Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 1
FIELD WISE PROJECT
Wireless Communication(RF, RFID,
Mobile, Zigbee, GPS,GSM)
Security Systems
Embedded and Microcontroller Industrial & Field Application
Serial Communication & Control(PC
Based )
Without Microcontroller
Communication Principle Biomedical
Mobile Communication Mat lab
Control System Mechanical
• Automobile
• Mechtronics & Automation
• Thermal Refrigeration
• Production
Power System & Protection Robotics
Power Electronics Software
• C/C++
• .Net/Java,
• Android)
Instrumentation
Civil
We offer Projects for Following Branches: Technology:
1. Electronics & Telecommunication 1. GPS
2. Electronics & Instrumentation 2. GSM
3. Electrical & Electronics 3. ZIGBEE
4. Applied Electronics & Instrumentation 4. RF & RFID
5. Electrical 5. Robotics
6. Biomedical 6. Embedded Systems
7. Automobile 7. C/C++
8. Mechanical 8. ASP .NET/C# .NET
9. Civil Engineering 9. JAVA
10. Marine Engineering 10. Automobile
11. Computer Science 11. Mechatronics
12. Information Technology 12. Image Processing
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)2
SL.No WIRELESS COMMUNICATION ( RF, RFID, GSM, GPS , MOBILE, PHONE
& GIZBEE BASED)
MP01 GPS and GSM based college bus position informer for students
MP02 Locker Security System with SMS Informer
MP03 Advanced Automatic Vehicle Crash Notification using GSM Technology
MP04 Bank Security System with Auto Dialer and Camera Recording System
MP05 Wireless Water Level Controller
MP06 GSM Based Home Security System to Get Intrusion Alerts like Door/
Windows Open Alerts onto Your Cell Phone
MP07 RF based automatic menu selection and ordering systems
MP08 Passenger Information System using GPS
MP09 GSM based traffic density controlling system
MP10 Wireless weather monitoring systems
MP11 Wireless Appliances control using DTMF Principle
MP12 GSM Based Automatic Irrigation Water Controller System
MP13 Mobile/Telephone controlled Access control
MP14 GSM Mobile Phone based Automobile Security System
MP15 GSM Based multi-machine industrial controlling system
MP16 RFID Based Car/Home/Bank security System
MP17 RFID Based Petrol pump Automation system
MP18 RFID Based Toll collection & Recharge System
MP19 Wireless Patient monitoring systems with wireless data communication
MP20 GPS and GSM based bus status and position information for blind people
MP21 GSM Based remote measurement of electricity and control system for home
MP22 SMS based Electricity Billing system
MP23 GPS and GSM based school kids van tracking
MP24 SMS controlled pick and place Robot with video camera
MP25 SMS Based Banking Security System
MP26 Wireless Automatic Antenna Positioning System
MP27 Wireless multi speed & bidirectional stepper/DC/AC Motor
MP28 GPS based location indicating system for unmanned automobile
MP29 Auditorium Monitor and Control Using GSM Technology
MP30 GSM based home automation with security system
MP31 GPS based bus or train collision avoiding system
MP32 SMS Based automatic power theft identification
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 3
MP33 GSM Based Speed Control of Induction Motor
MP34 Wireless data communication between PC’s
MP35 Real Time Security Guard Robot Using GSM/CDMA Networking
MP36 SMS Enabled Autonomous Robotics for Military Applications
MP37 GSM based school van speed monitoring and control system
MP38 Mobile phone tracking system by using GPM and GSM
MP39 Automatic root announcement system for blind people
MP40 Auto-Dialer Home Security System
MP41 GSM and GPS Interface For Human Tracking System
MP42 Wireless highway speed monitoring & over speed detector
MP43 Voice based wireless patient monitoring system with data communication
MP44 GSM based ambulance intimation system
MP45 Automatic station announcement and display system for trains/buses
MP46 GSM based AC or DC motor speed monitoring and controlling system
MP47 GSM Based Highway Road Traffic Monitoring System
MP48 Automatic Transformer Fault Message Indicator Based on GSM SMS and
ZIGBEE
MP49 Prepaid Energy meter with telephone based re-charge
MP50 Zigbee based wireless temperature display & control System
SL No. EMBEDDED SYSTEM & MICROCONTROLLER
MC001 An intelligent secure and privacy-preserving parking scheme through
vehicular communications
MC002 Access control System
MC003 Intelligent Power Sharing of Transformers with Auto Protection
MC004 Microcontroller based Moving Person Detecting System
MC005 A service of home security system on intelligent network
MC006 Automatic Vehicle over Speed Indication and Controlling System
MC007 Real Time Passenger information System (RTPIS) using ZIGBEE Technology
MC008 I2C Based Energy Billing System
MC009 Speed Control of DC Motor using FQ / TQ Chopper Drive
MC010 Microcontroller based web camera positioning system
MC011 Digital locking system (Password) for two wheeler
MC012 Voice operated home appliances controlling system
MC013 Microcontroller based controlling of transformer from substation
MC014 Prototype of RF based station intimation coach status information and
control system
MC015 PIR based human focus light movement
MC016 Microcontroller Based Railway track crack detection system
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)4
MC017 Microcontroller Based Railway Accident Avoiding system
MC018 Microcontroller Based automatic railway gate control
MC019 Microcontroller Based Voice controlled D.C/A.C Motor
MC020 Automatic Gas leakage detection and auto dialing
MC021 Inverter based Low - High Input Voltage Buck Booster Converter System
MC022 Wheel chair operated by voice and hand
MC023 Highway Car Accident Identification and Auto Communication to Patrol or
Hospital
MC024 Finger print based door open close system
MC025 Coin Based Mobile Phone Charger
MC026 Bus Identification System for Visually Impaired People
MC027 Finger print based banking system
MC028 Microcontroller based automatic visitor guided vehicle
MC029 Automatic Traffic and Street Light Controlling System
MC030 Remote control using mobile through spoken commands
MC031 Automatic power factor controlling system
MC032 Automatic Electronic Bus Fare System
MC033 Automatic pollution detection and monitoring system using carbon sensors
MC034 Temperature and Respiration Monitoring System
MC035 Automatic Water Level Indicator and Controlling System
MC036 Remote distribution transformer monitoring and controlling system using RF
MC037 Automatic drunken drive avoiding system for automobile
MC038 Involuntary toll gate system for vehicle traffic management
MC039 MOSFET based Current Mode Control Buck / Boost Converter
MC040 Touch Screen based Appliances Control system
MC041 Touch Screen based Vehicle Driving System
MC042 Touch Screen based security system
MC043 Touch Screen based Restaurant Menu selection system
MC044 Touch Screen based Robot
MC045 Front vehicle monitoring system with accident preventer
MC046 Automatic multiple transformer fault detection and production system
MC047 Ultrasonic based Vehicle Parking Guidance System
MC048 Microcontroller Based Building Security System
MC049 Automatic Traffic Controller for Ambulance and VIP Vehicles
MC050 Energy Billing Through Power Line Carrier Communication
MC051 Automatic Moisture and Light control System for Garden
MC052 Electronic voting machine
MC053 Automatic Train Station Announcement with Bomb Detection System
MC054 Driver Fatigue Accident Prevention using Eye Blink Sensor
MC055 Multipurpose measuring system with inbuilt data acquisition
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 5
MC056 Touch Screen based home/industrial automation and controlling system
MC057 Remote controlled AC/DC Motor Controlling System
MC058 Microcontroller based Automatic Power theft identifier
MC059 Microcontroller Based Fire Fighting Robot
MC060 Microcontroller Based Prepaid card for petrol bump
MC061 Real Time Temperature Monitoring Using Multiple Sensor
MC062 Microcontroller based wireless energy meter
MC063 Visitors Counter with Automatic Light ON/OFF system
MC064 Finger Print based medical announcement system
MC065 Prepaid card for Electronic Bus fair system
MC066 Involuntary station name display with voice attentive system for train
MC067 MC based clock design
MC068 Automatic college/school bell automation system
MC069 Mobile/Telephone based access control with security system
MC070 Load sharing of a Transformer
SLNO. SERIAL COMMUNICATION & CONTROL(PC BASED)
PC001 Communication between PC’s using IR, Laser Beam
PC002 PC based Electrical appliances control System
PC003 PC based no load transformer testing system
PC004 PC based wireless code locking system for machines
PC005 PC Based Motor Speed Monitoring System
PC006 RS 232 communication based touch screen monitoring
PC007 PC based On-Load monitoring of distribution transformer tap changer using
RF communication
PC008 RS 232 communication Based automatic moisture & light control system
PC009 PC Based industrial temperature controller
PC010 PC based sun seeker
PC011 PC based wireless multi-machine control system
PC012 PC based pressure management and controlling system
PC013 PC based different industrial parameter measuring using ADC control
PC014 RS 232 communication Based voltage monitoring system
PC015 Wireless Controller cum Internet Controller for Home Appliances
PC016 PC based stepper motor speed controlling system
PC017 PC based room cooling system
PC018 Remote home control through internet
PC019 RS232 communication Based Digital to Analog converter
PC020 PC Based Multi-Motor control System
PC021 RS232 communication Based Analog to Digital converter
PC022 PC based door opening and closing system
PC023 PC Based DC Motor Speed Control system
PC024 Interface your PC with light and fans
PC025 PC based Material handling Equipment
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)6
PC026 PC based Solar Car
PC027 Most Advanced Land Rover with Wireless Remote Control Using PC with
Camera and Solar Cell Power
PC028 PC based Wireless Robot
PC029 PC based multiple transformer or motor fault detection and monitoring
system
PC030 PC Controlled Alive Human Being Detector in War Fields / Affected Areas
Using WAP with Model & Camera PIR Sensor for Rescue Operations with
2 Way Communications
PC031 RS 232 communication Based length measurement system
PC032 Multi-Device control system using PC
PC033 PC based solar panel sun tracking and controlling system
PC034 Programmable PC speed control of A.C (or) D.C Motor
PC035 PC based visitor counter
PC036 PC based wireless Material handling Vehicle
PC037 PC based Home Automation
PC038 PC based A.C motor speed, voltage and current monitoring and controlling system
PC039 PC based wireless pick and place crane
PC040 PC based multilevel car parking
PC041 PC based patent heart beat and temperature monitoring system
PC042 PC based Auto Dialing Home Security System
PC043 PC based wireless pick and place Robot
PC044 PC Based Moving Message Display
PC045 PC based double axis pick and place Robot
PC046 PC based Temperature, Voltage and Speed (T-V-S) monitoring System
SL NO COMMUNICATION PRINCIPLE
CP01 Voice Communication based wireless robot
CP02 Voice communication based appliances control system
CP03 Automatic tracking Antenna
CP04 TV Remote based appliances control
CP05 Telephone based Appliances control system
CP06 PC interface Automatic tracking Antenna
CP07 TV Remote based stepper motor controller
CP08 TV Remote based DC motor speed control system
CP09 Railway Traffic positioning system
CP10 PC based path finder robot
CP12 Wireless data communication between 2 Microcontroller
CP13 Data communication between Microcontroller and PC
CP14 IR based PMDC Motor controller
CP15 Data transfer using Zig-bee
CP16 RF based AC motor speed control system
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 7
SLNO. MOBILE COMMUNICATION
MOB01 Mobile based Appliances control
MOB02 Mobile based Access Control
MOB03 Prepaid Energy meter with mobile based Recharge
MOB04 Mobile based speed control of a DC motor.
MOB05 Mobile based security systems
MOB06 Mobile based wireless robot
MOB07 Mobile based Transformer protection systems
MOB08 Mobile based Electronic Notice board
MOB09 Mobile based live human tracking using GPS & GSM
MOB10 Mobile based weather alert system using GSM
MOB11 Mobile based transformer protection systems
MOB12 Mobile and GSM based railway track crack detection system
MOB13 Mobile and GSM based railway level crossing gate control system
MOB14 Mobile and GSM based heart beat monitoring system
MOB15 Mobile and GSM based Industrial security system
SL NO CONTROL SYSTEM
CONS01 PC based speed control of a DC/AC/Stepper motor
CONS02 PC based Appliances Control system
CONS03 PC based wireless Robot
CONS04 Water level monitoring and control system
CONS05 IR based DC/AC/Stepper Motor control system
CONS06 Intelligent way finder vehicle
CONS07 Touch screen based DC/AC/Stepper Motor control system
CONS08 IR based Appliances control system
CONS09 Zig-bee based Appliances control system
CONS10 Zig-bee based wireless temperature Monitoring and control system
CONS11 Telephone controlled Robot
CONS12 Telephone based Appliances control system
CONS13 Voice activated DC/AC/Stepper motor control system
CONS14 Voice activated Appliances control system
CONS15 Human detection based Escalator
SL NO POWER SYSTEM & PROTECTION
PSP01 Universal Transformer protection System
PSP02 Wireless motor monitoring and protection system
PSP03 Prepaid Energy meter and tampering protection system
PSP04 Combine protection systems of electrical machine
PSP05 Wireless substation control and protection system
PSP06 MC based single phase cyclo-converter
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)8
PSP07 Speed control of a AC/DC motor using Thyrister
PSP08 Mobile based Boiler protection System
PSP09 Mobile based appliances control and protection system
PSP10 PC based over voltage and under voltage relay
PSP11 PC based embedded protection system
PSP12 Automatic load shading system
PSP13 PC based universal motor monitoring and protection system
PSP14 Mobile based Industrial protection system
PSP15 Power analyzer
PSP16 Zig-bee based Energy meter monitoring
SL NO POWER ELECTRONICS
PE01 Speed control of a AC motor using Thyrister with LCD display
PE02 Voltage control using Thyrister
PE03 Automatic Robot Over speed controlling system for People Zone
PE04 Traffic and Street Light Controller
PE05 Multi-Device Control System Using Frequency Modulation
PE06 Sensor Based Multi-Channel Fire Alarm System
PE07 Remote Controlled solar Car
PE08 Sensor Operated Automatic Reverse Braking System
PE09 Automatic Water Tap Controlling System
PE10 SMS Based Electric Billing System
PE11 Remote controlled Antenna/Dish tracking System
PE12 Sensor Operated Conveyor Automation
PE13 Automatic railway track crack detecting Vehicle
PE14 Multi-Motor Control Using Password
PE15 MOSFET based chopper drive for universal motor
SL NO INSTRUMENTATION
IM01 MC based Data Acquisition system using Zig-bee
IM02 RFID based wireless health care systems
IM03 MC based wireless temperature control for Data Acquisition system using
Zig-bee
IM04 Ultrasonic based distance measurement and LCD display
IM05 RFID based Car parking system
IM06 Automatic head light control in a mines area
IM07 Solar tracking system
IM08 Touch screen based advance menu display and ordering system
IM09 Accelerometer based wireless robot
IM10 Ultrasonic based water level monitoring system
IM11 Zig-bee based parameter monitoring and control system
IM12 Electronic Voting Machine (EVM)
IM13 Automatic solar street lighting system
IM14 Cost effective appliances control and visitor counter
IM15 MC based Environmental control with SMS Notification
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 9
SL NO SECURITY SYSTEMS
SS01 MC based Industrial security system
SS02 RFID/PIR based Home security system
SS03 Voice activated access control
SS04 Four Zone IR based security system with LCD Display
SS05 Mobile phone based Home/Industry Security system
SS06 Finger print based access control and security system
SS07 SMS based LPG/Fire/CO2 detection and alert system
SS08 GPS and GSM based Human/Baby tracking system
SS09 RF based Human/Baby tracking system
SS10 Mobile phone based disaster monitoring system
SS11 Modern security system with visitor counter
SS12 MC based locker safety system using keypad
SS13 Medical help calling device using Mobile phone
SS14 Anti electric shock device using Mobile phone
SS15 Speed control of a vehicle in a school Area/People Zone
SL NO INDUSTRIAL & FIELD APPLICATION
IFA01 Railway track crack detection system using RF
IFA02 MC based car parking system
IFA03 Land mine detection vehicle
IFA04 Prepaid Energy meter with sms alert
IFA05 Solar Tracking System
IFA06 Automatic Path finder vehicle
IFA07 Anti electric shock device
IFA08 Mobile based substation management system
IFA09 MC Based Traffic light controller
IFA10 Automatic railway level crossing controller
IFA11 Remotely Appliances controller
IFA12 Power management system with visitor counter
IFA13 Mobile based temperature and humidity controller
IFA14 Touch screen based Industry Automation system
IFA15 Zig-bee based wireless data acquisition system
SL NO WITH OUT MICROCONTROLLER
WM01 Railway track crack detection system using RF
WM02 Automatic railway accident avoiding system
WM03 RF based appliance control system
WM04 Human/baby tracking system using RF
WM05 Land mine detection robot
WM06 RF based wireless robot
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)10
WM07 Anti-electric shock device using RF
WM08 Medical help calling device
WM09 Fire extinguisher robot
WM10 IR based security system
WM11 Water level control system
WM12 Solar based wireless robot
WM13 Intelligent way finder vehicle
WM14 Wireless speed control of a DC Motor
WM15 Maglev train
SLNO. BIO-MEDICAL PROJECTS
BIO01 Smart Card based Bio Medical Health Card Systems
BIO02 Wireless nurse calling systems for Advance patient Care.
BIO03 Human Detection by GPS & GSM
BIO04 RFID based Medical information system
BIO05 Wireless Hospital management system
BIO06 Health rate and temperature monitoring system
BIO07 Hospital Emergency caring systems
BIO08 Infant monitoring systems using CO2 sensor
BIO09 Robotic Wheelchair for disabled person
BIO10 Hospital Emergency caring systems
SL NO MAT-LAB PROJECT
MAT01 Noise cancellation using adaptive filter in MATLAB(Software based)
MAT02 ECG simulation using MATLAB.(Software based)
MAT03 MATLAB based Optical Character Reader(OCR).(Software based)
MAT04 SUBSPACE based channel estimation for MIMO OFDM using
MATLAB.(Software based)
MAT05 Solving TSP using PSO in MATLAB.(Software based)
MAT06 SMART ANTENNA systems for mobile communication.(Software based)
MAT07 MATLAB based GSM mobile.(Hardware and Software based)
MAT08 MATLAB based RFID toll gate money collection.(Hardware and Software
based)
MAT09 MATLAB Image Processing based SURFACE COMPUTING (Hardware and
Software based)
MAT10 MATLAB Image Processing based touch screen(Covert your college wall
into a large touch screen (Hardware and Software based)
MAT11 Edge Detection, Color Find, Maximum Color in Image User Interface
MAT12 Image watermark embedding system
MAT13 Motion Detection in a video
MAT14 ECC Image Alignment Algorithm
MAT15 Active noise control system using Fx-LMS algorithm
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 11
MAT16 Canny Edge Detector
MAT17 Image Compression using Wavelet
MAT18 CAMB Interface for Mat-lab
MAT19 Calculating distances between points on the image
MAT20 Speak the re-cognitized character
MAT21 Phase Based Template Matching
MAT22 Wi-MAX 802.16e Physical Layer
MAT23 Car Number plate detection
MAT24 JPEG Compression
MAT25 Total Variation Grayscale and Color Image De-noising
MAT26 DTMF decoder
MAT27 Finger Print Detection system and Authentication
MAT28 Object Tracking system Real time.
MAT29 Implementation OF CDMA Signaling Technique Using Mat-Lab
MAT30 DC-DC Converter Adequate for Alternative Supply System
MAT31 Speed Control of DC motor with PID controller
MECHANICAL PROJECT
SL NO AUTOMOBILE
MA01 Fabrication of new type of motorized wheel chair and personal vehicle for
handicapped people
MA02 Fabrication of two wheeler water lifting pump
MA03 Fabrication of sweeper robot
MA04 Fabrication of robot war machine
MA05 Fabrication of play ball collecting robot
MA06 Fabrication of motorized tricycle for children
MA07 Fabrication of robotic wheel chair
MA08 Fabrication of over speed indication and automated braking system for four wheelers
MA09 Fabrication of road cleaning and scrap collecting robotic vehicle
MA10 Fabrication of obstacle sensing and path changing vehicle
MA11 Economical anti theft system for two-wheeler
MA12 System ensuring seat belt application
MA13 Advance antitheft system for two wheeler
MA14 Fabrication of electric two wheeler
MA15 Fabrication of demonstrative model of fish like propulsion system
MA16 Fabrication of speed breaker electricity generation unit
MA17 Fabrication of solar operated tricycle
MA18 Fabrication of automated multi-floor car parking system for four wheelers
MA19 Fabrication of remote operated weapon system
MA20 Fabrication of 360 degree turning vehicle
MA21 Fabrication of in wheel motor
MA22 Fabrication of wind power generation system using railway
MA23 Fabrication of automatic path finding vehicle
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)12
MA24 Fabrication of automatic railway gate controller
MA25 Fabrication of Two wheeler mileage testing machine
MA26 Fabrication of remote controlled tilting chair for physically handicapped
person
MA27 Fabrication of remote controlled waste collecting vehicle
MA28 Fabrication of bicycle operated water lifting pump
MA29 Fabrication of solar powered portable exhaust fan for cars
MA30 Fabrication of special robotic vehicle for bomb defusing squad
MA31 Fabrication of PC operated versatile robotic vehicle
MA32 Fabrication of multistory car parking system
MA33 Fabrication of conceptual solar vehicle
SL NO MECHATRONICS & AUTOMATION
MA01 Automatic tap control
MA02 Automatic wash basin
MA03 Automatic Heat chamber control system
MA04 Railways Accident avoiding system
MA05 Automatic Room perfume spray Mechanism
MA06 Fabrication of Automatic temperature controller with cooling system
MA07 Fabrication of Path finder Robot
MA08 Electronic Numeric keyboard safety locking system
MA09 Automatic Rain operated wiper
MA10 Automatic Railway signaling system
MA11 Fabrication of Automatic Railway gate controller
MA12 Fabrication of Automatic Motorized Door open/close mechanism
MA13 Fabrication of sensor operated automated guided vehicle
MA14 Automatic pressure monitor and cut off system
MA15 Fabrication of solar automatic cell phone charger.
MA16 Over speed indicator and automatic accident avoiding system for four
wheeler
MA17 Sensor operated automatic track guided vehicle
MA18 Fabrication of Automated guided vehicle
MA19 Timing operated solar pump
SL NO THERMAL REFRIGERATION
TR01 Fabrication of thermo-electric solar air conditioner
TR02 Water Cooler cum Air Conditioner
TR03 Water cooler cum Water heater by using refrigeration System
TR04 Remote controlled boiler flame adjustment system
TR05 Fabrication of Automatic temperature controller with cooling system
TR06 Fabrication of Hot and Cold Water Dispenser
TR07 Fabrication of Solar air conditioning Machine
TR08 Fabrication of Solar Air Conditioner
TR09 Fabrication of Solar Water Heater by using parabolic collector
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 13
TR10 Electrical Power Generation using Thermal Power Plant
TR11 Fabrication of Solar refrigeration system
TR12 Fabrication of Solar Fridge
TR13 Fabrication of Solar Air Cooler
TR14 Fabrication of Mini Water Heater
TR15 Fabrication of Ground Dryer
TR16 Fabrication of Micro Wave Oven
TR17 Fabrication of Miniature Boiler
TR18 Fabrication of Solar Air Dryer
TR19 Fabrication of double effecting solar cooker
TR20 Fabrication of Solar Air Cooler cum Heater
TR21 Fabrication of refrigeration system (trainer)
TR22 Fabrication of solar Water Heater
TR23 Fabrication of Cooling tower
TR24 Electrical Power Generation using Steam Power Plant
TR25 Fabrication of automatic humidification system
SL NO MECHANICAL @ PRODUCTION
PR01 Fabrication of heat exchanger
PR02 Fabrication of Remote operated weapon system
PR03 Fabrication escalator
PR04 Fabrication of water cooler cum air conditioner
PR05 Remote controlled motorized crane
PR06 Fabrication of Turbo cooling Engine
PR07 Solar Powered Auto charging grinding machine
PR08 Remote controlled wheel chair
PR09 Fabrication of automated Drilling Machine
PR10 Fabrication of Electric Two Wheeler with Rechargeable Battery
PR11 Fabrication of Pelton Wheel Turbine
PR12 Fabrication of Automatic typical Pipe Cutting Machine
PR13 Digital Locking System for material handling Vehicle
PR14 Automatic Car Parking System
PR15 Sensor Based Inspection Conveyor
PR16 Automatic Visitor Guided with Material Handling Vehicle
PR17 Automatic Water level Sensing Crane
PR18 PC based wireless material handling vehicle for industrial application
PR19 Fabrication of Automatic Bottle filling plant
PR20 Fabrication of Hybrid Vehicle
PR21 Fabrication of Pedal Washing Machine
PR22 Fabrication of Steam Power Plant
PR23 Fabrication of Hydro Power Plant
PR24 Hand based Gear Changer for 2 wheeler
PR25 Automatic Motorized Door Open/Close Mechanism
PR26 Automatic Plant Water Moistening System for Garden
PR27 Automatic Water level Indicator and Controlling System
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)14
SL.NO ROBOTICS
RB01 Human joint control robot- a robot which can work by the help of human
joints.
RB02 Robotic arm- an arm which can perform several tasks and can be control
through remote control.
RB03 Automatic vehicle control device- a wireless system which can control the
vehicle externally by the help of radio frequency.
RB04 IR sensor based accident avoiding device.
RB05 Robotic crane- remote control crane which can pick and place the object
from one place to another.
RB06 Automatic pipe cutting machine-sensor based pipe cutting machine for
industrial purpose.
RB07 Robotic arm with moving plate form- it can pick and place the objects from
one place to another place.
RB08 Fire extinguisher robot- it is an automatic working robot which can rotate
in 360*and it can extinguish the fire without any human assistance.
RB09 Fire detection system- it is automatic fire detection system which can be
able to detect the fire weather it is electrical or chemical fire.
RB10 Intelligent motion sensor alarm – automatic alarm system which starts
working if it detects the moving body.
RB11 Track pick and place robot-it is remote based pick and place robot which can
lift the heavy luggage and place in another end of track.(industrial robot)
RB12 Robotic camera car or boat-it is a robot which can control externally by RF
and it can also send the real time video to the pc.
RB13 Solar powered car-a car will completely work on the solar energy.
RB14 Touch sensitive robot-an automated robot which will only perform the task
if you touch the parts of the robot.
RB15 Photo sensitive robot-a robot which will perform the task if the light fall on it
RB16 Robotic grass cutter-automatic or remote control grass cutter robot.
RB17 Robotic boat-remote control boat it can move forward, left and right.
RB18 Solar powered boat-it is the boat which will completely work on the solar
power no external power supply.(with storage system)
RB19 Robotic submarine- it is remote control water robot which can do the
different tasks, for ex:-pick and place object and move forward, left, right
& upwards and downwards.
RB20 Land mine detector and diffuser robot-it is remote or automatic robot which
will detect and diffuse the land mines with and without the help of human
assistance.
RB21 Remote control movable robotic fire extinguisher for industrial fire- it is
high temperature robot which can extinguish the chemical and electrical
fire with or without the help of human assistance.
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 15
RB22 MAGLEV train – magnetic leviation vehicle which moves forward by the
help of magnetic field.
RB23 Bipedal iron wall climber robot- robot which can climb the wall vertically.(iron
wall)
RB24 Robotic elevator-sensor based elevator.
RB25 Sumo robot- very heavy robots for sumo fighting ex:-(crusher, cutter, electric
shock)
RB26 Iron collector robot –robot which collects the spare or unused parts in
industrial area.
RB27 Irrigation robot-it is automatic robot which can irrigate the farm itself.
RB28 Robotic bipedal insect-it is the bipedal insect which cam moves in all
direction.
RB29 Bipedal robot or waking robot- it is bipedal robot which can rotate in 360*
and can also move in all direction.
RB30 PC voice signal based programmable robot.(pc based project)
RB31 Color identification or color detector robot.
RB32 Iron collecting vehicle
RB33 Magnetic crane
RB34 Voice operated Intelligent Fire extinguisher vehicle.
RB35 Zigbee controlled Boat with wireless video and voice transmission with
night vision capability.
RB36 Voice operated robot with speaker identification technology.
RB37 Live Human being detection wireless remote controlled Robot. (Useful for
detection of terrorists hiding inside buildings).
RB38 Micro Electro Mechanical Sensor (MEMS) Accelerometer/Gyroscope based
self-balancing robot.
RB39 Flying Quad robot chopper with wireless video camera.
RB40 Wireless operated war field land Rover that alerts on sensing planted
Land Mines.
Sl. No SOFTWARE PROJECT – C / C++
SC01 Employee Information System
SC02 College Search Engine
SC03 Advanced College Search Engine
SC04 Airline Reservation SysteM
SC05 Gas Management System
SC06 Full Month Calendar
SC07 Customer Call Tracking System
SC08 College Automation System
SC09 Address Book System
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)16
SC10 Time Table Generate System
SC11 Exam System
SC12 Payroll Management System
SC13 Office Automation
SC14 Hotel Management System
SC15 School Automation System
SC16 Library Automation System
SC17 High Low Game
SC18 Job Consultancy Management System
SC19 GK Quiz
SC20 Car Racing Game
SC21 3d car show
SC22 Chess Game
SC23 Brick Game
SC24 Shifting Card Game
SC25 Snake Game
SC26 Computer Lodu Game
SL NO SOFTWARE - .NET / JAVA
SW01 Payroll management Software
SW02 Employee Information management System
SW03 Library Automation Software
SW04 Online School Automation Software
SW05 Office Automation System
SW06 Attendance Register
SW07 Departmental Store
SW08 Project Management System
SW09 Shopping Mall Management Software
SW10 Tutorial Management System
SW11 Web Based Recruitment Process For A HR Group Of Company
SW12 Recruitment Management System Of An Institute
SW13 Online E-Commerce & Application Development
SW14 Payroll Management System
SW15 Employee Information Management System
SW16 Online Exam Software
SW17 Telecom Distributorship Management Software
SW18 E-Symposium System
SW19 E-HR System
SW20 Online Job Consultancy Management System
SW21 Inventory Management Software
SW22 Hotel Management Software
SW23 Hospital Management Software
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 17
SW24 Banking System
SW25 School Management Software
SW26 Medicine Store Automation Software
SW27 Restaurant Billing Software
SW28 Jewelry Shop Automation System
SW29 Phone Directory Service
SW30 Online College Automation System
SW31 E-profile Management System Office Automation system
SW32 Financial organization Management Software
SW33 Sales & Distribution Management Software
SW34 Customer Relationship Management Software
SW35 Document Management Software
SW36 Assets Management Software
SW37 Task Management Software
SW38 Computer Shop Automation Software
SW39 Departmental Store Management Software
SW40 E-Advertisement
SW41 E-Consultancy Service System
SW42 E-Banking System
SW43 E-HR System
SW44 E-Resume Builder
SW45 Financial Accounting System
SW46 Front Office Management System
SW47 HR Management System
SW48 Information System For Team Leader (LIC)
SW49 Employee Insurance And Capital System
SW50 Builders Management System
SW51 Automation of Internet parlor
SW52 Administrative Block For Oil Company
SW53 Online Shop Management system
SW54 Online Shopping
SW55 Online Train/Bus/Air/Cinema Ticket Booking System
SW56 Intra Network Chatting System
SW57 IVRS Billing System
SW58 Marketing Management System
SW59 Online Certification Exam
SW60 Logistics Care
SW61 Online Gas Booking Software
SW62 Online Project Submission System
SW63 Online Stock Management System
SW64 Online Criminal Information System
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)18
SW65 Online Community System
SW66 Online Resume Submission System
SW67 Mortgage system
SW68 Online Course Finder
SW69 Issue Tracking system
SW70 Online Hospital Management System
SW71 E-Tendering System
SW72 Petrol Pump Automation Software
SW73 Online Task Management system
Sl No ANDROID BASED PROJECT
AND01 Bank Account Tracker
AND02 Attendance Management
AND03 Employee Directory Management
AND04 Mobile Based Examination System
AND05 Message Protection system
AND06 Wiki-tionary
AND07 Teacher’s Utility
AND08 Calculator
AND09 Task Scheduler
AND10 Personal Diary
AND11 Personal Address Book
AND12 Sudoku Game
AND13 Sales & Purchase Inventory
AND14 Snake Game
AND15 Birthday Reminder
AND16 Tic Tac Toe Game
AND17 Police Hand Register
AND18 Dictionary
AND19 Bluetooth based Attendance management
AND20 Office Employee tracking and Work Assignment system
AND21 Device theft detection and Tracking System
SL NO CIVIL PROJECTS
C01 Model, Planning & Cost estimation of a building
C02 Model, Planning & Cost estimation of a fly-over
C03 Model, Planning & Cost estimation of a Bridge
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches) 19
C04 Model, Planning & Cost estimation of a Housing Board Building
C05 Model, Planning & Cost estimation of a International Airport
C06 Model, Planning & Cost estimation of a BDA Housing board project
C07 Model, Planning & Cost estimation of a Railway Station
C08 Model, Planning & Cost estimation of a Engineering College
C09 Model, Planning & Cost estimation of a Dam
C10 Model, Planning & Cost estimation of a 4 lane High-way
C11 Model, Planning & Cost estimation of a International school
C12 Model, Planning & Cost estimation of a Cinema Hall
C13 Model, Planning & Cost estimation of Burj Khalifa
C14 Model, Planning & Cost estimation of a Duplex House
Note
Visit Us: www.bputproject.com , www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666
SR INFO SYSTEMS (SRIS)
(Software Development & Final Year Project Provider for all Branches)20
Note

Sris @ bput project

  • 1.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 1 FIELD WISE PROJECT Wireless Communication(RF, RFID, Mobile, Zigbee, GPS,GSM) Security Systems Embedded and Microcontroller Industrial & Field Application Serial Communication & Control(PC Based ) Without Microcontroller Communication Principle Biomedical Mobile Communication Mat lab Control System Mechanical • Automobile • Mechtronics & Automation • Thermal Refrigeration • Production Power System & Protection Robotics Power Electronics Software • C/C++ • .Net/Java, • Android) Instrumentation Civil We offer Projects for Following Branches: Technology: 1. Electronics & Telecommunication 1. GPS 2. Electronics & Instrumentation 2. GSM 3. Electrical & Electronics 3. ZIGBEE 4. Applied Electronics & Instrumentation 4. RF & RFID 5. Electrical 5. Robotics 6. Biomedical 6. Embedded Systems 7. Automobile 7. C/C++ 8. Mechanical 8. ASP .NET/C# .NET 9. Civil Engineering 9. JAVA 10. Marine Engineering 10. Automobile 11. Computer Science 11. Mechatronics 12. Information Technology 12. Image Processing
  • 2.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)2 SL.No WIRELESS COMMUNICATION ( RF, RFID, GSM, GPS , MOBILE, PHONE & GIZBEE BASED) MP01 GPS and GSM based college bus position informer for students MP02 Locker Security System with SMS Informer MP03 Advanced Automatic Vehicle Crash Notification using GSM Technology MP04 Bank Security System with Auto Dialer and Camera Recording System MP05 Wireless Water Level Controller MP06 GSM Based Home Security System to Get Intrusion Alerts like Door/ Windows Open Alerts onto Your Cell Phone MP07 RF based automatic menu selection and ordering systems MP08 Passenger Information System using GPS MP09 GSM based traffic density controlling system MP10 Wireless weather monitoring systems MP11 Wireless Appliances control using DTMF Principle MP12 GSM Based Automatic Irrigation Water Controller System MP13 Mobile/Telephone controlled Access control MP14 GSM Mobile Phone based Automobile Security System MP15 GSM Based multi-machine industrial controlling system MP16 RFID Based Car/Home/Bank security System MP17 RFID Based Petrol pump Automation system MP18 RFID Based Toll collection & Recharge System MP19 Wireless Patient monitoring systems with wireless data communication MP20 GPS and GSM based bus status and position information for blind people MP21 GSM Based remote measurement of electricity and control system for home MP22 SMS based Electricity Billing system MP23 GPS and GSM based school kids van tracking MP24 SMS controlled pick and place Robot with video camera MP25 SMS Based Banking Security System MP26 Wireless Automatic Antenna Positioning System MP27 Wireless multi speed & bidirectional stepper/DC/AC Motor MP28 GPS based location indicating system for unmanned automobile MP29 Auditorium Monitor and Control Using GSM Technology MP30 GSM based home automation with security system MP31 GPS based bus or train collision avoiding system MP32 SMS Based automatic power theft identification
  • 3.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 3 MP33 GSM Based Speed Control of Induction Motor MP34 Wireless data communication between PC’s MP35 Real Time Security Guard Robot Using GSM/CDMA Networking MP36 SMS Enabled Autonomous Robotics for Military Applications MP37 GSM based school van speed monitoring and control system MP38 Mobile phone tracking system by using GPM and GSM MP39 Automatic root announcement system for blind people MP40 Auto-Dialer Home Security System MP41 GSM and GPS Interface For Human Tracking System MP42 Wireless highway speed monitoring & over speed detector MP43 Voice based wireless patient monitoring system with data communication MP44 GSM based ambulance intimation system MP45 Automatic station announcement and display system for trains/buses MP46 GSM based AC or DC motor speed monitoring and controlling system MP47 GSM Based Highway Road Traffic Monitoring System MP48 Automatic Transformer Fault Message Indicator Based on GSM SMS and ZIGBEE MP49 Prepaid Energy meter with telephone based re-charge MP50 Zigbee based wireless temperature display & control System SL No. EMBEDDED SYSTEM & MICROCONTROLLER MC001 An intelligent secure and privacy-preserving parking scheme through vehicular communications MC002 Access control System MC003 Intelligent Power Sharing of Transformers with Auto Protection MC004 Microcontroller based Moving Person Detecting System MC005 A service of home security system on intelligent network MC006 Automatic Vehicle over Speed Indication and Controlling System MC007 Real Time Passenger information System (RTPIS) using ZIGBEE Technology MC008 I2C Based Energy Billing System MC009 Speed Control of DC Motor using FQ / TQ Chopper Drive MC010 Microcontroller based web camera positioning system MC011 Digital locking system (Password) for two wheeler MC012 Voice operated home appliances controlling system MC013 Microcontroller based controlling of transformer from substation MC014 Prototype of RF based station intimation coach status information and control system MC015 PIR based human focus light movement MC016 Microcontroller Based Railway track crack detection system
  • 4.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)4 MC017 Microcontroller Based Railway Accident Avoiding system MC018 Microcontroller Based automatic railway gate control MC019 Microcontroller Based Voice controlled D.C/A.C Motor MC020 Automatic Gas leakage detection and auto dialing MC021 Inverter based Low - High Input Voltage Buck Booster Converter System MC022 Wheel chair operated by voice and hand MC023 Highway Car Accident Identification and Auto Communication to Patrol or Hospital MC024 Finger print based door open close system MC025 Coin Based Mobile Phone Charger MC026 Bus Identification System for Visually Impaired People MC027 Finger print based banking system MC028 Microcontroller based automatic visitor guided vehicle MC029 Automatic Traffic and Street Light Controlling System MC030 Remote control using mobile through spoken commands MC031 Automatic power factor controlling system MC032 Automatic Electronic Bus Fare System MC033 Automatic pollution detection and monitoring system using carbon sensors MC034 Temperature and Respiration Monitoring System MC035 Automatic Water Level Indicator and Controlling System MC036 Remote distribution transformer monitoring and controlling system using RF MC037 Automatic drunken drive avoiding system for automobile MC038 Involuntary toll gate system for vehicle traffic management MC039 MOSFET based Current Mode Control Buck / Boost Converter MC040 Touch Screen based Appliances Control system MC041 Touch Screen based Vehicle Driving System MC042 Touch Screen based security system MC043 Touch Screen based Restaurant Menu selection system MC044 Touch Screen based Robot MC045 Front vehicle monitoring system with accident preventer MC046 Automatic multiple transformer fault detection and production system MC047 Ultrasonic based Vehicle Parking Guidance System MC048 Microcontroller Based Building Security System MC049 Automatic Traffic Controller for Ambulance and VIP Vehicles MC050 Energy Billing Through Power Line Carrier Communication MC051 Automatic Moisture and Light control System for Garden MC052 Electronic voting machine MC053 Automatic Train Station Announcement with Bomb Detection System MC054 Driver Fatigue Accident Prevention using Eye Blink Sensor MC055 Multipurpose measuring system with inbuilt data acquisition
  • 5.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 5 MC056 Touch Screen based home/industrial automation and controlling system MC057 Remote controlled AC/DC Motor Controlling System MC058 Microcontroller based Automatic Power theft identifier MC059 Microcontroller Based Fire Fighting Robot MC060 Microcontroller Based Prepaid card for petrol bump MC061 Real Time Temperature Monitoring Using Multiple Sensor MC062 Microcontroller based wireless energy meter MC063 Visitors Counter with Automatic Light ON/OFF system MC064 Finger Print based medical announcement system MC065 Prepaid card for Electronic Bus fair system MC066 Involuntary station name display with voice attentive system for train MC067 MC based clock design MC068 Automatic college/school bell automation system MC069 Mobile/Telephone based access control with security system MC070 Load sharing of a Transformer SLNO. SERIAL COMMUNICATION & CONTROL(PC BASED) PC001 Communication between PC’s using IR, Laser Beam PC002 PC based Electrical appliances control System PC003 PC based no load transformer testing system PC004 PC based wireless code locking system for machines PC005 PC Based Motor Speed Monitoring System PC006 RS 232 communication based touch screen monitoring PC007 PC based On-Load monitoring of distribution transformer tap changer using RF communication PC008 RS 232 communication Based automatic moisture & light control system PC009 PC Based industrial temperature controller PC010 PC based sun seeker PC011 PC based wireless multi-machine control system PC012 PC based pressure management and controlling system PC013 PC based different industrial parameter measuring using ADC control PC014 RS 232 communication Based voltage monitoring system PC015 Wireless Controller cum Internet Controller for Home Appliances PC016 PC based stepper motor speed controlling system PC017 PC based room cooling system PC018 Remote home control through internet PC019 RS232 communication Based Digital to Analog converter PC020 PC Based Multi-Motor control System PC021 RS232 communication Based Analog to Digital converter PC022 PC based door opening and closing system PC023 PC Based DC Motor Speed Control system PC024 Interface your PC with light and fans PC025 PC based Material handling Equipment
  • 6.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)6 PC026 PC based Solar Car PC027 Most Advanced Land Rover with Wireless Remote Control Using PC with Camera and Solar Cell Power PC028 PC based Wireless Robot PC029 PC based multiple transformer or motor fault detection and monitoring system PC030 PC Controlled Alive Human Being Detector in War Fields / Affected Areas Using WAP with Model & Camera PIR Sensor for Rescue Operations with 2 Way Communications PC031 RS 232 communication Based length measurement system PC032 Multi-Device control system using PC PC033 PC based solar panel sun tracking and controlling system PC034 Programmable PC speed control of A.C (or) D.C Motor PC035 PC based visitor counter PC036 PC based wireless Material handling Vehicle PC037 PC based Home Automation PC038 PC based A.C motor speed, voltage and current monitoring and controlling system PC039 PC based wireless pick and place crane PC040 PC based multilevel car parking PC041 PC based patent heart beat and temperature monitoring system PC042 PC based Auto Dialing Home Security System PC043 PC based wireless pick and place Robot PC044 PC Based Moving Message Display PC045 PC based double axis pick and place Robot PC046 PC based Temperature, Voltage and Speed (T-V-S) monitoring System SL NO COMMUNICATION PRINCIPLE CP01 Voice Communication based wireless robot CP02 Voice communication based appliances control system CP03 Automatic tracking Antenna CP04 TV Remote based appliances control CP05 Telephone based Appliances control system CP06 PC interface Automatic tracking Antenna CP07 TV Remote based stepper motor controller CP08 TV Remote based DC motor speed control system CP09 Railway Traffic positioning system CP10 PC based path finder robot CP12 Wireless data communication between 2 Microcontroller CP13 Data communication between Microcontroller and PC CP14 IR based PMDC Motor controller CP15 Data transfer using Zig-bee CP16 RF based AC motor speed control system
  • 7.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 7 SLNO. MOBILE COMMUNICATION MOB01 Mobile based Appliances control MOB02 Mobile based Access Control MOB03 Prepaid Energy meter with mobile based Recharge MOB04 Mobile based speed control of a DC motor. MOB05 Mobile based security systems MOB06 Mobile based wireless robot MOB07 Mobile based Transformer protection systems MOB08 Mobile based Electronic Notice board MOB09 Mobile based live human tracking using GPS & GSM MOB10 Mobile based weather alert system using GSM MOB11 Mobile based transformer protection systems MOB12 Mobile and GSM based railway track crack detection system MOB13 Mobile and GSM based railway level crossing gate control system MOB14 Mobile and GSM based heart beat monitoring system MOB15 Mobile and GSM based Industrial security system SL NO CONTROL SYSTEM CONS01 PC based speed control of a DC/AC/Stepper motor CONS02 PC based Appliances Control system CONS03 PC based wireless Robot CONS04 Water level monitoring and control system CONS05 IR based DC/AC/Stepper Motor control system CONS06 Intelligent way finder vehicle CONS07 Touch screen based DC/AC/Stepper Motor control system CONS08 IR based Appliances control system CONS09 Zig-bee based Appliances control system CONS10 Zig-bee based wireless temperature Monitoring and control system CONS11 Telephone controlled Robot CONS12 Telephone based Appliances control system CONS13 Voice activated DC/AC/Stepper motor control system CONS14 Voice activated Appliances control system CONS15 Human detection based Escalator SL NO POWER SYSTEM & PROTECTION PSP01 Universal Transformer protection System PSP02 Wireless motor monitoring and protection system PSP03 Prepaid Energy meter and tampering protection system PSP04 Combine protection systems of electrical machine PSP05 Wireless substation control and protection system PSP06 MC based single phase cyclo-converter
  • 8.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)8 PSP07 Speed control of a AC/DC motor using Thyrister PSP08 Mobile based Boiler protection System PSP09 Mobile based appliances control and protection system PSP10 PC based over voltage and under voltage relay PSP11 PC based embedded protection system PSP12 Automatic load shading system PSP13 PC based universal motor monitoring and protection system PSP14 Mobile based Industrial protection system PSP15 Power analyzer PSP16 Zig-bee based Energy meter monitoring SL NO POWER ELECTRONICS PE01 Speed control of a AC motor using Thyrister with LCD display PE02 Voltage control using Thyrister PE03 Automatic Robot Over speed controlling system for People Zone PE04 Traffic and Street Light Controller PE05 Multi-Device Control System Using Frequency Modulation PE06 Sensor Based Multi-Channel Fire Alarm System PE07 Remote Controlled solar Car PE08 Sensor Operated Automatic Reverse Braking System PE09 Automatic Water Tap Controlling System PE10 SMS Based Electric Billing System PE11 Remote controlled Antenna/Dish tracking System PE12 Sensor Operated Conveyor Automation PE13 Automatic railway track crack detecting Vehicle PE14 Multi-Motor Control Using Password PE15 MOSFET based chopper drive for universal motor SL NO INSTRUMENTATION IM01 MC based Data Acquisition system using Zig-bee IM02 RFID based wireless health care systems IM03 MC based wireless temperature control for Data Acquisition system using Zig-bee IM04 Ultrasonic based distance measurement and LCD display IM05 RFID based Car parking system IM06 Automatic head light control in a mines area IM07 Solar tracking system IM08 Touch screen based advance menu display and ordering system IM09 Accelerometer based wireless robot IM10 Ultrasonic based water level monitoring system IM11 Zig-bee based parameter monitoring and control system IM12 Electronic Voting Machine (EVM) IM13 Automatic solar street lighting system IM14 Cost effective appliances control and visitor counter IM15 MC based Environmental control with SMS Notification
  • 9.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 9 SL NO SECURITY SYSTEMS SS01 MC based Industrial security system SS02 RFID/PIR based Home security system SS03 Voice activated access control SS04 Four Zone IR based security system with LCD Display SS05 Mobile phone based Home/Industry Security system SS06 Finger print based access control and security system SS07 SMS based LPG/Fire/CO2 detection and alert system SS08 GPS and GSM based Human/Baby tracking system SS09 RF based Human/Baby tracking system SS10 Mobile phone based disaster monitoring system SS11 Modern security system with visitor counter SS12 MC based locker safety system using keypad SS13 Medical help calling device using Mobile phone SS14 Anti electric shock device using Mobile phone SS15 Speed control of a vehicle in a school Area/People Zone SL NO INDUSTRIAL & FIELD APPLICATION IFA01 Railway track crack detection system using RF IFA02 MC based car parking system IFA03 Land mine detection vehicle IFA04 Prepaid Energy meter with sms alert IFA05 Solar Tracking System IFA06 Automatic Path finder vehicle IFA07 Anti electric shock device IFA08 Mobile based substation management system IFA09 MC Based Traffic light controller IFA10 Automatic railway level crossing controller IFA11 Remotely Appliances controller IFA12 Power management system with visitor counter IFA13 Mobile based temperature and humidity controller IFA14 Touch screen based Industry Automation system IFA15 Zig-bee based wireless data acquisition system SL NO WITH OUT MICROCONTROLLER WM01 Railway track crack detection system using RF WM02 Automatic railway accident avoiding system WM03 RF based appliance control system WM04 Human/baby tracking system using RF WM05 Land mine detection robot WM06 RF based wireless robot
  • 10.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)10 WM07 Anti-electric shock device using RF WM08 Medical help calling device WM09 Fire extinguisher robot WM10 IR based security system WM11 Water level control system WM12 Solar based wireless robot WM13 Intelligent way finder vehicle WM14 Wireless speed control of a DC Motor WM15 Maglev train SLNO. BIO-MEDICAL PROJECTS BIO01 Smart Card based Bio Medical Health Card Systems BIO02 Wireless nurse calling systems for Advance patient Care. BIO03 Human Detection by GPS & GSM BIO04 RFID based Medical information system BIO05 Wireless Hospital management system BIO06 Health rate and temperature monitoring system BIO07 Hospital Emergency caring systems BIO08 Infant monitoring systems using CO2 sensor BIO09 Robotic Wheelchair for disabled person BIO10 Hospital Emergency caring systems SL NO MAT-LAB PROJECT MAT01 Noise cancellation using adaptive filter in MATLAB(Software based) MAT02 ECG simulation using MATLAB.(Software based) MAT03 MATLAB based Optical Character Reader(OCR).(Software based) MAT04 SUBSPACE based channel estimation for MIMO OFDM using MATLAB.(Software based) MAT05 Solving TSP using PSO in MATLAB.(Software based) MAT06 SMART ANTENNA systems for mobile communication.(Software based) MAT07 MATLAB based GSM mobile.(Hardware and Software based) MAT08 MATLAB based RFID toll gate money collection.(Hardware and Software based) MAT09 MATLAB Image Processing based SURFACE COMPUTING (Hardware and Software based) MAT10 MATLAB Image Processing based touch screen(Covert your college wall into a large touch screen (Hardware and Software based) MAT11 Edge Detection, Color Find, Maximum Color in Image User Interface MAT12 Image watermark embedding system MAT13 Motion Detection in a video MAT14 ECC Image Alignment Algorithm MAT15 Active noise control system using Fx-LMS algorithm
  • 11.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 11 MAT16 Canny Edge Detector MAT17 Image Compression using Wavelet MAT18 CAMB Interface for Mat-lab MAT19 Calculating distances between points on the image MAT20 Speak the re-cognitized character MAT21 Phase Based Template Matching MAT22 Wi-MAX 802.16e Physical Layer MAT23 Car Number plate detection MAT24 JPEG Compression MAT25 Total Variation Grayscale and Color Image De-noising MAT26 DTMF decoder MAT27 Finger Print Detection system and Authentication MAT28 Object Tracking system Real time. MAT29 Implementation OF CDMA Signaling Technique Using Mat-Lab MAT30 DC-DC Converter Adequate for Alternative Supply System MAT31 Speed Control of DC motor with PID controller MECHANICAL PROJECT SL NO AUTOMOBILE MA01 Fabrication of new type of motorized wheel chair and personal vehicle for handicapped people MA02 Fabrication of two wheeler water lifting pump MA03 Fabrication of sweeper robot MA04 Fabrication of robot war machine MA05 Fabrication of play ball collecting robot MA06 Fabrication of motorized tricycle for children MA07 Fabrication of robotic wheel chair MA08 Fabrication of over speed indication and automated braking system for four wheelers MA09 Fabrication of road cleaning and scrap collecting robotic vehicle MA10 Fabrication of obstacle sensing and path changing vehicle MA11 Economical anti theft system for two-wheeler MA12 System ensuring seat belt application MA13 Advance antitheft system for two wheeler MA14 Fabrication of electric two wheeler MA15 Fabrication of demonstrative model of fish like propulsion system MA16 Fabrication of speed breaker electricity generation unit MA17 Fabrication of solar operated tricycle MA18 Fabrication of automated multi-floor car parking system for four wheelers MA19 Fabrication of remote operated weapon system MA20 Fabrication of 360 degree turning vehicle MA21 Fabrication of in wheel motor MA22 Fabrication of wind power generation system using railway MA23 Fabrication of automatic path finding vehicle
  • 12.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)12 MA24 Fabrication of automatic railway gate controller MA25 Fabrication of Two wheeler mileage testing machine MA26 Fabrication of remote controlled tilting chair for physically handicapped person MA27 Fabrication of remote controlled waste collecting vehicle MA28 Fabrication of bicycle operated water lifting pump MA29 Fabrication of solar powered portable exhaust fan for cars MA30 Fabrication of special robotic vehicle for bomb defusing squad MA31 Fabrication of PC operated versatile robotic vehicle MA32 Fabrication of multistory car parking system MA33 Fabrication of conceptual solar vehicle SL NO MECHATRONICS & AUTOMATION MA01 Automatic tap control MA02 Automatic wash basin MA03 Automatic Heat chamber control system MA04 Railways Accident avoiding system MA05 Automatic Room perfume spray Mechanism MA06 Fabrication of Automatic temperature controller with cooling system MA07 Fabrication of Path finder Robot MA08 Electronic Numeric keyboard safety locking system MA09 Automatic Rain operated wiper MA10 Automatic Railway signaling system MA11 Fabrication of Automatic Railway gate controller MA12 Fabrication of Automatic Motorized Door open/close mechanism MA13 Fabrication of sensor operated automated guided vehicle MA14 Automatic pressure monitor and cut off system MA15 Fabrication of solar automatic cell phone charger. MA16 Over speed indicator and automatic accident avoiding system for four wheeler MA17 Sensor operated automatic track guided vehicle MA18 Fabrication of Automated guided vehicle MA19 Timing operated solar pump SL NO THERMAL REFRIGERATION TR01 Fabrication of thermo-electric solar air conditioner TR02 Water Cooler cum Air Conditioner TR03 Water cooler cum Water heater by using refrigeration System TR04 Remote controlled boiler flame adjustment system TR05 Fabrication of Automatic temperature controller with cooling system TR06 Fabrication of Hot and Cold Water Dispenser TR07 Fabrication of Solar air conditioning Machine TR08 Fabrication of Solar Air Conditioner TR09 Fabrication of Solar Water Heater by using parabolic collector
  • 13.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 13 TR10 Electrical Power Generation using Thermal Power Plant TR11 Fabrication of Solar refrigeration system TR12 Fabrication of Solar Fridge TR13 Fabrication of Solar Air Cooler TR14 Fabrication of Mini Water Heater TR15 Fabrication of Ground Dryer TR16 Fabrication of Micro Wave Oven TR17 Fabrication of Miniature Boiler TR18 Fabrication of Solar Air Dryer TR19 Fabrication of double effecting solar cooker TR20 Fabrication of Solar Air Cooler cum Heater TR21 Fabrication of refrigeration system (trainer) TR22 Fabrication of solar Water Heater TR23 Fabrication of Cooling tower TR24 Electrical Power Generation using Steam Power Plant TR25 Fabrication of automatic humidification system SL NO MECHANICAL @ PRODUCTION PR01 Fabrication of heat exchanger PR02 Fabrication of Remote operated weapon system PR03 Fabrication escalator PR04 Fabrication of water cooler cum air conditioner PR05 Remote controlled motorized crane PR06 Fabrication of Turbo cooling Engine PR07 Solar Powered Auto charging grinding machine PR08 Remote controlled wheel chair PR09 Fabrication of automated Drilling Machine PR10 Fabrication of Electric Two Wheeler with Rechargeable Battery PR11 Fabrication of Pelton Wheel Turbine PR12 Fabrication of Automatic typical Pipe Cutting Machine PR13 Digital Locking System for material handling Vehicle PR14 Automatic Car Parking System PR15 Sensor Based Inspection Conveyor PR16 Automatic Visitor Guided with Material Handling Vehicle PR17 Automatic Water level Sensing Crane PR18 PC based wireless material handling vehicle for industrial application PR19 Fabrication of Automatic Bottle filling plant PR20 Fabrication of Hybrid Vehicle PR21 Fabrication of Pedal Washing Machine PR22 Fabrication of Steam Power Plant PR23 Fabrication of Hydro Power Plant PR24 Hand based Gear Changer for 2 wheeler PR25 Automatic Motorized Door Open/Close Mechanism PR26 Automatic Plant Water Moistening System for Garden PR27 Automatic Water level Indicator and Controlling System
  • 14.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)14 SL.NO ROBOTICS RB01 Human joint control robot- a robot which can work by the help of human joints. RB02 Robotic arm- an arm which can perform several tasks and can be control through remote control. RB03 Automatic vehicle control device- a wireless system which can control the vehicle externally by the help of radio frequency. RB04 IR sensor based accident avoiding device. RB05 Robotic crane- remote control crane which can pick and place the object from one place to another. RB06 Automatic pipe cutting machine-sensor based pipe cutting machine for industrial purpose. RB07 Robotic arm with moving plate form- it can pick and place the objects from one place to another place. RB08 Fire extinguisher robot- it is an automatic working robot which can rotate in 360*and it can extinguish the fire without any human assistance. RB09 Fire detection system- it is automatic fire detection system which can be able to detect the fire weather it is electrical or chemical fire. RB10 Intelligent motion sensor alarm – automatic alarm system which starts working if it detects the moving body. RB11 Track pick and place robot-it is remote based pick and place robot which can lift the heavy luggage and place in another end of track.(industrial robot) RB12 Robotic camera car or boat-it is a robot which can control externally by RF and it can also send the real time video to the pc. RB13 Solar powered car-a car will completely work on the solar energy. RB14 Touch sensitive robot-an automated robot which will only perform the task if you touch the parts of the robot. RB15 Photo sensitive robot-a robot which will perform the task if the light fall on it RB16 Robotic grass cutter-automatic or remote control grass cutter robot. RB17 Robotic boat-remote control boat it can move forward, left and right. RB18 Solar powered boat-it is the boat which will completely work on the solar power no external power supply.(with storage system) RB19 Robotic submarine- it is remote control water robot which can do the different tasks, for ex:-pick and place object and move forward, left, right & upwards and downwards. RB20 Land mine detector and diffuser robot-it is remote or automatic robot which will detect and diffuse the land mines with and without the help of human assistance. RB21 Remote control movable robotic fire extinguisher for industrial fire- it is high temperature robot which can extinguish the chemical and electrical fire with or without the help of human assistance.
  • 15.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 15 RB22 MAGLEV train – magnetic leviation vehicle which moves forward by the help of magnetic field. RB23 Bipedal iron wall climber robot- robot which can climb the wall vertically.(iron wall) RB24 Robotic elevator-sensor based elevator. RB25 Sumo robot- very heavy robots for sumo fighting ex:-(crusher, cutter, electric shock) RB26 Iron collector robot –robot which collects the spare or unused parts in industrial area. RB27 Irrigation robot-it is automatic robot which can irrigate the farm itself. RB28 Robotic bipedal insect-it is the bipedal insect which cam moves in all direction. RB29 Bipedal robot or waking robot- it is bipedal robot which can rotate in 360* and can also move in all direction. RB30 PC voice signal based programmable robot.(pc based project) RB31 Color identification or color detector robot. RB32 Iron collecting vehicle RB33 Magnetic crane RB34 Voice operated Intelligent Fire extinguisher vehicle. RB35 Zigbee controlled Boat with wireless video and voice transmission with night vision capability. RB36 Voice operated robot with speaker identification technology. RB37 Live Human being detection wireless remote controlled Robot. (Useful for detection of terrorists hiding inside buildings). RB38 Micro Electro Mechanical Sensor (MEMS) Accelerometer/Gyroscope based self-balancing robot. RB39 Flying Quad robot chopper with wireless video camera. RB40 Wireless operated war field land Rover that alerts on sensing planted Land Mines. Sl. No SOFTWARE PROJECT – C / C++ SC01 Employee Information System SC02 College Search Engine SC03 Advanced College Search Engine SC04 Airline Reservation SysteM SC05 Gas Management System SC06 Full Month Calendar SC07 Customer Call Tracking System SC08 College Automation System SC09 Address Book System
  • 16.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)16 SC10 Time Table Generate System SC11 Exam System SC12 Payroll Management System SC13 Office Automation SC14 Hotel Management System SC15 School Automation System SC16 Library Automation System SC17 High Low Game SC18 Job Consultancy Management System SC19 GK Quiz SC20 Car Racing Game SC21 3d car show SC22 Chess Game SC23 Brick Game SC24 Shifting Card Game SC25 Snake Game SC26 Computer Lodu Game SL NO SOFTWARE - .NET / JAVA SW01 Payroll management Software SW02 Employee Information management System SW03 Library Automation Software SW04 Online School Automation Software SW05 Office Automation System SW06 Attendance Register SW07 Departmental Store SW08 Project Management System SW09 Shopping Mall Management Software SW10 Tutorial Management System SW11 Web Based Recruitment Process For A HR Group Of Company SW12 Recruitment Management System Of An Institute SW13 Online E-Commerce & Application Development SW14 Payroll Management System SW15 Employee Information Management System SW16 Online Exam Software SW17 Telecom Distributorship Management Software SW18 E-Symposium System SW19 E-HR System SW20 Online Job Consultancy Management System SW21 Inventory Management Software SW22 Hotel Management Software SW23 Hospital Management Software
  • 17.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 17 SW24 Banking System SW25 School Management Software SW26 Medicine Store Automation Software SW27 Restaurant Billing Software SW28 Jewelry Shop Automation System SW29 Phone Directory Service SW30 Online College Automation System SW31 E-profile Management System Office Automation system SW32 Financial organization Management Software SW33 Sales & Distribution Management Software SW34 Customer Relationship Management Software SW35 Document Management Software SW36 Assets Management Software SW37 Task Management Software SW38 Computer Shop Automation Software SW39 Departmental Store Management Software SW40 E-Advertisement SW41 E-Consultancy Service System SW42 E-Banking System SW43 E-HR System SW44 E-Resume Builder SW45 Financial Accounting System SW46 Front Office Management System SW47 HR Management System SW48 Information System For Team Leader (LIC) SW49 Employee Insurance And Capital System SW50 Builders Management System SW51 Automation of Internet parlor SW52 Administrative Block For Oil Company SW53 Online Shop Management system SW54 Online Shopping SW55 Online Train/Bus/Air/Cinema Ticket Booking System SW56 Intra Network Chatting System SW57 IVRS Billing System SW58 Marketing Management System SW59 Online Certification Exam SW60 Logistics Care SW61 Online Gas Booking Software SW62 Online Project Submission System SW63 Online Stock Management System SW64 Online Criminal Information System
  • 18.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)18 SW65 Online Community System SW66 Online Resume Submission System SW67 Mortgage system SW68 Online Course Finder SW69 Issue Tracking system SW70 Online Hospital Management System SW71 E-Tendering System SW72 Petrol Pump Automation Software SW73 Online Task Management system Sl No ANDROID BASED PROJECT AND01 Bank Account Tracker AND02 Attendance Management AND03 Employee Directory Management AND04 Mobile Based Examination System AND05 Message Protection system AND06 Wiki-tionary AND07 Teacher’s Utility AND08 Calculator AND09 Task Scheduler AND10 Personal Diary AND11 Personal Address Book AND12 Sudoku Game AND13 Sales & Purchase Inventory AND14 Snake Game AND15 Birthday Reminder AND16 Tic Tac Toe Game AND17 Police Hand Register AND18 Dictionary AND19 Bluetooth based Attendance management AND20 Office Employee tracking and Work Assignment system AND21 Device theft detection and Tracking System SL NO CIVIL PROJECTS C01 Model, Planning & Cost estimation of a building C02 Model, Planning & Cost estimation of a fly-over C03 Model, Planning & Cost estimation of a Bridge
  • 19.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches) 19 C04 Model, Planning & Cost estimation of a Housing Board Building C05 Model, Planning & Cost estimation of a International Airport C06 Model, Planning & Cost estimation of a BDA Housing board project C07 Model, Planning & Cost estimation of a Railway Station C08 Model, Planning & Cost estimation of a Engineering College C09 Model, Planning & Cost estimation of a Dam C10 Model, Planning & Cost estimation of a 4 lane High-way C11 Model, Planning & Cost estimation of a International school C12 Model, Planning & Cost estimation of a Cinema Hall C13 Model, Planning & Cost estimation of Burj Khalifa C14 Model, Planning & Cost estimation of a Duplex House Note
  • 20.
    Visit Us: www.bputproject.com, www.liveprojects.co.in , Contact: 0674 6574123, 9776169050, 9556016666 SR INFO SYSTEMS (SRIS) (Software Development & Final Year Project Provider for all Branches)20 Note