GLOBAL FORCE GLOBAL ACCEPTANCE
• TESTING • INSPECTION • CERTIFICATION • AUDITING •
• VALIDATION • TRAINING • ADVISORY • RESEARCH •
3
By The Numbers
UL Consumer Technology Division
2G/3G/4G
Regulatory
Approvals
Bluetooth
Qualifications
Ultra-
Wide Band
(UWB)
Wireless USB
Wi-Fi Alliance
Qualifications
Global
Market
Access
(GMA)
Smart Grid
NFC
&
RFID OTA
Antenna
Performance60GHz
Wireless HD
Notified
Body
Approvals
Wireless
Charging
IOT &
Interoperability
EMC and RF
Testing &
Certification
Wireless/EMC – Chambers
9 x 3m Chambers
5 x 5m Chambers
2 x10m Chambers
Wireless Conformance for 2G 3G 4G
• Global Certification Forum (GCF)
• PTCRB member since 2002
• CTIA – The Wireless Association
• CTIA Authorised Test Lab
• OTA performance, Converged Device, HAC
6
Bluetooth Qualification and Compliance
• UL labs are accredited to offer the complete
Bluetooth® Qualification Package – RF,
Protocol and Profile to all
Bluetooth standards.
• We have over a decade of experience in
Bluetooth compliance and are an accredited
member of the Bluetooth Special Interest
Group (SIG),
• Qualification is required for any product using
Bluetooth wireless technology and displaying
the Bluetooth trademark.
• We can guide our customers through every
step of the conformance and certification
process.
7
Wireless – RF Exposure (SAR)
SPEAG cSAR 3D Fast SAR System
13 - SPEAG Daisy 5 Systems
Wireless – Antenna Performance (OTA)
9
Theta Arm Antenna
Multi-Axis Positioner (MAPS)
Antenna Performance MIMO
• Antenna Pattern
Measurements
• Overall Performance
Measurement on
End Products
60GHz Wireless HD
Wi-Fi Alliance
• The only lab that can do testing to 60GHz
Wireless HD requirements today
• For WiFi Alliance we can currently offer the
following qualified programs:
– 11n (includes a, b, g)
– 11ac
– PMF
– Wi-Fi Direct [P2P]
– Miracast
– WPS2
– WMMPS
Solar Panels
Smart Grid to Smart Meters to Smart Appliances
White House Green Button Initiative
• UL is sole Test & Certification Body
participating in development of the UCA
(Utilities Communications Architecture)
Certification Program
Consortium for Smart Energy Profile (CSEP)
• UL is actively involved in the
development of the Test & Certification
program for CSEP
Smart Energy
Wireless Charging & Fast Charging
Wireless Charging
• PMA (Power Matters Alliance)
- UL is the Lead Test Lab – UL USA, UL
Taiwan
- Magnetic Inductance – 200-350kHz
• Qi (Wireless Power Consortium)
- UL Japan
- Magnetic Inductance – 100-205kHz
Fast Charging
Qualcomm Quick Charge 3.0
• Designed to interoperate with existing
USB charging solutions
• Enabled device must be paired with a
Quick Charge 2.0 certified adapter
• UL FRE provides testing and
certification laboratory services
• Adapters displaying the Quick Charge
icon indicate the accessory has passed
the certification process.
Near Field Communications - NFC
• Fully accredited test lab for NFC forum
testing and certification
– Can provide testing to all available test cases
– Can conduct EMVCo payment security testing
• Can conduct secure contactless Two-
Way Communications between
Devices
• Active in NFC Committees
• Co-Chairmanship of Plug Fest
Committee
UL’s Incubation and Innovation
Support Services for the
Internet of Things - IOT
15
Internet of Things
Source: http://www.libelium.com
Internet of Things – 5 Primary Market Focus Areas
16
Internet of Things – UL Involvement
Smart Interconnected Living
• UL is actively engaged with such organizations as
mentioned earlier like:
 The Wi-Fi Alliance
 The Wireless Broadband Alliance
 Bluetooth SiG
 NFC Forum
 Zigbee Alliance
 Thread Group
 GCF
 GSMA
As these are fundamental enabling communications
protocols for the IoT 17
Internet of Things – Industry Focus
Mobile Devices
- Cellular
- WiFi
- BT
- NFC
- GPS
18
19
Internet of Things – Mobile Devices
Internet of Things – Industry Focus
Smart Buildings & Smart Homes
• Working with organizations such as Google’s Thread Group,
in the development of test and certification programs for
interoperability of enabled devices in homes and
commercial buildings.
20
Internet of Things – Industry Focus
Wearable Technology
http://www.thesocialstandard.net/business/wearable-technology-fad-or-the-future/
• 20M units shipped in 2014
• Expected 112M by 2018
22
Internet of Things – Wearable Technology
Internet of Things – Industry Focus
Smart Health
• Assisting in development
of wireless medical
devices
• For use is home health
• Hospitals
• Remote monitoring
• Self health monitoring
• Products that are
evolving wearable
wireless devices
24
Internet of Things – Industry Focus
Smart Transport
• UL currently working with
automotive industry associations
and manufacturers on the
development of communication
test and certification programs
for:
• V2D (Vehicle to Device)
• V2V (Vehicle to Vehicle)
• V2I (Vehicle to Infrastructure
25
Internet of Things – Industry Focus
Automotive Vehicle Development
26
Vehicle to Device Communications
• OEM and Telecom support/testing
• Enhancing connectivity and performance
Vehicle to Vehicle Communications
• Dedicated Short Range Communication (DSRC)
• Improving Safety between Vehicles and Drivers
Vehicle to Infrastructure Communications
• Tracking and Managing Vehicles
• Protecting goods, vehicles, and passengers
Automotive Testing – UL DTW
Only Third Party EMC lab in Metro Detroit recognized by
GM, Ford and Chrysler – among others
Automotive OEM Standards Tested in 2013
Honda Ford Chrysler GM
Nissan VW/Audi Toyota BMW
Volvo Fiat Mercedes Hyundai/Kia
Scania Daimler Peugeot Mitsubishi
Renault Porsche Jaguar/Land Rover Mazda
Other EMC/Electrical Standards
GMW 3172 MIL STD 461F ECE Reg.10.04
Freightliner PACCAR John Deere
SAE/ISO/IEC/JASO Cummins
UL Labs are A2LA ISO 17025 Accredited
27
Interoperability
The National Analysis Center
(NAC) Acquisition
July 01, 2015
Philosophy
• Products are tested as part
of a complete system
– The way customers really use
them
• Our goal is to identify
customer affecting
problems before products
are released
– Testing is not run with
‘blinders on’
Confidential 29
Test lab focused on
interoperability and
compatibility testing
Flexible test procedures which
are improved with lessons
learned
Passionate about finding
customer affecting problems
• Closed feedback loop to integrate
customer complaints
A regulatory and/or
compliance test house e.g.
FCC, GCF, SAR
Restricted by industry standard
test plans and testing
committees
Indifferent to product reviews,
performance, sales and
success
What NAC is… What NAC
is not…
Confide
ntial
30
Service Lines & Industry Sectors Summary
Services
Benchmarking (Futuremark)
Chemical Testing
EMC
Energy Efficiency*
Global Market Access*
Performance Testing*
Product Inspection & Factory
Audits
Product Safety Testing &
Certification
Regulatory
Reliability
Wireless & Interoperability*
Light and Laser Safety*
Industry Sectors
Automotive*
Batteries*
Consumer Electronics
(Mobile products)*
Hi-Tech Components
Home Automation*
IOT, M2M*
IT Equipment
PCB’s (PWB’s)
Power Supplies
Smart Home, Smart Grid,
Smart Technologies*
Telecommunications
Wearables*
• Significant recent focus / investment 31
Global Market Access
August 2015
Introduction
Navigating the regulatory landscape of global
markets is a complex and challenging task.
UL can handle your global market access needs
to reach your destination smoothly.
34
35
Very competitive
market…
I need to reduce my
costs…
Time to market is
key…
I need speed…
This whole thing is so
complicated…I need
simplicity…
So many changing
regulations…
I need the latest
requirements…
What Customers Want
Why Use UL for Global Market Access?
• North America project management team – dedicated PM
• Approx. 120 Global staff located in over 19 countries
• Dedicated team for research and regulatory knowledge management
• GMA's knowledgeable experts
‒ Strive to understand our customers’ products, needs and priorities
at the earliest opportunity
‒ Work with customers and delivery alternatives to find the best
cost-effective compliance option to meet their needs
‒ Guide customers through each country process every step of the
way and provide accurate project status updates
36
Planning Your GMA Approach Is Key
37
Have a clear plan on when and where you are going to
market the product!
Define the Order of approval requirements.
Think about the wider approvals requirements and possible
acceptance of existing approvals documentation.
Do you need Local Representation?
Make sure the samples are configured correctly!
Ensure the documentation is correct!
Get the application form right!
Understand the rules for importation of products for approval
and customs clearance.
So What's So Difficult About GMA?
38
39
Certification v’s Qualification
Our Top Countries!
No. of new certs Q1 – Q3 2013 (Jan-Sep): over 3500!
Our Top Countries include:
South America:
Argentina, Brazil, Chile, Mexico, Peru, Venezuela,
Asia:
China, India, Indonesia, Japan, Korea, Malaysia, Philippines, Singapore, Taiwan,
Thailand, Vietnam
Middle East:
Bahrain, Israel, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, United Arab
Emirates,
Africa:
Egypt, Kenya, Lesotho, Morocco, Nigeria, South Africa
40
What you need to prepare
Samples: Typically 1 - 5 samples will be required
• Will they just be doing a visual inspection, or full RF Testing?
• RF Testing will usually want:
• Transmit and Receive on Static Channels (Top, Middle, Bottom)
• Control modulation (e.g. CW or >98% duty cycle with modulation)
• Transmit using all modes/data rates the device supports (EDR/Basic Rate)
Documents:
• R&TTE / FCC Test Reports (Must be accredited for some countries)
• Technical Specification
• User Guide (English + Local language)
• Label Artwork and Position
• Internal & External Photos
• PCB Artwork (Track Layout)
• Schematic Diagram
• BoM (Bill of Materials)
41
Modular Approvals For Wireless Products
The Following may consider modular approvals:
42
Albania
Algeria
Anguilla
Antigua and Barbuda
Argentina
Armenia
Aruba
Bahrain
Barbados
Belize
Benin
Bermuda
Bolivia
Botswana
Brazil
British Virgin Islands
Burkina Faso
Cameroon (data only)
Cape Verde
Central African Republic
Chad
Chile
Colombia (Data Only)
Costa Rica
Cote D'Ivoire Ivory Coast
Curacao
Dominica
Dominican Rep.
East Timor (Timor Leste)
Ecuador (data only)
Egypt
El Salvador
Ethiopia
Fiji
French Polynesia/Tahiti
Ghana
Grenada
Guinea Bissau
Guinea Conakry
Guyana
Haiti
Honduras
Hong Kong
Israel
Jamaica
Jordan
Kenya
Kiribati
Korea
Lesotho
Liberia
Malawi
Maldives
Mali
Mauritania
Mexico
Moldova
Montserrat
Morocco
Nepal
Nicaragua
Niger
Panama
Papua New Guinea
Paraguay
Peru
Philippines
Rwanda
Saint Kitts&Nevis
Saint Lucia
Saint Vincent&Grenadines
Samoa, Independent state of
Senegal
Serbia
Seychelles
Saba, Bonaire, St. Eustaius
Sint Maarten
Suriname
Swaziland
Taiwan
Togo
Trinidad and Tobago
Tunisia
Turks & Caicos
Venezuela
Total: 88
43
The Two Main Approaches
to
Market Access
How do we operate? – Initial Interaction
RFQ
Detailed Product
Review and
Country
Prioritization
Comprehensive
Quotation
Project
Opened, PM
Assigned
44
How do we operate? – Project Handling
45
• Dedicated PM assigned
• PM re-confirm project
information, country
priorities, and deadlines
with customer
• Country assignments
distributed across UL team
Project
Initiation
• PM defines and works with
customer to gather all
required documentation
• PM distributes
documentation to country
handlers
• PM provides customer with
project updates, weekly as a
minimum!
Ongoing
Project •As each country certification is
issued, you will be immediately
notified.
•The invoice will then be issued for
the completion of that country
•Once the final country certification
is issued and the project is
complete, the PM will schedule an
overall project review meeting with
the customer to discuss what went
well and any opportunities for
improvement that will be
implemented.
Project
Conclusion
Global Market Access
Integrated solutions for safety, EMC, wireless and energy efficiency compliance
46
UL can handle testing, issue certifications
and obtain approvals for customers’ target markets
http://www.ul-certification.com/
Marks & Safety Certificates Issued by UL
Latin America
Argentina: UL-AR S Mark
Brazil: UL-BR INMETRO Mark,
ANATEL CoC
Mexico: UL-MX NOM Mark
(safety, wireless and Energy
Efficiency) and UL-MX
Certificate of Compliance
Europe
Denmark: D Mark
Germany: UL-GS Mark
Europe: ENEC and UL-EU Mark
Europe: Notified Body for EMC &
R&TTE Directives
Asia
Australia/New Zealand: Certificate of Approval or Compliance
Japan: PSE Mark, UL-JP S Mark, MIC Type Approval
Singapore: Certificate of Conformity
The Approvals Certificate
48
49
Product Labelling
Test Report Recognition
• Test report recognition is often derived from Certification Schemes
or Mutual Recognition Agreements (MRAs) between country
governments
• Certification Schemes
• CB Scheme
• Several key MRAs are in place between the US and other countries
for wireless devices
o EU, Australia/New Zealand, Hong Kong, Korea, Japan, Singapore, Taiwan and
Vietnam
o Other key MRAs that afford report recognition such as ILAC agreement
o Broad recognition of EU/US test reports in emerging countries - geographic
50

UL Consumer Technology

  • 1.
  • 2.
    our mission driveseverything we do… working for a safer world since 1894 2
  • 3.
    GLOBAL FORCE GLOBALACCEPTANCE • TESTING • INSPECTION • CERTIFICATION • AUDITING • • VALIDATION • TRAINING • ADVISORY • RESEARCH • 3 By The Numbers
  • 4.
    UL Consumer TechnologyDivision 2G/3G/4G Regulatory Approvals Bluetooth Qualifications Ultra- Wide Band (UWB) Wireless USB Wi-Fi Alliance Qualifications Global Market Access (GMA) Smart Grid NFC & RFID OTA Antenna Performance60GHz Wireless HD Notified Body Approvals Wireless Charging IOT & Interoperability EMC and RF Testing & Certification
  • 5.
    Wireless/EMC – Chambers 9x 3m Chambers 5 x 5m Chambers 2 x10m Chambers
  • 6.
    Wireless Conformance for2G 3G 4G • Global Certification Forum (GCF) • PTCRB member since 2002 • CTIA – The Wireless Association • CTIA Authorised Test Lab • OTA performance, Converged Device, HAC 6
  • 7.
    Bluetooth Qualification andCompliance • UL labs are accredited to offer the complete Bluetooth® Qualification Package – RF, Protocol and Profile to all Bluetooth standards. • We have over a decade of experience in Bluetooth compliance and are an accredited member of the Bluetooth Special Interest Group (SIG), • Qualification is required for any product using Bluetooth wireless technology and displaying the Bluetooth trademark. • We can guide our customers through every step of the conformance and certification process. 7
  • 8.
    Wireless – RFExposure (SAR) SPEAG cSAR 3D Fast SAR System 13 - SPEAG Daisy 5 Systems
  • 9.
    Wireless – AntennaPerformance (OTA) 9 Theta Arm Antenna Multi-Axis Positioner (MAPS) Antenna Performance MIMO • Antenna Pattern Measurements • Overall Performance Measurement on End Products
  • 10.
    60GHz Wireless HD Wi-FiAlliance • The only lab that can do testing to 60GHz Wireless HD requirements today • For WiFi Alliance we can currently offer the following qualified programs: – 11n (includes a, b, g) – 11ac – PMF – Wi-Fi Direct [P2P] – Miracast – WPS2 – WMMPS
  • 11.
    Solar Panels Smart Gridto Smart Meters to Smart Appliances White House Green Button Initiative • UL is sole Test & Certification Body participating in development of the UCA (Utilities Communications Architecture) Certification Program Consortium for Smart Energy Profile (CSEP) • UL is actively involved in the development of the Test & Certification program for CSEP Smart Energy
  • 12.
    Wireless Charging &Fast Charging Wireless Charging • PMA (Power Matters Alliance) - UL is the Lead Test Lab – UL USA, UL Taiwan - Magnetic Inductance – 200-350kHz • Qi (Wireless Power Consortium) - UL Japan - Magnetic Inductance – 100-205kHz Fast Charging Qualcomm Quick Charge 3.0 • Designed to interoperate with existing USB charging solutions • Enabled device must be paired with a Quick Charge 2.0 certified adapter • UL FRE provides testing and certification laboratory services • Adapters displaying the Quick Charge icon indicate the accessory has passed the certification process.
  • 13.
    Near Field Communications- NFC • Fully accredited test lab for NFC forum testing and certification – Can provide testing to all available test cases – Can conduct EMVCo payment security testing • Can conduct secure contactless Two- Way Communications between Devices • Active in NFC Committees • Co-Chairmanship of Plug Fest Committee
  • 14.
    UL’s Incubation andInnovation Support Services for the Internet of Things - IOT
  • 15.
    15 Internet of Things Source:http://www.libelium.com
  • 16.
    Internet of Things– 5 Primary Market Focus Areas 16
  • 17.
    Internet of Things– UL Involvement Smart Interconnected Living • UL is actively engaged with such organizations as mentioned earlier like:  The Wi-Fi Alliance  The Wireless Broadband Alliance  Bluetooth SiG  NFC Forum  Zigbee Alliance  Thread Group  GCF  GSMA As these are fundamental enabling communications protocols for the IoT 17
  • 18.
    Internet of Things– Industry Focus Mobile Devices - Cellular - WiFi - BT - NFC - GPS 18
  • 19.
    19 Internet of Things– Mobile Devices
  • 20.
    Internet of Things– Industry Focus Smart Buildings & Smart Homes • Working with organizations such as Google’s Thread Group, in the development of test and certification programs for interoperability of enabled devices in homes and commercial buildings. 20
  • 21.
    Internet of Things– Industry Focus Wearable Technology http://www.thesocialstandard.net/business/wearable-technology-fad-or-the-future/ • 20M units shipped in 2014 • Expected 112M by 2018
  • 22.
  • 23.
    Internet of Things– Wearable Technology
  • 24.
    Internet of Things– Industry Focus Smart Health • Assisting in development of wireless medical devices • For use is home health • Hospitals • Remote monitoring • Self health monitoring • Products that are evolving wearable wireless devices 24
  • 25.
    Internet of Things– Industry Focus Smart Transport • UL currently working with automotive industry associations and manufacturers on the development of communication test and certification programs for: • V2D (Vehicle to Device) • V2V (Vehicle to Vehicle) • V2I (Vehicle to Infrastructure 25
  • 26.
    Internet of Things– Industry Focus Automotive Vehicle Development 26 Vehicle to Device Communications • OEM and Telecom support/testing • Enhancing connectivity and performance Vehicle to Vehicle Communications • Dedicated Short Range Communication (DSRC) • Improving Safety between Vehicles and Drivers Vehicle to Infrastructure Communications • Tracking and Managing Vehicles • Protecting goods, vehicles, and passengers
  • 27.
    Automotive Testing –UL DTW Only Third Party EMC lab in Metro Detroit recognized by GM, Ford and Chrysler – among others Automotive OEM Standards Tested in 2013 Honda Ford Chrysler GM Nissan VW/Audi Toyota BMW Volvo Fiat Mercedes Hyundai/Kia Scania Daimler Peugeot Mitsubishi Renault Porsche Jaguar/Land Rover Mazda Other EMC/Electrical Standards GMW 3172 MIL STD 461F ECE Reg.10.04 Freightliner PACCAR John Deere SAE/ISO/IEC/JASO Cummins UL Labs are A2LA ISO 17025 Accredited 27
  • 28.
    Interoperability The National AnalysisCenter (NAC) Acquisition July 01, 2015
  • 29.
    Philosophy • Products aretested as part of a complete system – The way customers really use them • Our goal is to identify customer affecting problems before products are released – Testing is not run with ‘blinders on’ Confidential 29
  • 30.
    Test lab focusedon interoperability and compatibility testing Flexible test procedures which are improved with lessons learned Passionate about finding customer affecting problems • Closed feedback loop to integrate customer complaints A regulatory and/or compliance test house e.g. FCC, GCF, SAR Restricted by industry standard test plans and testing committees Indifferent to product reviews, performance, sales and success What NAC is… What NAC is not… Confide ntial 30
  • 31.
    Service Lines &Industry Sectors Summary Services Benchmarking (Futuremark) Chemical Testing EMC Energy Efficiency* Global Market Access* Performance Testing* Product Inspection & Factory Audits Product Safety Testing & Certification Regulatory Reliability Wireless & Interoperability* Light and Laser Safety* Industry Sectors Automotive* Batteries* Consumer Electronics (Mobile products)* Hi-Tech Components Home Automation* IOT, M2M* IT Equipment PCB’s (PWB’s) Power Supplies Smart Home, Smart Grid, Smart Technologies* Telecommunications Wearables* • Significant recent focus / investment 31
  • 32.
  • 33.
    Introduction Navigating the regulatorylandscape of global markets is a complex and challenging task. UL can handle your global market access needs to reach your destination smoothly. 34
  • 34.
    35 Very competitive market… I needto reduce my costs… Time to market is key… I need speed… This whole thing is so complicated…I need simplicity… So many changing regulations… I need the latest requirements… What Customers Want
  • 35.
    Why Use ULfor Global Market Access? • North America project management team – dedicated PM • Approx. 120 Global staff located in over 19 countries • Dedicated team for research and regulatory knowledge management • GMA's knowledgeable experts ‒ Strive to understand our customers’ products, needs and priorities at the earliest opportunity ‒ Work with customers and delivery alternatives to find the best cost-effective compliance option to meet their needs ‒ Guide customers through each country process every step of the way and provide accurate project status updates 36
  • 36.
    Planning Your GMAApproach Is Key 37 Have a clear plan on when and where you are going to market the product! Define the Order of approval requirements. Think about the wider approvals requirements and possible acceptance of existing approvals documentation. Do you need Local Representation? Make sure the samples are configured correctly! Ensure the documentation is correct! Get the application form right! Understand the rules for importation of products for approval and customs clearance.
  • 37.
    So What's SoDifficult About GMA? 38
  • 38.
  • 39.
    Our Top Countries! No.of new certs Q1 – Q3 2013 (Jan-Sep): over 3500! Our Top Countries include: South America: Argentina, Brazil, Chile, Mexico, Peru, Venezuela, Asia: China, India, Indonesia, Japan, Korea, Malaysia, Philippines, Singapore, Taiwan, Thailand, Vietnam Middle East: Bahrain, Israel, Jordan, Kuwait, Lebanon, Oman, Qatar, Saudi Arabia, United Arab Emirates, Africa: Egypt, Kenya, Lesotho, Morocco, Nigeria, South Africa 40
  • 40.
    What you needto prepare Samples: Typically 1 - 5 samples will be required • Will they just be doing a visual inspection, or full RF Testing? • RF Testing will usually want: • Transmit and Receive on Static Channels (Top, Middle, Bottom) • Control modulation (e.g. CW or >98% duty cycle with modulation) • Transmit using all modes/data rates the device supports (EDR/Basic Rate) Documents: • R&TTE / FCC Test Reports (Must be accredited for some countries) • Technical Specification • User Guide (English + Local language) • Label Artwork and Position • Internal & External Photos • PCB Artwork (Track Layout) • Schematic Diagram • BoM (Bill of Materials) 41
  • 41.
    Modular Approvals ForWireless Products The Following may consider modular approvals: 42 Albania Algeria Anguilla Antigua and Barbuda Argentina Armenia Aruba Bahrain Barbados Belize Benin Bermuda Bolivia Botswana Brazil British Virgin Islands Burkina Faso Cameroon (data only) Cape Verde Central African Republic Chad Chile Colombia (Data Only) Costa Rica Cote D'Ivoire Ivory Coast Curacao Dominica Dominican Rep. East Timor (Timor Leste) Ecuador (data only) Egypt El Salvador Ethiopia Fiji French Polynesia/Tahiti Ghana Grenada Guinea Bissau Guinea Conakry Guyana Haiti Honduras Hong Kong Israel Jamaica Jordan Kenya Kiribati Korea Lesotho Liberia Malawi Maldives Mali Mauritania Mexico Moldova Montserrat Morocco Nepal Nicaragua Niger Panama Papua New Guinea Paraguay Peru Philippines Rwanda Saint Kitts&Nevis Saint Lucia Saint Vincent&Grenadines Samoa, Independent state of Senegal Serbia Seychelles Saba, Bonaire, St. Eustaius Sint Maarten Suriname Swaziland Taiwan Togo Trinidad and Tobago Tunisia Turks & Caicos Venezuela Total: 88
  • 42.
    43 The Two MainApproaches to Market Access
  • 43.
    How do weoperate? – Initial Interaction RFQ Detailed Product Review and Country Prioritization Comprehensive Quotation Project Opened, PM Assigned 44
  • 44.
    How do weoperate? – Project Handling 45 • Dedicated PM assigned • PM re-confirm project information, country priorities, and deadlines with customer • Country assignments distributed across UL team Project Initiation • PM defines and works with customer to gather all required documentation • PM distributes documentation to country handlers • PM provides customer with project updates, weekly as a minimum! Ongoing Project •As each country certification is issued, you will be immediately notified. •The invoice will then be issued for the completion of that country •Once the final country certification is issued and the project is complete, the PM will schedule an overall project review meeting with the customer to discuss what went well and any opportunities for improvement that will be implemented. Project Conclusion
  • 45.
    Global Market Access Integratedsolutions for safety, EMC, wireless and energy efficiency compliance 46 UL can handle testing, issue certifications and obtain approvals for customers’ target markets http://www.ul-certification.com/
  • 46.
    Marks & SafetyCertificates Issued by UL Latin America Argentina: UL-AR S Mark Brazil: UL-BR INMETRO Mark, ANATEL CoC Mexico: UL-MX NOM Mark (safety, wireless and Energy Efficiency) and UL-MX Certificate of Compliance Europe Denmark: D Mark Germany: UL-GS Mark Europe: ENEC and UL-EU Mark Europe: Notified Body for EMC & R&TTE Directives Asia Australia/New Zealand: Certificate of Approval or Compliance Japan: PSE Mark, UL-JP S Mark, MIC Type Approval Singapore: Certificate of Conformity
  • 47.
  • 48.
  • 49.
    Test Report Recognition •Test report recognition is often derived from Certification Schemes or Mutual Recognition Agreements (MRAs) between country governments • Certification Schemes • CB Scheme • Several key MRAs are in place between the US and other countries for wireless devices o EU, Australia/New Zealand, Hong Kong, Korea, Japan, Singapore, Taiwan and Vietnam o Other key MRAs that afford report recognition such as ILAC agreement o Broad recognition of EU/US test reports in emerging countries - geographic 50