with the icon of “Eco Navi.” The company has air conditioners that
  are good for the environment and refrigerators that save electricity at night or when people are not at home.
  The “Eco Navi” campaign has been very successful, winning an award for the most environmentally friendly
  brand in 2010.

  Suntory is the latest brand recognized for its efforts to help the environment. It won first prize for its efforts in
  2011. One of their activities is to plant a trees, adding 7,000ha of trees to forests across the country. The goal
  is to help promote water conservation. Suntory communicates their philosophy through a corporate slogan of
  “Living together with water.” An individual movement in Japan is to save chopsticks. The aim of the campaign
  is to reduce deforestation caused by the widespread use of disposable chopsticks. People are encouraged to
  bring their own chopsticks when they go out to eat. Some restaurants offer special discounts or free drinks to
  those who bring their own utensils for dining.



  The Korean food maker, Daesang, started its organic food
  business actively under the brand name of “O’food ‘”
  with an intention of          upgrading its core brand
  “Cheongjeongwon”.          O’food     originates from a
  compound word , mixture of Organic and Food. Raw
  materials used in O’food          product s     all obtain
  certification from organic food certificate authority
  including CAAE and WSDA . The brand has been leading
  the organic food market with more than 30 products
  such as organic olive oil, tomato ketchup, sesame oil, red
  pepper sauce, soy sauce and bean paste .
Favorite green brands / movements




Human Nature is a line of personal care and beauty products that advocates natural ingredients. It guarantees
not only the use of at least 95% natural ingredients, but also biodegradable, from renewable resources with no
petroleum compounds and processed without harming the environment. Human Nature is a business that
helps sustain Gawad Kalinga, a nation-building movement known globally. Producing and processing the raw
materials and end products for Human Nature are the livelihood of a number of families under the GK program.
Human Nature is also distributed outside the Philippines, making the Philippines a player in the beauty business
worldwide. The philosophy of Human Nature is to be Pro-Philippines, Pro-poor and Pro-environment.




BRAC Kanon, an endeavor of BRAC Social Enterprises in Bangladesh, started its journey in the capital aiming to
promote greenery through their green products and services in order to save energy, money and the
planet. The outlet is fully powered by BRAC solar and supports a 2.4 kilowatt load for eight hours. It is located
on the Gulshan-Tajgaon Link Road and is spread over one bigha of land. The country's first ever green retail
outlet comprising four enterprises -- BRAC Solar, BRAC Nursery, BRAC Recycled Handmade Paper and BRAC
Sericulture was inaugurated by internationally renowned human rights activist Irene Khan. The outlet will
feature their products and services, including ornamental, fruit, timber and medicinal plants, seedlings,
landscaping and plant rental services, silk products produced by rural artisans, recycled handmade paper-based
products and office stationary, and energy saving solar instant power supply and power solutions.
Favorite green brands / movements




Go digital. Save paper.

Back in 2010, Idea Cellular Services came up with yet another innovative campaign called ‘Use mobile Save Paper’
that promoted the idea of mobile VAS usage for a vast number of day to day activities to save paper and save the
Earth. The commercial showcased how the mobile phone can be used as an efficient tool to read daily
newspapers, generate e-bills, make payments and transactions, issue e-tickets and boarding passes; thereby saving
tons of paper everyday. Taking it further, IDEA partnered with two leading Coffee chains – Barista and Café Coffee
Day – to spread awareness about its green campaign through a unique mobile application that will allow people to
download the menu card and bill on their mobile phones. The application is intended to eliminate the need for a
paper-based menu and bill in that particular transaction.

Watch the TVC here - http://www.youtube.com/watch?v=bBuAUKJXZGw

Back then, it seemed like a good brand initiative carried across media but maybe too niche. Until we found out that
come September 2011, the Indian Railways announced that there is no need to take print-out of your e-
ticket. Instead it is sufficient to carry the ticket on electronic mode as – mobile, laptop and i-pad. Imagine the
impact of this single act considering that the Indian railways carry over 30 million passengers daily. (Source:
Wikipedia).

Another Save Paper, Save Forests campaign that runs on digital media was developed by the Cheil India team
asking people to adopt a simple practice to make their valuable contribution towards a greener world. Cheil WW
SW Asia has rolled out a CSR campaign in a bid to help save forests and to make the human beings responsible
towards Nature. The practice, aptly called MINUS ONE, asks us to reduce the font size by 1 before taking a
printout which reduces the number of pages required for the printout. It helps in saving the forests by shrinking
the paper need as paper is responsible for one-third of all the axed trees.

For instance, a 39 page document reduces to 32 pages once the font size is reduced from 11 to 10. That’s an 18%
reduction in paper consumption. So one can take all the printouts he wants while ensuring a better world for the
generations to come. At an average rate of 18%, around 21 billion sheets of paper can be saved every year. And
that means thousands of hectares of forests can be saved from being axed.
The cover of this issue of Wassup, showing a
 caparisoned elephant, was not shot in Asia, but
 in San Francisco’s Clarion Alley. We use it to
 show how the reach of Asian culture is now
 widespread, riding on a wave of Asian brands.




Graffiti Wall at the Radisson Blu in Shanghai
For more information, to request a presentation
on cultural insights, or to contribute your
perspectives in your market, please write to:
kunal.sinha@ogilvy.com




                             Graffiti aimed to beautify plain walls in Lahore, Pakistan
Wassup january 2012

Wassup january 2012

  • 1.
    Wassup Issue 7 January 2012
  • 2.
    Wassup The cultural trendsmagazine from Ogilvy & Mather Asia Pacific Edited & designed by Kunal Sinha Editorial assistant: Lara Farrar Correspondents: Astrid Savitri (Jakarta) Elaine Dai (Beijing) Timothy Sarker (Dhaka) Naima Hamid (Dhaka) Neha Punjabi (Mumbai) Donnah Alcoseba (Makati City) Wine Chua-Leonardo (Makati City) Tania Chan (Singapore) Naoko Ito (Tokyo) Azusa Fukai (Tokyo) Natalie Gruis (Ho Chi Minh City) Siddharth Roy (Colombo) Mei Wu (Taipei) Caryl Heah (Kuala Lumpur) Beatrice Yong (Kuala Lumpur) Josephine Phang (Kuala Lumpur) Scheherezade Saadat (Lahore) Serena Park (Seoul) © Ogilvy & Mather Asia Pacific, 2012
  • 3.
    Move over Greeks.The Big Fat Wedding is happening now, and in Asia. If there is one event in a lifetime when families let go of their wallets and inhibitions, it is at the wedding. The heady mix of traditional rituals with what they see on the big screen tells us something about a cultural melting pot. Why is the seating arrangement at Chinese weddings in the Western banquet style, while the food is always typically local? Why are some families choosing to forego inviting everyone they know, rather fly a smaller number of guests to an intimate seaside resort for the big day? To find answers, we turned to wedding planners. Get a sense of the color and flamboyance in the first issue of this year. We then get up close and personal with village folks. Even as the wave of migration from rural to urban areas continues unabated, the majority of Asia’s inhabitants live in villages. But they are no longer isolated: mobile phones, television and better transportation means they are well connected with the city. That has changed everything: their expectations, what they want their children to be. The discontent with politics and national leadership is a recurring theme. It is making people angry and tense. India’s Outlook magazine brought out a special issue called ‘The Age of Rage’ this month. Should businesses be wary of the angry customer? They should, because he or she is no longer going to accept shoddy products or broken promises. Wassup is an early warning system of consumer sentiment, so be mindful of what we report. Plunge right in. At eighty-two pages, this is our meatiest issue ever.
  • 4.
    14 countries. 20 correspondentsdeeply immersed in popular and leading edge culture bring you Cultural Insights that will make a world of difference to your business SOUTH KOREA BANGLADESH PHILIPPINES SINGAPORE INDONESIA SRI LANKA THAILAND MALAYSIA PAKISTAN VIETNAM TAIWAN JAPAN CHINA INDIA
  • 5.
    contents Look who’s talking: Meet the Wedding Planners Knowing me, Knowing you: Village folks Movie of the Year Rage against Waiting list Tense about Favorite Green Brands
  • 6.
    Look who’s talking Look who’s talking Meet the Wedding Planners
  • 7.
    Look who’s talking… PAKISTAN When it comes to weddings in Pakistan, there is one thing that is guaranteed: Couples will go all out to make their fairytale wedding mixed with tradition come true! According to Jalal, a renowned Pakistani wedding planner who works for the famous J&S event management company (the company has planned weddings for the rich and famous as well as concerts for international celebrities such as Edward Maya and Bryan Adams) a good floor plan, event manager and location are crucial to making a wedding one that is memorable. Weddings in Pakistan usually last for four days and are one of the most important events for families. All eyes will be on the bride, which means a lot of money is spent on wedding attire that is decorated with traditional and very intricate embroidery and beading from top to bottom to ensure she looks nothing short of a royal Mughal princess. The father of the bride is responsible for the cuisine, which typically consists of elaborate spreads of scrumptious desi dishes ranging from biryani and korma to modern fusion and Mediterranean fare. Each event has up to six main course dishes. While Pakistani weddings typically have three main functions, they now also include bachelor and bachelorette parties as well as qawwali night and a post-wedding brunch. Throughout the lengthy affair, the mother of the bride plays a pivotal role. She is tasked with adorning her daughter in up to four expensive and exclusive jewelry sets. Jewels are also exchanged between the families at each of the five wedding events. The groom also takes part in the glamour with his wedding attire costing around $2,300. The bride’s wedding clothes usually run between $3,000 and $5,000. With so many decisions to be made about decorations, location and activities, more Pakistani families are investing in wedding planners for help. To save money, more Pakistani newlyweds are opting to go to the Far East on honeymoons.
  • 8.
    Look who’s talking… SINGAPORE An interview with Deirdre Foo THOUGHTS ON MODERN WEDDINGS For many young Singaporeans, their notion of a wedding is a lot more Westernized, but we are often held back due to Chinese customs. For us, the 100 table banquet is unnecessary. Our wedding should be about the people who truly matter. But it’s a tough battle because being Asian, we will always try and respect our parents’ wishes. MUST HAVES Your own personal touch. Weddings tend to be rather cookie- cutter and commercialized so it was important for me to inject my own style into the wedding. From personalized, hand-written place cards to the bonnataires that don’t have flowers. LOCATION In terms of locations, I’d say the more unique the better. But most importantly, pick a place that means something to you as a couple and that feels instinctively right – not by the availability of a hotel ballroom. WHAT’S IN The releasing of balloons/lanterns is quite a big thing, as are photo booths. The general trend is to involve your guests in a meaningful way. HONEYMOONS Many couples these days are into short honeymoons – possibly because of work constraints. It really works out though! I have a friend who did her honeymoon over 2 years but she got to go to 3 different countries and kept her post-marital bliss for a lot longer. COST In Singapore, it ranges from $50,000 - $80,000 – depending on the number of tables at the banquet. 8
  • 9.
    Look who’s talking… MALAYSIA Meet Ratna Rashidi of Perfect Day Planner Ratna Rashidi (http://perfectdayplanner.blogspot.com/); a wedding planner with eight years under her belt in the industry. She typically plans weddings for Malay couples, and her clientele can be divided into three groups: yuppies, or young urban professionals who lead busy lives leaving them with little time to plan; motherless grooms, who need a feminine hand; and families for which this is the first wedding, and require her expertise. Akad Nikah; the solemnization ceremony in a Malay wedding. Her clients usually engage her services for one or more of three ceremonies important in Malay marriages: the engagement ceremony; the akad nikah, or solemnization ceremony; and the wedding reception that follows the akad nikah. On average, her clients will spend only about 20,000 MYR (about $6,300) on their weddings, preferring to splurge on their honeymoons instead. Typically, the cost of the wedding is split between the bridal couple and their parents, with the couple footing the bill for smaller items such as invitation cards and wedding favors, and their parents covering the bigger costs, like the ballroom and catering. According Ratna, there are two trends influencing Malaysian wedding customs today. One is the influence of Western wedding culture – while the traditional customs are still important and included, Malaysian weddings are increasingly incorporating Western touches into traditional customs. For example, despite Malaysia’s hot, humid and capricious weather, garden themed weddings are extremely popular among couples. Western influence is also evident in the brides’ gowns. Increasingly, some Malay brides will forgo the traditional Malay dress for a Western wedding dress, or they will incorporate Western bridal styles, such as the color white and more risqué designs, into the traditional Malay dress. Traditional Malay dress in the style of a wedding gown and a Western style wedding gown. The second trend Ratna noticed is the increasing desire for couples to create weddings that reflect their personalities. One example involves a groom and a drum instructor giving a drum performance during his reception. In the past, weddings were almost solely dictated by what the couple’s parents wanted. However, now couples are asserting more say in creating the kind of wedding they want – they feel that they have a right to since they are also financially contributing. Ratna believes this desire for a more personalized wedding is born out of a desire to stand out from the rest – by creating a wedding that is memorable and better than others’. “There’s an ‘I want to do better than the Jones’ mentality,’” Ratna explained. 9 Garden themed wedding decorations.
  • 10.
    Look who’s talking… SRI LANKA Nelunika Wejeshijnghe (aka Nels) has always been into party planning with her cousins and friends for fun. For every occasion - Christmas, New Years, birthdays - Nels and her gang were busy planning parties. That soon took a back seat when she started working. During her account management sting at Ogilvy Sir Lanka, Nels got a real taste of events, thanks largely to her client Ceylon Tobacco Company. At the same time, her cousin began managing a wedding magazine business. He wanted to expand his business to include wedding planning and other wedding-related events. Nels leaped at the opportunity. Over the next 18 months, Nels ended up planning around 15 weddings. “Wedding planners have been around for some time. We’re the latest entrants,” said Nels. According to her her busy schedule as a wedding planner, such professionals are becoming must-haves at weddings in Sri Lanka. “Of course, its still skewed towards the urban affluent class,” she said. Not surprisingly, considering the average budget range is between $10,000 and $20,000. According to Nels, the important aspects of a wedding are the venue, the designer of wedding clothes and wedding brands. What brands couples use at their weddings indicate social status. “Hosting a daughter’s wedding at the Hilton says a lot about the father of the bride. Attending a reception at such a venue also helps the invitee make an impression among his or her social circle,” she said. Plus there are added benefits such as great service, food and accessibility in terms of transportation. 10
  • 11.
    Look who’s talking… “Local clients always play it safe when it comes to venues. They’d prefer an enclosed space to avoid risks of bad weather and also other associated benefits, which you get from a hotel. Whereas expat clients are far more adventurous. That’s also because they bring foreign friends in town to attend the wedding, so they would much rather prefer a beach wedding than a wedding in a hotel.” “Who dressed the bride, who did her make-up… are the most discussed topics among the women invitees at a wedding,” Nels said. With many weddings being covered by popular media, these elements become extremely important. Similar to weddings in other cultures, Sri Lankan weddings today are less about tradition and more about celebration. “Gone are the days of unending Poruwa ceremonies,” Nels said. “People just want to have a ball.” Honeymoon planning is not as important for wedding planners. “Honeymoon destinations are often given as a surprise gift to the newlyweds by friends and relatives so they decide themselves,” she said. On a more philosophical note, Nels says that being a wedding planner can be a thankless job and frustrating at times. “There are clients who have already decided what they want. They just want the planners to execute. And then there are those who simply treat you as their secretary, only wanting you to coordinate meetings and negotiate rates. No input on anything else. But there are clients who come with an absolutely open brief. They just give you a budget and ask you to organize something that people will talk about and remember. These are also the people who print the names of the wedding planner on the invitations. What better way to advertise ourselves! And when they start the wedding celebration, they first thank the wedding planners. It’s icing on the cake,” she said. 11
  • 12.
    Look who’s talking… VIETNAM This is Thuy, a busy professional and the official wedding planner of her own wedding this year in Vietnam. Her wedding was held in Vietnamese tradition: a ceremony at home with family followed by a reception at a local well-loved restaurant. Both families were heavily involved in the day’s preparations. The traditional ceremony invites the groom’s family to bring several gifts to the bride’s family covered in a red cloth to express their desire for the bride: a roast pig, ao dai, gold rings, gold jewelry, money, wine, tea and fruit. Both parents invite their guests to a dinner and celebration in the evening to toast the new couple. The Traditional Ceremony The Banquet However, like many modern brides in Vietnam , Thuy wanted to do something less formal and in her own taste and style, deciding to have a separate party just for friends after her wedding day with family. This took her over the usual $10,000 budget for a wedding, but with memories she can look back on worth so much more. 12
  • 13.
    Look who’s talking… TAIWAN Wedding planners, also called a bride secretary in Taiwan, have to know both the traditional customs and what's trendy so they can make the bride’s dream come true and satisfy the needs of the parents. Lucy has been a wedding planner for about 4 years. She says that the job is not as fancy as it may look: “Most people think all we do is have parties all the time, but they do not see the preparation and trivial aspects behind the job.” A wedding costs about NT$1 million~NT$2million, the price includes the process of getting married, the wedding banquet, and wedding photos. The expenditure can usually be balanced out by receiving the traditional red envelope, which contains monetary gifts from wedding guests. However, if a couple wants a dream wedding, they have to shoulder more of the cost. For example, some brides like to plan their weddings Western style at a manor during the fall season to get the look of weddings seen in the movies. “Brides of this generation take more control than before; they will tell us what their ideas are, or even the details of the execution, so sometimes you will see that the invitation is designed by the bride,” Lucy said. However, in order to increase the value of a wedding planner, Lucy likes to plan some activities during the wedding, such as inviting male guests to come on stage, but not to throw and catch the bridal bouquet but cauliflower. Of course the man that catches the cauliflower is terribly sad as he’s the next in line. Except the funny parts, Lucy says wedding planners also edit a video for others to share the memories of the bride and groom. “It usually touches everyone because you can see the bride and grooms family and friends”. 13
  • 14.
    Snapshots from aTaiwanese wedding There are usually wedding photos and a guest book to share their happiness. Photos by Lucy 14
  • 15.
    It’s popular nowto have the wedding ceremony outdoors, especially in fall. 15
  • 16.
    Snapshots from aTaiwanese wedding Brides in Taiwan often have the 3 different looks through the wedding day: the invitation,the show up, and escorting the visitor out, while the groom will have only one look because men are not the point (as we know). 16 Photos by Lucy
  • 17.
    Also, it’s commonto invite friends to sing a song or play music in Taiwan because people think it is a way to express their blessing. 17
  • 18.
    A Chinese groomis picking up the bride at her family home Chinese wedding cake with the “double happiness” symbol on the top The new couple’s friends are “disturbing the bridal room” by Chinese wedding photography Friends at the new couples house to “disturbing the bridal requesting the new couple and playing games room” A Chinese wedding in hotel 18 Wedding reception in a five star hotel The tea ceremony
  • 19.
    Look who’s talking… CHINA Vivian Lee is a 29-year-old independent wedding planner in Shanghai. She has been trained at Weddings Beautiful, an American association of professional wedding planners that provides quality education to aspiring wedding planners worldwide as well as issues professional certification to qualified wedding planners. Vivian has been working in the industry for 3 years, she is very happy to share some of her knowledge about modern Chinese weddings with us: A wedding is one of the most important and significant ceremonies in Chinese culture. Average Chinese couples are willing to spend more on weddings compare to their Western counterparts. More importantly, an affluent Chinese middle class is growing in big cities such as Shanghai, Beijing and Shenzhen, therefore, the cost of weddings is increasing steadily in those cities. According to Vivian’s previous experience, the average wedding budget in Shanghai is between 150,000 yuan to 250,000 RMB. Some couples who are from wealthy families or make decent incomes even spend up to 400,000 RMB because their families want to show status through wedding. Modern Chinese weddings in big cities, such as Shanghai, are combinations of Eastern and Western cultures. Chinese traditional weddings are rich with symbols, traditions and rituals. However, many of them have been lost over time. They are practiced in family beliefs and respect to committed marriage relationship. For instance, the choice of the wedding date is very important, some couples or their parents will ask astrologists to study their birth date and birth time to choose a date that is considered lucky. For example, a date with even numbers is considered luckier. In China, there is an old saying that “good things come in pairs.” Chinese wedding ceremonies are usually scheduled to begin on the half hour because it is believed that time is on the upswing then. There are also many cultural symbols that appear with weddings. The symbol of “double happiness” may be used on invitations, decorations and cakes. Tea ceremonies are also popular. The original way of the tea ceremony was conducted for the bride to privately serve her own family before the wedding ceremony and for the newlyweds to serve the groom’s family together following the marriage vows. However, many Chinese couples who adopt this custom in modern weddings only have one tea ceremony with both ceremonies present, which usually takes place after the end of the marriage ceremony. Modern wedding receptions usually take place in four or five star hotels. A wedding host will lead the ceremony with activities including introducing the couple, having the couple’s families give a speech, creating games for a new couple to play in front of all guests, announcing marriage and the tea ceremony etc. This is followed by a banquet that serves Chinese food and alcohol. New couples have to go to each table to toast their guests. At most modern Chinese weddings, the bride wears three different dresses during the ceremony. The first is the Western style white wedding dress during the wedding ceremony. The second dress is a traditional Chinese wedding dress that is used at the banquet. The last dress is called the bride’s going away dress. At night, the couple’s friends will visit the new couples house to “disturb the bridal room” by asking the new couple to play games, which ends the wedding day. A large percentage of Chinese couples prefer using wedding planning companies or wedding planners because they are able to come up with more ideas. They save time and make sure everything goes smoothly on the special day. Must-haves for Chinese weddings include engagement rings and wedding bands, wedding photography, wedding cars, ceremony and banquet, wedding host and wedding gifts. Today more and more Chinese couples want personalized weddings in China and abroad. One emerging trend are destination weddings since a large number of Chinese female celebrities who recently married had destination weddings, such as Barbie Hsu. Popular honeymoon destinations are Sanya, the Maldives, Bali, Spain 19 and Thailand.
  • 20.
    Look who’s talking… INDONESIA TJAN ING ING,THE MOTHER WHO PLANNED HER DAUGHTER’S WEDDING “Finally comes the day when my daughter is getting married. It’s a mixed feeling between excitement and worry. The biggest worry that comes to mind is about the new life she will have.” An Indonesian with a Chinese background, Tjan’s planning starts with choosing a good date for the wedding. Traditionally, the good date will impact the life the couple will have in the future. It was decided to have it after Chinese New Year since it’s considered bad to have it before. Tjan then planned to leave other decisions to the couple, but, being a mom, she was actually involved in everything from deciding the gown, the color theme, invitation, decoration and the cuisine. Required activities are Sangjit and Tea Pay. “These are the Chinese traditions that we should keep,” she said. Sangjit acts as a traditional proposal between the two families. The groom’s family comes over to exchange gifts with the bride’s family. The gifts are traditional clothing from top to bottom, and for the groom, they have to bring two red envelops of money called “Uang Susu” or in English, “Milk fee”. The bride’s family is supposed to receive both envelops and return the bigger one to the groom at the end of Sangjit event to show that “you don’t buy my daughter, you just pay a respect to me for raising her.” The Tea Pay is when the couple pays respect to the elders, and when the family wishes them a happy marriage by giving the red envelop “Angpao”. “I did it when I got married too,” said the mother of three. For the reception, “She [the bride] wants the color theme to be black and gold, and I’m trying to be more modern and agree to that, but I think there should have been at least a little bit of red [Chinese traditional color for marriage] or pink,” said the mother who eventually ordered peach-colored flowers on every dining table at the reception. They are having the reception at the Ritz Carlton Hotel in Jakarta, with 60 dining tables. Sit down receptions are becoming common in Jakarta. People are trying to invite fewer guests, making the ceremony more and more personal instead of having a standing buffet with a thousand people. 20
  • 21.
    Look who’s talking… The reception starts with a jazzy orchestra, which finally welcomes the two families and the couple. These families are the celebrities of the night and sit at a special dining table on the stage, facing the guest tables. “It’s a little awkward when you’re put under the spotlight and people are observing you, what you wear top down, but I can still enjoy the dinner and champagne.” On the menu, there must be shark fin soup and bird’s nest. These are the traditional celebration cuisines for Chinese. “So out of all the 10 cuisine we have, we have shark fin soup as one of the appetizer, then we mix it with Indonesian foods like Bangka noodles because the groom’s family comes from Bangka, and we also have pasta and steak because the couple loves it, then we ended it with bird’s nest and chocolate cake as dessert.” As always, there are toasts, the wedding cake cutting and a little bit of video showing the morning church ceremony and Sangjit. For the couple and their friends, they have the after party with hard liquor and live music. “My husband also had drinks with his business partners. He said there is this guy who got drunk and slept on the table for a bit and they have to bring him to the room. They also took a photo booth picture together,” she said as she shows the picture. “We planned on the budget to be under 2 BILLION RUPIAH in total for the reception - Sangjit, gowns and all. But it ended up to be 2.5 billion Rupiah at the end. It’s very costly we thought, all that money for just 2 days, it’s a waste of money. But at the end, I think it’s worthwhile. It’s a once in a life time event for them, and I don’t want people to remember that “Han’s and Lilie’s wedding was the one that the food doesn’t taste good or the event is very unorganized.’ It has to leave a good memory in other’s minds as well,” says Tjan. 21 The father of the bride on the top left, accompanied by his business partners from China at the after party.
  • 22.
    Look who’s talking… JAPAN March 2011, the month of the devastating tsunami and earthquake in Japan. The cataclysm changed people’s view towards their lives, and to many, it provided them areason to seriously think about their future. Many realized the true importance of their partner. Many realized that there is more to life, choosing to move on by themselves. Either way, one big key word that has come up in 2011 was “KIZUNA” (bond) between family and friends. KIZUNA was chosen as the word of the year for 2011. KIZUNA Wedding is now the big trend in the wedding industry, says Kei Yamamoto, a wedding planner in Tokyo. Many couples who come to plan their wedding often mention that they have decided to have the wedding because they want to express their gratitude to their parents. According to Zexy, the biggest wedding planning cooperation in Japan, the top three reasons why people have wedding parties are 1) To express their appreciation to their parents, 2) To make their parents happy 3) To express their appreciation to their friends and relatives. This tendency seems to have increased post 3.11. Kei says that activities which involve parents to participate in the wedding has increased. In addition, so has the tradition of the father of the bride escorting the bride into the church (venue). Activities such as mother of the bride placing the bridal veil and parents or siblings escorting the couple out of the wedding venue is becoming popular. Another activity is the candle relay where all the participants relay the candle light to the person sitting next to them. Once all the candles are lit, they blow the candles, making a wish. The average expenditure per wedding has increased in 2011 (it has been constantly increasing in the past 5 years) and this trend is predicted to increase. Despite the recession and despite the disaster, or because of the recession and the disaster, people acknowledge and treasure the importance of bonding with people. 22
  • 23.
    Look who’s talking… “Being a wedding planner requires me to wear several hats. You have to be part-psychologist, life coach, personal assistant and friend.” – Pat Pastelero According to Pat, the challenge lies in helping the bride always see things in perspective. The term “bride-zilla” is often the norm than it is the exception. Years of PHILIPPINES working with brides has been instrumental in managing last-minute glitches and coming up with solutions on In the business of weddings, the Philippines is a prime the spot. market for designer dresses, elaborate flower arrangements and professional videography. Gaining Being a wedding planner in the Philippines is a lucrative clients has less to do with marketing and more to do business, especially since women nowadays get married with referrals from people within the business. mid-career, which makes it difficult for them to be very hands-on with their weddings. Pat Pastelero started off as a florist in 2008, catering to offices, luncheons, and events. Her business However, success depends on the network you’ve built. Spruce Floral Designs, enabled her to grow a network Brides are not convinced by advertising, but the of happy brides, designers and wedding suppliers recommendations of people they know and trust. For willing to refer her. Not too long ago, she decided to now, she is working on weddings of close friends. branch out to wedding planning, at the request of some of her clients who appreciated her impeccable taste, keen attention to detail, and professionalism. BANGLADESH In Bangladesh, more people are turning to wedding planners to help organize their special day. So much so that it could be considered the next big trend in the country’s wedding industry. What should wedding planners offer to their clients here? There are key components, including special “Dala” decorations, stage decorations and “Rasam” functions. Must-have trends for brides include an elongated Rakhi ceremony, which is the entrance of the bride in a Palki or some other extravagant vehicle to showcase her beauty. Massive, glamorous centerpieces at dinner tables are also popular. Couples prefer to have an open location rather than a community center. Such open locations enable the bride and the groom to have more luxurious ceremonies. Activities at the wedding include small plays where the bride and the groom along with their families act out the story of how they met each other. Weddings are done with a carnival theme with many stalls offering food and other activities. The themes are very flamboyant, some are more Mughal focused, often with very bright colors. People don’t usually have traditional biryani cuisine but rather different types of food. More attention is given to the clothing worn by the bride than the groom. People prefer more gaudy dresses with heavy embellishment work. Popular 23 honeymoon destinations include Thailand and Bali.
  • 24.
    Look who’s talking… SOUTH KOREA Eunkyung Chang, Director of Design Wedding (www.designwedding.net), is a veteran wedding consultant with more than 15 years of experience working as a wedding planner. She is now focusing more on new business development, training and recruiting staff. This veteran wedding consultant said the current Korean wedding market is undergoing big changes from many perspectives. Let’s hear some major trends and interesting points of latest Korean wedding culture from her. How does a much wedding cost? Per couple, it costs approximately 70 to 100 US grand including all wedding ceremonies, furniture, honeymoon and other related expenses (this excludes housing). One interesting old Korean traditional wedding culture in Korea is money gift for the ceremony, which can cover a guest’s meal for wedding. What are the most popular locations? The majority of Korean couples are married in a wedding hall, which is a wedding exclusive venue. Some very devout Christians or Catholics will not use such What kind of food is served? facilities. More recently, the convention halls of renowned hotels have become one of the popular After wedding ceremony, guests are guided to a wedding venues. And the wedding hall interior style is banquet hall where different types of cuisine awaits under transition, from Baroque elegant style into more them. There are three main types of wedding cuisine. modern and simpler one. One is Korean cuisine, the second is more Western and the third is a typical buffet style. One interesting meal in Among some very high society people, very luxurious Korean weddings is a warm noodle traditionally house weddings for a very small number of guests (less believed to imbue the newlyweds with a long and happy than 100 ) are preferred as being very private and more marriage. This dish is still one mainstays of Korean flexible time management. weddings. 24 27
  • 25.
    What do thebride and groom wear? Look who’s talking … Generally Korean couples have a Western-style wedding ceremony. No wonder the core of the ceremony is a dress! Every bride has a fantasy over her own dress for one single special day for entire of one’s life. That’s why the wedding dress is worth more than fuss about. One big change for wedding dresses over the last decade is that Ewha Women’s Street, a once popular place to buy wedding dresses, is not as popular among couples anymore. Now, the previously up-market dress shop street Cheongdam has become the most popular shopping area now for wedding attire. Preferences for wedding dress have also changed. After one top Korean celebrity wore a dress from Vera Wang, many Korean women started to shop for imported designers. Another change is that Korean males are now more involved in the decision making processes. Men’s clothing is also more important than before. More grooms prefer custom-made tuxedos with luxurious materials from designer brands rather than ready- made ones. Where do they go for their honeymoon? Interestingly, the top priority of Korean couple in selecting a honeymoon destination is a location where there are not many Koreans. However, due to their time limit (average Koreans have maximum only 7 to 9 days off for a honeymoon), long flights and high costs, the majority of couples choose to go to South East Asian countries. If the couple has enough time and money, Cancun, Tahiti and Bora Bora are also preferable destinations. More couples are also aware of branded resorts, such as Banyan Tree or the Four Seasons, for example. Sometimes these resorts matter more than the destination itself. Any other trends? A decade ago, it was not difficult to see a wedding reception where the friends of the bride and groom party with each other after the wedding. Now, as couples become more economically conscious. they are having fewer extravagant banquets. Friends also do not want to burden the couple as they know they will have to reciprocate in the future. In short, young Korean couples tend to be more individualistic and also Western in terms of the style of their weddings. They do not want to place too much burden on others. It is likely the worldwide economic downturn is one of the key influencers of this trend - 25 27 28 weddings are becoming more realistic and mature rather than overly romantic and expensive.
  • 26.
    Look who’s talking… INDIA Meet Varun Raj and Smriti Chabbra. They are a Smriti’s wedding was originally budgeted at INR 8lakhs newlywed Indian couple who planned their own but they ended up spending INR 12-15 lakhs. This wedding with necessary approvals and requests from spillover was mainly due to accommodation of guests family and friends. Like many other young couples, at the venue. “We selected a destination wedding, Smriti and her beau wanted their wedding to be which shot the budget by 30%,” the couple said. different. Different today means how the wedding is Must-haves done and/or where it is done. Food : Most important. That’s what most people Though Varun is from Mumbai, his family is settled in attend weddings for. Good food. Offering 3-4 different Dubai. Smriti’s family is in Chandigarh. Usually, couples kind of cuisines is the norm. Indian and Chinese used opt to plan their wedding in the same or one of their to be must. Italian and continental are the new must hometowns. haves. Besides these, many people choose to also However, they chose to have a destination wedding in keep some dishes that are popular from the Goa, which is a seaside destination in southern India. community they belong to. They said they chose Goa because there is a beach, and Venue : The grander the venue, the better the image its closer to Mumbai than Chandigarh and Dubai. It’s of the financial stability of the families involved. also cheaper than Mumbai and has a certain romantic Second to that is the convenience of the venue in nostalgia for them since they frequently vacationed terms of proximity to the main roads, facilities and there. They also wanted more friends to attend their residence of both the families. wedding rather than only old relatives! “Destination weddings are popular. And most of them are planned on beaches or palaces,” says Divya Tejuja who works with the wedding planning team at a company called Percept. Besides Goa, Jaipur is a popular destination for those who seek grandeur in their wedding. 26 27 28 29 30
  • 27.
    Look who’s talking… Activities Mehendi : Earlier both families would have a separate Mehendi party for their respective relatives. But now to save costs, many functions and puja ceremonies, like Mehendi, are combined functions. Before and after party : The party before the wedding is usually termed as a cocktail party where rings are exchanged. The after party is more of a youngsters party where the couple can now celebrate the wedding without any ceremonies involved. Music : A good DJ and dance music is an integral part of every wedding. Everybody tries to get into clothes that allow easy maneuvering and bold dance moves. Performance : A group from both sides of the families performs a skit about how the couple met, eccentricities of each – the bride and groom, the crazy families coming together. It is supposed to be humorous at the expense of both the families and creates an entertaining spectacle for the entertainment of the outsiders. The two groups practice this performance for a few months before the wedding with the help of a choreographer. Décor Drapes instead of traditional heavy flowers. Earlier the seating arrangement would be like in a theatre, with a stage and everyone facing it. Now , the preference is for round table setting. The hanging out area is separate from the eating area. Favorite honeymoon destinations West India: Goa South India : Kerala North India : Shimla/Nainital Overseas: Thailand, Singapore, Malaysia and SriLanka are popular destinations because they are affordable and adventurous. Plus it is not too difficult to acquire a visa. 27 28 29 30 31 32
  • 28.
  • 29.
    Knowing me, knowingyou Rural Pakistan is an emerging market that comprises 67.5 percent of the country’s total population. Small villages exist in clusters where the main source of income is derived from farming and raising cattle for dairy products. Key challenges faced in rural areas include sanitation, education and health facilities. Sewage systems usually consist of small wells that are built outside of houses. Few villages have government-funded schools, which means parents interested in educating their children have to send them to cities that are often far away. Males tend to be sent away for high school while females only complete primary school. Villages have few government or private hospitals, which means health services and information is mostly spread through so- called Lady Health workers who go from door-to-door in selected communities. Strained finances, security of elders and strong values of sharing have nurtured a tradition of joint household living in villages. This sometimes leads to family disputes over distribution of wealth and disputes between women living in one household. Religion dominates the lives of villagers and religious festivals are of vital importance. The most popular festivals include the birthdays of Sufi saints that are commemorated through exciting, colorful festivals called melas. During these festivals, everyone comes together to showcase their individual flair for creativity via folklore, folk music, traditional food as well as crafts such as embroidery, stitching and pottery. Numerous vendors sell different wares. Young men take part in activities such as the wrestling sport called kabbadi. Behind the colorful lives of rural villagers, are strong undercurrents of conservatism. Arranged marriages are ubiquitous. Women are restricted from going out in public alone. There is shocking gender discrimination and limited educational opportunities for females. Yet those living in rural Pakistan continually hope for a better future. They want access to clean drinking water and other basic infrastructure. That the health risks they face on a daily basis go away with better hospitals and more doctors. They seek empowerment - empowerment in education, entertainment, vocation, freedom of expression, finances or simply access to basic utilities. In the face of continual hardships, Pakistan’s rural population is inspirational. They are genuinely warm and hospitable people who are always smiling and forever hopeful. Diana’s approach to life is simple. Why fuss about things when you can just “be happy”? She strongly believes in taking things easy and bearing no ill will towards others. Despite the rising cost of living in Singapore, she appreciates the governments small effort in trying to ease the burden on the lower economic strata but feels it is barely enough to make a difference. At home, she often prefers to veg out on her sofa and watch her favorite Tamil cartoons, instead of using her computer. “When you go online, you have to read this, read that, click here, click there. I rather just watch cartoons on TV – it’s so enjoyable and always puts a smile on my face. When you watch movies, sometimes you get sad also – what’s the point?” Her love of the telly has Diana lusting for her next home furnishing purchase – an L-shaped couch with a reclining back rest!
  • 30.
    Knowing me, knowingyou Her son Adam, in the living room Safida and her dad Safida, who is 31, lives with her parents and her four- Safida’s biggest challenge is having to travel around on year-old adopted son in a hilly Malay village in Kuala her wheelchair. She contracted a fever when young and Lumpur called Kampung Palimbayan. The village is gradually lost control over her motor abilities. The situated close to the city centre and, as a result, many limited infrastructure and facilities available for the developers flock to the village to set up retreats for physically disabled makes it hard to earn a living. people looking for a quick escape from the city. Currently, when she needs to travel, her parents have no choice but to carry her down the steep stairs of her The village isn’t your typical village scene as community home. Their health is her biggest worry, especially with ties are not very strong, perhaps due to the close the strain of transporting her to work and back proximity to Kuala Lumpur. Safida commutes to the city everyday. However, thanks to technology and her good to work. She works from 8 in the morning until around 6 command of English, she has found a solution - an at night as a secretary/ receptionist at an oil and gas online English tutoring job which will give her the company situated 45 minutes away. She earns RM1500 freedom to work from home. (US$476) every month. Her parents sell nasi lemak (rice cooked with coconut) every morning at the local market She hopes the government will be more supportive of and run a small catering business. On a good day, they their community and provide more job placements and make RM200 (US$63). They have a comfortable life with facilities for the disabled. Despite her challenges, she their combined household income. Her home is simple has never given up and plans to set up a school after with all the basic amenities. She has a car, two televisions she moves back to her dad’s hometown in Perak where and subscribes to cable TV and wireless internet. The there is a stronger knit of family and community to family loves to watch Masterchef Malaysia together as support her. her parents love to cook. Safida isn’t the typical village folk either. She’s more tech savvy than most and uses an Asus laptop to update her blog (www.girlonchairblog.blogspot.com), a Blackberry phone to connect with her friends and also teaches her son to type and use the internet using an Android Tablet. She says, “There is no limit when it comes to education these days” and hopes that she can prepare him to become someone useful like a doctor or a pilot who is able to take care of the family. Her son speaks English and Malay and goes to an established English medium 30 Smart Reader Kid preschool.
  • 31.
    Sumanapala Knowing me, knowing you Paddy field worker Anuradhapura He is also happy that the road to the village is now paved and wider and that the government is giving fertilizer to farmers at cheaper prices. But there are still problems. It is hard to get good prices for paddy harvests, for example. Yet, overall, the eldest son says he believes the future of his children will be brighter and better than his - better socially as well as economically. Sumanapala is a rice paddy cultivator from Anuradhapura, in Sri Lanka. Rice paddy cultivation is the staple of this economy in addition to Chena, or vegetable, cultivation. He works nearly 16 hours a day, his time divided between paddy fields and the Chena. He rarely travels outside the village, but when he does, he takes a bus. Sumanapala has a large family with four children. His parents’ generation had families with as many as 10 children. The smallest son is in grade six and studies at a local primary school run by the government. He has a sister who just completed her O/Ls and his currently hoping to enroll in a computer class in their town. This will likely place a strain on the family’s budget, but they have decided it is necessary for the child. Akira Wakabayashi moved to Kagoshima prefecture Sumanapala has never touched a computer, but his (southern tip of Kyushu, Japan) in 2007. He was younger daughter will need the knowledge to find working in Fukuoka city (a big city in Kyushu) as a success in the future. His eldest daughter and eldest computer engineer for 10 years and decided to move son never learned how to use a computer. Now the to a rural place with his family to lead a self- eldest daughter works in a garment factor. The son is sustainable, simple life. He now manipulates an ax in the army. instead of a computer. He built a house and cultivates vegetables. Sumanapala’s home is sparse. It has a few old, wooden arm chairs and a table with a few chairs where the He has a mobile phone for an emergency, but does not family gathers for meals. He has an old black and white have TV anymore. If you live in Japan whether rural or television and a radio, which is youngest son wants to urban, things you can get, watch or hear are not so replace with a model that has color. Sumanpala says different. Same national TV shows are available, he could find a better use for the money, hoping to nationally standardized education systems are equally buy a small tractor that he could use to plough other available, Any fashion items or gourmet dishes are all fields and earn extra income. one click away. He says there is really no use for a better TV as he only However, there is an increasing number of people who uses it to watch the news and a few random drama wish to lead a simple life. They choose to live in the programs. His youngest son likes to watch cartoons. scarcity of things. Mr. Wakabayashi believes that rural They have no landline but instead a mobile phone, living can give a rich experience not only to him and his which functions as the home phone. It was purchased wife, but also to his children. He says “now we by the eldest son who says he is relieved the war is appreciate every single thing around us that we used 31 over. to take for granted. It is a joy of life”
  • 32.
    Wang Dong andher daughter Samsung desk computer mixed with parts of other brands Unknown brand air conditioner 32 Skin care and laundry products
  • 33.
    Knowing me, knowingyou Wang watches TV and uses her computer after work at home for an hour or two. National news and local news are her favorite content. Wang’s most often watched channels are CCTV 13, the Liaoning provincial channel and Liaoning local channels. The motivation of watching TV is she wants to know government’s policies and what Wang Dong is a 34-year-old rural doctor who lives in happened around her Linhai, a county level city in China’s Liaoning Province. Inspired by her friend’s parents, Wang decided to study She also likes reading her friends’ diary at their QQ medicine at Linghai Hygiene School when she was young spaces. It is the main way for her to understand what’s and has received her professional certificate. Wang’s going on with them, what do they worry about and husband runs his own shipping business, and they have what are the things they are happy about. She also a 12-year-old daughter. Both Wang’s parents and her reads newspapers at work and especially focuses on parents-in-law are from and now still live in the recruitment information. countryside. Wang and her husband make around 2,500 yuan per Wang’s family used to live in a one-story house that is month. She thinks their income is not high enough and made of red bricks. They had to sell it since the land was the “comfortable life” has not yet arrived. “If I see a bag needed by developers two years ago, and their old that I like, I cannot buy it because I cannot afford,” she house has since been knocked down. They bought a said. Wang also dreams of traveling. But she doesn’t new apartment by using the money from selling the old have the money. The only place that she has travelled to one. Wang’s family moved into the new apartment two is Qianshan mountain in Anshan, the same province that years ago. It is in a newly built brick blocks on the edge she currently lives in. Wang is not a sophisticated of the city. People living in the neighborhood are also consumer for fashion and beauty products. She mainly from rural families. There are very few cars parked in purchases low-end Chinese skincare brands such as Da the neighborhood, and those cars that are there are Bao. However, she desires to go to a beauty salon since entry models. Some families with ground floor flats her girlfriends who are able to afford to go are using even keep the habit of rural lifestyle, growing their own direct-sale cosmetics and skin care products bought at vegetables on the first floor. that salon such as Chedoven. Wang’s apartment has 2 bedrooms and 2 living rooms. Wang worries about inflation. She thinks the inflation in The overall feeling of the living space is simple and the past few years is making things more and more minimal, but bright. The dining room, kitchen and unaffordable for average people like her. When I asked bathroom are decorated in a green color. All big ticket her how she deals with inflation, she replies that they items in Wang’s apartment were mostly purchased from “eat less meat”. “I only make 33 yuan per day, but the local private shops through friend’s recommendations. meat (pork) price is now 17 RMB per half kilogram, so I They are currently using home appliances, including a have to look for discounted meat from supermarket Samsung desk computer mixed with parts of other everyday,” Wang said. brands, a Panasonic TV, a Royal Star refrigerator and an unknown domestic brand air conditioner. Wang prefers However, Wang still feels optimistic about the future of joint venture brands because Chinese brands are still in her family. She thinks the government will launch better the process of learning advanced technology from policies that are going to benefit more people. She also foreign brands, but most of the time she can only afford believes her family will be able to have a “comfortable domestic brands. She also uses Nokia cell phone. life” because they will work more and work harder. 33
  • 34.
    Knowing me, knowingyou It is not an easy job to be an over-60 year old female “I don’t agree that this is good for kids, but it’s true if farmer in Taiwan, but Mrs. Chen does not take the you study in the city, you have more chances to study cultivation as a dirty job. Instead, she is thankful that at a better college and get a better job,” she said. nature can give her and her family such a beautiful life without the pressure form an urban lifestyle. Although she can only see her grandsons about 3 to 5 times a year, she keeps in contact with them through “Although there are no such fancy entertainment as in the use of a mobile phone, and recently her son the big city, we still have lots of fun on any normal recommend that she should have a computer so they day,” Mrs. Chen said. can visit more frequently via webcam. Mrs. Chen likes to sing with her relatives and friend. “I have learn some computer skills through the They will have a gathering twice a week at a local KTV. Township Office, but computers are not practical to Recently she likes to invite people to her place me. However, I recently have wanted a smartphone, because her husband bought her a karaoke stereo set. especially since the Elder Farmer allowance has been “Of course I am very happy, and I look forward to raised to NT$ 7,000 per month in 2012,” she said. singing with my sons and grandsons in the coming Chinese New Year,” she said. Generally, Mrs. Chen is satisfied with her life, and welcomed the youth back to the rural life. “Maybe you Just like the rural people go to city to pursue a better can’t get wealthy, but you can enrich your life here.” life, Mrs. Chen’s son also as a job in Taipei where his child can attend a better school, which means the students have to study 10 hours per day. 34
  • 35.
    Knowing me, knowingyou Maria is a 32-year-old living in Deli Serdang, a second-tier city near Medan, North Sumatra in Indonesia. She is the mother of a 7-year- old son. Maria is optimistic and tough. Even with rising prices for food and other basic goods, she still manages her family’s needs by working as a high school teacher in the morning and as a private teacher twice a week in the afternoon. Her husband works for a manufacturer in Medan. While life seems slow in her small city, things continually move faster with technology - TV, internet, mobile phones. Family drama, music shows and infotainment are her favorite TV programs, but her attention is frequently diverted to her mobile while she watches television. She constantly chats on Facebook, updating her status and posting photos. “The government is busy with their own concerns. They don’t think of us, their citizens,” she says. “Politicians are busy creating their good images. Political parties race to get our hearts by doing social activities. I only care about my family life - how to run it well, make sure my child gets a better education. I hope we can buy our own house next year and no longer live in my parents’ home.” Taju Sarker, who is also called Tajuddin, is a painter who lives in rural Bangladesh. He also works as an electrician and earns a salary that is slightly higher compared to others in his village. His income has increased recently as more people in his community are building their own homes, which means they need to hire a painter. In his home, he has a television, a transistor and other home appliances. He has no clear idea of any major purchases he would like to make in the future, adding that he would rather save his money than spend it on any one particular item. Tajuddin has two sons: One is 7 and the other is only two. His eldest son attends a school located at the end of their street. The family watches mainly Bangla movies on TV as well as dance shows - apparently Hindi TV dance shows are a big hit in the villages. None of the family members have ever used a computer. But there is a mobile phone repair store that just opened right next to their home. They have gone to this store to watch its owner work on a computer. When asked whether the government is doing enough to help the nation’s poor, Taju said: “I do not care as long as I live well and my children grow up well, I am more than happy. I do not care what the government does.” He owns two mobile phones, which his children use to talk to their relatives. Tajuddin said he did not want any photos taken of him or his family. He insisted it was better not to take any 35 photos because his house was being renovated and his wife was not present. He said he did not want to send out an “unfinished” photo of his life for the world to see.
  • 36.
    Knowing me, knowingyou Eugenio, who lives of North Luzon in the Philippines, learned farming from his father who learned farming from his. He spends everyday tending to his vegetables as it is the main source of income for his family. Everyday starts early at 430am and the rest of the day is spent instructing his employed workers hands- on or conversing with agricultural specialist on different crop issues. Eugenio seeks to improve his farming practice to remain competitive in the market. He makes sure to establish close relationships with his buyers and sees to it that they get the consistent quality that they have come to expect from his produce. His years in farming taught him that reputation of his produce is valuable in gaining and maintaining buyers. He knows that his chosen livelihood requires daily personal attention. Because of this, he rarely goes on holidays. In fact, the first time ever he rode a plane out of his province was last December 2011 (which was partly also for his business). He takes pride in his respected vocation but does not wish his children to inherit it. Under his management he strived to grow their family’s farming livelihood so that, unlike generations before them, his children can go to college. This way, they can have a more prosperous life without having to toil under the sun. Phuong is a Vietnamese housewife with 2 children under 10 years old who both go to public school. Her life is non-stop work with both her weekdays and weekends being filled work in the fields or chores in the house. Her husband works as a building assistant and lives away so that they can earn more money for the family. Her life is becoming more difficult with the increasing price of necessities such as fuel, water, and electricity, hoping that the government will have new policies to support their lives and control price fluctuations. Her reputation is important to her and while money may be tight, she doesn’t want her family to ‘lose face’ so she still has goods in her home such as a TV, motorbike, CD/VCD player and electric fan. Phuong’s main form of entertainment is chatting with friends or watching TV for normally 1-2 hours/day during lunch, dinner, or relaxing at the end of the day. Computers aren’t something she feels she needs to buy or have in her home yet: she believes that because she has never needed one before, her money will be better spent on other products more essential to her family’s lifestyle like her mobile phone that she uses to keep in contact with her husband living away. 36
  • 37.
    Knowing me, knowingyou Ram Naresh Yadav is a 32-year-old commerce graduate employed with a local bank called the Regional Rural Bank, in the outskirts of New Delhi. He is married and has two kids. Ram stays with his parents and younger brother who is single. His father is a farmer who owns 1 hectare of semi irrigated land. Ram is the first person in the family to break out of the farming occupation. He wants his kids to study in New Delhi and then become civil servants (as they call collectors), or go abroad. Has life got better or worse for them recently? He says that mobile connectivity, a media explosion, improved infrastructure and government funded rural development schemes have made a difference to his and his peer group’s life. He also says the quality of health care has improved over the last ten years. What's in their homes? He has white goods, including a TV, refrigerator, washing machine, water heater, fan, etc. He drives a motor bike and has a small sofa set, a few chairs and a double bed. He has a bone china tea set. Food is consumed using steel utensils. What are they planning to buy next? He wants to buy a big screen TV and a DVD player. Where do the kids go to school - what kind of school? Ram’s daughter goes to a government primary school and and his son to a local English medium school, which they call a convent school. What TV programs do they like to watch? Mostly Bollywood movies, the quiz show Kaun Banega Crorepati,, laughter shows and news on Aaj Tak or India TV (instead of saying news he mentioned channel names). Have they ever used a computer? Yes. Ram says that most of the youngsters in his village want to learn how to use a computer because that is perceived as the key to success. This belief has aided in mushrooming of computer centers all over around the community. Is the government doing a good job? He and most of his peer group feel that the schemes proposed by different governments don’t reach them and middlemen siphons it all off. Also, they think that the caste factor plays a major role in getting government support in rural areas. Do they use a mobile phone? Yes he uses mobile phone. There are two phones in his house, one he carries with him and the other used by everyone at home. The second phone is never carried out of home, it has replaced the landline! 37 45
  • 39.
    Movie of theYear PAKISTAN : BOL 'Bol‘ is a renowned Pakistani film director Shoaib Mansoor’s second dramatic film that reveals the country’s rigid social, cultural and right-win religious complexities. The film takes place in Lahore in a household with a number of daughters. Their life is, on the surface, vibrant. However they have severe restrictions on freedom of expression. ‘Bol’ takes audiences on a journey into the life of this family, illuminating their sufferings and triumphs. As the women try to solve their problems, they face even deeper challenges. The complexity of their circumstances becomes a struggle between life and death. The movie was nothing short of controversial. The name itself means “speak” and is a simple and symbolic comment on the lack of free expression in Pakistan. Never before have issues such as homosexuality, the stigmatization of female use of contraception, the freedom to choose one’s partner and public demonstration of singing and dancing been addressed so directly in Pakistani cinema. ‘Bol” is undoubtedly the most provocative and most talked about movie of the year in Pakistan. SINGAPORE: ALREADY FAMOUS Following ‘The Noose’s’ Emmy Nomination for Best International Comedy, Michelle Chong has shifted gears for her directorial debut, ‘Already Famous.’ The movie was extremely well-received by Singaporeans. Its performance matched Hollywood movies released the same weekend and raked in S$1.04 million in just 11 days. Beyond just a good directorial debut, this movie symbolises an increasing appreciation of our country’s local talent, both amongst Singaporeans and international audiences. Storyline: Lim Ka Kiao sells TVs but she wants to be on TV! The young Malaysian girl heads off to Singapore to fulfill her dream of becoming a famous TV star. In her journey to superstardom, she meets a shy coffee shop assistant named Ah Seng who helps her achieve her dream. Seemingly light- hearted but not without moments of vulnerability and emotion, ‘Already Famous’ is touted as "not just about the trials and tribulations of making it in showbiz, but also a message of truth and heart to anyone who's ever wished upon a star".
  • 40.
    Movie of theYear Malaysia’s Movie of the Year goes to controversial local film ‘Nasi Lemak 2.0.’ The comedy, named after Malaysia’s national dish, takes an unflinching look at racial stereotypes that persist among the locals. ‘Nasi Lemak 2.0’ tells a story of a Malaysian Chinese chef who, ignorant of the other cultures that comprise TAIWAN: YOU ARE THE APPLE OF MY EYE Malaysia, discovers the meaning of being Malaysian on his journey to learn about local cuisine. The blockbuster ‘You Are the Apple of My Eye’ has become the highest-grossing Chinese-language movie One of the reasons for the popularity of ‘Nasi Lemak in Taiwan. The film has grossed NT$410 million 2.0’ is the fact that it originated from Namewee, a (US$13.54 million) at the box office in Taiwan since Chinese Malaysian who shot to fame after he released its release in August. a controversial song fused with Malaysia’s national anthem that aired his views of Malaysia and its The romantic comedy adapted from one of Ko's leadership. In a country where media is highly novels, which opened in Hong Kong theaters on Oct. controlled, his bravery and transparency won him 20, depicts the life of a troubled high-school boy who many supporters. falls in love with a girl who is adored by almost every boy in her class. While Hollywood movies dominate screen time in Malaysia, ‘Nasi Lemak 2.0’ is one of the few locally- Taiwan movie critics have said the film's ability to made movies that has captured the attention of arouse the "collective memory" of audiences in Malaysians. Many look to ‘Nasi Lemak 2.0’ as an reliving their high-school years is what has made the honest portrayal of life in Malaysia, in a society where film so popular. media tend to gloss over sensitive issues, such as race. The style of acting, script and characters is uniquely After ‘You Are the Apple of My Eye’ was released to Malaysian, and local references to typical Malaysian audiences in Taiwan and Hong Kong, some large-scale problems, such as the well-known poor quality of plots have triggered intense discussion between Malaysian made cars, is also included. moviegoers. Therefore, the movie successfully passed the Chinese mainland film censorship board, the This theme of finding a Malaysian identity clearly production company behind the film immediately reflects a cultural shift. In the past, we were less aware announced that the film is set to hit theaters on of racial divides, but these days, there is a January 6, 2012 in China. hyperawareness towards racial lines. The trailer: http://www.youtube.com/watch?v=3QyRzSKuwkY&fe ature=related
  • 41.
    Movie of theYear SRI LANKA : VIDHU Directed by Asoka Handagama, the film features an adolescent boy called Vidhu, presumably, an offspring of a politician. With no birth certificate, he is denied access to free education. His mother, a prostitute and pickpocket, educates him and pushes him up the socioeconomic ladder. With his inborn skill of speaking, he overwhelms the whole country and achieves his dreams. A politician, thought to be his father, tries to maneuver Vidhu to attract audiences to his superior’s election rallies. The catalyst of the film revolves around the politician’s arduous attempt at manipulating the child into speaking on the political stage, and the child’s resistance to speaking on the school stage at the same time. The story entails a layer of fantasy, and achieves a closure similar to that of Slumdog Millionaire. ‘Vidhu’ presents a criticism of the contemporary economic and socio-political issues of Sri Lanka. Vidhu’s mother has to sin to keep the son alive. As she says to the son, her value vacillates by the day, and when it has no value, she cannot help but pick pockets. The politician, a former lover of hers, typifies a Sri Lankan politician entrapped in the impenetrable mire of corruption and misuse of power. JAPAN: KOKIRUKO – ZAKA KARA (From Up on Poppy Hill) ‘Kokuriko-Zaka Kara’ is the second film from director Goro Miyazaki, the son of Ghibli founder Hayao Miyazaki. It adapts Chizuru Takahashi and Tetsuro Sayama's original manga about the coming of age of a high school girl named Umi. Bunkatsushin.com reported ‘From up on Poppy Hill’ had grossed over 587,337,400 yen at the box office. During these three days, over 445,000 people watched this film. http://www.youtube.com/watc h?v=c2hBnA-R4uw
  • 42.
    Movie of theYear CHINA: LOVE IS NOT BLIND The movie ‘Love Is Not Blind’ is about a 27-year-old woman breaking up and dealing with the challenges of being single before she eventually finds a new boyfriend. The movie was released on November 8 to coincide with a holiday in China called Singles Day. The low- budget film swept the national box office chart after raking in 160 million RMB (US$25.2 million) in five days during its first week of screening, according to a Mtime.com report. It was one of the most successful releases ever for a Chinese film. Slogans of the film are also becoming very popular among young Chinese. For example: “When you’re in love, be crazy; when you lose love, be independent!’” and “Breaking up can be a chance to love yourself again.” The movie reflects a current cultural phenomenon that an increasing number of young Chinese women and men are staying single. Today they have more freedom to achieve independent success and explore exciting urban lifestyles. At the same time, their expectations of potential partners are becoming higher. Meanwhile, many young men are unable to buy property that most women and their parents consider necessary for marriage. As time goes, aging singles feeling bad about themselves and trying to find a partner as quickly as possible. The movie has delivered a positive message that single women and men should embrace independent values, at the same time searching for successful single lifestyles to match. Life can still be awesome without a partner. The mass movement feeling helps create a communal experience of banding together with other singles for comfort and support. PHILIPPINES: NO OTHER WOMAN The film revolves on a man’s journey on becoming a successful working husband whose perfect marriage becomes complicated when he commits into an adulterous affair that changes his life. Released: September 28, 2011 Box Office Sales: Php 278.39M It is the 2nd highest grossing Filipino film of all time The movie was loved by audiences for its numerous quotable lines.
  • 43.
    Movie of theYear INDONESIA: ARISAN! 2 Nia Dinata, the famous Indonesian director, released the movie in December. It is a continuance of ‘Arisan!’, which was 8 years ago. The movie created a buzz on Kaskus, the biggest online community in Indonesia, and is much loved for showing an ugly truth about Indonesian socialites which no other movies dare to speak. It also shows a lot about the social pressure to fit in in Indonesia. Tora Sudiro plays a famous gay architect and Cut Mini played as a successful career woman coming from a well off family. The second ‘Arisan!’ shows a life progress among a small group of socialites who, in the first movie, realized that life should never be superficial, and, in this second movie, embark on a new discovery that life is not all about working hard and playing hard. It’s about appreciating the time that God has given by stepping back, relaxing and seeing the world with clear eyes, listening with opened ears and embracing friendship and love. The movie depicts the change in Indonesian culture where people start accepting differences like homosexuality, and the young generation are becoming more and more educated, Watch the trailer: hence more open minded, creative and expressive. The movie http://www.youtube.com/watch?v=MBIpmmW is an example of the creative industry in Indonesia that is AayE, growing and accounted for 6.3% of the total GDP. More and http://ekonomi.kompasiana.com/bisnis/2011/1 more Indonesian movies are liked not only by people living in 1/24/ekonomi-kreatif-berbasis-budaya-lokal/ suburbs, but by the educated young generation in big cities . SOUTH KOREA: SUNNY The 1980s retro drama ‘Sunny’ is about seven junior high friends reuniting 25 years later and has been noted for its vivid portrayal of the 1980s, consequently evoking the nostalgia of retro pop culture and the wonders of youth. The film captures the restlessness of youth as much as it evokes the nostalgic pangs of middle age, appealing to teenagers and older viewers alike. The coming-of-age drama sees a timely release for Family Month here, but its universal themes aptly pave possibilities of a wider exposure. It was not uncommon to see mothers and daughters go to the movie theater hand in hand.
  • 44.
    Movie of theYear INDIA & BANGLADESH : THE DIRTY PICTURE ‘The Dirty Picture’ not only thrives on these traits but literally celebrates them like never before in its 144 minutes of unabashed, in-your-face entertainment, entertainment and entertainment. It has been hot not only in India but also in Bangladesh. Reshma (played by Vidya Balan) is a non-conformist who leaves her home to become a star in the big bad world of Bollywood. The character she plays in the movie is called Silk. She has no qualms about her sexuality. She is brazen enough to put her neighbors to sleep with her fake moans. She is well aware that everything comes at a price, especially the much-vaunted fame. But soon she realizes that success without honor is an unseasoned dish; it will satisfy your hunger, but it won't taste good. And Silk learns this bitter truth the hard way. Overall it is a great movie. Vidya carries her role as a professional. This movie has taught the viewers how an actress in the film industry grows. How they have to control their emotions and how they are working as team to change the minds of the people who do not know how things are done in this industry. It’s one of the in-your-face movie which does not care for any critics view but to uplift the scene behind a career in the film industry. With ‘The Dirty Picture’ director, Milan Luthria tries to explore the dirty underbelly of the Indian cinema and excavates a gem in the form of Vidya Balan. You can’t help but appreciate the effort she puts in to make her Silk look authentic. In the age where majority of leading ladies won’t dare to look ugly or overweight, Vidya carries her ample love-handles and haggard looks with aplomb. It’s the role which is bound to earn her some of the most prestigious awards in town. VIETNAM Long Ruoi is the first Vietnamese film to become the highest grossing film of the year against the increasing number of international movies screening in Vietnam. This comedy captures not only Vietnamese humor, but the dream of many that come to the city for a better life. The movie follows the story of Teo, who started his journey moving from the countryside to Saigon. After arriving in the city determined to become rich, he soon discovers that he is the spitting image of a local ring leader named Long Ruoi. A recent ambush has left Long Ruoi in a comatose condition, forcing his henchmen to enlist the hapless Teo to masquerade as the ring leader to prevent an all-out gang war. Teo must transform into the stereotypical ‘ city slicker’ to survive, playing out well known rural and city references which comes together as a comedic performance for all audiences.
  • 45.
    What’s making peoplereally angry, and why?
  • 46.
    Rage against After a decade and a half of hysteria about how the web would obliterate conventional advertising with its raging tsunami of digitally empowered consumers, the results have been somewhat…flaccid. Yes, there have been occasional steamy successes, but those have been the exceptions rather than the rule. (I bet half a donut you’re thinking about Old Spice, the T-mobile flash mob or BMW’s ‘The Hire’.) Even those had extensive ATL support before they went viral. Ask any web pundit for an example of digital advertising success in more digitized countries, and they will likely parrot the same three tired campaigns back to you. For all the promises made by the Digerati, the web has “Are we donkeys?” the graffiti asks. The proven to be a stubborn advertising nut to crack. Now vandal hit a public taxi signboard shortly after we’re told social media is where it’s at, and Comfort (Singapore’s largest taxi provider) ‘conversations’ are the aphrodisiac that will transform announced price hikes in its taxi fares. While your business into an irresistible hurricane of brand several fare items were discounted, many potency. more were raised, leading many Singaporeans to question if price fixing had Now personally, and I have been advertising profession occurred. for some time now, I've never had a social media ‘conversation’ about the laundry detergent I use or Disgruntled citizens protested not just with which butter I buy. And if I had friends who did have vandalism but also with a boycott of taxis. conversations like that, I’d de-friend them immediately. Cabbies are reported to have experienced But for all I know, I’m in a minority. I might brag about lower numbers of passengers since the fares making an expensive purchase, but that usually happens were raised. after the fact, and it’s more about me showing off generally to annoy other people. Will this trend continue? Or will most Singaporeans, as some would predict, “adapt So, to my Digerati friends residing in other parts of the to it” and continue to help our local taxi world, who claim divine knowledge, insight, and business flourish? prophecy into the future of advertising, this heretic asks you but one ignorant question: When was the last time you purchased a product after participating in a social media campaign / conversation? Omair Ahmed, Creative Manager, Ogilvy Lahore
  • 47.
    Rage against Malaysia’s PrimeMinister Najib recently announced plans to review or abolish laws inconsistent with the constitutional right to freedom of speech, assembly and association. The Peaceful Assembly Bill 2011 was passed in December. The bill was part of Najib’s promise to grant more freedom of assembly to the citizens. Malaysia’s Prime Minister Najib recently announced India’s Lokpal: To be passed, or not to be However, when the contents inconsistent with the passed plans to review or abolish laws of the bill were revealed, local commentators such as the Bar Councilto freedom of speech, assembly constitutional right and netizens were enraged that the new law was, in many ways, more restrictive than the previous laws in place. The bill placesmuch Anna Hazare’s middle-class and association. The Peaceful Assembly Bill 2011 was However more restrictions on the freedom was part of Najib’s does nothing tofans in Indiapotential passed in December. The bill to assemble and curtail the want to paint the entire political class as unscrupulous, political India remains for arbitrary exercise of police of assemblyrecent example is the police refusal to promise to grant more freedom powers. A to the passionately involved with the art of political allow Seksuality Merdeka (“Sexuality Independence”), an annual sexuality citizens. rights festival, to be held as certain religious groups lodged complaints against rooted big leaders. Give play and the craft of the gathering. the contents of the bill were revealed, However, when Team Anna credit. But for its two Delhi local commentators such as the Bar Council and protests, the political class, especially the Enragedwere enraged that the new law was, in awareness and UPA, would not have woken up to its netizens netizens used Facebook to spread many gather momentum for themore restrictivethe bill which culminatedplace.protest by growing public anger against corruption and ways, opposition of than the previous laws in in a hundreds of acted on the Lokpal Bill. From being Malaysians in more restrictions on the freedom to lawyers marched to the The bill places the KLCC Park. Some six hundred projected as an apolitical, anti-corruption Parliament to does nothing Bill, vowing that they would “continue knocking on the assemble and oppose the to curtail the potential for doors of Parliamentpolice the bill was removed." arbitrary exercise of until powers. A recent example movement, it has turned into an unabashed is the police refusal to allow Seksuality Merdeka anti-Congress bandwagon, with little scope Even though the bill has beenannual sexuality rights and protestshide its politicaltill and RSS link-up. (“Sexuality Independence”), an passed, the debate to still continue bias today. to be held as certain religious groups lodged festival, Anna tested the UPA in 2011, and, in the complaints against the gathering. New Year, he, himself, will be tested.While everyday news updates us about the details Enraged netizens used Facebook to spread awareness of the journey of the Lokpal bill, everyone’s and gather momentum for the opposition of the bill attitude towards it has gone from inspired to which culminated in a protest by hundreds of angered to, with the recent events, resigned. Malaysians in the KLCC Park. Some six hundred The fate of the bill seems shaken, but behind lawyers marched to the Parliament to oppose the Bill, the rage against the political system is a little vowing that they would “continue knocking on the ray of hope that wants this one baton in the doors of Parliament until the bill was removed." form of a bill to correct the corruption in the country. Even though the bill has been passed, the debate and protests still continue till today. 47
  • 48.
    Rage against Sri Lanka's parliament passed controversial legislation recently that will allow the government to acquire enterprises or assets it deems underperforming or underutilized, despite concerns the bill could hit investment in the country. The new law will pave the way for the state to acquire 37 properties, including from two listed companies it has said are underperforming. Leases on the assets, mainly land, were Sri Lanka's or sold at a discount years ago legislation given awayparliament passed controversialeither as an recently that will allow the government to incentive for investment or with the aim that loss-making acquire enterprises or assets it deems underperforming or underutilized, despite concerns the bill state-owned enterprises could be turned around. could hit investment in the country. The new law will pave the way for the state to acquire 37 properties, including from two listed President Mahinda Rajapaksa's ruling party has been strongly companies it has said are underperforming. Leases on the assets, mainly land, were given away criticized by opposition parties and leading business chambers orfor seeking discount years ago either as an incentive for investment or with the aim that loss- sold at a to expedite the bill without public discussion and making state-owned enterprises could be turned around. without any opportunity for the properties' holders to argue President Mahinda Rajapaksa's ruling the owners been strongly criticized by opposition parties and against their listing.The government says party has will be leading business chambers forwhat criteria expedite the bill without public discussion and without compensated, but it is not clear seeking to compensation any opportunity on. the properties' holders to argue against their listing.The government says the would be based for owners will be compensated, but it is not clear what criteriaEnraged residents of San Juan Cityon. the compensation would be based in The main opposition UnitedNational Party said during the the debate that the a would damage The main opposition United National Party said during Philippines threwbill homemade grenade at the government demolition team who arrived investor that the bill would damage investor investment debate sentiment and discourage foreignsentiment andin the $50 billion economy, hindering Sri to tear down the shanties. Lanka's post-war development. the $50 billion economy, discourage foreign investment in The asset Sri Lanka's post-war development. hindering acquisition bill allows the government to appoint authorities to manage "in the interests Homes of some 300 people were torn down of the national economy”. The opposition argued that the bill violates 2011country's constitution to in January the as people were forced The asset acquisition bill allows the government to appoint and should not be debated while a rulingof thefundamental evacuate the against it is pending. given authorities to manage "in the interests on a national rights case area. Settlers had been Though Rajapaksa has said the bill will be a violates the acquire the specified properties, demolition, economy”. The opposition argued that the bill 'one-off' to notices by the government on the economists, investors, state officials be debated whilepoliticians few heeded heeded the notice. country's constitution and should not and opposition a but have warned it amounts to nationalization and couldrights casebusiness confidence. ruling on a fundamental damage against it is pending. "ItThough Rajapaksa has said the bill will be a investorsto large scale will be worried," Frontier out will impact larger projects and potentially 'one-off' of Residents, homeless and hapless, lashed Research economistproperties, economists,told Reuters. acquire the specified Amal Sandarathne investors, state to the government for not giving them A officials bank economist speaking on condition of anonymity said the way in About 50 people were senior and opposition politicians have warned it amounts to enough support . which the bill had nationalization and could damage business confidence. injured , due to the onslaught of bottles and been introduced risked discouraging investors. mini-grenades being fired at the demolition "It will impact larger projects and potentially investors of large team. scale will be worried," Frontier Research economist Amal Sandarathne told Reuters.A senior bank economist speaking According to local officials, the clearing on condition of anonymity said the way in which the bill had operations will pave the way for the been introduced risked discouraging investors. construction of the San Juan 48 hall. City
  • 49.
    Rage against Overloaded SchoolVan Killed 18 Children in China On November 18, 2011, a severe car accident occurred in Yulin County, Qingyang City, Gansu Province. A dump truck carrying coal smashed into a kindergarten school bus in a head-on collision. The accident caused 20 deaths. The bus driver and four kindergarteners were killed immediately and 15 others died in the hospital. The revised Land Expropriation Act Amendments hurt farmer groups Several civic groups lashed out Taiwan’s president, making claims that his administration had been working to reform laws governing land use and housing “lies.” “The government has made the changes in favor of developers and big corporations. The revised Land Expropriation Act should be a protection for disadvantaged people. However, it is now a weapon against them," Liao said. The so-called school bus is actually just a small van which was supposed to carry maximum of 9 In the revised law, the government promised to people. According to Gansu Province emergency grant landowners compensation for expropriated team, this school van was carrying a total of 64 land based on the market value of the land — people at the time of the accident, including one bus instead of the published value, which is usually driver, one kindergarten teacher and 62 much lower. kindergarteners. The school bus driver and four children were killed at the scene, 14 children and the Maybe some people do not realize this policy, but teacher already died in the hospital. The remaining they all notice the 84-year-old farmer Hsieh, who 44 children were injured, 13 seriously. faces forced expropriation of his farmland. The amended Land Expropriation Act focuses too much Badly maintained school transport has been the focus on compensation, and fails to pay attention to the of public anger for months after a series of accidents rights of those who do not want to sell their land. in which children were killed on their way to and from school. In December, China's safety regulator “The government always said that they would demanded immediate action to improve safety protect designated agricultural zones, but that was aboard frequently overloaded and badly maintained a lie,” Hsieh said. “I don’t want to give up my land, school buses. The demand from the State no matter how much they pay me. Administration of Work Safety came and followed by a high-profile pledge from Premier Wen Jiabao that Countries all over the world are trying to boost their new rules to ensure school bus safety would be food self-sufficiency rate, but our government is still drafted soon. Road safety is also a serious problem in seizing farmland. How can we guarantee food - China, with many accidents caused by poorly security for generations to come if we don’t protect maintained roads and bad driving habits. farmland? 49
  • 50.
    Rage against New Years is the biggest holiday event in Japan, just like Christmas in Western countries. The countdown to the beginning of a new year is a big event as it is anywhere in the world. The count down to the In Indonesia, it is reported that there are 700 to 1,000 beginning of the New Year is a big event just like cases of disputes between palm oil developers and anywhere in the world. local communities each year. The latest one under scrutiny is Mesuji land dispute in South Sumatra. The case has always been in the grey area between state law and customary law. The companies who have bought the land and have been using it as crude palm oil plantations feel that they have the right to do so based on the state law where they already bought the land and have permission for exploitation. Local communities feel like they own the land because they have been living there generation for generations. In recent years, Shibuya Tokyo has been a popular venue for young people and foreigners to unite for a big count down event. But it has perhaps become a little too popular. Local representatives seeks justice, reporting human rights violation to the National Commission of Human Rights in Jakarta The land dispute in Mesuji has already involved three different companies: PT. Barat Selatan Makmur Investindo, PT. Sumber Wangi Alam, and PT Silva Inhutani. The dispute itself has been going on since “It’s really scary” was the first impression to many. April 2011 and has previous records of clashes. The Scramble Intersection right in front of the Shibuya recent one has been rumored to have taken the lives station was packed with young people and of some locals with the involvement of local police. foreigners. Once the lights turned green, a flood of The local police reportedly supported the companies people flowed into the middle of the intersection, instead of the locals, which heated the situation. most of them drunk. Empty beer cans and bottles were thrown everywhere. The sound of crackers There have been angry debates about who is actually were heard everywhere along with the sound of responsible for the clashes, but people are debating roaring. Many who had taken off their shirts were on two different bases: One is on the customary law piggy back riding on their friends’ shoulders and for the locals, and others are on the state law for the screaming. A man was transferred to a hospital companies. As a collective community, Indonesians because his hand was smashed in the crowd, tend to stand for the community but the government breaking his finger. Over a hundred policemen tried tends to side with the businessmen due to a long diet to stop the chaos but failed. of Holland colonization and way of governing back then. Where did they leave behind their morals?
  • 52.
    Waiting list PAKISTAN With thecoming of winter, we once again are seeing snakelike lines at petrol stations as motorcyclists and cars await their turn. Sometimes they wait patiently and sometimes they wait not so patiently for their CNG fill. There has been a shortage of compressed natural gas in Pakistan over the past several years. With the recent price hikes for petrol, a number of motorists have converted their engines into ones that run on CNG. Little did they know this would not solve their problems but rather add to them. The recent decision to keep CNG filling stations closed in Karachi is fueling unemployment and poverty. The gas reserves in Pakistan are enough to meet demand and it was ensured in the constitution that the people had the first right to use the country’s resources. Lengthy lines of motorcycles and cars can be hence seen at the CNG pumps due to a low pressure of gas that is alarming. Pakistan has much reservoirs of compressed natural gas but there is a dire need to think over how to use these reservoirs effectively SRI LANKA Colombo’s busy streets were invaded by mean machines on Dec. 16 and 17, 2011 when the city experienced its first-ever Colombia Night Races. The races took place in the middle of the country’s capital. Cars and motorbikes lined up on a racecourse at night. Ten car events and seven bike events took place. The main race took place on Dec. 17. It included those who qualified for it based upon their performance in races on Dec. 16. Streets were mapped out for the racecourse. Different races were allotted to different car brands. One race, for example, was for Ford cars while another for Mazdas and Honda Civis. The main event was a race for GT3 and GT4 cars with top international drivers taking part. Sri Lankan fans had the opportunity to see Aston Martins, Porsches, BMWs, Moslers, Lamborghinis and other racing cars competing on home soil. They also got to see Sri Lanka’s only international driver, Dilantha Malagamuwa, drive his new Lamborghini. Pulsating beats from the bands Basement Jaxx and Chicane accompanied the races as part of the Electric Peacock Festiva, the country’s annual electronic and house music event. Countless Sri Lankans in Colombo sought much coveted passes to attend the two events.
  • 53.
    Waiting list Waiting list SINGAPORE Moshi Monsters Nintendo is a game that was on every child’s wish list this Christmas. The Nintendo version of the wildly popular Moshi Monsters was sold out across all toy stores a week before Christmas in Singapore. What is it? It’s Tamagotchi meets Facebook meets Sesame Street. Kids adopt pets, take educational quizzes in order to earn rox (currency) to purchase items for their monster, grow their brood and eventually trade/sell monsters for more rox. Kids compete with one another within their community and chat with other kids who are playing. With monster names like Dustbin Beaver and Lady Googoo, who can resist? TAIWAN Currently, only two department stores in Taiwan have reported annual revenue of more than NT$10 billion: Pacific Sogo Department Stores Co's Fu-xing and Zhongxiao outlets in Taipei City. But these department stores are far for those consumers with the buying power in Taiwan’s tier two cities. These populations are waiting for the new “Mega City” mall, which is run by the Far Eastern Group. After opening two huge new shopping malls - one in the Greater Tai-chung area, and the Banchiao District, New Taipei City - Far Eastern Department Stores Ltd said it expected the malls to make a combined revenue of NT$14 billion (US$426 million) in the first year. A Far Eastern's manager surnamed Cheng said, “The residents there like to try out new things and many purchases were made at our mall, we were taken aback by the spending power in Greater Taichung and New Taipei City.” 53
  • 54.
    Waiting list: Waitinglist Food- crazy Malaysians queue for popcorn Picture credit: www.dropsofcontentment.blogsp ot.com MALAYSIA Malaysia is a nation obsessed with food fads. We’ve seen many fads come and go: from donuts, to cupcakes, to macaroons, to bubble tea. And while the latest craze for bubble tea has died down, a new craze has taken over. Malaysians have been queuing for flavored gourmet popcorn. While popcorn has always been a favorite movie snack among Malaysians, there aren’t many flavors to choose from and freshly made popcorn isn’t easy to find. Thus, when Garrett’s premium popcorn from Chicago launched in Kuala Lumpur late last year, Malaysians queued up to 30 minutes just to try their gourmet variety of freshly made popcorn despite hefty price tags. Their popcorn is well-known for their crunchy and caramelized nutty exteriors. Another chain named Planet Popcorn from Taiwan has sprung up with flavors such as seaweed, curry, cheese, chocolate and coffee to cater to those with more eclectic tastes. These two brands have stood out for their quality, variety and re-sealable packaging, which has helped to transform popcorn into a versatile snack that can be eaten anytime, anywhere, not just in a cinema. INDONESIA Indonesian teenage girls have been eagerly awaiting the news as to whether the next Mnet Global Awards (MOA) will be held in Jakarta in 2012. The rumor has been making itself a twitter trend in Indonesia, and recently it just made more buzz since there is more and more proof of MOA coming to Jakarta. As K-Pop is growing vastly among Indonesian teenage girls, they are waiting for the announcement in suspense, hoping they can watch the MOA and see Super Junior in February 2012. Based on their tweets, it seems that many of them have been saving money to buy 54 MOA tickets.
  • 55.
    Waiting list Waiting list BANGLADESH Everyone in this cricket-loving nation is eagerly awaiting the chance to see foreign and domestic CHINA players battling it out at home for dominance in the sport. They will have their chance on Feb. 9, 2012 The release of Air Jordan XI Retro “Concord” sneaker has when the Bangladesh Premier League launches in caused a frenzy among Chinese sneaker fans. It is officially the country. The 20-day tournament will include six launched in China on the morning of Dec. 23, 2011. teams playing each other twice in a round-robin However, in big cities such as Shanghai and Beijing, lines format with the final matches held on Feb. 29. were already forming outside of Nike shops the night Games will be played in Chittagong and Dhaka. before its release since people who had hoped to buy a pair have been told stores are receiving as little as 12 pairs. Teams will be allowed to field five foreign players as Plus they’ll likely be snatched up by Nike employees. On opposed to the four foreign players allowed in IPL. China’s largest e-commerce website, Taobao.com, prices Adam Gilchrist, Matthew Hayden, Kieron Pollard, of the sneaker are already jump from 1,429 RMB to 2,000 Dwayne Bravo and Kamran Akmal are among the at RMB, and it is still hard to get one pair competing with least 25 non-Bangladeshi players taking part in the other Jordan fans. tournament. Bringing back the old days, the Original Air Jordan 11 (XI) The BPL will be televised on a new sports channel in Concords was worn by Michael Jordan back in 1995 in the Bangladesh and the organizers are believed to be in NBA semi finals. Sadly, each game Jordan wore the Original discussions with Ten Sports to broadcast the Air Jordan 11 (XI) Concords he was fined $5,000 because tournament in India. However, India's domestic 50- the OG Air Jordan 11 (XI) Concords was a black and white over tournament begins on February 20 and shoe, and the whole Chicago Bulls team only wore black therefore could restrict Indian participation. "India sneakers. Even though, he continued to wear the Original is a problem," Lal said. "In the first six or eight Air Jordan 11 (XI) Concords for two more games, then games, they [India players] could play.“The switched shoes. organizers are also hoping that the winner of the BPL will be given a place in the Champions League Since 1995, the “Concords” have only been retro’d twice. Twenty20 next year.Game on Sports paid US$44.3 And fans last opportunity to buy a pair came all the way million for the rights to the BPL for six years. back in 2006. The new retro “Concord” has no doubt being expected by Jordan fans and sneaker collectors for BANGLADESH is very eager to get55 show on the this years. road.
  • 56.
    Waiting list Waiting list JAPAN Fukubukuro– Happy & surprise bag In Japan, the New Year is celebrated on a much bigger scale than Christmas. All stores are closed on New Year’s Day. On January 2, it is quite common for department stores and other large retail stores to open and many people flock to a "fukubukuro”. Fukubukuro is one of the most typical features of the Japanese New Year. As the name indicates, they are bags (usually paper) that contain several items inside. The items are usually much more valuable than the price of each fukubukuro (ex: 10,000 yen fukubukuro may contain items that are worth 30,000 yen), so, fukubukuro are considered to be a "good deal.” The most popular ones are the fukubukuro of trendy fashion brands, with the price around 5,000-20,000 yen. At Shibuya 109, the most famous fashion complex in Japan, about 40,000 people formed a line in order to get fukubukuro. Department stores also sell special fukubukuro that are super-expensive or very unique. Fukubukuro are usually sealed firmly so you cannot see what's inside until you buy one as it is considered as a "good deal," but also something that people try their luck on. If you find something good in the bag, it can be a good start for the New Year. If you find something you don't like or you don't need, some people exchange their goods in front of shops. 56
  • 57.
  • 58.
    Tense about SRI LANKA Therecent murder of Bharatha Lakshman Premachandra by Dumina Silva during the keenly contested Colombo Municipal Election has set off a series of events and intense criticism of the ruling regime. The response of the Rajapakse government has surprised even the most hardened critics of the regime. Despite eyewitness testimony as to the identity of the murderer, no action has been taken to arrest him, and to add insult to injury, Gotabhaya Rajapkse, the president’s brother & the nation’s defense secretary, has allegedly pressurized the police to not include the name of the prime accused in the B report. Cries from the public to rein in the politicos who hire their own security details (who are mostly made up of thugs and criminals) are gaining volume, and, in typical fashion, some of them have used the situation to cause problems for their opponents. What is highly amusing in this is that the `opponents` involved in this incident are from the same political party. SINGAPORE Singapore is well-known for its methodical efficiency. So when trains started to breakdown, Singaporeans were understandably shocked and enraged, with some even calling for SMRT Chief, Saw Phaik Hwa, to step down. Passengers affected by the breakdown described scenes of confusion and panic across the 2 breakdowns, which happened over 2 days. Commuters continuously banged on train doors during the hours of their entrapment, with one even using a fire extinguisher to break the windows of the underground train due to lack of ventilation. In the end, thousands were left stranded as shuttle bus services and taxis could not cope with the excessive demand. Hmmm. I think I’ll take the bus for now.
  • 59.
    Tense about PAKISTAN The New Year is here and people worrying about new resolutions. They are thinking about the ones they failed at sticking to and are making numerous plans: getting married, being single. Yet the biggest tension on New Year’s Eve was where to find a party in Pakistan. Even with movements to become more liberal when it comes to celebrating, partying in Pakistan is still largely an underground phenomenon. So for those of us who want to dance and drink the night away, the planning must start at least a week or two before the actual date. How many parties are happening? Who is throwing them? Where are they being arranged? And how will we even get in? People start using their social circle, asking around for details (social networks like Facebook are crucial tools for communication) to find those in the know about New Year’s Eve soirees. It is not easy to find a party. Then there are further challenges - what clothes to wear, how to find a date, who will be a designated driver? After finding solutions to those questions, there is still the challenge of surviving the actual party itself. Fun will be had, music will be danced to, women will be flirted with and there will be a guaranteed hangover the next day. But the key element is always how to secure a graceful exit. In Pakistan, New Year’s Eve is a heavily policed event. One wrong move, and partygoers could have a lot of explaining to do to the plethora of law enforcement friends policing the streets. As all of us underground party people know, it’s good to have a wild night of fun and craziness as long as you don’t get caught. MALAYSIA There has been intense scrutiny and debate as to how the ruling party, the National Front, will perform in the run up to the 13th General Elections, which are due to be called sometime this year. The National Front has been in power since Malaysia’s independence in 1957. However, their popularity has slowly declined over time, especially in the past year. 2011 has been a particularly challenging year for Malaysia, with increasing racial and religious tension between the three primary races in Malaysia (Malays, Chinese, Indians) and a fast rising cost of living. Political youth movements, previously been suppressed by the government, have started to gain ground through technology and social media. Young people have led campaigns to spread awareness amongst Malaysia’s largely apathetic youth community, urging them to stand up and vote for their rights. Netizens are also taking the Malaysian cyberspace by storm with a movement called “Anything But UMNO” (The ‘United Malays National Organisation- Malaysia’s largest political party and a founding member of the National Front coalition), which supports anyone at the helm of the nation so long as it is not the UMNO party. While there is great discussion and speculation, many are also apprehensive and uncertain about what the future holds after the 13th General Elections. Ultimately, the upcoming elections will reveal if the ruling party, which has been in power for the past 54 years, has any chance left at securing the administration of the federal government. This long-awaited moment, deemed the “Mother of All Battles,” will definitely be an unprecedented moment in Malaysian history.
  • 60.
    Tense about Tense about INDONESIA Indonesia has started the switching process from card ID to electronic ID called e-KTP, however the process have been far too slow. Jakarta’s administration has asked the Home Ministry to push back its deadline for the registration period for electronic ID cards (e-KTP) for Jakarta residents from December 2011 to April 2012. Based on calculations, only 40 percent of people in Jakarta will have had their e-KTP made by November 2011 given that each set of equipment CHINA can serve only up to 150 people per day. Young Compensated Dating Girls in Shanghai Enkō means "compensated dating” and is a practice which originated in Japan where older men give money or luxury gifts to attractive young women for their companionship and, possibly, for sexual favors. The female participants range from primarily school-aged girls to housewives. The first week of November 2011, Shanghai prosecutors disclosed a case which involved more than 20 middle and high school girls in compensated dating. In this case, most of the female students are under 18. The youngest is less than 14. This case caused public uproar that rippled In Praya, a small area in Jakarta, out of 93,000 through the entire country. Shanghai Zhabei people, so far e-KTP has only been made for Procuratorate also published a signed article in local 3,500 people while the deadline is December media that said these female high school students 2011. Everyday, the authorities in the area can “organized prostitution, referred clients and formed a only make e-KTP for 250 people and if you divide fixed circle, kind of like the so-called enkō in the Japanese it up, it will take around 300 days to complete all society.” They blame the influence of Japanese and 93,000. Taiwanese culture for the phenomenon of young women accompanying men in return for money. After the Shanghai “compensated dating” phenomenon, more groups of “compensated dating” were revealed nationwide. However, according to the confession of one "compensated dating" girl in Shanghai, it is a way to make some extra money which for them is not considered equivalent to prostitution. The practice does not necessarily mean having sex with a customer (though it may) but often refers to escorting or accompanying a man in return for payment. Others see the trend as a reflection of the materialism that rapid economic and 60 social change has brought to China.
  • 61.
    Tense about Tense about JAPAN “Shohi-zei” – Consumption tax Fifty-eight percent of respondents in a nationwide survey in Japan are opposed to the government's policy of doubling the consumption tax rate in stages by the mid-2010s. Most of Japanese are against the consumption tax hike because of the added burden on the public, People in Bangladesh are tense about rising fuel prices, especially those with low incomes, at a time when which have gone up four times now. there are growing concerns about Japan's economic outlook in the wake of the rising yen and The most recent hike was BDT 5 per liter of fuel. This has the debt crisis in Europe. become a major concern for commuters in the country as it becomes more expensive to travel and take public The survey also found that 72 percent are in favor transportation. of a general election before laws on the planned sales tax hike are enacted. In Bangladesh, once fuel prices go up, they never come down. Additionally the price of everyday consumer goods Japanese prime minister Noda has said he may go is also increasing. Economists blame inflation; locals say to the people but not until after the relevant they are worried about putting food on the table. Price legislation has been passed by parliament. hikes are becoming unbearable in the country and public sentiment is starting to boil over. Source : Tokyo Shimbun (January 1, 2012) 61
  • 62.
    Tense about Tense about PHILIPPINES Aweek before Christmas, Cagayan de Oro province in Mindanao, Philippines was struck by the typhoon “Sendong” that sent a flash flood rushing through sleeping towns and villages killing close to 1500 people. An area that is not normally visited by typhoons, the province was shocked not only by the weather pattern change but also the amount of destruction it created. INDIA Indian Rupee is under attack. At the end of December, the Indian rupee nearly breached the Rs 50 per dollar mark, closing at 49.90, its weakest rate against the greenback since May 2009. As the concerns mount, the Reserve Bank had to intervene As evidenced by images of the devastation, massive in the market by selling part of its $300 billion reserves illegal logging was thought to be the culprit. National to curb the volatility as well as clamp down on traders. and local government officials, even Catholic Church From an investors’ perspective, the movement of rupee officials, have started finger pointing given that the may not matter much as only a few can figure out that president has declared a total log ban since February unlike Sensex, the rupee going up is not positive news. 2011. On the contrary, it actually means rupee is becoming weaker. Many wrongly think that if rupee goes up it is something good for them not realizing when the Indian currency depreciates against any foreign currency it has many negative impacts from the economic point of view. When a currency loses its value it creates many problems for the economy. It leads to inflation. As India imports around 70 per cent of its crude oil requirement, the government will have to pay more for it in rupee terms. Due to the control on oil prices, the government may not easily pass the increased prices to the consumers. Further, this higher import bill will lead to a rise in fiscal deficit for the government and will push the inflation, which is already hovering around the double- digit mark. Two weeks later, a landslide due to heavy rains killed 31 people in an illegal gold mining area in Compostela Valley, also in Mindanao. The people await the government’s investigation and action toward the obvious cause of these tragedies. 62
  • 63.
    Tense about Tense about On the other hand, India Inc will also have to pay more in rupee terms for procuring their raw materials, despite drop in global commodity prices, only because of a depreciating rupee against dollar. Already, oil companies cited the fall in the rupee value to the dollar to increase petrol prices recently. For oil marketing companies, with every fall in the rupee, the under-recovery on account of petroleum products goes up by Rs 9,500 crore per year on the price-controlled items, said an HPCL official. Just like oil, all products and commodities are more expensive to import now. Corporations, who have foreign currency loans on their books, also take a view that despite a depreciating rupee, keeping the benign interest rates in VIETNAM developed markets would be lot better to hold on to foreign currency debt as one gets 0-2 percent interest on Inflation is one the biggest concerns for Vietnamese dollar debt compared with 12-14 percent on rupee debt. for 2012. With continued fluctuations in prices Individually, traveling abroad becomes more expensive as across all goods, both high income and low income travel costs can go up by at least 10 percent. Students consumers are becoming more conscientious about studying abroad too will be hit as more rupee will go out their spending and investment. to pay for tuition. Depreciation of rupee also affects the money flow in the Indian stock markets. FIIs, the main A lowering confidence in the dong brought on the investors in the Indian equity markets, also start rise of buying gold as the most secure method of withdrawing their investments from the markets fearing saving for Vietnamese, making gold almost a loss of value. In terms of portfolios, if you hold stocks in oil currency. More recently, banks have been and gas, infrastructure, fertilizer or tyre business, your aggressively drawing in Vietnamese with attractive returns will take a hit as the shares of these companies interest rates, encouraging saving accounts to will fall when the rupee falls as they procure their raw become more acceptable, and often more affordable materials from abroad. On the other hand stocks of as gold prices rose. However, as worries about the Information Technology (IT) companies and export- economy and financial security will continue into oriented units should do better. 2012, turning the dong into gold is still believed to be the safest way to spend money. 63
  • 64.
    Everyone’s talking about Brands & campaigns generating buzz
  • 65.
    Everyone’s talking about IINDIA Mumbai Mirror Newspaper Now, people of Mumbai will wake up every morning to nothing but the truth as the tabloid newspaper, the Mumbai Mirror, the second largest read English daily in Mumbai from The Times of India PAKISTAN Group, pledges to reach out to its readers with real voices daily. The hard-hitting After decades of political stagnation, Pakistan’s politics have a new campaign based on four real stories underdog, the extremely popular Imran Khan. He has rocked the broken by Mumbai Mirror in the recent boat and has done something very few politicians have managed, past is the brain child of TOI’s creative in any country. He has excited young people about politics, hope agency, TapRoot India. The central idea and change. was to create a fictionalized account of What is really interesting, however, is that he is the first Pakistani how affected citizens from all walks of politician to craft a smart, sustained political campaign that life found a strong and powerful voice in specifically targets the youth. He has stormed social media; the paper. Facebook, Twitter and YouTube are buzzing with messages, videos and pictures from his enormously successful rallies. Shot in black & white, the television commercial shows the resentment and His rallies themselves feature performances by the country’s the fury expressed by the central biggest pop stars and rock stars, (and by extension, their protagonists of each of the stories, which endorsement of Khan’s party). His party’s website features includes a writer protesting over his pictures, videos and blogs. burnt books, a mother raging over the Imran Khan is a politician who use of sewage water in milk fed to her knows how to talk to the young children, street urchins screaming about people in their own language. And their inhuman living conditions, and a wow, have they responded. His young lad dissenting about the political campaign has basically turned a parties’ posters pasted on the city walls. nation of apathetic youngsters into active, enthusiastic voters. Watch it here: He made democracy cool again. http://www.youtube.com/watch?v=y Now that’s a campaign. vLIjemSIs4&feature=related
  • 66.
    Everyone’s talking about Everyone’s talking about SINGAPORE and MALAYSIA … Everyone from my sister to my And boy, did their launch set tongues wagging in Malaysia! Leading up grandmother wanted a piece of that! to the opening of the store, A&F employed about 40 male models to get Singaporeans excited about the opening. These men, sourced from Some 425 shoppers queued before the international A&F locations throughout the world, were positioned opening of Singapore’s first outside the store daily wearing nothing but red A&F sweatpants and Abercombie & Fitch, with the earliest sandals. According to Singaporean newspaper Straits Times, response fan arriving around 5 in the morning was tepid at first, with onlookers taking pictures from afar. But the on opening day. passers-by quickly overcame their shyness and within half an hour, the men were swarmed. Once the doors opened, the first few in line rushed enthusiastically to enter The hype surrounding the A&F models quickly spread to Malaysia the 2,000 square-meter flagship at through Facebook. For about two weeks, the models were a hot Knightsbridge, along the famed conversation topic and photos of these shirtless men dominated Orchard Road. For almost a week, A&F Facebook news feeds. What’s more, the A&F models even became a had been on our sunny island’s Twitter tourist attraction – Malaysian women who travelled down to Singapore trending topics with the public lapping made it a point to journey to the A&F store to snap a few photos with up the bevy of shirtless hunks the chiseled men. The Malaysian men’s reaction, on the other hand, was stationed outside the store. to scoff at the hype over the models, but even they joined into the fun by sharing spoofs about the hype over the models’ built bodies. 66
  • 67.
    Everyone’s talking about SRI LANKA The idea behind Mobitel’s M Tunes capmapign was to promote the ring-in Tones based on individualism. The commercial features different animals and their favorite tunes. The commercials received a lot of attention for the below reasons: - Different in execution to the other commercials that are on-air currently - Has Famous / Popular songs appealing across age groups - Each song gels extremely well with the animals featured - Humorous The commercials also got more air plays to create buzz, especially during cricket matches. Watch them here: http://www.youtube.com/watch?v=W1yyXkVd-vA&feature=related http://www.youtube.com/watch?v=xpakHAWDnR8&feature=related http://www.youtube.com/watch?v=vFxWIgwUZ9Q&feature=related http://www.youtube.com/watch?v=AodEZxxbt3c&feature=related http://www.youtube.com/watch?v=mYpZZIT6Ox0&feature=related http://www.youtube.com/watch?v=3OdJNqZa--k&feature=related “One Seal, One Legendary Y Chi” VIETNAM On November 11, SAB Miller Vietnam unveiled the highly-anticipated first brew of its premium Czech beer Gambrinus into the Vietnam market. The launch campaign developed by Ogilvy & Mather Vietnam brings to life the Gambrinus spirit of Y Chi: the strength, vision and determination that drives real success. The fully integrated campaign captures the aspiration and respect of Vietnamese men who believe that real success comes from overcoming challenges with the spirit of Y Chi. This spirit of authenticity and commitment to quality is translated into the Gambrinus brew itself – guaranteeing Vietnamese beer lovers that every premium Gambrinus bottle is brewed longer with 100% Czech barley and aromatic hops – recognized by the distinctive gold Gambrinus seal. 67
  • 68.
  • 69.
    Everyone’s talking about Sponsoredjointly by Guylian and Lindt, the Chocolate Wonderland in Shanghai is drawing in the crowds. If you thought that chocolates had to be brown or white, if you believed that they could be shaped like the Alps (Toblerone) or seashells (Guylian) , the artisans here will blow your mind. Over two acres of exhibition space, they’ve created dragons, the Pudong cityscape, toy poodles and fancy hats, scooters and robots, in the wildest of colors and shapes. Visitors can pause in between the tours to take in educational programs and tasting sessions. No, you can’t taste any of the magnificent creations, but you can take pictures. Dress warm, for the whole show – on until late February 2012, is kept at a constant 4 degrees Celsius. At the Jumeirah Himalayas Center, Shanghai .
  • 70.
    Everyone’s talking about Everyone’s talking about TAIWAN One Bike One http://www.onebikeone.tw/ The last day of the Republic of China’s (ROC) CHINA 100th year was celebrated in elaborate fashion as a record--breaking cycling event drew more than 110,000 cyclists across the country to ride at the During September, 2011, Johnson & Jonson launched a same time, which truly rocks the brand “Taiwan”. new advertising campaign featuring a diary purportedly written by “Little V” (V indicating vagina, “小V日记” in The event “One Bike One” heralds the arrival of Chinese). The video commercial has been viewed over the next century in Taiwan, event organizers said, 1,180,000 times on video sharing sites such as adding that the rolling wheels symbolizes the Tudou.com within three months. Viewers note that energy of the Taiwanese. there is barely a product image or brand name shown in the advertisement until you search it online. If people “This is the most significant event I have ever search “The Little V’s Dairy”, they will find a small participated in in my life because we needed to booklet published by Johnson & Johnson to share work together to set a new world record,” said knowledge about gynecological health. The book is Chen, who started from the National Chiang Kai- thirty pages long and covers sexual health in a friendly shek Memorial Hall, one of the event's major way with articles covering friendship, fashion, traveling, points in Taipei. fitness, love and sex. It is free and available both on and offline. The previous world record for the most cyclists riding at once was set in Italy in 2000, with With the rapid development of China’s economy, 48,615 people cycling at the same time. Taiwan’s Chinese consumers are becoming more experienced success in setting a new record was confirmed and mature. They are able to handle more honest after the event by Guinness World Records conversations, more daring innovations as well as more authorities. quirky flavors. The campaign is an interesting step by a brand to add information to a topic that is mostly ignored for fear of embarrassment. While young people today are certainly engaging in sex, formal education is still minimal. Even though some pilot sex education programs are being launched in schools, young people’s primary resources are still word of mouth from friends and online. Mini site of the campaign: http://www.xiaov.tudou.com/#/diary/ 70
  • 71.
    Everyone’s talking about INDONESIA Afterteasing Indonesians for weeks by a big red Blackberry ad on billboards around Jakarta, BlackBerry placed a full- page ad on the day of its launch on Kompas, the most read newspaper in Indonesia. The strategy comes to a too fruitful result where thousands of Indonesians jammed into Pacific Place mall on November 25 to get hold of the BlackBerry Bold 9790s, which will be JAPAN the first in the world launched in Indonesia. With a 50 percent discount on the $540 phone for the first 1,000 buyers, lines started forming in front of the mall on Thursday night. By daybreak, impatient shoppers started rattling the gates. Fearing a riot, hundreds of police were deployed outside, tying up traffic in the heart of the capital for hours. And when rumors spread that the new What's going to emerge next when social media BlackBerry, called Bellagio, had already sold out, the crowd comes to an end? Key persons who lead the of 3,000 went crazy. Several people fainted in the crush. cultural context in Japan got together at the "Social Lab 0.0" to achieve an ambitious objective Source: http://www.seattlepi.com/news/article/Thousands- of finding out what's beyond social and seeking a queue-in-Indonesia-to-buy-new-Blackberry- rich future. The social network can become vicious 2291906.php#ixzz1hEJxNhRU or, at other times, become an innocent baby. What kind of future will it let us see? http://www.youtube.com/watch?v=j_enzFZW1dw http://www.youtube.com/watch?v=iMcmhXVYRH0 The ‘Blind’ film is set in post-nuclear Tokyo in a dimension not so distant from ours. Young salary-man's morning commute takes a surreal turn. http://www.blind-film.net http://vimeo.com/28533174 http://www.youtube.com/watch?v=E2SgonaD4U0
  • 72.
    Everyone’s talking about Everyone’s talking about BANGLADESH One of Bangladesh’s most popular daily newspapers Prothom Alo recently launched a campaign called “Ut Pakhi,” or “Ostrich.” The campaign centers on raising public awareness PHILIPPINES against indecencies in the country, encouraging people to not ignore bad things happening in Social media in the Philippines were abuzz with activity as society. the Department of Tourism’s advertising campaign was unveiled. Filipinos were quick to jump on the bandwagon The campaign has garnered much appeal as and create different variations of why countless people use repeat the phrase in #It’smorefuninthePhilippines. reference to unsavory activities they see in public. The advertisement, featured both in print and The campaign initially drew flak from some quarters, electronic media, encourages people to take a crying plagiarism because the words had been used stand against violence, indecency and corruption. before in an old Swiss tourism ad with the headline “It’s Its core message: “Do not live the life of an “ut more fun in Switzerland”. This allegation fueled a wave pakhi,” lift your head up and raise your voice.” of backlash from supporters who responded by saying the only way to create a truly unique advertising slogan http://www.youtube.com/watch?v=XmEdKZzyVC4 “with words that have never been used before” is to develop our own language. For a few days, pundits have been posting their own versions of the ads with trademarked gibberish talk, signing off with “It’s more fun in the Philippines!” Complaints have died down, as more citizens have been rallying Filipinos to support rather than criticize our own campaign. After all, it’s not a DOT campaign, it’s every Filipino’s campaign. 72
  • 74.
    Favorite green brands/ movements When it comes to eco-friendly brands in Pakistan, you may have to think hard to come up with a few names. However, there are such brands that are taking initiative to spread awareness and promote a green movement. In Malaysia, the one environmentally-friendly initiative that really took off iin 2011 wa the “No Plastic Bag Day.” Beginning One such name is Espresso, a renowned January 1, 2011, “No Plastic Bag Saturdays” was placed into coffee house in Lahore, which has initiated effect in hypermarkets, supermarkets, department stores, the change from within first and then spread convenience stores and retail stores all over the nation. Those it to its customers. The practice of recycled who require plastic bags are charged 20 cents for each bag. napkins, eco-friendly reusable bags, recycled paper towels and energy saving light bulbs is This campaign initially appealed only to a niche – the more common at Espresso. A step further into the environmentally conscious – and was not without its complaints green initiative, the brand team has not only in its infancy. For the average Malaysian, the plastic bag was planted trees around the city but also indispensable in the shopping routine; annoyed shoppers observes Earth Hour religiously. Yet observing derided the plastic bag ban as inconvenient and ultimately the green movement is still a niche market in having little impact on the environment. Pakistan and has a long way to go as not many people pay much heed to it. However since its introduction a year ago, Malaysian shoppers Nevertheless, at Espresso you will never find have slowly adjusted their shopping habits to bringing reusable anything packed in a plastic bag. bags on their trips. Furthermore, the “No Plastic Bag Day” has been expanded in some Malaysian cities – in Penang, for example, everyday is a “No Plastic Bag Day!” The Green Corridor movement
  • 75.
    Favorite green brands/ movements In a historic land swap between Singapore and its immediate neighbor Malaysia, what remains unknown is the fate of the 26km tract from Woodlands to Tanjong Pagar. Will it too, fall victim to the rapid urbanisation that has overtaken this Little Red Dot? The Nature Society Singapore backed by over 8,000 pledges, submitted a proposal called the The Green Corridor: A Proposal to Keep the Railway Lands as a Continuous Green Corridor, to the Singapore government late last year. A readymade nature trail, recreational space and eco-friendly transport route all rolled into one – the NSS argued that the Green Corridor is a valuable piece of ecological and historical heritage that should be preserved for future generations of Singaporeans. In the end, our society will be defined not only by what we create, but by what we refuse to destroy. – John C. Sawhill Recently, the “eco-friendly” concept has been introduced by mainstream Chinese fashion brand Me & City. The brand is from Metersbonwe Group, the largest domestic apparel retailer in China. Me & City has been compared to Zara of Spain and H&M of Sweden. It emphasizes quality, style and personality. Metersbonwe introduced the brand to capture the market of consumers aged 25 to 35 - a group that has strong purchasing power but not yet received much attention from other domestic brands. The eco-friendly line of Me & City claims to be made from recyclable material right down to the label. In order to educate target consumers, the brand is also using social media channels such as twitter-like service Sina Weibo to promote the line by explaining its eco-friendly features. A few weeks after it launched, the line has received great attention from fashion conscious young people online and offline. One of their followers on Sina Weibo commented: “The design and colors of the new eco-friendly line look great, the price is also similar compared to non eco-friendly products of its type. I will definitely check it out in the store and give it a try.”
  • 76.
    Favorite green brands/ movements Your text here According to scientific studies, many cleansing products contain toxic ingredients, such as surfactants, fluorescent agents, and other artificial materials that can be bad for our health and the planet. In order to prevent the environment from deteriorating and bring a better living environment to our offspring, finally the Taiwanese company Yuen Foong Yu created “Orange House”, a natural cleansing brand. They have adopted a 100% natural cold-pressed orange oil as the main ingredient to replace all the chemicals. The orange oil consisting of 90% d-Limonene has an amazing cleansing effect. And unlike the chemical materials used in most commercial brands, the non-toxic orange oil does no harm to both human bodies and the environment. According to their core belief, Orange House would like to leave behind a cleaner earth for the coming generations. Bike To Work started with a small group of people who love to bike and got themselves into Jalur Pipa Gas Community with the goal to create clearer air in Indonesia’s cities. From there they created the Bike To Work Community, which started their first campaign on August 6, 2004. The Bike to Work center was officially opened by program manager Toto Sugito, head of the National Council on Climate Change Rachmat Witoelar and Deputy Minister of Environment, Hendri Gustaman. There are now 9,320 members on their website and more than 30,000 bikers in total. These are the people who commit to bike to work for greener Indonesia. Their concept is as simple as car-pooling. They meet at one point and go together to the area where they work. There are many sub-groups in the community, depending on where members bike from or where they go to. People going to the same destination can meet at some assigned meeting points, bike together and separate when they reach. They have some resource centers often called “homes” that also serve as a meeting point for the nation’s biking enthusiasts. B2W has also announced corporate sponsorship deals with state flag carrier PT Garuda Indonesia 76 and Sodexo Pass Indonesia.
  • 77.
    Favorite green brands/ movements Panasonic create the icon “ECO NAVI” for environment friendly product. Your text here Suntory’s corporate slogan “Live together with water” Toyota Prius Portable “my chop-sticks” with box to carry The environmentally friendly movement in Japan ranges widely from corporate activity, personal activity to government policy. The Toyota Prius is Japan’s most famous environmentally friendly product. Panasonic succeeded in enhancing its brand value through environmentally friendly products. It has more eco-friendly electrical appliances, selling the products with the icon of “Eco Navi.” The company has air conditioners that are good for the environment and refrigerators that save electricity at night or when people are not at home. The “Eco Navi” campaign has been very successful, winning an award for the most environmentally friendly brand in 2010. Suntory is the latest brand recognized for its efforts to help the environment. It won first prize for its efforts in 2011. One of their activities is to plant a trees, adding 7,000ha of trees to forests across the country. The goal is to help promote water conservation. Suntory communicates their philosophy through a corporate slogan of “Living together with water.” An individual movement in Japan is to save chopsticks. The aim of the campaign is to reduce deforestation caused by the widespread use of disposable chopsticks. People are encouraged to bring their own chopsticks when they go out to eat. Some restaurants offer special discounts or free drinks to those who bring their own utensils for dining. The Korean food maker, Daesang, started its organic food business actively under the brand name of “O’food ‘” with an intention of upgrading its core brand “Cheongjeongwon”. O’food originates from a compound word , mixture of Organic and Food. Raw materials used in O’food product s all obtain certification from organic food certificate authority including CAAE and WSDA . The brand has been leading the organic food market with more than 30 products such as organic olive oil, tomato ketchup, sesame oil, red pepper sauce, soy sauce and bean paste .
  • 78.
    Favorite green brands/ movements Human Nature is a line of personal care and beauty products that advocates natural ingredients. It guarantees not only the use of at least 95% natural ingredients, but also biodegradable, from renewable resources with no petroleum compounds and processed without harming the environment. Human Nature is a business that helps sustain Gawad Kalinga, a nation-building movement known globally. Producing and processing the raw materials and end products for Human Nature are the livelihood of a number of families under the GK program. Human Nature is also distributed outside the Philippines, making the Philippines a player in the beauty business worldwide. The philosophy of Human Nature is to be Pro-Philippines, Pro-poor and Pro-environment. BRAC Kanon, an endeavor of BRAC Social Enterprises in Bangladesh, started its journey in the capital aiming to promote greenery through their green products and services in order to save energy, money and the planet. The outlet is fully powered by BRAC solar and supports a 2.4 kilowatt load for eight hours. It is located on the Gulshan-Tajgaon Link Road and is spread over one bigha of land. The country's first ever green retail outlet comprising four enterprises -- BRAC Solar, BRAC Nursery, BRAC Recycled Handmade Paper and BRAC Sericulture was inaugurated by internationally renowned human rights activist Irene Khan. The outlet will feature their products and services, including ornamental, fruit, timber and medicinal plants, seedlings, landscaping and plant rental services, silk products produced by rural artisans, recycled handmade paper-based products and office stationary, and energy saving solar instant power supply and power solutions.
  • 79.
    Favorite green brands/ movements Go digital. Save paper. Back in 2010, Idea Cellular Services came up with yet another innovative campaign called ‘Use mobile Save Paper’ that promoted the idea of mobile VAS usage for a vast number of day to day activities to save paper and save the Earth. The commercial showcased how the mobile phone can be used as an efficient tool to read daily newspapers, generate e-bills, make payments and transactions, issue e-tickets and boarding passes; thereby saving tons of paper everyday. Taking it further, IDEA partnered with two leading Coffee chains – Barista and Café Coffee Day – to spread awareness about its green campaign through a unique mobile application that will allow people to download the menu card and bill on their mobile phones. The application is intended to eliminate the need for a paper-based menu and bill in that particular transaction. Watch the TVC here - http://www.youtube.com/watch?v=bBuAUKJXZGw Back then, it seemed like a good brand initiative carried across media but maybe too niche. Until we found out that come September 2011, the Indian Railways announced that there is no need to take print-out of your e- ticket. Instead it is sufficient to carry the ticket on electronic mode as – mobile, laptop and i-pad. Imagine the impact of this single act considering that the Indian railways carry over 30 million passengers daily. (Source: Wikipedia). Another Save Paper, Save Forests campaign that runs on digital media was developed by the Cheil India team asking people to adopt a simple practice to make their valuable contribution towards a greener world. Cheil WW SW Asia has rolled out a CSR campaign in a bid to help save forests and to make the human beings responsible towards Nature. The practice, aptly called MINUS ONE, asks us to reduce the font size by 1 before taking a printout which reduces the number of pages required for the printout. It helps in saving the forests by shrinking the paper need as paper is responsible for one-third of all the axed trees. For instance, a 39 page document reduces to 32 pages once the font size is reduced from 11 to 10. That’s an 18% reduction in paper consumption. So one can take all the printouts he wants while ensuring a better world for the generations to come. At an average rate of 18%, around 21 billion sheets of paper can be saved every year. And that means thousands of hectares of forests can be saved from being axed.
  • 80.
    The cover ofthis issue of Wassup, showing a caparisoned elephant, was not shot in Asia, but in San Francisco’s Clarion Alley. We use it to show how the reach of Asian culture is now widespread, riding on a wave of Asian brands. Graffiti Wall at the Radisson Blu in Shanghai
  • 81.
    For more information,to request a presentation on cultural insights, or to contribute your perspectives in your market, please write to: kunal.sinha@ogilvy.com Graffiti aimed to beautify plain walls in Lahore, Pakistan