The document summarizes modifications made to TPH Series II Hubs based on customer feedback. All internal piping was changed from plastic to welded copper and brass fittings for increased durability. The rear air line fitting was changed to allow the front wheel to remain on during installation. The modifications allow each hub to be fitted within 10 minutes for improved efficiency.