This Training include several parts of Oil & Gas Engineering:
Petroleum Geology
Process Presentation
Utilities in an Oil & Gas Field
Process Engineering
Safety Engineering
Mechanical Engineering
Civil Engineering
Control & Instrumentation Engineering
Electrical Engineering
Design Engineering - 3D Model
Field Engineering
Commissioning & Startup
For more détails, please contact: Ramzi Fathallah
https://www.linkedin.com/in/ramzi-fathallah-a3762b85?trk=nav_responsive_tab_profile
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESpetroEDGE
This 4 day (separately bookable) intensive training course will cover the details of drilling rigs and how they operate, especially for deepwater activities. Current drilling rigs are highly automated and efficient. These advances will be illustrated with animations and videos. The relationship between drilling and production will be explored with examples of current field developments
This Training include several parts of Oil & Gas Engineering:
Petroleum Geology
Process Presentation
Utilities in an Oil & Gas Field
Process Engineering
Safety Engineering
Mechanical Engineering
Civil Engineering
Control & Instrumentation Engineering
Electrical Engineering
Design Engineering - 3D Model
Field Engineering
Commissioning & Startup
For more détails, please contact: Ramzi Fathallah
https://www.linkedin.com/in/ramzi-fathallah-a3762b85?trk=nav_responsive_tab_profile
INTRODUCTION TO OFFSHORE DRILLING AND PRODUCTION FACILITIESpetroEDGE
This 4 day (separately bookable) intensive training course will cover the details of drilling rigs and how they operate, especially for deepwater activities. Current drilling rigs are highly automated and efficient. These advances will be illustrated with animations and videos. The relationship between drilling and production will be explored with examples of current field developments
Robotic surgery is a type of minimally invasive surgery. “Minimally invasive” means that instead of operating on patients through large incisions, we use miniaturized surgical instruments that fit through a series of quarter-inch incisions.
Presentation on Industrial Internship | Internship Presentation BSc in Textil...Md Rakibul Hassan
Internship Presentation at STANDARD GROUP. Industrial Internship at Standard Group. Green University of Bangladesh. Internee Presentation on Internee / Project Work. Internee Presentation | Internship Presentation | Internship Presentation BSc in Textile
Presentation on Internship Department of Textile Engineering Green University of Bangladesh.
By
Md Rakibul Hassan
Green University of Bangladesh
Email: therealrakib@gmail.com
Social: www.facebook.com/rakibpwf | www.linkedin.com/in/mdrakibulhassan/
This is a report on ERP implementation in INDIAN OIL CORPORATION LTD.
This report was made for a class assignment and submitted to Prof. C.K. Mani ,(Faculty: XLRI Jamsedhpur)(Supply Chain Management & Logistics)
Top 10 Construction Projects Under Construction in Atlanta PlanGrid
Which upcoming Atlanta construction projects are getting the most buzz? Flip through our SlideShare to find out more about 10 of the most exciting projects under construction in Atlanta right now.
16 of the Most Iconic College Campus BuildingsPlanGrid
Campus architecture not only enhances student experience but also provides a memorable first impression among students, parents and the community at large. To showcase some of the most incredible feats of higher education construction, we’ve compiled our list of most iconic university building
Top 10 U.S. Cities with the Fastest Construction Growth in 2018PlanGrid
Here are the US cities that will experience the most construction growth in 2018. These stats are primarily based off of findings from the "2018 North American Construction Forecast Report.” The report can be found here: https://bit.ly/2JVMiy3
Did your city make the list?
Robotic surgery is a type of minimally invasive surgery. “Minimally invasive” means that instead of operating on patients through large incisions, we use miniaturized surgical instruments that fit through a series of quarter-inch incisions.
Presentation on Industrial Internship | Internship Presentation BSc in Textil...Md Rakibul Hassan
Internship Presentation at STANDARD GROUP. Industrial Internship at Standard Group. Green University of Bangladesh. Internee Presentation on Internee / Project Work. Internee Presentation | Internship Presentation | Internship Presentation BSc in Textile
Presentation on Internship Department of Textile Engineering Green University of Bangladesh.
By
Md Rakibul Hassan
Green University of Bangladesh
Email: therealrakib@gmail.com
Social: www.facebook.com/rakibpwf | www.linkedin.com/in/mdrakibulhassan/
This is a report on ERP implementation in INDIAN OIL CORPORATION LTD.
This report was made for a class assignment and submitted to Prof. C.K. Mani ,(Faculty: XLRI Jamsedhpur)(Supply Chain Management & Logistics)
Top 10 Construction Projects Under Construction in Atlanta PlanGrid
Which upcoming Atlanta construction projects are getting the most buzz? Flip through our SlideShare to find out more about 10 of the most exciting projects under construction in Atlanta right now.
16 of the Most Iconic College Campus BuildingsPlanGrid
Campus architecture not only enhances student experience but also provides a memorable first impression among students, parents and the community at large. To showcase some of the most incredible feats of higher education construction, we’ve compiled our list of most iconic university building
Top 10 U.S. Cities with the Fastest Construction Growth in 2018PlanGrid
Here are the US cities that will experience the most construction growth in 2018. These stats are primarily based off of findings from the "2018 North American Construction Forecast Report.” The report can be found here: https://bit.ly/2JVMiy3
Did your city make the list?
15 of the Largest Megaprojects Still Under ConstructionPlanGrid
Construction needs are growing around the world and so is the size of projects. Here are some of the largest and most expensive megaprojects around the world still being built.
List of the top 10 construction companies primarily based off of rankings from ENR top international contractors https://www.enr.com/toplists/2017-Top-250-International-Contractors-1
Affordable Stationery Printing Services in Jaipur | Navpack n PrintNavpack & Print
Looking for professional printing services in Jaipur? Navpack n Print offers high-quality and affordable stationery printing for all your business needs. Stand out with custom stationery designs and fast turnaround times. Contact us today for a quote!
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
As a business owner in Delaware, staying on top of your tax obligations is paramount, especially with the annual deadline for Delaware Franchise Tax looming on March 1. One such obligation is the annual Delaware Franchise Tax, which serves as a crucial requirement for maintaining your company’s legal standing within the state. While the prospect of handling tax matters may seem daunting, rest assured that the process can be straightforward with the right guidance. In this comprehensive guide, we’ll walk you through the steps of filing your Delaware Franchise Tax and provide insights to help you navigate the process effectively.
Improving profitability for small businessBen Wann
In this comprehensive presentation, we will explore strategies and practical tips for enhancing profitability in small businesses. Tailored to meet the unique challenges faced by small enterprises, this session covers various aspects that directly impact the bottom line. Attendees will learn how to optimize operational efficiency, manage expenses, and increase revenue through innovative marketing and customer engagement techniques.
Explore our most comprehensive guide on lookback analysis at SafePaaS, covering access governance and how it can transform modern ERP audits. Browse now!
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
Memorandum Of Association Constitution of Company.pptseri bangash
www.seribangash.com
A Memorandum of Association (MOA) is a legal document that outlines the fundamental principles and objectives upon which a company operates. It serves as the company's charter or constitution and defines the scope of its activities. Here's a detailed note on the MOA:
Contents of Memorandum of Association:
Name Clause: This clause states the name of the company, which should end with words like "Limited" or "Ltd." for a public limited company and "Private Limited" or "Pvt. Ltd." for a private limited company.
https://seribangash.com/article-of-association-is-legal-doc-of-company/
Registered Office Clause: It specifies the location where the company's registered office is situated. This office is where all official communications and notices are sent.
Objective Clause: This clause delineates the main objectives for which the company is formed. It's important to define these objectives clearly, as the company cannot undertake activities beyond those mentioned in this clause.
www.seribangash.com
Liability Clause: It outlines the extent of liability of the company's members. In the case of companies limited by shares, the liability of members is limited to the amount unpaid on their shares. For companies limited by guarantee, members' liability is limited to the amount they undertake to contribute if the company is wound up.
https://seribangash.com/promotors-is-person-conceived-formation-company/
Capital Clause: This clause specifies the authorized capital of the company, i.e., the maximum amount of share capital the company is authorized to issue. It also mentions the division of this capital into shares and their respective nominal value.
Association Clause: It simply states that the subscribers wish to form a company and agree to become members of it, in accordance with the terms of the MOA.
Importance of Memorandum of Association:
Legal Requirement: The MOA is a legal requirement for the formation of a company. It must be filed with the Registrar of Companies during the incorporation process.
Constitutional Document: It serves as the company's constitutional document, defining its scope, powers, and limitations.
Protection of Members: It protects the interests of the company's members by clearly defining the objectives and limiting their liability.
External Communication: It provides clarity to external parties, such as investors, creditors, and regulatory authorities, regarding the company's objectives and powers.
https://seribangash.com/difference-public-and-private-company-law/
Binding Authority: The company and its members are bound by the provisions of the MOA. Any action taken beyond its scope may be considered ultra vires (beyond the powers) of the company and therefore void.
Amendment of MOA:
While the MOA lays down the company's fundamental principles, it is not entirely immutable. It can be amended, but only under specific circumstances and in compliance with legal procedures. Amendments typically require shareholder
Personal Brand Statement:
As an Army veteran dedicated to lifelong learning, I bring a disciplined, strategic mindset to my pursuits. I am constantly expanding my knowledge to innovate and lead effectively. My journey is driven by a commitment to excellence, and to make a meaningful impact in the world.
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...Kumar Satyam
According to TechSci Research report, “India Orthopedic Devices Market -Industry Size, Share, Trends, Competition Forecast & Opportunities, 2030”, the India Orthopedic Devices Market stood at USD 1,280.54 Million in 2024 and is anticipated to grow with a CAGR of 7.84% in the forecast period, 2026-2030F. The India Orthopedic Devices Market is being driven by several factors. The most prominent ones include an increase in the elderly population, who are more prone to orthopedic conditions such as osteoporosis and arthritis. Moreover, the rise in sports injuries and road accidents are also contributing to the demand for orthopedic devices. Advances in technology and the introduction of innovative implants and prosthetics have further propelled the market growth. Additionally, government initiatives aimed at improving healthcare infrastructure and the increasing prevalence of lifestyle diseases have led to an upward trend in orthopedic surgeries, thereby fueling the market demand for these devices.
Premium MEAN Stack Development Solutions for Modern BusinessesSynapseIndia
Stay ahead of the curve with our premium MEAN Stack Development Solutions. Our expert developers utilize MongoDB, Express.js, AngularJS, and Node.js to create modern and responsive web applications. Trust us for cutting-edge solutions that drive your business growth and success.
Know more: https://www.synapseindia.com/technology/mean-stack-development-company.html
Premium MEAN Stack Development Solutions for Modern Businesses
Top 10 Billion Dollar Cost Overruns on Megaprojects
1.
2. THE CHANNEL
TUNNEL
Cost overrun: $21.1 billion (145%)
Delay: 1 year (20%)
Country: UK
Photo: Billy69150, Entrance to the tunnel near Coquelles, France
Wikipedia, CC BY-SA 4.0, https://creativecommons.org/licenses/by-sa/4.0/
3. THREE
GORGES DAM
Cost overrun: $16.1 billion (163%)
Delay: Ahead of schedule
Country: China
Photo: Rehman, Le Grand Portage, The Three Gorges Dam on the Yangtze River, China.
Wikipedia, CC BY 2.0, https://en.wikipedia.org/wiki/Three_Gorges_Dam#/media/File:ThreeGorgesDam-China2009.jpg
5. JUBILEE LINE
EXTENSION
Cost overrun: $4 billion (84%)
Delay: 2 years (50%)
Country: UK
Photo: Adrian Pingstone, The Jubilee Line platform of Westminster tube station, London, England.
Wikipedia, https://commons.wikimedia.org/wiki/File:Westminster.tube.station.jubilee.arp.jpg
8. BRAZIL WORLD
CUP STADIUMS
Cost overrun: $2.5 billion (227%)
Delay: On time
Country: Brazil
Photo: Brazilian Government, Maraca Stadium on June 2013
Wikipedia, CC BY 3.0 br, https://en.wikipedia.org/wiki/2014_FIFA_World_Cup_venues#/media/File:Maracana_Stadium_June_2013.jpg