This document presents a draft vision and plan for San Francisco Unified School District (SFUSD) called Vision 2025. It was created through an extensive community engagement process to reimagine public education in San Francisco. The plan aims to prepare students for the future by developing their unique talents and skills to thrive in the changing world. It proposes big shifts over the next decade, such as personalized learning pathways, reimagined school spaces and schedules, cultural competence, and attracting top teaching talent. The vision builds on past reforms and strategic plans while addressing the need to transform education for 21st century demands and opportunities.
Vassar college partners with gcsen foundation, launching innovative social en...GCSEN Foundation
Vassar College has partnered with the Global Center for Social Entrepreneur Network (GCSEN) Foundation to launch an innovative Social Venture Internship program. The program offers Vassar students a three-part experience to learn fundamentals of social entrepreneurship and create their own social venture or enterprise. It provides certification, internship credit, and support for students to develop a business pitch and identify local resources. Both Vassar and GCSEN see the program as mutually beneficial in preparing students for success through practical experience in social entrepreneurship.
Preparing Youth of Today for the Workforce of 2030Michael Horwitz
The document discusses challenges facing the workforce of 2030 and skills gaps. It proposes that early childhood development programs can help address these gaps and close the skills gap by promoting skills like teamwork, self-awareness and social skills. Such programs include Head Start, Junior Achievement, Village Academies and Urban Youth Impact, which aim to develop leadership skills in youth. Evaluations found these programs improved student achievement, motivation and understanding of how the real world works.
Education of th e gifted and talentedsylvia b. rimmronak56
The document provides an overview of gifted education and summarizes the 7th edition of the textbook "Education of the Gifted and Talented". Key points include:
- The 7th edition contains approximately 30% new content including new directions in gifted education, identification of underserved groups, Response to Intervention models, and new curriculum and teaching models.
- Gifted education has historically cycled between periods of increased interest and funding followed by cuts, though it has shown resilience through differentiated instruction and ability grouping.
- The authors thank the many contributors to the new edition and acknowledge the ongoing cycling of gifted education issues between progress and challenges to the field.
Job Description - Assistant School Leader, AllentownDon Stewart
Overview:
Building 21 is seeking an experienced and creative Assistant School Leader to support the Founding School Leader in the implementation of our second high school, located in Allentown, PA. The Assistant School Leader will report to the Founding School Leader and will work collaboratively with a cross-functional team of instructors, technology experts, community members, students, parents, administrators, and representatives of industry to realize the vision of Building 21 to “customize education at scale” (see About Building 21 below for additional information). Building 21 is committed to customizing learning for each student through: strong relationships; a competency-based system; the robust use of technology as a means, not an end, to improved teaching and learning; and learning opportunities based on the interests and passions of students. Building 21’s model includes a highly collaborative structures for teachers, students and partners; and community-embedded learning experiences.
The second Building 21 School will open as a high autonomy, in-district public school in the Allentown School District (ASD) in August 2015. The school will open with approximately 150 students and will grow to 600 students over four years.
The ideal candidate for Assistant School Leader will possess the following beliefs, mindsets and characteristics:
● Belief that building strong and caring relationships with students and adults is the foundation upon which a successful school is built.
● Deep commitment to positive youth development and an unwavering faith in the potential of every student.
● Fundamental belief that, with the right supports and expectations, every student has the ability to design their own path to success in the post-secondary world.
● Strong desire to support and design authentic problem-based/project-based learning experiences and performance assessments to increase students exposure to different fields of study.
● Willingness to implement and oversee learning through a competency-based approach.
● Strong technology skills and the belief in using a one-to-one model to support personalized learning for students.
● Comfort with utilizing multiple types of data.
● Comfort with change, iteration and ambiguity.
● A growth mindset, understanding that failure is the path to success.
● Commitment to working on personal growth and continuous learning.
● Willingness to collaborate, design and co-teach with community and business partners.
● Willingness to challenge traditional mindsets and beliefs about what school is and what school is not.
● Willingness to contribute to a collaborative culture that challenges and supports each other.
The Chicago Public Education Fund works to transform schools through investing in principals and teachers. It has supported thousands of educators impacting over 100,000 students. The Fund launched its fourth fund to double the number of effective principals and grow its educator network. It will invest $20 million over four years in organizations dedicated to principal quality and placement. The Fund remains committed to the idea that great schools are led by great principals and teachers.
The Education Alliance launched several new initiatives in the past year focused on remaking learning for West Virginia students, including a STEM Network Schools program, financial literacy initiative, and partnerships to support early childhood education. The STEM Network Schools program aims to increase student engagement in STEM subjects and has already trained over 430 teachers. A new financial literacy initiative works to strengthen students' financial capability and increase college access. United Way Born Learning Academies partner with schools to provide early childhood education resources and support to over 260 families.
Woodland Preparatory School Alabama #Gulen #SonerTarimGulen Cemaat
Woodland Preparatory School (Washington County Alabama) has hired Soner Tarim of the Gulen Movement out of Texas as their CMO (Unity Student Services) they will handle the marketing, curriculum development, software, website and everything that the inexperienced board members cannot handle. The building of their school is handled out of Utah by another controversial group called ACD American Charter Development. Same old Gulen fraud except this time the ACD (Mormon Mafia) will wipe the floor with the Gulen Muslim Mafia.
https://www.washingtonpost.com/education/2019/05/03/telling-story-about-charter-school-controversy-rural-alabama-county/?fbclid=IwAR0Tefei5Gk4EyuaifszEFXxoePpaKcmIPIy28UQYLFD76vwzXS_QOqSUZg&utm_term=.fb8c1f62c1ed
https://www.alreporter.com/2019/03/27/an-islamic-movement-fraud-and-improper-hires-even-more-and-weirder-questions-arise-about-montgomerys-first-charter-school/
http://www.woodlandprep.blogspot.com
https://gulencharterschoolsusa.blogspot.com/2019/04/washington-county-in-battle-with.html
Killinged.com
Producing highly qualified teachers to meet Michigan’s growing teacher shortage is just one of the ways Michigan’s University Research Corridor (URC) is creating and implementing solutions to Michigan’s education challenges. The university alliance also is creating the programs and support students need to succeed.
Vassar college partners with gcsen foundation, launching innovative social en...GCSEN Foundation
Vassar College has partnered with the Global Center for Social Entrepreneur Network (GCSEN) Foundation to launch an innovative Social Venture Internship program. The program offers Vassar students a three-part experience to learn fundamentals of social entrepreneurship and create their own social venture or enterprise. It provides certification, internship credit, and support for students to develop a business pitch and identify local resources. Both Vassar and GCSEN see the program as mutually beneficial in preparing students for success through practical experience in social entrepreneurship.
Preparing Youth of Today for the Workforce of 2030Michael Horwitz
The document discusses challenges facing the workforce of 2030 and skills gaps. It proposes that early childhood development programs can help address these gaps and close the skills gap by promoting skills like teamwork, self-awareness and social skills. Such programs include Head Start, Junior Achievement, Village Academies and Urban Youth Impact, which aim to develop leadership skills in youth. Evaluations found these programs improved student achievement, motivation and understanding of how the real world works.
Education of th e gifted and talentedsylvia b. rimmronak56
The document provides an overview of gifted education and summarizes the 7th edition of the textbook "Education of the Gifted and Talented". Key points include:
- The 7th edition contains approximately 30% new content including new directions in gifted education, identification of underserved groups, Response to Intervention models, and new curriculum and teaching models.
- Gifted education has historically cycled between periods of increased interest and funding followed by cuts, though it has shown resilience through differentiated instruction and ability grouping.
- The authors thank the many contributors to the new edition and acknowledge the ongoing cycling of gifted education issues between progress and challenges to the field.
Job Description - Assistant School Leader, AllentownDon Stewart
Overview:
Building 21 is seeking an experienced and creative Assistant School Leader to support the Founding School Leader in the implementation of our second high school, located in Allentown, PA. The Assistant School Leader will report to the Founding School Leader and will work collaboratively with a cross-functional team of instructors, technology experts, community members, students, parents, administrators, and representatives of industry to realize the vision of Building 21 to “customize education at scale” (see About Building 21 below for additional information). Building 21 is committed to customizing learning for each student through: strong relationships; a competency-based system; the robust use of technology as a means, not an end, to improved teaching and learning; and learning opportunities based on the interests and passions of students. Building 21’s model includes a highly collaborative structures for teachers, students and partners; and community-embedded learning experiences.
The second Building 21 School will open as a high autonomy, in-district public school in the Allentown School District (ASD) in August 2015. The school will open with approximately 150 students and will grow to 600 students over four years.
The ideal candidate for Assistant School Leader will possess the following beliefs, mindsets and characteristics:
● Belief that building strong and caring relationships with students and adults is the foundation upon which a successful school is built.
● Deep commitment to positive youth development and an unwavering faith in the potential of every student.
● Fundamental belief that, with the right supports and expectations, every student has the ability to design their own path to success in the post-secondary world.
● Strong desire to support and design authentic problem-based/project-based learning experiences and performance assessments to increase students exposure to different fields of study.
● Willingness to implement and oversee learning through a competency-based approach.
● Strong technology skills and the belief in using a one-to-one model to support personalized learning for students.
● Comfort with utilizing multiple types of data.
● Comfort with change, iteration and ambiguity.
● A growth mindset, understanding that failure is the path to success.
● Commitment to working on personal growth and continuous learning.
● Willingness to collaborate, design and co-teach with community and business partners.
● Willingness to challenge traditional mindsets and beliefs about what school is and what school is not.
● Willingness to contribute to a collaborative culture that challenges and supports each other.
The Chicago Public Education Fund works to transform schools through investing in principals and teachers. It has supported thousands of educators impacting over 100,000 students. The Fund launched its fourth fund to double the number of effective principals and grow its educator network. It will invest $20 million over four years in organizations dedicated to principal quality and placement. The Fund remains committed to the idea that great schools are led by great principals and teachers.
The Education Alliance launched several new initiatives in the past year focused on remaking learning for West Virginia students, including a STEM Network Schools program, financial literacy initiative, and partnerships to support early childhood education. The STEM Network Schools program aims to increase student engagement in STEM subjects and has already trained over 430 teachers. A new financial literacy initiative works to strengthen students' financial capability and increase college access. United Way Born Learning Academies partner with schools to provide early childhood education resources and support to over 260 families.
Woodland Preparatory School Alabama #Gulen #SonerTarimGulen Cemaat
Woodland Preparatory School (Washington County Alabama) has hired Soner Tarim of the Gulen Movement out of Texas as their CMO (Unity Student Services) they will handle the marketing, curriculum development, software, website and everything that the inexperienced board members cannot handle. The building of their school is handled out of Utah by another controversial group called ACD American Charter Development. Same old Gulen fraud except this time the ACD (Mormon Mafia) will wipe the floor with the Gulen Muslim Mafia.
https://www.washingtonpost.com/education/2019/05/03/telling-story-about-charter-school-controversy-rural-alabama-county/?fbclid=IwAR0Tefei5Gk4EyuaifszEFXxoePpaKcmIPIy28UQYLFD76vwzXS_QOqSUZg&utm_term=.fb8c1f62c1ed
https://www.alreporter.com/2019/03/27/an-islamic-movement-fraud-and-improper-hires-even-more-and-weirder-questions-arise-about-montgomerys-first-charter-school/
http://www.woodlandprep.blogspot.com
https://gulencharterschoolsusa.blogspot.com/2019/04/washington-county-in-battle-with.html
Killinged.com
Producing highly qualified teachers to meet Michigan’s growing teacher shortage is just one of the ways Michigan’s University Research Corridor (URC) is creating and implementing solutions to Michigan’s education challenges. The university alliance also is creating the programs and support students need to succeed.
This document is a resume for Daniel Schwartz, who has 24 years of experience leading progressive independent schools. It summarizes his qualifications and experience as the head of Baker Demonstration School, where he increased enrollment and student retention. It also outlines his experience as principal of Carleton Washburne School, where he oversaw curriculum development and facilities planning. The resume lists his areas of expertise in strategic leadership, fiscal administration, and developing strong community and board relations.
An examination of collegiality in selected Christian schools in Oregon, Washi...Scot Headley
This document summarizes a study examining collegiality in Christian schools in Oregon, Washington and Idaho through the Christian School Leadership program. The program aims to promote collaborative leadership, shared responsibility and accountability through professional development activities like mentoring, administrators' networks, and online resources. Evaluation found the program fostered collaboration between schools and sustainable transformations like teacher leadership and renewed commitment to Christian education.
The School of Education & Human Development at the University of Colorado Denver is pursuing a bold, transformative agenda. This includes leading the way in measuring learning outcomes in teacher preparation programs. The SEHD recently won an $8.5 million grant to recruit and prepare teachers. It also launched new bachelor's degrees in early childhood education, elementary education, special education, and human development and family relations. The SEHD is adding strength in both its education and human development programs through new faculty hires and innovative initiatives.
A positive school culture is key to making initiatives successful when facing limited budgets. The principal of Shiloh High School outlines several strategies to build such a culture, including celebrating successes, modeling expectations, increasing parent/community involvement, and developing a shared vision. He emphasizes the importance of collaboration through common planning times, technology, and professional development led by teacher leaders. Building capacity in teachers, students, and administrators helps ensure consistent messaging that supports the school's vision.
The document is a parent handbook for the Progressive Schoolhouse, a private school with programs from developmental kindergarten through high school. It provides an overview of the school's educational philosophy, which is based on developmental theories and aims to support each student's unique learning style and potential. The handbook describes the school's curriculum, which includes traditional academic subjects as well as additional areas like life skills. It also outlines the full-time and part-time academic programs available to students.
Schools and communities gathered to discuss growing the whole child movement one year after "A Nation At Hope". The day included framing the current state of the field through a panel discussion, exploring how learning happens through social and emotional skills, and examining how to support equity at the core of whole child approaches. Participants shared successes and challenges communicating these concepts to different audiences and reflected on next steps to develop a more coherent narrative around social, emotional, and academic development.
The document provides an overview of the core curriculum at the Progressive Schoolhouse private school. It offers a developmental educational framework focusing on individual student needs and learning styles. The curriculum covers traditional classroom subjects like math, reading, writing, sciences, English, and humanities. It emphasizes a sequential, progressive skill acquisition process to ensure student proficiency and mastery across grade levels.
Dr. Jennifer Moore has extensive experience in education spanning over 25 years, including roles as an interim principal, director of curriculum and instruction, assistant principal, literacy coordinator, teacher, and consultant. She has a Doctorate in Education from Pepperdine University with a focus on organizational change.
Duval County Public Schools' Proposed Strategic Plandcpsweb
The document outlines the proposed strategic plan for Duval County Public Schools. It includes the mission to provide excellence for every student every day. The core values are excellence, integrity, innovation, equity, and collaboration. There are four pillars of the strategic plan: great teachers and leaders, engage parents and community, efficient use of resources, and develop the whole child. Various strategies are outlined under each pillar along with metrics that will be used to measure progress. An online survey is provided for feedback.
The document outlines the execution timeline and operating assumptions for establishing Community Roots Academy (CRA), a proposed charter school. The timeline details activities from 2010-2011 for gathering support, submitting charter applications, student and teacher recruitment, facility acquisition and renovations, and opening in August 2011. Operating assumptions include that CRA will serve preschool through 8th grade, open with 100-140 students, and be financially supported through state per-pupil funding. The document also provides details on CRA's guiding principles, including values-based and project-based learning, community partnerships, and environmental stewardship.
The document is a final report and action plan from RocCity Coalition that outlines their vision for Greater Rochester to be an attractive community for young professionals by 2025. The report discusses findings from a survey of over 700 young professionals that identified key issues related to demographics, housing, employment, education, lifestyle/mobility, and community connections. It then outlines research conducted, including focus groups and benchmarking other cities, to further analyze these issues and understand young professional perspectives. The report proposes that addressing these issues through civic engagement, policy changes, and community development initiatives could help attract, retain, and empower young professionals in Rochester over the next decade.
The document outlines objectives, measures, targets, and initiatives across several pillars to achieve Pakistan's Vision 2025. The pillars include: developing human and social capital; achieving sustained, indigenous, and inclusive growth; democratic governance and institutional reform; modernizing the public sector; and ensuring energy, water, and food security. Specific targets are set for increasing literacy rates, reducing poverty levels, boosting tax revenues, improving governance, and enhancing energy supply and efficiency. Initiatives proposed include reforms in education, healthcare, taxation, civil service, and efforts to formalize the economy and leverage diaspora investments.
This document outlines a strategic regional initiative to modernize infrastructure and connectivity in Pakistan by 2025. It discusses the benefits of regional integration, including economic growth. Key opportunities for Pakistan include opening trade with India and developing Gwadar port. Challenges include conflict, energy deficiencies, and weak industrial base. Priority initiatives include upgrading rail lines, extending trade with India, developing Gwadar port, and connecting to Central Asia via Kashgar. Risks that need mitigating include insurgencies and sectarian violence. Roadmaps are proposed for medium and ambitious resource scenarios.
Este documento describe la situación actual y las preocupaciones de la profesión de ingeniería civil en 2006. Reconoce los logros pasados pero señala desafíos como la falta de inversión en infraestructura, la necesidad de que los ingenieros civiles participen más en política y toma de decisiones, y la importancia creciente de la sostenibilidad. Vislumbra un futuro en 2025 donde la población mundial continúe creciendo y desplazándose a ciudades, exigiendo soluciones sostenibles a demandas de energía, ag
This document outlines the education system in Pakistan. It discusses flaws in the current system including unequal public and private sectors that create disparity, regional disparity especially in Balochistan, and gender discrimination. Literacy rates are provided, showing an overall rate of 57.7% but only 45.2% for females. Issues with the system like lack of accessibility, uneducated parents, and textbook/teacher issues are covered. Recommendations to address problems include a decentralized system, uniform updated syllabi, increased education budget, primary education for all, encouraging girls' education, teacher incentives, expanding technical education, and focusing on rural areas.
The document discusses the problems with Pakistan's education system. It notes that Pakistan has failed to properly educate its citizens, with only 25% of the workforce being literate. The education system suffers from political interference, corruption, lack of accountability, and absence of learning standards. This has led to a crisis in education quality. Problems include an authoritarian teaching style, rote memorization, cheating on exams, and an impoverished academic research environment. Real reform is needed to improve education quality by stopping practices that don't work, such as rewarding meaningless research, and instead focusing on teacher competency, subject understanding, and discipline-specific research.
The document discusses the Development, Relief, and Education for Alien Minors (DREAM) Act, which would provide a path to citizenship for undocumented students brought to the US as children. To be eligible, individuals must have entered the country before age 16, lived in the US continuously for 5 years, and graduated from a US high school or obtained a GED. The bill failed to pass the Senate in 2007. It also describes DREAMers as undocumented young people and children whose parents brought them to the US at a young age, and who identify as American despite limitations like inability to vote or access scholarships.
Leveraging social media for CPEC & OBOR | Wali ZahidWali Zahid
A keynote by Wali Zahid, ceo, Skill City and President, IMC, on how to use social media for the success of CPEC (China-Pakistan Economic Corridor) and OBOR (One Belt One Road).
CPEC: https://walizahid.com/2015/02/china-pakistan-economic-corridor-a-timeline/
OBOR: https://walizahid.com/2015/10/chinas-world-reshaping-one-belt-one-road-obor/
The Education Sector Reform 2003 (ERS 2003) aimed to reform Pakistan's education system based on efficiency, equity, and poverty reduction. Key goals included achieving universal primary education, adult literacy, vocational secondary education, improving science education, technical education, quality assurance, mainstreaming madrasahs, and public-private partnerships. Reforms focused on improving infrastructure, resources, teacher training, curriculum, governance and increasing access across all levels of education.
The document outlines Millennium's new 5-year strategic plan to advance its mission of designing and disseminating developmental science-based methods of education that promote well-being. The plan focuses on four strategic priorities: 1) Aligning the community around an updated mission and vision; 2) Creating new methods, programs and roles; 3) Transforming the educational landscape by sharing methods broadly; and 4) Sustaining ongoing programs and initiatives. The plan aims to make Millennium unique by focusing on student-centered learning, developing the whole self, and training educators to serve as models of well-being for students.
Most Prestigious Schools With Success Plans for Student's Future, 2023.pdfinsightssuccess2
This edition features a handful of The Most Prestigious Schools With Success Plans for Student's Future that are leading us to a better future
Read More: https://insightssuccess.com/most-prestigious-schools-with-success-plans-for-students-future-2023-december-2023/
This document is a resume for Daniel Schwartz, who has 24 years of experience leading progressive independent schools. It summarizes his qualifications and experience as the head of Baker Demonstration School, where he increased enrollment and student retention. It also outlines his experience as principal of Carleton Washburne School, where he oversaw curriculum development and facilities planning. The resume lists his areas of expertise in strategic leadership, fiscal administration, and developing strong community and board relations.
An examination of collegiality in selected Christian schools in Oregon, Washi...Scot Headley
This document summarizes a study examining collegiality in Christian schools in Oregon, Washington and Idaho through the Christian School Leadership program. The program aims to promote collaborative leadership, shared responsibility and accountability through professional development activities like mentoring, administrators' networks, and online resources. Evaluation found the program fostered collaboration between schools and sustainable transformations like teacher leadership and renewed commitment to Christian education.
The School of Education & Human Development at the University of Colorado Denver is pursuing a bold, transformative agenda. This includes leading the way in measuring learning outcomes in teacher preparation programs. The SEHD recently won an $8.5 million grant to recruit and prepare teachers. It also launched new bachelor's degrees in early childhood education, elementary education, special education, and human development and family relations. The SEHD is adding strength in both its education and human development programs through new faculty hires and innovative initiatives.
A positive school culture is key to making initiatives successful when facing limited budgets. The principal of Shiloh High School outlines several strategies to build such a culture, including celebrating successes, modeling expectations, increasing parent/community involvement, and developing a shared vision. He emphasizes the importance of collaboration through common planning times, technology, and professional development led by teacher leaders. Building capacity in teachers, students, and administrators helps ensure consistent messaging that supports the school's vision.
The document is a parent handbook for the Progressive Schoolhouse, a private school with programs from developmental kindergarten through high school. It provides an overview of the school's educational philosophy, which is based on developmental theories and aims to support each student's unique learning style and potential. The handbook describes the school's curriculum, which includes traditional academic subjects as well as additional areas like life skills. It also outlines the full-time and part-time academic programs available to students.
Schools and communities gathered to discuss growing the whole child movement one year after "A Nation At Hope". The day included framing the current state of the field through a panel discussion, exploring how learning happens through social and emotional skills, and examining how to support equity at the core of whole child approaches. Participants shared successes and challenges communicating these concepts to different audiences and reflected on next steps to develop a more coherent narrative around social, emotional, and academic development.
The document provides an overview of the core curriculum at the Progressive Schoolhouse private school. It offers a developmental educational framework focusing on individual student needs and learning styles. The curriculum covers traditional classroom subjects like math, reading, writing, sciences, English, and humanities. It emphasizes a sequential, progressive skill acquisition process to ensure student proficiency and mastery across grade levels.
Dr. Jennifer Moore has extensive experience in education spanning over 25 years, including roles as an interim principal, director of curriculum and instruction, assistant principal, literacy coordinator, teacher, and consultant. She has a Doctorate in Education from Pepperdine University with a focus on organizational change.
Duval County Public Schools' Proposed Strategic Plandcpsweb
The document outlines the proposed strategic plan for Duval County Public Schools. It includes the mission to provide excellence for every student every day. The core values are excellence, integrity, innovation, equity, and collaboration. There are four pillars of the strategic plan: great teachers and leaders, engage parents and community, efficient use of resources, and develop the whole child. Various strategies are outlined under each pillar along with metrics that will be used to measure progress. An online survey is provided for feedback.
The document outlines the execution timeline and operating assumptions for establishing Community Roots Academy (CRA), a proposed charter school. The timeline details activities from 2010-2011 for gathering support, submitting charter applications, student and teacher recruitment, facility acquisition and renovations, and opening in August 2011. Operating assumptions include that CRA will serve preschool through 8th grade, open with 100-140 students, and be financially supported through state per-pupil funding. The document also provides details on CRA's guiding principles, including values-based and project-based learning, community partnerships, and environmental stewardship.
The document is a final report and action plan from RocCity Coalition that outlines their vision for Greater Rochester to be an attractive community for young professionals by 2025. The report discusses findings from a survey of over 700 young professionals that identified key issues related to demographics, housing, employment, education, lifestyle/mobility, and community connections. It then outlines research conducted, including focus groups and benchmarking other cities, to further analyze these issues and understand young professional perspectives. The report proposes that addressing these issues through civic engagement, policy changes, and community development initiatives could help attract, retain, and empower young professionals in Rochester over the next decade.
The document outlines objectives, measures, targets, and initiatives across several pillars to achieve Pakistan's Vision 2025. The pillars include: developing human and social capital; achieving sustained, indigenous, and inclusive growth; democratic governance and institutional reform; modernizing the public sector; and ensuring energy, water, and food security. Specific targets are set for increasing literacy rates, reducing poverty levels, boosting tax revenues, improving governance, and enhancing energy supply and efficiency. Initiatives proposed include reforms in education, healthcare, taxation, civil service, and efforts to formalize the economy and leverage diaspora investments.
This document outlines a strategic regional initiative to modernize infrastructure and connectivity in Pakistan by 2025. It discusses the benefits of regional integration, including economic growth. Key opportunities for Pakistan include opening trade with India and developing Gwadar port. Challenges include conflict, energy deficiencies, and weak industrial base. Priority initiatives include upgrading rail lines, extending trade with India, developing Gwadar port, and connecting to Central Asia via Kashgar. Risks that need mitigating include insurgencies and sectarian violence. Roadmaps are proposed for medium and ambitious resource scenarios.
Este documento describe la situación actual y las preocupaciones de la profesión de ingeniería civil en 2006. Reconoce los logros pasados pero señala desafíos como la falta de inversión en infraestructura, la necesidad de que los ingenieros civiles participen más en política y toma de decisiones, y la importancia creciente de la sostenibilidad. Vislumbra un futuro en 2025 donde la población mundial continúe creciendo y desplazándose a ciudades, exigiendo soluciones sostenibles a demandas de energía, ag
This document outlines the education system in Pakistan. It discusses flaws in the current system including unequal public and private sectors that create disparity, regional disparity especially in Balochistan, and gender discrimination. Literacy rates are provided, showing an overall rate of 57.7% but only 45.2% for females. Issues with the system like lack of accessibility, uneducated parents, and textbook/teacher issues are covered. Recommendations to address problems include a decentralized system, uniform updated syllabi, increased education budget, primary education for all, encouraging girls' education, teacher incentives, expanding technical education, and focusing on rural areas.
The document discusses the problems with Pakistan's education system. It notes that Pakistan has failed to properly educate its citizens, with only 25% of the workforce being literate. The education system suffers from political interference, corruption, lack of accountability, and absence of learning standards. This has led to a crisis in education quality. Problems include an authoritarian teaching style, rote memorization, cheating on exams, and an impoverished academic research environment. Real reform is needed to improve education quality by stopping practices that don't work, such as rewarding meaningless research, and instead focusing on teacher competency, subject understanding, and discipline-specific research.
The document discusses the Development, Relief, and Education for Alien Minors (DREAM) Act, which would provide a path to citizenship for undocumented students brought to the US as children. To be eligible, individuals must have entered the country before age 16, lived in the US continuously for 5 years, and graduated from a US high school or obtained a GED. The bill failed to pass the Senate in 2007. It also describes DREAMers as undocumented young people and children whose parents brought them to the US at a young age, and who identify as American despite limitations like inability to vote or access scholarships.
Leveraging social media for CPEC & OBOR | Wali ZahidWali Zahid
A keynote by Wali Zahid, ceo, Skill City and President, IMC, on how to use social media for the success of CPEC (China-Pakistan Economic Corridor) and OBOR (One Belt One Road).
CPEC: https://walizahid.com/2015/02/china-pakistan-economic-corridor-a-timeline/
OBOR: https://walizahid.com/2015/10/chinas-world-reshaping-one-belt-one-road-obor/
The Education Sector Reform 2003 (ERS 2003) aimed to reform Pakistan's education system based on efficiency, equity, and poverty reduction. Key goals included achieving universal primary education, adult literacy, vocational secondary education, improving science education, technical education, quality assurance, mainstreaming madrasahs, and public-private partnerships. Reforms focused on improving infrastructure, resources, teacher training, curriculum, governance and increasing access across all levels of education.
The document outlines Millennium's new 5-year strategic plan to advance its mission of designing and disseminating developmental science-based methods of education that promote well-being. The plan focuses on four strategic priorities: 1) Aligning the community around an updated mission and vision; 2) Creating new methods, programs and roles; 3) Transforming the educational landscape by sharing methods broadly; and 4) Sustaining ongoing programs and initiatives. The plan aims to make Millennium unique by focusing on student-centered learning, developing the whole self, and training educators to serve as models of well-being for students.
Most Prestigious Schools With Success Plans for Student's Future, 2023.pdfinsightssuccess2
This edition features a handful of The Most Prestigious Schools With Success Plans for Student's Future that are leading us to a better future
Read More: https://insightssuccess.com/most-prestigious-schools-with-success-plans-for-students-future-2023-december-2023/
The NMC/CoSN Horizon Report: 2017 K–12 Edition examines emerging technologies for their
potential impact on and use in teaching, learning, and creative inquiry in schools.
Seizing the Moment - Student-Centered LearningSteven Brown
This document discusses student-centered learning and makes recommendations to promote its adoption. It contains the following key points:
1. Student-centered learning engages students in powerful learning experiences that inspire passion and prepare them for an unpredictable future.
2. Traditional classrooms are not adequately preparing many students, especially those in disadvantaged communities, for 21st century skills. Student-centered learning can help close achievement gaps while raising standards for all.
3. The document recommends policies at the federal, state, and local levels to support student-centered approaches, expand learning opportunities for underserved youth, and build public support for educational innovation.
The document summarizes the work of the Service Transformation Work Stream (STWS) which aimed to transform educational services in Croydon, UK prior to capital investment projects. The STWS engaged schools through a Lead Advocate in each school and worked to broaden horizons, critically examine practices, develop educational visions, and build capacity for change. Key activities included immersion days, provocation papers, workshops to develop school strategies, visits to examples of next practices, and community involvement programs. The goal was to ensure new facilities supported improved educational experiences and transformed mindsets around new ways of working.
Woodbury University has developed a new 2025 Strategic Plan called "The Excellence of Integration" to prepare students for an evolving world. The plan aims to: 1) provide transdisciplinary education that addresses complex problems from multiple perspectives; 2) develop students' entrepreneurial and civic leadership skills; and 3) distinguish Woodbury through the integration of transdisciplinarity, design thinking, entrepreneurship, and civic engagement across its programs. The university hopes this integrated approach will help students and Woodbury excel and contribute to positive social change.
This annual report summarizes the 2021-2022 school year for Millennium School. It highlights the school's resilience and success in navigating the ongoing challenges of the pandemic, including providing high-quality education, supporting students' well-being, and sustaining their mission. It also thanks donors and community members whose generosity helped provide $900,000 in financial assistance and support programs like teacher professional development and social-emotional learning. The report concludes by recognizing the school's sixth year of operations and accomplishments like graduating another class and expanding their Forum program.
This annual report summarizes Millennium School's 2020-2021 school year. Despite challenges from the ongoing COVID-19 pandemic, the school adapted to virtual and hybrid learning while continuing to focus on students' well-being and whole-student education. With support from generous donors, the school provided financial assistance to families, invested in teacher professional development, and reached more educators through its signature Forum program. The report highlights the resilience of the school community and the impact of philanthropic donations in helping the school fulfill its mission.
This annual report summarizes Millennium School's 2020-2021 school year. Despite challenges from the ongoing COVID-19 pandemic, the school adapted to virtual and hybrid learning while continuing its commitment to social-emotional learning and diversity. With support from generous donors, the school provided financial assistance to families, supported teacher development, and expanded its education forum program to more teachers. The school successfully completed its fifth year of operations having graduated its second class.
This annual report from Bowie State University summarizes the 2014-2015 academic year. It discusses the construction of a new science building on campus, innovations in entrepreneurship education including a student business hatchery, and the university's efforts to train more students and join the fight against cyber threats, such as a partnership to integrate cybersecurity tools into coding courses. It also highlights faculty achievements, community partnerships in teacher training programs, and events celebrating the university's 150th anniversary.
The Bethpage 21st Century Scholars' Program was created to help students develop 21st century skills like critical thinking, problem solving, and global awareness through voluntary after-school activities. Over 450 students from Bethpage High School signed up for the first year of the program. It offers activities in seven categories, and students build an electronic portfolio to track their progress earning points in different areas. Examples of popular activities included trips to museums, guest speakers, literature circles, and simulations. The program was later expanded to the middle school. It provides students enriching learning experiences outside of the regular school day to prepare them for future success.
The Year in Review report offers a glance at the work of the departments and areas that comprise Student Affairs. There is much beyond what's contained here, however. We continue to look for ways to collaborate among departments and with our colleagues across the university in efforts to creating an inclusive campus environment and a signature undergraduate experience.
The document outlines the strategic planning process for Sunnyside Unified School District (SUSD) from 2015-2020. It discusses developing a mission and vision based on core beliefs around students, teaching/learning, families/community, and leadership. Surveys will gather input on district strengths/weaknesses. A day-long planning session in January 2015 will use data to set goals and objectives. Subcommittees will further develop action plans through March 2015. A draft plan will be shared in April 2015 for public comment before the board approves the plan in June 2015. Progress updates are planned for December 2015 and April 2016. The overall goal is to ensure all SUSD graduates are prepared for college, career, and personal success
Undergraduate Assembly February Newsletter 2021CarsonSheumaker
The February 2021 newsletter of the Undergraduate Assembly at the University of Pennsylvania provides updates on several UA projects and committees. The President's letter highlights projects focusing on issues like food insecurity, climate action, and diversity initiatives. Project highlights include efforts to address food insecurity through a grocery delivery pilot program and increasing transparency around the university's Morton crania collection. Committee spotlights give updates on supporting first-year student wellness, establishing anti-bias education, and making midterm grades more accessible. Members of the month and messages from administrative partners are also included.
The annual report summarizes the progress and work of the SDG Academy over the past year. It discusses how the SDG Academy has provided education on sustainable development and the SDGs to nearly 500,000 learners globally over the past 6 years using digital technology. The COVID-19 pandemic has highlighted the importance of the SDG Academy's work in educating citizens around the world on issues of sustainable development. Going forward, the SDG Academy aims to create more high-quality content on all the SDGs, engage more educators, and leverage their platform to amplify the work of experts in the field.
In the latest edition, The Most Effective Schools in Mexico, 2023, The Knowledge Review magazine is pleased to feature Escuela Preparatoria Central de Ciudad Juarez and other prominent schools contributing to nation's growth and development
The mayor's $190 million proposal to expand after-school programs is often lost amid the controversy over his plan to establish free, full-day prekindergarten, but city officials say both initiatives could be in jeopardy if Albany doesn't allow New York City to increase income taxes on the wealthy.
Academic Plan Executive Summary 091709Jenny Darrow
Executive Summary - This academic plan outlines the multi-dimensional efforts of Keene State College and the Division of Academic Affairs to achieve academic excellence. It comes at a time in history when it will not be enough for educational institutions to be known for the physical attributes of their campus or community, or the measures of the many inputs that historically have equated with status in the educational pecking order. Our stakeholders—students, parent, community, system and legislators—are demanding evidence of real educational outcomes, which are captured best in one overarching College strategic goal—achieving academic excellence. The institutions that rise to this new challenge will succeed and prosper, while those that do not will languish. While the Division of Academic Affairs at Keene State College has primary responsibility for meeting this challenge, our success will depend on the creative energies and hard work of the entire College community.
Innovations in curriculum to make it globaldrvijayamravi
1. The document discusses the need for innovation in school curriculum to equip students for the modern world and global competition. It argues traditional teaching methods are inefficient and curriculum must be comprehensive, inclusive, and address a global, multicultural perspective.
2. Four aspects of curriculum innovation are identified: approach, design, procedure, and evaluation. Schools should ask why they are innovating and how benefits and challenges will be addressed. An innovative leader is key to managing curriculum changes.
3. Suggestions include establishing an advisory committee to regularly evaluate fields and update the curriculum. The focus should be on competency-based instructional objectives and concept evaluation rather than content. Schools must support research, technology use, and independent curriculum
1. 1
Reimagining
Public Education in
San Francisco
for a New Generation
SFUSD
Vision
2025
DRAFT
June 2014
iiii’’mmmmmmmmmmm ready
?
thththththeeeeeee wowowowow rlrlrlrlddddd
ggisisiss cchahahh ngnginingg
i illlii wiwillll
mmamakekeee aaaam
ddiiffffererrrenenenencececececi
bibibbioootttto ececchhh
enengigineneererinnggg
jobsb
fffffoooooooorrrrrrrrrrmmmmmmmmmmmmssssssnnnnnnneeeeeewwwwwwwwwwwwww ffffffffffffffff
oooooooooooooobbbbbbiiiilliittyyyoooooofffffffff mmmmmmmmmmmmmoooooooo
ad
tttthhhhiisss iissssss iihhiis is
mmmmmyyyy cccciitttttyyyyyy
2. 2
The plan is bold but simple:
in it every student is challenged
to kindle her or his unique spark,
chart a course for a meaningful
future, and build the knowledge
and skills to achieve it.
SUPERINTENDENT RICHARD A. CARRANZA
The plan is bold but simple: in it every
student is challenged to kindle her
or his unique spark, chart a course
for a meaningful future, and build the
knowledge and skills to achieve it.
Vision 2025 defines what we believe
education needs to be for every
SFUSD student. It is not only a plan,
but a call to action. This is something
we must and can do for the future
of our students, their families and the
entire San Francisco community.
SUPERINTENDENT RICHARD A. CARRANZA
BOARD PRESIDENT SANDRA FEWER
3. 3
Introduction
The Vision Process2
Vision 20254
Why this Vision?3
A Call to Action5
1
Thank you to the Evelyn and Walter Haas Jr. Fund for
their generous support of SFUSD and Vision 2025
4. 4
Introduction
In the fall of 2013, the superintendent of San Francisco Unified
School District (SFUSD), under the leadership of the Board of Educa-
tion, launched an ambitious undertaking:to develop a new vision for
the future of public education in San Francisco, and then use that
vision as a guide to transform the city’s school system, over the next
decade, into one of the premier systems in the world.
Earlier in 2013, we released a two-year strategic plan that strongly
signaled our commitment to reimagining SFUSD in order to bet-
ter and more equitably prepare our students for the demands and
opportunities of life and work in the 21st century. While this plan is
already helping to break new ground in the way that education is
being delivered in this city, it quickly became clear that we needed
a longer-term plan as well—one that reached far enough into the
future that it could serve as a true “north star,” guiding and aligning
all of the District’s plans and innovations, both big and small, toward
the same clear and ambitious goal.
But what should that future look like? What do our students need
from their education, and what does SFUSD need to look like to
make that happen? How might we innovate while still maintaining
and supporting the good work being done today?
To answer these questions, we initiated a process designed to
engage the city in imagining and exploring the possibilities for our
school system over the next decade. Getting to that vision was no
small undertaking.Throughout the 2013–2014 school year, we
engaged hundreds of stakeholders—including teachers, admin-
istrators, parents, students, paraprofessionals, elected officials,
community based organizations, representatives from the mayor’s
office, members of the funding community, and academic thought
leaders—to collectively grapple with the challenges and opportuni-
ties facing education in San Francisco today.
students
parents
teachers
principals
administrators
civic
leaders
labor
leaders
community
based
organizations
experts
funders
business
partners
5. 5
Our visioning process was both grounded and inspired by the bold
and thoughtful participation of each of these stakeholder groups, as
well as by research and experiential learning journeys that took us
deep into the world of best and emerging practices in Pre-K through
high school education. From the outset, our process was framed by
four guiding questions:
How are current and future trends shaping the world into which
SFUSD students will graduate over the next 10 years?
What knowledge, skills, values, and experiences will the SFUSD
graduate need to thrive in the San Francisco of tomorrow?
How will we transform what, how, when, and with whom students
learn to prepare them for the future?
What will it take to rally schools, families, businesses, the city,
the District, and the community at large around a shared vision?
How will we cooperate to give it life?
The vision shared in this document is both our response to these
questions and a statement of our deep commitment to improving
academic, social, and emotional outcomes for all of our students
while helping to restore balance in our city in equitable and socially
just ways. It is our deep belief that we have both the opportunity and
the responsibility to create a new and better future for our students,
our schools, and, by extension, our city—and that doing so will fur-
ther position San Francisco as one of the most innovative, forward-
thinking cities in the world.
If there was one surprise in this process, it was the extent to which a
shared vision already exists in our community and how easy it would
be for diverse groups, given the tools to build and communicate
these ideas collaboratively, to agree on the types of teaching and
learning environments we want to build in San Francisco.
This report reflects the best thinking of all of the stakeholders who
gave us the gift of their time. We hope that everyone who reads it
feels as committed as we do to creating the social transformation
that is necessary to realize the future that Vision 2025 promises for
our students and for all of San Francisco.
1
3
2
4
Vision 2025 A Call to ActionIntroduction The Vision Process Why this Vision? Why Now?
6. 6
present
1. Implement the SFUSD Core Curriculum and
use student data to make informed decisions
and monitor our progress toward goals.
2. Provide tiered levels of academic and behav-
ior support to all students using a Response to
Instruction and Intervention (RTI 2) model.
3. Build a clear vision, culture and conditions for
college and career readiness at all school levels.
4. Differentiate central office supports to
schools through a Multi-Tiered System of
Supports (MTSS).
5. Recruit, develop and retain highly qualified
teachers, leaders, and staff.
6. Increase awareness and build the supports
necessary to fully implement SFUSD’s Family
Engagement Standards.
Vision 2025 builds on solid scaffolding provided by
the 2013-15 strategic plan entitled Impact Learning.
Impact Lives.The vision is also informed by the many
successes and challenges involved in three decades
of educational reform.
Consent Decree and Reconstitution
Dream Schools
Strategic Refresh:Impact Learning. Impact Lives.
Comprehensive School Improvement Plan
Strategic Plan:“Beyond the Talk”
1983
2005
2013
1992
2008
Building on 30 Years of Reform History
and a New Strategic Plan
The Path to the Vision
7. 7
future
Graduate Profile
The SFUSD Graduate Profile
will define the knowledge, skills,
dispositions and behaviors we
expect our graduates to possess
so they are prepared to thrive in
life and career.
Personalized Pathways
All students will have personal-
ized learning and development
pathways.
Reimagined Space and Time
We will reimagine the
school day, keeping learning
standards constant while we
explore new ways to use space
and time.
Motivation and Mastery
We will embrace engaging new
ways to demonstrate mastery
while motivating and inspiring
ever-greater levels of learning.
Real-Life Tasks
We will integrate rich
and meaningful real-life tasks
into all levels of the curriculum.
Cultural Competence
and Multilingualism
Students will be globally aware,
multilingual and culturally com-
petent, and fluent in a range of
“second languages” including sign
language and computer coding.
Our graduates will see diversity in
its many forms as an asset.
Blended Learning
All our schools will be equipped
with technologies that support
blended learning and increase
personalization.
Talent and Collaboration
We will attract and grow top
talent to fuel our students’ suc-
cess and to embody a culture of
boundless aspiration, innovation
and collaboration.
Innovative System
SFUSD will be a center of innova-
tion and a leader in creating an
engaging new learning eco-sys-
tem in the Bay Area—and beyond.
Aligned Investments
Funding and other forms of
investment from public, private
and philanthropic sources will be
more tightly aligned to our vision.
1
2
3
4 8
6
10
5
9
7
2025
10 Big Shifts from 2014 to 2025
Vision 2025 A Call to ActionIntroduction The Vision Process Why this Vision? Why Now?
8. The Vision
Process
The Vision 2025
process was grounded
in research. We
interviewed and
conducted hands-on
workshops with district
administrators, princi-
pals, teachers and
community members to
learn what was impor-
tant to them. We also
drew on published work
of and advice from
respected academics,
education futurists,
regional planners and
policymakers.
Research 1 2 3 4
What are the goals of a 21st
century education, and what
forces of change will shape the
education landscape in the year
2025? What will it be like to live
and work in San Francisco in
the year 2025? Experts in
future studies, neuroscience,
economic forecasting, and
urban development shared their
perspectives on the future of
education, careers, and life in
the Bay Area.
Guiding Coalition 1:
The Forces Shaping
the U.S. Education
Landscape
October 10-11, 2013
Both students and teachers
shared their SFUSD experi-
ences and how they would like
public education in the city to
evolve over the coming decade.
Working in 15 design teams,
participants engaged in a
prototyping exercise, using
creative materials to build
tabletop models of what SFUSD
schools could look like in the
future, based on student and
teacher needs.
Guiding Coalition 2:
The Future of Learning
Through the Eyes of
Students and Educators
November 21-22, 2013
Participants explored two
critical questions:How might we
promote equity and social
justice through the vision we
create? And what systemic
patterns must we interrupt to
enable a more just and
equitable future? A panel of
parents representing the
diversity of our students shared
their perspectives on equity
issues and parent voice in the
school system. Participants also
explored three provocative
scenarios depicting different
possible futures for San
Francisco’s schools. (These are
shared in Appendix 2.)
Guiding Coalition 3:
Equity, Social Justice,
and Three Scenarios for
the Future of SFUSD
December 12-13, 2013
Guiding Coalition members had
their first opportunity to review
and react to an initial draft of
the vision statement and the
graduate profile—the set of
skills, dispositions, capabilities,
and knowledge that we want all
SFUSD students to achieve.
Guiding Coalition 4:
Review
February 7, 2014
Spaced over four months, each session brought together more than 150 stakeholders for a day and a half of learning,
reflection, and facilitated small-group collaboration.These highly interactive sessions were designed to create
common understanding, promote frank dialogue about problems and opportunities, and connect SFUSD more deeply
with the broader community.
Guiding Coalitions
9. 99
SFUSD leaders and Guiding Coalition members made a series of live and
virtual visits to innovative schools and learning sites—both inside and
outside San Francisco—that are reimagining Pre-K–12 education by
embracing new technologies and new learning models.
Learning Journeys
Video
Engagement
The Vision team, along with students from Galileo High School, filmed each Guiding
Coalition session, as well as numerous interviews with students, administrators,
teachers, and parents that captured their unique voices and perspectives.
Hundreds of Tweets and Facebook Posts, Likes, and Shares
Vision 2025 A Call to ActionIntroduction The Vision Process Why this Vision? Why Now?
10. 10
There is little doubt that Pre-K–12 education will be transformed
over the next decade—not just in San Francisco but in school
districts across the U.S. Among education experts, there is deep
consensus that the industrial model of education on which the
U.S. has relied for more than 100 years cannot, in its current form,
prepare our students to thrive in the future that is coming. Nor is it
adequately serving students now. Among the 34 countries belong-
ing to the Organization for Economic Cooperation and Development
(OECD), the U.S. is behind only Switzerland in terms of spending per
student—yet globally, we are well below average in both math profi-
ciency (#22) and literacy skills (#17).
Unfortunately, the gap between what and how we teach our young
people and the knowledge, skills, competencies, and dispositions
that students in America will need to compete and thrive in the
21st century is only widening. We are not sufficiently preparing
students for a world that demands higher levels of problem-solving,
deeper levels of knowledge, and a broader range of skills and com-
petencies;we are also not preparing them for the types of jobs and
careers that characterize the knowledge economy.This is a problem
not just for our students, but for our cities, our economy, and our
country at large.
As a result, in San Francisco and across the U.S., we’re seeing the
emergence of new educational models that change the way that stu-
dents learn and teachers teach. Significant shifts in our approaches
to education and instruction—including the introduction of the
Common Core State Standards (a set of rigorous subject matter
standards that provide new clarity about what children should know
and be able to do);a new national focus on science, technology, en-
gineering, the arts, and math (STEAM) education;and a move away
from the era of No Child Left Behind federal policy—are opening up
exciting new pathways and options for learning.
There is also growing agreement that preparing students for the de-
mands of 21st century life will require not just strong academic and
career-focused instruction, but the development of a wider range
of social and emotional skills and dispositions that have histori-
cally not been an explicit focus of pubic education. Meanwhile, new
technologies are beginning to dramatically change what is possible
in the classroom, opening up new options for more personalized
and real-world learning and creating unprecedented opportunities
to change the education paradigm and to nurture learning in ways
previously unimaginable.
Yet there is no blueprint for what that new paradigm should look
like—and no roadmap for San Francisco Unified School District
or any other school system to follow. It is our belief that a reimagined
SFUSD school system must link student learning not just with the
requirements of life in a global society, but with the opportunities
and imperatives of living, working, and thriving in the city of San
Francisco—which is currently undergoing its own rapid transfor-
mations. By linking San Francisco’s public education system more
tightly to the city’s emerging needs and opportunities, we have the
ability to create brighter futures not just for our students but for
the city as well.
Why this Vision? Why Now?
Education
is Changing
11. 11
Right now, San Francisco is a tale of two cities. On the one hand,
San Francisco is a flourishing global epicenter of innovation and
creativity in the throes of yet another economic boom, driven in
large part by the technology sector. In 2013, there was more venture
capital investment in San Francisco than in Silicon Valley. More than
1,700 tech companies now call San Francisco home, infusing the city
with new creative energy and helping to drive down its unemploy-
ment rate to its current 4.8 percent—more than 2 percentage points
lower than the national average.
On the other hand, the sharp influx of wealth, combined with
limited available housing, has created an affordability crisis that
threatens to undermine the values and spirit that have long de-
fined San Francisco. Rents and home prices are soaring, and even
longstanding families who have lived here for generations are being
driven out, due to evictions or to simply being unable to afford the
rapidly rising costs of living. Long known as a haven for immigrants
and safe place for a diverse range of individuals, the city is threaten-
ing to contract into a place that only the wealthy can afford. More
than 23 percent of San Francisco residents live below the poverty
threshold, according to the Public Policy Institute of California and
the Stanford Center on Poverty and Inequality.The problem is par-
ticularly acute for the city’s low-income African American families.
In 1980, 12 percent of San Francisco’s population was African Ameri-
can.Today, it’s just 6 percent.
While the city already has the lowest per capita number of children
of any major U.S. city, that number continues to decline as more
families leave. While the reasons for this outflow are largely eco-
nomic, they are also driven in part by uncertainty among families
about the quality of the city’s public school system. San Francisco
is the highest achieving urban district in the state of California—
and at the same time it has some of the largest achievement gaps
between and among student subgroups, including English Learners,
African Americans, Latinos, Pacific Islanders, and students with dis-
abilities. We have also not yet been able to demonstrate a solution
for engaging and retaining at-risk youth, particularly young men of
color. With Vision 2025, we firmly declare that these current condi-
tions will be neither tolerated nor ignored.
San Francisco
is Changing
Why this Vision? Why Now?
Education is Changing
San Francisco is Changing
A Vision of Equity—Trends Vision 2025 A Call to ActionIntroduction The Vision Process
12. 12
The vision shared in the following pages is as much about ad-
dressing these longstanding disparities and inequities as it is about
making classrooms vibrant, more engaging centers of learning that
prepare all of our students for opportunities in both San Francisco
and the wider world.
Great cities demand excellent—and equitable—public education
systems.Yet despite good intentions and well-orchestrated efforts
in the past, we do not yet have a premier public education system
that can provide a solid foundation for all of the children of this gen-
eration—let alone generations to come. We must insist on a vision
for a whole new world in which innovation, community, family, lead-
ership, and social justice are a seamless part of what great teaching
and learning look like in San Francisco.This is critical, because the
quality of our public education system can and will play an enor-
mous role in nurturing the soul of the city and in defining its future.
This is a seminal moment in the city of San Francisco. How we pre-
pare our students will have an impact on the community members
they become. How invested we become in their success—as a
district and as a city—will be reflected back to us for generations to
come.Yet as Vision 2025 clearly illustrates, we believe it will be pos-
sible to look back on the decade that is about to unfold as the time
when we worked together across racial, language, and economic
lines, harnessing all that the city has to offer in service of creating an
education system that attracts and engages all youth and families
in a world-class education that both lives up to and enhances the
global reputation for innovation that is San Francisco.
A Vision of
Equity
13. 13
SFUSD
White
Latino
Chinese
Other Asian
African American
Other
We can preserve the rich cultural tapestry of this city by ensuring that
all our graduates have the skills and knowledge they’ll need if they
choose to stay here. San Francisco’s 53,000 public school students
are currently more diverse than the city is projected to be overall.In
that sense we already have the pipeline to a diverse workforce in the
future.
If our students are to retain the option to make their lives in the city
in which they were raised—and,in so doing,to preserve the city’s
multicultural heritage—we must ensure they graduate well-equipped
to compete in the local workforce and to address the social,economic,
civic and environmental challenges of life here in the mid-2020s.
We know today where the high-paying jobs will be in the San Fran-
cisco of 2025. Nearly 58,000 jobs will be added to the local workforce
in the next decade,a 10% increase from 2015–2025.These trends can
be expected to continue through 2040 as the Professional Services,
Health and Education,Leisure and Hospitality,Government,and
Information sectors all increase their footprint in the San Francisco
Bay Area.
Science,technology,engineering and math proficiencies will be keys
to success in the Bay Area job market. We expect our graduates to be
accomplished in the arts and humanities.That commitment is critical
to our mission as educators.We also know,however,that the greatest
number of high-paying jobs in the future will require more compe-
tency in science,technology,engineering and/or math (STEM).
The income differential between STEM and non-STEM careers will be
consequential.In 2010,a worker with a high school diploma or less
in a non-STEM career earned 59.6% less than a similar worker in a
STEM occupation,and we can expect that differential to continue.Yet
in San Francisco the number of living-wage job opportunities that
don’t require advanced degrees—many,but not all STEM-related—
are growing too.Jobs like home health aids and pharmacy technicians
may require on-the-job training or vocational certificates (or,in some
cases,an Associates degree) but not an advanced degree.So the jobs
will be there for our graduates.We need to make sure all our students,
particularly those of poverty and color,are ready for them.
Trends
Why this Vision? Why Now?
Education is Changing
San Francisco is Changing
A Vision of Equity—Trends Vision 2025 A Call to ActionIntroduction The Vision Process
14. 14
The vision outlined in this report is
more than an effort to better prepare
SFUSD students for the 21st century
world.It is an intentional plan to in-
terrupt some of the trends we’ve laid
out here.This is a statement of how
earnestly SFUSD takes its role as a
diversity engine for San Francisco’s
future workforce by graduating high-
ly skilled and culturally competent
young adults who are ready for the
high-income jobs and high-impact
opportunities that will be available to
them in 2025.
Our vision is both a response to what
is happening in our city and a stance
about the bustling,diverse,and eq-
uitable San Francisco that we intend
to help create.
projected increase in projected income
Source:www.onebayarea.org, July 2013
2012
2025
BiomedicalEngineering
Microbiology
Computer&InformationResearchScience
Software/SystemsDevelopment
MarketResearch/Analysis
Biochemistry/Biophysics
MedicalScience(exceptepidemiology)
HomeHealthAids
BiologicalTechnicians
Meeting,ConventionandEventPlanning
123.7%
76.3%
57.6%
57.3%
55.1%
54.1%
52.6%
52.2%
50.4%
50.0%
15. 15
Vision 2025
Visions are creative,descriptive stories designed to help us step outside the
constraints of the present in order to more fully and openly explore what we
want to see happen in the future.It is important to note that the vision depicted
in the following pages is not a strategy.Rather,its chief goal is to paint a rich
and aspirational picture of what SFUSD could look and feel like in 2025.This
picture will serve as a guiding star that aligns our actions,shapes our strategies,
and directs our growth—as a school district and as a city—in the years ahead.
Vision 2025 is based on the many ideas and contributions generated by a
wide range of stakeholders throughout the visioning process,which took place
during the 2013–2014 school year.While that initial process has ended,it is
important to recognize that the vision itself will,inevitably,continue to evolve.
In the coming years,we will identify additional opportunities to engage with a
similar cross-section of stakeholders in helping to clarify and refine Vision 2025
as our needs,our resources,our opportunities,and our aspirations expand in
ways that we cannot yet anticipate.
Vision 2025Why this Vision? Why Now? A Call to ActionIntroduction The Vision Process
16. 16
In 2025, the San Francisco Unified School District is unified in
exciting new ways. The District’s strong commitment to equity and
social justice across all of its communities and all of its schools
enables not just some students but all students to realize their
potential. Every school and every student is part of a District-
wide system of supports designed to ensure that all students and
families—of every race, language and ethnicity, learning level and
ability—have the support and the resources they need to thrive.
The District’s commitment to the success of every student means
that all are ensured the opportunities to learn, grow, and express
themselves—and that each school is capable of helping its students
achieve their goals.
Across the District, all available resources are carefully marshaled
to create the optimal conditions within every school community and
to set up every student to reach their maximum potential.The school
system continues to maintain a commitment to social justice, refin-
ing a system of resource allocation based on providing equitable lev-
els of support to all students.There are also mechanisms in place to
address institutional bias—and continuous learning, improvement,
and reflection are the norm.This leads to a deeper ability among all
adults in the school system to recognize where inequitable and dis-
proportionate outcomes exist and take positive steps to counteract
and address them.
Members of the broader school community acknowledge that fos-
tering positive relationships among students and adults is critically
important.The District has made great strides in emphasizing family
empowerment and shared accountability among all stakeholders.
The embrace of Restorative Practices continues to foster more posi-
tive school cultures, as well as more trust, cooperation, listening,
accountability, and mutual understanding among all members of the
school community.This enhanced relational trust has encouraged
increased levels of collaboration among adults, improved student
engagement, and created thoughtful discourse around accomplish-
ing shared goals.
The District is fully committed not just to access and equity within
San Francisco public schools, but to empowering students to foster
social justice in their communities. A core goal of SFUSD is to instill
in its students both a sense of pride in their racial and cultural
identity and an appreciation for the unique and diverse identities
of others. Indeed, San Francisco continues to boast one of the most
diverse student bodies in the country. By framing that diversity as
an asset at every turn from pre-K through high school graduation,
SFUSD produces broadminded graduates who possess a deep re-
spect for others, enabling them to be thoughtful and compassionate
members of their communities and of the world.
A Truly Equitable
School District
=
=
=
SFUSD Definition of Equity:
The work of eliminating oppression,
ending biases,and ensuring equally
high outcomes for all participants
through the creation of multicultur-
al,multiethnic,multiracial practices
and conditions;removing the pre-
dictability of success or failure that
currently correlates with any social
or cultural factor.
17. 17
In 2025, SFUSD students graduate from high school with a sense
of purpose and self-efficacy. They possess the skills and confi-
dence to achieve their dreams and goals for their future. Graduates
understand that they are part of a global society, and feel a sense
of responsibility to make a contribution both at the local level and
in the wider world.They are equipped to succeed in either context
and have a clear sense of the next steps toward accomplishing their
career goals.
This confidence comes from having been “seen” and nurtured for
who they are throughout their public schooling. All students enter-
ing the SFUSD school system are viewed through the lens of their
assets—the unique set of abilities and aspirations that define who
they are. Indeed, a key component of a SFUSD student’s education is
the development of a healthy self-identity.Just as having a student
body that reflects tremendous diversity in race, ethnicity, language,
and background is considered a District advantage, so too is the
spectrum of assets that students bring to a school seen as contrib-
uting to the richness of the learning environment for everyone.
Helping students discover, pursue, and realize their motivating
“sparks”—those activities and interests that help them express their
personalities and can set the trajectory for the rest of their lives—is
seen as central to the SFUSD learning experience. Role models play
a part in helping students identify their interests and passions, and
schools provide high levels of enrichment and exposure to experi-
ences beyond students’ known local context. Meeting experts and
mentors from a variety of sectors—including business, government,
and social services—expands students’ horizons and exposes them
to a wider world of learning.
Student input and voice are at the forefront of learning. In addition
to gaining a mastery of expected learning standards, every student
has a personalized learning pathway tailored to his or her unique
needs and interests—and all students participate in planning and
goal-setting when it comes to their own learning. SFUSD’s student-
centered learning environment employs new methods and technolo-
gies to ensure that all students have an opportunity for their voices
to be heard.
Students Find Their “Sparks”
—and Their Voice
Vision 2025
Students–The Classroom–The City
Teachers–Parents–Communities
Culture–Thriving–Target GroupsWhy this Vision? Why Now? A Call to ActionIntroduction The Vision Process
18. 18Mastery of the core knowledge, critical thinking skills,
and competencies outlined by the Common Core State
Standards (CCSS). Standards-based knowledge and
skills will remain the central pillars of every student’s
learning, creating a deep foundation that enables further
inquiry and exploration in a variety of fields and areas of
interest. As part of this core learning, SFUSD students
will develop global, civil, and environmental literacies, as
well as financial, health, and media literacies, throughout
their schooling.
Content Knowledge
The knowledge, skills, and experience to navigate the
“real world” and solve problems that arise in everyday
life and in the workplace. Students will have been
exposed to a spectrum of industries and sectors and had
experience working and implementing their learning in a
variety of real-world settings. Students will know how to
create compelling content in a variety of formats-
through writing, speaking, and multimedia—and be able
to express themselves digitally, artistically, musically, or
with their hands.
Career and Life Skills
The ability to navigate and engage in a 21st century
global society that is more inclusive and intercon-
nected. Students will be “multilingual,” gaining exposure
to or fluency in other languages that might range from
Spanish and Chinese to sign language and computer
coding.They will know how to contribute their voices
responsibly in all aspects of daily life, from social media
to face-to-face communication.They will display an
understanding and a respect for different cultures, and
possess the ability to connect across racial, cultural, and
linguistic lines.
Global, Local, and Digital Identity
Strong interpersonal skills and the ability to positively
influence and collaborate with others. SFUSD students
will have the experience and the knowledge to lead
others toward solutions and to manage the resources and
decisions entrusted to them equitably and responsibly.
Our graduates will display empathy for others and-
having had abundant opportunities to work in teams with
both peers and adults during their schooling—will be well
prepared to lead and collaborate, both inside and outside
the workplace.
Leadership, Empathy, and Collaboration
The freedom, confidence, and ability to express their
unique selves. Students will have exposure to and
experience in a variety of creative and artistic forms and
disciplines that serve to ignite their curiosity and enable
them to find new pathways for expressing their unique
identities and for exploring their own skills and styles.
They will know how to integrate creative problem-solving
into their work and how to approach problems and
challenges creatively and from multiple perspectives.
Creativity
Our graduates will see themselves as filled with purpose
and value. Having been nurtured to focus on their
capacity to grow intellectually, socially, and creatively
(sometimes described as having a “growth mindset”),
SFUSD graduates will possess the grit to persist in
long-term efforts and persevere toward important goals.
They will graduate with a strong, healthy sense of self and
the confidence that they have a valuable role to play in the
world.They will possess self-knowledge and self-esteem,
conduct themselves ethically and with integrity, and know
how to reflect on and learn from their experiences.
Sense of Purpose and Sense of Self
1 2 3
4 5 6
KNOWLEDGE AND SKILLS
DISPOSITIONS AND BEHAVIORS
SFUSD is committed to helping all students develop strong
academic knowledge and skills, as well as a host of disposi-
tions and behaviors, that increase their curiosity and engage-
ment, activate their full potential for learning, and prepare
them for life, work, and study beyond their secondary school
years. While the pace and the path toward achieving these
outcomes will vary among students and unfold along a set of
learning progressions, the goal is for every SFUSD student to
possess these capacities by the time they graduate.
The Graduate Profile:
Developing Students
to Compete and Thrive in
the 21st Century World
19. 19
SFUSD’s student-centered approach to learning has led to a near
total transformation of the teaching and learning experience. Class-
rooms have become dynamic 21st century learning environments
supported by an array of pedagogies and pathways.They are, in
effect, inquiry-based learning hubs or hands-on “labs” that expose
students to new kinds of content and more deeply engaging ways to
acquire knowledge.
More and deeper human relationships. While technology can mag-
nify the impact and deepen the efficacy of the interaction between
teachers, students, and content, it is not a substitute for human
relationship. Incorporating technology into the classroom frees up
more time for teachers to dive more deeply into lessons and content.
Teachers and students are also supported by a host of other adults
who contribute to classroom learning, including parents who have
students in the school, community members with lessons and skills
to share, and a range of skilled paraprofessionals—all of whom play
an expanded role in supporting the dynamic learning taking place
inside SFUSD schools.
Lessons based on real-world content with real-world application.
Students work with teachers, industry experts, and their peers to
create and launch their own real-world projects, creating tighter
connections between their school work, their personal interests, and
the world outside the classroom.These projects help lift lessons “off
the page,” connect them to real life, and help students understand
how their studies can translate into real-world occupations.
More technology. All classrooms are infused with next-generation
media and technology capabilities, including universal wireless con-
nectivity and devices that enable collaboration not only within the
classroom but among teachers and students globally.These tech-
nologies also create rich opportunities for blended learning, where
students learn at least in part through the online delivery of content
and instruction, have more control over the pace of their learning,
and receive real-time feedback on their work.
The Reimagined
Classroom
?
n
19
Vision 2025
Students–The Classroom–The City
Teachers–Parents–Communities
Culture–Thriving–Target GroupsWhy this Vision? Why Now? A Call to ActionIntroduction The Vision Process
20. 20
Mastery-based learning. Students continually move at a self-
determined rate through levels of accomplishment and toward full
mastery of a subject, skill, or competency.This approach ignites
students’ intrinsic motivation to learn and to seek, and pushes them
beyond their known talents, interests, and competencies. Students
spend less time on skills they have already mastered and are not
locked into a “median” pace of learning. Ultimately, this approach
helps accelerate everyone’s learning and ensures that students,
including English Learners and special needs students, receive the
right resources and interventions exactly when they need them.
Authentic, performance-based assessment. A reimagined digital
assessment system marks students’ progress and creates much
more authentic accountability than a reliance only on scores and
grades. When students feel they fully comprehend a topic, skill,
or piece of content, they participate in any number of real-time
formative assessments that determine their command of a subject,
identify any areas of confusion, and recommend additional material
based on those results.
Students also have new ways to demonstrate what they have
learned. Digital portfolios (which represent students’ development
over time), public presentations, and other creative forms of expres-
sion are used to communicate students’ mastery of core content
and the questions they are exploring. As a result, parents, teachers,
colleges, and employers are able to gauge the full range of skills and
competencies that students have developed—both in and out of
school—beyond the traditional report card or transcript. Capstone
projects demonstrate the attainment of students’ personalized
learning goals.
New approaches to “class time.” To support and foster personal-
ized learning, SFUSD has embraced new approaches (including
but not limited to the “flipped classrooms” popularized in the early
2010s) that break from traditional “seat time” expectations and has
scaled up the most successful new ways of structuring student and
teacher time (such as by reformatted school schedules). Schools are
also open for longer periods of time, further enabling new learning
models and configurations. Students have wider access to support-
ive and varied learning spaces, resources, and people to help their
learning.
45,000
50%
The number of K-12 students in
the U.S. who took an online course
Percentage of high school
courses delivered online
in 2019 (projected)
in 2000
in 2009
million+
3
21. 21
In 2025, learning isn’t confined to classrooms but extends seam-
lessly into the dynamic city—and the wider world—that surrounds
them. San Francisco has become a fully networked ecosystem of
learning where education happens everywhere, in both formal and
informal learning environments.
Carefully curated partnerships between the District, the city,
local institutions, and local businesses (chosen both for their
commitment to helping SFUSD students achieve Vision 2025 out-
comes and for their diversity along socioeconomic, racial, ethnic,
and linguistic lines) create an evolving array of opportunities for
students to enhance their in-school experiences with new kinds of
out-of-school, hands-on learning.The citywide learning network
also offers students opportunities to demonstrate—and get credit
for—mastery of skills and competencies that are harder to learn
in a classroom setting.
Museums, parks, libraries, arts centers, entrepreneurial startups,
and established businesses offer internships, apprenticeships, and
other experiential learning opportunities that expose students to
new areas of knowledge, tie academic and practical experience
together, and enable SFUSD students to get pre-professional experi-
ence in their areas of interest. A student might learn the physical
and mathematical basis of engineering in a formal learning experi-
ence, then use that information in a real-world setting, helping to
develop smart buildings or robotic devices. Biology and biotechnol-
ogy might be applied in a hospital setting, a commercial kitchen, or
a research lab. Liberal and studio arts might be explored through
developing museum exhibits, creating public art projects, or helping
to stage professional productions.
These experiences offer support, mentorship, and feedback that
galvanize progress for students who might otherwise struggle to
identify their “spark” or see their future path—or, for that matter, the
real-world relevance of certain subjects.They also help students de-
velop the tools and the skills to understand their career options and
move seamlessly into a workplace to earn a living wage. As a result,
there is a significant uptick in the number of SFUSD graduates hired
(or sponsored through college with the promise of later employment)
by local organizations. Additionally, an increased emphasis on the
practical application of science, technology, engineering, math, and
the arts has greatly increased the number of students who pursue
careers or higher degrees in these subjects.
Opening the walls of the classroom also enables students to spend
more active time outdoors, participating in activities that support
both their physical and mental health and expand their engagement
in the local environment. Students might regularly participate in
beach cleanups, park improvement efforts, urban tree planting, and
other service-oriented activities that get their bodies moving while
also activating their sense of civic involvement.
The City as
Classroom
Hills of SF
Immigration
????????????????
F
?
eAAAAAAAAAAAAAAArrrrrrrrrrrrrrrrrrrrrrcccccccccccccccccccchhhhhhhhhhhhhhhiiiiiiiiiiittttttteeeeeeeeeeeeeeeecccccccccccccccccccccccccccctttttttttttttttttttttttttuuuuuuuuuuuuuuuuuuuuuuurrrrrrrrrrrrrrrrrrrrrrrrrreeeeeeeeeeeeeeeeeeeh
HHHHHHHHHHiiiiiiiiiiiissssssssssssssssssstttttttttttooooooooorrrrrrrrrrrrrryyyyyyyyyyyyyyyyyyyyyyHi
eeeooooooommmmmmmmmmmmmmmmmmmmeeeeeeeeeeeeeeeeeeeeeetttttttttttttttttttttttttttttttttrrrrrrrrrrrrrrrrrryyyyyyyyyyyyyyyyyyyyyyoommettrryGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGeeeeeeeeeeeeeeeeeeeeooooooGGeeooGGGGGGGGGGGGGGeoHHHHHHHHHHHHHHHiiiiiiiiisssssssstttttttttttttttttttooooooooooooooorrrrrrrrrrrryyyyyyyyyyyyyyyyyyory
SSSSSSSSSSSSSSSSaaaaaaaaaaaaaaaannnnn FFFFFFFrrrrrrrraaaaaaaaaaaaaaaaannnnnnnnnnnncccccccccccccccccciiiiiiiiisssssssscccccooooooooooooSSSSSaaaannn F ncisco
NNNNNNNNNNNNNNNeiiiggghhhhhhhhhhhhbbbbbbbbbbbbboooooooooorrrrrrrrrrrhhhhhhhhhhhhhhhhoooooooooooooddddddddsssssssssssNNeeiigghhbborhhoodsgg
Vision 2025
Students–The Classroom–The City
Teachers–Parents–Communities
Culture–Thriving–Target GroupsWhy this Vision? Why Now? A Call to ActionIntroduction The Vision Process
22. 22
These major shifts in how San Francisco’s students learn mean
major shifts in how educators create, facilitate, and deliver
instruction—and how they are selected, trained, and supported to
advance in their careers.Teachers not only teach but also nimbly fa-
cilitate student learning along different paths and through multiple
pedagogies—and they are trusted not just as experts in instruction
but as the creators of educational experiences.Their practice is
always changing and evolving, as they develop new ways to build the
scaffolding that enables their students to connect to what they are
learning across diverse environments and opportunities.
In order to meet these demands, teachers are given new opportuni-
ties to develop the skills and competencies they need to master their
subject matter, innovate their practice, and collaborate with other
professionals.The District has made it a priority to professionalize
the field, honoring teachers’ work and reflecting back to them the
importance of their role not only within their schools but within the
larger world.Teachers have time to plan, problem solve, and reflect
on their work. Experimenting with new learning approaches, working
cooperatively with other teachers and across disciplines, and engag-
ing in peer-to-peer learning are also built into the job.
There is also a high priority on job-relevant and high-quality profes-
sional development. Personalized, mastery-based, and technology-
enabled learning are not just for SFUSD students—these are
principles that inform professional development for teachers and
administrators too. All adults in the school system receive job-em-
bedded support via instructional coaches and are given the tools to
continuously grow and learn as professionals using the most current
research-based strategies. SFUSD has a commitment to support-
ing educators’ continued professional learning at every level of the
career lattice. While there is an identified core knowledge base for
all educators, teachers and others have an opportunity to develop a
personalized professional learning plan that will contribute to their
increased knowledge of content and pedagogy.
In addition to academic and technical knowledge, all adults in the
school system are given the opportunity to develop the same social
and emotional skills that the District aims to build and measure in
its students—qualities like empathy, leadership, and resilience. In
order to have the time, energy, and balance that the demands of
teaching require, teachers are supported by additional educators,
as well as by paraprofessionals, parents, counselors, and student
interns who help to establish, encourage, and support the growth of
self-driven learning for all students across all grades.
Recruiting the best teachers also remains a critical priority. In 2025,
SFUSD is known for the quality and comprehensiveness ofv its
new teacher induction program and its professional development
strategies. As a result, SFUSD is able to attract and retain the most
energetic, innovative, and talented educators, who together form
a diverse and culturally representative faculty. SFUSD has also
worked across a broad political spectrum at the local and state level
to help California honor its commitment to education by continuing
to raise funding to a level where all employees can be paid competi-
tive wages, ensuring that SFUSD’s educators can live and thrive in
the city where they work.
Teachers at the
Core of the Vision
AAAAAAA--hhhhhhhaaaaa!!!!!
23. 23
In 2025, a high percentage of SFUSD parents, caregivers, and fami-
lies are deeply engaged in their students’ learning. Indeed, sup-
porting parents in advocating for their children and ensuring that all
parents consistently feel like valued and respected members of the
SFUSD community have become strong District priorities.Teachers,
administrators, family liaisons, and other District representatives
regularly partner with parents in more proactive ways, giving them
full access to the information they need to be successful in navigat-
ing the school system, understanding their choices, and knowing
how to access the variety of learning experiences that can help their
children achieve their potential.
Schools have both deepened and broadened their communica-
tions and engagement with parents, reaching out to them in new
ways to make sure that they feel more included and informed about
what is happening in their children’s schools—and pointing them
toward the many pathways they can follow to become more ac-
tively engaged. SFUSD has both the values and structures in place
to promote parent advocacy and engage parents as true partners
in supporting student learning and contributing to building strong
school communities.
In order to ensure that all families have equal access to important
school information, every school’s written communications are
translated into multiple languages, and interpretation services
are regularly provided at school meetings and events. Because the
District takes parent engagement as a core responsibility, repre-
sentatives from the District also do outreach into neighborhoods for
parents who might not feel comfortable attending such sessions at
school sites.
It used to be that families were engaged in their children’s schools
during the early years of their schooling but became less involved
as their children grew older. In 2025, the vast majority of parents
stay engaged throughout their children’s entire school career.This
continuous family involvement has had a transformational effect on
the District, strengthening parents’ roles as vital stakeholders and
true partners in the District’s efforts to lead community transforma-
tion. Parents feel empowered as decision makers within schools as
well, and their voices (as well as the voices of students) are clearly
reflected in the District’s programs, services, and structures, many of
which are the direct result of their recommendations.
Parents as
Partners and Advocates
Vision 2025
Students–The Classroom–The City
Teachers–Parents–Communities
Culture–Thriving–Target GroupsWhy this Vision? Why Now? A Call to ActionIntroduction The Vision Process
24. 24
In their “off” hours, SFUSD schools serve as vibrant community
hubs that promote learning, health, wellbeing, collaboration, and
resilience within San Francisco’s neighborhoods. Recognizing the
need to help students and families gain access to a fuller array of
services and supports that together contribute to whole-family
success, the city’s public schools have become community schools
in the truest sense, bringing together community resources and
partners to offer a range of supports and opportunities for students,
parents, and other community members before and after school, on
weekends and holidays, and during the summer.
Working in close partnership with city departments and community-
based organizations, SFUSD schools offer a full range of services
to support the overall health and wellbeing of students and their
families and help further the goal of preparing students for college
or career. Onsite wellness centers address families’ physical and
behavioral health needs, while nurses, social workers, and a host
of paraprofessionals help families and students address at-home
tensions. School staff work in integrated and collaborative ways to
implement the community schools approach, and multidisciplinary
school support teams know how to assess and support students’
needs. Schools have meaningful partnerships with community-
based organizations and align their services and extended learning
opportunities to support students and families.
Students are also offered a host of opportunities to bolster their in-
school learning, including after-school tutoring, healthcare services,
summer learning programs, and enrichment classes designed to
advance their learning and link them to opportunities in the larger
world, such as college or career counseling, financial literacy train-
ing, classes in poetry and the arts, and vocational training programs.
Parents can also attend classes and receive practical and easy-
access guidance on issues ranging from housing, employment, and
government programs to how to use and manage technology in the
home or help their kids transition to middle school.
Schools as
Centers of Community Life
Having preordered lunch online
the night before,Tuyen grabs a
brown bag from a rolling cart in
the cafeteria—no waiting in line.
Her meal is fresh and has been
sourced from local suppliers and
cooked in a communal kitchen.
She devours it while seated with
friends on beanbag chairs.
On her way out, she picks up a
dinner kit for her family. In the
early grades,Tuyen’s lunch-
room focused on the routines
and rituals of communal
eating. In the middle years,
students had “participatory”
lunchrooms in which they
collaboratively redesigned
the lunch environment every
year. Now in high school,Tuyen
has a lunchroom that offers a
range of options for bustling,
multi-tasking adolescents.
The 2025 School Lunch Experience
12:11pm
25. 25
Under the close guidance of the superintendent and the deputy
superintendent for innovation, instruction, and social justice,
the SFUSD Innovation Lab is a pivotal District investment in the
development, testing, and refinement of promising new pedago-
gies, school models, policies, and practices. Schools, principals, and
teachers with great ideas for new learning or teaching approaches
have the opportunity to participate in Innovation Lab activities and
become part of a larger network of learners.The central office plays
an important knowledge management role in this regard, tracking
and disseminating what is learned from prototypes and spreading
and scaling those that prove successful.Just as importantly, District
leadership sets quality standards for joint innovations and site-
based innovations alike, ensuring that the most promising proto-
types are vetted before being put into practice.
At the same time, the message is clear:innovation in SFUSD is a
function of everybody working together.The District offers small
pools of funding, training, technical support, or process coaching
for multidisciplinary design teams—comprising some combina-
tion of principals, teachers, parents, students, and central office
staff—who identify important problems of practice, commit to work-
ing collaboratively to identify potential solutions, and develop and
implement promising approaches that can inform broader systemic
strategies.
SFUSD operates as a coherent learning organization not just at the
school site level but at a system level as well.There is a high degree
of sustained collaboration among all parts of the school system,
including the formation of new and more trusting alignments and
alliances between schools and administrators and the creation of a
new District-wide culture built around inquiry, shared purpose, and
innovation.The chief goal of the central office is to support the field
in accomplishing the goals that the District has set in policy.
A Culture of Innovation
and Shared Purpose
Vision 2025
Students–The Classroom–The City
Teachers–Parents–Communities
Culture–Thriving–Target GroupsWhy this Vision? Why Now? A Call to ActionIntroduction The Vision Process
26. 26
While the District has little control over citywide issues like
affordable housing and employment, it uses its leverage with the
city to help influence policies and decisions that benefit District stu-
dents, teachers, and families. In 2014, high costs and rents forced
many families—especially African American families—out of the
city, and San Francisco had the lowest per capita number of children
of any major U.S. city. By 2025, San Francisco has emerged as a city
that prioritizes families and is committed to ensuring that its youth
are successful in and out of school.
Meanwhile, SFUSD has emerged as a point of pride in a city that
once wondered whether its public school system would ever live up
to its promise. Back in 2014, Superintendent Richard Carranza said,
“The quality of our education system will play a huge role in nurtur-
ing the soul of the city and in defining the future of San Francisco.”
Through its innovative learning approaches, its commitment to
equity and social justice, and its focus on developing every student’s
full potential of skills and talents, SFUSD has successfully linked
student learning with the imperatives of life in an ever-changing
global society—and in an ever-changing San Francisco.
SFUSD graduates can be found living in and contributing to every
community in the city, and working and leading locally in jobs across
all sectors and industries.The ability of SFUSD alums to work across
racial, linguistic, cultural, and economic lines to harness the intel-
ligence and resources of the city helps further elevate San Fran-
cisco as one of the greatest cities in the world. SFUSD continues to
attract more families to San Francisco—and continues to graduate
students who are well prepared to become active, engaged, and re-
sponsible community members in a city that welcomes their unique
contributions.
Thriving Schools,
Thriving City
In 2025, students will be
expected to be leaders in
their own lives, schools,
and communities.They
will be trained as leaders
throughout all of their
curriculum, acquir-
ing a suite of skills that
includes empathy, active
communication, problem-
solving, collaborating
with teams, project plan-
ning, taking the initiative,
reflection, and evaluation.
Students will also have
authentic opportunities
to practice these skills
through peer-to-peer
education, mentoring,
and tutoring;peer-to-
younger-peer services
(through partnered el-
ementary and middle
schools, and partnered
middle and high schools
throughout the District);
internships and paid
jobs for older youth in
after-school and summer
programs;youth advisory
boards for CTE programs;
student government;
and student-led training
for SFUSD teachers on
youth voice and leader-
ship. Student voice will
also be a consistent ele-
ment of the communica-
tion and decision-making
systems across indi-
vidual schools and the
district at large. Student
input will be given on a
proactive basis, allowing
for real representation
in decision-making at
school sites and at the
District level.
Student Leadership in 2025
27. 27
Target Student Groups:
Students with Disabilities
Vision 2025 represents a cultural shift in terms of how we think
about the differential challenges—racism and poverty, for exam-
ple—and the unique assets our students bring to their educational
experience. In SFUSD’s next chapter we will ensure that each child
is on a personalized learning pathway with the tools and resources
they need to advance both academically and socio-emotionally.
We expect this degree of personalization will particularly benefit
three target groups of SFUSD students.
Students with Disabilities:
Assistive technologies. Every school will have a suite of research-
supported assistive technologies that give students with disabilities
access to new ways of learning designed around their specific needs.
In many cases, they will use the same devices as other students but
the device will be loaded with the appropriate adaptive software. In
other cases, students will have access to specialized technology
created specifically with their disabilities in mind.Teachers and
other adults will be well versed in the use of a variety of assistive
technologies to enhance their students’ learning experiences.
A team-based, whole-child teaching approach. Students’ learning
styles and strengths will be understood, respected and nurtured by
all who work with them. In all classrooms—but especially in later
grades—a team teaching approach (e.g., special education teachers,
subject-area teachers, behavioral experts, social skills coaches, etc.)
will ensure that all students get the attention and assistance they
need to be successful.Teachers will have access to training, support,
and resources required for team-teaching.
A focus on post–high-school success. Part of the job of SFUSD and
its community partners will be to develop post–high-school path-
ways for all students that reflect and utilize their individual abilities
while giving them the tools to move seamlessly into the workplace.
Creating such pathways for students with significant disabilities
will require an imaginative and diverse spectrum of internships,
vocational education opportunities and apprenticeships as well as
continued development of social opportunities for students who
may otherwise feel isolated after leaving the school system.
A non-biased approach to subjective disabilities assessment.
Currently, a disproportionate number of SFUSD students diagnosed
with subjective disabilities—including learning disabilities, speech
and language challenges, and emotional disturbance—are minori-
ties, whereas the racial breakdown of students with objective dis-
abilities—blindness, deafness, and other physical limitations—is
much more racially balanced. In Vision 2025, special education
is not considered the first or only avenue for students exhibiting
behavior challenges.There are more interventions in place, not only
to support students and teachers but also to help the school system
identify where implicit bias is impeding our progress toward equity.
Vision 2025
Students–The Classroom–The City
Teachers–Parents–Communities
Culture–Thriving–Target GroupsWhy this Vision? Why Now? A Call to ActionIntroduction The Vision Process
28. 28
Target Student Groups:
African American Students
Engaging experiences to nurture students’ identities. We expect
that personalized learning pathways and engagement around per-
sonal interests will help our African American students thrive. We
will accelerate achievement and ensure success at critical transi-
tion points on the African American student’s educational journey
by adopting promising local, state and national strategies.These will
range from rigorous implementation of the common core curriculum
to real-world learning experiences and engaging digital learning pro-
grams and specialized ethnic studies programs.
Strong support networks and family partnerships. Partnership
with the city and community-based organizations will ensure that
African American students are interacting with cooperative adults
and systems that fully support the aspirations and needs of African
American students and their families. Families and caretakers will
have clear roles in the shaping and promotion of learning oppor-
tunities that support the unique needs of their students. We will
establish thorough communication and feedback loops between the
District and African American families toward this end.
Research-based options and supports to achieve success. SFUSD
will have take up President Obama’s “My Brother’s Keeper” initiative,
a call-to-action to join a national network of school districts and
cities who are committed to educate and support African American
students and families. Supported by engaging workforce experi-
ences throughout the course of their education, African American
students will become leaders in high-demand fields to help diversify
the City’s workforce.
Culturally Relevant Pedagogy. Vision 2025 describes a school
district where all staff, especially teachers and principals, are sup-
ported to achieve mastery of both the academic and multi-cultural
strategies necessary to enact the values of equity. All teachers will
have the deep professional development and support necessary
to master and integrate culturally relevant pedagogy across the
curriculum. All SFUSD staff will be able to identify and mitigate the
impact of implicit racial bias and will have practical and research-
based strategies to reduce stereotype threats that African American
students and others of color experience on a daily basis. The SFUSD
Board of Education and executive leadership will also identify and
address institutional and structural forms of racism that continue
to replicate oppressive learning conditions. We will maintain strong
partnerships beyond SFUSD to address such pernicious systemic
challenges. In addition, the restorative practices movement will be
deeply rooted in all school cultures with the goal of increasing trust
between African American families and school staff.
29. 29
Target Student Groups:
English Learners
English Learners will be provided the necessary resources and sup-
ports to succeed academically person par with their peers in 2025.
Accelerated Language Development. In Vision 2025, English Learn-
ers’ opportunity to accelerate English Language Development is
evident throughout the instructional day, and all ELs have access to
a pre-K-12 language pathway. English Learners will have ongoing
opportunities to interact with other students and adults through
academic discourse in both English and their native language.
Technology will be accessible to all English Learners regardless of
family background and will be used effectively to support language
acquisition in English while continuing to develop and maintain
our students’ native languages. Schools will have rich libraries of
classroom materials aligned to the common core state standards
and these will be available in multiple languages.
Teacher supports. Teachers will be adequately prepared to leverage
the “reimagined classroom” so their English Learners have access to
the core curriculum. English Learner’s parents will also be equipped
with skills to contribute to their children’s academic success. Eng-
lish Language Development and technology classes will be readily
available for EL parents seeking to better understand the needs of
their children and to effectively partner with teachers.
Access to opportunity. English Learners will gain English profi-
ciency as soon as is feasible so they have increased access to A-G
courses for graduation and preparation for post-secondary edu-
cation. Students’ goals and interests will not be impeded by their
English proficiency;instead, their native language and English skills
will expand their college and career options.
Culturally Relevant Pedagogy:English Learners bring a wealth
of cultural and ethnic contributions and identities. All teachers
will understand the value that this diversity brings to the classroom
and will be responsive to the cultures of different groups as they
design curriculum, plan learning activities and establish assess-
ment procedures.
Vision 2025
Students–The Classroom–The City
Teachers–Parents–Communities
Culture–Thriving–Target GroupsWhy this Vision? Why Now? A Call to ActionIntroduction The Vision Process
30. 36
In the coming years,the vision shared in this report will serve as a guiding force
that aligns the District’s priorities,programs,and partnerships.It will also continue
to inspire fresh insights into both what is necessary and what is possible for San
Francisco’s students,families,schools,and communities.
But bringing Vision 2025 to life—turning it from a vision into a true social movement
with a heartbeat all its own—will require more than that.It will require coordinated
efforts across the city by multiple stakeholders.It will require that families,caregiv-
ers,educators,administrators,funders,and community members feel inspired to
support,contribute to,and hold themselves accountable for better outcomes for all
public school students—and,by extension,for the city of San Francisco itself.
We need everyone’s help in broadcasting this vision and doing their part to create
the ecosystem that will help manifest and support it.It is only through the commit-
ment of all of us—of all San Franciscans—that we will be able to truly transform
education in this city,empowering our public school system to become an engine for
growth and change throughout San Francisco.
We look forward to the work ahead—and to continuing to broaden and deepen the
collective conversation about the future of our students,our city,and the world.
San Francisco
has a rich history
of dreams and
determination
coming together
to make this
one of the great-
est cities in the
world—imagine
what this combi-
nation can do for
our schools and
our future.
SUPERINTENDENT RICHARD A. CARRANZA
A Call to Action
Why this Vision? Why Now? Vision 2025 A Call to ActionIntroduction The Vision Process