Pineland Stud Planer UHMW Hold-Downs
Michael Ford, Process Engineer
Issue:
There isa continual issue withboardsskewingafter beingdippedandfallingbackintothe diptank at
the stud planer.(Ref:Photo#1) Throughobservation,thisoccurs because the boardisnotable to stay
inthe lugproperlyupthe tipple incline. Thisissue createsconsiderable downtimeasthe operatorhas
to stopthe productionline,use apike pole andpositionthe boardbackintoitscorrect lug.
Observeddowntime for Weeks30-33 resultingfromthis issue:
 Week30 - 55 mins. (July19-25, 2015)
 Week31 - 71 mins. (July26-August1,2015)
 Week32 - 50 mins. (August2-8,2015)
 Week33 - 73 mins. (August9-15, 2015)
Proposal:
Finda solution thatwouldpreventlumberfromskewingandfallingbackintothe diptank,
resultingin asignificantdecreaseorend downtime relativetothisissue atthe diptank.
Plan of Action:
The projectinvolvedhoursof studyingthe processandissuesthatoperatorshadtocorrect on a
dailybasis.
I createda specificdesign thatpositonseachboardintoalug andtransfersit ontothe out feed
chainswithoutthe lumberskewingandcausingdowntime. Theyare referredtoashold-downs.
The total projectcostwas roughly$50.
The hold-downswere installedunderthe magentaholdingtankFriday, August14,2015 at the
endof shift. (Ref:Photo#2)
Conclusion:
The hold-downswere installedonAugust14,2015. Since implementation tothe studplanerprocess,
there hasbeenzerotime lostat the diptank. The hold-downshave yieldedanimprovedstud planer
processand increase tototal production.
Observeddowntime forWeek34:
 Week34 – 0 mins.(August16 -22, 2015)
2
Observationof studplanergradersRodneyAdamsandEdwardDavenport:
Note observation done on 2x4x8 (92 5/8)
 Before the hold-downswere installedRodneywasable tograde 14 loadsan hourand Edward
was able tograde 16 loadsan hour.Since implementationof the hold-downs,Rodneyhas
increasedhisloadsanhourby 3 and Edwardby 4.
o Rodney- (+4,815Bf) increase
o Edward- (+6,420Bf) increase
o 1LOAD/208 pcs/1,605.50 Bf= $371.63
The dip tankat the stud planerwasopportunityforme to create long-termvalue tothe stud
line.
Hold-downsinstalledatthe studplanersavesthe companymoneysignificantly byeliminatingall
downtime atthe dip tank relative tothe aforementionedissue.
Hold-downsinstalledatthe studplanereliminate the needof the companytospendfundson
differentmachinerytoimprove the processandincrease total production.
3
Photo #1
Photo #2

More Related Content

Viewers also liked

Days 1& 2 introduction to ldc
Days 1& 2 introduction to ldcDays 1& 2 introduction to ldc
Days 1& 2 introduction to ldc
Melissa Laramie
 
Realidade Aumentada
Realidade AumentadaRealidade Aumentada
Realidade Aumentada
dalmompr
 
แนะนำวิธีการใช้โปรแกรม 1
แนะนำวิธีการใช้โปรแกรม 1แนะนำวิธีการใช้โปรแกรม 1
แนะนำวิธีการใช้โปรแกรม 1
M'Chirachaya Thangsooksan
 
αλλαγές στην επιφάνεια της γης 3η ομάδα
αλλαγές στην επιφάνεια της γης 3η ομάδααλλαγές στην επιφάνεια της γης 3η ομάδα
αλλαγές στην επιφάνεια της γης 3η ομάδα10odskaterinis1
 
Yosemite Program Information
Yosemite Program InformationYosemite Program Information
Yosemite Program Information
CUSDScienceMath
 
Download presentation531
Download presentation531Download presentation531
Download presentation531
Indra Pratap
 
PROPERTY MARKET IN BANGALORE
PROPERTY MARKET IN BANGALOREPROPERTY MARKET IN BANGALORE
PROPERTY MARKET IN BANGALORE
Advocate Selvakumar
 
ธนาคารกลาง
ธนาคารกลางธนาคารกลาง
ธนาคารกลาง
Whisper Inlfe
 
Glosario de terminos ambientales
Glosario de terminos ambientalesGlosario de terminos ambientales
Glosario de terminos ambientales
juliethmvargas
 

Viewers also liked (9)

Days 1& 2 introduction to ldc
Days 1& 2 introduction to ldcDays 1& 2 introduction to ldc
Days 1& 2 introduction to ldc
 
Realidade Aumentada
Realidade AumentadaRealidade Aumentada
Realidade Aumentada
 
แนะนำวิธีการใช้โปรแกรม 1
แนะนำวิธีการใช้โปรแกรม 1แนะนำวิธีการใช้โปรแกรม 1
แนะนำวิธีการใช้โปรแกรม 1
 
αλλαγές στην επιφάνεια της γης 3η ομάδα
αλλαγές στην επιφάνεια της γης 3η ομάδααλλαγές στην επιφάνεια της γης 3η ομάδα
αλλαγές στην επιφάνεια της γης 3η ομάδα
 
Yosemite Program Information
Yosemite Program InformationYosemite Program Information
Yosemite Program Information
 
Download presentation531
Download presentation531Download presentation531
Download presentation531
 
PROPERTY MARKET IN BANGALORE
PROPERTY MARKET IN BANGALOREPROPERTY MARKET IN BANGALORE
PROPERTY MARKET IN BANGALORE
 
ธนาคารกลาง
ธนาคารกลางธนาคารกลาง
ธนาคารกลาง
 
Glosario de terminos ambientales
Glosario de terminos ambientalesGlosario de terminos ambientales
Glosario de terminos ambientales
 

Similar to UMHW Hold Downs

RME-085_TQM Unit-4 Part 3
RME-085_TQM Unit-4  Part 3RME-085_TQM Unit-4  Part 3
RME-085_TQM Unit-4 Part 3
ssuserf6c4bd
 
Plant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxPlant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptx
ssuser61b22e
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Laukik Raut
 
Sandia 2014 Wind Turbine Blade Workshop- Nolet
Sandia 2014 Wind Turbine Blade Workshop- NoletSandia 2014 Wind Turbine Blade Workshop- Nolet
Sandia 2014 Wind Turbine Blade Workshop- Nolet
Sandia National Laboratories: Energy & Climate: Renewables
 
2010 Longwall conference slides
2010 Longwall conference slides2010 Longwall conference slides
2010 Longwall conference slides
John Coughlan
 
2.Improvement of plant MTBF by reducing repeating failure - 23.05.2023.pptx
2.Improvement of plant MTBF by reducing repeating failure - 23.05.2023.pptx2.Improvement of plant MTBF by reducing repeating failure - 23.05.2023.pptx
2.Improvement of plant MTBF by reducing repeating failure - 23.05.2023.pptx
MangalGhosh
 
Offshore Rig Productivity using AFT Xtegra Manifold Curtain Containment System
Offshore Rig Productivity using AFT Xtegra Manifold Curtain Containment SystemOffshore Rig Productivity using AFT Xtegra Manifold Curtain Containment System
Offshore Rig Productivity using AFT Xtegra Manifold Curtain Containment System
Jay Nowlin
 
10-3 Term Paper Submission QSO-680 Seminar in.docx
10-3 Term Paper Submission                    QSO-680 Seminar in.docx10-3 Term Paper Submission                    QSO-680 Seminar in.docx
10-3 Term Paper Submission QSO-680 Seminar in.docx
hyacinthshackley2629
 
Presentation (1) (1)
Presentation (1) (1)Presentation (1) (1)
Presentation (1) (1)
Joseph Johnson
 

Similar to UMHW Hold Downs (9)

RME-085_TQM Unit-4 Part 3
RME-085_TQM Unit-4  Part 3RME-085_TQM Unit-4  Part 3
RME-085_TQM Unit-4 Part 3
 
Plant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptxPlant Sustainability and Relaibility.pptx
Plant Sustainability and Relaibility.pptx
 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
 
Sandia 2014 Wind Turbine Blade Workshop- Nolet
Sandia 2014 Wind Turbine Blade Workshop- NoletSandia 2014 Wind Turbine Blade Workshop- Nolet
Sandia 2014 Wind Turbine Blade Workshop- Nolet
 
2010 Longwall conference slides
2010 Longwall conference slides2010 Longwall conference slides
2010 Longwall conference slides
 
2.Improvement of plant MTBF by reducing repeating failure - 23.05.2023.pptx
2.Improvement of plant MTBF by reducing repeating failure - 23.05.2023.pptx2.Improvement of plant MTBF by reducing repeating failure - 23.05.2023.pptx
2.Improvement of plant MTBF by reducing repeating failure - 23.05.2023.pptx
 
Offshore Rig Productivity using AFT Xtegra Manifold Curtain Containment System
Offshore Rig Productivity using AFT Xtegra Manifold Curtain Containment SystemOffshore Rig Productivity using AFT Xtegra Manifold Curtain Containment System
Offshore Rig Productivity using AFT Xtegra Manifold Curtain Containment System
 
10-3 Term Paper Submission QSO-680 Seminar in.docx
10-3 Term Paper Submission                    QSO-680 Seminar in.docx10-3 Term Paper Submission                    QSO-680 Seminar in.docx
10-3 Term Paper Submission QSO-680 Seminar in.docx
 
Presentation (1) (1)
Presentation (1) (1)Presentation (1) (1)
Presentation (1) (1)
 

UMHW Hold Downs

  • 1. 1 Pineland Stud Planer UHMW Hold-Downs Michael Ford, Process Engineer Issue: There isa continual issue withboardsskewingafter beingdippedandfallingbackintothe diptank at the stud planer.(Ref:Photo#1) Throughobservation,thisoccurs because the boardisnotable to stay inthe lugproperlyupthe tipple incline. Thisissue createsconsiderable downtimeasthe operatorhas to stopthe productionline,use apike pole andpositionthe boardbackintoitscorrect lug. Observeddowntime for Weeks30-33 resultingfromthis issue:  Week30 - 55 mins. (July19-25, 2015)  Week31 - 71 mins. (July26-August1,2015)  Week32 - 50 mins. (August2-8,2015)  Week33 - 73 mins. (August9-15, 2015) Proposal: Finda solution thatwouldpreventlumberfromskewingandfallingbackintothe diptank, resultingin asignificantdecreaseorend downtime relativetothisissue atthe diptank. Plan of Action: The projectinvolvedhoursof studyingthe processandissuesthatoperatorshadtocorrect on a dailybasis. I createda specificdesign thatpositonseachboardintoalug andtransfersit ontothe out feed chainswithoutthe lumberskewingandcausingdowntime. Theyare referredtoashold-downs. The total projectcostwas roughly$50. The hold-downswere installedunderthe magentaholdingtankFriday, August14,2015 at the endof shift. (Ref:Photo#2) Conclusion: The hold-downswere installedonAugust14,2015. Since implementation tothe studplanerprocess, there hasbeenzerotime lostat the diptank. The hold-downshave yieldedanimprovedstud planer processand increase tototal production. Observeddowntime forWeek34:  Week34 – 0 mins.(August16 -22, 2015)
  • 2. 2 Observationof studplanergradersRodneyAdamsandEdwardDavenport: Note observation done on 2x4x8 (92 5/8)  Before the hold-downswere installedRodneywasable tograde 14 loadsan hourand Edward was able tograde 16 loadsan hour.Since implementationof the hold-downs,Rodneyhas increasedhisloadsanhourby 3 and Edwardby 4. o Rodney- (+4,815Bf) increase o Edward- (+6,420Bf) increase o 1LOAD/208 pcs/1,605.50 Bf= $371.63 The dip tankat the stud planerwasopportunityforme to create long-termvalue tothe stud line. Hold-downsinstalledatthe studplanersavesthe companymoneysignificantly byeliminatingall downtime atthe dip tank relative tothe aforementionedissue. Hold-downsinstalledatthe studplanereliminate the needof the companytospendfundson differentmachinerytoimprove the processandincrease total production.