Small Hydro CDM Project S-J-3 for SaleA Kyoto Protocol “Clean Deveolpement Mechanism” Sample Project “Jabusnica 3” in Gacko, BiH - Presentation
What is CDMCDM stands for UNFCCC Kyoto Protocol “Clean Development Mechanism”http://unfccc.int/resource/docs/publications/08_cdm_in_brief.pdfWhen verified and confirmed for additionality CER’s or Certified Emission Reductions are issued. CER’s are recognized in EU ETS and have a price. The most relevant source for checking spot emission allowances price ishttp://bluenext.eu/
CPM Energetika     CPM Energetika is a part of CPM group of companies registered in Slovenia, EUhttp://cpm-en.com/CPM d.d. built 50 MW Hydro in Sloveniahttp://www.cpm.si/CPMBH is a specialist in building tunnelshttp://www.cpmbh.ba/
We Own Concessions in BiHIn the territory of RepublikaSrpska in BiH we have access to many (50+) small hydro power plant concessions (20 year / 5% / up to 10MW, renewable). All locations and capacities are verified.  We own three.We only offer a location for sale when it receives building permit and we get confirmation from grid operator that there is enough grid capacity to accept entire plant’s production .
From Concession to Building Permit9. Grid Connectivity ConsentZoning ApprovalEcological PermitMain DesignLand Use RightsRevision of Main DesignFire Prevention PermitBuilding PermitStudy for the Issue of ConcessionConcession ContractFeasibility StudyGeneral DesignZoning RequirementsPlots&Pipeline StudyHydrological StudyPreliminary Ecological Analysis
The Importance of Thorough PlanningIt is of utmost importance to know local legislation concernig: Zoning and Building codeEnergyEcologyNational ParksLabourSecurity and Fire PreventionAdministrative ProceduresIt is also vise (necessary) to speak local language
Characteristicsof Jabušnica 3 (S-J-3)Water Flow                       Q = 1.0 m3 /sFall                                     H = 270.6mPower installed                 P = 2,124 MWAnticipated Production   E = 10.350 MWh/YearPreliminary calculations show that in BiH small hydro power plant saves 1,091 T CO2/MWh
Approximate Price Without CER’s~ 2.000€/kW installed pays for:The plant on “turnkey” basis
Calculations for S-J-3 without CERPrice for 2.124 MW installed = ~€ 4.248.000Revenue from electricity production-> 10.350MWh/Y * 50€/MWh 	=~ 517.500Net Revenue -(5% maintenance, 5% concession fee) 			=~ 465.750IRR (30Y)				= 10,33%Return in 9.1 years
Approximate Price~ 2.300€/kW installed pays for:The plant on “turnkey” basis100% of issued Certified Emission ReductionsCertificate of Origin
Calculations for S-J-3 with CERPrice for 2.124 MW installed = ~€ 4.885.200Revenue from electricity production-> 10.350MWh/Y * 50€/MWh 	=~ €517.500Net Revenue -(5% maintenance, 5% concession fee) 			=~ €465.750Revenue from CER’s 15€/T         	=~ €169.378Total yearly revenue			=~ €635.128IRR (30Y)					= ~12,58%Return in 7.7 yearsCertificate of Origin no price as yet but expected
+ 386 2 33 21 281CPM Energetika, Tržaška 39, Si-2000 Maribor, SloveniaE-mail: info@cpm-en.comWeb :  http://cpm-en.comCDM – a global tool for global warming problems

Small Hydro Cdm Project S J 3

  • 1.
    Small Hydro CDMProject S-J-3 for SaleA Kyoto Protocol “Clean Deveolpement Mechanism” Sample Project “Jabusnica 3” in Gacko, BiH - Presentation
  • 2.
    What is CDMCDMstands for UNFCCC Kyoto Protocol “Clean Development Mechanism”http://unfccc.int/resource/docs/publications/08_cdm_in_brief.pdfWhen verified and confirmed for additionality CER’s or Certified Emission Reductions are issued. CER’s are recognized in EU ETS and have a price. The most relevant source for checking spot emission allowances price ishttp://bluenext.eu/
  • 3.
    CPM Energetika CPM Energetika is a part of CPM group of companies registered in Slovenia, EUhttp://cpm-en.com/CPM d.d. built 50 MW Hydro in Sloveniahttp://www.cpm.si/CPMBH is a specialist in building tunnelshttp://www.cpmbh.ba/
  • 4.
    We Own Concessionsin BiHIn the territory of RepublikaSrpska in BiH we have access to many (50+) small hydro power plant concessions (20 year / 5% / up to 10MW, renewable). All locations and capacities are verified. We own three.We only offer a location for sale when it receives building permit and we get confirmation from grid operator that there is enough grid capacity to accept entire plant’s production .
  • 5.
    From Concession toBuilding Permit9. Grid Connectivity ConsentZoning ApprovalEcological PermitMain DesignLand Use RightsRevision of Main DesignFire Prevention PermitBuilding PermitStudy for the Issue of ConcessionConcession ContractFeasibility StudyGeneral DesignZoning RequirementsPlots&Pipeline StudyHydrological StudyPreliminary Ecological Analysis
  • 6.
    The Importance ofThorough PlanningIt is of utmost importance to know local legislation concernig: Zoning and Building codeEnergyEcologyNational ParksLabourSecurity and Fire PreventionAdministrative ProceduresIt is also vise (necessary) to speak local language
  • 7.
    Characteristicsof Jabušnica 3(S-J-3)Water Flow                       Q = 1.0 m3 /sFall                                     H = 270.6mPower installed                 P = 2,124 MWAnticipated Production   E = 10.350 MWh/YearPreliminary calculations show that in BiH small hydro power plant saves 1,091 T CO2/MWh
  • 8.
    Approximate Price WithoutCER’s~ 2.000€/kW installed pays for:The plant on “turnkey” basis
  • 9.
    Calculations for S-J-3without CERPrice for 2.124 MW installed = ~€ 4.248.000Revenue from electricity production-> 10.350MWh/Y * 50€/MWh =~ 517.500Net Revenue -(5% maintenance, 5% concession fee) =~ 465.750IRR (30Y) = 10,33%Return in 9.1 years
  • 10.
    Approximate Price~ 2.300€/kWinstalled pays for:The plant on “turnkey” basis100% of issued Certified Emission ReductionsCertificate of Origin
  • 11.
    Calculations for S-J-3with CERPrice for 2.124 MW installed = ~€ 4.885.200Revenue from electricity production-> 10.350MWh/Y * 50€/MWh =~ €517.500Net Revenue -(5% maintenance, 5% concession fee) =~ €465.750Revenue from CER’s 15€/T =~ €169.378Total yearly revenue =~ €635.128IRR (30Y) = ~12,58%Return in 7.7 yearsCertificate of Origin no price as yet but expected
  • 12.
    + 386 233 21 281CPM Energetika, Tržaška 39, Si-2000 Maribor, SloveniaE-mail: info@cpm-en.comWeb : http://cpm-en.comCDM – a global tool for global warming problems