For the students admitted from the Academic year 2012-2013(R 2012) 
Sri Ramakrishna Engineering College, Coimbatore-22 
Department of Electrical and Electronics Engineering 
Regulations: 2012 
Curriculum 
Semester III Electrical and Electronics Engineering Marks 
Code No. Course Title L T P C CA FE Total 
THEORY 
12MA2301 Transforms and Partial Differential 
Equations 3 1 0 4 20 80 100 
12EE2302 Analysis and Synthesis of Electrical 
Networks 3 1 0 4 20 80 100 
12EE2303 Electromagnetic Field Theory 3 1 0 4 20 80 100 
12EE2304 Measurements and Instrumentation 3 0 0 3 20 80 100 
12EE2305 Analog Electronic Circuits 3 0 0 3 20 80 100 
12EE2306 Digital Principles and Design 3 0 0 3 20 80 100 
PRACTICALS 
12EE2307 Measurements and Instrumentation 
Laboratory 0 0 3 2 20 80 100 
12EE2308 Electronic Circuits Laboratory 0 0 3 2 20 80 100 
Total 18 3 6 25 - - - 
Semester IV Electrical and Electronics Engineering Marks 
Code No. Course Title L T P C CA FE Total 
THEORY 
12MA2001 Numerical Methods 3 1 0 4 20 80 100 
12EE2402 DC Machines and Transformers 3 1 0 4 20 80 100 
12EE2403 Transmission & Distribution of 
Electrical Energy 3 0 0 3 20 80 100 
12EE2404 IC Fabrication and Linear Integrated 
Circuits 3 0 0 3 20 80 100 
12EE2405 Introduction to Signals and Systems 3 0 0 3 20 80 100 
12EE2406 Principles of Communication 
Engineering 3 0 0 3 20 80 100 
PRACTICALS 
12EE2407 DC Machines and Transformers 
Laboratory 0 0 3 2 20 80 100 
12EE2408 Linear Integrated Circuits Laboratory 0 0 3 2 20 80 100 
Total 18 2 6 24 - - - 
Page 1 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
Semester V Electrical and Electronics Engineering Marks 
Code No. Course Title L T P C CA FE Total 
THEORY 
12EE2501 Control System Engineering 3 1 0 4 20 80 100 
12EE2502 Synchronous and Induction Machines 3 1 0 4 20 80 100 
12EE2503 Power System Protection & Switchgear 3 0 0 3 20 80 100 
12EE2504 Microprocessors and Microcontrollers 3 0 0 3 20 80 100 
12EE2505 Digital Signal Processing for Electrical 
Engineers 3 0 0 3 20 80 100 
12EE2506 Data Structures and Developing 
Algorithms 3 0 0 3 20 80 100 
PRACTICALS 
12EE2507 Synchronous and Induction Machines 
Laboratory 0 0 3 2 20 80 100 
12EE2508 Data Structures and Algorithms 
Laboratory 0 0 3 2 20 80 100 
12EN2001 Communication skills laboratory 0 0 2 1 20 80 100 
Total 18 2 8 25 - - - 
Semester VI Electrical and Electronics Engineering Marks 
Code No. Course Title L T P C CA FE Total 
THEORY 
12EE2601 Electric Machine Design 3 1 0 4 20 80 100 
12EE2602 Power System Analysis 3 1 0 4 20 80 100 
12EE2603 Power Electronics 3 1 0 4 20 80 100 
12EE2604 Embedded System Engineering 3 0 0 3 20 80 100 
12EE2605 Management Concepts and Practices 3 0 0 3 20 80 100 
Elective I 3 0 0 3 20 80 100 
PRACTICALS 
12EE2607 Control Systems Laboratory 0 0 3 2 20 80 100 
12EE2608 DSP and Microprocessors 
Laboratory 0 0 3 2 20 80 100 
Total 18 3 6 25 - - - 
Page 2 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
Semester VII Electrical and Electronics Engineering Marks 
Code No. Course Title L T P C CA FE Total 
THEORY 
12EE2701 Electric Energy- Generation, Utilisation 
and Conservation 3 0 0 3 20 80 100 
12EE2702 Electric Drives and Controls 3 0 0 3 20 80 100 
12EE2703 Power System Economics and Control 
Techniques 3 1 0 4 20 80 100 
12ME2001 Total Quality Management 3 0 0 3 20 80 100 
Elective II 3 0 0 3 20 80 100 
Elective III 3 0 0 3 20 80 100 
PRACTICALS 
12EE2707 Power Electronics and Drives 
Laboratory 0 0 3 2 20 80 100 
12EE2708 Power System Simulation Laboratory 0 0 3 2 20 80 100 
12EE2709 Comprehensive Viva Voce 0 0 2 1 100 100 
Total 18 1 8 24 - - - 
Semester VIII Electrical and Electronics Engineering Marks 
Code No. Course Title L T P C CA FE Total 
THEORY 
Elective IV 3 0 0 3 20 80 100 
Elective V 3 0 0 3 20 80 100 
Elective VI 3 0 0 3 20 80 100 
PRACTICALS 
12EE2804 Project Work 0 0 18 6 20 80 100 
Total 9 0 18 15 - - - 
Electives Electrical and Electronics Engineering Marks 
Page 3 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
Group Code No. Course Title L T P C CA FE Total 
Group I 
12CS2001 Java Programming 3 0 0 3 20 80 100 
12EE2E01 Introduction to Data Base Management System 3 0 0 3 20 80 100 
12EE2E02 DSP based System Design 3 0 0 3 20 80 100 
12EE2E03 Introduction to Computer Architecture 3 0 0 3 20 80 100 
Group II 
12EE2E04 LabView and Virtual Instrumentation 3 0 0 3 20 80 100 
12EE2E05 Power Quality 3 0 0 3 20 80 100 
12EE2E06 Transients in Power System 3 0 0 3 20 80 100 
12EE2E07 Networking in Smart Grids 3 0 0 3 20 80 100 
12EE2E08 Soft Computing Techniques 3 0 0 3 20 80 100 
12EE2E09 EHV AC and DC Power Transmission 3 0 0 3 20 80 100 
12EE2E10 Digital System Design 3 0 0 3 20 80 100 
12EE2E11 Analog VLSI Design 3 0 0 3 20 80 100 
Group III 
12EE2E12 Electronic Product Design 3 0 0 3 20 80 100 
12EE2E13 Computer Aided Design of Electrical Apparatus 3 0 0 3 20 80 100 
12EE2E14 High Voltage Engineering 3 0 0 3 20 80 100 
12EE2E15 Opto Electronics 3 0 0 3 20 80 100 
12EE2E16 Nano Science 3 0 0 3 20 80 100 
12EE2E17 Distributed Control System 3 0 0 3 20 80 100 
12EE2E18 Flexible AC Transmission Systems 3 0 0 3 20 80 100 
12EE2E19 AI Applications to Power Systems 3 0 0 3 20 80 100 
12EE2E20 Robotics Technology and Flexible Automation 3 0 0 3 20 80 100 
12EE2E21 Special Electrical Machines 3 0 0 3 20 80 100 
12EE2E22 Non-conventional Energy Sources 3 0 0 3 20 80 100 
12IT2002 Soft Skills 3 0 0 3 20 80 100 
12IT2004 Business Intelligence and its Applications 3 0 0 3 20 80 100 
Total credits for the Course - 190 
L : Lecture *CA : Continuous assessment 
T : Tutorial *FE : Final Examination 
P : Practical 
C : Credits 
Criterion for passing: 
· Minimum Marks (FE) : 50/100 (In the Final Examination) 
· Minimum Marks (CA+FE) : 50 
Page 4 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
SEMESTER III 
12MA2301 TRANSFORMS AND PARTIAL DIFFERENTIAL EQUATIONS 3 1 0 4 
(Common to all branches of Engineering and Technology except BME) 
AIM 
The course aims to develop the skills of the students in the areas of Partial differential equations, Boundary value 
problems and Transform techniques. This will be necessary for their effective studies in a large number of 
engineering subjects like heat conduction, communication systems, electro optics and electromagnetic theory. 
OBJECTIVES 
At the end of the course the students would 
· Be capable of mathematically formulating certain practical problems in terms of partial differential equations, 
solve them and physically interpret the results. 
· Have gained the knowledge of Fourier series, their different possible forms and the frequently needed practical 
harmonic analysis that an engineer may have to make from discrete data. 
· Have obtained capacity to formulate and identify certain boundary value problems encountered in engineering 
practices, decide on applicability of the Fourier series method of solution, solve them and interpret the results. 
· Have grasped the concept of expression of a function, under certain conditions, as a double integral leading to 
identification of transform pair, and specialization on Fourier transform pair, their properties, the possible 
special cases with attention to their applications. 
· Have learnt the basics of Z-Transform in its applicability to discretely varying functions, gained the skill to 
formulate certain problems in terms of difference equations and solve them. 
UNIT- I PARTIAL DIFFERENTIAL EQUATIONS 12 
Formation of partial differential equations by elimination of arbitrary constants and arbitrary functions – Solution of 
of first order partial differential equations of the forms F(p,q) = 0, Z= px + qy + F(p,q) and F(z,p,q) = 0 – Lagrange’s 
linear equation – Linear partial differential equations of second and higher order with constant coefficients. 
UNIT- II FOURIER SERIES 12 
Dirichlet’s conditions – General Fourier series – Odd and Even functions – Half range sine series and cosine series – 
Parseval’s identity – Harmonic Analysis. 
UNIT- III BOUNDARY VALUE PROBLEMS 12 
Classification of second order quasi linear partial differential equations – Solutions of one dimensional wave 
equation (Problems only) – One dimensional heat equation (Problems only) -Steady state solution of two-dimensional 
heat equation in Cartesian coordinates (Insulated edges excluded) Problems only. 
UNIT- IV FOURIER TRANSFORMS 12 
Fourier integral theorem (without proof) – Fourier transform pair - Sine and Cosine transforms – Properties– 
Transforms of simple functions – Convolution theorem – Parseval’s identity. 
UNIT- V Z -TRANSFORMS AND DIFFERENCE EQUATIONS 12 
Z-transform– Elementary properties– Inverse Z-transform– Convolution theorem– Formation of difference 
equations (Direct problems only) – Solution of difference equations using Z - Transform. 
Total Periods (45+15T): 60 
TEXT BOOKS 
Page 5 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
1. Kandasamy.P.,Thilagavathy.K., and Gunavathy.K., “Engineering Mathematics’’, S. Chand & 
Company ltd., Volume II, New Delhi, 2011. 
2. Grewal.B.S., “Higher Engineering Mathematics”, Khanna Publishers, 40th Edition, New Delhi, 
2008. 
REFERENCE BOOKS 
1. Wylie C. Ray and Barrett Louis.C., “Advanced Engineering Mathematics”, McGraw-Hill, Inc., 
6thEdition, New York, 1995. 
2. Andrews.L.A., and Shivamoggi B.K., “Integral Transforms for Engineersand Applied 
Mathematicians”, Macmillen , 1st Edition, New York ,1988. 
3. Churchill.R.V. and Brown.J.W., “Fourier Series and Boundary Value Problems”, McGraw-Hill 
Book Co., 4th Edition, Singapore,1987. 
Page 6 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2302 ANALYSIS AND SYNTHESIS OF ELECTRICAL NETWORKS 3 1 0 4 
AIM 
To provide depth knowledge on network analysis and synthesis concepts 
OBJECTIVES 
· To understand the concepts of graph theory 
· To learn about two port networks 
· To study about network functions of one port and two port networks 
· To understand the concept of network synthesis 
· To study about active and passive filters 
UNIT – I GRAPH THEORY 12 
Graph of a Network – Definitions – Tree - Co tree – Link - Basic loop and basic cut set - Incidence matrix - Cut set 
matrix - Tie set matrix – Duality - Loop and Nodal methods of analysis. 
UNIT – II TWO PORT NETWORKS 12 
Characterization of LTI two port networks – Z, Y, ABCD and h parameters - Reciprocity and symmetry – Inter 
relationships between the parameters - Inter-connections of two port networks - Ladder and Lattice networks - T & I 
Representation. 
UNIT – III NETWORK FUNCTIONS 12 
Concept of Complex frequency, Transform Impedances Network functions of one port and two port networks, 
concept of poles and zeros, properties of driving point and transfer functions, time response and stability from pole 
zero plot. 
UNIT – IV NETWORK SYNTHESIS 12 
Positive real functions - definition and properties- properties of RL, RC & LC - pointing functions-synthesis of RL, 
RC, LC driving point admittance functions using Foster and Cauer first and second forms. 
UNIT – V FILTERS 12 
Image parameters and characteristics impedance- Passive and active filters fundamentals - Low pass filters- High 
pass filters - Constant K type filters- Introduction to active & passive filters. 
Total Periods (45 +15T): 60 
TEXT BOOKS 
1. Van – Valkenburg M.E., “Network Analysis”, Prentice Hall of India, 3rd Edition, New Delhi, 2011. 
2. Sudhakar A., and Shyammohan, “Circuits and Networks Analysis and Synthesis”, Tata McGraw Hill 
Publishing Co. Ltd., 3rd Edition, New Delhi, 2007. 
REFERENCES 
1. Chakrabati A, “Circuits Theory (Analysis and synthesis)”, Dhanpath Rai & Sons, New Delhi, 1999. 
2. Van Valkenburg M.E., “Introduction to Modern Network Synthesis”, Wiley Eastern Limited, 1999. 
3. Jagan N.C., and Lakshminarayanan C., “ Network Analysis”, B.S.Publications, 2008. 
4. Suresh Kumar K.S.,”Electric Circuits and Networks”, Pearson Education, 2009. 
Page 7 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2303 ELECTROMAGNETIC FIELD THEORY 3 1 0 4 
AIM 
This subject aims to provide the student an understanding of the fundamentals of electromagnetic fields and 
their applications in electrical engineering. 
OBJECTIVES 
To impart knowledge on 
· Sources and effects of electromagnetic fields. 
· Concepts of electrostatics, electrical potential, energy density and their applications. 
· Concepts of magnetostatics, magnetic flux density, scalar and vector potential and its applications. 
· Faraday’s laws, induced emf and their applications. 
· Concepts of electromagnetic waves and pointing vector. 
UNIT- I INTRODUCTION 12 
Sources and effects of electromagnetic fields – Vector fields – Different co-ordinate systems – Vector calculus – 
Gradient, Divergence and Curl - Divergence theorem – Stoke’s theorem. 
UNIT - II ELECTROSTATICS 12 
Coulomb’s Law – Electric field intensity – Field due to point and continuous charges – Gauss’s law and application 
– Electrical potential – Electric field and equipotential plots – Electric field in free space, conductors, dielectric 
– Dielectric polarization, Electric field in multiple dielectrics – Boundary conditions, Poisson’s and Laplace’s 
equations – Capacitance-Energy density – Dielectric strength. 
UNIT - III MAGNETOSTATICS 12 
Lorentz Law of force, magnetic field intensity – Biot–savart Law - Ampere’s Law – Magnetic field due to straight 
conductors, circular loop, infinite sheet of current – Magnetic flux density (B) – B in free space, conductor, 
magnetic materials – Magnetization – Magnetic field in multiple media – Boundary conditions – Scalar and vector 
potential – Magnetic force – Torque – Inductance – Energy density – Magnetic circuits. 
UNIT - IV ELECTRODYNAMIC FIELDS 12 
Faraday’s laws, induced emf – Transformer and motional EMF, Maxwell’s equations (differential and integral 
forms) – Displacement current – Relation between field theory and circuit theory. 
UNIT - V ELECTROMAGNETIC WAVES 12 
Generation – Electro Magnetic Wave equations – Wave parameters; velocity, intrinsic impedance, propagation 
constant – Waves in free space, lossy and lossless dielectrics, conductors-skin depth, Poynting vector – Plane 
wave reflection and refraction. 
Total Periods (45 +15T): 60 
TEXT BOOKS 
1. William .H. Hayt, “Engineering Electromagnetics”, Tata McGraw Hill, 7th Edition, 2006. 
2. Gangadhar K.A, “Field Theory”, Khanna Publishers, 13th Edition, New Delhi, 1997. 
REFERENCES 
1. John.D.Kraus, “Electromagnetics”, McGraw Hill book Co., 4th Edition, New York, 1992. 
2. Joseph. A.Edminister, “Theory and Problems of Electromagnetics”, Schaum Series, Tata McGraw Hill, 2nd 
Edition, 2006. 
3. Kraus and Fleish, “Electromagnetics with Applications”, McGraw Hill International Editions, 5th Edition, 
1999. 
4. Mathew N.O.Sadiku, ‘Elements of Electromagnetics’, 3rd Edition, Oxford University Press, 2003. 
Page 8 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2304 MEASUREMENTS AND INSTRUMENTATION 3 0 0 3 
AIM 
To provide adequate knowledge in electrical instruments and measurements techniques. 
OBJECTIVES 
· To make the student have a clear knowledge of the basic laws governing the operation of the 
instruments, relevant circuits and their working. 
· Introduction to general instrument system, error, calibration etc. Emphasis is laid on analog and digital 
techniques used to measure voltage, current, energy and power etc. 
· To have an adequate knowledge of comparison methods of measurement. 
· Elaborate discussion about storage & display devices. 
· Exposure to various transducers and data acquisition system. 
UNIT - I INTRODUCTION 9 
Functional elements of an instrument – Static and dynamic characteristics – Errors in measurement – Statistical 
evaluation of measurement data – Primary and secondary standards - Calibration. 
UNIT - II ELECTRICAL AND ELECTRONICS INSTRUMENTS 9 
Principle and types of analog and digital voltmeters, ammeters, multimeters – Average ,RMS and peak responding 
type meters- Digital Phase meter- Single and three phase wattmeters and energy meters – Magnetic 
measurements – Determination of B-H curve and measurements of iron loss – Instrument transformers – 
Instruments for measurement of frequency and phase- Power factor meters. 
UNIT - III COMPARISON METHODS OF MEASUREMENTS 9 
D.C. & A.C. potentiometers - D.C & A.C bridges - transformer ratio bridges - self-balancing bridges. Interference & 
screening – Multiple earth and earth loops - Electrostatic and electromagnetic interference – Grounding 
techniques. 
UNIT - IV STORAGE AND DISPLAY DEVICES 9 
Magnetic disk and tape – Recorders, digital plotters and printers (qualitative treatment only), LED, LCD & dot 
matrix display – DSO, MSO, Digital transceiver recorder, Power measurement and analysis, Real time 
spectrum analysers. 
UNIT - V TRANSDUCERS AND DATA ACQUISITION SYSTEM 9 
Classification of transducers – Selection of transducers – Resistive, capacitive & inductive transducers – 
Piezoelectric, optical and digital transducers – Elements of data acquisition system – A/D, D/A converters. 
Total periods: 45 
TEXT BOOKS 
1. Doebelin E.O., “Measurement Systems – Application and Design”, Tata McGraw Hill publishing 
company, 5th Edition, 2006. 
2. Sawhney, A.K. “A Course in Electrical & Electronic Measurements & Instrumentation”, Dhanpat Rai and 
Co, 2004. 
REFERENCES 
1. Golding,E.W., and Widdis,F.C., “Electrical Measurements and Measuring Instruments”, A H Wheeler & 
Company, 5th Edition, 2003. 
2. Kalsi H.S., ‘Electronic Instrumentation’, Tata McGraw Hill publishing company, 2nd Edition, New Delhi, 
2004. 
3. Bouwens, A.J. “Digital Instrumentation’, Tata McGraw Hill Publishing Company, 1997. 
4. Moorthy, D.V.S. “Transducers and Instrumentation, Prentice Hall of India Pvt Ltd, 2003. 
5. Martin Reissland, ‘Electrical Measurements’, New Age International (P) Ltd., Delhi, 2001. 
6. Gupta, J. B. “A Course in Electronic & Electrical Measurements”, Kataria & Sons, Delhi, 2003. 
Page 9 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2305 ANALOG ELECTRONIC CIRCUITS 3 0 0 3 
AIM 
To introduce the concept of realizing circuits using active and passive devices for signal generation and 
amplification. 
OBJECTIVES 
· To learn and analyse the process of AC to DC conversion. 
· To expose the students to study the different biasing and configurations of the amplifier circuits. 
· To study the characteristics of tuned amplifier. 
· To expose the students to various amplifiers and oscillator circuits with feedback concepts. 
· To learn the wave shaping process and circuits. 
UNIT - I RECTIFIERS AND POWER SUPPLY CIRCUITS 9 
Half wave & full wave rectifier analysis - Inductor filter – Capacitor filter - Series voltage regulator – Switched 
mode power supply. 
UNIT - II TRANSISTOR BIASING AND AMPLIFIERS 9 
Need for biasing-Types of biasing-Fixed and self biasing of BJT & FET – Stability factor - Fixed bias circuit, Load 
line and quiescent point analysis. Small signal analysis of CE, CC & Common source amplifiers – Cascade and 
Darlington connections, transformer coupled class A, B & AB amplifiers – Push-pull amplifiers. 
UNIT - III DIFFERENTIAL AND TUNED AMPLIFIERS 9 
Differential amplifiers – Common mode and differential mode analysis - DC and AC analysis - Characteristics of 
tuned amplifiers – Single & double tuned amplifier. 
UNIT - IV FEEDBACK AMPLIFIER AND OSCILLATOR 9 
Characteristics of negative feedback amplifiers – Voltage / current, series/shunt feedback – Theory of sinusoidal 
oscillators – Hartley, Colpitts, and crystal oscillators - Phase shift and Wien bridge oscillators. 
UNIT - V WAVE SHAPING CIRCUITS AND OSCILLATORS 9 
RC wave shaping circuits – Diode clampers and clippers – Multivibrators – Schmitt triggers – Barkhausen’s 
criterion for Oscillation- UJT based saw tooth oscillators. 
Total periods: 45 
TEXT BOOKS 
1. David A. Bell, “Electronic Devices & Circuits”, Prentice Hall of India/Pearson Education, 4th Edition, 
Eighth printing, 2004. 
2. Jacob Millman & Christos.C.Halkias, “Integrated Electronics: Analog and Digital Circuits and System”, 
Tata McGraw Hill, 2002. 
REFERENCES 
1. Robert. L. Boylestad & Lo Nashelsky, “Electronic Devices & Circuit Theory”, 8th Edition, Pearson 
Education, 2002 / PHI. 
2. Jacob Millman & Herbert Taub, “Pulse, Digital & Switching Waveforms”, Tata McGraw Hill Publishing 
Co, 2nd Edition, New Delhi, 2008. 
3. Donald L.Schilling and Charles Belove, “Electronic Circuits”, Tata McGraw Hill Publishing Co., 3rd 
Edition, 2003. 
4. Floyd, “Electronic Devices”, Pearson Education India, 7th Edition, New Delhi, 2005. 
Page 10 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2306 DIGITAL PRINCIPLES AND DESIGN 3 0 0 3 
AIM 
To introduce the fundamentals of digital circuits, combinational and sequential circuits. 
OBJECTIVES 
· To study various number systems and to simplify the mathematical expressions using Boolean functions – 
simple problems. 
· To study implementation of combinational circuits 
· To study the design of various synchronous and asynchronous circuits. 
· To expose the students to various memory devices. 
UNIT - I NUMBER SYSTEM & BOOLEAN ALGEBRA 9 
Binary, Octal, Decimal, Hexadecimal - Number base conversions – 1’s and 2’s complements - Signed Binary 
numbers - Binary Arithmetic - Binary codes: Weighted – BCD - 2421- Gray code -Excess 3 code - ASCII – Error 
detecting and correcting codes - De-Morgan’s Theorem- Principle of Duality- Boolean expression – Boolean 
function - Minimization of Boolean expressions – Sum of Products (SOP) – Product of Sums (POS) – Minterm – 
Maxterm - Karnaugh map Minimization – Don’t care conditions - Quine McCluskey method. 
UNIT - II COMBINATIONAL CIRCUITS 9 
Logic Gates: AND, OR, NOT, NAND, NOR, Exclusive-OR and Exclusive-NOR - Implementations of Logic 
Functions using gates, NAND, NOR – Combinational circuits: Adder- Subtractor – Serial adder/ Subtractor - 
Parallel adder / Subtractor- Carry look ahead adder- BCD adder- Magnitude Comparator- Multiplexer/ 
Demultiplexer- Encoder / decoder – Parity Generator/Checker – code converters. 
UNIT - III SYNCHRONOUS SEQUENTIAL CIRCUITS 9 
Latches and Flip flops SR, JK, T, D and Master slave – Characteristic table and equation –Application table – Edge 
triggering –Level Triggering –Realization of one flip flop using other flip flops –Asynchronous / Ripple counters – 
Synchronous counters –Modulo – n counter – Classification of sequential circuits: Moore and Mealy circuits - 
Design of Synchronous counters: state diagram- State table –State minimization –State assignment – Register: shift 
registers- Universal shift register. 
UNIT - IV ASYNCHRONOUS SEQUENTIAL CIRCUIT 9 
Design of fundamental mode and pulse mode circuits – primitive state / flow table – Minimization of primitive state 
table –state assignment – Excitation table – Excitation map - cycles – Races – Hazards: Static –Dynamic – Essential 
– Hazards elimination. 
UNIT - V PROGRAMMABLE LOGIC DEVICES, MEMORY AND LOGIC FAMILIES 9 
Memories: ROM, PROM, EPROM, PLA, PAL and FPGA - Digital logic families: TTL, ECL and CMOS. 
Total periods: 45 
TEXT BOOKS 
1. Morris Mano M., “Digital Design”, Pearson Education Inc., 4th Edition, New Delhi, 2008. 
2. John.M Yarbrough, “Digital Logic Applications and Design”, Vikas publishing house, New Delhi, 2006. 
REFERENCES 
1. Salivahanan S. and Arivazhagan S., “Digital Circuits and Design”, Vikas Publishing House Pvt. Ltd, 4th 
Edition, New Delhi, 2004. 
2. Thomas L. Floyd, “Digital Fundamentals”, Pearson Education Inc., 10th Edition, New Delhi, 2008. 
3. Charles H.Roth. “Fundamentals of Logic Design”, Thomson Publication Company, 2003. 
4. Donald P.Leach and Albert Paul Malvino, “Digital Principles and Applications”, Tata McGraw Hill 
Publishing Company Limited, 5th Edition, New Delhi, 2003. 
Page 11 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
5. Jain R.P., “Modern Digital Electronics”, Tata McGraw–Hill publishing company limited,3rd Edition, New 
Delhi, 2003. 
Page 12 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2307 MEASUREMENT AND INSTRUMENTATION LABORATORY 0 0 3 2 
AIM 
The aim of this lab is to fortify the students with an adequate work experience in the measurement of 
different quantities and also the expertise in handling the instruments involved. 
OBJECTIVES 
To train the students in the measurement of displacement, resistance, inductance, torque and angle etc., and 
to give exposure to AC, DC bridges and transient measurement. 
1. Study of displacement and pressure transducers 
2. Measurement of high resistance using Kelvin’s double bridge and Megger 
3. Measurement of frequency using Wien bridge 
4. To study dielectric behavior (using Schering bridge and standard capacitor) 
5. Measurement of inductance using maxwell’s bridge 
6. Instrumentation amplifiers 
7. Measurement of transients using DSO 
8. Calibration of single-phase energy meter 
9. Calibration of current transformer (both measurement and protection) 
10. Measurement of three phase power and power factor 
11. Measurement of iron loss 
12. Measurement systems using LabVIEW and MATLAB 
13. Design and construction of resistive and capacitive dividers 
Practical 45 
Page 13 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2308 ELECTRONIC CIRCUITS LABORATORY 0 0 3 2 
AIM 
This laboratory aims to train the students in both analog and digital electronics circuits so that they can 
acquire practical knowledge in electronics. 
1. Single Phase Half and Full wave rectifier with inductive and capacitive filters. 
2. RC coupled and differential amplifier. 
3. Frequency response of common emitter amplifiers. 
4. RC Phase shift, Hartley, Colpitts oscillators 
5. Astable / Monostable multivibrator 
6. Series voltage regulator. 
7. Study of Basic Digital gates. 
(Verification of truth table for AND, OR, EXOR, NOT, NOR, NAND, JK FF, RS FF, D FF) 
8. Implementation of Boolean Functions, Adder/ Subtractor circuits 
9. Code converters, Parity generator and parity checking, Excess 3, 2s Complement, Binary to grey code 
using suitable IC’s. 
10. Encoders and Decoders 
11. Multiplexer/ De-multiplexer: Study of 4:1; 8:1 multiplexer and Study of 1:4; 1:8 Demultiplexer 
12. Shift Registers: Design and implementation of 4-bit shift registers in SISO, SIPO, PISO, PIPO modes 
using suitable IC’s. 
Practical 45 
Page 14 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
SEMESTER IV 
12MA2001 NUMERICAL METHODS 3 1 0 4 
AIM 
With the present development of the computer technology, it is necessary to develop efficient algorithms for 
solving problems in Science, Engineering and Technology. 
OBJECTIVES 
At the end of the course, the students would be acquainted with the basic concepts in numerical methods and their 
uses are summarized as follows 
· The solution of nonlinear (algebraic or transcendental) equations, system of linear equations and eigen 
value problem of matrix can be obtained numerically where analytical methods fail to give solution. 
· When huge amounts of experimental data are involved, the methods discussed on interpolation will be 
useful in constructing approximate polynomial to represent the data and to find the intermediate values. 
· The numerical differentiation and integration find application when the function in the analytical form is 
too complicated or the huge amounts of data are given. 
· The methods introduced in the solution of ordinary differential equations and partial differential equations 
will be useful in attempting any engineering problem. 
UNIT- I SOLUTION OF EQUATIONS AND EIGENVALUE PROBLEMS 12 
Solution of algebraic and transcendental equations– Regula-Falsi method– Newton’s method– Solution of linear 
system by Gaussian elimination and Gauss-Jordon methods– Inverse of a matrix by Gauss Jordon method - Iterative 
methods: Gauss Jacobi and Gauss-Seidel methods – Eigen value of a matrix by power method. 
UNIT-II INTERPOLATION AND APPROXIMATION 12 
Newton’s forward and backward interpolation– Lagrange’s interpolation– Newton’s divided difference interpolation 
– Interpolating with a cubic spline 
UNIT-III NUMERICAL DIFFERENTIATION AND INTEGRATION 12 
Derivatives using Newton’s forward and backward interpolation– Numerical integration by trapezoidal and 
Simpson’s 1/3 and 3/8 rules- Romberg’s method– Two and Three point Gaussian quadrature formula– Double 
integrals using trapezoidal and Simpson’s rule. 
UNIT-IV INITIAL VALUE PROBLEMS FOR ORDINARY DIFFERENTIAL 
EQUATIONS 12 
Single step methods: Taylor series method– Euler and modified Euler methods– Fourth order Runge– Kutta method 
for solving first and second order equations– Multistep methods: Milne’s and Adam’s predictor and corrector 
methods. 
UNIT-V BOUNDARY VALUE PROBLEMS IN ORDINARY AND PARTIAL DIFFERENTIAL 
EQUATIONS 12 
Finite difference solution of second order ordinary differential equation– Finite difference solution of one 
dimensional heat equation by explicit and implicit methods– One dimensional wave equation and two dimensional 
Laplace and Poisson equations. 
Total Periods (45+15T): 60 
TEXT BOOKS 
1. Gerald.C.F. andWheatley.P.O. “Applied Numerical Analysis”, Pearson Education Asia, 6th 
Edition, New Delhi, 2002. 
2. Kandasamy.P., Thilagavathy.K. andGunavathy.K., “Numerical Methods”, S.Chand Co. Ltd., 3rd 
Edition, New Delhi, 2010. 
REFERENCE BOOKS 
Page 15 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
1. Veerarajan.T., “Numerical Methods”, Tata McGraw Hill Pub.Co.Ltd, 2 nd Edition, New Delhi, 
2011. 
2. Burden.R.L. andFaires.T.D., “Numerical Analysis”, Thomson Asia Pvt. Ltd., 7th Edition, 
Singapore, 2002. 
Page 16 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2402 DC MACHINES AND TRANSFORMERS 3 1 0 4 
AIM 
To introduce the basic concepts of rotating machines and to expose the students to the concepts of DC machines 
and Transformers and analyse their performance. 
OBJECTIVES 
To impart knowledge on 
· Principles of electromechanical energy conversion and basic concepts in rotating machines. 
· Construction, principle of operation and performance of DC generators. 
· Principle of operation, performance, starting methods and speed control of DC motors. 
· Construction, principle of operation and performance of transformers. 
· Losses and efficiency, testing of DC machines and transformers. 
UNIT - I BASIC CONCEPTS OF ROTATING MACHINES 8 
Principles of electromechanical energy conversion – Single and multiple excited systems – Field energy and co-energy 
– Force and Torque - MMF of distributed A.C. windings – Rotating magnetic field – Generated voltage – 
Torque in round rotor machine. 
UNIT - II DC GENERATORS 9 
Constructional details – Principle of operation - EMF equation – Methods of excitation – Self and separately excited 
generators – Characteristics of series, shunt and compound generators – Armature reaction and commutation – 
Parallel operation of DC shunt and compound generators. 
UNIT - III DC MOTORS 9 
Principle of operation – Back EMF and torque equations – Characteristics of series, shunt and compound motors – 
Starting of DC motors – Types of starters – Speed control of DC series and shunt motors. 
UNIT - IV TRANSFORMERS 10 
Constructional details - principle of operation – types - EMF equation – Transformation ratio – Transformer on no-load 
– Transformer on load - Equivalent circuit - Regulation - Parallel operation of transformers - Three phase 
transformer connections - Auto transformer. 
UNIT - V TESTING OF DC MACHINES AND TRANSFORMERS 9 
Losses and efficiency in DC machines and transformers – Condition for maximum efficiency Testing of DC 
machines – Brake test, Swinburne’s test, Hopkinson’s test and Retardation test – Testing of transformers – Polarity 
test - Open circuit and short circuit tests – Sumpner’s test – All day efficiency. 
Note: UNIT 5 may be covered along with UNIT 2, 3, and 4. 
Total periods (45+15T): 60 
TEXT BOOKS 
1. Kothari D.P., & Nagrath I.J., “Electric Machines”, Tata McGraw Hill Publishing Company Ltd, 3rd Edition, 
2004. 
2. Albert E. Clayton and Hancock N. N., “The performance and Design of Direct Current Machines”, Oxford 
and IBH Publishing Company Pvt. Ltd., New Delhi, 1990. 
REFERENCES 
1. Gupta J.B., “Theory and Performance of Electrical Machines”, S.K.Kataria and Sons,14th Edition, 2009. 
2. Fitzgerald.A.E., Charles Kingsely Jr, Stephen D.Umans, “Electric Machinery”, McGraw Hill Books 
Company, 6th Edition, 2003. 
3. Irving L. Kosow “Electric Machinery and Transformers” PHI, New Delhi, 2nd Edition, 1991. 
Page 17 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2403 TRANSMISSION AND DISTRIBUTION OF ELECTRICAL ENERGY 3 0 0 3 
AIM 
To become familiar with the function of different components used in Transmission and Distribution levels 
of power systems and modeling of these components. 
OBJECTIVES 
· To develop expression for computation of fundamental parameters of lines. 
· To categorize the lines into different classes and develop equivalent circuits for these classes. 
· To analyse the voltage distribution in insulator strings and cables and methods to improve the same. 
UNIT - I INTRODUCTION 9 
Structure of electric power system: Various levels such as generation, transmission and distribution; HVDC and 
EHV AC transmission: comparison of economics of transmission, technical performance and reliability, application 
of HVDC transmission system. FACTS (qualitative treatment only): TCSC, SVC, STATCOM, UPFC. 
UNIT - II TRANSMISSION LINE PARAMETERS 9 
Parameters of single and three phase transmission lines with single and double circuits: Resistance, inductance and 
capacitance of solid, stranded and bundled conductors: Symmetrical and unsymmetrical spacing and transposition; 
application of self and mutual GMD; skin and proximity effects; interference with neighbouring communication 
circuits. Typical configuration, conduct types and electrical parameters of 400, 220, 110, 66 and 33 kV lines. 
UNIT - III MODELLING AND PERFORMANCE OF TRANSMISSION LINES 9 
Classification of lines: Short line, medium line and long line; equivalent circuits, attenuation constant, phase 
constant, surge impedance; transmission efficiency and voltage regulation; real and reactive power flow in lines: 
Power-angle diagram; surge-impedance loading, load ability limits based on thermal loading, angle and voltage 
stability considerations; shunt and series compensation, Ferranti effect and corona loss. 
UNIT - IV INSULATORS AND CABLES 9 
Insulators: Types, voltage distribution in insulator string and grading, improvement of string efficiency. 
Underground cables: Constructional features of LT and HT cables, capacitance, dielectric stress and grading, 
thermal characteristics. 
UNIT - V SUBSTATION, GROUNDING SYSTEM AND DISTRIBUTION SYSTEM 9 
Types of substations; bus-bar arrangements; substation bus schemes: single bus scheme, double bus with double 
breaker, double bus with single breaker, main and transfer bus, ring bus, breaker-and-a-half with two main buses, 
double bus-bar with bypass isolators. 
Resistance of grounding systems: Resistance of driven rods, resistance of grounding point electrode, grounding 
grids; design principles of substation grounding system; neutral grounding. 
Radial and ring-main distributors; interconnectors; AC distribution: AC distributor with concentrated load; three-phase, 
four-wire distribution system; sub-mains; stepped and tapered mains. 
Total periods: 45 
TEXT BOOKS 
1. Gupta B.R, “Power System Analysis and Design”, S.Chand and company, New Delhi, 2008. 
2. Singh S.N, “Electric Power Generation, Transmission and Distribution”, Prentice Hall of India Pvt. Ltd, 
New Delhi, 2004. 
REFERENCES 
1. Luces M.Fualkenberry, Walter Coffer, “Electrical Power Distribution and Transmission”, Pearson 
education, 2007. 
2. Begamudre R.D, “Extra high voltage AC Transmission Engineering”, NewAge International (P) Ltd., 
January 2009. 
3. Central Electricity Authority (CEA), “Guidelines for Transmission System Planning”, New Delhi 
4. Tamil Nadu Electricity Board Handbook, 2003. 
Page 18 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2404 IC FABRICATION AND LINEAR INTEGRATED CIRCUITS 3 0 0 3 
AIM 
To expose the students to the concepts of IC fabrication, characteristics of op-amp, applications of op-amp 
and special ICs. 
OBJECTIVES 
· To study the IC fabrication. 
· To study characteristics of Op-amp, sine wave oscillators and waveform generators using Op-amp 
ICs. 
· To study the applications of Op-amp. 
· To study internal functional blocks and applications of special ICs like 555 IC Timer, 565 IC PLL, 
723 & LM317 IC Regulators, and AD533 IC Analog multiplier. 
· To study the various types of ADCs and DACs. 
UNIT - I IC FABRICATION 9 
IC classification, fundamental of monolithic IC technology- Epitaxial growth- Masking and etching- Diffusion of 
impurities- Isolation Techniques- Metallization- Packaging- Fabrication of Transistors, Diodes, Capacitors and 
Resistors- Fabrication of a typical circuit. 
UNIT - II CHARACTERISTICS OF OPAMP 9 
Ideal OP-AMP characteristics- DC characteristics- Voltage series feedback and shunt feedback amplifiers- 
Differential amplifier- AC characteristics- Frequency response of OP-AMP- Basic applications of op-amp– 
Summer, differentiator and integrator. 
UNIT - III APPLICATIONS OF OPAMP-I 9 
Instrumentation amplifier- First and second order active filters- V/I & I/V converters- Comparators- Sine wave 
oscillators- Square, triangular and sawtooth wave generators- Peak detector- Clipping and Clamping circuits. 
UNIT - IV APPLICATIONS OF OPAMP-II 9 
S/H circuit- D/A converter- R-2R ladder and weighted resistor types- A/D converter - Dual slope, successive 
approximation and flash types. 
UNIT -V SPECIAL IC”S AND THEIR APPLICATIONS 9 
555 Timer IC – Functional block diagram & applications; 565 IC-Phase lock loop- Functional block diagram and 
applications, LM317 and 723 IC voltage regulators, MA 7840 IC switching regulator- MCT2E IC opto-coupler- 
-AD533 IC Analog multiplier. 
Total periods: 45 
TEXT BOOKS 
1. Ramakant A.Gayakward, “Op-amps and Linear Integrated Circuits”, 4th Edition, Pearson Education, New 
Delhi, 2011. 
2. Roy Choudhary D, Sheil B.Jani, “Linear Integrated Circuits”, 4th Edition, New Age International Publishers, 
2010 
REFERENCES 
1. Jacob Millman, Christos C. Halkias, “Integrated Electronics: Analog and Digital circuitssystem”, 2nd Edition, 
Tata McGraw Hill, 2011. 
2. Robert F. Coughlin, Fredrick F. Driscoll, “Op-amps and Linear ICs”, Pearson Education, 6th Edition, 2011. 
3. David A. Bell, “Op-amp & Linear ICs”, Prentice Hall of India, 2nd Edition, 1997. 
4. Salivahanan S, V.S. Kanchana Bhaaskaran, “Linear Integrated Circuits”, New Delhi, Tata McGraw-Hill, 2008. 
Page 19 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2405 INTRODUCTION TO SIGNALS AND SYSTEMS 3 1 0 3 
AIM 
To study and analyze the characteristics of continuous and discrete signals and systems. 
OBJECTIVES 
· To study the properties and representation of discrete and continuous signals. 
· To study the sampling process and analysis of discrete system using Z-transform. 
· To analyse continuous time system using Fourier and Laplace transforms. 
· To learn about analysis and synthesis of discrete time systems. 
· To learn about system with impulse response. 
UNIT - I REPRESENTATION OF SIGNALS 9 
Continuous and discrete time signals: Classification of Signals – Periodic and aperiodic – Even and odd – Energy 
and power signals – Deterministic and random signals–periodicity – Properties of discrete time complex exponential 
UNIT impulse – UNIT step impulse functions –Transformation in independent variable of signals: time scaling, 
time shifting. Determination of Fourier series - Representation of continuous time and discrete time periodic signals. 
UNIT - II ANALYSIS OF CONTINUOUS TIME SIGNALS AND SYSTEMS 9 
Continuous time Fourier Transform and Laplace Transform analysis with examples – Properties of the Continuous 
time Fourier Transform and Laplace Transform basic properties, Parseval’s relation, and convolution in time and 
frequency domains. 
Basic properties of continuous time systems: Linearity, Causality, time invariance, stability, magnitude and Phase 
representations of frequency response of LTI systems -Analysis and characterization of LTI systems using Laplace 
transform: Computation of impulse response and transfer function using Laplace transform. 
UNIT - III SAMPLING THEOREM AND Z-TRANSFORM 9 
Representation of continuous time signals by its sample - Sampling theorem – Reconstruction of a Signal from its 
samples, aliasing – Discrete time processing of continuous time signals, sampling of band pass signals - Basic 
principles of z-transform - Z-transform definition – Region of convergence – Properties of ROC – Properties of z-transform 
– Poles and Zeros – Inverse z-transform using Contour integration – Residue Theorem, Power Series 
expansion and Partial fraction expansion, Relationship between z-transform and Fourier transform. 
UNIT - IV DISCRETE TIME SYSTEMS 9 
Computation of Impulse response & Transfer function using Z Transform. DTFT Properties and examples – LTI-DT 
systems -Characterization using difference equation – Block diagram representation – Properties of convolution 
and the interconnection of LTI Systems-Static variable equations and matrix representation of system. 
UNIT - V SYSTEMS WITH FINITE AND INFINITE DURATION IMPULSE RESPONSE 9 
Systems with finite duration and infinite duration impulse response – recursive and non-recursive discrete time 
system – realization structures – direct form – I, direct form – II, cascade and parallel forms. 
Total periods (45+15T): 60 
TEXT BOOKS 
1. AlanV.Oppenheim, Alan S.Willsky with Hamid Nawab.S, “Signals & Systems”, 3/e, Pearson Education, 
2000. 
REFERENCES 
1. John G.Proakis and Dimitris G.Manolakis, “Digital Signal Processing, Principles, Algorithms and 
Applications”, 4/e PHI, 2007. 
2. M.J.Roberts, “Fundamentals of Signals and Systems”, TMH 2008. 
3. K.Lindner, “Signals and Systems”, McGraw Hill International, 2000. 
4. H.P.Hsu, “Signals and systems “, Schaum”s outlines, Tata McGraw-Hill Co Ltd., 2006. 
Page 20 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2406 PRINCIPLES OF COMMUNICATION ENGINEERING 3 0 0 3 
AIM 
To introduce the concepts of communication systems engineering using wire and wireless medium 
OBJECTIVES 
· To introduce different methods of analog communication and their significance. 
· To introduce Digital Communication methods for high bit rate transmission.. 
· To introduce the concepts of source and line coding techniques for enhancing rating of transmission of 
minimizing the errors in transmission. 
· To introduce MAC used in communication systems for enhancing the number of users. 
· To introduce various media for digital communication 
UNIT - I ANALOG COMMUNICATION 9 
AM – Frequency spectrum – Vector representation – Power relations – Generation of AM – DSB,DSB/SC, SSB, 
VSB AM Transmitter & Receiver; FM and PM – Frequency spectrum – Power relations : NBFM & WBFM, 
Generation of FM and DM, Amstrong method & Reactance modulations :FM & PM frequency. 
UNIT - II DIGITAL COMMUNICATION 9 
Pulse modulations – Concepts of sampling and sampling theormes, PAM, PWM, PPM, PTM,quantization and 
coding : DCM, DM, slope overload error. ADM, DPCM, OOK systems –ASK, FSK, PSK, BSK, QPSK, QAM, 
MSK, GMSK, applications of Data communication. 
UNIT - III SOURCE CODES, LINE CODES & ERROR CONTROL (Qualitative only) 9 
Primary communication – Entropy, properties, BSC, BEC, source coding : Shaum, Fao, Huffman coding : noiseless 
coding theorum, BW – SNR trade off codes: NRZ, RZ, AMI, HDBP, ABQ,MBnB codes : Efficiency of 
transmissions, error control codes and applications:convolutions & block codes. 
UNIT - IV MULTIPLE ACCESS TECHNIQUES 9 
SS&MA techniques: FDMA, TDMA, CDMA, SDMA application in wire and wireless communication: Advantages 
(merits), Wi-Fi, i-pad, i-pod, Blue tooth devices. 
UNIT - V SATELLITE, OPTICAL FIBER – POWERLINE, SCADA 9 
Orbits: types of satellites: frequency used link establishment, MA techniques used in satellite Communication, earth 
station; aperture actuators used in satellite – Intelsat and Insat: fibers – Types: sources, detectors used, digital filters, 
optical link: power line carrier communications: SCADA 
Total periods: 45 
TEXT BOOKS 
1.Taub & Schiling “Principles of communication systems” Tata McGraw hill 2007 
2.Das J, Chatterjee P.K., Mullik S.K., “Principles of digital communication” New Age International, 2nd Edition, 
2012. 
REFERENCES 
1. Kennedy and Davis “Electronic communication systems” Tata McGraw hill, 4th edition, 1993, 35th Reprint 
(2008). 
2. Sklar “Digital communication fundamentals and applications“ Pearson Education, 2nd Edition, 2001 
3. Bary le, Memuschmidt, digital Communication, Kluwer Publication, 2004. 
4. Lathi B.P, “Modern digital and analog communication systems” Oxford University Press, 4th Edition, 2009. 
Page 21 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2407 DC MACHINES AND TRANSFORMERS LABORATORY 0 0 3 2 
AIM 
To expose the students to the operation of D.C. machines and transformers and give them 
experimental skill. 
EXPERIMENTS 
1. Open circuit and load characteristics of D.C separately and self excited shunt generator 
2. Load characteristics of D.C. compound generator with differential and cumulative connections 
3. Load characteristics of D.C. shunt motor 
4. Load characteristics of D.C. compound motor 
5. Load characteristics of D.C series motor 
6. Swinburne”s test 
7. Speed control of D.C shunt motor 
8. Hopkinson”s test on D.C motor – generator set 
9. Load test on single-phase transformer and 
10. Open circuit and short circuit tests on single phase transformer 
11. Sumpner”s test on transformers 
12. Separation of no-load losses in single phase transformer 
Practical 45 
Additional experiments 
13. Study of D.C.motor starters 
14. Three phase transformer connections 
Page 22 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2408 LINEAR INTEGRATED CIRCUITS LABORATORY 0 0 3 2 
AIM 
To impart practical knowledge to the students to understand the basic concepts and applications of op-amps 
and special ICs. 
OUTCOMES 
After successful completion of this course, the students will be able to, 
· Design op-amp circuits for practical applications. 
· Design voltage regulators, A/D and D/A converters for practical applications. 
· Design Astable and Monostable multivibrators using 555 Timer IC for practical applications. 
· Design frequency multiplier using 565 PLL IC for practical applications. 
LIST OF EXPERIMENTS 
1. Inverting and non-inverting amplifiers 
2. Integrator and differentiator 
3. Square and Triangular wave generators 
4. Op-Applications – Adder, Subtractor, Averaging amplifier 
5. Comparators using LM311 IC 
6. 555 Timer IC Applications- Astable and Monostable multivibrator 
7. Analog to Digital and Digital to Analog Converters. 
8. 565 PLL IC Applications - Frequency multiplier 
9. 723 IC and LM317 IC Voltage Regulators 
10. Differential and Instrumentation amplifier 
11. Measurement of op-amp parameters 
Practical 45 
Page 23 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
V SEMESTER 
12EE2501 CONTROL SYSTEM ENGINEERING 3 1 0 4 
AIM 
To expose the students to the basic concepts of control systems. 
OBJECTIVES 
· To understand the open loop and closed loop systems. 
· To understand the modelling of physical systems using transfer function and state space approach. 
· To understand time domain and frequency domain analysis of control systems. 
· To understand the compensation techniques used to stabilize control systems. 
UNIT - I CONTROL SYSTEM MODELLING 9 
System concept- Open loop and closed loop systems- Modelling of electrical, mechanical, and electromechanical 
systems- Transfer function of DC generator- DC and AC servomotor- Electrical analogy of mechanical systems- 
Block diagram representation of systems- Block diagram reduction Techniques- Signal flow graphs- Mason”s gain 
formula- Examples. 
UNIT - II TIME DOMAIN ANALYSIS 9 
Standard Test signals–Time response of first and second order systems- Performance parameters- Type and order of 
systems- Steady state error constants - Generalized error series– Steady state error- Introduction to P, PI and PID 
controllers- Design of PID controllers. 
UNIT - III FREQUENCY DOMAIN ANALYSIS 9 
Frequency domain specifications – Peak resonance- Resonant frequency- Bandwidth and cut-off rate- Correlation 
between time and frequency response of second order systems- Bode plots- Polar plots- Determination of closed 
loop response from open loop response. 
UNIT - IV STABILITY ANALYSIS 9 
Characteristic equation – Location of roots of characteristic equation for stability– Absolute stability and Relative 
stability- Routh Hurwitz criterion for stability- Root locus– Effect of pole- Zero addition, Nyquist stability criterion- 
Gain margin- phase margin. 
UNIT – V COMPENSATOR AND STATE SPACE REPRESENTATION 9 
Design of lag, lead, and lag-lead compensator using Bode plot - Modelling of physical systems using state space 
approach- Advantages of state space approach over transfer function model. 
Total periods (45+15T): 60 
TEXT BOOKS 
1. Nagrath I.J and Gopal M, “Control Systems Engineering”, New Age International Publishers, 5th edition, 2008. 
REFERENCESS 
1. Benjamin C. Kuo, “Automatic Control Systems”, John Wiley and Sons, 9th Edition, 2010. 
2. Gopal M, “Control Systems, Principles & Design”, Tata McGraw Hill, New Delhi, 3rd Ed., 2008. 
3. Bandyopadhyay M.N,“Control Engineering Theory and Practice”, Prentice Hall of India, 2003 
4. Ogata K, “Modern Control Engineering”, 5th edition, Pearson Education, New Delhi, 2010. 
5. Norman S. Nise, Control Systems Engineering, 5th Edition, John Wiley, New Delhi, 2009. 
6. Samarjit Ghosh, Control systems, Pearson Education, New Delhi, 2004. 
Page 24 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2502 SYNCHRONOUS AND INDUCTION MACHINES 3 1 0 4 
AIM 
To expose the students to the concepts of synchronous and asynchronous machines and to analyse their 
performance. 
OBJECTIVES 
To impart knowledge on 
· Construction and performance of salient and non – salient type synchronous generators. 
· Principle of operation and performance of synchronous motor. 
· Construction, principle of operation and performance of induction machines. 
· Starting and speed control of three-phase induction motors. 
· Construction, principle of operation and performance of single phase induction motors and special 
machines. 
UNIT - I SYNCHRONOUS GENERATOR 9 
Constructional details – Types of rotors – emf equation – Synchronous reactance – Armature reaction – Voltage 
regulation – e.m.f, m.m.f, z.p.f and A.S.A methods – Synchronizing and parallel operation – Synchronizing torque - 
Change of excitation and mechanical input – Two reaction theory – Determination of direct and quadrature axis 
synchronous reactance using slip test – Operating characteristics - Capability curves. 
UNIT - II SYNCHRONOUS MOTOR 8 
Principle of operation – Torque equation – Operation on infinite bus bars - Phasor diagrams -V and inverted V 
curves - Hunting – Power input and power developed equations – Starting methods – Current loci for constant 
power input, constant excitation and constant power developed. 
UNIT - III THREE PHASE INDUCTION MOTOR 12 
Constructional details – Types of rotors – Principle of operation – Slip – Equivalent circuit – Slip-torque 
characteristics - Condition for maximum torque – Losses and efficiency – Load test - No load and blocked 
rotor tests - Circle diagram – Separation of no load losses – Double cage rotors – Induction generator – 
Synchronous induction motor. 
UNIT - IV STARTING AND SPEED CONTROL OF THREE PHASE INDUCTION MOTOR 7 
Need for starting – Types of starters – Stator resistance and reactance, autotransformer and star-delta starters – Rotor 
resistance starter – Speed control – Change of voltage, frequency, number of poles and slip – Cascaded 
connection – Slip power recovery scheme. 
UNIT - V SINGLE PHASE INDUCTION MOTORS AND SPECIAL MACHINES 9 
Constructional details of single phase induction motor – Double revolving field theory and operation – Equivalent 
circuit – No load and blocked rotor test – Performance analysis – Starting methods of single-phase induction 
motors - Special machines - Shaded pole induction motor, reluctance motor, repulsion motor, hysteresis motor, 
stepper motor and AC series motor. 
Total periods (45+15T): 60 
TEXT BOOKS 
1. Kothari D.P and Nagrath I.J., “Electric Machines”, Tata McGraw Hill Publishing Company Ltd, 4th Edition, 2010. 
REFERENCES 
1. Gupta J.B, “Theory and Performance of Electrical Machines”, S.K.Kataria and Sons, 2002. 
2. Murugesh Kumar K, “Induction and synchronous machines” Vikas publishing house Pvt Ltd., 2009. 
3. Sheila.C.Haran, “Electrical Machines II”, Scitech Publications, 2nd Edition 2008. 
4. Say M.G, “Alternating Current Machines”, 5th Edition, Pitman, 1992. 
5. Bhimbhra P.S, “Electrical Machinery”, Khanna Publishers, 2003. 
Page 25 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
Page 26 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2503 POWER SYSTEM PROTECTION AND SWITCHGEAR 3 0 0 3 
AIM 
To study the various faults and protection schemes in power systems. 
OBJECTIVES 
· To discuss the need for the protection and various protection schemes. 
· To study relays characteristics 
· To study apparatus protection 
· To understand the method of circuit breaking, arcing phenomena – various arc theories-capacitive and 
inductive breaking 
· To understand the working of different types of circuit breakers and their testing methods 
UNIT- I INTRODUCTION 9 
Principles and need for protective schemes – nature and causes of faults – types of faults – fault current calculation 
using symmetrical components – Earthing – Zones of protection and essential qualities of protection – Protection 
schemes – CTs and PTs and their applications. 
UNIT - II PROTECTIVE RELAYS 9 
Operating principles of relays, the universal relay, electromagnetic relays (including torque equation, relay 
characteristics): over current, directional, distance and differential relays, negative sequence relays, frequency relays 
- static relays (including amplitude and phase comparators), Introduction to numerical relays. 
UNIT - III APPARATUS PROTECTION 9 
Apparatus protection – transformer, generator, motor - protection of bus bars, transmission lines 
UNIT - IV THEORY OF CIRCUIT INTERRUPTION 9 
Physics of arc phenomena and arc interruption, Restriking voltage & Recovery voltage, rate of rise of recovery 
voltage, resistance switching, current chopping, Interruption of capacitive current – DC circuit breaking. 
UNIT - V CIRCUIT BREAKERS 9 
Types of Circuit Breakers – Oil and Air blast circuit breakers (Qualitative Treatment only), SF6 and Vacuum circuit 
breakers - Air break circuit breakers – comparative merits of different circuit breakers – Testing of circuit breakers. 
Total periods: 45 
TEXT BOOKS 
1. Badri Ram, Vishwakarma, “Power System Protection and Switchgear”, Tata McGraw Hill Publishing Co. 
Ltd., 2001. 
2. Bhuvanesh Oza,Nirmal-Kumar Nair, Rashesh Mehta,Vijay Makwana, “Power System Protection & 
Switchgear”, First Edition, Tata McGraw hill, 2010. 
REFERENCE BOOKS 
1. Sunil S. Rao, “Switchgear and Protection”, Khanna publishers, New Delhi, 1986. 
2. Wadhwa C.L., “Electrical Power Systems”, New age International (P) Ltd., Fourth Edition, 2005. 
Page 27 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
3. Paithankar Y.G., and Bhide S.R., “Fundamentals of Power System Protection”, Prentice Hall of India Pvt. 
Ltd., New Delhi – 110001, 2003. 
4. Van A. R. and Warrington C., “Protective Relays - Their Theory and Practice: Vol. I and Vol. II”, Third 
Edition, Chapman and Hall Ltd. 
5. Madhavrao T.S., “Power System Protection: Static Relays”, Tata McGraw Hill Publishing Co. Ltd., Second 
Edition, 2008. 
6. Lythall R.T., “J and P Switchgear Handbook”, Newness Butterworths, 1972. 
7. Prof. S.A. Soman, IIT, Bombay, Web course on “Power System Protection”, http://www.nptel.iiim.ac.in 
8. Madhavrao T.S., “Digital Numerical Relays”, Tata McGraw Hill Publishing Co. Ltd., 2005. 
Page 28 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2504 MICROPROCESSORS AND MICRO CONTROLLERS 3 0 0 3 
AIM 
To introduce Microprocessor Intel 8085, Arm processor and Micro Controllers 
OBJECTIVES 
· To study about architecture and programming of 8085. 
· To learn about Pentium processor. 
· To study about arm processor. 
· To study about 8051 microcontroller. 
· To learn about PIC microcontroller. 
UNIT - I 8085 PROCESSOR & PROGRAMMING 9 
Functional block diagram – Memory interfacing - Interrupt structure.- Instruction set and addressing modes- 
Assembly language format-simple programming exercises. 
UNIT - II PENTIUM PROCESSOR 9 
Intel Pentium processors-Superscalar architecture and signals-special registers-cache structure-memory 
management-Instruction set-Simple programs. 
UNIT - III ARM PROCESSOR 9 
The ARM architecture-ARM Assembly Language Program-ARM organization-Instruction set-The thumb 
Instruction set-ARM CPU cores. 
UNIT - IV MICRO CONTROLLER 8051 9 
Functional block diagram - Instruction set and addressing modes – Interrupt structure-simple programming 
exercises- Use of C compliers for 8051. 
UNIT - V PIC MICROCONTROLLER 9 
CPU Architecture-Instruction set-Interrupts-I2C bus-Timers-I/O port expansion-UART. 
Total periods: 45 
TEXT BOOKS 
1. Gaonkar, S., “Microprocessor Architecture Programming and Application”, Penram International, Fifth 
Edition, New Delhi, 2002. 
2. Muhammad Ali Mazidi & Janice Gilli Mazidi, “The 8051 Micro Controller and Embedded Systems”, 
Pearson Education, 5th Indian reprint, 2003. 
3. Barry. B. Bery “The Intel Microprocessors 8086/8088,80186/80188,80286,80386,80486,pentium and 
Pentium pro processor-Architecture, programming and Interfacing”, Prentice Hall of India pvt.Ltd., 
Seventh Edition, 2006. 
REFERENCES 
1. Steve Furber, “ARM Sytem –On Chip architecture”, Addison Wesley, 2000. 
2. John.B.Peatman, “Design with PIC Microcontrollers” Pearson Education, 1998. 
Page 29 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2505 DIGITAL SIGNAL PROCESSING FOR ELECTRICAL ENGINEERS 3 1 0 3 
AIM 
To study the signal processing methods, processors and applications. 
OBJECTIVES 
· To study DFT and its computation 
· To study the design techniques for digital filters 
· To study the finite word length effects in signal processing 
· To study the fundamentals of digital signal processors. 
· To study the DSP applications 
UNIT - I FAST FOURIER TRANSFORM 9 
Introduction to DFT – Efficient computation of DFT- Properties of DFT – FFT algorithms – Radix-2 FFT 
algorithms – Decimation in Time – Decimation in Frequency algorithms – convolution- overlap save method. 
UNIT - II DESIGN OF INFINITE IMPULSE RESPONSE DIGITAL FILTER 9 
Review of design of analogue Butterworth and Chebyshev Filters- Frequency transformation in analog domain – 
Design of IIR digital filters using impulse invariance technique – Design of IIR digital filters using bilinear 
transformation – pre warping – Frequency transformation in digital domain – Realization - Direct form I, Direct 
form II, cascade and parallel. 
UNIT - III DESIGN OF FINITE IMPULSE RESPONSE DIGITAL FILTERS 9 
Linear phase response of FIR- Windowing techniques for design of linear phase FIR filters: Rectangular- 
Hamming- Hanning- Blackman and Kaiser Windows. Gibbs phenomenon – Frequency sampling technique-. 
Realization of FIR filters-lattice structure- Comparision of FIR & IIR. 
UNIT - IV FINITE WORD LENGTH EFFECTS & DIGITAL SIGNAL PROCESSOR 9 
Quantization noise – derivation for quantization noise power – Binary fixed point and floating-point number 
representations – Comparison – truncation and rounding error – input quantization error-coefficient quantization 
error – limit cycle oscillations-dead band- overflow error-signal scaling-scaling-Introduction to general and special 
purpose hardware for DSP – Harvard architecture-Pipelining – Addressing Modes – Overview of Architecture and 
instruction set of TMS320C50. 
UNIT – V APPLICATIONS OF DIGITAL SIGNAL PROCESSING 9 
Speech and Audio Signal Processing- Radar Signal Processing- Vocal Mechanism-Speech Technology- Parameters 
of Speech- Speech Analysis- Speech Loading- Digital Processing of Audio Signals- Biomedical-ECG, EEG. 
Total periods (45+15T): 60 
TEXT BOOKS 
1. John G Proakis- Dimtris G Manolakis- Digital Signal Processing Principles- Algorithms and Application- 
Pearson/PHI- 4th /e- 2007. 
2. Allan V.Openheim, Ronald W.Sehafer & John R.Buck-“Discrete Time Signal Processing”, second /e- 
Pearson/Prentice Hall. 
3. Mitra S.K, “Digital Signal Processing- A Computer based approach”- Tata McGraw-Hill- 1998- New 
Delhi. 
REFERENCES 
1. Venkataramani B & Bhaskar M, “Digital Signal Processor Architecture- Programming and 
application” TMH 2002. 
2. Johny R ”Johnson Introduction to Digital Signal Processing” Prentice Hall- 1984. 
3. Li Tan, “Digital Signal Processing” Elsevier-2008. 
Page 30 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2506 DATA STRUCTURES AND DEVELOPING ALGORITHMS 3 0 0 3 
AIM 
To provide an in-depth knowledge in problem solving techniques and data structures. 
OBJECTIVES 
· To learn the systematic way of solving problems 
· To understand the different methods of organizing large amounts of data 
· To learn to program in C 
· To efficiently implement the different data structures 
· To efficiently implement solutions for specific problems 
UNIT - I INTRODUCTION TO DATA STRUCTURES 9 
Abstract data types - Sequences as value definitions - Data types in C - Pointers in C -Data structures and C - Arrays 
in C - Array as ADT - One dimensional array -Implementing one dimensional array - Array as parameters - Two 
dimensional array -Structures in C - Implementing structures - Unions in C - Implementation of unions -Structure 
parameters - Allocation of storage and scope of variables. Recursive definition and processes: Factorial function - 
Fibonacci sequence - Recursion in C - Efficiency of recursion. 
UNIT - II STACK, QUEUE AND LINKED LIST 9 
Stack definition and examples – Primitive operations – Example - Representing stacks in C - Push and pop operation 
implementation. Queue as ADT - C Implementation of queues - Insert operation - Priority queue - Array 
implementation of priority queue. Inserting and removing nodes from a list-linked implementation of stack, queue 
and priority queue - Other list structures - Circular lists: Stack and queue as circular list -Primitive operations on 
circular lists. Header nodes - Doubly linked lists - Addition of long positive integers on circular and doubly linked 
list. 
UNIT - III TREES 9 
Binary trees: Operations on binary trees - Applications of binary trees - Binary tree representation - Node 
representation of binary trees - Implicit array representation of binary tree – Binary tree traversal in C - Threaded 
binary tree - Representing list as binary tree - Finding the Kth element - Deleting an element. Trees and their 
applications: C representation of trees - Tree traversals - Evaluating an expression tree - Constructing a tree. 
UNIT -IV SORTING AND SEARCHING 9 
General background of sorting: Efficiency considerations, Notations, Efficiency of sorting. Exchange sorts; Bubble 
sort; Quick sort; Selection sort; Binary tree sort; Heap sort. Heap as a priority queue - Sorting using a heap-heap sort 
procedure - Insertion sorts: Simple insertion - Shell sort - Address calculation sort - Merge sort -Radix 
sort.Sequential search: Indexed sequential search - Binary search - Interpolation search. 
UNIT - V GRAPHS 9 
Application of graph - C representation of graphs - Transitive closure - Warshall”s algorithm – Shortest path 
algorithm - Linked representation of graphs - Dijkstra”s algorithm - Graph traversal - Traversal methods for graphs - 
Spanning forests - Undirected graph and their traversals - Depth first traversal - Application of depth first traversal - 
Efficiency of depth first traversal - Breadth first traversal - Minimum spanning tree - Kruskal”s algorithm - Round 
robin algorithm. 
Total periods: 45 
TEXT BOOKS 
1. Aaron M. Tenenbaum, Yeedidyah Langsam, Moshe J. Augenstein, “Data structures using C”, Pearson 
Education, 2004 / PHI 
REFERENCES 
1. Balagurusamy E, “Programming in Ansi C”, Fifth Edition, Tata McGraw Hill Publication, 2010. 
2. Robert L. Kruse, Bruce P. Leung Clovis L.Tondo, “Data Structures and Program Design in C”, Pearson 
Education, 2000 / PHI. 
Page 31 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2507 SYNCHRONOUS AND INDUCTION MACHINES LABORATORY 0 0 3 2 
AIM 
To expose the students to the operation of synchronous machines and induction motors and give them 
experimental skill. 
EXPERIMENTS 
1. Regulation of three phase alternator by emf and mmf methods. 
2. Regulation of three phase alternator by ZPF and ASA methods. 
3. Regulation of three phase salient pole alternator by slip test. 
4. Measurements of negative sequence and zero sequence impedance of alternators. 
5. V and Inverted V curves of three Phase Synchronous Motor. 
6. Load test on three-phase induction motor. 
7. No load and blocked rotor test on three-phase induction motor. 
8. Separation of No-load losses of three-phase induction motor. 
9. Load test on single-phase induction motor 
10. No load and blocked rotor test on single-phase induction motor. 
Practical 45 
Additional experiments 
11. Study of starters for synchronous and induction motors. 
12. Parallel operation of three phase alternators. 
Page 32 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2508 DATA STRUCTURES AND ALGORITHMS LABORATORY 0 0 3 2 
AIM 
To train the students in developing algorithms and writing programs in data structures. 
EXPERIMENTS 
1. Queue implementation using arrays. 
2. Stack implementation-using arrays. 
3. Singly, doubly and circular liked list implementation and all possible operation on lists. 
4. Queue and Stack implementation using linked list 
5. Binary search tree implementation using linked list and possible operations on binary search trees 
6. In-order, pre-order and post order traversals. 
7. Quick sort implementation and its efficiency calculation. 
8. Binary Search implementation. 
9. Graph implementation-using arrays and list structure. 
10. Depth first and Breadth first traversal in graphs. 
Practical 45 
Page 33 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EN2001 COMMUNICATION SKILLS LABORATORY 0 0 2 1 
AIM 
Globalization has brought in numerous opportunities for the teeming millions, with more focus on the students over 
all capability apart from academic competence. Many students, particularly those from non- English medium 
schools, find that they are not preferred due to their inadequacy of communication skills and soft skills, despite 
possessing sound knowledge in their subject area along with technical capability. Keeping in view their pre-employment 
needs and career requirements, this course on Communication Skills Laboratory will prepare students 
to adapt themselves with ease to the industry environment, thus rendering them as prospective assets to industries. 
The course will equip the students with the necessary communication skills that would go a long way in helping 
them in their profession. 
OBJECTIVES 
· To equip students of engineering and technology with effective speaking and listening skills in English. 
· To help them develop their soft skills and people skills, which will make 
The transition from college to workplace smoother and help them to excel in their jobs. 
· To enhance students’ performance at Placement Interviews, Group Discussions and other recruitment exercises. 
I.PC based session (weightage- 40%) 
A. English Language Lab 
1. Listening Comprehension 
Listening and typing- Listening and sequencing of sentences - Filling in the blanks - Listening and answering 
the questions. 
2. Reading Comprehension and Vocabulary 
Filling in the blanks - Cloze Exercises - vocabulary building –Verbal Passages. 
3. Speaking. 
Phonetics: Intonation - Ear Training - Correct Pronunciation - Sound recognition exercises - Common Errors in 
English. 
Conversations: Face to Face Conversation - Telephone Conversation -Role play activities (Students take on 
roles and engage in Conversation) 
B. Career Lab 
(Samples are available to learn and practice in the class room session) 
1. Resume / Report preparation / Letter writing 
Structuring the resume / report - Letter writing / E-mail Communication -Samples. 
2. Presentation skills 
Elements of an effective presentation - Structure of a presentation - Presentation tools - Voice Modulation- 
Audience analysis - Body Language -Video Samples 
3. Group Discussion 
Page 34 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
Why is GD part of selection process? - Structure of a GD - Moderator- Led and other GDs - Strategies in GD - 
Team work - Body Language - Mock GD -Video samples 
4. Interview Skills 
Kinds of Interviews -Required Key Skills - Corporate culture - Mock Interviews -Video Samples 
5. Corporate Etiquette: Telephone etiquette-email etiquette-dining etiquette 
II Class Room Session (Weightage - 60 %) Periods 
· Presentation Skills. 
· Group Discussion. 
· Presenting a Sales Plan. 
· Presenting a Company Profile 
· Product Demonstration. 
· Mock Interview. 
· Introducing a famous personality to the Audience. 
· Welcome address & Vote of thanks. 
· Case Study.(Related to Engineering). 
· Decision Making & Problem Solving Techniques. 
Note: 
Class room sessions are practice sessio 
Page 35 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
VI SEMESTER 
12EE2601 ELECTRIC MACHINE DESIGN 3 1 0 4 
AIM 
To expose the students to the concept of design of various types of electrical machines 
OBJECTIVES 
To provide sound knowledge about constructional details and design of various electrical machines. 
· To study mmf calculation and thermal rating of various types of electrical machines. 
· To design armature and field systems for D.C. machines. 
· To design core, yoke, windings and cooling systems of transformers. 
· To design stator and rotor of induction machines. 
· To design stator and rotor of synchronous machines and study their thermal behaviour. 
UNIT - I INTRODUCTION 9 
Major considerations in Electrical Machine Design - Electrical Engineering Materials – Space factor –Choice of 
Specific Electrical and Magnetic loadings - Thermal considerations - Heat flow –Temperature rise - Rating of 
machines – Standard specifications. 
UNIT - II D.C. MACHINES 9 
Output equation – Main dimensions - Choice of specific loadings – Choice of number of poles – Armature design – 
Design of field poles and field coil – Design of commutator and brushes – Losses and efficiency calculations. 
UNIT - III TRANSFORMERS 9 
Output rating of single phase and three phase transformers – Optimum design of transformers – Design of core, 
yoke and windings for core and shell type transformers – Equivalent circuit parameter from designed data – Losses 
and efficiency calculations – Design of tank and cooling tubes of transformers. 
UNIT IV THREE PHASE INDUCTION MOTORS 9 
Output equation – Main dimensions – Choice of specific loadings – Design of stator – Design of squirrel cage and 
slip ring rotor – Equivalent circuit parameters from designed data – Losses and efficiency calculations. 
UNIT V SYNCHRONOUS MACHINES 9 
Output equation – Choice of specific loadings – Main dimensions – Short circuit ratio – Design of stator and rotor of 
cylindrical pole and salient pole machines - Design of field coil - Performance calculation from designed data - 
Introduction to computer aided design. 
Total periods (45+15T): 60 
TEXT BOOKS 
1. Sawhney A.K, “A Course in Electrical Machine Design”, Dhanpat Rai and Sons, New Delhi, 2004. 
2. Sen S.K, “Principles of Electrical Machine Design with Computer Programmes”, Oxford and IBH 
Publishing Co.Pvt Ltd., New Delhi, 1987. 
REFERENCES 
1. Agarwal R.K, “Principles of Electrical Machine Design”, S.K.Kataria and Sons, Delhi, 2009. 
2. Mittle V.N and Mittle A, “Design of Electrical Machines”, Standard Publications and Distributors, Delhi, 
2002. 
Page 36 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2602 POWER SYSTEM ANALYSIS 3 1 0 4 
AIM 
To become familiar with the modeling of various power system components and different methods of 
analysis for power system planning and operation. 
OBJECTIVES 
· To model steady-state operation of large-scale power systems and to solve the power flow problems using 
efficient numerical methods suitable for computer simulation. 
· To model and analyse power systems under abnormal (fault) conditions. 
· To model and analyse the dynamics of power system for small-signal and large signal disturbances and o 
design the systems for enhancing stability. 
UNIT - I INTRODUCTION 9 
Overview of Power System Analysis: Importance of system planning and operational analysis; Distinction between 
steady state, quasi steady state and transient analysis; Per phase analysis of symmetrical three phase system, single 
line diagram, per UNIT representation; different models for generator, load and transmission lines based on the 
analysis of interest – π equivalent circuit of transformer with off nominal-tap ratio. 
UNIT - II BASICS OF ANALYSIS AND COMPONENT MODELLING 9 
Primitive network and its matrices, bus admittance matrix formation by inspection method and singularity 
transformation method, bus impedance matrix formation by L-U factorisation of bus admittance matrix and by 
building algorithm. Symmetrical component transformation, sequence impedances and sequence networks. 
UNIT - III POWER FLOW ANALYSIS 9 
Importance of power flow analysis in planning and operation of power systems; Power flow problem: Description of 
the problem, classification of buses into P-Q buses, P-V (voltage-controlled) buses and slack bus. Power flow 
equations and solution: Development of power flow model in complex variable form, Iterative solution using Gauss- 
Seidel and Newton-Raphson methods including Q-limit check for voltagecontrolled buses, flow chart- numerical 
examples. 
UNIT - IV FAULT ANALYSIS 9 
Symmetrical short circuits: Thevenin”s theorem and applications, short circuit analysis - Numerical examples. Short 
circuit capacity - Circuit breaker selection. Unsymmetrical short circuits: Derivation of fault current for LG, LL, 
LLG short circuits and development of interconnection of sequence networks. 
UNIT - V STABILITY ANALYSIS 9 
Description of power system stability problem; importance of stability analysis in power system planning and 
operation; classification of power system stability. Single Machine Infinite Bus (SMIB) system: Development of 
swing equation; power-angle equation; Equal Area Criterion; determination of critical clearing angle and time; 
algorithm for numerical solution of swing equation using modified Euler method; usage of numerical algorithm for 
determination of critical clearing time by trial and error – Digital simulation. 
Total periods (45+15T): 60 
TEXT BOOKS 
1. Hadi Saadat, “Power System Analysis”, Tata McGraw Hill Publishing Company Ltd., 2nd Edition, New 
Delhi, 2009. 
2. John J. Grainger and W.D. Stevenson Jr., “Power System Analysis”, Tata McGraw Hill Publishing 
Company Ltd., New Delhi,2003. 
3. Kothari D.P, Nagarath I.J., “Power System Engineering”,Tata McGraw-Hill Publishing Company Ltd., 2nd 
Edition, NewDelhi, 2008. 
REFERENCES 
Page 37 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
1. Kundur P, “Power System Stability and Control, Tata McGraw-Hill Publishing Company Ltd., New Delhi, 1994. 
2. Nagrath I.J. and Kothari D.P., “Modern Power System Analysis”, Tata McGraw-Hill Publishing Company Ltd., 
3rd Edition, New Delhi, 2003. 
3. Olle. I. Elgerd, “Electric Energy Systems Theory – An Introduction”, Tata McGraw Hill Publishing Company 
Limited, 2nd Edition, New Delhi, 2008. 
Page 38 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2603 POWER ELECTRONICS 3 1 0 4 
AIM 
To introduce the application of electronic devices for conversion, control and conditioning of electric power. 
OBJECTIVES 
· To get an overview of different types of power semi-conductor devices and their switching characteristics. 
· To understand the operation, characteristics and performance parameters of controlled rectifiers. 
· To study the operation, switching techniques and basic topologics of DC-DC switching regulators. 
· To learn the different modulation techniques of pulse width modulated inverters and to understand the 
harmonic reduction methods. 
· To know the practical application for power electronics converters in conditioning the power supply. 
UNIT - I POWER SEMI-CONDUCTOR DEVICES 9 
Structure, operation and characteristics of SCR, TRIAC, power transistor, MOSFET and IGBT. Driver and snubber 
circuits for MOSFET - Turn-on and turn-off characteristics and switching losses. 
UNIT - II LINE COMMUTATED CONVERTERS 9 
2,4 pulse converter with R,RL,RLE loads, effect of free wheeling diode – continuous and discontinuous conduction 
mode - Effect of source inductance and load inductance – introduction to 3,6 pulse converter - Dual converters- 
Series converters. Basic principle of operation of single phase cycloconverter- AC voltage controllers. 
UNIT - III DC TO DC CONVERTERS 9 
Step-down and step-up choppers - Time ratio control and current limit control – class of choppers - Switching mode 
regulators: Buck, boost, buck-boost and cuk converter - Resonant switching based SMPS. 
UNIT - IV INVERTERS 9 
Single phase and three phase (both 1200 mode and 1800 mode) inverters - PWM techniques: Sinusoidal PWM, 
modified sinusoidal PWM and multiple PWM - Voltage and harmonic control - Series resonant inverter - Current 
source inverters. 
UNIT - V APPLICATIONS 9 
Uninterrupted power supply topologies - Flexible AC transmission systems - Shunt and series static VAR 
compensator - Unified power flow controller- HVDC Transmission. 
Total periods (45+15T): 60 
TEXT BOOKS 
1. Bimbhra P.S, “Power Electronics” , Khanna Publishers, New Delhi, 2012 
2. Singh M.D, Khandchandni K.B, Power Electronics, Tata Mc Graw Hill, 2nd Edition, 2007 
REFERENCES 
1. Muhammad H. Rashid, “Power Electronics: Circuits, Devices and Applications”, Pearson 
Education, 3rd edition, 2004 / PHI 
2. Cyril.W.Lander, “Power Electronics”, McGraw Hill International, 3rd edition, 1994 
3. Bimal K. Bose, “Modern Power Electronics and AC Drives”, Pearson Education, 2003 
4. Jagannathan V., “Introduction to Power Electronics”, Prentice Hall of India, 2004 
Page 39 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2604 EMBEDDED SYSTEM DESIGN 3 0 0 3 
AIM 
To understand the basic concepts of embedded system design and its applications to various fields. 
OBJECTIVES 
To provide a clear understanding of 
· Embedded system terminologies and its devices. 
· Various Embedded software Tools 
· Design and architecture of Memories. 
· Architecture of processor and memory organizations. 
· Input/output interfacing 
· Various processor scheduling algorithms. 
· Basics of Real time operating systems. 
· Introduction to PIC and its applications. 
UNIT - I INTRODUCTION TO EMBEDDED SYSTEMS 9 
Introduction to embedded real time systems – The build process for embedded systems – Types of memory – 
Memory management methods. 
UNIT - II EMBEDDED SYSTEM ORGANIZATION 9 
Structural UNITs in processor , selection of processor & memory devices – DMA – I/O devices : timer & counting 
devices – Serial communication using I2C , CAN USB buses – Parallel communication using ISA , PCI ,PCI/X 
buses – Device drivers 
UNIT - III PROGRAMMING AND SCHEDULING 9 
Intel I/O instructions – Synchronization - Transfer rate, latency; interrupt driven input and output - Nonmaskable 
interrupts, software interrupts, Preventing interrupts overrun - Disability interrupts. Multithreaded programming – 
Context Switching, Preemptive and non-preemptive multitasking, semaphores. Scheduling-thread states, pending 
threads, context switching 
UNIT - IV REAL-TIME OPERATING SYSTEMS 9 
Introduction to basic concepts of RTOS, UNIX as a Real Time Operating system – Unix based Real Time operating 
system - Windows as a Real time operating system – POSIX – RTOS-Interrupt handling - A Survey of 
contemporary Real time Operating systems:PSOS, VRTX, VxWorks, QNX, чC/OS-II, RT Linux – Benchmarking 
Real time systems – Basics. 
UNIT - V PIC MICROCONTROLLER BASED EMBEDDED SYSTEM DESIGN 9 
PIC microcontroller – MBasic compiler and Development boards – The Basic Output and digital input – 
Applications 
Total periods: 45 
TEXT BOOKS 
1. Rajkamal, “Embedded system-Architecture, Programming, Design”, Tata Mc graw Hill, 2nd Edition, 2008. 
2. Daniel W. Lewis ,”Fundamentals of Embedded Software”, Pearson College Division, 2nd Edition, 2012. 
REFERENCES 
1. Jack R Smith “Programming the PIC microcontroller with MBasic” Elsevier, 2005 
2. Tammy Noergaard, “Embedded Systems Architecture”, Elsevier, 2005 
3. Rajib Mall “Real-Time systems Theory and Practice” Pearson Education, 2007 
4. Sriram. V.Iyer & Pankaj Gupta, “Embedded real time systems Programming”, Tata McGraw Hill, 2004. 
Page 40 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2605 MANAGEMENT CONCEPTS AND PRACTICES 3 0 0 3 
AIM 
To expose the students to Management concepts and techniques. 
OBJECTIVE 
Knowledge on the management concepts is essential for all kinds of people in all kinds of organizations. After 
studying this course, students will be able to have a clear understanding of the basic concepts and functions of 
management, human resource management, Marketing Management & Financial Management, accounting 
concepts, Management Information System & Production/Operations, Social and Ethical Issues in Management. 
Students will also gain some basic knowledge on international aspect of management. 
UNIT - I BASIC CONCEPTS AND FUNCTIONS OF MANAGEMENT 9 
Planning: Nature Purpose and OBJECTIVEs of Planning; Organizing; Nature and Purpose of Organizing; Authority 
and Responsibility; Staffing, Supply of Human Resources; Performance Appraisal; Controlling; System and Process 
of Controlling; Control Techniques. 
UNIT - II HUMAN RESOURCE MANAGEMENT 9 
Nature and Scope of Human Resource Planning; Training and Development : Recruitment and Selection; Career 
Growth; Absenteeism: Grievances; Motivation and its Types; Need for Motivation: Reward and Punishment; 
Models of Motivation; Leaders; Kinds of Leaders, Leadership Styles, roles and Functions of Leaders; Conflict 
Management; Kinds and ; Causes of Conflict; Settlement of Conflicts. Group and Team Working, organizational 
Design and Development. 
UNIT–III MARKETING MANAGEMENT & FINANCIAL MANAGEMENT, ACCOUNTING 
CONCEPTS 9 
Marketing Environment: Consumer Markets and Buyer Behaviour; Marketing Mix, Advertising and Sales 
Promotions; Channels of Distribution. Financial Management and Accounting Concepts Book Keeping; Financial 
Statements Analysis: Financial Ratios: Capital Budgeting: break-even Analysis Production/Operations Management 
Planning and Design of Production and Operations Systems; Facilities Planning Location, Layout and Movement of 
materials; Materials Management and Inventory Control; Maintenance Management PERT & CPM. 
UNIT– IV MANAGEMENT INFORMATION SYSTEM & PRODUCTION/OPERATIONS 
MANAGEMENT 9 
Role of Information in decision making; Information System Planning, Design and Implementation Evaluation and 
Effectiveness of the Information System. Statistical Quality Control, Total Quality Management and ISO 
Certification. Production/Operations Management: Planning and Design of Production and Operations Systems; 
Facilities Planning Location, Layout and Movement of materials; Materials Management and Inventory Control; 
Maintenance Management PERT & CPM. 
UNIT - V SOCIAL AND ETHICAL ISSUES IN MANAGEMENT 9 
Ethics in Management, Social Factors; Unfair and Restrictive Trade Practices. Strategic and Technology 
Management Need, Nature, Scope and Strategy SWOT analysis, value chain concept. 
Total periods: 45 
TEXT BOOKS 
1. Kotler Philip, “Marketing Management”, Prentice Hall of India, 11th Edition, 2003. 
2. Luthans Fred, “Human Resource Management”, McGraw-Hill Inc., 1997 
3. Robbins Stephen, P., “Organizational Behaviours Concepts, Controversies and Application”, Prentice Hall, 
Englewood, Cliffs, New Jersey, 2010. 
4. Khan, M.Y. & Jain, P.K., “Financial Management”, Tata McGraw-Hill, 4th Edition, 2004. 
Page 41 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
REFERENCES 
1. Porter Michael, “Competitive Advantage”, The Free Press, 1985. 
2. Porter Micheal, “Competitive Strategy”, The Free Press, 1980. 
3. Bhushan, Y.K., “Fundamentals of Business Organization and Management”, Sultan Chand and Sons, 1965. 
4. Ahuja, K.K., “Industrial Management”, Khanna Publishers, 1998. 
Page 42 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2607 CONTROL SYSTEMS LABORATORY 0 0 3 2 
AIM 
To provide a platform for understanding the basic concepts of control system and to apply them for the 
design and control of practical systems. 
OBJECTIVES 
After successful completion of this course, the students will be able to, 
· Experimentally determine transfer functions of practical systems. 
· Obtain the step response of practical systems. 
· Carry out the stability analysis of practical systems. 
· Design PID controller for practical systems. 
List of EXPERIMENTS 
1. Open loop and closed loop speed control of dc servo motor. 
2. Determination of transfer function of armature controlled DC servomotor. 
3. Determination of transfer function of AC servomotor. 
4. Determination of transfer function of a third order (or higher order) system from its frequency response. 
5. Determination of transfer function of a higher order system with two or more sub systems. 
6. Step response of type-0 and type-1 UNITy feedback first and second order systems. 
7. Stability analysis of third order (or higher order) systems. 
8. Design of a second order (or third order) system for the desired specifications. 
9. Design of PID controller for a given system. 
10. Study of any one closed-loop control system such as dc position control, temperature control water level 
control systems. 
11. MATLAB simulation of step response of LTI systems. 
12. Stability analysis of LTI systems using Root locus, Bode and Nyquist plots. 
Practical 45 
Page 43 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2608 DSP AND MICROPROCESSORS LABORATORY 0 0 3 2 
AIM 
To expose the students to gain programming skills in DSP and Microprocessors. 
DSP 
1. Generation of basic sequences using MATLAB 
UNIT sample sequence 
UNIT step sequence 
UNIT ramp sequence 
2. Computation of Fast Fourier Transform using MATLAB 
DIT – FFT algorithm 
DIF – FFT algorithm 
3. Design and simulation of FIR filter using windowing technique 
4. Design and simulation of IIR filter using Bilinear Transformation and Impulse Invariant method. 
5. Generation of following waveforms using TMS320C50 trainer Kit 
Sine wave 
Square wave 
Saw tooth wave 
Triangular wave 
6. Linear convolution and circular convolution using TMS320C50 trainer Kit 
MICROPROCESSORS: 
1. Simple arithmetic operations: Multi precision addition / subtraction / multiplication / division. 
2. Programming with control instructions: Increment / Decrement. Ascending / Descending order. Maximum / 
minimum of numbers. 
3. Rotate instructions. Hex / ASCII / BCD code conversions. 
4. Interface EXPERIMENTS: A/D Interfacing. D/A Interfacing. Traffic light controller. 
5. Interface EXPERIMENTS: Simple EXPERIMENTS using 8251, 8279, 8253, and 8254. 
6. Programming practice on assembler and simulator tools. 
Practical 45 
Page 44 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
VII SEMESTER 
12EE2701 ELECTRIC ENERGY GENERATION, UTILISATION AND CONSERVATION 
3 0 0 3 
AIM 
To expose the students to the main aspects of electric energy generation, utilization and conservation. 
OBJECTIVES 
To impart knowledge on 
· Conventional methods of generation and conservative methods. 
· Principle and design of illumination systems and 
· Methods of heating and welding 
· Electric traction systems and their performance. 
· Industrial applications of electric drives. 
UNIT - I GENERATION 9 
Generation of electrical power by conventional methods – Introduction to the concept of distributed generation – 
Effect on system operation. 
UNIT - II CONSERVATION 9 
Economics of generation – Definitions – Load curves – Number and size of UNITs – Cost of electrical energy – 
Tariff – Need for electrical energy conservation – Methods – Energy efficient equipment – Energy management – 
Energy auditing. Economics of power factor improvement – Design for improvement of power factor using power 
capacitors – Power quality – Effect on conservation. 
UNIT - III ILLUMINATION 9 
Definition and meaning of terms used in illumination Engineering – Classification of light sources – Laws of 
illumination - Nature of radiation – Photometry – Lighting calculations – Design of illumination systems (for 
residential, industrial, commercial, health care, street lightings, sports, administrative complexes) - Types of lamps: 
Incandescent lamps, sodium vapour lamps, mercury vapour lamps, fluorescent lamps - Energy efficiency lamps. 
UNIT - IV HEATING AND WELDING 9 
Introduction – Advantages of Electric heating – Modes of heat transfer – Methods of heating, requirement of heating 
material – Design of heating element – Furnaces – Welding generator – Welding transformer and its characteristics. 
Requirements of good weld – Preparation of work – Electrodes – Power supply for arc welding. 
UNIT - V ELECTRIC TRACTION 9 
Introduction – Requirements of an ideal traction system – Supply systems – Mechanics of train movement – 
Traction motors and control – Multiple UNITs – Braking – Current collection systems – Recent trends in electric 
traction. 
Total periods: 45 
TEXT BOOKS 
1. Openshaw Taylor E, “Utilization of Electrical Energy in SI UNITs”, Orient Longman Pvt.Ltd, 2003. 
2. Gupta B.R, “Generation of Electrical Energy”, Eurasia Publishing House (P) Ltd, New Delhi, 2009. 
REFERENCES 
1. Partab H, “Art and Science of Utilisation of Electrical Energy”, Dhanpat Rai and Co, New Delhi, 2004 
2. Gopal.K.Dubey, “Fundamentals of Electrical Drives”, Narosa Publishing House, New Delhi, 2nd edition, 
2004. 
Page 45 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
3. Wadhwa C.L, “Generation, Distribution and Utilization of Electrical Energy”, New Age International Pvt.Ltd,2nd 
Edition, 2003 
4. Gupta J.B, “Utilization of Electric Power and Electric Traction”, S.K.Kataria and Sons, 2002. 
Page 46 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2702 ELECTRIC DRIVES AND CONTROL 3 0 0 3 
AIM 
To expose the students to the concepts of electric drives and controls. 
OBJECTIVES 
· To learn about basic concepts of electric drives. 
· To learn about different types of DC drives. 
· To study about Induction motor drives. 
· To learn about special machines drives. 
· To understand design of controllers for drives. 
UNIT - I Introduction to Electric Drives 9 
History and development of Electric Drives, Classification of Electric Drives, Basic elements & advantages of 
variable speed drives- Joint Speed-Torque characteristics of various types of loads and drive motors- Modes of 
operation, closed loop control of drives - Selection of power rating for drive motors with regard to thermal 
overloading and load variation-Load Equalization. 
UNIT - II Dc Drives 9 
Speed control of DC motors - Ward - Leonard scheme - drawbacks - Thyristor converter fed dc drives: Single, two 
and four quadrant operations - Chopper fed DC drives : - Time ratio control and current limit control - Single, two 
and four quadrant operations – Effect of ripples on the motor performance. 
UNIT - III Three Phase Induction Motor Drives 9 
Speed control of 3 phase Induction Motors - Stator control: PWM &V/f control, rotorcontrol: Rotor resistance 
control - Static control of rotor resistance using DC chopper - Static Krammer and Scherbius drives – Introduction to 
Vector Controlled Induction Motor Drives. 
UNIT - IV Drives for Special Machines 9 
Speed control of 3 phase Synchronous Motors - True synchronous and self controlled modes of operations - DC 
servo drives principle of operation AC servo drives principle of operation - Principle and control of Stepper motor 
and Switched Reluctance Motor drives. 
UNIT - V Digital Control and Drive Applications 9 
Digital techniques in speed control - Advantages and limitations - Microprocessor/Microcontroller and PLC based 
control of drives, networking of drives - Selection of drives and control schemes for Steel rolling mills, Paper mills, 
Cement mills, Machine tools, Lifts and Cranes. Solar and battery powered drives. 
Total periods: 45 
TEXT BOOKS 
1. Dubey, G.K., “Fundamentals of Electrical Drives”, Narosa Publishing House, 2nd Edition, New Delhi, 
2004. 
2. Bose, B.K., “Modern Power Electronics and AC Drives", Prentice Hall India Ltd., New Delhi, 2002. 
REFERENCES 
1. Ion Boldea and Nasar S. A., “Electric Drives”, CRC Press LLC, New York, 2nd Edition, 2006. 
2. Krishnan R, “Electric Motor Drives: Modelling, Analysis and Control, Prentice Hall of India Pvt. Ltd., New 
Delhi, 2002. 
3. Vedam Subramanyam, “Electric Drives: Concepts and Applications”, Tata McGraw Hill Publishing 
Company Limited, New Delhi, 2004. 
Page 47 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2703 POWER SYSTEM ECONOMICS AND CONTROL TECHNIQUES 3 1 0 4 
AIM 
To become familiar with the preparatory work necessary for meeting the next day’s power system 
operation and the various control actions to be implemented on the system to meet the minute-to-minute variation of 
system load. 
OBJECTIVES 
· To get an overview of system operation and control. 
· To understand & model power-frequency dynamics and to design power-frequency controller. 
· To understand & model reactive power-voltage interaction and different methods of control for 
maintaining voltage profile against varying system load. 
UNIT - I INTRODUCTION 9 
System load variation: System load characteristics, load curves daily, weekly and annual, load-duration curve, load 
factor, diversity factor. Reserve requirements: Installed reserves, spinning reserves, cold reserves, hot reserves. 
Overview of system operation: Load forecasting, UNIT commitment, load dispatching. Overview of system control: 
Governor Control, LFC, EDC, AVR, system voltage control, security control. 
UNIT - II REAL POWER - FREQUENCY CONTROL 8 
Fundamentals of speed governing mechanism and modeling: Speed-load characteristics – Load sharing between two 
synchronous machines in parallel; concept of control area, LFC control of a single-area system: Static and dynamic 
analysis of uncontrolled and controlled cases, Economic Dispatch Control. Multi-area systems: Two-area system 
modeling; static analysis, uncontrolled case; tie line with frequency bias control of two-area system derivation, state 
variable model. 
UNIT - III REACTIVE POWER–VOLTAGE CONTROL 9 
Typical excitation system, modeling, static and dynamic analysis, stability compensation; generation and absorption 
of reactive power: Relation between voltage, power and reactive power at a node; method of voltage control: 
Injection of reactive power. Tap-changing transformer, numerical problems - System level control using generator 
voltage magnitude setting, tap setting of OLTC transformer and MVAR injection of switched capacitors to maintain 
acceptable voltage profile and to minimize transmission loss. 
UNIT - IV UNIT COMMITMENT AND ECONOMIC DISPATCH 9 
Statement of UNIT Commitment (UC) problem; constraints in UC: spinning reserve, thermal UNIT constraints, 
hydro constraints, fuel constraints and other constraints; UC solution methods: Priority-list methods, forward 
dynamic programming approach, numerical problems only in priority-list method using full-load average production 
cost. Incremental cost curve, co-ordination equations without loss and with loss, solution by direct method and λ- 
iteration method. (No derivation of loss coefficients.) Base point and participation factors. Economic dispatch 
controller added to LFC control. 
UNIT - V COMPUTER CONTROL OF POWER SYSTEMS 10 
Energy control centre: Functions – Monitoring, data acquisition and control. System hardware configuration – 
SCADA and EMS functions: Network topology determination, state estimation, security analysis and control. 
Various operating states: Normal, alert, emergency, inextremis and restorative. State transition diagram showing 
various state transitions and control strategies. 
Total periods (45+15T): 60 
TEXT BOOKS 
1. Olle. I. Elgerd, “Electric Energy Systems Theory – An Introduction”, Tata McGraw Hill Publishing 
Company Ltd, New Delhi, 2nd Edition, 2008 
2. Allen.J.Wood and Bruce F.Wollenberg, “Power Generation, Operation and Control”, John Wiley & Sons, 
Inc., 2003 
3. Kundur P, “Power System Stability & Control”, Tata-McGraw Hill publications,USA,2005 
Page 48 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
REFERENCES 
1. Kothari D.P and Nagrath I.J, “Modern Power System Analysis”, 3rd Edition, Tata McGraw Hill Publishing 
Company Limited, New Delhi, 2003. 
2. Grigsby L.L, “The Electric Power Engineering, Hand Book”, CRC Press and IEEE Press, 2001. 
Page 49 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12ME2001 TOTAL QUALITY MANAGEMENT 3 0 0 3 
AIM 
To provide a platform to have a sound understanding of the basic concepts to the students of TQM. 
OBJECTIVES 
· To enable the students understand the principles of Quality Management 
· To provide students details of quality planning and TQM techniques 
UNIT – I INTRODUCTION 7 
Definition of Quality, Dimensions of Quality, Factors affecting Quality, Quality Planning, Quality costs, 
Comparison of TQM concept with older concept, Leadership – Concepts, characteristics and role of Quality leaders, 
Deming Philosophy, Barriers to TQM Implementation. 
UNIT – II TQM PRINCIPLES 11 
Customer satisfaction – Customer Perception of Quality, Customer Complaints, Service Quality, Customer 
Retention, Employee Involvement – Motivation, Empowerment, Teams, Recognition and Reward, Performance 
Appraisal.Continuous Process Improvement – Juran Trilogy, PDSA Cycle, 5S, Kaizen. Taguchi’s Quality 
Engineering - Quality Loss Function, Parameter and Tolerance design, signal to noise ratio. Supplier Partnership – 
Concept of Quality Circle -Business Excellence Model-Rajiv Gandhi National Quality Award 
UNIT – III STATISTICAL PROCESS CONTROL (SPC) 9 
The seven tools of Quality, Statistical methods for quality improvement. Process control -Control charts for 
variables: X, R charts and Control charts for attributes – P, np, c and u charts. Concept of Process Capability, 
Concept of six sigma, New seven management tools. 
UNIT – IV TQM TOOLS 9 
Benchmarking – Reasons to Benchmark, Benchmarking Process, Quality Function Deployment (QFD) – House of 
Quality, QFD Process, Benefits, Taguchi Quality Loss Function, Total Productive Maintenance (TPM) – Concept, 
Improvement Needs, FMEA – Stages of FMEA. 
UNIT – V QUALITY SYSTEMS 9 
Quality Management System: Need for QMS, Elements, Reasons for implementation of Quality System, ISO 
9000:2008: Classification, Quality System Requirements, Documentation of Quality System, Quality Auditing, ISO 
14000 – Environmental Management System, Major elements of EMS, EMS Model, Benefits. 
Total Periods: 45 
TEXT BOOKS 
1. Dale.H.Besterfiled, et al., “Total Quality Management”, Pearson Education Asia, 2nd Edition, 1999, 
Indian Reprint, 2002. 
2. James.R.Evans, &William.M.Lidsay., “Management and Control of Quality”, Thompson Learning, 
2005. 
REFERENCE BOOKS 
1. SubburajRamasamy., “Total Quality Management”, Tata McGraw Hill, NewDelhi, 2005 
2. Narayana.V and Sreenivasan.N.S., “Quality Management – Concepts and Tasks”, New Age 
International Edition, 1996. 
3. KanishkaBedi., “Total Quality Management”, Oxford University Press, 2006. 
4. Mukherjee.P.N, “Total Quality Management”, Prentice Hall, 2005. 
5. Suganthi .L., Anand.A.Samuel., “Total Quality Management”, Prentice Hall of India, 2008. 
12EE2707 POWER ELECTRONICS AND DRIVES LABORATORY 0 0 3 2 
Page 50 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
AIM 
To introduce the basic concepts of power electronics and drives. 
EXPERIMENTS 
1. Characteristics of SCR, TRIAC. 
2. AC phase control using TRIAC/ SCR with R and RL load. 
3. Transient characteristics of SCR and MOSFET 
4. AC to DC fully controlled converter & half controlled converter 
5. Step down and step up MOSFET based choppers 
6. IGBT based single-phase & three phase PWM inverter 
7. Simulation of closed loop control of converter fed DC motor. 
8. Simulation of closed loop control of chopper fed DC motor. 
9. Simulation of VSI fed 3 phase induction motor. 
10. Speed control of DC motor using 3 Phase Rectifier. 
11. Speed control of 3 phase induction motor using PWM inverter. 
12. PLC based drives. 
Practical 45 
Page 51 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2708 POWER SYSTEM SIMULATION LABORATORY 0 0 3 2 
AIM 
To acquire software development skills and experience in the usage of standard packages necessary for 
analysis and simulation of power system required for its planning, operation and control. 
OBJECTIVES 
I. To develop simple C programs for the following basic requirements: 
a) Formation of bus admittance and impedance matrices and network solution. 
b) Power flow solution of small systems using simple method, Gauss-Seidel P.F. Method. 
c) UNIT Commitment and Economic Dispatch. 
II. To acquire experience in the usage of standard packages for the following analysis / simulation / control 
functions. 
d) Steady-state analysis of large system using NRPF and FDPF methods. 
e) Quasi steady-state (Fault) analysis for balanced and unbalanced faults. 
f) Transient stability simulation of multimachine power system. 
g) Simulation of Load-Frequency Dynamics and control of power system. 
EXPERIMENTS 
1. Computation of Parameters and Modelling of Transmission Lines 
2. `Formation of Bus Admittance and Impedance Matrices and Solution of Networks. 
3. Load Flow Analysis - I: Solution of Load Flow And Related Problems Using Gauss-Seidel Method 
4. Load Flow Analysis - II: Solution of Load Flow and Related Problems Using Newton-Raphson and Fast- 
Decoupled Methods 
5. Fault Analysis 
6. Transient and Small Signal Stability Analysis: Single-Machine Infinite Bus system 
7. Transient Stability Analysis of Multimachine Power Systems 
8. Electromagnetic Transients in Power Systems 
9. Load – Frequency Dynamics of Single- Area and Two-Area Power Systems 
10. Economic Dispatch in Power Systems. 
Practical 45 
Page 52 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2709 COMPREHENSIVE VIVAVOCE 0 0 2 1 
AIM 
To encourage the students to comprehend the knowledge acquired from the first Semester to Seventh 
Semester of B.E Degree Course through periodic exercise. 
· Electric Circuit Theory 
· Electronic Devices 
· Analog and Digital Electronics 
· DC Machines and Transformers 
· Electromagnetic Field Theory 
· Measurements and Instrumentation 
· Transmission and Distribution of Electric Energy 
· Linear Integrated Circuits 
· Control System Engineering 
· Synchronous and Induction Machines 
· DSP and Microprocessors 
· Power System Protection and Switch Gear 
· Power System Analysis 
· Electric Machine Design 
· Power System Economics and Control Techniques 
· Electric Energy Generation, Utilization and Conversion 
· Electric drives and controls. 
Page 53 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2801 PROJECT WORK 0 0 18 100 
Aim 
To enable the students to identify and solve electrical engineering problems. 
Objectives 
· To develop and apply electrical/computer engineering knowledge acquired through earlier 
semesters for successfully solving engineering problems 
· To function effectively in multidisciplinary teams 
· To effectively communicate technical information in multiple formats and 
· To kindle the interest in life-long learning 
Procedure 
· Project work is to identify and provide solution to an application oriented problem, which will be 
experimental in nature and others will be based on some innovative / theoretical work. 
· Each project has to be carried out by a group of students. In order to ensure participation of each student, 
the group size should be preferably 3/4 students for Under Graduate courses. Formation of project groups 
should be done such that each group has representation of students with varying academic merit from best 
to average. 
· Each project group has to prepare and submit the project report at the time of end semester project work 
and viva voce examination. 
Page 54 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
ELECTIVES 
GROUP I 
12CS2001 JAVA PROGRAMMING 3 0 0 3 
AIM 
To motivate the students to understand the concepts of Java Programming. 
OBJECTIVE 
· To provide necessary skills to write Java programs and work with applet and applications. 
· To familiarize the concepts and practices of packages and multi threaded applications. 
· To perform event handling functionality in response to GUI events. 
· To create application with database connectivity along with client server architecture. 
· To study the concepts of files, streams and sockets. 
UNIT - I INTRODUCTION TO JAVA 9 
Object Oriented language: Overview – The JAVA Environment – Comparing JAVA C and C++ – Keywords & 
Operators – Identifiers – Literal – Expressions – Control Statements – Arrays & Strings – Command line Arguments 
– Data members – Methods – Overloading Constructors – Class Assignment – This – Static members & methods – 
Final – Super keyword – Exception Handling. 
UNIT - II INHERITANCE, PACKAGES AND THREADS 9 
Abstract classes – Inheritance: Types – Single – Mutilevel – Hierarchical – Interfaces: defining – implementing – 
Packages: Introduction – Importing packages – Implementation – Multithreaded Programming: Thread model – 
Creating a thread – Creating multiple thread – Thread Exceptions – Thread Priority – Synchronization – Inter thread 
communication. 
UNIT - III AWT AND APPLET 9 
HTML: Introduction – Webpage design – Basic Tags – Simple programs – Applet: Lifecycle – Simple Applet 
Display– Labels – Text fields – Buttons – Combo Boxes – Passing parameters to applet – AWT: Windows 
fundamentals – Creating frame Window – AWT Controls – Event handling: Sources of events – Event Delegation 
Model – Event Classes – Event Listener interfaces– Adapter classes – AWT Classes –Working with graphics – 
Working with Color – Working with font – Layout Managers – Menu Bars and menus. 
UNIT - IV DATABASE CONNECTIVITY 9 
JDBC: Architecture – JDBC Connectivity – Drivers – Setting up a database – Setting up tables – Establishing 
connection – Getting Data from a table – Select – Update – Record Sets – Prepared Statements – Callable 
Statements. 
UNIT - V INPUT/OUTPUT STREAMS AND NETWORKING BASICS 9 
Input Output: I/O classes and Interfaces – The Character Stream – Buffered Reader and Buffered Writer – 
Serialization – Files – Java and Net: Stream classes – Socket – InetAddress – URL Connection – TCP/IP sockets – 
Data grams – Simple client/server program. 
Total periods: 45 
TEXT BOOKS 
1. Herbert Schildt, The Complete Reference “Java”, Seventh edition Tata McGraw Hills, 2011. 
REFERENCES 
1. Balaguruswamy E, Programming with java , Fourth Edition,TMH,2007. 
2. Deitel H M and Deitel P J, “JAVA - How to Program”, Prentice Hall of India / Pearson Education, New 
Delhi, Seventh Edition, 2007. 
3. Elliote Harold Rusty, Network Programming, Third Edition 2004. 
4. Steven Holzner et al, “ Java 2 Programming”, Dream Tech Press, 2001. 
Page 55 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
5. Bernard Van Haecke, “JDBC 3 Jaba Database Connectivity”, Wiley-Dream Tech Press India P Ltd, 2002. 
Page 56 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E01 INTRODUCTION TO DATABASE MANAGEMENT SYSTEMS 3 0 0 3 
AIM 
To expose the students to the concept of database management system and different data models. 
OBJECTIVES 
· To learn the basics in database systems 
· To learn about E-R model and its structure 
· To study about relational commercial languages and relational database design 
· To learn about network data model 
· To study the concept of hierarchical data model 
UNIT- I INTRODUCTION 4 
Purpose of database systems – Data abstraction – Data models – Instances and schemas – Data independence – Data 
definition language – Database manager – Database users over all system structure. 
UNIT - II E-R MODEL 8 
E-R model – E-R diagram, reducing E-R diagram to tables.relational model: Structure of relational databases – the 
relational algebra – Tuple and domain relational calculus modifying the databases. 
UNIT - III RELATIONAL COMMERCIAL LANGUAGES 7 
SQL - Query – by – example, Query integrity constraints – Domain constraints – Referential integrity – functional 
dependencies – Assertions – Triggers. 
UNIT - IV RELATIONAL DATABASE DESIGN 10 
Pitfalls in relational database designs – Normalisation using multivalued dependencies, join dependencies. Domain-key 
normalform. Mapping relational data to file data directory storage, buffer management. Typical database design 
approach for: Airline reservation systems – Inventory control – Library information system. 
UNIT - V NETWORK DATA MODEL 9 
DBTG set construct and restrictions, Expressing M:N relationship DBTG, cycles in DBTG, data description in 
network model, scheme and sub scheme, DBTG data manipulation facility, Data base manipulation. 
UNIT - VI HIERARCHIAL DATA MODEL 7 
Tree concepts, data definition, data manipulation, updation, implementation of the hierarchical databases, additional 
features of the hierarchical DML. 
Total periods: 45 
TEXT BOOKS 
1. Abraham, Siberschatz, Henry.F.Korth and Sudharshan. S, “Database System Concepts”, McGraw Hill, New 
Delhi, 2002. 
2. Ramez Elmasri and Shamkant Navethe, “Fundamentals of Database Systems”, Pearson Education, New 
Delhi, 2003. 
REFERENCES 
1. Raghu, Ramakrishnan, “Database Management Systems”, Tata McGraw Hill, 3rd Edition New Delhi, 
2004. 
2. Thomas Connolly. Carolyn Begg, “Database system” Pearson education Limited, 3rd Edition, New Delhi, 
2002. 
3. Jeffrey A. Hoffer, Mary B.Presscott, Fred R Mcfadden “ Modern database Management Pearson Education, 
New Delhi, 2002. 
12EE2E02 DSP BASED SYSTEM DESIGN 3 0 0 3 
Page 57 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
AIM 
To impart knowledge on digital signal processors, programming concepts and its applications. 
OBJECTIVES 
· To understand the internal architecture of different types of digital signal processors. 
· To learn about simple programming concepts in DSP. 
· To study about development tools in DSP implementations. 
· To study about a few applications using digital signal processors 
UNIT- I ARCHITECTURE FOR PROGRAMMABLE DIGITAL SIGNAL PROCESSING 
DEVICES 9 
Basic architectural features – DSP computational building blocks; multiplier, shifter, Multiply and 
Accumulate(MAC) UNIT – Arithmetic and Logic UNIT – Bus Architecture – Onchip memory, Data Addressing 
Capabilities; Addressing modes; Special addressing modes, Programmability & Program execution. Speed issues: 
Harvard architecture –parallelism – pipelining – system level parallelism and pipelining. Features for external 
interfacing. 
UNI - II DIGITAL SIGNAL PROCESSORS 9 
Commercial Digital Signal Processing devices – Architecture of TMS320C54XX Digital signal processors – Bus 
Structures – CPU – Internal memory and memory mapped registers – Data addressing modes of the TMS320C54XX 
processors - Memory space of 54XX processors – Program control. 
UNIT - III PROGRAMMING CONCEPTS 9 
Instructions and Programming – simple program using TMS320C54XX processors. On chip peripherals: Hardware 
Timer – Host port Interface – clock generator – Serial I/O ports – Interrupts – Pipeline operation of the 
TMS320C54XX processors. 
UNIT - III DEVELOPMENT TOOLS FOR DIGITAL SIGNAL PROCESSING 
IMPLEMENTATIONS 9 
DSP Development tools – DSP system design kit(DSK) – Software for development – Assembler and the Assembly 
source file – Linker and Memory Allocation – C/C++ compiler – Code composer studio – Building a Project, Debug 
Options. DSP software development Examples. 
UNIT - IV APPLICATIONS OF PROGRAMMABLE DSP DEVICES 9 
Position control system for Hard disk drive – DSP based Power Meter : Power measurement system – Software for 
Power Meter. 
Total periods: 45 
TEXT BOOK 
1.Avatar Singh and S.Srinivasan, “Digital Signal Processing : Implementations using DSP microprocessors with 
examples from TMS320C54XX”, Thompson Brooks / Cole, 2004. 
REFERENCESS 
1. TMS320C54X DSP Reference set Volume 1 – CPU and Peripherals (Literature No.SPRU131) 
2. TMS320C54X DSP Reference set Volume 2 – Mnemonic instruction set (Literature No.SPRV 172) 
3. TMS320C54X DSP Reference set Volume 4 – Applications Guide (Literature No. SPRV 173) 
4. TMS320C54X DSP Reference set Volume 5 – Enhanced Peripherals (Literature No. SPRV 302) 
Page 58 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E04 INTRODUCTION TO COMPUTER ARCHITECTURE 3 0 0 3 
AIM 
To Study the structure and behavior of processors, memories and input and output units and to study their 
interactions. 
OBJECTIVES 
· To study the various representations of data, register transfer language for micro-operations 
and organization and design of a digital computer. 
· To teach the concept of micro-programmed control unit, the central processing 
unit, stack and instruction formats. 
· To Study the various arithmetic operation’s algorithms and their hardware implementations and concept of 
pipelining and vector processing. 
· To illustrate the techniques to communicate with input and output devices. 
· To study the organization and operation of various memories and memory management hardware. 
UNIT - I DATA REPRESENTATION, MICRO-OPERATIONS AND ORGANIZATIONAND 
DESIGN 13 
Data representation: Data types, complements, fixed–point representation, floating-point representation, other binary 
codes, error detection codes. 
Register transfer and micro operations: Register transfer language, register transfer, bus and memory transfers, 
arithmetic micro-operations, logic micro-operations, shift micro-operations, arithmetic logic shift UNIT. 
Basic computer organization and design: Instruction codes, computer registers, computer instructions, timing and 
control, instruction cycle, memory reference instructions, input-output and interrupt. Complete computer 
description, design of basic computer, design of accumulator logic. 
UNIT - II CONTROL AND CENTRAL PROCESSING UNIT 8 
Micro programmed control: Control memory, address sequencing, micro-program example, and design of control 
UNIT. Central processing UNIT: General register organization, stack organization, instruction formats, addressing 
modes, data transfer and manipulation, program control,reduced instruction set computer. 
UNIT - III COMPUTER ARITHMETIC, PIPELINE AND VECTOR PROCESSING 8 
Computer arithmetic: Addition and subtraction, multiplication algorithms, division algorithms, floating-point 
arithmetic operations, decimal arithmetic UNIT, decimal arithmetic operations. Pipeline and vector processing: 
Parallel processing, instruction pipeline, vector processing array processors 
UNIT - IV INPUT-OUTPUT ORGANIZATION 8 
Input-output organization: Peripheral devices, input-output interface, asynchronous data transfer, modes of transfer, 
priority interrupt, direct memory access, input-output processor, serial communication. 
UNIT - V MEMORY ORGANIZATION 8 
Memory organization: Memory hierarchy, main memory, auxiliary memory, associative memory, cache memory, 
virtual memory, memory management hardware. 
Total periods: 45 
TEXT BOOK 
1.Morris Mano, “Computer System Architecture”, 3rd Edition, Pearson Education, 2002 / PHI. 
REFERENCES 
1. Vincent P.Heuring and Harry F.Jordan, “Computer Systems Design and Architecture”, Pearson Education 
Asia Publications, 2002. 
2. John P.Hayes, “Computer Architecture and Organization”, Tata McGraw Hill, 3rd Edition, New Delhi 
1998. 
3. Andrew S.Tanenbaum, “Structured Computer Organization”, 4th Edition, Prentice Hall of India/Pearson 
Page 59 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
Education, 2002. 
4. William Stallings, “Computer Organization and Architecture”, 6th Edition, Prentice Hall of India/Pearson 
Education, 2003. 
Page 60 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
GROUP II 
12EE2E04 LABVIEW AND VIRTUAL INSTRUMENTATION 3 0 0 3 
AIM 
To expose the students with the comprehensive knowledge in virtual instrumentation and some of its 
applications. 
OBJECTIVES 
· To review background information required for studying virtual instrumentation. 
· To study the importance and applications of virtual instrumentation. 
· To study the basic building blocks of virtual instrumentation. 
· To study the graphical programming concepts in LabVIEW. 
· To study the hardware interfacing concepts in LabVIEW. 
· To study a few applications in virtual instrumentation. 
UNIT - I FUNDAMENTALS OF VIRTUAL INSTRUMENTATION 9 
General Functional description of a digital instrument - Block diagram of a Virtual Instrument - Physical quantities 
and Transducers- Role of Hardware and Software in Virtual instrumentation- User interfaces- Architecture of a 
Virtual instrument- Advantages of Virtual instruments over conventional instruments. 
UNIT - II SOFTWARE OVERVIEW 9 
LabVIEW - Graphical user interfaces - Controls and Indicators - “G” programming - Data types - Data flow 
programming - Editing - Debugging and Running a Virtual instrument - Graphical programming pallets - Front 
panel objects - Controls, Indicators, Object properties and their configuration - Typical 
examples. 
UNIT - III PROGRAMMING STRUCTURE 9 
FOR loops, WHILE loop, CASE structure, formula node, Sequence structures - Arrays and Clusters – Array 
operations - Bundle - Bundle/Unbundle by name, graphs and charts - String and file I/O - High level and Low level 
file I/O”s - Attribute modes Local and Global variables. 
UNIT - IV DATA ACQUISITION AND INSTRUMENT CONTROL 9 
DAQ Components- Buffers: Buffered and non buffered I/O- Triggering- Analog I/O- Digital I/O- Counters and 
timers- Data Acquisition: Analog and Digital signals, Analog interfacing, Types of grounding- Instrument control: 
VISA, GPIB, VXI and PXI. 
UNIT- V SIMPLE APPLICATIONS IN VI 9 
Measurement of voltage and current- Measurement of frequency – Temperature indicator – ON/OFF controller – P-I- 
D controller- Simulation of a simple second order system – Generation of HTML page. 
Total periods: 45 
TEXT BOOKS 
1. Jerome Jovitha, “Virtual Instrumentation and LabVIEW”, PHI Learning, 1st Edition, New Delhi, 2010. 
REFERENCES 
1.Garry M Johnson, "LabVIEW Graphical Programming", Tata McGraw Hill, 2nd Edition, 1996. 
2. Sanjay Gupta and Joseph John, “Virtual Instrumentation Using LabVIEW”, Tata McGraw-Hill, 1st Edition, 
2005. 
3. LabVIEW: Basics I & II Manual, National Instruments, 2006 
4. Barry Paron, “Sensors, Transducers and LabVIEW", Prentice Hall, 2000. 
5. Kevin James, “PC Interfacing and Data Acquisition: Techniques for Measurement, Instrumentation and 
Control”, Newnes, 2000. 
Page 61 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E05 POWER QUALITY 3 0 0 3 
AIM 
To study the various issues affecting Power Quality, their production, monitoring and suppression. 
OBJECTIVES 
· To study the production of voltages sags, overvoltages and harmonics and methods of control. 
· To study various methods of power quality monitoring. 
UNIT - I INTRODUCTION TO POWER QUALITY 9 
Definitions – Power quality, Voltage quality – Power quality issues : Short duration voltage variations, Long 
duration voltage variations, Transients, Waveform distortion, Voltage imbalance, Voltage fluctuation, Power 
frequency variations, low power factor – Sources and Effects of power quality problems – Power quality terms – 
Power quality and Electro Magnetic Compatibility (EMC) Standards. Computer Business Equipment Manufacturers 
Associations (CBEMA) curve. 
UNIT - II VOLTAGE SAGS AND INTERRUPTIONS 9 
Sources of sags and interruptions, estimating voltage sag performance, motor starting sags, estimating the sag 
severity, mitigation of voltage sags, active series compensators, static transfer switches and fast transfer switches. 
UNIT - III OVERVOLTAGES 9 
Sources of over voltages: Capacitor switching, lightning, ferro resonance; mitigation of voltage swells: Surge 
arresters, low pass filters, power conditioners – Lightning protection, shielding, line arresters, protection of 
transformers and cables, computer analysis tools for transients, PSCAD and EMTP. 
UNIT - IV HARMONICS 9 
Harmonic distortion: Voltage and current distortion, harmonic indices, harmonic sources from commercial and 
industrial loads, locating harmonic sources; power system response characteristics, resonance, harmonic distortion 
evaluation, devices for controlling harmonic distortion, passive filters, active filters, IEEE and IEC standards. 
UNIT - V POWER QUALITY MONITORING 9 
Monitoring considerations: Power line disturbance analyzer, per quality measurement equipment, harmonic / 
spectrum analyzer, flicker meters, disturbance analyzer, applications of expert system for power quality monitoring. 
Total periods: 45 
REFERENCES 
1. Roger.C.Dugan, Mark.F.McGranagham, Surya Santoso, H.Wayne Beaty, “Electrical Power Systems 
Quality” McGraw Hill, 2003 
2. PSCAD User Manual. 
Page 62 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E06 TRANSIENTS IN POWER SYSTEM 3 0 0 3 
AIM 
To impart knowledge on different types of transients in power system. 
OBJECTIVES 
· To learn about sources of transients in power system. 
· To study about different types of switching transients. 
· To impart depth knowledge on lighting transients. 
· To learn about transient response and its computation. 
· To get knowledge on transients in integrated power system. 
UNIT- I INTRODUCTION AND SURVEY 5 
Source of transients, various types of power systems transients, effect of transients on power systems, importance of 
study of transients in planning. 
UNIT - II SWITCHING TRANSIENTS 10 
Introduction, circuit closing transients: RL circuit with sine wave drive, double frequency transients, observations in 
RLC circuit and basic transforms of the RLC circuit. Resistance switching: Equivalent circuit for the resistance 
switching problems, equivalent circuit for interrupting the resistor current. Load switching: Equivalent circuit, 
waveforms for transient voltage across the load, switch; normal and abnormal switching transients. Current 
suppression, current chopping, effective equivalent circuit. Capacitance switching, effect of source regulation, 
capacitance switching with a restrike, with multiple restrikes, illustration for multiple restriking transients, ferro 
resonance. 
UNIT - III LIGHTNING TRANSIENTS 10 
Causes of over voltage, lightning phenomenon, charge formation in the clouds, rate of charging of thunder clouds, 
mechanisms of lighting strokes, characteristics of lightning strokes; factors contributing to good line design, 
protection afforded by ground wires, tower footing resistance. Interaction between lightning and power system: 
Mathematical model for lightning. 
UNIT - IV TRAVELLING WAVES ON TRANSMISSION LINE COMPUTATION OF 
TRANSIENTS 10 
Computation of transients: Transient response of systems with series and shunt lumped parameters and distributed 
lines. Travelling wave concept: step response, Bewely”s lattice diagram, standing waves and natural frequencies, 
reflection and refraction of travelling waves. 
UNIT - V TRANSIENTS IN INTEGRATED POWER SYSTEM 10 
The short line and kilometric fault, distribution of voltage in a power system: Line dropping and load rejection; 
voltage transients on closing and reclosing lines; over voltage induced by faults; switching surges on integrated 
system; EMTP for transient computation. 
Total periods: 45 
TEXT BOOKS 
1. Allan Greenwood, “Electrical Transients in Power Systems”, Wiley Interscience, New York, 2nd Edition 1991. 
2. Begamudre R.D, “Extra High Voltage AC Transmission Engineering”, New Age International, 2007. 
REFERENCES 
1. M.S.Naidu and V.Kamaraju, “High Voltage Engineering”, Tata McGraw Hill, 2nd Edition, 2000. 
Page 63 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E07 NETWORKING IN SMART GRIDS 
3 0 0 3 
AIM 
To expose the students to the concept of Smart Grids 
OBJECTIVES 
· Explain the roles of distributed generation technologies, communication infrastructures, advanced metering 
infrastructure, advanced control methods, and demand management in smart grid operation 
· Discuss operating principles and develop simplified models of smart grid components 
· Analyze the impact of smart grid component integration on distribution network operation 
UNIT I INTRODUCTION TO SMART GRID AND EMERGING TECHNOLOGIES 9 
Traditional Power Systems- limited flow control and monitoring, centralized generation, low utilization; Smart 
Grids- concept, WAN, FAN, HAN; early smart grid initiatives; overview of the technologies required. 
UNIT II INFORMATION AND COMMUNICATION TECHNOLOGIES 9 
Data Communication-dedicated and shared channels, switching techniques, communication channels, layered 
architecture and protocols; communication technologies; information security- encryption and decryption, 
authentication, digital signatures, cyber security standards; 
UNIT III SENSING, MEASUREMENT, CONTROL AND AUTOMATION TECHNOLOGIES 
9 
Smart metering- overview of the hardware used, communications infrastructure and protocols for smart metering, 
demand side integration; distribution automation equipment- substation automation equipment, faults in the 
distribution system, voltage regulation; 
UNIT IV POWER ELECTRONICS IN THE SMART GRID 9 
Renewable energy generation- fault current limiting-shunt compensation - series compensation- FACTS- HVDC-PHEV 
Technology 
UNIT V DEMAND MANAGEMENT 9 
Distribution Management Systems- introduction, data sources and associated external systems, modelling and 
analysis tools, applications; Transmission system operation- introduction, data sources, energy management 
systems, wide area applications, visualisation techniques 
Lecture Hours: 45 
TEXT BOOK: 
1. Smart Grid: Technology and Applications Janaka Ekanayake, Nick Jenkins, Kithsiri Liyanage, Jianzhong 
Wu, Akihiko Yokoyama 
ISBN: 978-0-470-97409-4 Hardcover 310 pages April 2012 Wiley 
REFERENCES 
1. Smart Grid Communications and Networking 
Edited by Ekram Hossain 
Edited by Zhu Han 
Edited by H. Vincent Poor Publisher: Cambridge University Press, Print Publication Year: 2012 
2. Smart Grids 
Nouredine Hadjsaïd (Editor), Jean-Claude Sabonnadière (Editor) 
Page 64 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
ISBN: 978-1-84821-261-9 Hardcover 350 pages May 2012, Wiley-ISTE 
WEBSITES 
2. www.siemens.co.in/Smart-Grid 
3. www.abb.com/smartgrids 
Page 65 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E08 SOFT COMPUTING TECHNIQUES 3 
0 0 3 
AIM 
To cater the knowledge of Neural Networks and Fuzzy Logic Control and use these for controlling real 
time systems. 
OBJECTIVES 
· To expose the students to the concepts of feed forward neural networks. 
· To provide adequate knowledge about feed back neural networks. 
· To teach about the concept of fuzziness involved in various systems. To provide adequate knowledge about 
fuzzy set theory. 
· To provide comprehensive knowledge of fuzzy logic control and adaptive fuzzy logic and to design the 
fuzzy control using genetic algorithm 
· To provide adequate knowledge of application of fuzzy logic control to real time systems 
UNIT- I INTRODUCTION 9 
Approaches to intelligent control. Architecture for intelligent control. Symbolic reasoning system, rule-based 
systems, the AI approach. Knowledge representation. Expert systems. 
UNIT - II NEURAL NETWORKS 9 
Concept of Artificial Neural Networks and its basic mathematical model, McCulloch-Pitts neuron model, simple 
perceptron, Adaline and Madaline, Feed-forward Multilayer Perceptron. Learning and Training the neural network. 
Data Processing: Scaling, Fourier transformation, principal-component analysis and wavelet transformations. 
Hopfield network, Self-organizing network and recurrent network. Neural Network based controller 
UNIT - III GENETIC ALGORITHM 9 
Basic concept of Genetic algorithm and detail algorithmic steps, adjustment of free parameters. Solution of typical 
control problems using genetic algorithm. Concept on some other search techniques like tabu search and ant-colony 
search techniques for solving optimization problems. 
UNIT - IV FUZZY LOGIC SYSTEM 9 
Introduction to crisp sets and fuzzy sets, basic fuzzy set operation and approximate reasoning. Introduction to fuzzy 
logic modeling and control. Fuzzification, inferencing and defuzzification. Fuzzy knowledge and rule bases. Fuzzy 
modeling and control schemes for nonlinear systems. Selforganizing fuzzy logic control. Fuzzy logic control for 
nonlinear time-delay system. 
UNIT=V APPLICATIONS 9 
GA application to power system optimisation problem, Case studies: Identification and control of linear and 
nonlinear dynamic systems using Matlab-Neural Network toolbox. Stability analysis of Neural-Network 
interconnection systems. Implementation of fuzzy logic controller using Matlab fuzzy-logic toolbox. Stability 
analysis of fuzzy control systems. 
Total periods: 45 
TEXT BOOKS 
1. Padhy.N.P., Artificial Intelligence and Intelligent System, Oxford University Press, 2005. 
2. KOSKO, B. "Neural Networks and Fuzzy Systems", Prentice-Hall of India Pvt. Ltd., 1994. 
REFERENCES 
1. Jacek.M.Zurada, "Introduction to Artificial Neural Systems", Jaico Publishing House, 1999. 
2. KLIR G.J. & FOLGER T.A. "Fuzzy sets, uncertainty and Information", Prentice-Hall of India Pvt. Ltd., 1993. 
Page 66 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
3. Zimmerman H.J. "Fuzzy set theory-and its Applications"-Kluwer Academic Publishers, 1994. 
4. Driankov, Hellendroon, "Introduction to Fuzzy Control", Narosa Publishers. 
5. Goldberg D.E. “Genetic algorithms in Search, Optimization and Machine learning”, Addison Wesley, 1989. 
Page 67 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E09 EHV AC and DC POWER TRANSMISSION 3 0 0 3 
AIM 
To develop the skills in the area of HVDC power transmission with the analysis of HVDC converters, 
harmonics and design of filters. 
OBJECTIVE 
· To understand the concept, planning of DC power transmission and comparison with AC 
· power transmission. 
· To analyze HVDC converters. 
· To study about compounding and regulation. 
· To analyze harmonics and design of filters. 
· To learn about HVDC cables and simulation tools. 
UNIT - I INTRODUCTION 9 
Introduction of DC Power transmission technology – Comparison of AC and DC transmission – Application of DC 
transmission – Description of DC transmission system – Planning for HVDC transmission – Modern trends in DC 
transmission. 
UNIT - II ANALYSIS OF HVDC CONVERTERS 9 
Pulse number – Choice of converter configuration – Simplified analysis of Graetz circuit – Converter bridge 
characteristics – Characteristics of a twelve pulse converter – Detailed analysis of converters. 
UNIT - III COMPOUNDING AND REGULATIONS 9 
General – Required regulation – Inverter compounding – Uncompounded inverter – Rectifier compounding – 
Transmission characteristics with the rectifier and inverter compounding – Communication link – Current regulation 
from the inverter side – Transformer tap changing 
UNIT - IV HARMONICS AND FILTERS 9 
Introduction – Generation of harmonics – Design of AC filters and DC filters – Interference with neighbouring 
communication lines. 
UNIT- V HVDC CABLES AND SIMULATION OF HVDC SYSTEMS 9 
Introduction of DC cables – Basic physical phenomenon arising in DC insulation – Practical dielectrics – Dielectric 
stress consideration – Economics of DC cables compared with AC cables. 
Introduction to system simulation – Philosophy and tools – HVDC system simulation – Modeling of HVDC systems 
for digital dynamic simulation. 
Total periods : 45 
TEXT BOOKS 
1. Padiyar, K. R., “HVDC power transmission system”, Wiley Eastern Limited, 1st edition, New Delhi, 1990, 
Reprint (2005). 
2. Edward Wilson Kimbark, “Direct Current Transmission”, Vol. I, Wiley interscience, New York, London, Sydney, 
1971. 
REFERENCES 
1. Colin Adamson and Hingorani N G, “High Voltage Direct Current Power Transmission”, Garraway Limited, 
London, 1960. 
2. Arrillaga, J., “High Voltage Direct Current Transmission”, Peter Pregrinus, London, 1983. 
3. Rakosh Das Begamudre, “Extra High Voltage AC Transmission Engineering”, New Age 
Interantional (P) Ltd., New Delhi, 1990. 
Page 68 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E10 DIGITAL SYSTEM DESIGN 3 0 0 3 
AIM 
To introduce to the concept of Digital system design. 
OBJECTIVES 
· To Study the structure of Standard and complex PLDs and system design using PLDs. 
· To introduce building blocks of FPGA. 
· To introduce VHDL. 
· To study about concurrent and sequential statements. 
· To introduce subprograms, Packages, and its configurations 
UNIT - I SYSTEM DESIGN USING PLDs AND CPLDs 9 
Structure of Standard PLDs and Complex PLDs (CPLDs) – Design of combinational and sequential circuits using 
PLDs and CPLDs – Design of state machines using Algorithmic State Machines (ASM) chart as a design tool. 
UNIT - II INTRODUCTION TO FIELD PROGRAMMABLE GATE ARRAYS (FPGAs) 9 
Types of FPGA – Xilinx XC3000 series: Logic Cell Array (LCA) - Configurable Logic Blocks (CLB) – 
Input/Output Blocks (IOB) – Programmable Interconnection Points (PIP) – Introduction to Xilinx XC4000 family – 
Design examples. 
UNIT - III INTRODUCTION TO VHDL 9 
Digital System Design process – Levels of abstraction – Need for Hardware Description Languages – VHDL: 
Design entities, Architectural body – Data types - Scalar types - Composite types - Access types - File types – 
Operators and expressions –Data objects. 
UNIT - IV CONCURRENT AND SEQUENTIAL STATEMENTS 9 
Concurrency – Signal Assignment – Conditional Signal Assignment – Signal Drivers – Inertial, Transport and delta 
delays – Sequential control – Wait-if–Case – Loop – Next – Exit – Null process – Component instantiation – Block 
– Generics – Assert. 
UNIT - V SUBPROGRAMS, PACKAGES AND CONFIGURATIONS 9 
Functions – Procedure– Package – Package declarations – Sub program declaration – Package body – Libraries – 
Predefined attributes – Configuration – Behavioural, Dataflow and Structural modeling of digital circuits. 
Total periods: 45 
TEXT BOOKS 
1. Nelson V.P., Nagale H.T., Carroll B.D., and Irwin J.D., "Digital Logic Circuit Analysis and Design", Prentice 
Hall International Inc. 1995 
2. Perry D.V., " VHDL: Programming by Example", Tata McGraw-Hill Publishing Company, 4th Edition, 2002. 
REFERENCES 
1. Palmer J.E., and Perlman D.E., " Introduction to Digital Systems", Schaum”s Outline Series, Tata McGraw 
Hill, New Delhi, 1996. 
2. Dueck R.K., “Digital Design with CPLD applications and VHDL”, Thomson Delmar Learning, 2001 
3. Navabi, Z.," VHDL: Analysis and Modelling of Digital Systems", McGraw-Hill, New Delhi, 2nd Edition, 1998. 
4. Roth C.H., “Digital Systems Sesign using VHDL”, Thomson Delmar Learning, 2001 
5. Programmable Logic Devices Data book and Design Guide", National Semiconductors, 1989. 
6. The Programmable Logic Data Book”, Xilinx, 1994. 
12EE2E11 ANALOG VLSI DESIGN 3 0 0 3 
Page 69 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
AIM 
To introduce the technology & concepts of ANALOG VLSI. 
OBJECTIVES: 
· To study device modelling for various devices. 
· To introduce basic building blocks of analog VLSI. 
· To study different types of amplifiers using BJT and MOS. 
· To study the design concept of operational amplifier. 
· To understand switched capacitor circuits. 
· To study data converter circuits 
· 
UNIT - I DEVICE MODELLING 9 
Introduction to Analog Design-MOS device model-DC, small signal and large signal model. Diode model- DC, 
small signal and high frequency model.BJT: DC small signal and high frequency model. Passive components in 
MOS technology. 
UNIT - II BASIC BUILDING BLOCKS 9 
Switches, Active Resistors, Current Mirrors: Types of Current mirrors-Simple,Widlar,Wilson and Cascode-Active 
loads, Voltage and Current REFERENCES Widlar Current Source, Band Gap Referenced Circuits. 
UNIT - III AMPLIFIERS (BJT & MOS) 9 
Single stage amplifiers-.Multistage Amplifiers:Darlington, Cascode and Differential Amplifiers Frequency response 
of Amplifiers: CE, CS, Cascode and Differential Amplifiers, Gilbert Multiplier cell. 
UNIT - IV OPERATIONAL AMPLIFIER 9 
Bipolar Operational Amplifier, Design Considerations, Basic Two stage MOS Opamp-Output stages Frequency 
response and Frequency Compensation,Comparators- charactersitic and two stage comparators. 
UNIT - V SWITCHED CAPACITOR CIRCUITS 9 
General Considerations, Sampling Switches, Switched Capacitor Amplifier, Switched Capacitor Integrator. 
Total periods: 45 
TEXT BOOK 
1. Grey, Hurst, Lewis and Meyer, “Analysis and Design of Analog Integrated Circuits”,, John Wiley & Sons 
Inc,4th Edition 2001. 
2. Behzad Razavi, “Design of Analog CMOS Integrated Circuits”, Tata McGraw Hill Edition, New Delhi, 2002. 
3. Jacob Baker R, Harry Li, David E.Boyce, “CMOS Circuit Design, Layout and Simulation”, IEEE Press, 1998. 
REFERENCES 
1. Phillip E.Allen & Douglas R Holberg, “CMOS Analog Circuit Design”, Oxford University Press 2002, 2nd 
Edition. 
2. David A. John, Ken Martin, " Analog Integrated Circuit Design” John Wiley & Sons, 2002. 
Page 70 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
GROUP III 
12EE2E12 ELECTRONIC PRODUCT DESIGN 3 0 0 3 
AIM 
To introduce different design techniques of electronic products. 
To introduce basic building blocks of PCB design. 
OBJECTIVES 
· To study the phases of development of electronic product. 
· To study low power design techniques. 
· To understand ergonomics for electronic design. 
· To study electromagnetic interference and noise sources. 
· To understand PCB layout planning. 
· To study Film master preparation. 
· To study different image transfer techniques 
UNIT - I DESIGN METHODOLOGY: 6 
Concept of a product - Electronic product design - Work content of a product - Systems concept of electronic 
product - Phases of development of electronic product - Pre-study phase, study phase and design phase - Industrial 
design - User centered design. 
UNIT - II CREATIVITY IN DESIGN TECHNIQUES: 6 
Integration of creativity - Requirements in design - Low power design - Input / output interface - Thermal design, 
approach of thermal management, basic thermal calculation - Heat sink selection - Fan and forced cooling. 
UNIT- III ERGONOMICS FOR ELECTRONIC PRODUCTS: 6 
Ergonomics requirements for products - Principles and rules of Ergonomics- Anthropometry - Control panel design 
- Ergonomics in work places, utility - Chassis and cabinet design - Typical professional electronic equipments. 
UNIT- IV ELECTROMAGNETIC INTERFERENCE: 6 
Noise in electronic equipments - Electromagnetic interference (EMI) - Methods of noise coupling, noise sources 
-Capacitor coupling and shielding inductive coupling and shielding , grounding , single point, multi point 
grounding and hardware grounds. 
UNIT - V PCB ART WORK GENERATION: 6 
Lay out planning - Lay out rules and considerations - Lay out sketch - Artwork generation, basic approaches - 
Artwork taping guidelines -Resistance, capacitance and inductance of PCB conductors - Conductor spacing - 
Supply and ground conductor considerations. 
UNIT - VI FILM MASTER PREPARATION: 5 
Film emulsion parameters - Film master dimension stability - Reprographic camera - Film processing and 
developing - Copper clad laminates, manufacturing process - Electrical and physical characteristics of laminates 
-Types of laminates and properties. 
UNIT - VII IMAGE TRANSFER TO PCBs 5 
Board cleaning - Photo printing - Photoresist types -Coating process for wet film resists - Processing stages for wet 
film - Dry film resist - Plating of PCBs - Principles of immersion, electroless plating and electroplating types. 
UNIT - VIII ETCHING AND SOLDERING OF PCB 5 
Types and operation, Etching machines - Etchant systems - Soldering, principles of solder connections - Solder 
alloys - Soldering fluxes - Soldering techniques - Solder masks - Testing and quality control of soldering. 
Total periods: 45 
Page 71 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
TEXT BOOKS 
1. Kim R. Fowler., "Electronic Instrument Design" Oxford press, England, 1997. 
2. Walter C. Bosshart., "Printed Circuit Boards Design and Technology", Tata McGraw Hill Publishing Company 
Ltd., New Delhi, 1983. 
REFERENCES 
1. John R. Barnes., "Electronic System Designing : Interference and Noise Control Techniques", Prentice Hall, New 
Jersey,1987 
2. Rao N.J., "Structuring of an Electronic Product”, CEDT Publication, Indian Institute of science, Bangalore, 1983. 
Page 72 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E13 COMPUTER AIDED DESIGN OF ELECTRICAL APPARATUS 3 0 0 3 
AIM 
To introduce the basics of Computer Aided Design technology for the design of Electrical Machines. 
OBJECTIVES: 
At the end of this course the student will be able to 
· Learn the importance of computer aided design method. 
· Understand the basic electromagnetic field equations and the problem formulation for CAD 
· applications. 
· Become familiar with Finite Element Method as applicable for Electrical Engineering. 
· Know the organization of a typical CAD package. 
· Apply Finite Element Method for the design of different Electrical apparatus. 
UNIT - I INTRODUCTION 8 
Conventional design procedures – Limitations – Need for field analysis based design – Review of Basic principles 
of energy conversion – Development of Torque/Force. 
UNIT - II MATHEMATICAL FORMULATION OF FIELD PROBLEMS 9 
Electromagnetic Field Equations – Magnetic Vector/Scalar potential – Electrical vector /Scalar potential – Stored 
energy in Electric and Magnetic fields – Capacitance - Inductance- Laplace and Poisson”s Equations – Energy 
functional. 
UNIT - III PHILOSOPHY OF FEM 10 
Mathematical models – Differential/Integral equations – Finite Difference method – Finite element method – Energy 
minimization – Variational method- 2D field problems – Discretisation – Shape functions – Stiffness matrix – 
Solution techniques. 
UNIT – IV CAD PACKAGES 9 
Elements of a CAD System –Pre-processing – Modelling – Meshing – Material properties- Boundary Conditions – 
Setting up solution – Post processing. 
UNIT- V DESIGN APPLICATIONS 9 
Voltage Stress in Insulators – Capacitance calculation - Design of Solenoid Actuator – Inductance and force 
calculation – Torque calculation in Switched Reluctance Motor. 
Total periods: 45 
TEXT BOOKS 
1. S.J Salon, “Finite Element Analysis of Electrical Machines”, Kluwer Academic Publishers, London, 1995. 
2. Nicola Bianchi, “Electrical Machine Analysis using Finite Elements”, CRC Taylor& Francis, 2005. 
REFERENCES 
1. Joao Pedro, A. Bastos and Nelson Sadowski, “Electromagnetic Modeling by Finite Element Methods”, Marcell 
Dekker Inc., 2003. 
2. P.P.Silvester and Ferrari, “Finite Elements for Electrical Engineers”, Cambridge University Press,1983. 
3. D.A.Lowther and P.P Silvester, “Computer Aided Design in Magnetics”, Springer Verlag, New York, 1986 
4. S.R.H.Hoole, “Computer Aided Analysis and Design of Electromagnetic Devices”, Elsevier, New York, 
1989. 
5. User Manuals of MAGNET, MAXWELL & ANSYS Softwares. 
Page 73 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E14 HIGH VOLTAGE ENGINEERING 3 0 0 3 
AIM 
To expose the students to various types of over voltage transients in power system and its effect on power 
system. 
- Generation of over voltages in laboratory. 
- Testing of power apparatus and system. 
OBJECTIVES 
· To understand the various types of over voltages in power system and protection 
methods. 
· Generation of over voltages in laboratories. 
· Measurement of over voltages. 
· Nature of Breakdown mechanism in solid, liquid and gaseous dielectrics. 
· Testing of power apparatus and insulation coordination. 
UNIT - I OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS 6 
Causes of over voltages and its effects on power system – Lightning, switching surges and temporary over voltages 
– protection against over voltages – Bewley”s lattice diagram. 
UNIT - II ELECTRICAL BREAKDOWN IN GASES, SOLIDS AND LIQUIDS 10 
Gaseous breakdown in uniform and non-uniform fields – Corona discharges – Vacuum breakdown – Conduction 
and breakdown in pure and commercial liquids – Breakdown mechanisms in solid and composite dielectrics. 
UNIT - III GENERATION OF HIGH VOLTAGES AND HIGH CURRENTS 10 
Generation of High DC, AC, impulse voltages and currents. Tripping and control of impulse generators. 
UNIT - IV MEASUREMENT OF HIGH VOLTAGES AND HIGH CURRENTS 10 
Measurement of High voltages and High currents – Digital techniques in high voltage measurement. 
UNIT- V HIGH VOLTAGE TESTING & INSULATION COORDINATION 9 
High voltage testing of electrical power apparatus – Power frequency, impulse voltage and DC testing – 
International and Indian standards – Insulation Coordination. 
Total periods: 45 
TEXT BOOK 
1. Naidu M. S., and Kamaraju V., “High Voltage Engineering”, Tata McGraw Hill, 4th Edition, 2009. 
REFERENCES 
1. Kuffel E., and Zaengel W. S., “High Voltage Engineering Fundamentals”, Pergamon Press, Oxford, London, 
1986. 
2. Kuffel E., and Abdullah M., “High Voltage Engineering”, Pergamon Press, Oxford, 1999. 
3. Alston L. L., Oxford University Press, New Delhi, 1st Indian Edition, 2006. 
Page 74 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E15 OPTO ELECTRONICS 3 0 0 3 
AIM 
Expose the students to basics of optoelectronic devices and circuits. 
OBJECTIVES 
· To understand elements of solid state physics 
· To learn about display devices and lasers 
· To study different types of optical detection devices 
· To understand analog and digital modulation techniques and modulators 
· To learn about optoelctornic integrated circuits 
UNIT - I ELEMENTS OF LIGHT AND SOLID STATE PHYSICS 9 
Wave nature of light- Polarization- Interference- Diffraction- Light Source- review of Quantum Mechanical 
concept- Review of Solid State Physics- Review of Semiconductor Physics and Semiconductor Junction Device. 
UNIT- II DISPLAY DEVICES AND LASERS 9 
Introduction- Photo Luminescence- Cathode Luminescence- Electro Luminescence- Injection Luminescence- 
Injection Luminescence- LED- Plasma Display- Liquid Crystal Displays- Numeric Displays- Laser Emission- 
Absorption- Radiation- Population Inversion- Optical Feedback- Threshold condition- Laser Modes- Classes of 
Lasers- Mode Locking- laser applications. 
UNIT- III OPTICAL DETECTION DEVICES 9 
Photo detector- Thermal detector- Photo Devices- Photo Conductors- Photo diodes- Detector Performance. 
UNIT- IV OPTOELECTRONIC MODULATOR 9 
Introduction- Analog and Digital Modulation- Electro-optic modulators- Magneto Optic Devices- Acoustoptic 
devices- Optical- Switching and Logic Devices. 
UNIT- V OPTOELECTRONIC INTEGRATED CIRCUITS 9 
Introduction- hybrid and Monolithic Integration- Application of Opto Electronic Integrated Circuits- 
Integrated transmitters and Receivers- Guided wave devices. 
Total periods: 45 
TEXT BOOKS 
1.Wilson and Haukes- “Opto Electronics – An Introduction”- Pearson/Prentice Hall of India Pvt-Ltd, New 
Delhi- 2007. 
2. Bhattacharya “Semiconductor Opto Electronic Devices”- Pearson/Prentice Hall of India Pvt. Ltd., New 
Delhi, 2006. 
REFERENCES 
1. Jasprit Singh- “Opto Electronics – As Introduction to materials and devices”-McGraw-Hill International /e- 
1998. 
2.Joachim Piprek, “Semiconductor Optoelectronic Devices”, Elsevier, 2003. 
3.Kasap S. O., Safa Kasap, “Optoelectronics and Photonics: Principles and Practices”, PHI, 2001. 
Page 75 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E16 NANO SCIENCE 3 0 0 3 
AIM 
Expose the students to basics of nano science and technology. 
UNIT - I INTRODUCTION 10 
Nanoscale Science and Technology - Implications for Physics, Chemistry, Biology and Engineering classifications 
of nano structured materials- nano particles- quantum dots, nano wires-ultra-thin films multilayered materials. 
Length Scales involved and effect on properties: Mechanical, Electronic, optical, Magnetic and Thermal properties. 
Introduction to properties and motivation for study (qualitative only). 
UNIT- II PREPARATION METHODS 5 
Bottom-up Synthesis-Top-down Approach: Precipitation, Mechanical Milling, Colloidal routes, Self assembly, 
Vapour phase deposition, MOCVD, Sputtering, Evaporation, Molecular Beam Epitaxy, Atomic Layer Epitaxy, 
MOMBE. 
UNIT - III PATTERNING AND LITHOGRAPHY FOR NANOSCALE DEVICES 5 
Introduction to optical/UV electron beam and X-ray Lithography systems and processes, Wet etching, dry (Plasma 
/reactive ion) etching, Etch resists-dip pen lithography 
UNIT- IV PREPARATION ENVIRONMENTS 10 
Clean rooms: specifications and design, air and water purity, requirements for particular processes, Vibration free 
environments: Services and facilities required. Working practices, sample cleaning, Chemical purification, chemical 
and biological contamination, Safety issues, flammable and toxic hazards, biohazards. 
UNIT - V CHARACTERIZATION TECHNIQUES 10 
X-ray diffraction technique, Scanning Electron Microscopy - environmental techniques, Transmission Electron 
Microscopy including high-resolution imaging, Surface Analysis techniques- AFM, SPM, STM, SNOM, ESCA, 
SIMS- Nano indentation 
Total periods: 45 
TEXT BOOKS 
1. A.S. Edelstein and R.C. Cammearata, eds., “Nanomaterials: Synthesis, Properties and Applications”, Institute 
of Physics Publishing, Bristol and Philadelphia, 1996. 
2. N John Dinardo, Nanoscale charecterisation of surfaces & Interfaces, Second edition, Weinheim Cambridge, 
Wiley-VCH, 2000. 
REFERENCES 
1. Timp G (Editor), “Nanotechnology”, AIP press/Springer, 1999. 
2. Akhlesh Lakhtakia (Editor) ,“The Hand Book of Nano Technology, Nanometer Structure, Theory, Modeling and 
Simulations”, Prentice-Hall of India (P) Ltd, New Delhi, 2007. 
Page 76 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E17 DISTRIBUTED CONTROL SYSTEM 3 0 0 3 
OBJECTIVE 
· To understand the basic industrial communication protocols. 
· To know the industrial application of PLC, SCADA, and open systems. 
· To impart knowledge about PLC and the programming 
· To give adequate information in the interfaces used in DCS. 
UNIT- I INTRODUCTION TO AUTOMATION 9 
Plant Automation and Control Systems Strategy, Evolution of instrumentation and control, Role of automation in 
industries, Benefits of automation, Introduction to automation tools PLC, DCS, SCADA, Hybrid DCS/PLC, 
Automation strategy evolution, Performance criteria and Safety Systems. 
UNIT - II PROGRAMMABLE LOGIC CONTROLLER (PLC) 9 
Basics of PLC – Architecture of PLC – Advantages – Types of PLC-Applications of PLC”s- Specifications of 
advanced PLC”s. PLC Programming – Simple process control programs are using Relay Ladder Logic and Boolean 
logic methods – Structured text, Sequential flow chart, State diagrams. System configuration hardware, system 
sizing and selection, wiring diagram, PLC installation, interfacing to PC. 
UNIT - III INTRODUCTION TO DCS 9 
DCS- Basic Packages Introduction, analog control, direct digital control, distributed process Control, DCS 
configuration with associated accessories, control console equipment, control UNIT (Relay Rack mounted 
equipments), local control UNITs and attributes of DCS & DCS Flow Sheet symbols. DCS System Integration I/O 
hardware stations, Set-point station control, Supervisory Computer Tasks & configurations, system integration with 
PLCs and computers. 
UNIT - IV INDUSTRIAL PROTOCOL 9 
Instrumentation Standard Protocols, HART Protocol, frame structure, programming, implementation examples, 
Benefits, Introduction, Advantages and Limitations of Field bus, FDS configuration, Comparison with other field 
bus standards including Device net, Profibus, Controlnet, CAN, Industrial Ethernet, MAP and TOP. 
UNIT - V APPLICATIONS 9 
Industrial applications of PLC, SCADA, DCS and open systems for following plants; Cement plant, Thermal power 
plant, Steel Plant, Glass manufacturing plant, Paper and Pulp plant. 
Total periods: 45 
TEXT BOOKS 
1. Dieter K. Hammer, Lonnie R. Welch, Dieter K. Hammer, “Engineering of Distributed Control Systems”, 
Nova Science Publishers, USA, 2001. 
2. John Mcbrewster, Frederic P.Miller, Agnes F.Vandome, “Distributed Control System”, Alphascript 
publishers, Mauritius, 2010. 
REFERENCES: 
1. Gary Dunning, “Introduction to Programmable Logic Controllers”, Thomson Business Information, New 
Delhi, 2nd Edition, 2009. 
2. Bolton. W, “Programmable Logic Controllers”, Elsevier India Private Limited, 5th Edition, New Delhi, 2010. 
Page 77 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E18 FLEXIBLE AC TRANSMISSION SYSTEMS 3 0 0 3 
AIM 
To enhance the transmission capability of transmission system by shunt and series compensation using 
static controllers. 
OBJECTIVES 
· To understand the concept of flexible AC transmission and the associated problems. 
· To review the static devices for series and shunt control. 
· To study the operation of controllers for enhancing the transmission capability. 
UNIT-IINTRODUCTION 9 
Reactive power control in electrical power transmission lines - Uncompensated transmission line – Series 
compensation - Basic concepts of Static VAR Compensator (SVC) - Thyristor Switched Series capacitor (TCSC) - 
Unified Power Flow Controller (UPFC). 
UNIT-II STATIC VAR COMPENSATOR (SVC) AND APPLICATIONS 9 
Voltage control by SVC –Advantages of slope in dynamic characteristics – Influence of SVC on system voltage – 
Design of SVC voltage regulator – Applications: Enhancement of transient stability – Steady state power transfer – 
Enhancement of power system damping- Prevention of voltage instability. 
UNIT-III THYRISTOR CONTROLLED SERIES CAPACITOR (TCSC) AND APPLICATIONS 
9 
Operation of the TCSC - Different modes of operation - Modeling of TCSC - Variable reactance model - Modeling 
of stability studies - Applications: Improvement of the system stability limit - Enhancement of system damping - 
Voltage collapse prevention. 
UNIT-IV EMERGINGFACTSCONTROLLERS 9 
Static Synchronous Compensator (STATCOM) – Principle of operation – V-I Characteristics –UPFC – Principle of 
operation – Modes of operation – Applications – Modeling of UPFC for power flow – Studies. 
UNIT-V CO-ORDINATION OF FACTS CONTROLLERS 9 
Controller interactions – SVC – SVC interaction - Co-ordination of multiple controllers using linear control 
techniques – Control coordination using genetic algorithms. 
Total Periods: 45 
TEXT BOOK 
1. Mohan Mathur, R., Rajiv. K. Varma, “Thyristor – Based Facts Controllers for Electrical Transmission Systems”, 
IEEE press and John Wiley & Sons, Inc. 
REFERENCES 
1. A.T.John, “Flexible AC Transmission System”, Institution of Electrical and Electronic Engineers (IEEE), 1999. 
2. Narain G.Hingorani, Laszio. Gyugyl, “Understanding FACTS Concepts and Technology of Flexible AC 
Transmission System”, Standard Publishers, Delhi, 2001. 
Page 78 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E19 AI APPLICATIONS TO POWER SYSTEMS 3 0 0 3 
AIM 
To learn the various Artificial Intelligence Techniques and their application to Power Systems. 
OBJECTIVES 
· To study about Artificial Neural Networks, Genetic Algorithm and Fuzzy Logic System. 
· To apply AI techniques to Power Systems. 
UNIT I INTRODUCTION 9 
Approaches to intelligent control – Architecture for intelligent control – Symbolic reasoning system – rule-based 
systems – the AI approach –Knowledge representation. Expert systems. 
UNIT II ARTIFICIAL NEURAL NETWORKS 9 
Concept of Artificial Neural Networks and its basic mathematical model – McCulloch- Pitts neuron model – simple 
perceptron – Adaline and Madaline – Feed-forward Multilayer Perceptron – Learning and Training the neural 
network – Data Processing: Scaling – Fourier transformation – principal-component analysis and wavelet 
transformations – Hopfield network – Self-organizing network and Recurrent network – Neural Network based 
controller. 
UNIT III GENETIC ALGORITHM 9 
Basic concept of Genetic algorithm and detailed algorithmic steps – adjustment of free parameters – Solution of 
typical control problems using genetic algorithm – Concept on some other search techniques like tabu search and 
ant-colony search techniques for solving optimization problems. 
UNIT IV FUZZY LOGIC SYSTEM 9 
Introduction to crisp sets and fuzzy sets – basic fuzzy set operation and approximate reasoning – Introduction to 
fuzzy logic modeling and control – Fuzzification – inferencing and defuzzification – Fuzzy knowledge and rule 
bases – Fuzzy modelling and control schemes for nonlinear systems – Self-organizing fuzzy logic control – Fuzzy 
logic control for nonlinear time-delay system. 
UNIT V APPLICATIONS TO POWER SYSTEMS 9 
GA application to power system optimisation problems, Neural Network Application to Load Forecasting, 
Contingency Analysis, Application of Fuzzy Logic Controllers to Power System Stability. 
TOTAL: 45 PERIODS 
TEXT BOOKS: 
1. Jacek.M.Zurada, "Introduction to Artificial Neural Systems", Jaico Publishing House, 1999. 
2. Kosko,B. "Neural Networks And Fuzzy Systems", Prentice-Hall of India Pvt. Ltd., 1994. 
REFERENCES: 
1. Klir G.J. & Folger T.A. "Fuzzy sets, uncertainty and Information", Prentice-Hall of India pvt. Ltd., 1993. 
2. Zimmerman H.J. "Fuzzy set theory-and its Applications", - Kluwer Academic Publishers, 1994. 
3. Driankov, Hellendroon, "Introduction to Fuzzy Control", Narosa Publishers. 
Page 79 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E20 ROBOTICS TECHNOLOGY AND FLEXIBLE AUTOMATION 3 0 0 3 
AIM 
To provide comprehensive knowledge of robotics in the design, analysis and control point of view. 
OBJECTIVES 
· To study the various classifications of robots and fields of robotics. 
· To study the various drives and control systems of robots. 
· To study the different types of sensors and vision systems used in robotics. 
· To study the programming techniques used in robotics. 
· To study the basic building blocks of automation 
· To understand the importance of PLC and CNC 
UNIT - I CLASSIFICATION OF ROBOTIC SYSTEMS 6 
Basic structure of a robot - Classification of robots: Cartesian, Cylindrical, Spherical, Articulated, SCARA. 
Accuracy, resolution and repeatability of robots. Robot application in manufacturing: Material transfers - Machine 
loading and unloading - Processing operations - Assembly and inspection. 
UNIT - II DRIVES AND CONTROL SYSTEMS 6 
Hydraulic and Pneumatic systems: cylinders, control valves, hydro motor. Types of mechanical power drive, rotary 
to linear motion conversion mechanisms. Robot end effectors. Servomotors – Operation, stepper motors - control 
loops using current and voltage amplifier. Robot controllers - configuration of robot controller. 
UNIT - III SENSORS AND VISION SYSTEMS 8 
Types of sensors, tactile sensors, proximity sensors and speed sensors – Encoder, resolvers. Vision systems: Image 
processing and analysis, Segmentation, Feature extraction, Object Recognition. 
UNIT - IV ROBOT PROGRAMMING 6 
Lead through programming - Textual programming, programming examples - Social and Economical Aspects of 
Robots - Typical layouts of robots in Industries. 
UNIT - V AUTOMATION 6 
Advantages of automation, building blocks of automation. Automatic feeding lines, material-handling devices, 
ASRS, transfer lines, automatic inspection, intelligent automation. 
Total periods: 45 
TEXT BOOKS 
1. Mikell P. Weiss G.M., Nagel R.N., Odraj N.G., Industrial Robotics, McGraw-Hill Singapore, 1996. 
2. Ghosh, Control in Robotics and Automation: Sensor Based Integration, Allied Publishers, Chennai, 1998. 
REFERENCES 
1. Bolton W, “Mechatronics”, Pearson Education Asia, 2002. 
2. Fu K.S, Gonzalez R.C, and C S G Lee, “Robotics: Control, Sensing, Vision and Intelligence”, McGraw Hill, 
New Delhi, 1987. 
Page 80 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E21 SPECIAL ELECTRICAL MACHINES 3 0 0 3 
AIM 
To expose the students to the construction, principle of operation and performance of special electrical 
machines as an extension to the study of basic electrical machines. 
OBJECTIVES 
To impart knowledge on 
· Construction, principle of operation and performance of synchronous reluctance motors. 
· Construction, principle of operation and performance of stepping motors. 
· Construction, principle of operation and performance of switched reluctance motors. 
· Construction, principle of operation and performance of permanent magnet brushless D.C. motors. 
UNIT - I SYNCHRONOUS RELUCTANCE MOTORS 9 
Constructional features – Types – Axial and radial air gap motors – Operating principle – Reluctance – Phasor 
diagram - Characteristics – Vernier motor. 
UNIT- II STEPPING MOTORS 9 
Constructional features – Principle of operation – Variable reluctance motor – Hybrid motor – Single and multi stack 
configurations – Theory of torque predictions – Linear and non-linear analysis – Characteristics – Drive circuits. 
UNIT- III SWITCHED RELUCTANCE MOTORS 9 
Constructional features – Principle of operation – Torque prediction – Power controllers – Non-linear analysis – 
Microprocessor based control - Characteristics – Computer control. 
UNIT - IV PERMANENT MAGNET BRUSHLESS D.C. MOTOR 9 
Principle of operation – Types – Magnetic circuit analysis – EMF and torque equations – Power controllers – Motor 
characteristics and control. 
UNIT - V PERMANENT MAGNET SYNCHRONOUS MOTORS 9 
Principle of operation – EMF and torque equations – Reactance – Phasor diagram – Power controllers - Converter - 
Volt-ampere requirements – Torque speed characteristics - Microprocessor based control. 
Total periods: 45 
TEXT BOOKS 
1. Miller T.J.E., “Brushless Permanent Magnet and Reluctance Motor Drives”, Clarendon Press, Oxford, 1989. 
2. Aearnley, “Stepping Motors – A Guide to Motor Theory and Practice”, Peter Perengrinus, London, 1982. 
REFERENCES 
1. Kenjo T, “Stepping Motors and Their Microprocessor Controls”, Clarendon Press London, 1984. 
2. Kenjo T and Nagamori S., “Permanent Magnet and Brushless DC Motors”, Clarendon Press, London, 1988. 
Page 81 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12EE2E22 NON CONVENTIONAL ENERGY SOURCES 3 0 0 3 
AIM 
To expose the students to the various nonconventional energy sources and thier importance. 
OBJECTIVES 
· To understand the need to develop new energy technologies 
· To study thermal power generation. 
· To understand photo voltaic energy conversion. 
· To study the various components of wind energy conversion scheme 
and the principles of MHD power 
generation 
· To study miscellaneous energy sources like Geothermal energy and 
Bio-mass. 
UNIT I INTRODUCTION 9 
Trends in energy consumption - World energy scenario - Energy sources and their availability - Conventional and 
renewable sources - Need to develop new energy technologies. 
UNIT II SOLAR THERMAL ELECTRIC CONVERSION 9 
Principle of solar thermal power generation - Low and medium temperature systems - Stirling cycle - Solar thermal 
power generation - Brayton cycle - Tower concept - Cost effectiveness. 
UNIT III PHOTO - VOLTAIC ENERGY CONVERSION 9 
Solar radiation and measurement - Solar cells and their characterisation - Influence of insulation and temperature - 
PV arrays - Electrical storage with batteries - Charge controllers. 
UNIT IV POWER CONDITIONING SCHEMES 9 
DC Power conditioning converters - Maximum power point tracking algorithms - AC Power conditioners - 
Line commutated Thyristor Inverters - Synchronised Operation with grid supply - Stand alone inverter - 
Applications - Economic analysis of PV systems. 
UNIT V WIND ENERGY SYSTEMS 9 
Basic principle of wind energy conversion - Nature of wind - Power in the wind - Components of a wind energy 
conversion system - Classification of WECS - Generator control - Load control. 
Total periods: 45 
TEXT BOOK 
1. Rao. S, and Paruklekar, “Energy Technology – Non Conventional, Renewable and Conventional”, Khanna Pub, 
New Delhi 1999. 
2. Mukund R. Patel, “Wind and Solar Power Systems”, CRC Press LLC, New York, 2006. 
REFERENCES 
1. Rai, G.D., "Non Conventional Energy Sources", Khanna Publishers, New Delhi, 1993. 
2. Garg, H.P., and Prakash, J., "Solar Energy - Fundamentals and Applications", Tata McGraw Hill, New Delhi, 
1997. 
Page 82 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12IT2002 SOFT SKILLS 3 0 0 3 
AIM 
The proposed elective course exposes the students to those soft skills which are crucial to an employee”s 
ability to work “smarter”. The Core Modules of this Elective includes Strengthening English, Art of 
Communication, Working in Teams, and Interview & GD handling skills amongst other related topics. 
OBJECTIVE 
At the end of this elective, student shall be able to / develop the skills necessary to: 
· Have competent knowledge of grammar with an understanding of its basic rules. 
· Speak and write appropriately applying these rules. 
· Communicate effectively and enhance their interpersonal relationship building skills with renewed self 
confidence. 
· Work together in teams and accomplish OBJECTIVEs in a cordial atmosphere. 
· Face interviews, GDs and presentations. 
· Understand and develop the etiquette necessary to present oneself in a professional setting. 
UNIT- I EFFECTIVE ENGLISH – WRITTEN AND SPOKEN ENGLISH 8 
Basic rules of Grammar - Parts of Speech – Tenses – Verbs, Sentence Construction - Vocabulary – Idioms & 
Phrases – Synonyms – Antonyms, Dialogues and Conversations – Writing, Exercises to practice and improve these 
skills. 
UNIT - II ART OF COMMUNICATION & THE HIDDEN DATA INVOLVED 8 
Verbal Communication - Effective Communication - Active listening – Paraphrasing - Feedback, Non Verbal 
Communication - Body Language of self and others, Importance of feelings in communication - Dealing with 
feelings in communication 
UNIT - III WORLD OF TEAMS 8 
Self Enhancement - importance of developing assertive skills- developing self confidence – developing emotional 
intelligence, Importance of Team work – Team vs. Group - Attributes of a successful team – Barriers involved, 
working with Groups – Dealing with People- Group Decision Making 
UNIT - IV INTERVIEW, GD & PRESENTATION SKILLS 8 
Interview handling Skills – Self preparation checklist – Grooming tips: do’s & don’ts – mock interview & feedback, 
GD skills – Understanding the OBJECTIVE and skills tested in a GD – General types of GDs – Roles in a GD – 
Do’s & Don’ts – Mock GD & Feedback, Presentation Skills – Stages involved in an effective presentation – 
selection of topic, content, aids – Engaging the audience – Time management – Mock Presentations & Feedback 
UNIT - V BUSINESS ETIQUETTE & ETHICS 8 
Grooming etiquette – Telephone & E-mail etiquette – Dining etiquette – Do”s & Don”ts in a formal setting – how to 
impress, Ethics – Importance of Ethics and Values – Choices and Dilemmas faced – Discussions from news 
headlines. 
Total periods: 45 
REFERENCES 
1. The Seven Habits of Highly Effective People -Stephen R. Covey. 
2. All the books in the “Chicken Soup for the Soul” series. 
3. Man’s search for meaning – Viktor Frankl 
4. The greatest miracle in the world – Og Mandino 
5. Goal - Eliyahu Goldratt. 
6. Working with Emotional Intelligence - David Goleman. 
7. Excel in English – Sundra Samuel, Samuel Publications 
8. Developing Communication Skills by Krishna Mohan and Meera Banerji; MacMillan India Ltd., Delhi 
Page 83 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
9. Essentials of Effective Communication, Ludlow and Panthon; Prentice Hall of India. 
10. Effective Presentation Skills (A Fifty-Minute Series Book) by Steve Mandel 
11. “Strategic interviewing” by Richaurd Camp, Mary E. Vielhaber and Jack L. Simonetti – Published by Wiley 
India Pvt. Ltd 
12. “Effective Group Discussion: Theory and Practice” by Gloria J. Galanes, Katherine Adams , John K. Brilhart 
Page 84 of 85
For the students admitted from the Academic year 2012-2013(R 2012) 
12IT2004 BUSINESS INTELLIGENCE AND ITS APPLICATION 3 0 0 3 
AIM 
The proposed elective course exposes students to business intelligence domain. It provides knowledge on basics of 
data integration, multi-dimensional data modeling and enterprise reporting. 
OBJECTIVE 
At the end of this elective, student will be able to: 
· Differentiate between Transaction Processing and Analytical applications and describe the need for 
Business Intelligence 
· Demonstrate understanding of technology and processes associated with Business Intelligence framework 
· Demonstrate understanding of Data Warehouse implementation methodology and project life cycle 
· Given a business scenario, identify the metrics, indicators and make recommendations to achieve the 
business goal 
· Design an enterprise dashboard that depicts the key performance indicators which helps in decision making 
· Demonstrate application of concepts in Microsoft BI suite 
UNIT - I INTRODUCTION TO BUSINESS INTELLIGENCE 4 
Introduction to OLTP and OLAP, BI Definitions & Concepts, Business Applications of BI, BI Framework, Role of 
Data Warehousing in BI, BI Infrastructure Components – BI Process, BI Technology, BI Roles & Responsibilities 
UNIT- II BASICS OF DATA INTEGRATION 12 
Concepts of data integration need and advantages of using data integration, introduction to common data integration 
approaches, introduction to ETL using SSIS, Introduction to data quality, data profiling concepts and applications 
UNIT - III INTRODUCTION TO MULTI-DIMENSIONAL DATA MODELING 6 
Introduction to data and dimension modeling, multidimensional data model, ER Modeling vs. multi dimensional 
modeling, concepts of dimensions, facts, cubes, attribute, hierarchies, star and snowflake schema, introduction to 
business metrics and KPIs, creating cubes using SSAS 
UNIT- IV BASICS OF ENTERPRISE REPORTING 12 
Introduction to enterprise reporting, concepts of dashboards, balanced scorecards, introduction to SSRS 
Architecture, enterprise reporting using SSRS 
UNIT -V TUTORIALS 6 
The assignments for Electives could include the following. 
Seminars from the topics related to Business Intelligence space 
Relevant lab exercises to get exposure to BI concepts & tool 
Total periods: 45 
REFERENCES 
1. Business Intelligence by David Loshin 
2. Business intelligence for the enterprise by Mike Biere 
3. Business intelligence roadmap by Larissa Terpeluk Moss, Shaku Atre 
4. Successful Business Intelligence: Secrets to making Killer BI Applications by Cindi Howson 
5. Delivering business intelligence with Microsoft SQL server 2008 by Brain, Larson 
6. Foundations of SQL Server 2005 Business Intelligence by Lynn Langit 
7. Information dashboard design by Stephen Few 
Page 85 of 85

SYLLABUS OF 2012 BATCHES

  • 1.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) Sri Ramakrishna Engineering College, Coimbatore-22 Department of Electrical and Electronics Engineering Regulations: 2012 Curriculum Semester III Electrical and Electronics Engineering Marks Code No. Course Title L T P C CA FE Total THEORY 12MA2301 Transforms and Partial Differential Equations 3 1 0 4 20 80 100 12EE2302 Analysis and Synthesis of Electrical Networks 3 1 0 4 20 80 100 12EE2303 Electromagnetic Field Theory 3 1 0 4 20 80 100 12EE2304 Measurements and Instrumentation 3 0 0 3 20 80 100 12EE2305 Analog Electronic Circuits 3 0 0 3 20 80 100 12EE2306 Digital Principles and Design 3 0 0 3 20 80 100 PRACTICALS 12EE2307 Measurements and Instrumentation Laboratory 0 0 3 2 20 80 100 12EE2308 Electronic Circuits Laboratory 0 0 3 2 20 80 100 Total 18 3 6 25 - - - Semester IV Electrical and Electronics Engineering Marks Code No. Course Title L T P C CA FE Total THEORY 12MA2001 Numerical Methods 3 1 0 4 20 80 100 12EE2402 DC Machines and Transformers 3 1 0 4 20 80 100 12EE2403 Transmission & Distribution of Electrical Energy 3 0 0 3 20 80 100 12EE2404 IC Fabrication and Linear Integrated Circuits 3 0 0 3 20 80 100 12EE2405 Introduction to Signals and Systems 3 0 0 3 20 80 100 12EE2406 Principles of Communication Engineering 3 0 0 3 20 80 100 PRACTICALS 12EE2407 DC Machines and Transformers Laboratory 0 0 3 2 20 80 100 12EE2408 Linear Integrated Circuits Laboratory 0 0 3 2 20 80 100 Total 18 2 6 24 - - - Page 1 of 85
  • 2.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) Semester V Electrical and Electronics Engineering Marks Code No. Course Title L T P C CA FE Total THEORY 12EE2501 Control System Engineering 3 1 0 4 20 80 100 12EE2502 Synchronous and Induction Machines 3 1 0 4 20 80 100 12EE2503 Power System Protection & Switchgear 3 0 0 3 20 80 100 12EE2504 Microprocessors and Microcontrollers 3 0 0 3 20 80 100 12EE2505 Digital Signal Processing for Electrical Engineers 3 0 0 3 20 80 100 12EE2506 Data Structures and Developing Algorithms 3 0 0 3 20 80 100 PRACTICALS 12EE2507 Synchronous and Induction Machines Laboratory 0 0 3 2 20 80 100 12EE2508 Data Structures and Algorithms Laboratory 0 0 3 2 20 80 100 12EN2001 Communication skills laboratory 0 0 2 1 20 80 100 Total 18 2 8 25 - - - Semester VI Electrical and Electronics Engineering Marks Code No. Course Title L T P C CA FE Total THEORY 12EE2601 Electric Machine Design 3 1 0 4 20 80 100 12EE2602 Power System Analysis 3 1 0 4 20 80 100 12EE2603 Power Electronics 3 1 0 4 20 80 100 12EE2604 Embedded System Engineering 3 0 0 3 20 80 100 12EE2605 Management Concepts and Practices 3 0 0 3 20 80 100 Elective I 3 0 0 3 20 80 100 PRACTICALS 12EE2607 Control Systems Laboratory 0 0 3 2 20 80 100 12EE2608 DSP and Microprocessors Laboratory 0 0 3 2 20 80 100 Total 18 3 6 25 - - - Page 2 of 85
  • 3.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) Semester VII Electrical and Electronics Engineering Marks Code No. Course Title L T P C CA FE Total THEORY 12EE2701 Electric Energy- Generation, Utilisation and Conservation 3 0 0 3 20 80 100 12EE2702 Electric Drives and Controls 3 0 0 3 20 80 100 12EE2703 Power System Economics and Control Techniques 3 1 0 4 20 80 100 12ME2001 Total Quality Management 3 0 0 3 20 80 100 Elective II 3 0 0 3 20 80 100 Elective III 3 0 0 3 20 80 100 PRACTICALS 12EE2707 Power Electronics and Drives Laboratory 0 0 3 2 20 80 100 12EE2708 Power System Simulation Laboratory 0 0 3 2 20 80 100 12EE2709 Comprehensive Viva Voce 0 0 2 1 100 100 Total 18 1 8 24 - - - Semester VIII Electrical and Electronics Engineering Marks Code No. Course Title L T P C CA FE Total THEORY Elective IV 3 0 0 3 20 80 100 Elective V 3 0 0 3 20 80 100 Elective VI 3 0 0 3 20 80 100 PRACTICALS 12EE2804 Project Work 0 0 18 6 20 80 100 Total 9 0 18 15 - - - Electives Electrical and Electronics Engineering Marks Page 3 of 85
  • 4.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) Group Code No. Course Title L T P C CA FE Total Group I 12CS2001 Java Programming 3 0 0 3 20 80 100 12EE2E01 Introduction to Data Base Management System 3 0 0 3 20 80 100 12EE2E02 DSP based System Design 3 0 0 3 20 80 100 12EE2E03 Introduction to Computer Architecture 3 0 0 3 20 80 100 Group II 12EE2E04 LabView and Virtual Instrumentation 3 0 0 3 20 80 100 12EE2E05 Power Quality 3 0 0 3 20 80 100 12EE2E06 Transients in Power System 3 0 0 3 20 80 100 12EE2E07 Networking in Smart Grids 3 0 0 3 20 80 100 12EE2E08 Soft Computing Techniques 3 0 0 3 20 80 100 12EE2E09 EHV AC and DC Power Transmission 3 0 0 3 20 80 100 12EE2E10 Digital System Design 3 0 0 3 20 80 100 12EE2E11 Analog VLSI Design 3 0 0 3 20 80 100 Group III 12EE2E12 Electronic Product Design 3 0 0 3 20 80 100 12EE2E13 Computer Aided Design of Electrical Apparatus 3 0 0 3 20 80 100 12EE2E14 High Voltage Engineering 3 0 0 3 20 80 100 12EE2E15 Opto Electronics 3 0 0 3 20 80 100 12EE2E16 Nano Science 3 0 0 3 20 80 100 12EE2E17 Distributed Control System 3 0 0 3 20 80 100 12EE2E18 Flexible AC Transmission Systems 3 0 0 3 20 80 100 12EE2E19 AI Applications to Power Systems 3 0 0 3 20 80 100 12EE2E20 Robotics Technology and Flexible Automation 3 0 0 3 20 80 100 12EE2E21 Special Electrical Machines 3 0 0 3 20 80 100 12EE2E22 Non-conventional Energy Sources 3 0 0 3 20 80 100 12IT2002 Soft Skills 3 0 0 3 20 80 100 12IT2004 Business Intelligence and its Applications 3 0 0 3 20 80 100 Total credits for the Course - 190 L : Lecture *CA : Continuous assessment T : Tutorial *FE : Final Examination P : Practical C : Credits Criterion for passing: · Minimum Marks (FE) : 50/100 (In the Final Examination) · Minimum Marks (CA+FE) : 50 Page 4 of 85
  • 5.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) SEMESTER III 12MA2301 TRANSFORMS AND PARTIAL DIFFERENTIAL EQUATIONS 3 1 0 4 (Common to all branches of Engineering and Technology except BME) AIM The course aims to develop the skills of the students in the areas of Partial differential equations, Boundary value problems and Transform techniques. This will be necessary for their effective studies in a large number of engineering subjects like heat conduction, communication systems, electro optics and electromagnetic theory. OBJECTIVES At the end of the course the students would · Be capable of mathematically formulating certain practical problems in terms of partial differential equations, solve them and physically interpret the results. · Have gained the knowledge of Fourier series, their different possible forms and the frequently needed practical harmonic analysis that an engineer may have to make from discrete data. · Have obtained capacity to formulate and identify certain boundary value problems encountered in engineering practices, decide on applicability of the Fourier series method of solution, solve them and interpret the results. · Have grasped the concept of expression of a function, under certain conditions, as a double integral leading to identification of transform pair, and specialization on Fourier transform pair, their properties, the possible special cases with attention to their applications. · Have learnt the basics of Z-Transform in its applicability to discretely varying functions, gained the skill to formulate certain problems in terms of difference equations and solve them. UNIT- I PARTIAL DIFFERENTIAL EQUATIONS 12 Formation of partial differential equations by elimination of arbitrary constants and arbitrary functions – Solution of of first order partial differential equations of the forms F(p,q) = 0, Z= px + qy + F(p,q) and F(z,p,q) = 0 – Lagrange’s linear equation – Linear partial differential equations of second and higher order with constant coefficients. UNIT- II FOURIER SERIES 12 Dirichlet’s conditions – General Fourier series – Odd and Even functions – Half range sine series and cosine series – Parseval’s identity – Harmonic Analysis. UNIT- III BOUNDARY VALUE PROBLEMS 12 Classification of second order quasi linear partial differential equations – Solutions of one dimensional wave equation (Problems only) – One dimensional heat equation (Problems only) -Steady state solution of two-dimensional heat equation in Cartesian coordinates (Insulated edges excluded) Problems only. UNIT- IV FOURIER TRANSFORMS 12 Fourier integral theorem (without proof) – Fourier transform pair - Sine and Cosine transforms – Properties– Transforms of simple functions – Convolution theorem – Parseval’s identity. UNIT- V Z -TRANSFORMS AND DIFFERENCE EQUATIONS 12 Z-transform– Elementary properties– Inverse Z-transform– Convolution theorem– Formation of difference equations (Direct problems only) – Solution of difference equations using Z - Transform. Total Periods (45+15T): 60 TEXT BOOKS Page 5 of 85
  • 6.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 1. Kandasamy.P.,Thilagavathy.K., and Gunavathy.K., “Engineering Mathematics’’, S. Chand & Company ltd., Volume II, New Delhi, 2011. 2. Grewal.B.S., “Higher Engineering Mathematics”, Khanna Publishers, 40th Edition, New Delhi, 2008. REFERENCE BOOKS 1. Wylie C. Ray and Barrett Louis.C., “Advanced Engineering Mathematics”, McGraw-Hill, Inc., 6thEdition, New York, 1995. 2. Andrews.L.A., and Shivamoggi B.K., “Integral Transforms for Engineersand Applied Mathematicians”, Macmillen , 1st Edition, New York ,1988. 3. Churchill.R.V. and Brown.J.W., “Fourier Series and Boundary Value Problems”, McGraw-Hill Book Co., 4th Edition, Singapore,1987. Page 6 of 85
  • 7.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2302 ANALYSIS AND SYNTHESIS OF ELECTRICAL NETWORKS 3 1 0 4 AIM To provide depth knowledge on network analysis and synthesis concepts OBJECTIVES · To understand the concepts of graph theory · To learn about two port networks · To study about network functions of one port and two port networks · To understand the concept of network synthesis · To study about active and passive filters UNIT – I GRAPH THEORY 12 Graph of a Network – Definitions – Tree - Co tree – Link - Basic loop and basic cut set - Incidence matrix - Cut set matrix - Tie set matrix – Duality - Loop and Nodal methods of analysis. UNIT – II TWO PORT NETWORKS 12 Characterization of LTI two port networks – Z, Y, ABCD and h parameters - Reciprocity and symmetry – Inter relationships between the parameters - Inter-connections of two port networks - Ladder and Lattice networks - T & I Representation. UNIT – III NETWORK FUNCTIONS 12 Concept of Complex frequency, Transform Impedances Network functions of one port and two port networks, concept of poles and zeros, properties of driving point and transfer functions, time response and stability from pole zero plot. UNIT – IV NETWORK SYNTHESIS 12 Positive real functions - definition and properties- properties of RL, RC & LC - pointing functions-synthesis of RL, RC, LC driving point admittance functions using Foster and Cauer first and second forms. UNIT – V FILTERS 12 Image parameters and characteristics impedance- Passive and active filters fundamentals - Low pass filters- High pass filters - Constant K type filters- Introduction to active & passive filters. Total Periods (45 +15T): 60 TEXT BOOKS 1. Van – Valkenburg M.E., “Network Analysis”, Prentice Hall of India, 3rd Edition, New Delhi, 2011. 2. Sudhakar A., and Shyammohan, “Circuits and Networks Analysis and Synthesis”, Tata McGraw Hill Publishing Co. Ltd., 3rd Edition, New Delhi, 2007. REFERENCES 1. Chakrabati A, “Circuits Theory (Analysis and synthesis)”, Dhanpath Rai & Sons, New Delhi, 1999. 2. Van Valkenburg M.E., “Introduction to Modern Network Synthesis”, Wiley Eastern Limited, 1999. 3. Jagan N.C., and Lakshminarayanan C., “ Network Analysis”, B.S.Publications, 2008. 4. Suresh Kumar K.S.,”Electric Circuits and Networks”, Pearson Education, 2009. Page 7 of 85
  • 8.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2303 ELECTROMAGNETIC FIELD THEORY 3 1 0 4 AIM This subject aims to provide the student an understanding of the fundamentals of electromagnetic fields and their applications in electrical engineering. OBJECTIVES To impart knowledge on · Sources and effects of electromagnetic fields. · Concepts of electrostatics, electrical potential, energy density and their applications. · Concepts of magnetostatics, magnetic flux density, scalar and vector potential and its applications. · Faraday’s laws, induced emf and their applications. · Concepts of electromagnetic waves and pointing vector. UNIT- I INTRODUCTION 12 Sources and effects of electromagnetic fields – Vector fields – Different co-ordinate systems – Vector calculus – Gradient, Divergence and Curl - Divergence theorem – Stoke’s theorem. UNIT - II ELECTROSTATICS 12 Coulomb’s Law – Electric field intensity – Field due to point and continuous charges – Gauss’s law and application – Electrical potential – Electric field and equipotential plots – Electric field in free space, conductors, dielectric – Dielectric polarization, Electric field in multiple dielectrics – Boundary conditions, Poisson’s and Laplace’s equations – Capacitance-Energy density – Dielectric strength. UNIT - III MAGNETOSTATICS 12 Lorentz Law of force, magnetic field intensity – Biot–savart Law - Ampere’s Law – Magnetic field due to straight conductors, circular loop, infinite sheet of current – Magnetic flux density (B) – B in free space, conductor, magnetic materials – Magnetization – Magnetic field in multiple media – Boundary conditions – Scalar and vector potential – Magnetic force – Torque – Inductance – Energy density – Magnetic circuits. UNIT - IV ELECTRODYNAMIC FIELDS 12 Faraday’s laws, induced emf – Transformer and motional EMF, Maxwell’s equations (differential and integral forms) – Displacement current – Relation between field theory and circuit theory. UNIT - V ELECTROMAGNETIC WAVES 12 Generation – Electro Magnetic Wave equations – Wave parameters; velocity, intrinsic impedance, propagation constant – Waves in free space, lossy and lossless dielectrics, conductors-skin depth, Poynting vector – Plane wave reflection and refraction. Total Periods (45 +15T): 60 TEXT BOOKS 1. William .H. Hayt, “Engineering Electromagnetics”, Tata McGraw Hill, 7th Edition, 2006. 2. Gangadhar K.A, “Field Theory”, Khanna Publishers, 13th Edition, New Delhi, 1997. REFERENCES 1. John.D.Kraus, “Electromagnetics”, McGraw Hill book Co., 4th Edition, New York, 1992. 2. Joseph. A.Edminister, “Theory and Problems of Electromagnetics”, Schaum Series, Tata McGraw Hill, 2nd Edition, 2006. 3. Kraus and Fleish, “Electromagnetics with Applications”, McGraw Hill International Editions, 5th Edition, 1999. 4. Mathew N.O.Sadiku, ‘Elements of Electromagnetics’, 3rd Edition, Oxford University Press, 2003. Page 8 of 85
  • 9.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2304 MEASUREMENTS AND INSTRUMENTATION 3 0 0 3 AIM To provide adequate knowledge in electrical instruments and measurements techniques. OBJECTIVES · To make the student have a clear knowledge of the basic laws governing the operation of the instruments, relevant circuits and their working. · Introduction to general instrument system, error, calibration etc. Emphasis is laid on analog and digital techniques used to measure voltage, current, energy and power etc. · To have an adequate knowledge of comparison methods of measurement. · Elaborate discussion about storage & display devices. · Exposure to various transducers and data acquisition system. UNIT - I INTRODUCTION 9 Functional elements of an instrument – Static and dynamic characteristics – Errors in measurement – Statistical evaluation of measurement data – Primary and secondary standards - Calibration. UNIT - II ELECTRICAL AND ELECTRONICS INSTRUMENTS 9 Principle and types of analog and digital voltmeters, ammeters, multimeters – Average ,RMS and peak responding type meters- Digital Phase meter- Single and three phase wattmeters and energy meters – Magnetic measurements – Determination of B-H curve and measurements of iron loss – Instrument transformers – Instruments for measurement of frequency and phase- Power factor meters. UNIT - III COMPARISON METHODS OF MEASUREMENTS 9 D.C. & A.C. potentiometers - D.C & A.C bridges - transformer ratio bridges - self-balancing bridges. Interference & screening – Multiple earth and earth loops - Electrostatic and electromagnetic interference – Grounding techniques. UNIT - IV STORAGE AND DISPLAY DEVICES 9 Magnetic disk and tape – Recorders, digital plotters and printers (qualitative treatment only), LED, LCD & dot matrix display – DSO, MSO, Digital transceiver recorder, Power measurement and analysis, Real time spectrum analysers. UNIT - V TRANSDUCERS AND DATA ACQUISITION SYSTEM 9 Classification of transducers – Selection of transducers – Resistive, capacitive & inductive transducers – Piezoelectric, optical and digital transducers – Elements of data acquisition system – A/D, D/A converters. Total periods: 45 TEXT BOOKS 1. Doebelin E.O., “Measurement Systems – Application and Design”, Tata McGraw Hill publishing company, 5th Edition, 2006. 2. Sawhney, A.K. “A Course in Electrical & Electronic Measurements & Instrumentation”, Dhanpat Rai and Co, 2004. REFERENCES 1. Golding,E.W., and Widdis,F.C., “Electrical Measurements and Measuring Instruments”, A H Wheeler & Company, 5th Edition, 2003. 2. Kalsi H.S., ‘Electronic Instrumentation’, Tata McGraw Hill publishing company, 2nd Edition, New Delhi, 2004. 3. Bouwens, A.J. “Digital Instrumentation’, Tata McGraw Hill Publishing Company, 1997. 4. Moorthy, D.V.S. “Transducers and Instrumentation, Prentice Hall of India Pvt Ltd, 2003. 5. Martin Reissland, ‘Electrical Measurements’, New Age International (P) Ltd., Delhi, 2001. 6. Gupta, J. B. “A Course in Electronic & Electrical Measurements”, Kataria & Sons, Delhi, 2003. Page 9 of 85
  • 10.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2305 ANALOG ELECTRONIC CIRCUITS 3 0 0 3 AIM To introduce the concept of realizing circuits using active and passive devices for signal generation and amplification. OBJECTIVES · To learn and analyse the process of AC to DC conversion. · To expose the students to study the different biasing and configurations of the amplifier circuits. · To study the characteristics of tuned amplifier. · To expose the students to various amplifiers and oscillator circuits with feedback concepts. · To learn the wave shaping process and circuits. UNIT - I RECTIFIERS AND POWER SUPPLY CIRCUITS 9 Half wave & full wave rectifier analysis - Inductor filter – Capacitor filter - Series voltage regulator – Switched mode power supply. UNIT - II TRANSISTOR BIASING AND AMPLIFIERS 9 Need for biasing-Types of biasing-Fixed and self biasing of BJT & FET – Stability factor - Fixed bias circuit, Load line and quiescent point analysis. Small signal analysis of CE, CC & Common source amplifiers – Cascade and Darlington connections, transformer coupled class A, B & AB amplifiers – Push-pull amplifiers. UNIT - III DIFFERENTIAL AND TUNED AMPLIFIERS 9 Differential amplifiers – Common mode and differential mode analysis - DC and AC analysis - Characteristics of tuned amplifiers – Single & double tuned amplifier. UNIT - IV FEEDBACK AMPLIFIER AND OSCILLATOR 9 Characteristics of negative feedback amplifiers – Voltage / current, series/shunt feedback – Theory of sinusoidal oscillators – Hartley, Colpitts, and crystal oscillators - Phase shift and Wien bridge oscillators. UNIT - V WAVE SHAPING CIRCUITS AND OSCILLATORS 9 RC wave shaping circuits – Diode clampers and clippers – Multivibrators – Schmitt triggers – Barkhausen’s criterion for Oscillation- UJT based saw tooth oscillators. Total periods: 45 TEXT BOOKS 1. David A. Bell, “Electronic Devices & Circuits”, Prentice Hall of India/Pearson Education, 4th Edition, Eighth printing, 2004. 2. Jacob Millman & Christos.C.Halkias, “Integrated Electronics: Analog and Digital Circuits and System”, Tata McGraw Hill, 2002. REFERENCES 1. Robert. L. Boylestad & Lo Nashelsky, “Electronic Devices & Circuit Theory”, 8th Edition, Pearson Education, 2002 / PHI. 2. Jacob Millman & Herbert Taub, “Pulse, Digital & Switching Waveforms”, Tata McGraw Hill Publishing Co, 2nd Edition, New Delhi, 2008. 3. Donald L.Schilling and Charles Belove, “Electronic Circuits”, Tata McGraw Hill Publishing Co., 3rd Edition, 2003. 4. Floyd, “Electronic Devices”, Pearson Education India, 7th Edition, New Delhi, 2005. Page 10 of 85
  • 11.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2306 DIGITAL PRINCIPLES AND DESIGN 3 0 0 3 AIM To introduce the fundamentals of digital circuits, combinational and sequential circuits. OBJECTIVES · To study various number systems and to simplify the mathematical expressions using Boolean functions – simple problems. · To study implementation of combinational circuits · To study the design of various synchronous and asynchronous circuits. · To expose the students to various memory devices. UNIT - I NUMBER SYSTEM & BOOLEAN ALGEBRA 9 Binary, Octal, Decimal, Hexadecimal - Number base conversions – 1’s and 2’s complements - Signed Binary numbers - Binary Arithmetic - Binary codes: Weighted – BCD - 2421- Gray code -Excess 3 code - ASCII – Error detecting and correcting codes - De-Morgan’s Theorem- Principle of Duality- Boolean expression – Boolean function - Minimization of Boolean expressions – Sum of Products (SOP) – Product of Sums (POS) – Minterm – Maxterm - Karnaugh map Minimization – Don’t care conditions - Quine McCluskey method. UNIT - II COMBINATIONAL CIRCUITS 9 Logic Gates: AND, OR, NOT, NAND, NOR, Exclusive-OR and Exclusive-NOR - Implementations of Logic Functions using gates, NAND, NOR – Combinational circuits: Adder- Subtractor – Serial adder/ Subtractor - Parallel adder / Subtractor- Carry look ahead adder- BCD adder- Magnitude Comparator- Multiplexer/ Demultiplexer- Encoder / decoder – Parity Generator/Checker – code converters. UNIT - III SYNCHRONOUS SEQUENTIAL CIRCUITS 9 Latches and Flip flops SR, JK, T, D and Master slave – Characteristic table and equation –Application table – Edge triggering –Level Triggering –Realization of one flip flop using other flip flops –Asynchronous / Ripple counters – Synchronous counters –Modulo – n counter – Classification of sequential circuits: Moore and Mealy circuits - Design of Synchronous counters: state diagram- State table –State minimization –State assignment – Register: shift registers- Universal shift register. UNIT - IV ASYNCHRONOUS SEQUENTIAL CIRCUIT 9 Design of fundamental mode and pulse mode circuits – primitive state / flow table – Minimization of primitive state table –state assignment – Excitation table – Excitation map - cycles – Races – Hazards: Static –Dynamic – Essential – Hazards elimination. UNIT - V PROGRAMMABLE LOGIC DEVICES, MEMORY AND LOGIC FAMILIES 9 Memories: ROM, PROM, EPROM, PLA, PAL and FPGA - Digital logic families: TTL, ECL and CMOS. Total periods: 45 TEXT BOOKS 1. Morris Mano M., “Digital Design”, Pearson Education Inc., 4th Edition, New Delhi, 2008. 2. John.M Yarbrough, “Digital Logic Applications and Design”, Vikas publishing house, New Delhi, 2006. REFERENCES 1. Salivahanan S. and Arivazhagan S., “Digital Circuits and Design”, Vikas Publishing House Pvt. Ltd, 4th Edition, New Delhi, 2004. 2. Thomas L. Floyd, “Digital Fundamentals”, Pearson Education Inc., 10th Edition, New Delhi, 2008. 3. Charles H.Roth. “Fundamentals of Logic Design”, Thomson Publication Company, 2003. 4. Donald P.Leach and Albert Paul Malvino, “Digital Principles and Applications”, Tata McGraw Hill Publishing Company Limited, 5th Edition, New Delhi, 2003. Page 11 of 85
  • 12.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 5. Jain R.P., “Modern Digital Electronics”, Tata McGraw–Hill publishing company limited,3rd Edition, New Delhi, 2003. Page 12 of 85
  • 13.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2307 MEASUREMENT AND INSTRUMENTATION LABORATORY 0 0 3 2 AIM The aim of this lab is to fortify the students with an adequate work experience in the measurement of different quantities and also the expertise in handling the instruments involved. OBJECTIVES To train the students in the measurement of displacement, resistance, inductance, torque and angle etc., and to give exposure to AC, DC bridges and transient measurement. 1. Study of displacement and pressure transducers 2. Measurement of high resistance using Kelvin’s double bridge and Megger 3. Measurement of frequency using Wien bridge 4. To study dielectric behavior (using Schering bridge and standard capacitor) 5. Measurement of inductance using maxwell’s bridge 6. Instrumentation amplifiers 7. Measurement of transients using DSO 8. Calibration of single-phase energy meter 9. Calibration of current transformer (both measurement and protection) 10. Measurement of three phase power and power factor 11. Measurement of iron loss 12. Measurement systems using LabVIEW and MATLAB 13. Design and construction of resistive and capacitive dividers Practical 45 Page 13 of 85
  • 14.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2308 ELECTRONIC CIRCUITS LABORATORY 0 0 3 2 AIM This laboratory aims to train the students in both analog and digital electronics circuits so that they can acquire practical knowledge in electronics. 1. Single Phase Half and Full wave rectifier with inductive and capacitive filters. 2. RC coupled and differential amplifier. 3. Frequency response of common emitter amplifiers. 4. RC Phase shift, Hartley, Colpitts oscillators 5. Astable / Monostable multivibrator 6. Series voltage regulator. 7. Study of Basic Digital gates. (Verification of truth table for AND, OR, EXOR, NOT, NOR, NAND, JK FF, RS FF, D FF) 8. Implementation of Boolean Functions, Adder/ Subtractor circuits 9. Code converters, Parity generator and parity checking, Excess 3, 2s Complement, Binary to grey code using suitable IC’s. 10. Encoders and Decoders 11. Multiplexer/ De-multiplexer: Study of 4:1; 8:1 multiplexer and Study of 1:4; 1:8 Demultiplexer 12. Shift Registers: Design and implementation of 4-bit shift registers in SISO, SIPO, PISO, PIPO modes using suitable IC’s. Practical 45 Page 14 of 85
  • 15.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) SEMESTER IV 12MA2001 NUMERICAL METHODS 3 1 0 4 AIM With the present development of the computer technology, it is necessary to develop efficient algorithms for solving problems in Science, Engineering and Technology. OBJECTIVES At the end of the course, the students would be acquainted with the basic concepts in numerical methods and their uses are summarized as follows · The solution of nonlinear (algebraic or transcendental) equations, system of linear equations and eigen value problem of matrix can be obtained numerically where analytical methods fail to give solution. · When huge amounts of experimental data are involved, the methods discussed on interpolation will be useful in constructing approximate polynomial to represent the data and to find the intermediate values. · The numerical differentiation and integration find application when the function in the analytical form is too complicated or the huge amounts of data are given. · The methods introduced in the solution of ordinary differential equations and partial differential equations will be useful in attempting any engineering problem. UNIT- I SOLUTION OF EQUATIONS AND EIGENVALUE PROBLEMS 12 Solution of algebraic and transcendental equations– Regula-Falsi method– Newton’s method– Solution of linear system by Gaussian elimination and Gauss-Jordon methods– Inverse of a matrix by Gauss Jordon method - Iterative methods: Gauss Jacobi and Gauss-Seidel methods – Eigen value of a matrix by power method. UNIT-II INTERPOLATION AND APPROXIMATION 12 Newton’s forward and backward interpolation– Lagrange’s interpolation– Newton’s divided difference interpolation – Interpolating with a cubic spline UNIT-III NUMERICAL DIFFERENTIATION AND INTEGRATION 12 Derivatives using Newton’s forward and backward interpolation– Numerical integration by trapezoidal and Simpson’s 1/3 and 3/8 rules- Romberg’s method– Two and Three point Gaussian quadrature formula– Double integrals using trapezoidal and Simpson’s rule. UNIT-IV INITIAL VALUE PROBLEMS FOR ORDINARY DIFFERENTIAL EQUATIONS 12 Single step methods: Taylor series method– Euler and modified Euler methods– Fourth order Runge– Kutta method for solving first and second order equations– Multistep methods: Milne’s and Adam’s predictor and corrector methods. UNIT-V BOUNDARY VALUE PROBLEMS IN ORDINARY AND PARTIAL DIFFERENTIAL EQUATIONS 12 Finite difference solution of second order ordinary differential equation– Finite difference solution of one dimensional heat equation by explicit and implicit methods– One dimensional wave equation and two dimensional Laplace and Poisson equations. Total Periods (45+15T): 60 TEXT BOOKS 1. Gerald.C.F. andWheatley.P.O. “Applied Numerical Analysis”, Pearson Education Asia, 6th Edition, New Delhi, 2002. 2. Kandasamy.P., Thilagavathy.K. andGunavathy.K., “Numerical Methods”, S.Chand Co. Ltd., 3rd Edition, New Delhi, 2010. REFERENCE BOOKS Page 15 of 85
  • 16.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 1. Veerarajan.T., “Numerical Methods”, Tata McGraw Hill Pub.Co.Ltd, 2 nd Edition, New Delhi, 2011. 2. Burden.R.L. andFaires.T.D., “Numerical Analysis”, Thomson Asia Pvt. Ltd., 7th Edition, Singapore, 2002. Page 16 of 85
  • 17.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2402 DC MACHINES AND TRANSFORMERS 3 1 0 4 AIM To introduce the basic concepts of rotating machines and to expose the students to the concepts of DC machines and Transformers and analyse their performance. OBJECTIVES To impart knowledge on · Principles of electromechanical energy conversion and basic concepts in rotating machines. · Construction, principle of operation and performance of DC generators. · Principle of operation, performance, starting methods and speed control of DC motors. · Construction, principle of operation and performance of transformers. · Losses and efficiency, testing of DC machines and transformers. UNIT - I BASIC CONCEPTS OF ROTATING MACHINES 8 Principles of electromechanical energy conversion – Single and multiple excited systems – Field energy and co-energy – Force and Torque - MMF of distributed A.C. windings – Rotating magnetic field – Generated voltage – Torque in round rotor machine. UNIT - II DC GENERATORS 9 Constructional details – Principle of operation - EMF equation – Methods of excitation – Self and separately excited generators – Characteristics of series, shunt and compound generators – Armature reaction and commutation – Parallel operation of DC shunt and compound generators. UNIT - III DC MOTORS 9 Principle of operation – Back EMF and torque equations – Characteristics of series, shunt and compound motors – Starting of DC motors – Types of starters – Speed control of DC series and shunt motors. UNIT - IV TRANSFORMERS 10 Constructional details - principle of operation – types - EMF equation – Transformation ratio – Transformer on no-load – Transformer on load - Equivalent circuit - Regulation - Parallel operation of transformers - Three phase transformer connections - Auto transformer. UNIT - V TESTING OF DC MACHINES AND TRANSFORMERS 9 Losses and efficiency in DC machines and transformers – Condition for maximum efficiency Testing of DC machines – Brake test, Swinburne’s test, Hopkinson’s test and Retardation test – Testing of transformers – Polarity test - Open circuit and short circuit tests – Sumpner’s test – All day efficiency. Note: UNIT 5 may be covered along with UNIT 2, 3, and 4. Total periods (45+15T): 60 TEXT BOOKS 1. Kothari D.P., & Nagrath I.J., “Electric Machines”, Tata McGraw Hill Publishing Company Ltd, 3rd Edition, 2004. 2. Albert E. Clayton and Hancock N. N., “The performance and Design of Direct Current Machines”, Oxford and IBH Publishing Company Pvt. Ltd., New Delhi, 1990. REFERENCES 1. Gupta J.B., “Theory and Performance of Electrical Machines”, S.K.Kataria and Sons,14th Edition, 2009. 2. Fitzgerald.A.E., Charles Kingsely Jr, Stephen D.Umans, “Electric Machinery”, McGraw Hill Books Company, 6th Edition, 2003. 3. Irving L. Kosow “Electric Machinery and Transformers” PHI, New Delhi, 2nd Edition, 1991. Page 17 of 85
  • 18.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2403 TRANSMISSION AND DISTRIBUTION OF ELECTRICAL ENERGY 3 0 0 3 AIM To become familiar with the function of different components used in Transmission and Distribution levels of power systems and modeling of these components. OBJECTIVES · To develop expression for computation of fundamental parameters of lines. · To categorize the lines into different classes and develop equivalent circuits for these classes. · To analyse the voltage distribution in insulator strings and cables and methods to improve the same. UNIT - I INTRODUCTION 9 Structure of electric power system: Various levels such as generation, transmission and distribution; HVDC and EHV AC transmission: comparison of economics of transmission, technical performance and reliability, application of HVDC transmission system. FACTS (qualitative treatment only): TCSC, SVC, STATCOM, UPFC. UNIT - II TRANSMISSION LINE PARAMETERS 9 Parameters of single and three phase transmission lines with single and double circuits: Resistance, inductance and capacitance of solid, stranded and bundled conductors: Symmetrical and unsymmetrical spacing and transposition; application of self and mutual GMD; skin and proximity effects; interference with neighbouring communication circuits. Typical configuration, conduct types and electrical parameters of 400, 220, 110, 66 and 33 kV lines. UNIT - III MODELLING AND PERFORMANCE OF TRANSMISSION LINES 9 Classification of lines: Short line, medium line and long line; equivalent circuits, attenuation constant, phase constant, surge impedance; transmission efficiency and voltage regulation; real and reactive power flow in lines: Power-angle diagram; surge-impedance loading, load ability limits based on thermal loading, angle and voltage stability considerations; shunt and series compensation, Ferranti effect and corona loss. UNIT - IV INSULATORS AND CABLES 9 Insulators: Types, voltage distribution in insulator string and grading, improvement of string efficiency. Underground cables: Constructional features of LT and HT cables, capacitance, dielectric stress and grading, thermal characteristics. UNIT - V SUBSTATION, GROUNDING SYSTEM AND DISTRIBUTION SYSTEM 9 Types of substations; bus-bar arrangements; substation bus schemes: single bus scheme, double bus with double breaker, double bus with single breaker, main and transfer bus, ring bus, breaker-and-a-half with two main buses, double bus-bar with bypass isolators. Resistance of grounding systems: Resistance of driven rods, resistance of grounding point electrode, grounding grids; design principles of substation grounding system; neutral grounding. Radial and ring-main distributors; interconnectors; AC distribution: AC distributor with concentrated load; three-phase, four-wire distribution system; sub-mains; stepped and tapered mains. Total periods: 45 TEXT BOOKS 1. Gupta B.R, “Power System Analysis and Design”, S.Chand and company, New Delhi, 2008. 2. Singh S.N, “Electric Power Generation, Transmission and Distribution”, Prentice Hall of India Pvt. Ltd, New Delhi, 2004. REFERENCES 1. Luces M.Fualkenberry, Walter Coffer, “Electrical Power Distribution and Transmission”, Pearson education, 2007. 2. Begamudre R.D, “Extra high voltage AC Transmission Engineering”, NewAge International (P) Ltd., January 2009. 3. Central Electricity Authority (CEA), “Guidelines for Transmission System Planning”, New Delhi 4. Tamil Nadu Electricity Board Handbook, 2003. Page 18 of 85
  • 19.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2404 IC FABRICATION AND LINEAR INTEGRATED CIRCUITS 3 0 0 3 AIM To expose the students to the concepts of IC fabrication, characteristics of op-amp, applications of op-amp and special ICs. OBJECTIVES · To study the IC fabrication. · To study characteristics of Op-amp, sine wave oscillators and waveform generators using Op-amp ICs. · To study the applications of Op-amp. · To study internal functional blocks and applications of special ICs like 555 IC Timer, 565 IC PLL, 723 & LM317 IC Regulators, and AD533 IC Analog multiplier. · To study the various types of ADCs and DACs. UNIT - I IC FABRICATION 9 IC classification, fundamental of monolithic IC technology- Epitaxial growth- Masking and etching- Diffusion of impurities- Isolation Techniques- Metallization- Packaging- Fabrication of Transistors, Diodes, Capacitors and Resistors- Fabrication of a typical circuit. UNIT - II CHARACTERISTICS OF OPAMP 9 Ideal OP-AMP characteristics- DC characteristics- Voltage series feedback and shunt feedback amplifiers- Differential amplifier- AC characteristics- Frequency response of OP-AMP- Basic applications of op-amp– Summer, differentiator and integrator. UNIT - III APPLICATIONS OF OPAMP-I 9 Instrumentation amplifier- First and second order active filters- V/I & I/V converters- Comparators- Sine wave oscillators- Square, triangular and sawtooth wave generators- Peak detector- Clipping and Clamping circuits. UNIT - IV APPLICATIONS OF OPAMP-II 9 S/H circuit- D/A converter- R-2R ladder and weighted resistor types- A/D converter - Dual slope, successive approximation and flash types. UNIT -V SPECIAL IC”S AND THEIR APPLICATIONS 9 555 Timer IC – Functional block diagram & applications; 565 IC-Phase lock loop- Functional block diagram and applications, LM317 and 723 IC voltage regulators, MA 7840 IC switching regulator- MCT2E IC opto-coupler- -AD533 IC Analog multiplier. Total periods: 45 TEXT BOOKS 1. Ramakant A.Gayakward, “Op-amps and Linear Integrated Circuits”, 4th Edition, Pearson Education, New Delhi, 2011. 2. Roy Choudhary D, Sheil B.Jani, “Linear Integrated Circuits”, 4th Edition, New Age International Publishers, 2010 REFERENCES 1. Jacob Millman, Christos C. Halkias, “Integrated Electronics: Analog and Digital circuitssystem”, 2nd Edition, Tata McGraw Hill, 2011. 2. Robert F. Coughlin, Fredrick F. Driscoll, “Op-amps and Linear ICs”, Pearson Education, 6th Edition, 2011. 3. David A. Bell, “Op-amp & Linear ICs”, Prentice Hall of India, 2nd Edition, 1997. 4. Salivahanan S, V.S. Kanchana Bhaaskaran, “Linear Integrated Circuits”, New Delhi, Tata McGraw-Hill, 2008. Page 19 of 85
  • 20.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2405 INTRODUCTION TO SIGNALS AND SYSTEMS 3 1 0 3 AIM To study and analyze the characteristics of continuous and discrete signals and systems. OBJECTIVES · To study the properties and representation of discrete and continuous signals. · To study the sampling process and analysis of discrete system using Z-transform. · To analyse continuous time system using Fourier and Laplace transforms. · To learn about analysis and synthesis of discrete time systems. · To learn about system with impulse response. UNIT - I REPRESENTATION OF SIGNALS 9 Continuous and discrete time signals: Classification of Signals – Periodic and aperiodic – Even and odd – Energy and power signals – Deterministic and random signals–periodicity – Properties of discrete time complex exponential UNIT impulse – UNIT step impulse functions –Transformation in independent variable of signals: time scaling, time shifting. Determination of Fourier series - Representation of continuous time and discrete time periodic signals. UNIT - II ANALYSIS OF CONTINUOUS TIME SIGNALS AND SYSTEMS 9 Continuous time Fourier Transform and Laplace Transform analysis with examples – Properties of the Continuous time Fourier Transform and Laplace Transform basic properties, Parseval’s relation, and convolution in time and frequency domains. Basic properties of continuous time systems: Linearity, Causality, time invariance, stability, magnitude and Phase representations of frequency response of LTI systems -Analysis and characterization of LTI systems using Laplace transform: Computation of impulse response and transfer function using Laplace transform. UNIT - III SAMPLING THEOREM AND Z-TRANSFORM 9 Representation of continuous time signals by its sample - Sampling theorem – Reconstruction of a Signal from its samples, aliasing – Discrete time processing of continuous time signals, sampling of band pass signals - Basic principles of z-transform - Z-transform definition – Region of convergence – Properties of ROC – Properties of z-transform – Poles and Zeros – Inverse z-transform using Contour integration – Residue Theorem, Power Series expansion and Partial fraction expansion, Relationship between z-transform and Fourier transform. UNIT - IV DISCRETE TIME SYSTEMS 9 Computation of Impulse response & Transfer function using Z Transform. DTFT Properties and examples – LTI-DT systems -Characterization using difference equation – Block diagram representation – Properties of convolution and the interconnection of LTI Systems-Static variable equations and matrix representation of system. UNIT - V SYSTEMS WITH FINITE AND INFINITE DURATION IMPULSE RESPONSE 9 Systems with finite duration and infinite duration impulse response – recursive and non-recursive discrete time system – realization structures – direct form – I, direct form – II, cascade and parallel forms. Total periods (45+15T): 60 TEXT BOOKS 1. AlanV.Oppenheim, Alan S.Willsky with Hamid Nawab.S, “Signals & Systems”, 3/e, Pearson Education, 2000. REFERENCES 1. John G.Proakis and Dimitris G.Manolakis, “Digital Signal Processing, Principles, Algorithms and Applications”, 4/e PHI, 2007. 2. M.J.Roberts, “Fundamentals of Signals and Systems”, TMH 2008. 3. K.Lindner, “Signals and Systems”, McGraw Hill International, 2000. 4. H.P.Hsu, “Signals and systems “, Schaum”s outlines, Tata McGraw-Hill Co Ltd., 2006. Page 20 of 85
  • 21.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2406 PRINCIPLES OF COMMUNICATION ENGINEERING 3 0 0 3 AIM To introduce the concepts of communication systems engineering using wire and wireless medium OBJECTIVES · To introduce different methods of analog communication and their significance. · To introduce Digital Communication methods for high bit rate transmission.. · To introduce the concepts of source and line coding techniques for enhancing rating of transmission of minimizing the errors in transmission. · To introduce MAC used in communication systems for enhancing the number of users. · To introduce various media for digital communication UNIT - I ANALOG COMMUNICATION 9 AM – Frequency spectrum – Vector representation – Power relations – Generation of AM – DSB,DSB/SC, SSB, VSB AM Transmitter & Receiver; FM and PM – Frequency spectrum – Power relations : NBFM & WBFM, Generation of FM and DM, Amstrong method & Reactance modulations :FM & PM frequency. UNIT - II DIGITAL COMMUNICATION 9 Pulse modulations – Concepts of sampling and sampling theormes, PAM, PWM, PPM, PTM,quantization and coding : DCM, DM, slope overload error. ADM, DPCM, OOK systems –ASK, FSK, PSK, BSK, QPSK, QAM, MSK, GMSK, applications of Data communication. UNIT - III SOURCE CODES, LINE CODES & ERROR CONTROL (Qualitative only) 9 Primary communication – Entropy, properties, BSC, BEC, source coding : Shaum, Fao, Huffman coding : noiseless coding theorum, BW – SNR trade off codes: NRZ, RZ, AMI, HDBP, ABQ,MBnB codes : Efficiency of transmissions, error control codes and applications:convolutions & block codes. UNIT - IV MULTIPLE ACCESS TECHNIQUES 9 SS&MA techniques: FDMA, TDMA, CDMA, SDMA application in wire and wireless communication: Advantages (merits), Wi-Fi, i-pad, i-pod, Blue tooth devices. UNIT - V SATELLITE, OPTICAL FIBER – POWERLINE, SCADA 9 Orbits: types of satellites: frequency used link establishment, MA techniques used in satellite Communication, earth station; aperture actuators used in satellite – Intelsat and Insat: fibers – Types: sources, detectors used, digital filters, optical link: power line carrier communications: SCADA Total periods: 45 TEXT BOOKS 1.Taub & Schiling “Principles of communication systems” Tata McGraw hill 2007 2.Das J, Chatterjee P.K., Mullik S.K., “Principles of digital communication” New Age International, 2nd Edition, 2012. REFERENCES 1. Kennedy and Davis “Electronic communication systems” Tata McGraw hill, 4th edition, 1993, 35th Reprint (2008). 2. Sklar “Digital communication fundamentals and applications“ Pearson Education, 2nd Edition, 2001 3. Bary le, Memuschmidt, digital Communication, Kluwer Publication, 2004. 4. Lathi B.P, “Modern digital and analog communication systems” Oxford University Press, 4th Edition, 2009. Page 21 of 85
  • 22.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2407 DC MACHINES AND TRANSFORMERS LABORATORY 0 0 3 2 AIM To expose the students to the operation of D.C. machines and transformers and give them experimental skill. EXPERIMENTS 1. Open circuit and load characteristics of D.C separately and self excited shunt generator 2. Load characteristics of D.C. compound generator with differential and cumulative connections 3. Load characteristics of D.C. shunt motor 4. Load characteristics of D.C. compound motor 5. Load characteristics of D.C series motor 6. Swinburne”s test 7. Speed control of D.C shunt motor 8. Hopkinson”s test on D.C motor – generator set 9. Load test on single-phase transformer and 10. Open circuit and short circuit tests on single phase transformer 11. Sumpner”s test on transformers 12. Separation of no-load losses in single phase transformer Practical 45 Additional experiments 13. Study of D.C.motor starters 14. Three phase transformer connections Page 22 of 85
  • 23.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2408 LINEAR INTEGRATED CIRCUITS LABORATORY 0 0 3 2 AIM To impart practical knowledge to the students to understand the basic concepts and applications of op-amps and special ICs. OUTCOMES After successful completion of this course, the students will be able to, · Design op-amp circuits for practical applications. · Design voltage regulators, A/D and D/A converters for practical applications. · Design Astable and Monostable multivibrators using 555 Timer IC for practical applications. · Design frequency multiplier using 565 PLL IC for practical applications. LIST OF EXPERIMENTS 1. Inverting and non-inverting amplifiers 2. Integrator and differentiator 3. Square and Triangular wave generators 4. Op-Applications – Adder, Subtractor, Averaging amplifier 5. Comparators using LM311 IC 6. 555 Timer IC Applications- Astable and Monostable multivibrator 7. Analog to Digital and Digital to Analog Converters. 8. 565 PLL IC Applications - Frequency multiplier 9. 723 IC and LM317 IC Voltage Regulators 10. Differential and Instrumentation amplifier 11. Measurement of op-amp parameters Practical 45 Page 23 of 85
  • 24.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) V SEMESTER 12EE2501 CONTROL SYSTEM ENGINEERING 3 1 0 4 AIM To expose the students to the basic concepts of control systems. OBJECTIVES · To understand the open loop and closed loop systems. · To understand the modelling of physical systems using transfer function and state space approach. · To understand time domain and frequency domain analysis of control systems. · To understand the compensation techniques used to stabilize control systems. UNIT - I CONTROL SYSTEM MODELLING 9 System concept- Open loop and closed loop systems- Modelling of electrical, mechanical, and electromechanical systems- Transfer function of DC generator- DC and AC servomotor- Electrical analogy of mechanical systems- Block diagram representation of systems- Block diagram reduction Techniques- Signal flow graphs- Mason”s gain formula- Examples. UNIT - II TIME DOMAIN ANALYSIS 9 Standard Test signals–Time response of first and second order systems- Performance parameters- Type and order of systems- Steady state error constants - Generalized error series– Steady state error- Introduction to P, PI and PID controllers- Design of PID controllers. UNIT - III FREQUENCY DOMAIN ANALYSIS 9 Frequency domain specifications – Peak resonance- Resonant frequency- Bandwidth and cut-off rate- Correlation between time and frequency response of second order systems- Bode plots- Polar plots- Determination of closed loop response from open loop response. UNIT - IV STABILITY ANALYSIS 9 Characteristic equation – Location of roots of characteristic equation for stability– Absolute stability and Relative stability- Routh Hurwitz criterion for stability- Root locus– Effect of pole- Zero addition, Nyquist stability criterion- Gain margin- phase margin. UNIT – V COMPENSATOR AND STATE SPACE REPRESENTATION 9 Design of lag, lead, and lag-lead compensator using Bode plot - Modelling of physical systems using state space approach- Advantages of state space approach over transfer function model. Total periods (45+15T): 60 TEXT BOOKS 1. Nagrath I.J and Gopal M, “Control Systems Engineering”, New Age International Publishers, 5th edition, 2008. REFERENCESS 1. Benjamin C. Kuo, “Automatic Control Systems”, John Wiley and Sons, 9th Edition, 2010. 2. Gopal M, “Control Systems, Principles & Design”, Tata McGraw Hill, New Delhi, 3rd Ed., 2008. 3. Bandyopadhyay M.N,“Control Engineering Theory and Practice”, Prentice Hall of India, 2003 4. Ogata K, “Modern Control Engineering”, 5th edition, Pearson Education, New Delhi, 2010. 5. Norman S. Nise, Control Systems Engineering, 5th Edition, John Wiley, New Delhi, 2009. 6. Samarjit Ghosh, Control systems, Pearson Education, New Delhi, 2004. Page 24 of 85
  • 25.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2502 SYNCHRONOUS AND INDUCTION MACHINES 3 1 0 4 AIM To expose the students to the concepts of synchronous and asynchronous machines and to analyse their performance. OBJECTIVES To impart knowledge on · Construction and performance of salient and non – salient type synchronous generators. · Principle of operation and performance of synchronous motor. · Construction, principle of operation and performance of induction machines. · Starting and speed control of three-phase induction motors. · Construction, principle of operation and performance of single phase induction motors and special machines. UNIT - I SYNCHRONOUS GENERATOR 9 Constructional details – Types of rotors – emf equation – Synchronous reactance – Armature reaction – Voltage regulation – e.m.f, m.m.f, z.p.f and A.S.A methods – Synchronizing and parallel operation – Synchronizing torque - Change of excitation and mechanical input – Two reaction theory – Determination of direct and quadrature axis synchronous reactance using slip test – Operating characteristics - Capability curves. UNIT - II SYNCHRONOUS MOTOR 8 Principle of operation – Torque equation – Operation on infinite bus bars - Phasor diagrams -V and inverted V curves - Hunting – Power input and power developed equations – Starting methods – Current loci for constant power input, constant excitation and constant power developed. UNIT - III THREE PHASE INDUCTION MOTOR 12 Constructional details – Types of rotors – Principle of operation – Slip – Equivalent circuit – Slip-torque characteristics - Condition for maximum torque – Losses and efficiency – Load test - No load and blocked rotor tests - Circle diagram – Separation of no load losses – Double cage rotors – Induction generator – Synchronous induction motor. UNIT - IV STARTING AND SPEED CONTROL OF THREE PHASE INDUCTION MOTOR 7 Need for starting – Types of starters – Stator resistance and reactance, autotransformer and star-delta starters – Rotor resistance starter – Speed control – Change of voltage, frequency, number of poles and slip – Cascaded connection – Slip power recovery scheme. UNIT - V SINGLE PHASE INDUCTION MOTORS AND SPECIAL MACHINES 9 Constructional details of single phase induction motor – Double revolving field theory and operation – Equivalent circuit – No load and blocked rotor test – Performance analysis – Starting methods of single-phase induction motors - Special machines - Shaded pole induction motor, reluctance motor, repulsion motor, hysteresis motor, stepper motor and AC series motor. Total periods (45+15T): 60 TEXT BOOKS 1. Kothari D.P and Nagrath I.J., “Electric Machines”, Tata McGraw Hill Publishing Company Ltd, 4th Edition, 2010. REFERENCES 1. Gupta J.B, “Theory and Performance of Electrical Machines”, S.K.Kataria and Sons, 2002. 2. Murugesh Kumar K, “Induction and synchronous machines” Vikas publishing house Pvt Ltd., 2009. 3. Sheila.C.Haran, “Electrical Machines II”, Scitech Publications, 2nd Edition 2008. 4. Say M.G, “Alternating Current Machines”, 5th Edition, Pitman, 1992. 5. Bhimbhra P.S, “Electrical Machinery”, Khanna Publishers, 2003. Page 25 of 85
  • 26.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) Page 26 of 85
  • 27.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2503 POWER SYSTEM PROTECTION AND SWITCHGEAR 3 0 0 3 AIM To study the various faults and protection schemes in power systems. OBJECTIVES · To discuss the need for the protection and various protection schemes. · To study relays characteristics · To study apparatus protection · To understand the method of circuit breaking, arcing phenomena – various arc theories-capacitive and inductive breaking · To understand the working of different types of circuit breakers and their testing methods UNIT- I INTRODUCTION 9 Principles and need for protective schemes – nature and causes of faults – types of faults – fault current calculation using symmetrical components – Earthing – Zones of protection and essential qualities of protection – Protection schemes – CTs and PTs and their applications. UNIT - II PROTECTIVE RELAYS 9 Operating principles of relays, the universal relay, electromagnetic relays (including torque equation, relay characteristics): over current, directional, distance and differential relays, negative sequence relays, frequency relays - static relays (including amplitude and phase comparators), Introduction to numerical relays. UNIT - III APPARATUS PROTECTION 9 Apparatus protection – transformer, generator, motor - protection of bus bars, transmission lines UNIT - IV THEORY OF CIRCUIT INTERRUPTION 9 Physics of arc phenomena and arc interruption, Restriking voltage & Recovery voltage, rate of rise of recovery voltage, resistance switching, current chopping, Interruption of capacitive current – DC circuit breaking. UNIT - V CIRCUIT BREAKERS 9 Types of Circuit Breakers – Oil and Air blast circuit breakers (Qualitative Treatment only), SF6 and Vacuum circuit breakers - Air break circuit breakers – comparative merits of different circuit breakers – Testing of circuit breakers. Total periods: 45 TEXT BOOKS 1. Badri Ram, Vishwakarma, “Power System Protection and Switchgear”, Tata McGraw Hill Publishing Co. Ltd., 2001. 2. Bhuvanesh Oza,Nirmal-Kumar Nair, Rashesh Mehta,Vijay Makwana, “Power System Protection & Switchgear”, First Edition, Tata McGraw hill, 2010. REFERENCE BOOKS 1. Sunil S. Rao, “Switchgear and Protection”, Khanna publishers, New Delhi, 1986. 2. Wadhwa C.L., “Electrical Power Systems”, New age International (P) Ltd., Fourth Edition, 2005. Page 27 of 85
  • 28.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 3. Paithankar Y.G., and Bhide S.R., “Fundamentals of Power System Protection”, Prentice Hall of India Pvt. Ltd., New Delhi – 110001, 2003. 4. Van A. R. and Warrington C., “Protective Relays - Their Theory and Practice: Vol. I and Vol. II”, Third Edition, Chapman and Hall Ltd. 5. Madhavrao T.S., “Power System Protection: Static Relays”, Tata McGraw Hill Publishing Co. Ltd., Second Edition, 2008. 6. Lythall R.T., “J and P Switchgear Handbook”, Newness Butterworths, 1972. 7. Prof. S.A. Soman, IIT, Bombay, Web course on “Power System Protection”, http://www.nptel.iiim.ac.in 8. Madhavrao T.S., “Digital Numerical Relays”, Tata McGraw Hill Publishing Co. Ltd., 2005. Page 28 of 85
  • 29.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2504 MICROPROCESSORS AND MICRO CONTROLLERS 3 0 0 3 AIM To introduce Microprocessor Intel 8085, Arm processor and Micro Controllers OBJECTIVES · To study about architecture and programming of 8085. · To learn about Pentium processor. · To study about arm processor. · To study about 8051 microcontroller. · To learn about PIC microcontroller. UNIT - I 8085 PROCESSOR & PROGRAMMING 9 Functional block diagram – Memory interfacing - Interrupt structure.- Instruction set and addressing modes- Assembly language format-simple programming exercises. UNIT - II PENTIUM PROCESSOR 9 Intel Pentium processors-Superscalar architecture and signals-special registers-cache structure-memory management-Instruction set-Simple programs. UNIT - III ARM PROCESSOR 9 The ARM architecture-ARM Assembly Language Program-ARM organization-Instruction set-The thumb Instruction set-ARM CPU cores. UNIT - IV MICRO CONTROLLER 8051 9 Functional block diagram - Instruction set and addressing modes – Interrupt structure-simple programming exercises- Use of C compliers for 8051. UNIT - V PIC MICROCONTROLLER 9 CPU Architecture-Instruction set-Interrupts-I2C bus-Timers-I/O port expansion-UART. Total periods: 45 TEXT BOOKS 1. Gaonkar, S., “Microprocessor Architecture Programming and Application”, Penram International, Fifth Edition, New Delhi, 2002. 2. Muhammad Ali Mazidi & Janice Gilli Mazidi, “The 8051 Micro Controller and Embedded Systems”, Pearson Education, 5th Indian reprint, 2003. 3. Barry. B. Bery “The Intel Microprocessors 8086/8088,80186/80188,80286,80386,80486,pentium and Pentium pro processor-Architecture, programming and Interfacing”, Prentice Hall of India pvt.Ltd., Seventh Edition, 2006. REFERENCES 1. Steve Furber, “ARM Sytem –On Chip architecture”, Addison Wesley, 2000. 2. John.B.Peatman, “Design with PIC Microcontrollers” Pearson Education, 1998. Page 29 of 85
  • 30.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2505 DIGITAL SIGNAL PROCESSING FOR ELECTRICAL ENGINEERS 3 1 0 3 AIM To study the signal processing methods, processors and applications. OBJECTIVES · To study DFT and its computation · To study the design techniques for digital filters · To study the finite word length effects in signal processing · To study the fundamentals of digital signal processors. · To study the DSP applications UNIT - I FAST FOURIER TRANSFORM 9 Introduction to DFT – Efficient computation of DFT- Properties of DFT – FFT algorithms – Radix-2 FFT algorithms – Decimation in Time – Decimation in Frequency algorithms – convolution- overlap save method. UNIT - II DESIGN OF INFINITE IMPULSE RESPONSE DIGITAL FILTER 9 Review of design of analogue Butterworth and Chebyshev Filters- Frequency transformation in analog domain – Design of IIR digital filters using impulse invariance technique – Design of IIR digital filters using bilinear transformation – pre warping – Frequency transformation in digital domain – Realization - Direct form I, Direct form II, cascade and parallel. UNIT - III DESIGN OF FINITE IMPULSE RESPONSE DIGITAL FILTERS 9 Linear phase response of FIR- Windowing techniques for design of linear phase FIR filters: Rectangular- Hamming- Hanning- Blackman and Kaiser Windows. Gibbs phenomenon – Frequency sampling technique-. Realization of FIR filters-lattice structure- Comparision of FIR & IIR. UNIT - IV FINITE WORD LENGTH EFFECTS & DIGITAL SIGNAL PROCESSOR 9 Quantization noise – derivation for quantization noise power – Binary fixed point and floating-point number representations – Comparison – truncation and rounding error – input quantization error-coefficient quantization error – limit cycle oscillations-dead band- overflow error-signal scaling-scaling-Introduction to general and special purpose hardware for DSP – Harvard architecture-Pipelining – Addressing Modes – Overview of Architecture and instruction set of TMS320C50. UNIT – V APPLICATIONS OF DIGITAL SIGNAL PROCESSING 9 Speech and Audio Signal Processing- Radar Signal Processing- Vocal Mechanism-Speech Technology- Parameters of Speech- Speech Analysis- Speech Loading- Digital Processing of Audio Signals- Biomedical-ECG, EEG. Total periods (45+15T): 60 TEXT BOOKS 1. John G Proakis- Dimtris G Manolakis- Digital Signal Processing Principles- Algorithms and Application- Pearson/PHI- 4th /e- 2007. 2. Allan V.Openheim, Ronald W.Sehafer & John R.Buck-“Discrete Time Signal Processing”, second /e- Pearson/Prentice Hall. 3. Mitra S.K, “Digital Signal Processing- A Computer based approach”- Tata McGraw-Hill- 1998- New Delhi. REFERENCES 1. Venkataramani B & Bhaskar M, “Digital Signal Processor Architecture- Programming and application” TMH 2002. 2. Johny R ”Johnson Introduction to Digital Signal Processing” Prentice Hall- 1984. 3. Li Tan, “Digital Signal Processing” Elsevier-2008. Page 30 of 85
  • 31.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2506 DATA STRUCTURES AND DEVELOPING ALGORITHMS 3 0 0 3 AIM To provide an in-depth knowledge in problem solving techniques and data structures. OBJECTIVES · To learn the systematic way of solving problems · To understand the different methods of organizing large amounts of data · To learn to program in C · To efficiently implement the different data structures · To efficiently implement solutions for specific problems UNIT - I INTRODUCTION TO DATA STRUCTURES 9 Abstract data types - Sequences as value definitions - Data types in C - Pointers in C -Data structures and C - Arrays in C - Array as ADT - One dimensional array -Implementing one dimensional array - Array as parameters - Two dimensional array -Structures in C - Implementing structures - Unions in C - Implementation of unions -Structure parameters - Allocation of storage and scope of variables. Recursive definition and processes: Factorial function - Fibonacci sequence - Recursion in C - Efficiency of recursion. UNIT - II STACK, QUEUE AND LINKED LIST 9 Stack definition and examples – Primitive operations – Example - Representing stacks in C - Push and pop operation implementation. Queue as ADT - C Implementation of queues - Insert operation - Priority queue - Array implementation of priority queue. Inserting and removing nodes from a list-linked implementation of stack, queue and priority queue - Other list structures - Circular lists: Stack and queue as circular list -Primitive operations on circular lists. Header nodes - Doubly linked lists - Addition of long positive integers on circular and doubly linked list. UNIT - III TREES 9 Binary trees: Operations on binary trees - Applications of binary trees - Binary tree representation - Node representation of binary trees - Implicit array representation of binary tree – Binary tree traversal in C - Threaded binary tree - Representing list as binary tree - Finding the Kth element - Deleting an element. Trees and their applications: C representation of trees - Tree traversals - Evaluating an expression tree - Constructing a tree. UNIT -IV SORTING AND SEARCHING 9 General background of sorting: Efficiency considerations, Notations, Efficiency of sorting. Exchange sorts; Bubble sort; Quick sort; Selection sort; Binary tree sort; Heap sort. Heap as a priority queue - Sorting using a heap-heap sort procedure - Insertion sorts: Simple insertion - Shell sort - Address calculation sort - Merge sort -Radix sort.Sequential search: Indexed sequential search - Binary search - Interpolation search. UNIT - V GRAPHS 9 Application of graph - C representation of graphs - Transitive closure - Warshall”s algorithm – Shortest path algorithm - Linked representation of graphs - Dijkstra”s algorithm - Graph traversal - Traversal methods for graphs - Spanning forests - Undirected graph and their traversals - Depth first traversal - Application of depth first traversal - Efficiency of depth first traversal - Breadth first traversal - Minimum spanning tree - Kruskal”s algorithm - Round robin algorithm. Total periods: 45 TEXT BOOKS 1. Aaron M. Tenenbaum, Yeedidyah Langsam, Moshe J. Augenstein, “Data structures using C”, Pearson Education, 2004 / PHI REFERENCES 1. Balagurusamy E, “Programming in Ansi C”, Fifth Edition, Tata McGraw Hill Publication, 2010. 2. Robert L. Kruse, Bruce P. Leung Clovis L.Tondo, “Data Structures and Program Design in C”, Pearson Education, 2000 / PHI. Page 31 of 85
  • 32.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2507 SYNCHRONOUS AND INDUCTION MACHINES LABORATORY 0 0 3 2 AIM To expose the students to the operation of synchronous machines and induction motors and give them experimental skill. EXPERIMENTS 1. Regulation of three phase alternator by emf and mmf methods. 2. Regulation of three phase alternator by ZPF and ASA methods. 3. Regulation of three phase salient pole alternator by slip test. 4. Measurements of negative sequence and zero sequence impedance of alternators. 5. V and Inverted V curves of three Phase Synchronous Motor. 6. Load test on three-phase induction motor. 7. No load and blocked rotor test on three-phase induction motor. 8. Separation of No-load losses of three-phase induction motor. 9. Load test on single-phase induction motor 10. No load and blocked rotor test on single-phase induction motor. Practical 45 Additional experiments 11. Study of starters for synchronous and induction motors. 12. Parallel operation of three phase alternators. Page 32 of 85
  • 33.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2508 DATA STRUCTURES AND ALGORITHMS LABORATORY 0 0 3 2 AIM To train the students in developing algorithms and writing programs in data structures. EXPERIMENTS 1. Queue implementation using arrays. 2. Stack implementation-using arrays. 3. Singly, doubly and circular liked list implementation and all possible operation on lists. 4. Queue and Stack implementation using linked list 5. Binary search tree implementation using linked list and possible operations on binary search trees 6. In-order, pre-order and post order traversals. 7. Quick sort implementation and its efficiency calculation. 8. Binary Search implementation. 9. Graph implementation-using arrays and list structure. 10. Depth first and Breadth first traversal in graphs. Practical 45 Page 33 of 85
  • 34.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EN2001 COMMUNICATION SKILLS LABORATORY 0 0 2 1 AIM Globalization has brought in numerous opportunities for the teeming millions, with more focus on the students over all capability apart from academic competence. Many students, particularly those from non- English medium schools, find that they are not preferred due to their inadequacy of communication skills and soft skills, despite possessing sound knowledge in their subject area along with technical capability. Keeping in view their pre-employment needs and career requirements, this course on Communication Skills Laboratory will prepare students to adapt themselves with ease to the industry environment, thus rendering them as prospective assets to industries. The course will equip the students with the necessary communication skills that would go a long way in helping them in their profession. OBJECTIVES · To equip students of engineering and technology with effective speaking and listening skills in English. · To help them develop their soft skills and people skills, which will make The transition from college to workplace smoother and help them to excel in their jobs. · To enhance students’ performance at Placement Interviews, Group Discussions and other recruitment exercises. I.PC based session (weightage- 40%) A. English Language Lab 1. Listening Comprehension Listening and typing- Listening and sequencing of sentences - Filling in the blanks - Listening and answering the questions. 2. Reading Comprehension and Vocabulary Filling in the blanks - Cloze Exercises - vocabulary building –Verbal Passages. 3. Speaking. Phonetics: Intonation - Ear Training - Correct Pronunciation - Sound recognition exercises - Common Errors in English. Conversations: Face to Face Conversation - Telephone Conversation -Role play activities (Students take on roles and engage in Conversation) B. Career Lab (Samples are available to learn and practice in the class room session) 1. Resume / Report preparation / Letter writing Structuring the resume / report - Letter writing / E-mail Communication -Samples. 2. Presentation skills Elements of an effective presentation - Structure of a presentation - Presentation tools - Voice Modulation- Audience analysis - Body Language -Video Samples 3. Group Discussion Page 34 of 85
  • 35.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) Why is GD part of selection process? - Structure of a GD - Moderator- Led and other GDs - Strategies in GD - Team work - Body Language - Mock GD -Video samples 4. Interview Skills Kinds of Interviews -Required Key Skills - Corporate culture - Mock Interviews -Video Samples 5. Corporate Etiquette: Telephone etiquette-email etiquette-dining etiquette II Class Room Session (Weightage - 60 %) Periods · Presentation Skills. · Group Discussion. · Presenting a Sales Plan. · Presenting a Company Profile · Product Demonstration. · Mock Interview. · Introducing a famous personality to the Audience. · Welcome address & Vote of thanks. · Case Study.(Related to Engineering). · Decision Making & Problem Solving Techniques. Note: Class room sessions are practice sessio Page 35 of 85
  • 36.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) VI SEMESTER 12EE2601 ELECTRIC MACHINE DESIGN 3 1 0 4 AIM To expose the students to the concept of design of various types of electrical machines OBJECTIVES To provide sound knowledge about constructional details and design of various electrical machines. · To study mmf calculation and thermal rating of various types of electrical machines. · To design armature and field systems for D.C. machines. · To design core, yoke, windings and cooling systems of transformers. · To design stator and rotor of induction machines. · To design stator and rotor of synchronous machines and study their thermal behaviour. UNIT - I INTRODUCTION 9 Major considerations in Electrical Machine Design - Electrical Engineering Materials – Space factor –Choice of Specific Electrical and Magnetic loadings - Thermal considerations - Heat flow –Temperature rise - Rating of machines – Standard specifications. UNIT - II D.C. MACHINES 9 Output equation – Main dimensions - Choice of specific loadings – Choice of number of poles – Armature design – Design of field poles and field coil – Design of commutator and brushes – Losses and efficiency calculations. UNIT - III TRANSFORMERS 9 Output rating of single phase and three phase transformers – Optimum design of transformers – Design of core, yoke and windings for core and shell type transformers – Equivalent circuit parameter from designed data – Losses and efficiency calculations – Design of tank and cooling tubes of transformers. UNIT IV THREE PHASE INDUCTION MOTORS 9 Output equation – Main dimensions – Choice of specific loadings – Design of stator – Design of squirrel cage and slip ring rotor – Equivalent circuit parameters from designed data – Losses and efficiency calculations. UNIT V SYNCHRONOUS MACHINES 9 Output equation – Choice of specific loadings – Main dimensions – Short circuit ratio – Design of stator and rotor of cylindrical pole and salient pole machines - Design of field coil - Performance calculation from designed data - Introduction to computer aided design. Total periods (45+15T): 60 TEXT BOOKS 1. Sawhney A.K, “A Course in Electrical Machine Design”, Dhanpat Rai and Sons, New Delhi, 2004. 2. Sen S.K, “Principles of Electrical Machine Design with Computer Programmes”, Oxford and IBH Publishing Co.Pvt Ltd., New Delhi, 1987. REFERENCES 1. Agarwal R.K, “Principles of Electrical Machine Design”, S.K.Kataria and Sons, Delhi, 2009. 2. Mittle V.N and Mittle A, “Design of Electrical Machines”, Standard Publications and Distributors, Delhi, 2002. Page 36 of 85
  • 37.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2602 POWER SYSTEM ANALYSIS 3 1 0 4 AIM To become familiar with the modeling of various power system components and different methods of analysis for power system planning and operation. OBJECTIVES · To model steady-state operation of large-scale power systems and to solve the power flow problems using efficient numerical methods suitable for computer simulation. · To model and analyse power systems under abnormal (fault) conditions. · To model and analyse the dynamics of power system for small-signal and large signal disturbances and o design the systems for enhancing stability. UNIT - I INTRODUCTION 9 Overview of Power System Analysis: Importance of system planning and operational analysis; Distinction between steady state, quasi steady state and transient analysis; Per phase analysis of symmetrical three phase system, single line diagram, per UNIT representation; different models for generator, load and transmission lines based on the analysis of interest – π equivalent circuit of transformer with off nominal-tap ratio. UNIT - II BASICS OF ANALYSIS AND COMPONENT MODELLING 9 Primitive network and its matrices, bus admittance matrix formation by inspection method and singularity transformation method, bus impedance matrix formation by L-U factorisation of bus admittance matrix and by building algorithm. Symmetrical component transformation, sequence impedances and sequence networks. UNIT - III POWER FLOW ANALYSIS 9 Importance of power flow analysis in planning and operation of power systems; Power flow problem: Description of the problem, classification of buses into P-Q buses, P-V (voltage-controlled) buses and slack bus. Power flow equations and solution: Development of power flow model in complex variable form, Iterative solution using Gauss- Seidel and Newton-Raphson methods including Q-limit check for voltagecontrolled buses, flow chart- numerical examples. UNIT - IV FAULT ANALYSIS 9 Symmetrical short circuits: Thevenin”s theorem and applications, short circuit analysis - Numerical examples. Short circuit capacity - Circuit breaker selection. Unsymmetrical short circuits: Derivation of fault current for LG, LL, LLG short circuits and development of interconnection of sequence networks. UNIT - V STABILITY ANALYSIS 9 Description of power system stability problem; importance of stability analysis in power system planning and operation; classification of power system stability. Single Machine Infinite Bus (SMIB) system: Development of swing equation; power-angle equation; Equal Area Criterion; determination of critical clearing angle and time; algorithm for numerical solution of swing equation using modified Euler method; usage of numerical algorithm for determination of critical clearing time by trial and error – Digital simulation. Total periods (45+15T): 60 TEXT BOOKS 1. Hadi Saadat, “Power System Analysis”, Tata McGraw Hill Publishing Company Ltd., 2nd Edition, New Delhi, 2009. 2. John J. Grainger and W.D. Stevenson Jr., “Power System Analysis”, Tata McGraw Hill Publishing Company Ltd., New Delhi,2003. 3. Kothari D.P, Nagarath I.J., “Power System Engineering”,Tata McGraw-Hill Publishing Company Ltd., 2nd Edition, NewDelhi, 2008. REFERENCES Page 37 of 85
  • 38.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 1. Kundur P, “Power System Stability and Control, Tata McGraw-Hill Publishing Company Ltd., New Delhi, 1994. 2. Nagrath I.J. and Kothari D.P., “Modern Power System Analysis”, Tata McGraw-Hill Publishing Company Ltd., 3rd Edition, New Delhi, 2003. 3. Olle. I. Elgerd, “Electric Energy Systems Theory – An Introduction”, Tata McGraw Hill Publishing Company Limited, 2nd Edition, New Delhi, 2008. Page 38 of 85
  • 39.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2603 POWER ELECTRONICS 3 1 0 4 AIM To introduce the application of electronic devices for conversion, control and conditioning of electric power. OBJECTIVES · To get an overview of different types of power semi-conductor devices and their switching characteristics. · To understand the operation, characteristics and performance parameters of controlled rectifiers. · To study the operation, switching techniques and basic topologics of DC-DC switching regulators. · To learn the different modulation techniques of pulse width modulated inverters and to understand the harmonic reduction methods. · To know the practical application for power electronics converters in conditioning the power supply. UNIT - I POWER SEMI-CONDUCTOR DEVICES 9 Structure, operation and characteristics of SCR, TRIAC, power transistor, MOSFET and IGBT. Driver and snubber circuits for MOSFET - Turn-on and turn-off characteristics and switching losses. UNIT - II LINE COMMUTATED CONVERTERS 9 2,4 pulse converter with R,RL,RLE loads, effect of free wheeling diode – continuous and discontinuous conduction mode - Effect of source inductance and load inductance – introduction to 3,6 pulse converter - Dual converters- Series converters. Basic principle of operation of single phase cycloconverter- AC voltage controllers. UNIT - III DC TO DC CONVERTERS 9 Step-down and step-up choppers - Time ratio control and current limit control – class of choppers - Switching mode regulators: Buck, boost, buck-boost and cuk converter - Resonant switching based SMPS. UNIT - IV INVERTERS 9 Single phase and three phase (both 1200 mode and 1800 mode) inverters - PWM techniques: Sinusoidal PWM, modified sinusoidal PWM and multiple PWM - Voltage and harmonic control - Series resonant inverter - Current source inverters. UNIT - V APPLICATIONS 9 Uninterrupted power supply topologies - Flexible AC transmission systems - Shunt and series static VAR compensator - Unified power flow controller- HVDC Transmission. Total periods (45+15T): 60 TEXT BOOKS 1. Bimbhra P.S, “Power Electronics” , Khanna Publishers, New Delhi, 2012 2. Singh M.D, Khandchandni K.B, Power Electronics, Tata Mc Graw Hill, 2nd Edition, 2007 REFERENCES 1. Muhammad H. Rashid, “Power Electronics: Circuits, Devices and Applications”, Pearson Education, 3rd edition, 2004 / PHI 2. Cyril.W.Lander, “Power Electronics”, McGraw Hill International, 3rd edition, 1994 3. Bimal K. Bose, “Modern Power Electronics and AC Drives”, Pearson Education, 2003 4. Jagannathan V., “Introduction to Power Electronics”, Prentice Hall of India, 2004 Page 39 of 85
  • 40.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2604 EMBEDDED SYSTEM DESIGN 3 0 0 3 AIM To understand the basic concepts of embedded system design and its applications to various fields. OBJECTIVES To provide a clear understanding of · Embedded system terminologies and its devices. · Various Embedded software Tools · Design and architecture of Memories. · Architecture of processor and memory organizations. · Input/output interfacing · Various processor scheduling algorithms. · Basics of Real time operating systems. · Introduction to PIC and its applications. UNIT - I INTRODUCTION TO EMBEDDED SYSTEMS 9 Introduction to embedded real time systems – The build process for embedded systems – Types of memory – Memory management methods. UNIT - II EMBEDDED SYSTEM ORGANIZATION 9 Structural UNITs in processor , selection of processor & memory devices – DMA – I/O devices : timer & counting devices – Serial communication using I2C , CAN USB buses – Parallel communication using ISA , PCI ,PCI/X buses – Device drivers UNIT - III PROGRAMMING AND SCHEDULING 9 Intel I/O instructions – Synchronization - Transfer rate, latency; interrupt driven input and output - Nonmaskable interrupts, software interrupts, Preventing interrupts overrun - Disability interrupts. Multithreaded programming – Context Switching, Preemptive and non-preemptive multitasking, semaphores. Scheduling-thread states, pending threads, context switching UNIT - IV REAL-TIME OPERATING SYSTEMS 9 Introduction to basic concepts of RTOS, UNIX as a Real Time Operating system – Unix based Real Time operating system - Windows as a Real time operating system – POSIX – RTOS-Interrupt handling - A Survey of contemporary Real time Operating systems:PSOS, VRTX, VxWorks, QNX, чC/OS-II, RT Linux – Benchmarking Real time systems – Basics. UNIT - V PIC MICROCONTROLLER BASED EMBEDDED SYSTEM DESIGN 9 PIC microcontroller – MBasic compiler and Development boards – The Basic Output and digital input – Applications Total periods: 45 TEXT BOOKS 1. Rajkamal, “Embedded system-Architecture, Programming, Design”, Tata Mc graw Hill, 2nd Edition, 2008. 2. Daniel W. Lewis ,”Fundamentals of Embedded Software”, Pearson College Division, 2nd Edition, 2012. REFERENCES 1. Jack R Smith “Programming the PIC microcontroller with MBasic” Elsevier, 2005 2. Tammy Noergaard, “Embedded Systems Architecture”, Elsevier, 2005 3. Rajib Mall “Real-Time systems Theory and Practice” Pearson Education, 2007 4. Sriram. V.Iyer & Pankaj Gupta, “Embedded real time systems Programming”, Tata McGraw Hill, 2004. Page 40 of 85
  • 41.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2605 MANAGEMENT CONCEPTS AND PRACTICES 3 0 0 3 AIM To expose the students to Management concepts and techniques. OBJECTIVE Knowledge on the management concepts is essential for all kinds of people in all kinds of organizations. After studying this course, students will be able to have a clear understanding of the basic concepts and functions of management, human resource management, Marketing Management & Financial Management, accounting concepts, Management Information System & Production/Operations, Social and Ethical Issues in Management. Students will also gain some basic knowledge on international aspect of management. UNIT - I BASIC CONCEPTS AND FUNCTIONS OF MANAGEMENT 9 Planning: Nature Purpose and OBJECTIVEs of Planning; Organizing; Nature and Purpose of Organizing; Authority and Responsibility; Staffing, Supply of Human Resources; Performance Appraisal; Controlling; System and Process of Controlling; Control Techniques. UNIT - II HUMAN RESOURCE MANAGEMENT 9 Nature and Scope of Human Resource Planning; Training and Development : Recruitment and Selection; Career Growth; Absenteeism: Grievances; Motivation and its Types; Need for Motivation: Reward and Punishment; Models of Motivation; Leaders; Kinds of Leaders, Leadership Styles, roles and Functions of Leaders; Conflict Management; Kinds and ; Causes of Conflict; Settlement of Conflicts. Group and Team Working, organizational Design and Development. UNIT–III MARKETING MANAGEMENT & FINANCIAL MANAGEMENT, ACCOUNTING CONCEPTS 9 Marketing Environment: Consumer Markets and Buyer Behaviour; Marketing Mix, Advertising and Sales Promotions; Channels of Distribution. Financial Management and Accounting Concepts Book Keeping; Financial Statements Analysis: Financial Ratios: Capital Budgeting: break-even Analysis Production/Operations Management Planning and Design of Production and Operations Systems; Facilities Planning Location, Layout and Movement of materials; Materials Management and Inventory Control; Maintenance Management PERT & CPM. UNIT– IV MANAGEMENT INFORMATION SYSTEM & PRODUCTION/OPERATIONS MANAGEMENT 9 Role of Information in decision making; Information System Planning, Design and Implementation Evaluation and Effectiveness of the Information System. Statistical Quality Control, Total Quality Management and ISO Certification. Production/Operations Management: Planning and Design of Production and Operations Systems; Facilities Planning Location, Layout and Movement of materials; Materials Management and Inventory Control; Maintenance Management PERT & CPM. UNIT - V SOCIAL AND ETHICAL ISSUES IN MANAGEMENT 9 Ethics in Management, Social Factors; Unfair and Restrictive Trade Practices. Strategic and Technology Management Need, Nature, Scope and Strategy SWOT analysis, value chain concept. Total periods: 45 TEXT BOOKS 1. Kotler Philip, “Marketing Management”, Prentice Hall of India, 11th Edition, 2003. 2. Luthans Fred, “Human Resource Management”, McGraw-Hill Inc., 1997 3. Robbins Stephen, P., “Organizational Behaviours Concepts, Controversies and Application”, Prentice Hall, Englewood, Cliffs, New Jersey, 2010. 4. Khan, M.Y. & Jain, P.K., “Financial Management”, Tata McGraw-Hill, 4th Edition, 2004. Page 41 of 85
  • 42.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) REFERENCES 1. Porter Michael, “Competitive Advantage”, The Free Press, 1985. 2. Porter Micheal, “Competitive Strategy”, The Free Press, 1980. 3. Bhushan, Y.K., “Fundamentals of Business Organization and Management”, Sultan Chand and Sons, 1965. 4. Ahuja, K.K., “Industrial Management”, Khanna Publishers, 1998. Page 42 of 85
  • 43.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2607 CONTROL SYSTEMS LABORATORY 0 0 3 2 AIM To provide a platform for understanding the basic concepts of control system and to apply them for the design and control of practical systems. OBJECTIVES After successful completion of this course, the students will be able to, · Experimentally determine transfer functions of practical systems. · Obtain the step response of practical systems. · Carry out the stability analysis of practical systems. · Design PID controller for practical systems. List of EXPERIMENTS 1. Open loop and closed loop speed control of dc servo motor. 2. Determination of transfer function of armature controlled DC servomotor. 3. Determination of transfer function of AC servomotor. 4. Determination of transfer function of a third order (or higher order) system from its frequency response. 5. Determination of transfer function of a higher order system with two or more sub systems. 6. Step response of type-0 and type-1 UNITy feedback first and second order systems. 7. Stability analysis of third order (or higher order) systems. 8. Design of a second order (or third order) system for the desired specifications. 9. Design of PID controller for a given system. 10. Study of any one closed-loop control system such as dc position control, temperature control water level control systems. 11. MATLAB simulation of step response of LTI systems. 12. Stability analysis of LTI systems using Root locus, Bode and Nyquist plots. Practical 45 Page 43 of 85
  • 44.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2608 DSP AND MICROPROCESSORS LABORATORY 0 0 3 2 AIM To expose the students to gain programming skills in DSP and Microprocessors. DSP 1. Generation of basic sequences using MATLAB UNIT sample sequence UNIT step sequence UNIT ramp sequence 2. Computation of Fast Fourier Transform using MATLAB DIT – FFT algorithm DIF – FFT algorithm 3. Design and simulation of FIR filter using windowing technique 4. Design and simulation of IIR filter using Bilinear Transformation and Impulse Invariant method. 5. Generation of following waveforms using TMS320C50 trainer Kit Sine wave Square wave Saw tooth wave Triangular wave 6. Linear convolution and circular convolution using TMS320C50 trainer Kit MICROPROCESSORS: 1. Simple arithmetic operations: Multi precision addition / subtraction / multiplication / division. 2. Programming with control instructions: Increment / Decrement. Ascending / Descending order. Maximum / minimum of numbers. 3. Rotate instructions. Hex / ASCII / BCD code conversions. 4. Interface EXPERIMENTS: A/D Interfacing. D/A Interfacing. Traffic light controller. 5. Interface EXPERIMENTS: Simple EXPERIMENTS using 8251, 8279, 8253, and 8254. 6. Programming practice on assembler and simulator tools. Practical 45 Page 44 of 85
  • 45.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) VII SEMESTER 12EE2701 ELECTRIC ENERGY GENERATION, UTILISATION AND CONSERVATION 3 0 0 3 AIM To expose the students to the main aspects of electric energy generation, utilization and conservation. OBJECTIVES To impart knowledge on · Conventional methods of generation and conservative methods. · Principle and design of illumination systems and · Methods of heating and welding · Electric traction systems and their performance. · Industrial applications of electric drives. UNIT - I GENERATION 9 Generation of electrical power by conventional methods – Introduction to the concept of distributed generation – Effect on system operation. UNIT - II CONSERVATION 9 Economics of generation – Definitions – Load curves – Number and size of UNITs – Cost of electrical energy – Tariff – Need for electrical energy conservation – Methods – Energy efficient equipment – Energy management – Energy auditing. Economics of power factor improvement – Design for improvement of power factor using power capacitors – Power quality – Effect on conservation. UNIT - III ILLUMINATION 9 Definition and meaning of terms used in illumination Engineering – Classification of light sources – Laws of illumination - Nature of radiation – Photometry – Lighting calculations – Design of illumination systems (for residential, industrial, commercial, health care, street lightings, sports, administrative complexes) - Types of lamps: Incandescent lamps, sodium vapour lamps, mercury vapour lamps, fluorescent lamps - Energy efficiency lamps. UNIT - IV HEATING AND WELDING 9 Introduction – Advantages of Electric heating – Modes of heat transfer – Methods of heating, requirement of heating material – Design of heating element – Furnaces – Welding generator – Welding transformer and its characteristics. Requirements of good weld – Preparation of work – Electrodes – Power supply for arc welding. UNIT - V ELECTRIC TRACTION 9 Introduction – Requirements of an ideal traction system – Supply systems – Mechanics of train movement – Traction motors and control – Multiple UNITs – Braking – Current collection systems – Recent trends in electric traction. Total periods: 45 TEXT BOOKS 1. Openshaw Taylor E, “Utilization of Electrical Energy in SI UNITs”, Orient Longman Pvt.Ltd, 2003. 2. Gupta B.R, “Generation of Electrical Energy”, Eurasia Publishing House (P) Ltd, New Delhi, 2009. REFERENCES 1. Partab H, “Art and Science of Utilisation of Electrical Energy”, Dhanpat Rai and Co, New Delhi, 2004 2. Gopal.K.Dubey, “Fundamentals of Electrical Drives”, Narosa Publishing House, New Delhi, 2nd edition, 2004. Page 45 of 85
  • 46.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 3. Wadhwa C.L, “Generation, Distribution and Utilization of Electrical Energy”, New Age International Pvt.Ltd,2nd Edition, 2003 4. Gupta J.B, “Utilization of Electric Power and Electric Traction”, S.K.Kataria and Sons, 2002. Page 46 of 85
  • 47.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2702 ELECTRIC DRIVES AND CONTROL 3 0 0 3 AIM To expose the students to the concepts of electric drives and controls. OBJECTIVES · To learn about basic concepts of electric drives. · To learn about different types of DC drives. · To study about Induction motor drives. · To learn about special machines drives. · To understand design of controllers for drives. UNIT - I Introduction to Electric Drives 9 History and development of Electric Drives, Classification of Electric Drives, Basic elements & advantages of variable speed drives- Joint Speed-Torque characteristics of various types of loads and drive motors- Modes of operation, closed loop control of drives - Selection of power rating for drive motors with regard to thermal overloading and load variation-Load Equalization. UNIT - II Dc Drives 9 Speed control of DC motors - Ward - Leonard scheme - drawbacks - Thyristor converter fed dc drives: Single, two and four quadrant operations - Chopper fed DC drives : - Time ratio control and current limit control - Single, two and four quadrant operations – Effect of ripples on the motor performance. UNIT - III Three Phase Induction Motor Drives 9 Speed control of 3 phase Induction Motors - Stator control: PWM &V/f control, rotorcontrol: Rotor resistance control - Static control of rotor resistance using DC chopper - Static Krammer and Scherbius drives – Introduction to Vector Controlled Induction Motor Drives. UNIT - IV Drives for Special Machines 9 Speed control of 3 phase Synchronous Motors - True synchronous and self controlled modes of operations - DC servo drives principle of operation AC servo drives principle of operation - Principle and control of Stepper motor and Switched Reluctance Motor drives. UNIT - V Digital Control and Drive Applications 9 Digital techniques in speed control - Advantages and limitations - Microprocessor/Microcontroller and PLC based control of drives, networking of drives - Selection of drives and control schemes for Steel rolling mills, Paper mills, Cement mills, Machine tools, Lifts and Cranes. Solar and battery powered drives. Total periods: 45 TEXT BOOKS 1. Dubey, G.K., “Fundamentals of Electrical Drives”, Narosa Publishing House, 2nd Edition, New Delhi, 2004. 2. Bose, B.K., “Modern Power Electronics and AC Drives", Prentice Hall India Ltd., New Delhi, 2002. REFERENCES 1. Ion Boldea and Nasar S. A., “Electric Drives”, CRC Press LLC, New York, 2nd Edition, 2006. 2. Krishnan R, “Electric Motor Drives: Modelling, Analysis and Control, Prentice Hall of India Pvt. Ltd., New Delhi, 2002. 3. Vedam Subramanyam, “Electric Drives: Concepts and Applications”, Tata McGraw Hill Publishing Company Limited, New Delhi, 2004. Page 47 of 85
  • 48.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2703 POWER SYSTEM ECONOMICS AND CONTROL TECHNIQUES 3 1 0 4 AIM To become familiar with the preparatory work necessary for meeting the next day’s power system operation and the various control actions to be implemented on the system to meet the minute-to-minute variation of system load. OBJECTIVES · To get an overview of system operation and control. · To understand & model power-frequency dynamics and to design power-frequency controller. · To understand & model reactive power-voltage interaction and different methods of control for maintaining voltage profile against varying system load. UNIT - I INTRODUCTION 9 System load variation: System load characteristics, load curves daily, weekly and annual, load-duration curve, load factor, diversity factor. Reserve requirements: Installed reserves, spinning reserves, cold reserves, hot reserves. Overview of system operation: Load forecasting, UNIT commitment, load dispatching. Overview of system control: Governor Control, LFC, EDC, AVR, system voltage control, security control. UNIT - II REAL POWER - FREQUENCY CONTROL 8 Fundamentals of speed governing mechanism and modeling: Speed-load characteristics – Load sharing between two synchronous machines in parallel; concept of control area, LFC control of a single-area system: Static and dynamic analysis of uncontrolled and controlled cases, Economic Dispatch Control. Multi-area systems: Two-area system modeling; static analysis, uncontrolled case; tie line with frequency bias control of two-area system derivation, state variable model. UNIT - III REACTIVE POWER–VOLTAGE CONTROL 9 Typical excitation system, modeling, static and dynamic analysis, stability compensation; generation and absorption of reactive power: Relation between voltage, power and reactive power at a node; method of voltage control: Injection of reactive power. Tap-changing transformer, numerical problems - System level control using generator voltage magnitude setting, tap setting of OLTC transformer and MVAR injection of switched capacitors to maintain acceptable voltage profile and to minimize transmission loss. UNIT - IV UNIT COMMITMENT AND ECONOMIC DISPATCH 9 Statement of UNIT Commitment (UC) problem; constraints in UC: spinning reserve, thermal UNIT constraints, hydro constraints, fuel constraints and other constraints; UC solution methods: Priority-list methods, forward dynamic programming approach, numerical problems only in priority-list method using full-load average production cost. Incremental cost curve, co-ordination equations without loss and with loss, solution by direct method and λ- iteration method. (No derivation of loss coefficients.) Base point and participation factors. Economic dispatch controller added to LFC control. UNIT - V COMPUTER CONTROL OF POWER SYSTEMS 10 Energy control centre: Functions – Monitoring, data acquisition and control. System hardware configuration – SCADA and EMS functions: Network topology determination, state estimation, security analysis and control. Various operating states: Normal, alert, emergency, inextremis and restorative. State transition diagram showing various state transitions and control strategies. Total periods (45+15T): 60 TEXT BOOKS 1. Olle. I. Elgerd, “Electric Energy Systems Theory – An Introduction”, Tata McGraw Hill Publishing Company Ltd, New Delhi, 2nd Edition, 2008 2. Allen.J.Wood and Bruce F.Wollenberg, “Power Generation, Operation and Control”, John Wiley & Sons, Inc., 2003 3. Kundur P, “Power System Stability & Control”, Tata-McGraw Hill publications,USA,2005 Page 48 of 85
  • 49.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) REFERENCES 1. Kothari D.P and Nagrath I.J, “Modern Power System Analysis”, 3rd Edition, Tata McGraw Hill Publishing Company Limited, New Delhi, 2003. 2. Grigsby L.L, “The Electric Power Engineering, Hand Book”, CRC Press and IEEE Press, 2001. Page 49 of 85
  • 50.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12ME2001 TOTAL QUALITY MANAGEMENT 3 0 0 3 AIM To provide a platform to have a sound understanding of the basic concepts to the students of TQM. OBJECTIVES · To enable the students understand the principles of Quality Management · To provide students details of quality planning and TQM techniques UNIT – I INTRODUCTION 7 Definition of Quality, Dimensions of Quality, Factors affecting Quality, Quality Planning, Quality costs, Comparison of TQM concept with older concept, Leadership – Concepts, characteristics and role of Quality leaders, Deming Philosophy, Barriers to TQM Implementation. UNIT – II TQM PRINCIPLES 11 Customer satisfaction – Customer Perception of Quality, Customer Complaints, Service Quality, Customer Retention, Employee Involvement – Motivation, Empowerment, Teams, Recognition and Reward, Performance Appraisal.Continuous Process Improvement – Juran Trilogy, PDSA Cycle, 5S, Kaizen. Taguchi’s Quality Engineering - Quality Loss Function, Parameter and Tolerance design, signal to noise ratio. Supplier Partnership – Concept of Quality Circle -Business Excellence Model-Rajiv Gandhi National Quality Award UNIT – III STATISTICAL PROCESS CONTROL (SPC) 9 The seven tools of Quality, Statistical methods for quality improvement. Process control -Control charts for variables: X, R charts and Control charts for attributes – P, np, c and u charts. Concept of Process Capability, Concept of six sigma, New seven management tools. UNIT – IV TQM TOOLS 9 Benchmarking – Reasons to Benchmark, Benchmarking Process, Quality Function Deployment (QFD) – House of Quality, QFD Process, Benefits, Taguchi Quality Loss Function, Total Productive Maintenance (TPM) – Concept, Improvement Needs, FMEA – Stages of FMEA. UNIT – V QUALITY SYSTEMS 9 Quality Management System: Need for QMS, Elements, Reasons for implementation of Quality System, ISO 9000:2008: Classification, Quality System Requirements, Documentation of Quality System, Quality Auditing, ISO 14000 – Environmental Management System, Major elements of EMS, EMS Model, Benefits. Total Periods: 45 TEXT BOOKS 1. Dale.H.Besterfiled, et al., “Total Quality Management”, Pearson Education Asia, 2nd Edition, 1999, Indian Reprint, 2002. 2. James.R.Evans, &William.M.Lidsay., “Management and Control of Quality”, Thompson Learning, 2005. REFERENCE BOOKS 1. SubburajRamasamy., “Total Quality Management”, Tata McGraw Hill, NewDelhi, 2005 2. Narayana.V and Sreenivasan.N.S., “Quality Management – Concepts and Tasks”, New Age International Edition, 1996. 3. KanishkaBedi., “Total Quality Management”, Oxford University Press, 2006. 4. Mukherjee.P.N, “Total Quality Management”, Prentice Hall, 2005. 5. Suganthi .L., Anand.A.Samuel., “Total Quality Management”, Prentice Hall of India, 2008. 12EE2707 POWER ELECTRONICS AND DRIVES LABORATORY 0 0 3 2 Page 50 of 85
  • 51.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) AIM To introduce the basic concepts of power electronics and drives. EXPERIMENTS 1. Characteristics of SCR, TRIAC. 2. AC phase control using TRIAC/ SCR with R and RL load. 3. Transient characteristics of SCR and MOSFET 4. AC to DC fully controlled converter & half controlled converter 5. Step down and step up MOSFET based choppers 6. IGBT based single-phase & three phase PWM inverter 7. Simulation of closed loop control of converter fed DC motor. 8. Simulation of closed loop control of chopper fed DC motor. 9. Simulation of VSI fed 3 phase induction motor. 10. Speed control of DC motor using 3 Phase Rectifier. 11. Speed control of 3 phase induction motor using PWM inverter. 12. PLC based drives. Practical 45 Page 51 of 85
  • 52.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2708 POWER SYSTEM SIMULATION LABORATORY 0 0 3 2 AIM To acquire software development skills and experience in the usage of standard packages necessary for analysis and simulation of power system required for its planning, operation and control. OBJECTIVES I. To develop simple C programs for the following basic requirements: a) Formation of bus admittance and impedance matrices and network solution. b) Power flow solution of small systems using simple method, Gauss-Seidel P.F. Method. c) UNIT Commitment and Economic Dispatch. II. To acquire experience in the usage of standard packages for the following analysis / simulation / control functions. d) Steady-state analysis of large system using NRPF and FDPF methods. e) Quasi steady-state (Fault) analysis for balanced and unbalanced faults. f) Transient stability simulation of multimachine power system. g) Simulation of Load-Frequency Dynamics and control of power system. EXPERIMENTS 1. Computation of Parameters and Modelling of Transmission Lines 2. `Formation of Bus Admittance and Impedance Matrices and Solution of Networks. 3. Load Flow Analysis - I: Solution of Load Flow And Related Problems Using Gauss-Seidel Method 4. Load Flow Analysis - II: Solution of Load Flow and Related Problems Using Newton-Raphson and Fast- Decoupled Methods 5. Fault Analysis 6. Transient and Small Signal Stability Analysis: Single-Machine Infinite Bus system 7. Transient Stability Analysis of Multimachine Power Systems 8. Electromagnetic Transients in Power Systems 9. Load – Frequency Dynamics of Single- Area and Two-Area Power Systems 10. Economic Dispatch in Power Systems. Practical 45 Page 52 of 85
  • 53.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2709 COMPREHENSIVE VIVAVOCE 0 0 2 1 AIM To encourage the students to comprehend the knowledge acquired from the first Semester to Seventh Semester of B.E Degree Course through periodic exercise. · Electric Circuit Theory · Electronic Devices · Analog and Digital Electronics · DC Machines and Transformers · Electromagnetic Field Theory · Measurements and Instrumentation · Transmission and Distribution of Electric Energy · Linear Integrated Circuits · Control System Engineering · Synchronous and Induction Machines · DSP and Microprocessors · Power System Protection and Switch Gear · Power System Analysis · Electric Machine Design · Power System Economics and Control Techniques · Electric Energy Generation, Utilization and Conversion · Electric drives and controls. Page 53 of 85
  • 54.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2801 PROJECT WORK 0 0 18 100 Aim To enable the students to identify and solve electrical engineering problems. Objectives · To develop and apply electrical/computer engineering knowledge acquired through earlier semesters for successfully solving engineering problems · To function effectively in multidisciplinary teams · To effectively communicate technical information in multiple formats and · To kindle the interest in life-long learning Procedure · Project work is to identify and provide solution to an application oriented problem, which will be experimental in nature and others will be based on some innovative / theoretical work. · Each project has to be carried out by a group of students. In order to ensure participation of each student, the group size should be preferably 3/4 students for Under Graduate courses. Formation of project groups should be done such that each group has representation of students with varying academic merit from best to average. · Each project group has to prepare and submit the project report at the time of end semester project work and viva voce examination. Page 54 of 85
  • 55.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) ELECTIVES GROUP I 12CS2001 JAVA PROGRAMMING 3 0 0 3 AIM To motivate the students to understand the concepts of Java Programming. OBJECTIVE · To provide necessary skills to write Java programs and work with applet and applications. · To familiarize the concepts and practices of packages and multi threaded applications. · To perform event handling functionality in response to GUI events. · To create application with database connectivity along with client server architecture. · To study the concepts of files, streams and sockets. UNIT - I INTRODUCTION TO JAVA 9 Object Oriented language: Overview – The JAVA Environment – Comparing JAVA C and C++ – Keywords & Operators – Identifiers – Literal – Expressions – Control Statements – Arrays & Strings – Command line Arguments – Data members – Methods – Overloading Constructors – Class Assignment – This – Static members & methods – Final – Super keyword – Exception Handling. UNIT - II INHERITANCE, PACKAGES AND THREADS 9 Abstract classes – Inheritance: Types – Single – Mutilevel – Hierarchical – Interfaces: defining – implementing – Packages: Introduction – Importing packages – Implementation – Multithreaded Programming: Thread model – Creating a thread – Creating multiple thread – Thread Exceptions – Thread Priority – Synchronization – Inter thread communication. UNIT - III AWT AND APPLET 9 HTML: Introduction – Webpage design – Basic Tags – Simple programs – Applet: Lifecycle – Simple Applet Display– Labels – Text fields – Buttons – Combo Boxes – Passing parameters to applet – AWT: Windows fundamentals – Creating frame Window – AWT Controls – Event handling: Sources of events – Event Delegation Model – Event Classes – Event Listener interfaces– Adapter classes – AWT Classes –Working with graphics – Working with Color – Working with font – Layout Managers – Menu Bars and menus. UNIT - IV DATABASE CONNECTIVITY 9 JDBC: Architecture – JDBC Connectivity – Drivers – Setting up a database – Setting up tables – Establishing connection – Getting Data from a table – Select – Update – Record Sets – Prepared Statements – Callable Statements. UNIT - V INPUT/OUTPUT STREAMS AND NETWORKING BASICS 9 Input Output: I/O classes and Interfaces – The Character Stream – Buffered Reader and Buffered Writer – Serialization – Files – Java and Net: Stream classes – Socket – InetAddress – URL Connection – TCP/IP sockets – Data grams – Simple client/server program. Total periods: 45 TEXT BOOKS 1. Herbert Schildt, The Complete Reference “Java”, Seventh edition Tata McGraw Hills, 2011. REFERENCES 1. Balaguruswamy E, Programming with java , Fourth Edition,TMH,2007. 2. Deitel H M and Deitel P J, “JAVA - How to Program”, Prentice Hall of India / Pearson Education, New Delhi, Seventh Edition, 2007. 3. Elliote Harold Rusty, Network Programming, Third Edition 2004. 4. Steven Holzner et al, “ Java 2 Programming”, Dream Tech Press, 2001. Page 55 of 85
  • 56.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 5. Bernard Van Haecke, “JDBC 3 Jaba Database Connectivity”, Wiley-Dream Tech Press India P Ltd, 2002. Page 56 of 85
  • 57.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E01 INTRODUCTION TO DATABASE MANAGEMENT SYSTEMS 3 0 0 3 AIM To expose the students to the concept of database management system and different data models. OBJECTIVES · To learn the basics in database systems · To learn about E-R model and its structure · To study about relational commercial languages and relational database design · To learn about network data model · To study the concept of hierarchical data model UNIT- I INTRODUCTION 4 Purpose of database systems – Data abstraction – Data models – Instances and schemas – Data independence – Data definition language – Database manager – Database users over all system structure. UNIT - II E-R MODEL 8 E-R model – E-R diagram, reducing E-R diagram to tables.relational model: Structure of relational databases – the relational algebra – Tuple and domain relational calculus modifying the databases. UNIT - III RELATIONAL COMMERCIAL LANGUAGES 7 SQL - Query – by – example, Query integrity constraints – Domain constraints – Referential integrity – functional dependencies – Assertions – Triggers. UNIT - IV RELATIONAL DATABASE DESIGN 10 Pitfalls in relational database designs – Normalisation using multivalued dependencies, join dependencies. Domain-key normalform. Mapping relational data to file data directory storage, buffer management. Typical database design approach for: Airline reservation systems – Inventory control – Library information system. UNIT - V NETWORK DATA MODEL 9 DBTG set construct and restrictions, Expressing M:N relationship DBTG, cycles in DBTG, data description in network model, scheme and sub scheme, DBTG data manipulation facility, Data base manipulation. UNIT - VI HIERARCHIAL DATA MODEL 7 Tree concepts, data definition, data manipulation, updation, implementation of the hierarchical databases, additional features of the hierarchical DML. Total periods: 45 TEXT BOOKS 1. Abraham, Siberschatz, Henry.F.Korth and Sudharshan. S, “Database System Concepts”, McGraw Hill, New Delhi, 2002. 2. Ramez Elmasri and Shamkant Navethe, “Fundamentals of Database Systems”, Pearson Education, New Delhi, 2003. REFERENCES 1. Raghu, Ramakrishnan, “Database Management Systems”, Tata McGraw Hill, 3rd Edition New Delhi, 2004. 2. Thomas Connolly. Carolyn Begg, “Database system” Pearson education Limited, 3rd Edition, New Delhi, 2002. 3. Jeffrey A. Hoffer, Mary B.Presscott, Fred R Mcfadden “ Modern database Management Pearson Education, New Delhi, 2002. 12EE2E02 DSP BASED SYSTEM DESIGN 3 0 0 3 Page 57 of 85
  • 58.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) AIM To impart knowledge on digital signal processors, programming concepts and its applications. OBJECTIVES · To understand the internal architecture of different types of digital signal processors. · To learn about simple programming concepts in DSP. · To study about development tools in DSP implementations. · To study about a few applications using digital signal processors UNIT- I ARCHITECTURE FOR PROGRAMMABLE DIGITAL SIGNAL PROCESSING DEVICES 9 Basic architectural features – DSP computational building blocks; multiplier, shifter, Multiply and Accumulate(MAC) UNIT – Arithmetic and Logic UNIT – Bus Architecture – Onchip memory, Data Addressing Capabilities; Addressing modes; Special addressing modes, Programmability & Program execution. Speed issues: Harvard architecture –parallelism – pipelining – system level parallelism and pipelining. Features for external interfacing. UNI - II DIGITAL SIGNAL PROCESSORS 9 Commercial Digital Signal Processing devices – Architecture of TMS320C54XX Digital signal processors – Bus Structures – CPU – Internal memory and memory mapped registers – Data addressing modes of the TMS320C54XX processors - Memory space of 54XX processors – Program control. UNIT - III PROGRAMMING CONCEPTS 9 Instructions and Programming – simple program using TMS320C54XX processors. On chip peripherals: Hardware Timer – Host port Interface – clock generator – Serial I/O ports – Interrupts – Pipeline operation of the TMS320C54XX processors. UNIT - III DEVELOPMENT TOOLS FOR DIGITAL SIGNAL PROCESSING IMPLEMENTATIONS 9 DSP Development tools – DSP system design kit(DSK) – Software for development – Assembler and the Assembly source file – Linker and Memory Allocation – C/C++ compiler – Code composer studio – Building a Project, Debug Options. DSP software development Examples. UNIT - IV APPLICATIONS OF PROGRAMMABLE DSP DEVICES 9 Position control system for Hard disk drive – DSP based Power Meter : Power measurement system – Software for Power Meter. Total periods: 45 TEXT BOOK 1.Avatar Singh and S.Srinivasan, “Digital Signal Processing : Implementations using DSP microprocessors with examples from TMS320C54XX”, Thompson Brooks / Cole, 2004. REFERENCESS 1. TMS320C54X DSP Reference set Volume 1 – CPU and Peripherals (Literature No.SPRU131) 2. TMS320C54X DSP Reference set Volume 2 – Mnemonic instruction set (Literature No.SPRV 172) 3. TMS320C54X DSP Reference set Volume 4 – Applications Guide (Literature No. SPRV 173) 4. TMS320C54X DSP Reference set Volume 5 – Enhanced Peripherals (Literature No. SPRV 302) Page 58 of 85
  • 59.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E04 INTRODUCTION TO COMPUTER ARCHITECTURE 3 0 0 3 AIM To Study the structure and behavior of processors, memories and input and output units and to study their interactions. OBJECTIVES · To study the various representations of data, register transfer language for micro-operations and organization and design of a digital computer. · To teach the concept of micro-programmed control unit, the central processing unit, stack and instruction formats. · To Study the various arithmetic operation’s algorithms and their hardware implementations and concept of pipelining and vector processing. · To illustrate the techniques to communicate with input and output devices. · To study the organization and operation of various memories and memory management hardware. UNIT - I DATA REPRESENTATION, MICRO-OPERATIONS AND ORGANIZATIONAND DESIGN 13 Data representation: Data types, complements, fixed–point representation, floating-point representation, other binary codes, error detection codes. Register transfer and micro operations: Register transfer language, register transfer, bus and memory transfers, arithmetic micro-operations, logic micro-operations, shift micro-operations, arithmetic logic shift UNIT. Basic computer organization and design: Instruction codes, computer registers, computer instructions, timing and control, instruction cycle, memory reference instructions, input-output and interrupt. Complete computer description, design of basic computer, design of accumulator logic. UNIT - II CONTROL AND CENTRAL PROCESSING UNIT 8 Micro programmed control: Control memory, address sequencing, micro-program example, and design of control UNIT. Central processing UNIT: General register organization, stack organization, instruction formats, addressing modes, data transfer and manipulation, program control,reduced instruction set computer. UNIT - III COMPUTER ARITHMETIC, PIPELINE AND VECTOR PROCESSING 8 Computer arithmetic: Addition and subtraction, multiplication algorithms, division algorithms, floating-point arithmetic operations, decimal arithmetic UNIT, decimal arithmetic operations. Pipeline and vector processing: Parallel processing, instruction pipeline, vector processing array processors UNIT - IV INPUT-OUTPUT ORGANIZATION 8 Input-output organization: Peripheral devices, input-output interface, asynchronous data transfer, modes of transfer, priority interrupt, direct memory access, input-output processor, serial communication. UNIT - V MEMORY ORGANIZATION 8 Memory organization: Memory hierarchy, main memory, auxiliary memory, associative memory, cache memory, virtual memory, memory management hardware. Total periods: 45 TEXT BOOK 1.Morris Mano, “Computer System Architecture”, 3rd Edition, Pearson Education, 2002 / PHI. REFERENCES 1. Vincent P.Heuring and Harry F.Jordan, “Computer Systems Design and Architecture”, Pearson Education Asia Publications, 2002. 2. John P.Hayes, “Computer Architecture and Organization”, Tata McGraw Hill, 3rd Edition, New Delhi 1998. 3. Andrew S.Tanenbaum, “Structured Computer Organization”, 4th Edition, Prentice Hall of India/Pearson Page 59 of 85
  • 60.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) Education, 2002. 4. William Stallings, “Computer Organization and Architecture”, 6th Edition, Prentice Hall of India/Pearson Education, 2003. Page 60 of 85
  • 61.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) GROUP II 12EE2E04 LABVIEW AND VIRTUAL INSTRUMENTATION 3 0 0 3 AIM To expose the students with the comprehensive knowledge in virtual instrumentation and some of its applications. OBJECTIVES · To review background information required for studying virtual instrumentation. · To study the importance and applications of virtual instrumentation. · To study the basic building blocks of virtual instrumentation. · To study the graphical programming concepts in LabVIEW. · To study the hardware interfacing concepts in LabVIEW. · To study a few applications in virtual instrumentation. UNIT - I FUNDAMENTALS OF VIRTUAL INSTRUMENTATION 9 General Functional description of a digital instrument - Block diagram of a Virtual Instrument - Physical quantities and Transducers- Role of Hardware and Software in Virtual instrumentation- User interfaces- Architecture of a Virtual instrument- Advantages of Virtual instruments over conventional instruments. UNIT - II SOFTWARE OVERVIEW 9 LabVIEW - Graphical user interfaces - Controls and Indicators - “G” programming - Data types - Data flow programming - Editing - Debugging and Running a Virtual instrument - Graphical programming pallets - Front panel objects - Controls, Indicators, Object properties and their configuration - Typical examples. UNIT - III PROGRAMMING STRUCTURE 9 FOR loops, WHILE loop, CASE structure, formula node, Sequence structures - Arrays and Clusters – Array operations - Bundle - Bundle/Unbundle by name, graphs and charts - String and file I/O - High level and Low level file I/O”s - Attribute modes Local and Global variables. UNIT - IV DATA ACQUISITION AND INSTRUMENT CONTROL 9 DAQ Components- Buffers: Buffered and non buffered I/O- Triggering- Analog I/O- Digital I/O- Counters and timers- Data Acquisition: Analog and Digital signals, Analog interfacing, Types of grounding- Instrument control: VISA, GPIB, VXI and PXI. UNIT- V SIMPLE APPLICATIONS IN VI 9 Measurement of voltage and current- Measurement of frequency – Temperature indicator – ON/OFF controller – P-I- D controller- Simulation of a simple second order system – Generation of HTML page. Total periods: 45 TEXT BOOKS 1. Jerome Jovitha, “Virtual Instrumentation and LabVIEW”, PHI Learning, 1st Edition, New Delhi, 2010. REFERENCES 1.Garry M Johnson, "LabVIEW Graphical Programming", Tata McGraw Hill, 2nd Edition, 1996. 2. Sanjay Gupta and Joseph John, “Virtual Instrumentation Using LabVIEW”, Tata McGraw-Hill, 1st Edition, 2005. 3. LabVIEW: Basics I & II Manual, National Instruments, 2006 4. Barry Paron, “Sensors, Transducers and LabVIEW", Prentice Hall, 2000. 5. Kevin James, “PC Interfacing and Data Acquisition: Techniques for Measurement, Instrumentation and Control”, Newnes, 2000. Page 61 of 85
  • 62.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E05 POWER QUALITY 3 0 0 3 AIM To study the various issues affecting Power Quality, their production, monitoring and suppression. OBJECTIVES · To study the production of voltages sags, overvoltages and harmonics and methods of control. · To study various methods of power quality monitoring. UNIT - I INTRODUCTION TO POWER QUALITY 9 Definitions – Power quality, Voltage quality – Power quality issues : Short duration voltage variations, Long duration voltage variations, Transients, Waveform distortion, Voltage imbalance, Voltage fluctuation, Power frequency variations, low power factor – Sources and Effects of power quality problems – Power quality terms – Power quality and Electro Magnetic Compatibility (EMC) Standards. Computer Business Equipment Manufacturers Associations (CBEMA) curve. UNIT - II VOLTAGE SAGS AND INTERRUPTIONS 9 Sources of sags and interruptions, estimating voltage sag performance, motor starting sags, estimating the sag severity, mitigation of voltage sags, active series compensators, static transfer switches and fast transfer switches. UNIT - III OVERVOLTAGES 9 Sources of over voltages: Capacitor switching, lightning, ferro resonance; mitigation of voltage swells: Surge arresters, low pass filters, power conditioners – Lightning protection, shielding, line arresters, protection of transformers and cables, computer analysis tools for transients, PSCAD and EMTP. UNIT - IV HARMONICS 9 Harmonic distortion: Voltage and current distortion, harmonic indices, harmonic sources from commercial and industrial loads, locating harmonic sources; power system response characteristics, resonance, harmonic distortion evaluation, devices for controlling harmonic distortion, passive filters, active filters, IEEE and IEC standards. UNIT - V POWER QUALITY MONITORING 9 Monitoring considerations: Power line disturbance analyzer, per quality measurement equipment, harmonic / spectrum analyzer, flicker meters, disturbance analyzer, applications of expert system for power quality monitoring. Total periods: 45 REFERENCES 1. Roger.C.Dugan, Mark.F.McGranagham, Surya Santoso, H.Wayne Beaty, “Electrical Power Systems Quality” McGraw Hill, 2003 2. PSCAD User Manual. Page 62 of 85
  • 63.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E06 TRANSIENTS IN POWER SYSTEM 3 0 0 3 AIM To impart knowledge on different types of transients in power system. OBJECTIVES · To learn about sources of transients in power system. · To study about different types of switching transients. · To impart depth knowledge on lighting transients. · To learn about transient response and its computation. · To get knowledge on transients in integrated power system. UNIT- I INTRODUCTION AND SURVEY 5 Source of transients, various types of power systems transients, effect of transients on power systems, importance of study of transients in planning. UNIT - II SWITCHING TRANSIENTS 10 Introduction, circuit closing transients: RL circuit with sine wave drive, double frequency transients, observations in RLC circuit and basic transforms of the RLC circuit. Resistance switching: Equivalent circuit for the resistance switching problems, equivalent circuit for interrupting the resistor current. Load switching: Equivalent circuit, waveforms for transient voltage across the load, switch; normal and abnormal switching transients. Current suppression, current chopping, effective equivalent circuit. Capacitance switching, effect of source regulation, capacitance switching with a restrike, with multiple restrikes, illustration for multiple restriking transients, ferro resonance. UNIT - III LIGHTNING TRANSIENTS 10 Causes of over voltage, lightning phenomenon, charge formation in the clouds, rate of charging of thunder clouds, mechanisms of lighting strokes, characteristics of lightning strokes; factors contributing to good line design, protection afforded by ground wires, tower footing resistance. Interaction between lightning and power system: Mathematical model for lightning. UNIT - IV TRAVELLING WAVES ON TRANSMISSION LINE COMPUTATION OF TRANSIENTS 10 Computation of transients: Transient response of systems with series and shunt lumped parameters and distributed lines. Travelling wave concept: step response, Bewely”s lattice diagram, standing waves and natural frequencies, reflection and refraction of travelling waves. UNIT - V TRANSIENTS IN INTEGRATED POWER SYSTEM 10 The short line and kilometric fault, distribution of voltage in a power system: Line dropping and load rejection; voltage transients on closing and reclosing lines; over voltage induced by faults; switching surges on integrated system; EMTP for transient computation. Total periods: 45 TEXT BOOKS 1. Allan Greenwood, “Electrical Transients in Power Systems”, Wiley Interscience, New York, 2nd Edition 1991. 2. Begamudre R.D, “Extra High Voltage AC Transmission Engineering”, New Age International, 2007. REFERENCES 1. M.S.Naidu and V.Kamaraju, “High Voltage Engineering”, Tata McGraw Hill, 2nd Edition, 2000. Page 63 of 85
  • 64.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E07 NETWORKING IN SMART GRIDS 3 0 0 3 AIM To expose the students to the concept of Smart Grids OBJECTIVES · Explain the roles of distributed generation technologies, communication infrastructures, advanced metering infrastructure, advanced control methods, and demand management in smart grid operation · Discuss operating principles and develop simplified models of smart grid components · Analyze the impact of smart grid component integration on distribution network operation UNIT I INTRODUCTION TO SMART GRID AND EMERGING TECHNOLOGIES 9 Traditional Power Systems- limited flow control and monitoring, centralized generation, low utilization; Smart Grids- concept, WAN, FAN, HAN; early smart grid initiatives; overview of the technologies required. UNIT II INFORMATION AND COMMUNICATION TECHNOLOGIES 9 Data Communication-dedicated and shared channels, switching techniques, communication channels, layered architecture and protocols; communication technologies; information security- encryption and decryption, authentication, digital signatures, cyber security standards; UNIT III SENSING, MEASUREMENT, CONTROL AND AUTOMATION TECHNOLOGIES 9 Smart metering- overview of the hardware used, communications infrastructure and protocols for smart metering, demand side integration; distribution automation equipment- substation automation equipment, faults in the distribution system, voltage regulation; UNIT IV POWER ELECTRONICS IN THE SMART GRID 9 Renewable energy generation- fault current limiting-shunt compensation - series compensation- FACTS- HVDC-PHEV Technology UNIT V DEMAND MANAGEMENT 9 Distribution Management Systems- introduction, data sources and associated external systems, modelling and analysis tools, applications; Transmission system operation- introduction, data sources, energy management systems, wide area applications, visualisation techniques Lecture Hours: 45 TEXT BOOK: 1. Smart Grid: Technology and Applications Janaka Ekanayake, Nick Jenkins, Kithsiri Liyanage, Jianzhong Wu, Akihiko Yokoyama ISBN: 978-0-470-97409-4 Hardcover 310 pages April 2012 Wiley REFERENCES 1. Smart Grid Communications and Networking Edited by Ekram Hossain Edited by Zhu Han Edited by H. Vincent Poor Publisher: Cambridge University Press, Print Publication Year: 2012 2. Smart Grids Nouredine Hadjsaïd (Editor), Jean-Claude Sabonnadière (Editor) Page 64 of 85
  • 65.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) ISBN: 978-1-84821-261-9 Hardcover 350 pages May 2012, Wiley-ISTE WEBSITES 2. www.siemens.co.in/Smart-Grid 3. www.abb.com/smartgrids Page 65 of 85
  • 66.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E08 SOFT COMPUTING TECHNIQUES 3 0 0 3 AIM To cater the knowledge of Neural Networks and Fuzzy Logic Control and use these for controlling real time systems. OBJECTIVES · To expose the students to the concepts of feed forward neural networks. · To provide adequate knowledge about feed back neural networks. · To teach about the concept of fuzziness involved in various systems. To provide adequate knowledge about fuzzy set theory. · To provide comprehensive knowledge of fuzzy logic control and adaptive fuzzy logic and to design the fuzzy control using genetic algorithm · To provide adequate knowledge of application of fuzzy logic control to real time systems UNIT- I INTRODUCTION 9 Approaches to intelligent control. Architecture for intelligent control. Symbolic reasoning system, rule-based systems, the AI approach. Knowledge representation. Expert systems. UNIT - II NEURAL NETWORKS 9 Concept of Artificial Neural Networks and its basic mathematical model, McCulloch-Pitts neuron model, simple perceptron, Adaline and Madaline, Feed-forward Multilayer Perceptron. Learning and Training the neural network. Data Processing: Scaling, Fourier transformation, principal-component analysis and wavelet transformations. Hopfield network, Self-organizing network and recurrent network. Neural Network based controller UNIT - III GENETIC ALGORITHM 9 Basic concept of Genetic algorithm and detail algorithmic steps, adjustment of free parameters. Solution of typical control problems using genetic algorithm. Concept on some other search techniques like tabu search and ant-colony search techniques for solving optimization problems. UNIT - IV FUZZY LOGIC SYSTEM 9 Introduction to crisp sets and fuzzy sets, basic fuzzy set operation and approximate reasoning. Introduction to fuzzy logic modeling and control. Fuzzification, inferencing and defuzzification. Fuzzy knowledge and rule bases. Fuzzy modeling and control schemes for nonlinear systems. Selforganizing fuzzy logic control. Fuzzy logic control for nonlinear time-delay system. UNIT=V APPLICATIONS 9 GA application to power system optimisation problem, Case studies: Identification and control of linear and nonlinear dynamic systems using Matlab-Neural Network toolbox. Stability analysis of Neural-Network interconnection systems. Implementation of fuzzy logic controller using Matlab fuzzy-logic toolbox. Stability analysis of fuzzy control systems. Total periods: 45 TEXT BOOKS 1. Padhy.N.P., Artificial Intelligence and Intelligent System, Oxford University Press, 2005. 2. KOSKO, B. "Neural Networks and Fuzzy Systems", Prentice-Hall of India Pvt. Ltd., 1994. REFERENCES 1. Jacek.M.Zurada, "Introduction to Artificial Neural Systems", Jaico Publishing House, 1999. 2. KLIR G.J. & FOLGER T.A. "Fuzzy sets, uncertainty and Information", Prentice-Hall of India Pvt. Ltd., 1993. Page 66 of 85
  • 67.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 3. Zimmerman H.J. "Fuzzy set theory-and its Applications"-Kluwer Academic Publishers, 1994. 4. Driankov, Hellendroon, "Introduction to Fuzzy Control", Narosa Publishers. 5. Goldberg D.E. “Genetic algorithms in Search, Optimization and Machine learning”, Addison Wesley, 1989. Page 67 of 85
  • 68.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E09 EHV AC and DC POWER TRANSMISSION 3 0 0 3 AIM To develop the skills in the area of HVDC power transmission with the analysis of HVDC converters, harmonics and design of filters. OBJECTIVE · To understand the concept, planning of DC power transmission and comparison with AC · power transmission. · To analyze HVDC converters. · To study about compounding and regulation. · To analyze harmonics and design of filters. · To learn about HVDC cables and simulation tools. UNIT - I INTRODUCTION 9 Introduction of DC Power transmission technology – Comparison of AC and DC transmission – Application of DC transmission – Description of DC transmission system – Planning for HVDC transmission – Modern trends in DC transmission. UNIT - II ANALYSIS OF HVDC CONVERTERS 9 Pulse number – Choice of converter configuration – Simplified analysis of Graetz circuit – Converter bridge characteristics – Characteristics of a twelve pulse converter – Detailed analysis of converters. UNIT - III COMPOUNDING AND REGULATIONS 9 General – Required regulation – Inverter compounding – Uncompounded inverter – Rectifier compounding – Transmission characteristics with the rectifier and inverter compounding – Communication link – Current regulation from the inverter side – Transformer tap changing UNIT - IV HARMONICS AND FILTERS 9 Introduction – Generation of harmonics – Design of AC filters and DC filters – Interference with neighbouring communication lines. UNIT- V HVDC CABLES AND SIMULATION OF HVDC SYSTEMS 9 Introduction of DC cables – Basic physical phenomenon arising in DC insulation – Practical dielectrics – Dielectric stress consideration – Economics of DC cables compared with AC cables. Introduction to system simulation – Philosophy and tools – HVDC system simulation – Modeling of HVDC systems for digital dynamic simulation. Total periods : 45 TEXT BOOKS 1. Padiyar, K. R., “HVDC power transmission system”, Wiley Eastern Limited, 1st edition, New Delhi, 1990, Reprint (2005). 2. Edward Wilson Kimbark, “Direct Current Transmission”, Vol. I, Wiley interscience, New York, London, Sydney, 1971. REFERENCES 1. Colin Adamson and Hingorani N G, “High Voltage Direct Current Power Transmission”, Garraway Limited, London, 1960. 2. Arrillaga, J., “High Voltage Direct Current Transmission”, Peter Pregrinus, London, 1983. 3. Rakosh Das Begamudre, “Extra High Voltage AC Transmission Engineering”, New Age Interantional (P) Ltd., New Delhi, 1990. Page 68 of 85
  • 69.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E10 DIGITAL SYSTEM DESIGN 3 0 0 3 AIM To introduce to the concept of Digital system design. OBJECTIVES · To Study the structure of Standard and complex PLDs and system design using PLDs. · To introduce building blocks of FPGA. · To introduce VHDL. · To study about concurrent and sequential statements. · To introduce subprograms, Packages, and its configurations UNIT - I SYSTEM DESIGN USING PLDs AND CPLDs 9 Structure of Standard PLDs and Complex PLDs (CPLDs) – Design of combinational and sequential circuits using PLDs and CPLDs – Design of state machines using Algorithmic State Machines (ASM) chart as a design tool. UNIT - II INTRODUCTION TO FIELD PROGRAMMABLE GATE ARRAYS (FPGAs) 9 Types of FPGA – Xilinx XC3000 series: Logic Cell Array (LCA) - Configurable Logic Blocks (CLB) – Input/Output Blocks (IOB) – Programmable Interconnection Points (PIP) – Introduction to Xilinx XC4000 family – Design examples. UNIT - III INTRODUCTION TO VHDL 9 Digital System Design process – Levels of abstraction – Need for Hardware Description Languages – VHDL: Design entities, Architectural body – Data types - Scalar types - Composite types - Access types - File types – Operators and expressions –Data objects. UNIT - IV CONCURRENT AND SEQUENTIAL STATEMENTS 9 Concurrency – Signal Assignment – Conditional Signal Assignment – Signal Drivers – Inertial, Transport and delta delays – Sequential control – Wait-if–Case – Loop – Next – Exit – Null process – Component instantiation – Block – Generics – Assert. UNIT - V SUBPROGRAMS, PACKAGES AND CONFIGURATIONS 9 Functions – Procedure– Package – Package declarations – Sub program declaration – Package body – Libraries – Predefined attributes – Configuration – Behavioural, Dataflow and Structural modeling of digital circuits. Total periods: 45 TEXT BOOKS 1. Nelson V.P., Nagale H.T., Carroll B.D., and Irwin J.D., "Digital Logic Circuit Analysis and Design", Prentice Hall International Inc. 1995 2. Perry D.V., " VHDL: Programming by Example", Tata McGraw-Hill Publishing Company, 4th Edition, 2002. REFERENCES 1. Palmer J.E., and Perlman D.E., " Introduction to Digital Systems", Schaum”s Outline Series, Tata McGraw Hill, New Delhi, 1996. 2. Dueck R.K., “Digital Design with CPLD applications and VHDL”, Thomson Delmar Learning, 2001 3. Navabi, Z.," VHDL: Analysis and Modelling of Digital Systems", McGraw-Hill, New Delhi, 2nd Edition, 1998. 4. Roth C.H., “Digital Systems Sesign using VHDL”, Thomson Delmar Learning, 2001 5. Programmable Logic Devices Data book and Design Guide", National Semiconductors, 1989. 6. The Programmable Logic Data Book”, Xilinx, 1994. 12EE2E11 ANALOG VLSI DESIGN 3 0 0 3 Page 69 of 85
  • 70.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) AIM To introduce the technology & concepts of ANALOG VLSI. OBJECTIVES: · To study device modelling for various devices. · To introduce basic building blocks of analog VLSI. · To study different types of amplifiers using BJT and MOS. · To study the design concept of operational amplifier. · To understand switched capacitor circuits. · To study data converter circuits · UNIT - I DEVICE MODELLING 9 Introduction to Analog Design-MOS device model-DC, small signal and large signal model. Diode model- DC, small signal and high frequency model.BJT: DC small signal and high frequency model. Passive components in MOS technology. UNIT - II BASIC BUILDING BLOCKS 9 Switches, Active Resistors, Current Mirrors: Types of Current mirrors-Simple,Widlar,Wilson and Cascode-Active loads, Voltage and Current REFERENCES Widlar Current Source, Band Gap Referenced Circuits. UNIT - III AMPLIFIERS (BJT & MOS) 9 Single stage amplifiers-.Multistage Amplifiers:Darlington, Cascode and Differential Amplifiers Frequency response of Amplifiers: CE, CS, Cascode and Differential Amplifiers, Gilbert Multiplier cell. UNIT - IV OPERATIONAL AMPLIFIER 9 Bipolar Operational Amplifier, Design Considerations, Basic Two stage MOS Opamp-Output stages Frequency response and Frequency Compensation,Comparators- charactersitic and two stage comparators. UNIT - V SWITCHED CAPACITOR CIRCUITS 9 General Considerations, Sampling Switches, Switched Capacitor Amplifier, Switched Capacitor Integrator. Total periods: 45 TEXT BOOK 1. Grey, Hurst, Lewis and Meyer, “Analysis and Design of Analog Integrated Circuits”,, John Wiley & Sons Inc,4th Edition 2001. 2. Behzad Razavi, “Design of Analog CMOS Integrated Circuits”, Tata McGraw Hill Edition, New Delhi, 2002. 3. Jacob Baker R, Harry Li, David E.Boyce, “CMOS Circuit Design, Layout and Simulation”, IEEE Press, 1998. REFERENCES 1. Phillip E.Allen & Douglas R Holberg, “CMOS Analog Circuit Design”, Oxford University Press 2002, 2nd Edition. 2. David A. John, Ken Martin, " Analog Integrated Circuit Design” John Wiley & Sons, 2002. Page 70 of 85
  • 71.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) GROUP III 12EE2E12 ELECTRONIC PRODUCT DESIGN 3 0 0 3 AIM To introduce different design techniques of electronic products. To introduce basic building blocks of PCB design. OBJECTIVES · To study the phases of development of electronic product. · To study low power design techniques. · To understand ergonomics for electronic design. · To study electromagnetic interference and noise sources. · To understand PCB layout planning. · To study Film master preparation. · To study different image transfer techniques UNIT - I DESIGN METHODOLOGY: 6 Concept of a product - Electronic product design - Work content of a product - Systems concept of electronic product - Phases of development of electronic product - Pre-study phase, study phase and design phase - Industrial design - User centered design. UNIT - II CREATIVITY IN DESIGN TECHNIQUES: 6 Integration of creativity - Requirements in design - Low power design - Input / output interface - Thermal design, approach of thermal management, basic thermal calculation - Heat sink selection - Fan and forced cooling. UNIT- III ERGONOMICS FOR ELECTRONIC PRODUCTS: 6 Ergonomics requirements for products - Principles and rules of Ergonomics- Anthropometry - Control panel design - Ergonomics in work places, utility - Chassis and cabinet design - Typical professional electronic equipments. UNIT- IV ELECTROMAGNETIC INTERFERENCE: 6 Noise in electronic equipments - Electromagnetic interference (EMI) - Methods of noise coupling, noise sources -Capacitor coupling and shielding inductive coupling and shielding , grounding , single point, multi point grounding and hardware grounds. UNIT - V PCB ART WORK GENERATION: 6 Lay out planning - Lay out rules and considerations - Lay out sketch - Artwork generation, basic approaches - Artwork taping guidelines -Resistance, capacitance and inductance of PCB conductors - Conductor spacing - Supply and ground conductor considerations. UNIT - VI FILM MASTER PREPARATION: 5 Film emulsion parameters - Film master dimension stability - Reprographic camera - Film processing and developing - Copper clad laminates, manufacturing process - Electrical and physical characteristics of laminates -Types of laminates and properties. UNIT - VII IMAGE TRANSFER TO PCBs 5 Board cleaning - Photo printing - Photoresist types -Coating process for wet film resists - Processing stages for wet film - Dry film resist - Plating of PCBs - Principles of immersion, electroless plating and electroplating types. UNIT - VIII ETCHING AND SOLDERING OF PCB 5 Types and operation, Etching machines - Etchant systems - Soldering, principles of solder connections - Solder alloys - Soldering fluxes - Soldering techniques - Solder masks - Testing and quality control of soldering. Total periods: 45 Page 71 of 85
  • 72.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) TEXT BOOKS 1. Kim R. Fowler., "Electronic Instrument Design" Oxford press, England, 1997. 2. Walter C. Bosshart., "Printed Circuit Boards Design and Technology", Tata McGraw Hill Publishing Company Ltd., New Delhi, 1983. REFERENCES 1. John R. Barnes., "Electronic System Designing : Interference and Noise Control Techniques", Prentice Hall, New Jersey,1987 2. Rao N.J., "Structuring of an Electronic Product”, CEDT Publication, Indian Institute of science, Bangalore, 1983. Page 72 of 85
  • 73.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E13 COMPUTER AIDED DESIGN OF ELECTRICAL APPARATUS 3 0 0 3 AIM To introduce the basics of Computer Aided Design technology for the design of Electrical Machines. OBJECTIVES: At the end of this course the student will be able to · Learn the importance of computer aided design method. · Understand the basic electromagnetic field equations and the problem formulation for CAD · applications. · Become familiar with Finite Element Method as applicable for Electrical Engineering. · Know the organization of a typical CAD package. · Apply Finite Element Method for the design of different Electrical apparatus. UNIT - I INTRODUCTION 8 Conventional design procedures – Limitations – Need for field analysis based design – Review of Basic principles of energy conversion – Development of Torque/Force. UNIT - II MATHEMATICAL FORMULATION OF FIELD PROBLEMS 9 Electromagnetic Field Equations – Magnetic Vector/Scalar potential – Electrical vector /Scalar potential – Stored energy in Electric and Magnetic fields – Capacitance - Inductance- Laplace and Poisson”s Equations – Energy functional. UNIT - III PHILOSOPHY OF FEM 10 Mathematical models – Differential/Integral equations – Finite Difference method – Finite element method – Energy minimization – Variational method- 2D field problems – Discretisation – Shape functions – Stiffness matrix – Solution techniques. UNIT – IV CAD PACKAGES 9 Elements of a CAD System –Pre-processing – Modelling – Meshing – Material properties- Boundary Conditions – Setting up solution – Post processing. UNIT- V DESIGN APPLICATIONS 9 Voltage Stress in Insulators – Capacitance calculation - Design of Solenoid Actuator – Inductance and force calculation – Torque calculation in Switched Reluctance Motor. Total periods: 45 TEXT BOOKS 1. S.J Salon, “Finite Element Analysis of Electrical Machines”, Kluwer Academic Publishers, London, 1995. 2. Nicola Bianchi, “Electrical Machine Analysis using Finite Elements”, CRC Taylor& Francis, 2005. REFERENCES 1. Joao Pedro, A. Bastos and Nelson Sadowski, “Electromagnetic Modeling by Finite Element Methods”, Marcell Dekker Inc., 2003. 2. P.P.Silvester and Ferrari, “Finite Elements for Electrical Engineers”, Cambridge University Press,1983. 3. D.A.Lowther and P.P Silvester, “Computer Aided Design in Magnetics”, Springer Verlag, New York, 1986 4. S.R.H.Hoole, “Computer Aided Analysis and Design of Electromagnetic Devices”, Elsevier, New York, 1989. 5. User Manuals of MAGNET, MAXWELL & ANSYS Softwares. Page 73 of 85
  • 74.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E14 HIGH VOLTAGE ENGINEERING 3 0 0 3 AIM To expose the students to various types of over voltage transients in power system and its effect on power system. - Generation of over voltages in laboratory. - Testing of power apparatus and system. OBJECTIVES · To understand the various types of over voltages in power system and protection methods. · Generation of over voltages in laboratories. · Measurement of over voltages. · Nature of Breakdown mechanism in solid, liquid and gaseous dielectrics. · Testing of power apparatus and insulation coordination. UNIT - I OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS 6 Causes of over voltages and its effects on power system – Lightning, switching surges and temporary over voltages – protection against over voltages – Bewley”s lattice diagram. UNIT - II ELECTRICAL BREAKDOWN IN GASES, SOLIDS AND LIQUIDS 10 Gaseous breakdown in uniform and non-uniform fields – Corona discharges – Vacuum breakdown – Conduction and breakdown in pure and commercial liquids – Breakdown mechanisms in solid and composite dielectrics. UNIT - III GENERATION OF HIGH VOLTAGES AND HIGH CURRENTS 10 Generation of High DC, AC, impulse voltages and currents. Tripping and control of impulse generators. UNIT - IV MEASUREMENT OF HIGH VOLTAGES AND HIGH CURRENTS 10 Measurement of High voltages and High currents – Digital techniques in high voltage measurement. UNIT- V HIGH VOLTAGE TESTING & INSULATION COORDINATION 9 High voltage testing of electrical power apparatus – Power frequency, impulse voltage and DC testing – International and Indian standards – Insulation Coordination. Total periods: 45 TEXT BOOK 1. Naidu M. S., and Kamaraju V., “High Voltage Engineering”, Tata McGraw Hill, 4th Edition, 2009. REFERENCES 1. Kuffel E., and Zaengel W. S., “High Voltage Engineering Fundamentals”, Pergamon Press, Oxford, London, 1986. 2. Kuffel E., and Abdullah M., “High Voltage Engineering”, Pergamon Press, Oxford, 1999. 3. Alston L. L., Oxford University Press, New Delhi, 1st Indian Edition, 2006. Page 74 of 85
  • 75.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E15 OPTO ELECTRONICS 3 0 0 3 AIM Expose the students to basics of optoelectronic devices and circuits. OBJECTIVES · To understand elements of solid state physics · To learn about display devices and lasers · To study different types of optical detection devices · To understand analog and digital modulation techniques and modulators · To learn about optoelctornic integrated circuits UNIT - I ELEMENTS OF LIGHT AND SOLID STATE PHYSICS 9 Wave nature of light- Polarization- Interference- Diffraction- Light Source- review of Quantum Mechanical concept- Review of Solid State Physics- Review of Semiconductor Physics and Semiconductor Junction Device. UNIT- II DISPLAY DEVICES AND LASERS 9 Introduction- Photo Luminescence- Cathode Luminescence- Electro Luminescence- Injection Luminescence- Injection Luminescence- LED- Plasma Display- Liquid Crystal Displays- Numeric Displays- Laser Emission- Absorption- Radiation- Population Inversion- Optical Feedback- Threshold condition- Laser Modes- Classes of Lasers- Mode Locking- laser applications. UNIT- III OPTICAL DETECTION DEVICES 9 Photo detector- Thermal detector- Photo Devices- Photo Conductors- Photo diodes- Detector Performance. UNIT- IV OPTOELECTRONIC MODULATOR 9 Introduction- Analog and Digital Modulation- Electro-optic modulators- Magneto Optic Devices- Acoustoptic devices- Optical- Switching and Logic Devices. UNIT- V OPTOELECTRONIC INTEGRATED CIRCUITS 9 Introduction- hybrid and Monolithic Integration- Application of Opto Electronic Integrated Circuits- Integrated transmitters and Receivers- Guided wave devices. Total periods: 45 TEXT BOOKS 1.Wilson and Haukes- “Opto Electronics – An Introduction”- Pearson/Prentice Hall of India Pvt-Ltd, New Delhi- 2007. 2. Bhattacharya “Semiconductor Opto Electronic Devices”- Pearson/Prentice Hall of India Pvt. Ltd., New Delhi, 2006. REFERENCES 1. Jasprit Singh- “Opto Electronics – As Introduction to materials and devices”-McGraw-Hill International /e- 1998. 2.Joachim Piprek, “Semiconductor Optoelectronic Devices”, Elsevier, 2003. 3.Kasap S. O., Safa Kasap, “Optoelectronics and Photonics: Principles and Practices”, PHI, 2001. Page 75 of 85
  • 76.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E16 NANO SCIENCE 3 0 0 3 AIM Expose the students to basics of nano science and technology. UNIT - I INTRODUCTION 10 Nanoscale Science and Technology - Implications for Physics, Chemistry, Biology and Engineering classifications of nano structured materials- nano particles- quantum dots, nano wires-ultra-thin films multilayered materials. Length Scales involved and effect on properties: Mechanical, Electronic, optical, Magnetic and Thermal properties. Introduction to properties and motivation for study (qualitative only). UNIT- II PREPARATION METHODS 5 Bottom-up Synthesis-Top-down Approach: Precipitation, Mechanical Milling, Colloidal routes, Self assembly, Vapour phase deposition, MOCVD, Sputtering, Evaporation, Molecular Beam Epitaxy, Atomic Layer Epitaxy, MOMBE. UNIT - III PATTERNING AND LITHOGRAPHY FOR NANOSCALE DEVICES 5 Introduction to optical/UV electron beam and X-ray Lithography systems and processes, Wet etching, dry (Plasma /reactive ion) etching, Etch resists-dip pen lithography UNIT- IV PREPARATION ENVIRONMENTS 10 Clean rooms: specifications and design, air and water purity, requirements for particular processes, Vibration free environments: Services and facilities required. Working practices, sample cleaning, Chemical purification, chemical and biological contamination, Safety issues, flammable and toxic hazards, biohazards. UNIT - V CHARACTERIZATION TECHNIQUES 10 X-ray diffraction technique, Scanning Electron Microscopy - environmental techniques, Transmission Electron Microscopy including high-resolution imaging, Surface Analysis techniques- AFM, SPM, STM, SNOM, ESCA, SIMS- Nano indentation Total periods: 45 TEXT BOOKS 1. A.S. Edelstein and R.C. Cammearata, eds., “Nanomaterials: Synthesis, Properties and Applications”, Institute of Physics Publishing, Bristol and Philadelphia, 1996. 2. N John Dinardo, Nanoscale charecterisation of surfaces & Interfaces, Second edition, Weinheim Cambridge, Wiley-VCH, 2000. REFERENCES 1. Timp G (Editor), “Nanotechnology”, AIP press/Springer, 1999. 2. Akhlesh Lakhtakia (Editor) ,“The Hand Book of Nano Technology, Nanometer Structure, Theory, Modeling and Simulations”, Prentice-Hall of India (P) Ltd, New Delhi, 2007. Page 76 of 85
  • 77.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E17 DISTRIBUTED CONTROL SYSTEM 3 0 0 3 OBJECTIVE · To understand the basic industrial communication protocols. · To know the industrial application of PLC, SCADA, and open systems. · To impart knowledge about PLC and the programming · To give adequate information in the interfaces used in DCS. UNIT- I INTRODUCTION TO AUTOMATION 9 Plant Automation and Control Systems Strategy, Evolution of instrumentation and control, Role of automation in industries, Benefits of automation, Introduction to automation tools PLC, DCS, SCADA, Hybrid DCS/PLC, Automation strategy evolution, Performance criteria and Safety Systems. UNIT - II PROGRAMMABLE LOGIC CONTROLLER (PLC) 9 Basics of PLC – Architecture of PLC – Advantages – Types of PLC-Applications of PLC”s- Specifications of advanced PLC”s. PLC Programming – Simple process control programs are using Relay Ladder Logic and Boolean logic methods – Structured text, Sequential flow chart, State diagrams. System configuration hardware, system sizing and selection, wiring diagram, PLC installation, interfacing to PC. UNIT - III INTRODUCTION TO DCS 9 DCS- Basic Packages Introduction, analog control, direct digital control, distributed process Control, DCS configuration with associated accessories, control console equipment, control UNIT (Relay Rack mounted equipments), local control UNITs and attributes of DCS & DCS Flow Sheet symbols. DCS System Integration I/O hardware stations, Set-point station control, Supervisory Computer Tasks & configurations, system integration with PLCs and computers. UNIT - IV INDUSTRIAL PROTOCOL 9 Instrumentation Standard Protocols, HART Protocol, frame structure, programming, implementation examples, Benefits, Introduction, Advantages and Limitations of Field bus, FDS configuration, Comparison with other field bus standards including Device net, Profibus, Controlnet, CAN, Industrial Ethernet, MAP and TOP. UNIT - V APPLICATIONS 9 Industrial applications of PLC, SCADA, DCS and open systems for following plants; Cement plant, Thermal power plant, Steel Plant, Glass manufacturing plant, Paper and Pulp plant. Total periods: 45 TEXT BOOKS 1. Dieter K. Hammer, Lonnie R. Welch, Dieter K. Hammer, “Engineering of Distributed Control Systems”, Nova Science Publishers, USA, 2001. 2. John Mcbrewster, Frederic P.Miller, Agnes F.Vandome, “Distributed Control System”, Alphascript publishers, Mauritius, 2010. REFERENCES: 1. Gary Dunning, “Introduction to Programmable Logic Controllers”, Thomson Business Information, New Delhi, 2nd Edition, 2009. 2. Bolton. W, “Programmable Logic Controllers”, Elsevier India Private Limited, 5th Edition, New Delhi, 2010. Page 77 of 85
  • 78.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E18 FLEXIBLE AC TRANSMISSION SYSTEMS 3 0 0 3 AIM To enhance the transmission capability of transmission system by shunt and series compensation using static controllers. OBJECTIVES · To understand the concept of flexible AC transmission and the associated problems. · To review the static devices for series and shunt control. · To study the operation of controllers for enhancing the transmission capability. UNIT-IINTRODUCTION 9 Reactive power control in electrical power transmission lines - Uncompensated transmission line – Series compensation - Basic concepts of Static VAR Compensator (SVC) - Thyristor Switched Series capacitor (TCSC) - Unified Power Flow Controller (UPFC). UNIT-II STATIC VAR COMPENSATOR (SVC) AND APPLICATIONS 9 Voltage control by SVC –Advantages of slope in dynamic characteristics – Influence of SVC on system voltage – Design of SVC voltage regulator – Applications: Enhancement of transient stability – Steady state power transfer – Enhancement of power system damping- Prevention of voltage instability. UNIT-III THYRISTOR CONTROLLED SERIES CAPACITOR (TCSC) AND APPLICATIONS 9 Operation of the TCSC - Different modes of operation - Modeling of TCSC - Variable reactance model - Modeling of stability studies - Applications: Improvement of the system stability limit - Enhancement of system damping - Voltage collapse prevention. UNIT-IV EMERGINGFACTSCONTROLLERS 9 Static Synchronous Compensator (STATCOM) – Principle of operation – V-I Characteristics –UPFC – Principle of operation – Modes of operation – Applications – Modeling of UPFC for power flow – Studies. UNIT-V CO-ORDINATION OF FACTS CONTROLLERS 9 Controller interactions – SVC – SVC interaction - Co-ordination of multiple controllers using linear control techniques – Control coordination using genetic algorithms. Total Periods: 45 TEXT BOOK 1. Mohan Mathur, R., Rajiv. K. Varma, “Thyristor – Based Facts Controllers for Electrical Transmission Systems”, IEEE press and John Wiley & Sons, Inc. REFERENCES 1. A.T.John, “Flexible AC Transmission System”, Institution of Electrical and Electronic Engineers (IEEE), 1999. 2. Narain G.Hingorani, Laszio. Gyugyl, “Understanding FACTS Concepts and Technology of Flexible AC Transmission System”, Standard Publishers, Delhi, 2001. Page 78 of 85
  • 79.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E19 AI APPLICATIONS TO POWER SYSTEMS 3 0 0 3 AIM To learn the various Artificial Intelligence Techniques and their application to Power Systems. OBJECTIVES · To study about Artificial Neural Networks, Genetic Algorithm and Fuzzy Logic System. · To apply AI techniques to Power Systems. UNIT I INTRODUCTION 9 Approaches to intelligent control – Architecture for intelligent control – Symbolic reasoning system – rule-based systems – the AI approach –Knowledge representation. Expert systems. UNIT II ARTIFICIAL NEURAL NETWORKS 9 Concept of Artificial Neural Networks and its basic mathematical model – McCulloch- Pitts neuron model – simple perceptron – Adaline and Madaline – Feed-forward Multilayer Perceptron – Learning and Training the neural network – Data Processing: Scaling – Fourier transformation – principal-component analysis and wavelet transformations – Hopfield network – Self-organizing network and Recurrent network – Neural Network based controller. UNIT III GENETIC ALGORITHM 9 Basic concept of Genetic algorithm and detailed algorithmic steps – adjustment of free parameters – Solution of typical control problems using genetic algorithm – Concept on some other search techniques like tabu search and ant-colony search techniques for solving optimization problems. UNIT IV FUZZY LOGIC SYSTEM 9 Introduction to crisp sets and fuzzy sets – basic fuzzy set operation and approximate reasoning – Introduction to fuzzy logic modeling and control – Fuzzification – inferencing and defuzzification – Fuzzy knowledge and rule bases – Fuzzy modelling and control schemes for nonlinear systems – Self-organizing fuzzy logic control – Fuzzy logic control for nonlinear time-delay system. UNIT V APPLICATIONS TO POWER SYSTEMS 9 GA application to power system optimisation problems, Neural Network Application to Load Forecasting, Contingency Analysis, Application of Fuzzy Logic Controllers to Power System Stability. TOTAL: 45 PERIODS TEXT BOOKS: 1. Jacek.M.Zurada, "Introduction to Artificial Neural Systems", Jaico Publishing House, 1999. 2. Kosko,B. "Neural Networks And Fuzzy Systems", Prentice-Hall of India Pvt. Ltd., 1994. REFERENCES: 1. Klir G.J. & Folger T.A. "Fuzzy sets, uncertainty and Information", Prentice-Hall of India pvt. Ltd., 1993. 2. Zimmerman H.J. "Fuzzy set theory-and its Applications", - Kluwer Academic Publishers, 1994. 3. Driankov, Hellendroon, "Introduction to Fuzzy Control", Narosa Publishers. Page 79 of 85
  • 80.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E20 ROBOTICS TECHNOLOGY AND FLEXIBLE AUTOMATION 3 0 0 3 AIM To provide comprehensive knowledge of robotics in the design, analysis and control point of view. OBJECTIVES · To study the various classifications of robots and fields of robotics. · To study the various drives and control systems of robots. · To study the different types of sensors and vision systems used in robotics. · To study the programming techniques used in robotics. · To study the basic building blocks of automation · To understand the importance of PLC and CNC UNIT - I CLASSIFICATION OF ROBOTIC SYSTEMS 6 Basic structure of a robot - Classification of robots: Cartesian, Cylindrical, Spherical, Articulated, SCARA. Accuracy, resolution and repeatability of robots. Robot application in manufacturing: Material transfers - Machine loading and unloading - Processing operations - Assembly and inspection. UNIT - II DRIVES AND CONTROL SYSTEMS 6 Hydraulic and Pneumatic systems: cylinders, control valves, hydro motor. Types of mechanical power drive, rotary to linear motion conversion mechanisms. Robot end effectors. Servomotors – Operation, stepper motors - control loops using current and voltage amplifier. Robot controllers - configuration of robot controller. UNIT - III SENSORS AND VISION SYSTEMS 8 Types of sensors, tactile sensors, proximity sensors and speed sensors – Encoder, resolvers. Vision systems: Image processing and analysis, Segmentation, Feature extraction, Object Recognition. UNIT - IV ROBOT PROGRAMMING 6 Lead through programming - Textual programming, programming examples - Social and Economical Aspects of Robots - Typical layouts of robots in Industries. UNIT - V AUTOMATION 6 Advantages of automation, building blocks of automation. Automatic feeding lines, material-handling devices, ASRS, transfer lines, automatic inspection, intelligent automation. Total periods: 45 TEXT BOOKS 1. Mikell P. Weiss G.M., Nagel R.N., Odraj N.G., Industrial Robotics, McGraw-Hill Singapore, 1996. 2. Ghosh, Control in Robotics and Automation: Sensor Based Integration, Allied Publishers, Chennai, 1998. REFERENCES 1. Bolton W, “Mechatronics”, Pearson Education Asia, 2002. 2. Fu K.S, Gonzalez R.C, and C S G Lee, “Robotics: Control, Sensing, Vision and Intelligence”, McGraw Hill, New Delhi, 1987. Page 80 of 85
  • 81.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E21 SPECIAL ELECTRICAL MACHINES 3 0 0 3 AIM To expose the students to the construction, principle of operation and performance of special electrical machines as an extension to the study of basic electrical machines. OBJECTIVES To impart knowledge on · Construction, principle of operation and performance of synchronous reluctance motors. · Construction, principle of operation and performance of stepping motors. · Construction, principle of operation and performance of switched reluctance motors. · Construction, principle of operation and performance of permanent magnet brushless D.C. motors. UNIT - I SYNCHRONOUS RELUCTANCE MOTORS 9 Constructional features – Types – Axial and radial air gap motors – Operating principle – Reluctance – Phasor diagram - Characteristics – Vernier motor. UNIT- II STEPPING MOTORS 9 Constructional features – Principle of operation – Variable reluctance motor – Hybrid motor – Single and multi stack configurations – Theory of torque predictions – Linear and non-linear analysis – Characteristics – Drive circuits. UNIT- III SWITCHED RELUCTANCE MOTORS 9 Constructional features – Principle of operation – Torque prediction – Power controllers – Non-linear analysis – Microprocessor based control - Characteristics – Computer control. UNIT - IV PERMANENT MAGNET BRUSHLESS D.C. MOTOR 9 Principle of operation – Types – Magnetic circuit analysis – EMF and torque equations – Power controllers – Motor characteristics and control. UNIT - V PERMANENT MAGNET SYNCHRONOUS MOTORS 9 Principle of operation – EMF and torque equations – Reactance – Phasor diagram – Power controllers - Converter - Volt-ampere requirements – Torque speed characteristics - Microprocessor based control. Total periods: 45 TEXT BOOKS 1. Miller T.J.E., “Brushless Permanent Magnet and Reluctance Motor Drives”, Clarendon Press, Oxford, 1989. 2. Aearnley, “Stepping Motors – A Guide to Motor Theory and Practice”, Peter Perengrinus, London, 1982. REFERENCES 1. Kenjo T, “Stepping Motors and Their Microprocessor Controls”, Clarendon Press London, 1984. 2. Kenjo T and Nagamori S., “Permanent Magnet and Brushless DC Motors”, Clarendon Press, London, 1988. Page 81 of 85
  • 82.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12EE2E22 NON CONVENTIONAL ENERGY SOURCES 3 0 0 3 AIM To expose the students to the various nonconventional energy sources and thier importance. OBJECTIVES · To understand the need to develop new energy technologies · To study thermal power generation. · To understand photo voltaic energy conversion. · To study the various components of wind energy conversion scheme and the principles of MHD power generation · To study miscellaneous energy sources like Geothermal energy and Bio-mass. UNIT I INTRODUCTION 9 Trends in energy consumption - World energy scenario - Energy sources and their availability - Conventional and renewable sources - Need to develop new energy technologies. UNIT II SOLAR THERMAL ELECTRIC CONVERSION 9 Principle of solar thermal power generation - Low and medium temperature systems - Stirling cycle - Solar thermal power generation - Brayton cycle - Tower concept - Cost effectiveness. UNIT III PHOTO - VOLTAIC ENERGY CONVERSION 9 Solar radiation and measurement - Solar cells and their characterisation - Influence of insulation and temperature - PV arrays - Electrical storage with batteries - Charge controllers. UNIT IV POWER CONDITIONING SCHEMES 9 DC Power conditioning converters - Maximum power point tracking algorithms - AC Power conditioners - Line commutated Thyristor Inverters - Synchronised Operation with grid supply - Stand alone inverter - Applications - Economic analysis of PV systems. UNIT V WIND ENERGY SYSTEMS 9 Basic principle of wind energy conversion - Nature of wind - Power in the wind - Components of a wind energy conversion system - Classification of WECS - Generator control - Load control. Total periods: 45 TEXT BOOK 1. Rao. S, and Paruklekar, “Energy Technology – Non Conventional, Renewable and Conventional”, Khanna Pub, New Delhi 1999. 2. Mukund R. Patel, “Wind and Solar Power Systems”, CRC Press LLC, New York, 2006. REFERENCES 1. Rai, G.D., "Non Conventional Energy Sources", Khanna Publishers, New Delhi, 1993. 2. Garg, H.P., and Prakash, J., "Solar Energy - Fundamentals and Applications", Tata McGraw Hill, New Delhi, 1997. Page 82 of 85
  • 83.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12IT2002 SOFT SKILLS 3 0 0 3 AIM The proposed elective course exposes the students to those soft skills which are crucial to an employee”s ability to work “smarter”. The Core Modules of this Elective includes Strengthening English, Art of Communication, Working in Teams, and Interview & GD handling skills amongst other related topics. OBJECTIVE At the end of this elective, student shall be able to / develop the skills necessary to: · Have competent knowledge of grammar with an understanding of its basic rules. · Speak and write appropriately applying these rules. · Communicate effectively and enhance their interpersonal relationship building skills with renewed self confidence. · Work together in teams and accomplish OBJECTIVEs in a cordial atmosphere. · Face interviews, GDs and presentations. · Understand and develop the etiquette necessary to present oneself in a professional setting. UNIT- I EFFECTIVE ENGLISH – WRITTEN AND SPOKEN ENGLISH 8 Basic rules of Grammar - Parts of Speech – Tenses – Verbs, Sentence Construction - Vocabulary – Idioms & Phrases – Synonyms – Antonyms, Dialogues and Conversations – Writing, Exercises to practice and improve these skills. UNIT - II ART OF COMMUNICATION & THE HIDDEN DATA INVOLVED 8 Verbal Communication - Effective Communication - Active listening – Paraphrasing - Feedback, Non Verbal Communication - Body Language of self and others, Importance of feelings in communication - Dealing with feelings in communication UNIT - III WORLD OF TEAMS 8 Self Enhancement - importance of developing assertive skills- developing self confidence – developing emotional intelligence, Importance of Team work – Team vs. Group - Attributes of a successful team – Barriers involved, working with Groups – Dealing with People- Group Decision Making UNIT - IV INTERVIEW, GD & PRESENTATION SKILLS 8 Interview handling Skills – Self preparation checklist – Grooming tips: do’s & don’ts – mock interview & feedback, GD skills – Understanding the OBJECTIVE and skills tested in a GD – General types of GDs – Roles in a GD – Do’s & Don’ts – Mock GD & Feedback, Presentation Skills – Stages involved in an effective presentation – selection of topic, content, aids – Engaging the audience – Time management – Mock Presentations & Feedback UNIT - V BUSINESS ETIQUETTE & ETHICS 8 Grooming etiquette – Telephone & E-mail etiquette – Dining etiquette – Do”s & Don”ts in a formal setting – how to impress, Ethics – Importance of Ethics and Values – Choices and Dilemmas faced – Discussions from news headlines. Total periods: 45 REFERENCES 1. The Seven Habits of Highly Effective People -Stephen R. Covey. 2. All the books in the “Chicken Soup for the Soul” series. 3. Man’s search for meaning – Viktor Frankl 4. The greatest miracle in the world – Og Mandino 5. Goal - Eliyahu Goldratt. 6. Working with Emotional Intelligence - David Goleman. 7. Excel in English – Sundra Samuel, Samuel Publications 8. Developing Communication Skills by Krishna Mohan and Meera Banerji; MacMillan India Ltd., Delhi Page 83 of 85
  • 84.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 9. Essentials of Effective Communication, Ludlow and Panthon; Prentice Hall of India. 10. Effective Presentation Skills (A Fifty-Minute Series Book) by Steve Mandel 11. “Strategic interviewing” by Richaurd Camp, Mary E. Vielhaber and Jack L. Simonetti – Published by Wiley India Pvt. Ltd 12. “Effective Group Discussion: Theory and Practice” by Gloria J. Galanes, Katherine Adams , John K. Brilhart Page 84 of 85
  • 85.
    For the studentsadmitted from the Academic year 2012-2013(R 2012) 12IT2004 BUSINESS INTELLIGENCE AND ITS APPLICATION 3 0 0 3 AIM The proposed elective course exposes students to business intelligence domain. It provides knowledge on basics of data integration, multi-dimensional data modeling and enterprise reporting. OBJECTIVE At the end of this elective, student will be able to: · Differentiate between Transaction Processing and Analytical applications and describe the need for Business Intelligence · Demonstrate understanding of technology and processes associated with Business Intelligence framework · Demonstrate understanding of Data Warehouse implementation methodology and project life cycle · Given a business scenario, identify the metrics, indicators and make recommendations to achieve the business goal · Design an enterprise dashboard that depicts the key performance indicators which helps in decision making · Demonstrate application of concepts in Microsoft BI suite UNIT - I INTRODUCTION TO BUSINESS INTELLIGENCE 4 Introduction to OLTP and OLAP, BI Definitions & Concepts, Business Applications of BI, BI Framework, Role of Data Warehousing in BI, BI Infrastructure Components – BI Process, BI Technology, BI Roles & Responsibilities UNIT- II BASICS OF DATA INTEGRATION 12 Concepts of data integration need and advantages of using data integration, introduction to common data integration approaches, introduction to ETL using SSIS, Introduction to data quality, data profiling concepts and applications UNIT - III INTRODUCTION TO MULTI-DIMENSIONAL DATA MODELING 6 Introduction to data and dimension modeling, multidimensional data model, ER Modeling vs. multi dimensional modeling, concepts of dimensions, facts, cubes, attribute, hierarchies, star and snowflake schema, introduction to business metrics and KPIs, creating cubes using SSAS UNIT- IV BASICS OF ENTERPRISE REPORTING 12 Introduction to enterprise reporting, concepts of dashboards, balanced scorecards, introduction to SSRS Architecture, enterprise reporting using SSRS UNIT -V TUTORIALS 6 The assignments for Electives could include the following. Seminars from the topics related to Business Intelligence space Relevant lab exercises to get exposure to BI concepts & tool Total periods: 45 REFERENCES 1. Business Intelligence by David Loshin 2. Business intelligence for the enterprise by Mike Biere 3. Business intelligence roadmap by Larissa Terpeluk Moss, Shaku Atre 4. Successful Business Intelligence: Secrets to making Killer BI Applications by Cindi Howson 5. Delivering business intelligence with Microsoft SQL server 2008 by Brain, Larson 6. Foundations of SQL Server 2005 Business Intelligence by Lynn Langit 7. Information dashboard design by Stephen Few Page 85 of 85