SIVASUBRAMANI.N
+91 -9894878905 - nsiva.msit@gmail.com
Experience Summary
• 9+ years of experience in Software Testing in Black Box and QA using Manual Test Processes and ETL/DWH
Testing.
• 4+ Yrs Exp in Data Warehouse Testing (ETL Testing), Corporate Banking Domain (SEPA Module).
• Working Experience in Batch Testing.
• Good software testing skills with focus on time and cost, team building, quality and profitability.
• Possessing positive attitudes like truthfulness, commitment punctuality, dynamism and adaptability and
Exposure to BANKING domain and FINANCE.
• Working knowledge of Ab-Initio & Informatica graph execution process.
• Having Experience in Database Testing.
• Working knowledge of Web Services Testing (SOAP UI).
• Working Experience of HP Quality Center (11.0).
• Extensive experience in RTM using HP Quality Center, Test Planning, Test data preparation, Test Execution,
Status Reports, Test Closure Report.
• Good working knowledge of QA preparation (Estimation, Integrated Test Plan (ITP Documents) Test Plan &
Test Case Preparation, QC Check List, Traceability Matrix, Test Report).
• Experience in multiple Platforms- Windows, Linux and UNIX.
• Working knowledge of Automation Tools like SoapUI Pro, Win runner
• Excellent knowledge on Software Testing Life Cycle (STLC) and Software Development Life Cycle (SDLC).
• Expertise in performing ETL Testing, Functional & Regression Testing, GUI Testing, Installation Testing, and
web applications.
• Self-motivation, Independent problem solving attitude and hard working with a quest and zeal to learn new
technologies.
Educational Qualification
• MS (Information Technology) from NMC, Bharathidasan University, 2003.
• B.Sc.(Maths) from Government Art’s College, Bharathidasan University, 2001
Work Experience:
• Working at Senior software Test Analyst in Accenture Services Pvt. Ltd- Chennai from Oct 2014 – Till date
• Worked at Sr Testing Engineer in Polaris Software Labs- Chennai from July 2011 – Oct 2014
• Worked as Testing Engineer in Tata Consultancy Services (Contract - With Six sigma Software Payroll)
Chennai from March 2010 – Jan 2011
• Worked as Test Engineer in Ideatec Softwares (India) Pvt. Ltd., Coimbatore, from April 2006 – March 2010
• Worked as Software Supporting Engineer in Ideatec Softwares (India) Pvt. Ltd., Coimbatore
from December 2004 – March 2006
Technical Skills:
Operating System Windows NT/2000/XP/2003/2007, 2008, 2010 and UNIX
Testing Tools WinRunner, Putty, TOAD, SOAP UI
Database SQL, Oracle
Languages C, C++, JAVA
Defect Tracking Tools Quality Center
Web Technologies HTML, VB Script
Page 1 of 5
Project Details
Project 1:
Project Name : TCOE - KPCC
Client : Kaiser Permanente
Duration : Nov 2014 to Till Date
Team Size : 10
Environment : HP Quality Center, Oracle 9i, PUTTY, BI
Project Description:
Kaiser Permanente ClaimsConnect represents an important business and technology transformation.
The ClaimsConnect program establishes a national, industry-competitive technology platform that will enable us to
administer claims timely, accurately, and efficiently.
In order to remain competitive in a rapidly evolving marketplace and regulatory environment, it is vital for KP to be
able to process claims timely, accurately, and efficiently. ClaimsConnect is also being driven by a need for flexibility
and timeliness in product administration, to facilitate transparency in claims utilization data
Responsibilities:
• Experience in leading 10 member team..
• Interacted with client on Daily meetings.
• Prepared the Daily and Weekly status Reports and publishing them to all the Stake holders.
• Developed test plan & test estimation efforts for the project.
• Review and maintain the test deliverable.
• Checking the data flow & functionality from Staging to Clarity and then to CDW.
• Involved in preparing the test scenarios and Database test cases.
• Actively participated in all phases of the testing cycle including reviews, inspections and project status
meetings.
• As it a Data warehouse project, completely involved in Back-end testing with good exposure in Database
and UNIX.
Project 2:
Project Name : CITI - GIW
Client : CITI BANK (USA)
Duration : May 2012 to Till Date
Team Size : 5
Environment : HP Quality Center, Oracle 9i, PUTTY
Project Description:
Global CITI corporate client payments or funds transfer, receivables at GIW level from different product processors
namely CITIFT, FTI, DDE, IMPS and Flexcube from NAM, EMEA and ASIA regions. Objective is to load the historical and
BAU payments data from this warehouse to data mart along with the corresponding repairs/rejects/amendments
information and to showcase the summarized data at MSTR report pages in
region/country/branch/customer/account levels.
Responsibilities:
• Interacted with client on Daily meetings.
• Prepared the Daily and Weekly status Reports and publishing them to all the Stake holders.
• Developed test plan & test estimation efforts for the project.
• Review and maintain the test deliverable.
• Follow and ensure the project team adheres to the process defined by the organization.
• Checking the data flow & functionality from Staging to GIW warehouse and then to Data Mart.
Page 2 of 5
• Involved in preparing the test scenarios and Database test cases.
• Actively participated in all phases of the testing cycle including reviews, inspections and project status
meetings.
• As it a Data warehouse project, completely involved in Back-end testing with good exposure in Database
and UNIX.
• Create Batch test for processing and Execute in UNIX
• Preparation of Test Data using Oracle9i and Traceability Matrix.
Project 3:
Title : Think Money Data Ware Housing
Client : Think Money (UK)
Duration : Jul 2011 to Apr 2012
Team Size : 4
Environment : HP Quality Center, SQL SERVER 2008
Project Description:
Think Money, a debt management solution organization helps its customers to solve their financial problems through
their innovative products. Some of their products in Debt advice are Debt management, Debt Consolidation, IVA and
Trust Deeds.IT department of Think Money has taken the initiative of building Data Warehouse and has invited
POLARIS to implement it. POLARIS has conducted a 6 weeks workshop in recommending a roadmap with a time line
of 24 months in 5 phases to implement a data warehouse for Think Money.
Responsibilities:
• Understanding the mapping specification documents.
• Preparing test cases for all the phases
• Preparation of test scripts for test cases
• Performed Integration testing, Regression Testing and system testing.
• Performed Package level validation
• Performed end to end and negative testing
• Interacted with Developer team
• Performed Data base testing.
• Analysing test results and involved in bug tracking and reporting.
• Involved in bug review meetings and weekly status calls.
Project 4:
Title : IDO – Retail Defined Hierarchy
Client : AC Nielsen, US
Duration : Mar 2010 to Jan 2011
Team Size : 3
Environment : HP Quality Center, Oracle 9i, PUTTY, TOAD
Project Description:
The Nielsen Company is the world's leading provider of marketing information, audience measurement, and business
media products and services.
AcNielsen offers an integrated suite of market information gathered from a wide range of sources, advanced
information management tools, sophisticated analytical systems and methodologies, and dedicated professional
client service to its customer.
Page 3 of 5
Innovation Delivery Organization (IDO) is a platform/architecture where the customer requirements are delivered as
Business Specific Reports. RDH is the part of IDO, through which customer gets their desired reports by providing the
requirements.
Responsibilities:
• Performing Functional and Regression testing
• Performed ETL testing
• Coordinating with onsite and Offshore.
• Preparing & maintain the Project specific weekly schedule
• Uploading the test cases and results in Mercury Quality Center
• Logging defects in QC and following up with developers
• Analyzing the testing metrics by preparing Daily and weekly reports.
Project 5:
Title : MMIL
Client : Mehala Machines, Tirupur
Duration : Jun 2009 to Mar 2010
Environment : ASP .Net, SQL-Server 2000
Project Description:
MMIL is specifically designed for Machinery dealers having a wide sales network at various geographical locations. It
covers all the basic Inventory modules including online integration of Financial Accounting modules at both the HO &
Branches. This provides a very clear picture to the clients thus enabling them to monitor & control the sales of
different branches in a simple & efficient manner.
Responsibilities:
• Requirement study and gathering the required modifications on the script
• Preparing test cases , test data and execute test cases
• Conducting team meeting to evaluate the performance of the team
• Preparing the defect & execution report and give the updates to Lead.
• Preparing status report to discuss with management team
Project 6:
Title : AMEX
Client : NSP Tex, Tirupur
Duration : Apr 2008 to May 2009
Environment : Visual Basic .Net, SQL-Server 2000
Project Description:
AMEX is specifically designed for the Apparel & Textile Industry and covers all areas of an Apparel Manufacturing &
Exporting organization and provides total solutions with Predictable Costs, Proven Performance & Low Maintenance
Costs.
Responsibilities:
• Understanding Business requirements
• Raising the defects and prioritize the defects
• Preparing the defect & execution report and give the updates to onsite.
• Attending Periodical Status Meetings
Page 4 of 5
Project 7:
Title : Pay Roll
Client : TopLight, Tirupur
Duration : Sep 2007 to Mar 2008
Environment : Visual Basic .Net, SQL-Server 2000
Project Description:
IPay provides a complete payroll management solution for an organization. iPay is used in automating and providing
timely & accurate payroll processing for different types of employees in the organization. An organization can be
benefited immensely by adopting iPay for its payroll processing, thereby reducing Payroll Production costs &
Administration overheads among others. The flexibility built into iPay with exhaustible wage structures allows the
organizations to meet all the necessary requirements with minimal customization.
Responsibilities:
• Preparing test cases and Executing
• Manual testing and Bug reporting
• Analyzing the actual versus the expected results
• Attending weekly meeting with team members and Test Lead.
Project 8:
Title : Dyeing
Client : DGK, Tirupur
Duration : Apr 2006 to Aug 2007
Environment : Visual Basic6.0, SQL-Server 2000
Project Description:
Dman is a software package providing total solutions to all the automation requirements of the Dyeing Industry.
By using Dman the user can keep track of all the different stages in the Dyeing cycle there by reducing the Overhead
Costs and other Write-offs. Creative Windows & GUI Designs have been utilized in the development of Dman.
It facilitates in maintaining the Inventory purchase order details and generating stock damages & stock modification
documents, Goods Inward, Job card, and Delivery necessary in the process of dyeing the material. Also performing
various calculations involved during the process of Accounts ledger and Voucher entry of Bank reconciliation. To
account for the entire expenditure incurred on each Dyeing Consignment and preparation of documents necessary
for Expense, Quotation, Water Inward and incentives.
Responsibilities:
• Systems analysis - Reviews client requirements documents and any preliminary analysis and identify the
needed configuration.
• Preparing test cases , Configuring test data to execute test cases
• Bug logging and preparing bug reports
Awards and Achievements
• ACE Award form Accenture (Year - 2015)
• GEM Award form Polaris Financial Technology(Year - 2013)
• Spot Award form Polaris Financial Technology.(Year - 2012)
Page 5 of 5
Project 7:
Title : Pay Roll
Client : TopLight, Tirupur
Duration : Sep 2007 to Mar 2008
Environment : Visual Basic .Net, SQL-Server 2000
Project Description:
IPay provides a complete payroll management solution for an organization. iPay is used in automating and providing
timely & accurate payroll processing for different types of employees in the organization. An organization can be
benefited immensely by adopting iPay for its payroll processing, thereby reducing Payroll Production costs &
Administration overheads among others. The flexibility built into iPay with exhaustible wage structures allows the
organizations to meet all the necessary requirements with minimal customization.
Responsibilities:
• Preparing test cases and Executing
• Manual testing and Bug reporting
• Analyzing the actual versus the expected results
• Attending weekly meeting with team members and Test Lead.
Project 8:
Title : Dyeing
Client : DGK, Tirupur
Duration : Apr 2006 to Aug 2007
Environment : Visual Basic6.0, SQL-Server 2000
Project Description:
Dman is a software package providing total solutions to all the automation requirements of the Dyeing Industry.
By using Dman the user can keep track of all the different stages in the Dyeing cycle there by reducing the Overhead
Costs and other Write-offs. Creative Windows & GUI Designs have been utilized in the development of Dman.
It facilitates in maintaining the Inventory purchase order details and generating stock damages & stock modification
documents, Goods Inward, Job card, and Delivery necessary in the process of dyeing the material. Also performing
various calculations involved during the process of Accounts ledger and Voucher entry of Bank reconciliation. To
account for the entire expenditure incurred on each Dyeing Consignment and preparation of documents necessary
for Expense, Quotation, Water Inward and incentives.
Responsibilities:
• Systems analysis - Reviews client requirements documents and any preliminary analysis and identify the
needed configuration.
• Preparing test cases , Configuring test data to execute test cases
• Bug logging and preparing bug reports
Awards and Achievements
• ACE Award form Accenture (Year - 2015)
• GEM Award form Polaris Financial Technology(Year - 2013)
• Spot Award form Polaris Financial Technology.(Year - 2012)
Page 5 of 5

Sivasubramani_N_Testing

  • 1.
    SIVASUBRAMANI.N +91 -9894878905 -nsiva.msit@gmail.com Experience Summary • 9+ years of experience in Software Testing in Black Box and QA using Manual Test Processes and ETL/DWH Testing. • 4+ Yrs Exp in Data Warehouse Testing (ETL Testing), Corporate Banking Domain (SEPA Module). • Working Experience in Batch Testing. • Good software testing skills with focus on time and cost, team building, quality and profitability. • Possessing positive attitudes like truthfulness, commitment punctuality, dynamism and adaptability and Exposure to BANKING domain and FINANCE. • Working knowledge of Ab-Initio & Informatica graph execution process. • Having Experience in Database Testing. • Working knowledge of Web Services Testing (SOAP UI). • Working Experience of HP Quality Center (11.0). • Extensive experience in RTM using HP Quality Center, Test Planning, Test data preparation, Test Execution, Status Reports, Test Closure Report. • Good working knowledge of QA preparation (Estimation, Integrated Test Plan (ITP Documents) Test Plan & Test Case Preparation, QC Check List, Traceability Matrix, Test Report). • Experience in multiple Platforms- Windows, Linux and UNIX. • Working knowledge of Automation Tools like SoapUI Pro, Win runner • Excellent knowledge on Software Testing Life Cycle (STLC) and Software Development Life Cycle (SDLC). • Expertise in performing ETL Testing, Functional & Regression Testing, GUI Testing, Installation Testing, and web applications. • Self-motivation, Independent problem solving attitude and hard working with a quest and zeal to learn new technologies. Educational Qualification • MS (Information Technology) from NMC, Bharathidasan University, 2003. • B.Sc.(Maths) from Government Art’s College, Bharathidasan University, 2001 Work Experience: • Working at Senior software Test Analyst in Accenture Services Pvt. Ltd- Chennai from Oct 2014 – Till date • Worked at Sr Testing Engineer in Polaris Software Labs- Chennai from July 2011 – Oct 2014 • Worked as Testing Engineer in Tata Consultancy Services (Contract - With Six sigma Software Payroll) Chennai from March 2010 – Jan 2011 • Worked as Test Engineer in Ideatec Softwares (India) Pvt. Ltd., Coimbatore, from April 2006 – March 2010 • Worked as Software Supporting Engineer in Ideatec Softwares (India) Pvt. Ltd., Coimbatore from December 2004 – March 2006 Technical Skills: Operating System Windows NT/2000/XP/2003/2007, 2008, 2010 and UNIX Testing Tools WinRunner, Putty, TOAD, SOAP UI Database SQL, Oracle Languages C, C++, JAVA Defect Tracking Tools Quality Center Web Technologies HTML, VB Script Page 1 of 5
  • 2.
    Project Details Project 1: ProjectName : TCOE - KPCC Client : Kaiser Permanente Duration : Nov 2014 to Till Date Team Size : 10 Environment : HP Quality Center, Oracle 9i, PUTTY, BI Project Description: Kaiser Permanente ClaimsConnect represents an important business and technology transformation. The ClaimsConnect program establishes a national, industry-competitive technology platform that will enable us to administer claims timely, accurately, and efficiently. In order to remain competitive in a rapidly evolving marketplace and regulatory environment, it is vital for KP to be able to process claims timely, accurately, and efficiently. ClaimsConnect is also being driven by a need for flexibility and timeliness in product administration, to facilitate transparency in claims utilization data Responsibilities: • Experience in leading 10 member team.. • Interacted with client on Daily meetings. • Prepared the Daily and Weekly status Reports and publishing them to all the Stake holders. • Developed test plan & test estimation efforts for the project. • Review and maintain the test deliverable. • Checking the data flow & functionality from Staging to Clarity and then to CDW. • Involved in preparing the test scenarios and Database test cases. • Actively participated in all phases of the testing cycle including reviews, inspections and project status meetings. • As it a Data warehouse project, completely involved in Back-end testing with good exposure in Database and UNIX. Project 2: Project Name : CITI - GIW Client : CITI BANK (USA) Duration : May 2012 to Till Date Team Size : 5 Environment : HP Quality Center, Oracle 9i, PUTTY Project Description: Global CITI corporate client payments or funds transfer, receivables at GIW level from different product processors namely CITIFT, FTI, DDE, IMPS and Flexcube from NAM, EMEA and ASIA regions. Objective is to load the historical and BAU payments data from this warehouse to data mart along with the corresponding repairs/rejects/amendments information and to showcase the summarized data at MSTR report pages in region/country/branch/customer/account levels. Responsibilities: • Interacted with client on Daily meetings. • Prepared the Daily and Weekly status Reports and publishing them to all the Stake holders. • Developed test plan & test estimation efforts for the project. • Review and maintain the test deliverable. • Follow and ensure the project team adheres to the process defined by the organization. • Checking the data flow & functionality from Staging to GIW warehouse and then to Data Mart. Page 2 of 5
  • 3.
    • Involved inpreparing the test scenarios and Database test cases. • Actively participated in all phases of the testing cycle including reviews, inspections and project status meetings. • As it a Data warehouse project, completely involved in Back-end testing with good exposure in Database and UNIX. • Create Batch test for processing and Execute in UNIX • Preparation of Test Data using Oracle9i and Traceability Matrix. Project 3: Title : Think Money Data Ware Housing Client : Think Money (UK) Duration : Jul 2011 to Apr 2012 Team Size : 4 Environment : HP Quality Center, SQL SERVER 2008 Project Description: Think Money, a debt management solution organization helps its customers to solve their financial problems through their innovative products. Some of their products in Debt advice are Debt management, Debt Consolidation, IVA and Trust Deeds.IT department of Think Money has taken the initiative of building Data Warehouse and has invited POLARIS to implement it. POLARIS has conducted a 6 weeks workshop in recommending a roadmap with a time line of 24 months in 5 phases to implement a data warehouse for Think Money. Responsibilities: • Understanding the mapping specification documents. • Preparing test cases for all the phases • Preparation of test scripts for test cases • Performed Integration testing, Regression Testing and system testing. • Performed Package level validation • Performed end to end and negative testing • Interacted with Developer team • Performed Data base testing. • Analysing test results and involved in bug tracking and reporting. • Involved in bug review meetings and weekly status calls. Project 4: Title : IDO – Retail Defined Hierarchy Client : AC Nielsen, US Duration : Mar 2010 to Jan 2011 Team Size : 3 Environment : HP Quality Center, Oracle 9i, PUTTY, TOAD Project Description: The Nielsen Company is the world's leading provider of marketing information, audience measurement, and business media products and services. AcNielsen offers an integrated suite of market information gathered from a wide range of sources, advanced information management tools, sophisticated analytical systems and methodologies, and dedicated professional client service to its customer. Page 3 of 5
  • 4.
    Innovation Delivery Organization(IDO) is a platform/architecture where the customer requirements are delivered as Business Specific Reports. RDH is the part of IDO, through which customer gets their desired reports by providing the requirements. Responsibilities: • Performing Functional and Regression testing • Performed ETL testing • Coordinating with onsite and Offshore. • Preparing & maintain the Project specific weekly schedule • Uploading the test cases and results in Mercury Quality Center • Logging defects in QC and following up with developers • Analyzing the testing metrics by preparing Daily and weekly reports. Project 5: Title : MMIL Client : Mehala Machines, Tirupur Duration : Jun 2009 to Mar 2010 Environment : ASP .Net, SQL-Server 2000 Project Description: MMIL is specifically designed for Machinery dealers having a wide sales network at various geographical locations. It covers all the basic Inventory modules including online integration of Financial Accounting modules at both the HO & Branches. This provides a very clear picture to the clients thus enabling them to monitor & control the sales of different branches in a simple & efficient manner. Responsibilities: • Requirement study and gathering the required modifications on the script • Preparing test cases , test data and execute test cases • Conducting team meeting to evaluate the performance of the team • Preparing the defect & execution report and give the updates to Lead. • Preparing status report to discuss with management team Project 6: Title : AMEX Client : NSP Tex, Tirupur Duration : Apr 2008 to May 2009 Environment : Visual Basic .Net, SQL-Server 2000 Project Description: AMEX is specifically designed for the Apparel & Textile Industry and covers all areas of an Apparel Manufacturing & Exporting organization and provides total solutions with Predictable Costs, Proven Performance & Low Maintenance Costs. Responsibilities: • Understanding Business requirements • Raising the defects and prioritize the defects • Preparing the defect & execution report and give the updates to onsite. • Attending Periodical Status Meetings Page 4 of 5
  • 5.
    Project 7: Title :Pay Roll Client : TopLight, Tirupur Duration : Sep 2007 to Mar 2008 Environment : Visual Basic .Net, SQL-Server 2000 Project Description: IPay provides a complete payroll management solution for an organization. iPay is used in automating and providing timely & accurate payroll processing for different types of employees in the organization. An organization can be benefited immensely by adopting iPay for its payroll processing, thereby reducing Payroll Production costs & Administration overheads among others. The flexibility built into iPay with exhaustible wage structures allows the organizations to meet all the necessary requirements with minimal customization. Responsibilities: • Preparing test cases and Executing • Manual testing and Bug reporting • Analyzing the actual versus the expected results • Attending weekly meeting with team members and Test Lead. Project 8: Title : Dyeing Client : DGK, Tirupur Duration : Apr 2006 to Aug 2007 Environment : Visual Basic6.0, SQL-Server 2000 Project Description: Dman is a software package providing total solutions to all the automation requirements of the Dyeing Industry. By using Dman the user can keep track of all the different stages in the Dyeing cycle there by reducing the Overhead Costs and other Write-offs. Creative Windows & GUI Designs have been utilized in the development of Dman. It facilitates in maintaining the Inventory purchase order details and generating stock damages & stock modification documents, Goods Inward, Job card, and Delivery necessary in the process of dyeing the material. Also performing various calculations involved during the process of Accounts ledger and Voucher entry of Bank reconciliation. To account for the entire expenditure incurred on each Dyeing Consignment and preparation of documents necessary for Expense, Quotation, Water Inward and incentives. Responsibilities: • Systems analysis - Reviews client requirements documents and any preliminary analysis and identify the needed configuration. • Preparing test cases , Configuring test data to execute test cases • Bug logging and preparing bug reports Awards and Achievements • ACE Award form Accenture (Year - 2015) • GEM Award form Polaris Financial Technology(Year - 2013) • Spot Award form Polaris Financial Technology.(Year - 2012) Page 5 of 5
  • 6.
    Project 7: Title :Pay Roll Client : TopLight, Tirupur Duration : Sep 2007 to Mar 2008 Environment : Visual Basic .Net, SQL-Server 2000 Project Description: IPay provides a complete payroll management solution for an organization. iPay is used in automating and providing timely & accurate payroll processing for different types of employees in the organization. An organization can be benefited immensely by adopting iPay for its payroll processing, thereby reducing Payroll Production costs & Administration overheads among others. The flexibility built into iPay with exhaustible wage structures allows the organizations to meet all the necessary requirements with minimal customization. Responsibilities: • Preparing test cases and Executing • Manual testing and Bug reporting • Analyzing the actual versus the expected results • Attending weekly meeting with team members and Test Lead. Project 8: Title : Dyeing Client : DGK, Tirupur Duration : Apr 2006 to Aug 2007 Environment : Visual Basic6.0, SQL-Server 2000 Project Description: Dman is a software package providing total solutions to all the automation requirements of the Dyeing Industry. By using Dman the user can keep track of all the different stages in the Dyeing cycle there by reducing the Overhead Costs and other Write-offs. Creative Windows & GUI Designs have been utilized in the development of Dman. It facilitates in maintaining the Inventory purchase order details and generating stock damages & stock modification documents, Goods Inward, Job card, and Delivery necessary in the process of dyeing the material. Also performing various calculations involved during the process of Accounts ledger and Voucher entry of Bank reconciliation. To account for the entire expenditure incurred on each Dyeing Consignment and preparation of documents necessary for Expense, Quotation, Water Inward and incentives. Responsibilities: • Systems analysis - Reviews client requirements documents and any preliminary analysis and identify the needed configuration. • Preparing test cases , Configuring test data to execute test cases • Bug logging and preparing bug reports Awards and Achievements • ACE Award form Accenture (Year - 2015) • GEM Award form Polaris Financial Technology(Year - 2013) • Spot Award form Polaris Financial Technology.(Year - 2012) Page 5 of 5