System Software DesignTerm Project: SLOS #214조200702111    오   적200702106    엽기류
Project IntroductionProject name: Project SSDTPProject goal: Change SLOS’s scheduler to Priority SchedulerFIQ HandleLED & 7-segment device driver
Cont.Project purpose: 어려운 문제 해결 능력오에스 포팅 경험임베디드 운영체제 개발 경험 습득임베디드 응용개발환경 경험프로젝트 유사 경험마당을 깔아준 것임(ps: copy from assignment ppt)
What is this project?This project designed to implements priority scheduling SLOS, it is another scheduler that could provide a better performance than traditional RR in multitask environment.Add a FIQ handler to SLOSProvide LED & 7-segment device driver
Team Composition200702111 오적Main scheduling algorithm, code complete, debugging.200702106 엽기류Main scheduling algorithm, code complete, Performance Analysis
Develop Schedule5.20 ~ 5.23   Analyze, flow process chart5.24 ~ 5.29	 Code complete5.30 ~  6.3 	 Debugging6.4   ~  6.8performance analysis

System software design 14

  • 1.
    System Software DesignTermProject: SLOS #214조200702111 오 적200702106 엽기류
  • 2.
    Project IntroductionProject name:Project SSDTPProject goal: Change SLOS’s scheduler to Priority SchedulerFIQ HandleLED & 7-segment device driver
  • 3.
    Cont.Project purpose: 어려운문제 해결 능력오에스 포팅 경험임베디드 운영체제 개발 경험 습득임베디드 응용개발환경 경험프로젝트 유사 경험마당을 깔아준 것임(ps: copy from assignment ppt)
  • 4.
    What is thisproject?This project designed to implements priority scheduling SLOS, it is another scheduler that could provide a better performance than traditional RR in multitask environment.Add a FIQ handler to SLOSProvide LED & 7-segment device driver
  • 5.
    Team Composition200702111 오적Mainscheduling algorithm, code complete, debugging.200702106 엽기류Main scheduling algorithm, code complete, Performance Analysis
  • 6.
    Develop Schedule5.20 ~5.23 Analyze, flow process chart5.24 ~ 5.29 Code complete5.30 ~ 6.3 Debugging6.4 ~ 6.8performance analysis