V-Empower, Inc.
Empowering the People
Empowering the People
www.v-empower.com
V-Empower, Inc. promotes an environment of alignment
between our resources and our customers by creating,
developing, integrating, sharing and applying knowledge
for the benefit of our customers.
Mission
Empowering the People
Vision
To produce innovative
products and superior
consulting services to fulfill
Empowering the People
consulting services to fulfill
our customer and users’
needs.
Inc. 500
• Inc. 500 Honoree (2006)
• One of 500 Fastest Growing Company in
America
• Rank 263
Empowering the People
• Rank 263
Deloitte Fast 50
Maryland Fastest Growing Technology Company
by Deloitte 2006 (Ranked #1)
Maryland Fastest Growing Technology Company
Empowering the People
by Deloitte 2007 (Ranked #7)
Company profile
$4,000,000
$5,000,000
$6,000,000
Our Revenues
Empowering the People
$0
$1,000,000
$2,000,000
$3,000,000
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
Our Philanthropy
• StateDemocracy
Foundation
• Ayesha and Ali Padder
Foundation
• Bowie Business
V-Empower’s contribution to the following Non Profit Organizations
$400,000
$500,000
$600,000
Empowering the People
• Bowie Business
Innovation Center
• Humanity First
• Institute of Policy &
Religion
$0
$100,000
$200,000
$300,000
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
Cash Technical Volunteer
Technology Services
LAMP Practice: Our LAMP (Linux, Apache, MySQL, PHP) Practice is a good
combination of experienced technical team with an exposure of working on various
open source applications like DRUPAL, JOOMLA, WordPress, Mambo, MODx,
Sugar CRM, Movable Type, etc.
Frameworks like: Zend, Symphony, CakePHP etc. and Open Source Apps Like
PHPBB, OS Commerce, Xcart, Ubercart, Mantis, Litecommerce , Magento and
Empowering the People
PHPBB, OS Commerce, Xcart, Ubercart, Mantis, Litecommerce , Magento and
ZenCart.
High experience in designing and developing e-commerce portals, community
portals, online transaction systems etc. Expertise to work with multiple databases
like My SQL, MS SQL Server and Oracle.
Content Management Services
A highly experienced team to take up projects in:
• Drupal: Open source CMS (content management system) written in PHP.
Lot of free plug-ins and includes wide range of features to be implemented quickly.
• Joomla: It is an award-winning , open source and free CMS, which enables you to
build Web sites and powerful online applications.
Empowering the People
• Wordpress: An open source publishing system built on PHP and MySQL and is the
largest self-hosted blogging tool and is completely customizable.
• Mambo: Full-featured, award-winning CMS that can be used for everything from
simple websites to complex corporate applications.
• MODx: It powers hundreds of thousands of websites, MODx is pretty safe, secure
and robust with zero creative restrictions.
Internet Marketing Services
A proficient team ready to take up projects in the following areas:
• Search Engine Optimization (SEO)
Enhance your website’s online presence and its search-engine listing.
List your website in the first page of Search Engine results for desired keywords.
Maximize ROI (Return on Investment).
• Social Media Optimization (SMO)
Social Media Optimization refers to social profiling and networking.
Empowering the People
Social Media Optimization refers to social profiling and networking.
Create awareness about your website in online social communities.
Be visible in news blocks, bookmarking websites, Press release submissions etc.
• Search Engine Marketing (SEM)
Get yourself top listed on Google, Yahoo & Bing and their associated websites.
Promote business online through Google Adwords, Facebook, Microsoft
AdCenter, LinkedIn and YouTube.
Staff Augmentation
• Availability of skilled, dedicated staff and infrastructure facility as virtual
extension of client’s operating environment.
• Work directly with offshore team in their own time zone.
• Reap cost benefits with greater amount of budget predictability.
• Gain efficiency, when revenue per employee grows.
Empowering the People
• Gain efficiency, when revenue per employee grows.
• Slash overhead cost of IT Staff and do more with less.
• Maximize Efficiency without compromising growth potential.
• Increase Net Income and reduce overhead costs drastically.
• Complete transparency in operations.
Application Security
• V-Empower Inc. has been providing “Application Security Services” to a
global clientele in United States, Asia and Europe.
• We specialize in providing exclusive services to Government agencies
enterprises and businesses.
• Our expertise in Application Security Solutions ensures that the key
Application Security and Privacy Parameters are adequately met.
Empowering the People
Security Services
Host Security
Secure Programming Development
Application Code Review
Training Services
Infrastructure Audit Services
Our Customers
Between 2003 & 2012, 75% revenue earned from repeat customers
Average length of relationship – 5years
Our Clients
- Microsoft - Click & Pledge
- Strayer University - IndusTrack
Empowering the People
- Strayer University - IndusTrack
- Yagnaum - Equiom
- Engage Voter - New Target
Teaming Partners
• Yagnaum (http://www.yagnaum.com) solutions integrator and consulting firm
specializing in technology and staffing solutions
• Click and Pledge (http://clickandpledge.com) provides complete online payment
system, fundraising tools along with many Salesforce and Mobile Apps.
• Tarika Technologies (http://tarikatechnologies.com) develops solutions for complex
Empowering the People
• Tarika Technologies (http://tarikatechnologies.com) develops solutions for complex
business issues.
• IndusTrack (http://www.industrack.com) manufacturer of GPS tracking and fleet
management solutions.
Human Resources
• Continuous Career Evaluation.
• Defined Career Path.
• Excellence focused culture.
• Work Life Balance.
• Aligning Company goals with personal goals.
• 100% Health Coverage to our employees and their family
Empowering the People
• 100% Health Coverage to our employees and their family
• Flexible time and Telecommuting
• Opportunities to learn new skills
• Mentoring and encouraging entrepreneurs to nurture innovative ideas
• Opportunities to grow
Development Process
NDA
Requirement Collection
• System Requirements Specifications
• Understanding Document
• Prototype as PPT / HTML / Word Doc
Estimation
• Effort Estimation * Hourly Price
• Fix Bid
Sign Off
• Proposal & Contract
• Project Kick Off
• System Design and Architecture
• Data Flow Diagrams
• Database Specification and Design
• Project Plan
• System Test Plan
• Technical Specification Document
Requirement
Analysis
Design
Waterfall Method
Empowering the People
• Coding Conventions and Guidelines
• Process Asset Library for Reusable components
• Coding
• Test Cases (Unit/Integration/System)
• Code Review
Development
Testing• Testing (White Box, Black Box, Grey Box)
• Unit Testing
• Integration Testing
• Regression Testing
• System Testing
• Acceptance Testing
• Configuration Guidelines
• Hardware and Software Specifications
• Manuals
• Deployments and Final Testing
• Metrics on Schedule and Effort variance
Implementation
• Configuration Guidelines
Maintenance
Defect Tracking
• Process Documents
• System Test Plan
• Test Cases
• Unit Test Cases
• Integration Test Cases
• System Test Cases
• Testing
• Unit Testing
• Integration Testing
• System Testing
• Regression Testing
• Acceptance Testing
System Feasibility
Validation
Software
Plans&
Requirements Validation
Product Design
Verification
Detailed Design
Verification
Empowering the People
• Acceptance Testing
Activities
Verification Validation
Inspections White or Glass Box
Reviews Black Box
Code Walkthroughs Gray Box
Design Reviews Build Testing
Smoke and Sanity Testing
Unit Test
Code
System Test
Integration
Product
Verification
Implementation
Revalidation
Operations and
Maintenance
Defect Tracking
Empowering the People
Phase Distribution & Resource Mapping
Analysis
Design
Development
Quality Control
Project Management
Quality Assurance
Configuration
Management
Training
Empowering the People
Role Team Comprises of (Designations) For Phase
Requirement Analysis Team Business Analyst + Project Manager + Database Administrator +
Graphics Lead + QC Lead
Analysis
Design (System + DB +Graphics) Architect – For System Design & Architecture
Project Manager + Project Lead + DBA - For DB Design
Project Lead + Graphics Lead – For Graphic Design
Project Lead + Developers – For Technical Specification Document
Design
Coding & Code Review Project Lead + Developers – For Coding Development
Verification and Validation Project Lead + QC Team + Developers – For Testing & Bug fixing Testing
Quality Assurance
Configuration Management
Project Monitoring and control
Project Manager + Project Lead + SQA + Networks Administrator Project Management
Deployment Project Manager + Project Lead + QC Lead + Network Administrator Deployment and Implementation
Products
• StateDemocracy – Developed in 2001, This connects US citizens with the
Lawmakers at Federal & State Level.
• ezElection – Developed in 2003, Simplified tools to register to vote and obtain
Absentee Ballot.
• WebLobbying - An online lobbying application for US citizens designed in 2003.
• ezListmailer - Customized emailing tool developed in the year 2004.
• ezQuestionnaire - An easy online survey tool built in 2004.
• ezCampaigns – An easy and affordable campaign presence developed in 2004.
Empowering the People
• CrimeBlotter - A tool to map crime in your community deployed in 2006.
• eProact – Customer Relationship Management tool developed in 2007.
• GolfFlyover – 3D Flyovers built in 2008, mapped over 14,000 Golf layouts
showing distance and layouts of the holes.
• Lobbydelegates – Tool to communicate directly with these Super Delegates
developed in 2008.
• Sample Ballot – Built in 2010, an application where a voter can make his own
sample ballot and share that ballot with neighbors.
USA Headquarters India
6800 Willow Creek Road, 10-1-17, Dana Chambers, 3rd Floor
Bowie, MD 20720 Masab Tank, Hyderabad. 500 028
Phone: 301 805 4721 Phone: 65891743
Contact Us
Empowering the People
For any information email your queries to: info@v-empower.com
V-Empower is committed to customer service and customer satisfaction.
Through our customer support team we aim to make things easy for you, from
finding the right person to helping you with your query or even feeding your
thoughts back to us.
Please Contact us by email / phone for:
Projects: quddus.mohd@v-empower.com / 301-576-0646
Customer Engagement
Empowering the People
Thank you for your time
www.v-empower.com
Marketing: ken.laureys@v-empower.com / 301-805-4721
Business Development: rahman.ahmed@v-empower.com /301-576-6007

V-Empower, Inc. Corporate Presentation 2013.

  • 1.
    V-Empower, Inc. Empowering thePeople Empowering the People www.v-empower.com
  • 2.
    V-Empower, Inc. promotesan environment of alignment between our resources and our customers by creating, developing, integrating, sharing and applying knowledge for the benefit of our customers. Mission Empowering the People
  • 3.
    Vision To produce innovative productsand superior consulting services to fulfill Empowering the People consulting services to fulfill our customer and users’ needs.
  • 4.
    Inc. 500 • Inc.500 Honoree (2006) • One of 500 Fastest Growing Company in America • Rank 263 Empowering the People • Rank 263
  • 5.
    Deloitte Fast 50 MarylandFastest Growing Technology Company by Deloitte 2006 (Ranked #1) Maryland Fastest Growing Technology Company Empowering the People by Deloitte 2007 (Ranked #7)
  • 6.
    Company profile $4,000,000 $5,000,000 $6,000,000 Our Revenues Empoweringthe People $0 $1,000,000 $2,000,000 $3,000,000 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012
  • 7.
    Our Philanthropy • StateDemocracy Foundation •Ayesha and Ali Padder Foundation • Bowie Business V-Empower’s contribution to the following Non Profit Organizations $400,000 $500,000 $600,000 Empowering the People • Bowie Business Innovation Center • Humanity First • Institute of Policy & Religion $0 $100,000 $200,000 $300,000 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Cash Technical Volunteer
  • 8.
    Technology Services LAMP Practice:Our LAMP (Linux, Apache, MySQL, PHP) Practice is a good combination of experienced technical team with an exposure of working on various open source applications like DRUPAL, JOOMLA, WordPress, Mambo, MODx, Sugar CRM, Movable Type, etc. Frameworks like: Zend, Symphony, CakePHP etc. and Open Source Apps Like PHPBB, OS Commerce, Xcart, Ubercart, Mantis, Litecommerce , Magento and Empowering the People PHPBB, OS Commerce, Xcart, Ubercart, Mantis, Litecommerce , Magento and ZenCart. High experience in designing and developing e-commerce portals, community portals, online transaction systems etc. Expertise to work with multiple databases like My SQL, MS SQL Server and Oracle.
  • 9.
    Content Management Services Ahighly experienced team to take up projects in: • Drupal: Open source CMS (content management system) written in PHP. Lot of free plug-ins and includes wide range of features to be implemented quickly. • Joomla: It is an award-winning , open source and free CMS, which enables you to build Web sites and powerful online applications. Empowering the People • Wordpress: An open source publishing system built on PHP and MySQL and is the largest self-hosted blogging tool and is completely customizable. • Mambo: Full-featured, award-winning CMS that can be used for everything from simple websites to complex corporate applications. • MODx: It powers hundreds of thousands of websites, MODx is pretty safe, secure and robust with zero creative restrictions.
  • 10.
    Internet Marketing Services Aproficient team ready to take up projects in the following areas: • Search Engine Optimization (SEO) Enhance your website’s online presence and its search-engine listing. List your website in the first page of Search Engine results for desired keywords. Maximize ROI (Return on Investment). • Social Media Optimization (SMO) Social Media Optimization refers to social profiling and networking. Empowering the People Social Media Optimization refers to social profiling and networking. Create awareness about your website in online social communities. Be visible in news blocks, bookmarking websites, Press release submissions etc. • Search Engine Marketing (SEM) Get yourself top listed on Google, Yahoo & Bing and their associated websites. Promote business online through Google Adwords, Facebook, Microsoft AdCenter, LinkedIn and YouTube.
  • 11.
    Staff Augmentation • Availabilityof skilled, dedicated staff and infrastructure facility as virtual extension of client’s operating environment. • Work directly with offshore team in their own time zone. • Reap cost benefits with greater amount of budget predictability. • Gain efficiency, when revenue per employee grows. Empowering the People • Gain efficiency, when revenue per employee grows. • Slash overhead cost of IT Staff and do more with less. • Maximize Efficiency without compromising growth potential. • Increase Net Income and reduce overhead costs drastically. • Complete transparency in operations.
  • 12.
    Application Security • V-EmpowerInc. has been providing “Application Security Services” to a global clientele in United States, Asia and Europe. • We specialize in providing exclusive services to Government agencies enterprises and businesses. • Our expertise in Application Security Solutions ensures that the key Application Security and Privacy Parameters are adequately met. Empowering the People Security Services Host Security Secure Programming Development Application Code Review Training Services Infrastructure Audit Services
  • 13.
    Our Customers Between 2003& 2012, 75% revenue earned from repeat customers Average length of relationship – 5years Our Clients - Microsoft - Click & Pledge - Strayer University - IndusTrack Empowering the People - Strayer University - IndusTrack - Yagnaum - Equiom - Engage Voter - New Target
  • 14.
    Teaming Partners • Yagnaum(http://www.yagnaum.com) solutions integrator and consulting firm specializing in technology and staffing solutions • Click and Pledge (http://clickandpledge.com) provides complete online payment system, fundraising tools along with many Salesforce and Mobile Apps. • Tarika Technologies (http://tarikatechnologies.com) develops solutions for complex Empowering the People • Tarika Technologies (http://tarikatechnologies.com) develops solutions for complex business issues. • IndusTrack (http://www.industrack.com) manufacturer of GPS tracking and fleet management solutions.
  • 15.
    Human Resources • ContinuousCareer Evaluation. • Defined Career Path. • Excellence focused culture. • Work Life Balance. • Aligning Company goals with personal goals. • 100% Health Coverage to our employees and their family Empowering the People • 100% Health Coverage to our employees and their family • Flexible time and Telecommuting • Opportunities to learn new skills • Mentoring and encouraging entrepreneurs to nurture innovative ideas • Opportunities to grow
  • 16.
    Development Process NDA Requirement Collection •System Requirements Specifications • Understanding Document • Prototype as PPT / HTML / Word Doc Estimation • Effort Estimation * Hourly Price • Fix Bid Sign Off • Proposal & Contract • Project Kick Off • System Design and Architecture • Data Flow Diagrams • Database Specification and Design • Project Plan • System Test Plan • Technical Specification Document Requirement Analysis Design Waterfall Method Empowering the People • Coding Conventions and Guidelines • Process Asset Library for Reusable components • Coding • Test Cases (Unit/Integration/System) • Code Review Development Testing• Testing (White Box, Black Box, Grey Box) • Unit Testing • Integration Testing • Regression Testing • System Testing • Acceptance Testing • Configuration Guidelines • Hardware and Software Specifications • Manuals • Deployments and Final Testing • Metrics on Schedule and Effort variance Implementation • Configuration Guidelines Maintenance
  • 17.
    Defect Tracking • ProcessDocuments • System Test Plan • Test Cases • Unit Test Cases • Integration Test Cases • System Test Cases • Testing • Unit Testing • Integration Testing • System Testing • Regression Testing • Acceptance Testing System Feasibility Validation Software Plans& Requirements Validation Product Design Verification Detailed Design Verification Empowering the People • Acceptance Testing Activities Verification Validation Inspections White or Glass Box Reviews Black Box Code Walkthroughs Gray Box Design Reviews Build Testing Smoke and Sanity Testing Unit Test Code System Test Integration Product Verification Implementation Revalidation Operations and Maintenance
  • 18.
  • 19.
    Phase Distribution &Resource Mapping Analysis Design Development Quality Control Project Management Quality Assurance Configuration Management Training Empowering the People Role Team Comprises of (Designations) For Phase Requirement Analysis Team Business Analyst + Project Manager + Database Administrator + Graphics Lead + QC Lead Analysis Design (System + DB +Graphics) Architect – For System Design & Architecture Project Manager + Project Lead + DBA - For DB Design Project Lead + Graphics Lead – For Graphic Design Project Lead + Developers – For Technical Specification Document Design Coding & Code Review Project Lead + Developers – For Coding Development Verification and Validation Project Lead + QC Team + Developers – For Testing & Bug fixing Testing Quality Assurance Configuration Management Project Monitoring and control Project Manager + Project Lead + SQA + Networks Administrator Project Management Deployment Project Manager + Project Lead + QC Lead + Network Administrator Deployment and Implementation
  • 20.
    Products • StateDemocracy –Developed in 2001, This connects US citizens with the Lawmakers at Federal & State Level. • ezElection – Developed in 2003, Simplified tools to register to vote and obtain Absentee Ballot. • WebLobbying - An online lobbying application for US citizens designed in 2003. • ezListmailer - Customized emailing tool developed in the year 2004. • ezQuestionnaire - An easy online survey tool built in 2004. • ezCampaigns – An easy and affordable campaign presence developed in 2004. Empowering the People • CrimeBlotter - A tool to map crime in your community deployed in 2006. • eProact – Customer Relationship Management tool developed in 2007. • GolfFlyover – 3D Flyovers built in 2008, mapped over 14,000 Golf layouts showing distance and layouts of the holes. • Lobbydelegates – Tool to communicate directly with these Super Delegates developed in 2008. • Sample Ballot – Built in 2010, an application where a voter can make his own sample ballot and share that ballot with neighbors.
  • 21.
    USA Headquarters India 6800Willow Creek Road, 10-1-17, Dana Chambers, 3rd Floor Bowie, MD 20720 Masab Tank, Hyderabad. 500 028 Phone: 301 805 4721 Phone: 65891743 Contact Us Empowering the People For any information email your queries to: info@v-empower.com
  • 22.
    V-Empower is committedto customer service and customer satisfaction. Through our customer support team we aim to make things easy for you, from finding the right person to helping you with your query or even feeding your thoughts back to us. Please Contact us by email / phone for: Projects: quddus.mohd@v-empower.com / 301-576-0646 Customer Engagement Empowering the People Thank you for your time www.v-empower.com Marketing: ken.laureys@v-empower.com / 301-805-4721 Business Development: rahman.ahmed@v-empower.com /301-576-6007