VECTOR
APARTMENTS
HILLSBORO OR
LEEB ARCHITECTS/KPFF ENGINEERS
PLATFORM STYLE HIGH END APARTMENTS
2.5 LEVELS OF PARKING
MIXED USE STORE FRONT & OFFICE SPACE
VECTOR APARTMENTS AT ORENCO
BUILDINGOWNER: HOLLAND PARTNER GROUP
PROJECT SUPERINTENDENT
RICK SOMMERFELD
START FRAMING
JUNE 2015
• TIMBERLAND
FRAMING
• BERG ELECTRIC
PIPER PLUMBING
LIMITED ACCESS & STAGING
STORMWATER CATCH BASIN INSTALLATION @ TRIMET SUBSTATION
EXCAVATION BY
KEN LEAHY CONSTRUCTION
LEVEL FOUR WALL FRAMING
METAL STAIR FABRICATION&INSTALL TIMBERLAND FRAMING
POUR BACK STRIP
ROUGH IN
PATIO CURBS
FOUNDATION WALLS
CONGESTION
LEVELTHREE
SWIMMINGPOOL
LEVELTHREE
METALSTUDFRAMING
LEVEL THREE CURBS
LEVEL FIVE
FRAMING
ROOF & PARAPET FRAMING

VECTOR APARTMENTS WOOD FRAMING