The document is a draft field investigation schedule for the SR 710 North Study from February to April 2013. It lists the proposed boring locations along the SR 710 corridor and adjacent streets in Los Angeles and South Pasadena. Exploratory borings will be drilled to depths ranging from 50 to 280 feet deep at each location to assess subsurface conditions. The schedule assigns dates for different drilling contractors to complete the work over the three month period.