Energy Management - Biomass Based CogenerationIshan Parekh
This document provides an overview of 3 biomass-based cogeneration case studies in India:
1. Arvind Mills Cogeneration Plant - A 27MW plant in Gujarat that meets the company's power, heating and cooling needs through a biomass-fueled CHP system. It has a payback period of 4 years.
2. DSL, Himachal Pradesh - A 5MW biomass CHP plant that provides reliable steam and power for a textile manufacturing plant. It uses biomass from local sources.
3. Jemara, Odisha - A 20kg/hr biomass gasifier system that provides electricity to 115 households in a remote
Energy Management - Biomass Based CogenerationIshan Parekh
This document provides an overview of 3 biomass-based cogeneration case studies in India:
1. Arvind Mills Cogeneration Plant - A 27MW plant in Gujarat that meets the company's power, heating and cooling needs through a biomass-fueled CHP system. It has a payback period of 4 years.
2. DSL, Himachal Pradesh - A 5MW biomass CHP plant that provides reliable steam and power for a textile manufacturing plant. It uses biomass from local sources.
3. Jemara, Odisha - A 20kg/hr biomass gasifier system that provides electricity to 115 households in a remote
SOCIAL CROWDFUNDING: a case study of EGAT invention making a positive impact...Par Sut
SOCIAL CROWDFUNDING:
a case study of EGAT invention making a positive impact on public health
in 7th ILSAS INTERNATIONAL CONFERENCE ON LEARNING & DEVELOPMENT 2023 ICLAD2023
by
Parichart Suttiprasit,
Chief of Sustainability Project Department,
Sustainability Strategy Division, Electricity Generating Authority of Thailand (EGAT),
Watcharaporn Watcharasareekul,
Head of Investment Analysis and Development Section 1,
Investment Analysis and Development Department, Business Development Division, EGAT
Ada Chirapaisarnkul, Chief Executive Office, Taejai.com
Regarding to Smart City Announcement on August 13, 2021 , Mae Moh is one of 5 city in Thailand to be developed as Thailand Smart City.
The overview of the city, our goal and Timeline. 1 Definition 7 Smarts Criteria which is announced from Thailand Smart City committee. This separate cities to 2 groups of city, Livable City and New City depend on either Brown field or Green field project and MaeMoh defined in Livable City
These 7 Smarts as shown is of Smart triple EEE Environment, Economy, Energy which EGAT has initially begun with. The other Smarts are Smart Mobility, People, Government, Living once we execute and accomplish our milestones we will continue the entire 7-smarts
The details of Lampang Hotspot application which is the integration Scope of work with ,local government and Lampang Provincial Government.
How Economic Value Management can be Applied to Power Plant ManagementPar Sut
15-19 October 2012 at Bali Nusa Dua Convention Center (BNDCC)
Nusa Dua - Bali, Indonesia19th Conference of the Electric Power Supply Industry (CEPSI 2012)
co-author: W,Tirakhan
The document discusses optimization of steam turbine and auxiliary systems outages through condition monitoring and risk assessment. Performance monitoring showed heat rate increasing over time, costing $2.45 million by 2010. Economic analysis using a replacement energy concept showed $3.44 million lost during an 8-day outage. Condition monitoring tools like vibration, oil analysis, and infrared helped assess equipment health. Risk assessment identified failure modes and effects. Optimization of auxiliaries like pumps could save $0.08 million per outage through condition-based maintenance. The overall goals are reducing outage time through advanced monitoring programs to save $1 million per outage.
SOCIAL CROWDFUNDING: a case study of EGAT invention making a positive impact...Par Sut
SOCIAL CROWDFUNDING:
a case study of EGAT invention making a positive impact on public health
in 7th ILSAS INTERNATIONAL CONFERENCE ON LEARNING & DEVELOPMENT 2023 ICLAD2023
by
Parichart Suttiprasit,
Chief of Sustainability Project Department,
Sustainability Strategy Division, Electricity Generating Authority of Thailand (EGAT),
Watcharaporn Watcharasareekul,
Head of Investment Analysis and Development Section 1,
Investment Analysis and Development Department, Business Development Division, EGAT
Ada Chirapaisarnkul, Chief Executive Office, Taejai.com
Regarding to Smart City Announcement on August 13, 2021 , Mae Moh is one of 5 city in Thailand to be developed as Thailand Smart City.
The overview of the city, our goal and Timeline. 1 Definition 7 Smarts Criteria which is announced from Thailand Smart City committee. This separate cities to 2 groups of city, Livable City and New City depend on either Brown field or Green field project and MaeMoh defined in Livable City
These 7 Smarts as shown is of Smart triple EEE Environment, Economy, Energy which EGAT has initially begun with. The other Smarts are Smart Mobility, People, Government, Living once we execute and accomplish our milestones we will continue the entire 7-smarts
The details of Lampang Hotspot application which is the integration Scope of work with ,local government and Lampang Provincial Government.
How Economic Value Management can be Applied to Power Plant ManagementPar Sut
15-19 October 2012 at Bali Nusa Dua Convention Center (BNDCC)
Nusa Dua - Bali, Indonesia19th Conference of the Electric Power Supply Industry (CEPSI 2012)
co-author: W,Tirakhan
The document discusses optimization of steam turbine and auxiliary systems outages through condition monitoring and risk assessment. Performance monitoring showed heat rate increasing over time, costing $2.45 million by 2010. Economic analysis using a replacement energy concept showed $3.44 million lost during an 8-day outage. Condition monitoring tools like vibration, oil analysis, and infrared helped assess equipment health. Risk assessment identified failure modes and effects. Optimization of auxiliaries like pumps could save $0.08 million per outage through condition-based maintenance. The overall goals are reducing outage time through advanced monitoring programs to save $1 million per outage.
2. Mechanical Engineer
Optimize the maintenance work scope to accomplish in asset management.
Execute any technical problems in power plants ofThailand with team of
engineers.
Planning Engineer
Prepare business plan and the organization appraisal support in generation
business unit
Accomplish the economic engineering project for Ratchaburi and MaeMoh power
plant
Education:
2004 - 2006 Master Degree in Business Administration (MBA): Financial
Management Concentration
Johnson &Wales University, Providence, RI, United States of America
1995 – 1999 Bachelor of Engineering: Mechanical Engineering Chulalongkorn
University, Bangkok,Thailand
3. AdditionalTraining
2007 Condition based maintenance, Indian Institute for Production Management
(IIPM)
Orissa, India
2009 ASEAN Residential School in Electric Power Engineering focused on Climate
Change and Power PlantTechnology
Bandung, Indonesia
Presenting/Speaking
2008 Performed as a presenter in
17th Conference of the Electric Power
Supply Industry (CEPSI 2008)
in the title of Outage Optimization
of SteamTurbine and Auxiliaries,
October 27th
-31st
, 2008
TheVenetian Macao-Resort-Hotel,
Macao
13. จากที่นายกฯ อภิสิทธิ์ ได้กล่าวสุนทรพจน์ในเวที
โลกที่โคเปนเฮเกนเรื่องการลดโลกร้อน และ
เรื่องพลังงานหมุนเวียน
“…in the National Economic and Social
Development Plans, for the periods
2007-2011 and 2012-2016 respectively.
These plans aim to move our economy
towards a new growth model -- a low
carbon economy…”
“… the "15-year National Alternative
Energy Development Plan (2008-2022),"
which aims to increase the share ofSource: www.eppo.go.th/admin/cab/sp-2009-