PROJECT EXPERIENCE
SUMMA HEALTH SYSTEM
West Parking Deck
PROJECT DESCRIPTION
Summa Health System contracted The Ruhlin Company to construct
their West Parking Deck. This parking structure serves as parking for
the Summa Akron City Hospital buildings. The construction method was
a cast-in-place post tensioned concrete. The structure consists of seven
levels and holds 920 cars.
PROJECT DETAILS
•	 LED lighting to conserve energy
•	 Auto Attendant
•	 Pedestrian bridge from second floor into hospital
CONSTRUCTION METHOD
General Contractor
PROJECT COST
$12.8 Million
SCHEDULE
August 2008 - December 2009
OWNER
Summa Health System
Ed Friedl
525 East Market Street
Akron, Ohio 44304
330-375-3000
ARCHITECT
Desman Associates
Jonathan Nuscher
20 North Clark Street, Suite 400
Chicago, Illinois 60602
312-263-8400

More Related Content

Similar to Summa_Parking_Deck

SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGWilliam Wieners
 
Why Go Solar? Why Third Sun Solar?
Why Go Solar? Why Third Sun Solar?Why Go Solar? Why Third Sun Solar?
Why Go Solar? Why Third Sun Solar?gkellythirdsun
 
2015-01-13-Resume (1) (1)
2015-01-13-Resume (1) (1)2015-01-13-Resume (1) (1)
2015-01-13-Resume (1) (1)Craig A Vannice
 
Airodek notable projects
Airodek   notable projectsAirodek   notable projects
Airodek notable projectsjd_stu
 
Kbe parking structures
Kbe parking structuresKbe parking structures
Kbe parking structurescharkins
 
Parking Today article: Louisville Arena
Parking Today article: Louisville ArenaParking Today article: Louisville Arena
Parking Today article: Louisville ArenaAMSYSCO Inc.
 
Green Fuel Digital Resume
Green Fuel Digital Resume Green Fuel Digital Resume
Green Fuel Digital Resume greenfuel
 
Amer Jundi Resume ABCD Makah Mega Projects Division Update Feb. 2016
Amer Jundi Resume  ABCD Makah Mega Projects Division Update Feb. 2016Amer Jundi Resume  ABCD Makah Mega Projects Division Update Feb. 2016
Amer Jundi Resume ABCD Makah Mega Projects Division Update Feb. 2016Amer Jundi
 
Updated resume.pdf
Updated resume.pdfUpdated resume.pdf
Updated resume.pdfAfzal Ahamed
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)MaxAlagoa
 
Virat Vanijya_ Vishwakarma Industrial Park_r.pptx
Virat Vanijya_  Vishwakarma Industrial Park_r.pptxVirat Vanijya_  Vishwakarma Industrial Park_r.pptx
Virat Vanijya_ Vishwakarma Industrial Park_r.pptxSomSaha1
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Boytoy Domer
 

Similar to Summa_Parking_Deck (20)

SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERING
 
Why Go Solar? Why Third Sun Solar?
Why Go Solar? Why Third Sun Solar?Why Go Solar? Why Third Sun Solar?
Why Go Solar? Why Third Sun Solar?
 
Ozone boulevard
Ozone boulevardOzone boulevard
Ozone boulevard
 
2015-01-13-Resume (1) (1)
2015-01-13-Resume (1) (1)2015-01-13-Resume (1) (1)
2015-01-13-Resume (1) (1)
 
Airodek notable projects
Airodek   notable projectsAirodek   notable projects
Airodek notable projects
 
Kbe parking structures
Kbe parking structuresKbe parking structures
Kbe parking structures
 
Inman Solar - snap shot
Inman Solar - snap shotInman Solar - snap shot
Inman Solar - snap shot
 
Mostafa CV
Mostafa CVMostafa CV
Mostafa CV
 
Parking Today article: Louisville Arena
Parking Today article: Louisville ArenaParking Today article: Louisville Arena
Parking Today article: Louisville Arena
 
Update profile 2015
Update profile 2015Update profile 2015
Update profile 2015
 
Green Fuel Digital Resume
Green Fuel Digital Resume Green Fuel Digital Resume
Green Fuel Digital Resume
 
Abdelmagid Abdel Aziz
Abdelmagid Abdel AzizAbdelmagid Abdel Aziz
Abdelmagid Abdel Aziz
 
Amer Jundi Resume ABCD Makah Mega Projects Division Update Feb. 2016
Amer Jundi Resume  ABCD Makah Mega Projects Division Update Feb. 2016Amer Jundi Resume  ABCD Makah Mega Projects Division Update Feb. 2016
Amer Jundi Resume ABCD Makah Mega Projects Division Update Feb. 2016
 
Updated resume.pdf
Updated resume.pdfUpdated resume.pdf
Updated resume.pdf
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
 
Iiepl profile
Iiepl profileIiepl profile
Iiepl profile
 
Inman Solar - snap shot
Inman Solar - snap shotInman Solar - snap shot
Inman Solar - snap shot
 
Virat Vanijya_ Vishwakarma Industrial Park_r.pptx
Virat Vanijya_  Vishwakarma Industrial Park_r.pptxVirat Vanijya_  Vishwakarma Industrial Park_r.pptx
Virat Vanijya_ Vishwakarma Industrial Park_r.pptx
 
Sankar CV
Sankar CVSankar CV
Sankar CV
 
Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1Domer L. Javier resume_rev.1
Domer L. Javier resume_rev.1
 

Summa_Parking_Deck

  • 1. PROJECT EXPERIENCE SUMMA HEALTH SYSTEM West Parking Deck PROJECT DESCRIPTION Summa Health System contracted The Ruhlin Company to construct their West Parking Deck. This parking structure serves as parking for the Summa Akron City Hospital buildings. The construction method was a cast-in-place post tensioned concrete. The structure consists of seven levels and holds 920 cars. PROJECT DETAILS • LED lighting to conserve energy • Auto Attendant • Pedestrian bridge from second floor into hospital CONSTRUCTION METHOD General Contractor PROJECT COST $12.8 Million SCHEDULE August 2008 - December 2009 OWNER Summa Health System Ed Friedl 525 East Market Street Akron, Ohio 44304 330-375-3000 ARCHITECT Desman Associates Jonathan Nuscher 20 North Clark Street, Suite 400 Chicago, Illinois 60602 312-263-8400