SlideShare a Scribd company logo
Tomahawk, Wisconsin
Community Wayfinding Technical Report
            April 2012




                prepared by




            arnett muldrow
               & ASSOCIATES

              316 West Stone Ave
             Greenville, SC 29609
            www.arnettmuldrow.com
                 864.233.0950


            in conjunction with:
2




                      THIS PAGE INTENTIONALLY LEFT BLANK.




COMMUNITY WAYFINDING TECHNICAL REPORT   | Tomahawk, Wisconsin
3




Introduction
This technical service report has been provided by Wisconsin Main Street in conjunction with Main Street Tomahawk,
Downtown Professionals Network, and Arnett Muldrow & Associates. A two-day workshop was held on March 28-29,
2012, during which a committee of community stakeholders worked with the consultant team to develop a draft version
of the wayfinding system contained in this report. Over the following three weeks, the system was revised and the final
system is detailed in this document.


System Characteristics
The wayfinding system outlined in this report contains a sign typology which is explained below:

Gateways
Gateway signs welcome residents and visitors to the community. These signs also establish the outer boundaries of the
wayfinding system.

Trailblazers
The majority of signs outlined in this system are trailblazers, which may feature one-to-three community destinations
as well as directional arrows that correspond to these destinations. These signs feature lettering with a cap height of
either four or six inches, depending upon the speed zone where the sign is to be place. (In speed zones 30 MPH and
below, cap height should be four inches. Otherwise, a six-inch cap height is required.)

Parking
All municipal parking lots should be clearly signed. Parking signs should share typeface and branding elements with
other system components.

Kiosks
A well-designed kiosk will provide a comprehensive range of local information for both the resident and visitor. Most
kiosks will include a large area map as well as printed collateral featuring local attractions and/or fold-out maps.

Specialty Signage
These signs denote districts (ex., “South Tomahawk Avenue District”) and other features (ex., “A Wisconsin Main
Street Community”). Such signage should be deployed sparingly and in accordance with strategic goals, such as the
promotion of special events.




                            COMMUNITY WAYFINDING TECHNICAL REPORT                         | Tomahawk, Wisconsin
4




Project Notes
Renderings
All sign drawings in this document are conceptual only. It is the responsibility of the Client to ensure the compliance of all elements
of the signs with all federal and state regulations. Placement of signs is also subject to WIDOT approval and must comply with all
applicable federal and state codes.

Codes and Regulations
All recommendations in this document are subject to the regulations and codes enumerated in the Manual on Uniform Traffic Control
Devices (2008 ed.) as well as WIDOT addenda to the federal document. All recommendations in this report are subject to WIDOT
approval. All sign copy will be Clearview Highway or equivalent FHWA/AASHTO-approved typeface. The final size and placement
of sign copy is subject to WIDOT approval. The types, size, and placement of arrows and other directional features will comply with
MUTCD standards. All installed signs will meet federal and state requirements for minimum height and breakaway features.

Project Phasing
The wayfinding system is divided into two phases, primarily based upon a future streetscaping project for Somo Avenue.

Online Resource
An online version of the technical service report may be found at the following web address and QR code:
http://maps.google.com/maps/ms?vps=2&ie=UTF8&hl=en&oe=UTF8&msa=0&msid=205776934961479258659.0004bc4d1dc041b79cd68




COMMUNITY WAYFINDING TECHNICAL REPORT                         | Tomahawk, Wisconsin
5




 THIS PAGE INTENTIONALLY LEFT BLANK.




COMMUNITY WAYFINDING TECHNICAL REPORT   | Tomahawk, Wisconsin
6


                      T-1

       Tomahawk
                North 4th St.
                      District                                                          Gateway
                                                                            T-1
                       Visitor
                 Information
                      Downtown
    T-1 Specs
    Cap Height: 4”
    Phase I

                       T-2
       Tomahawk
                          Visitor                                                         Parking
                     Information                                                              K-2
                      Downtown

                                                                              T-2
      Library
                                                                                          T-3
    T-2 Specs                                                                              K-1
    Cap Height: 4”
    Phase I

                      T-3                               K-1                                     K-2
                                       T-3 Specs        Notes                                   Notes
       Tomahawk                        Cap Height: 4”   Kiosk containing area map and           Visitor kiosk adjacent to Veterans
                                       Phase I          destinations as well as printed         Memorial Park should include a map

                             Library                    collateral (brochures, fold-out maps,
                                                        etc.).
                                                                                                of Tomahawk that includes its trail
                                                                                                systems as well as the Hiawatha
                                                                                                Trail.

COMMUNITY WAYFINDING TECHNICAL REPORT                           | Tomahawk, Wisconsin
7


                 T-4                                     T-5                             T-6

  Tomahawk                               Tomahawk                       Tomahawk
                 Downtown                                SARA Park                   Visitor
                                                                                Information
  City Hall                                                                        Veterans
                                                         Downtown             Memorial Park
  SARA Park                                                 Visitor     Schools
                                                       Information      Complex
T-4 Specs                             T-5 Specs                       T-6 Specs
Cap Height: 4”                        Cap Height: 4”                  Cap Height: 4”
Phase I                               Phase I                         Phase I

                                                                                           T-7
                                                                           Tomahawk
 Parking
   K-3
                          T-4                                                           Schools
                       T-7             T-5                                             Complex
                                    T-6
                                                                                         Visitor
                                                                                    Information
                                                                                       Veterans
                                                                                  Memorial Park
                                                                        T-7 Specs
                                                                        Cap Height: 4”
                         K-3                                            Phase I
                         Notes
                         Kiosk containing area map and
                         destinations.




                           COMMUNITY WAYFINDING TECHNICAL REPORT                       | Tomahawk, Wisconsin
8




                                                                          T-8


                                                                          T-9


                                                                             K-6
                                                                                   T-10
                                                                         T-11

                                                           T-12
                       T-13

                                                                         T-14


T-8                                   T-9                                   T-10

    Tomahawk                    Tomahawk                             Tomahawk
                 SARA Park                       Library                            City Hall
                                                                  T-10 Specs
                  Dog Park                     SARA Park          Cap Height: 4”
                                                                  Phase I



    Library                     Visitor
                                Information
T-8 Specs                     T-9 Specs
Cap Height: 4”                Cap Height: 4”
Phase I                       Phase I




COMMUNITY WAYFINDING TECHNICAL REPORT           | Tomahawk, Wisconsin
9




                 T-11                                   T-12

   Tomahawk                              Tomahawk
          Downtown                       Bradley Park
T-11 Specs                             T-12 Specs
Cap Height: 4”                         Cap Height: 4”
Phase I                                Phase I

                 T-13                                   T-14

   Tomahawk                              Tomahawk
             Bradley Park                          Bradley Park
T-13 Specs                             T-14 Specs
Cap Height: 4”                         Cap Height: 4”
Phase I                                Phase I


K-6
Notes
Roll-out sign featuring magnetized
event stickers (to be managed by
TMS in partnership with the City).




                 COMMUNITY WAYFINDING TECHNICAL REPORT         | Tomahawk, Wisconsin
10


                  T-15
  Tomahawk
  S. Tomahawk Ave.                                    T-15
       District

  Downtown
  Visitor
  Information
T-15 Specs
Cap Height: 4”
Phase I

                 T-16
  Tomahawk
           S. Tomahawk
            Ave. District                                                       SG-1
                  Downtown
                      Visitor
                 Information        Gateway    T-16

T-16 Specs
Cap Height: 4”
Phase I

                                                      SG-1
                                 Welcome
                                South Tomahawk        SG-1 Specs
                                 Avenue District      Phase I
                                                      Notes: District Signage
COMMUNITY WAYFINDING TECHNICAL REPORT   | Tomahawk, Wisconsin
11


                                                                T-17
                                                Tomahawk
                                                         S. Tomahawk
                                                          Ave. District
     T-17                                                       Downtown
                 Gateway                                            Visitor
                                                               Information
                                              T-17 Specs
                                              Cap Height: 4”
                                              Phase I
                                                                T-18
                                                 Tomahawk
                                                                    Schools
                                                                   Complex
                          Gateway
SG-2 T-18
                                                                Downtown
                                                                    Visitor
                                                               Information
                                              T-18 Specs
                                              Cap Height: 6”
                                              Phase II

SG-2
                           Tomahawk
SG-2 Specs                 A Wisconsin Main
Phase II
Notes: District Signage
                           Street Community
       COMMUNITY WAYFINDING TECHNICAL REPORT       | Tomahawk, Wisconsin
12




                                                                                     T-20
                             T-22
                          T-23      T-21
                                                                                     T-19




                 T-19                                  T-20                              T-21

  Tomahawk                              Tomahawk                          Tomahawk
                  Downtown              Schools                                              Schools
                                        Complex                                             Complex
                      Visitor         T-20 Specs                        T-21 Specs
                 Information          Cap Height: 4”                    Cap Height: 4”
                                      Phase II                          Phase II

  Schools                                              T-22                              T-23
  Complex
                                        Tomahawk                          Tomahawk
T-19 Specs
Cap Height: 6”
Phase II
                                        Pride Park                                        Pride Park
                                      T-22 Specs                        T-23 Specs
                                      Cap Height: 4”                    Cap Height: 4”
                                      Phase II                          Phase II

COMMUNITY WAYFINDING TECHNICAL REPORT                     | Tomahawk, Wisconsin
13




                        Parking        K-5



                       K-4        Parking




K-4                           K-5
Notes                         Notes
Kiosk with area map.          Kiosk with area map and Hiawatha
                              Trail map.




      COMMUNITY WAYFINDING TECHNICAL REPORT                      | Tomahawk, Wisconsin

More Related Content

Viewers also liked (7)

การสื่อสารข้อมูล
การสื่อสารข้อมูลการสื่อสารข้อมูล
การสื่อสารข้อมูล
 
เครือข่ายคอมพิวเตอร์
เครือข่ายคอมพิวเตอร์เครือข่ายคอมพิวเตอร์
เครือข่ายคอมพิวเตอร์
 
โครงการสอน 1.56
โครงการสอน 1.56โครงการสอน 1.56
โครงการสอน 1.56
 
ลักษณะของข้อมูลที่ดี
ลักษณะของข้อมูลที่ดีลักษณะของข้อมูลที่ดี
ลักษณะของข้อมูลที่ดี
 
บริการบนอินเทอร์เน็ต
บริการบนอินเทอร์เน็ตบริการบนอินเทอร์เน็ต
บริการบนอินเทอร์เน็ต
 
อินเทอร์เน็ต
อินเทอร์เน็ตอินเทอร์เน็ต
อินเทอร์เน็ต
 
เฉลยแบบทดสอบปลายภาค ม.5
เฉลยแบบทดสอบปลายภาค ม.5เฉลยแบบทดสอบปลายภาค ม.5
เฉลยแบบทดสอบปลายภาค ม.5
 

Recently uploaded

Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Stone Art Hub
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
➒➌➎➏➑➐➋➑➐➐Dpboss Matka Guessing Satta Matka Kalyan Chart Indian Matka
 
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
ISONIKELtd
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
PennapaKeavsiri
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
obriengroupinc04
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
JoeYangGreatMachiner
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
IPLTech Electric
 
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
Freelance
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results
 
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & InnovationInnovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Operational Excellence Consulting
 
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Herman Kienhuis
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
GraceKohler1
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
katiejasper96
 
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
BBPMedia1
 
Virtual Leadership and the managing work
Virtual Leadership and the managing workVirtual Leadership and the managing work
Virtual Leadership and the managing work
IruniUshara1
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
Operational Excellence Consulting
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
irhcs
 
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
concepsionchomo153
 

Recently uploaded (20)

Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666Best Competitive Marble Pricing in Dubai - ☎ 9928909666
Best Competitive Marble Pricing in Dubai - ☎ 9928909666
 
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
Dpboss Matka Guessing Satta Matta Matka Kalyan panel Chart Indian Matka Dpbos...
 
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
1 Circular 003_2023 ISO 27001_2022 Transition Arrangments v3.pdf
 
Science Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around UsScience Around Us Module 2 Matter Around Us
Science Around Us Module 2 Matter Around Us
 
Discover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling ServiceDiscover the Beauty and Functionality of The Expert Remodeling Service
Discover the Beauty and Functionality of The Expert Remodeling Service
 
The latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from NewentideThe latest Heat Pump Manual from Newentide
The latest Heat Pump Manual from Newentide
 
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
Sustainable Logistics for Cost Reduction_ IPLTech Electric's Eco-Friendly Tra...
 
Prescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPTPrescriptive analytics BA4206 Anna University PPT
Prescriptive analytics BA4206 Anna University PPT
 
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan ChartSatta Matka Dpboss Kalyan Matka Results Kalyan Chart
Satta Matka Dpboss Kalyan Matka Results Kalyan Chart
 
Innovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & InnovationInnovation Management Frameworks: Your Guide to Creativity & Innovation
Innovation Management Frameworks: Your Guide to Creativity & Innovation
 
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
Presentation by Herman Kienhuis (Curiosity VC) on Investing in AI for ABS Alu...
 
GKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt PresentationGKohler - Retail Scavenger Hunt Presentation
GKohler - Retail Scavenger Hunt Presentation
 
Kirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper PresentationKirill Klip GEM Royalty TNR Gold Copper Presentation
Kirill Klip GEM Royalty TNR Gold Copper Presentation
 
DearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUniDearbornMusic-KatherineJasperFullSailUni
DearbornMusic-KatherineJasperFullSailUni
 
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...
 
Virtual Leadership and the managing work
Virtual Leadership and the managing workVirtual Leadership and the managing work
Virtual Leadership and the managing work
 
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium PresentationKirill Klip GEM Royalty TNR Gold Lithium Presentation
Kirill Klip GEM Royalty TNR Gold Lithium Presentation
 
Digital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital ExcellenceDigital Transformation Frameworks: Driving Digital Excellence
Digital Transformation Frameworks: Driving Digital Excellence
 
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
1Q24_HYUNDAI CAPITAL SERVICES INC. AND SUBSIDIARIES
 
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
欧洲杯投注-欧洲杯投注外围盘口-欧洲杯投注盘口app|【​网址​🎉ac22.net🎉​】
 

Tomahawk Wayfinding Report

  • 1. Tomahawk, Wisconsin Community Wayfinding Technical Report April 2012 prepared by arnett muldrow & ASSOCIATES 316 West Stone Ave Greenville, SC 29609 www.arnettmuldrow.com 864.233.0950 in conjunction with:
  • 2. 2 THIS PAGE INTENTIONALLY LEFT BLANK. COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 3. 3 Introduction This technical service report has been provided by Wisconsin Main Street in conjunction with Main Street Tomahawk, Downtown Professionals Network, and Arnett Muldrow & Associates. A two-day workshop was held on March 28-29, 2012, during which a committee of community stakeholders worked with the consultant team to develop a draft version of the wayfinding system contained in this report. Over the following three weeks, the system was revised and the final system is detailed in this document. System Characteristics The wayfinding system outlined in this report contains a sign typology which is explained below: Gateways Gateway signs welcome residents and visitors to the community. These signs also establish the outer boundaries of the wayfinding system. Trailblazers The majority of signs outlined in this system are trailblazers, which may feature one-to-three community destinations as well as directional arrows that correspond to these destinations. These signs feature lettering with a cap height of either four or six inches, depending upon the speed zone where the sign is to be place. (In speed zones 30 MPH and below, cap height should be four inches. Otherwise, a six-inch cap height is required.) Parking All municipal parking lots should be clearly signed. Parking signs should share typeface and branding elements with other system components. Kiosks A well-designed kiosk will provide a comprehensive range of local information for both the resident and visitor. Most kiosks will include a large area map as well as printed collateral featuring local attractions and/or fold-out maps. Specialty Signage These signs denote districts (ex., “South Tomahawk Avenue District”) and other features (ex., “A Wisconsin Main Street Community”). Such signage should be deployed sparingly and in accordance with strategic goals, such as the promotion of special events. COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 4. 4 Project Notes Renderings All sign drawings in this document are conceptual only. It is the responsibility of the Client to ensure the compliance of all elements of the signs with all federal and state regulations. Placement of signs is also subject to WIDOT approval and must comply with all applicable federal and state codes. Codes and Regulations All recommendations in this document are subject to the regulations and codes enumerated in the Manual on Uniform Traffic Control Devices (2008 ed.) as well as WIDOT addenda to the federal document. All recommendations in this report are subject to WIDOT approval. All sign copy will be Clearview Highway or equivalent FHWA/AASHTO-approved typeface. The final size and placement of sign copy is subject to WIDOT approval. The types, size, and placement of arrows and other directional features will comply with MUTCD standards. All installed signs will meet federal and state requirements for minimum height and breakaway features. Project Phasing The wayfinding system is divided into two phases, primarily based upon a future streetscaping project for Somo Avenue. Online Resource An online version of the technical service report may be found at the following web address and QR code: http://maps.google.com/maps/ms?vps=2&ie=UTF8&hl=en&oe=UTF8&msa=0&msid=205776934961479258659.0004bc4d1dc041b79cd68 COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 5. 5 THIS PAGE INTENTIONALLY LEFT BLANK. COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 6. 6 T-1 Tomahawk North 4th St. District Gateway T-1 Visitor Information Downtown T-1 Specs Cap Height: 4” Phase I T-2 Tomahawk Visitor Parking Information K-2 Downtown T-2 Library T-3 T-2 Specs K-1 Cap Height: 4” Phase I T-3 K-1 K-2 T-3 Specs Notes Notes Tomahawk Cap Height: 4” Kiosk containing area map and Visitor kiosk adjacent to Veterans Phase I destinations as well as printed Memorial Park should include a map Library collateral (brochures, fold-out maps, etc.). of Tomahawk that includes its trail systems as well as the Hiawatha Trail. COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 7. 7 T-4 T-5 T-6 Tomahawk Tomahawk Tomahawk Downtown SARA Park Visitor Information City Hall Veterans Downtown Memorial Park SARA Park Visitor Schools Information Complex T-4 Specs T-5 Specs T-6 Specs Cap Height: 4” Cap Height: 4” Cap Height: 4” Phase I Phase I Phase I T-7 Tomahawk Parking K-3 T-4 Schools T-7 T-5 Complex T-6 Visitor Information Veterans Memorial Park T-7 Specs Cap Height: 4” K-3 Phase I Notes Kiosk containing area map and destinations. COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 8. 8 T-8 T-9 K-6 T-10 T-11 T-12 T-13 T-14 T-8 T-9 T-10 Tomahawk Tomahawk Tomahawk SARA Park Library City Hall T-10 Specs Dog Park SARA Park Cap Height: 4” Phase I Library Visitor Information T-8 Specs T-9 Specs Cap Height: 4” Cap Height: 4” Phase I Phase I COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 9. 9 T-11 T-12 Tomahawk Tomahawk Downtown Bradley Park T-11 Specs T-12 Specs Cap Height: 4” Cap Height: 4” Phase I Phase I T-13 T-14 Tomahawk Tomahawk Bradley Park Bradley Park T-13 Specs T-14 Specs Cap Height: 4” Cap Height: 4” Phase I Phase I K-6 Notes Roll-out sign featuring magnetized event stickers (to be managed by TMS in partnership with the City). COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 10. 10 T-15 Tomahawk S. Tomahawk Ave. T-15 District Downtown Visitor Information T-15 Specs Cap Height: 4” Phase I T-16 Tomahawk S. Tomahawk Ave. District SG-1 Downtown Visitor Information Gateway T-16 T-16 Specs Cap Height: 4” Phase I SG-1 Welcome South Tomahawk SG-1 Specs Avenue District Phase I Notes: District Signage COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 11. 11 T-17 Tomahawk S. Tomahawk Ave. District T-17 Downtown Gateway Visitor Information T-17 Specs Cap Height: 4” Phase I T-18 Tomahawk Schools Complex Gateway SG-2 T-18 Downtown Visitor Information T-18 Specs Cap Height: 6” Phase II SG-2 Tomahawk SG-2 Specs A Wisconsin Main Phase II Notes: District Signage Street Community COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 12. 12 T-20 T-22 T-23 T-21 T-19 T-19 T-20 T-21 Tomahawk Tomahawk Tomahawk Downtown Schools Schools Complex Complex Visitor T-20 Specs T-21 Specs Information Cap Height: 4” Cap Height: 4” Phase II Phase II Schools T-22 T-23 Complex Tomahawk Tomahawk T-19 Specs Cap Height: 6” Phase II Pride Park Pride Park T-22 Specs T-23 Specs Cap Height: 4” Cap Height: 4” Phase II Phase II COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin
  • 13. 13 Parking K-5 K-4 Parking K-4 K-5 Notes Notes Kiosk with area map. Kiosk with area map and Hiawatha Trail map. COMMUNITY WAYFINDING TECHNICAL REPORT | Tomahawk, Wisconsin