SlideShare a Scribd company logo
1 of 58
Presented by Strategic Business Development Dr. Akram Sheikh Minister of State  Deputy Chairman, Planning Commission Government of Pakistan (August 30, 2007) Siemens Pakistan Engineering Co. Ltd. Company Presentation
Vision 2030 – A historical step forward ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],To remain market leader and  technology pace setter in the engineering and electronics industry  by utilizing the high-tech engineering expertise of the  Siemens Group worldwide . To maintain our strong and prominent  local presence Siemens Pakistan’s Vision Planning Commission GoP’s Vision Source:  1) Vision 2030-Planning Commission, GoP 2) Siemens Pakistan Developed,  industrialized , just and prosperous Pakistan through rapid and  sustainable development  in a resource constraint economy by deploying  knowledge inputs Siemens Pakistan’s Mission statement
Vision 2030 – Important Pillars  Vision 2030 Rural and Urban Development Alternative Energy Energy for Growth Manufacturing & Industry Water Resources Healthcare Employment Source: Vision 2030-Planning Commission, GoP
Vision 2030- Focus ,[object Object],[object Object],[object Object],[object Object],[object Object],Vision 2030 Rural and Urban Development Alternative Energy Energy for Growth Manufacturing & Industry Water Resources Health care Employment Source: Vision 2030-Planning Commission, GoP
Siemens Power Solutions Gas Turbines Industrial application 4MW to 45 MW - Large Scale Application 68 MW to 340 MW Steam Turbines Industrial application upto 180 MW - Large scale application upto 1200 MW Wind Turbines Capacity up to 3.6 MW Napier Turbo Chargers For marine power generation and rail traction up to 11 MW Compressors Ranging from 150 to 824,000 CFM Hydro Power Generation Advance technologies and integrated services
Siemens Power Solutions Equipment and Substations for Power Transmission  and Distributions (PTD) Systems (66KV to 500KV) Market Leaders in High Voltage Circuit Breakers KESC 132 / 220KV  GIS Substation Karachi Airport 132KV Conventional Substation
Siemens Power Solutions Power Transformers  (upto 160MVA) Distribution Transformers  (upto 5000 KVA) Special Application Transformers > 400 units > 250,000  units Earthing, Auto & Convertor Transformer Dry Type Transformers  (~2000KVA) Voltage Regulators  (2.5KV to 35KV) Exporting to:
Siemens Power Solutions Ring Main Units & Capacitor Banks Low Voltage Switchgear Medium Voltage Switchgear Medium Voltage Utility Switchgear KIOSK Substations  (up to 2.5 MVA) Exporting to:
Siemens Power Solutions 20 KVA to 1100 KVA DG Sets Manual Change Over Panel Synchronizing Panels (Auto & Manual) Acoustic and Weather Proof Canopies Auto Mains Failure Panel Free Standing & Underground Fuel Tanks Mobile Units After Sales Services Exporting to: Siemens D.G.Sets won  Consumer Choice Award in 2006 and again in 2007
Siemens Power Solutions Protection & Control Systems Power Quality Systems Substation Automation Systems SCADA & LDC Turnkey Solutions Substation Communication Systems Protection Relays, Relay panels, Control panels Energy Meters, Power Quality Recorders, Fault Recorders Complete solutions for industry & utilities with Smart Remote Terminal Units Complete Solutions with Power Line Carriers, Fiber optic, Microwave & High Speed Digital Link (HSDL) Comprehensive SCADA solutions with Energy Management Systems & Distribution Management Systems COMPLETE Energy Automation Solutions 1996 Protection Relay RTU MUX
Siemens Power Solutions Asset Services of PTD Products & Projects Maintenance, Rehabilitation, Up grading, Retrofitting, Spare Parts Management, Transformer Life Management  Network Analysis & Consultancy Technical due diligence and technical audits. Network studies including load flows, short circuits, insulation coordination & harmonic analysis. Metering Services Automatic Remote Metering, Pre-payment metering Specialized Tools Software tool for Stability Studies, Protection coordination tool, Tools for Distribution & Transmission networks. Customer Support, Training Support in all power transmission and distribution problems, hotline, customized training programs.
Success Stories – Hydro Power Ghazi Barotha Hydro Power Station Tarbela Hydro Electric Power Station
Success Story - Dubai Electric & Water Authority (DEWA) DEWA Grid Station Projects - First Order 5  High Voltage 132 kV Grid Stations DEWA Grid Station Projects - Repeat Orders  13  High Voltage 132 kV Grid Stations Emirates Mall Largest Shopping Mall of UAE Dubai Investment Park Dubai Festival City Dubai Sports City  Burj Dubai Tower Expected World Tallest Building
Siemens Building Management Solutions Security Products Access control, Intrusion detection, CCTV, Smart Card Technology Fire Safety Products Fire protection and detection  HVAC Products Valves, Actuators, Sensors, Thermostats, Controllers etc Building Management System (BMS) Room Management & Energy Services  Data Darbar, Lahore OSRAM Lighting Products Wide range of lighting products and lighting system components Zaver Pearl Continental Hotel, Gwadar
Siemens BMS for HVAC Integration Energy Management via HVAC Integration that ,[object Object],[object Object],[object Object],This can be reduced by: Fact!  In a building, the highest operating cost is incurred by  HVAC systems !
Vision 2030- Focus ,[object Object],[object Object],[object Object],[object Object],Vision 2030 Rural and Urban Development Alternate Energy Energy for Growth Manufacturing & Industry Water Resources Health care Employment Source: Vision 2030-Planning Commission, GoP
Siemens Local Manufacturing Capabilities Transformers Switchboards Switch Gear Eqpt. Traffic Control System Railway Signaling Eqpt. Motors DG Sets Control Panels
Siemens Local Capacity Enhancement Special Application Transformers Factory  Rating ~ 220kV/160MVA
Siemens Local Capacity Enhancement Digital Microwave Radio System Optic Fiber Transmission Equipment Desktop Computers & Servers Carrier Telephone Industries (CTI) Islamabad is now a Siemens Pakistan’s Subsidiary
Siemens Process Industries Solutions Telemetry and SCADA Process Control and Automation Process Instrumentation Management Information Systems (MIS) Pakistan Cement  Maple Leaf Cement  Attock Cement  Gulf Cement Co.  Specialized Services  Instrumentation & Control Systems Project  Boiler Control System  Process Control System
Siemens Automation & Drives Solutions Low Voltage Three Phase Induction Motors Medium Voltage Three Phase Induction Motors Gear Motors Brake Motors Explosion Proof Motors Special Design Motors Textile Machine Motors Hollow Shaft Motors Single Phase Motors Fan Motors Exporting to: Siemens Motors won  Consumer Choice Award in 2007
Siemens Automation & Drives Solutions Industrial Automation System Control & Distribution Products Process Instrumentation Products Power Factor Relays UPS (0.7 to 400KVA ratings) Pumps for Special Applications Large Drives and Standard Drives Discharge Reactors Exporting to:
Siemens On Call, Logistics & Maintenance Solutions Operation & Maintenance Service  (Industrial, Power Plants & Utilities) Repair, Overhauling & Maintenance of Motors & Alternators Spare Parts Management Condition Monitoring  (Thermography, Vibration analysis, NDI & Oil analysis) For all your engineering solutions,  Contact our Call Centre at Karachi: 111-066-077 PLC based Alarm Annunciation and Control System for two compressors in National Refinery Ltd. Dual Feeder System Maple Leaf Cement Operations & Maintenance contract of Kohat Tunnel
Siemens Business Driven by Engineering Capabilities Local Engineering Capabilities are the cornerstone of our success
Vision 2030- Focus ,[object Object],[object Object],Vision 2030 Rural and Urban Development Alternate Energy Energy for Growth Manufacturing & Industry Water Resources Health care Employment Source: Vision 2030-Planning Commission, GoP
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Siemens Water & Waste Water Solutions Standard products for industrial use Equipment Standard products and integrated systems for water management System Maintenance, operation,  build-own-operate, repairs, troubleshooting, mobile water treatment Services Mobile treatment units Mobile Service
Success Story – DCL Cogeneration Project in Karachi 94 MW Combined Cycle Power Plant 3 Million Gallons per day Desalination Capacity
Success Story - K III Greater Water Supply Project Project   Dhabeji & NEK Pump Houses Customer Karachi Water & Sewerage Board Contract Type EPC – Turnkey Contract Pumping Capacity 140 MGD  (Total Design Capacity) Early Completion of the project by  TWO  months Civil Work Mechanical Work Electrical Work
Success Story - New Murree Bulk Water Supply Project A view of New Murree Bulk Water Supply Project Turnkey Project (Under Execution) Treatment Plant Site
Vision 2030- Focus ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Vision 2030 Healthcare Energy for Growth Manufacturing & Industry Water Resources Alternate Energy Employment Source: Vision 2030-Planning Commission, GoP Rural and Urban Development
Mega City of Pakistan   Karachi identified amongst Mega Cities of the world
Mega Trends & Siemens Strengths
Mega Trends & Siemens Strengths
Mega Trends & Siemens Strengths
Siemens Transportation Solutions Rail Automation Traction Power Supply System Mass Transit Systems Electrical & Diesel Electric Locomotives Passenger Coaches Electrical Multiple Units
Siemens Information Technology Solutions ERP / ERM Solutions (SAP) Software Development Solutions Certified Training Academy First SAP Value Added Reseller Authorized training centre of SAP ,[object Object],[object Object],[object Object]
One Mega City – One Siemens Traffic Signals Airports Water Plant Power Plant Sport Venues Residential Complex Broadcasting Center Hospital Hotels/Hospitality Railways Transmission & Distribution Waste Water &  Sewerage Plant
Vision 2030- Focus ,[object Object],[object Object],Vision 2030 Employment Energy for Growth Manufacturing & Industry Water Resources Alternate Energy Healthcare Source: Vision 2030-Planning Commission, GoP Rural and Urban Development Alternate Energy
Siemens Solar Energy Solutions Solar Energy powering Roadside Emergency Communication System on M-1 & M-3 Motorway.  Electrification of a house in Sukkur via Solar Energy. Solar Powered Cathodic Protection System  in Chakwal
Alternative Energy- Wind Siemens Pakistan and New Park Energy Ltd. (NPEL) have signed a Contract for the supply of electrical part on turnkey basis for NPEL 50MW Wind Power Project near Gharo.  Siemens Pakistan shall provide the entire electrical system for the Wind Power Projects and its related civil works on turnkey basis. Most of the electrical equipment required by the Wind Power Projects is already being manufactured by Siemens Pakistan locally.
Vision 2030- Focus ,[object Object],[object Object],Vision 2030 Energy for Growth Manufacturing & Industry Water Resources Alternate Energy Employment Source: Vision 2030-Planning Commission, GoP Rural and Urban Development Healthcare
Siemens Medical Solutions Diagnostic Imaging Modalities & Solutions Radiation Therapy Systems Image Management Systems  Managed Healthcare Services Clinical & Administrative Solutions Operation Theatre Solutions Telemedicine & Teleradiology Siemens Medical Solutions Siemens Medical Solutions Cardiac Workflow
Some of our Landmark Projects in Healthcare Sector Children Hospital, Quetta Turnkey Project National Institute of Child Health, Karachi MRI System Tabba Heart Institute,   Karachi Complete Cardiac Workflow Haniifa Sulaiman Oncology Building(SIUT), Karachi Complete Oncology Solutions Armed Forces Institute of Cardiology, Rawalpindi Cardiac Workflow - Dual Source CT Scanner for  CT based Angiography HEALTHCARE HOSPITAL Diagnostic Imaging Solutions Healthcare Hospital, Karachi Children Hospital, Lahore Imaging Solutions for Radiology Pakistan Institute of Medical Sciences, Islamabad Cardiac Workflow - Dual Source CT Scanner for  CT based Angiography National Institute of Cardiovascular Disease, Karachi Cardiac Workflow - Dual Source CT Scanner for CT based Angiography
Vision 2030- Focus ,[object Object],[object Object],[object Object],Vision 2030 Rural and Urban Development Climate Change Energy for Growth Manufacturing & Industry Water Resources Health care Employment Source: Vision 2030-Planning Commission, GoP
Human Capital in Siemens Pakistan More than  4,000 *  employees Including over  750  professional engineers Siemens Leadership Framework Business Excellence through Leadership Excellence * Average Figure
Siemens Apprentice Training Program Siemens Pakistan has well established state-of-the-art Apprentice Training Centre, where young men are exposed to latest technology and trained for the industry. The three year course imparts training on Electrical & Mechanical trades and pays stipend to the trainees.
WHY SIEMENS?? WHY SIEMENS?
Global Resources Local Presence Siemens Strength Our comprehensive portfolio of products, systems and services allows us to offer virtually any type of solution that customer requires, using a single source.
Siemens in Pakistan Head Office & Industrial Complex Regional Offices Sales Offices Subsidiary Company
1922 –  Siemens first office in Lahore  1870 - 1 st  telegraph line from London to Calcutta 1932 -  Cable laying project in Karachi 1953 -  Siemens Pakistan Engineering Co. founded as Private Limited Company. 1957 -  Switchboards production commenced  1963 -  Siemens became Public Limited Company. Factory for Motors & Transformers -  1963 1976 -  Diesel Generating Sets introduced Power Transformers production started~30MVA -  1981 1985  - Railway signaling equipment assembly started Extension in Power Transformer rating~60MVA -  1987 1993 -  Pakistan 1 st  Digital Mobile Telephony Network 412 MW Rousch Combined Cycle Power Plant -  1996 1998  - Become first Value Added Reseller of SAP Export order for 132 kV fully automated substation for DEWA Dubai  -  2000 2002  - Launched   1.1 MVA DG Sets highest rating in the country Signed agreement for first desalination plant in Karachi -  2003 Launched new line of Low Voltage Switchgear System of family SIVACON 8PT -  2004 2005 - Acquired CTI Secured contract for Operation & Management of KESC   -   2005 Siemens Pakistan pioneered to manufacture 220 kV/160 MVA Auto Transformer in Pakistan -  2006   Siemens History, Progress & Success Dubai Sports City Project  -  2006   Launched Home Appliances  -  2000
Some of our Landmark Projects in Pakistan Defense Housing Authority, Lahore Phase-V Underground Electrification MCB Tower, tallest building of Pakistan Complete Electrification / Illumination of the project Bagh-e-Quaid, Karachi Electrification / Illumination of Tomb and Park ICI Shaikhupura Electrical & Instrumentation Works OGDC, Qadirpur Capacity Enhancement Project Civil, ME & I Procurement & Construction Punjab Industrial Estate Underground Electrification of Sundar Industrial Estate
Some of our Landmark Projects in Pakistan Urban Traffic Control Project (Phase-I) Government of Sindh Japan Power Generation Ltd IPP Project, Lahore Project Management, Turnkey Construction (EM & Civil) TELENOR Mobile Network Project Management & Turnkey Solution Project for Improvement of Financial Reporting and Auditing (PIFRA) Turnkey ERP Solution, 127 Locations, 1144 Users, about 3 million employee records, LAN & WAN Solution Pehur High Level Canal Project, Tarbela Turnkey Mechanical, E&I Solution, SCADA & Telemetry LAN / WAN Project CBR (34 Locations), NADRA, Habib Bank, Karachi University Bosicor 30,000 BPD Refinery Project Civil, Electrical, Mechanical and Instrumentation works Quaid-e-Azam International Airport, Karachi  Airfield Lighting (AFL) System
WHY SIEMENS?? SIEMENS as corporate citizen!
Few of our Awards & Honors ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Siemens as Responsible Corporate Citizen (CSR) Caring for Environment
Siemens Awarding Gold Medals & Scholarships We provide scholarships for education in the fields of Medicine, Engineering and Business studies. Siemens Gold Medal for students achieving top positions in the field of Engineering is setting the standards for excellence and helping to motivate Engineering students to put in their best efforts to receive this coveted prize.
 
Thank you The information provided in this presentation contains  general descriptions or characteristics of performance which in case of actual use may not always apply as described or which may change as a result of further development of the products. An obligation to provide the respective products/services and their characteristics shall only exist if expressly agreed in the terms of contract. Availability and technical specifications are subject to change without notice. The trademarks and pictures used are owned by Siemens AG or their respective owners.

More Related Content

What's hot

What's hot (19)

Rao cv supervisor
Rao cv supervisorRao cv supervisor
Rao cv supervisor
 
Mukesh_Kumar_(1)
Mukesh_Kumar_(1)Mukesh_Kumar_(1)
Mukesh_Kumar_(1)
 
Cv (5) converted
Cv (5) convertedCv (5) converted
Cv (5) converted
 
subrat resume
subrat resumesubrat resume
subrat resume
 
company profile kumar
company profile kumarcompany profile kumar
company profile kumar
 
RESUME_PP
RESUME_PPRESUME_PP
RESUME_PP
 
Mohamed_Saad
Mohamed_SaadMohamed_Saad
Mohamed_Saad
 
NTAMC
NTAMCNTAMC
NTAMC
 
Project report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and DrivesProject report - Industrial applications of PLCs and Drives
Project report - Industrial applications of PLCs and Drives
 
Electrical and Electronics Engineering (EEE Internship presentation
Electrical and Electronics Engineering (EEE Internship presentationElectrical and Electronics Engineering (EEE Internship presentation
Electrical and Electronics Engineering (EEE Internship presentation
 
EEM PROFILE
EEM PROFILEEEM PROFILE
EEM PROFILE
 
induction motor protection system
induction motor protection systeminduction motor protection system
induction motor protection system
 
Alaa cv update
Alaa cv updateAlaa cv update
Alaa cv update
 
RAHUL_KASHYAP_ResumeW
RAHUL_KASHYAP_ResumeWRAHUL_KASHYAP_ResumeW
RAHUL_KASHYAP_ResumeW
 
Ls catalog thiet bi tu dong power transformers 110816-dienhathe.vn
Ls catalog thiet bi tu dong power transformers 110816-dienhathe.vnLs catalog thiet bi tu dong power transformers 110816-dienhathe.vn
Ls catalog thiet bi tu dong power transformers 110816-dienhathe.vn
 
irfan final cv (2)
irfan final cv (2)irfan final cv (2)
irfan final cv (2)
 
ELECTRONIC PROTECTION FOR EXAM PAPER LEAKAGE
ELECTRONIC PROTECTION FOR EXAM PAPER LEAKAGEELECTRONIC PROTECTION FOR EXAM PAPER LEAKAGE
ELECTRONIC PROTECTION FOR EXAM PAPER LEAKAGE
 
apratimkangkan
apratimkangkanapratimkangkan
apratimkangkan
 
CV YUVARAJS
CV YUVARAJSCV YUVARAJS
CV YUVARAJS
 

Similar to Siemens Pakistan’s Presentation To Planning Commision 30 Aug 2007

Pyrotech World Profile
Pyrotech World ProfilePyrotech World Profile
Pyrotech World ProfilePriyanka Pande
 
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridIncreasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridTata Power Delhi Distribution Limited
 
Schneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric India
 
Company profile Felidae Systems
Company profile Felidae SystemsCompany profile Felidae Systems
Company profile Felidae SystemsManish Jain
 
Aia tata power_26112010 r1
Aia tata power_26112010 r1Aia tata power_26112010 r1
Aia tata power_26112010 r1Ajinkya Dalvi
 
Engage with...Control Techniques, a Nidec Brand | Driving the Electric Revolu...
Engage with...Control Techniques, a Nidec Brand | Driving the Electric Revolu...Engage with...Control Techniques, a Nidec Brand | Driving the Electric Revolu...
Engage with...Control Techniques, a Nidec Brand | Driving the Electric Revolu...KTN
 
Nidec asi corporate overview
Nidec asi corporate overviewNidec asi corporate overview
Nidec asi corporate overviewNidec Corporation
 
AEIL Company profile
AEIL Company profileAEIL Company profile
AEIL Company profileRaghavendra M
 
en.company_presentation.pdf
en.company_presentation.pdfen.company_presentation.pdf
en.company_presentation.pdfMikeDinho
 
Emerson_Smart_Wireless_Solutions.pdf
Emerson_Smart_Wireless_Solutions.pdfEmerson_Smart_Wireless_Solutions.pdf
Emerson_Smart_Wireless_Solutions.pdfssuserd973fe
 

Similar to Siemens Pakistan’s Presentation To Planning Commision 30 Aug 2007 (20)

Pyrotech World Profile
Pyrotech World ProfilePyrotech World Profile
Pyrotech World Profile
 
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter GridIncreasing Role of Technology in Power Distribution: Moving towards Smarter Grid
Increasing Role of Technology in Power Distribution: Moving towards Smarter Grid
 
control tech brochure
control tech brochurecontrol tech brochure
control tech brochure
 
Universal Transformers Presentation
Universal Transformers PresentationUniversal Transformers Presentation
Universal Transformers Presentation
 
Schneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domainsSchneider Electric Smart energy Presentation - Smart Gird domains
Schneider Electric Smart energy Presentation - Smart Gird domains
 
Company profile Felidae Systems
Company profile Felidae SystemsCompany profile Felidae Systems
Company profile Felidae Systems
 
MAS Profile
MAS ProfileMAS Profile
MAS Profile
 
Aia tata power_26112010 r1
Aia tata power_26112010 r1Aia tata power_26112010 r1
Aia tata power_26112010 r1
 
Sidima AG Template_Rev1
Sidima AG Template_Rev1Sidima AG Template_Rev1
Sidima AG Template_Rev1
 
Engage with...Control Techniques, a Nidec Brand | Driving the Electric Revolu...
Engage with...Control Techniques, a Nidec Brand | Driving the Electric Revolu...Engage with...Control Techniques, a Nidec Brand | Driving the Electric Revolu...
Engage with...Control Techniques, a Nidec Brand | Driving the Electric Revolu...
 
Resume Haris
Resume HarisResume Haris
Resume Haris
 
Nidec asi corporate overview
Nidec asi corporate overviewNidec asi corporate overview
Nidec asi corporate overview
 
Chandrajeet Singh
Chandrajeet SinghChandrajeet Singh
Chandrajeet Singh
 
AEIL Company profile
AEIL Company profileAEIL Company profile
AEIL Company profile
 
en.company_presentation.pdf
en.company_presentation.pdfen.company_presentation.pdf
en.company_presentation.pdf
 
Jakson Power Solutions
Jakson Power SolutionsJakson Power Solutions
Jakson Power Solutions
 
Capability overview
Capability overview Capability overview
Capability overview
 
Varun group
Varun groupVarun group
Varun group
 
Varun group
Varun groupVarun group
Varun group
 
Emerson_Smart_Wireless_Solutions.pdf
Emerson_Smart_Wireless_Solutions.pdfEmerson_Smart_Wireless_Solutions.pdf
Emerson_Smart_Wireless_Solutions.pdf
 

Siemens Pakistan’s Presentation To Planning Commision 30 Aug 2007

  • 1. Presented by Strategic Business Development Dr. Akram Sheikh Minister of State Deputy Chairman, Planning Commission Government of Pakistan (August 30, 2007) Siemens Pakistan Engineering Co. Ltd. Company Presentation
  • 2.
  • 3. Vision 2030 – Important Pillars Vision 2030 Rural and Urban Development Alternative Energy Energy for Growth Manufacturing & Industry Water Resources Healthcare Employment Source: Vision 2030-Planning Commission, GoP
  • 4.
  • 5. Siemens Power Solutions Gas Turbines Industrial application 4MW to 45 MW - Large Scale Application 68 MW to 340 MW Steam Turbines Industrial application upto 180 MW - Large scale application upto 1200 MW Wind Turbines Capacity up to 3.6 MW Napier Turbo Chargers For marine power generation and rail traction up to 11 MW Compressors Ranging from 150 to 824,000 CFM Hydro Power Generation Advance technologies and integrated services
  • 6. Siemens Power Solutions Equipment and Substations for Power Transmission and Distributions (PTD) Systems (66KV to 500KV) Market Leaders in High Voltage Circuit Breakers KESC 132 / 220KV GIS Substation Karachi Airport 132KV Conventional Substation
  • 7. Siemens Power Solutions Power Transformers (upto 160MVA) Distribution Transformers (upto 5000 KVA) Special Application Transformers > 400 units > 250,000 units Earthing, Auto & Convertor Transformer Dry Type Transformers (~2000KVA) Voltage Regulators (2.5KV to 35KV) Exporting to:
  • 8. Siemens Power Solutions Ring Main Units & Capacitor Banks Low Voltage Switchgear Medium Voltage Switchgear Medium Voltage Utility Switchgear KIOSK Substations (up to 2.5 MVA) Exporting to:
  • 9. Siemens Power Solutions 20 KVA to 1100 KVA DG Sets Manual Change Over Panel Synchronizing Panels (Auto & Manual) Acoustic and Weather Proof Canopies Auto Mains Failure Panel Free Standing & Underground Fuel Tanks Mobile Units After Sales Services Exporting to: Siemens D.G.Sets won Consumer Choice Award in 2006 and again in 2007
  • 10. Siemens Power Solutions Protection & Control Systems Power Quality Systems Substation Automation Systems SCADA & LDC Turnkey Solutions Substation Communication Systems Protection Relays, Relay panels, Control panels Energy Meters, Power Quality Recorders, Fault Recorders Complete solutions for industry & utilities with Smart Remote Terminal Units Complete Solutions with Power Line Carriers, Fiber optic, Microwave & High Speed Digital Link (HSDL) Comprehensive SCADA solutions with Energy Management Systems & Distribution Management Systems COMPLETE Energy Automation Solutions 1996 Protection Relay RTU MUX
  • 11. Siemens Power Solutions Asset Services of PTD Products & Projects Maintenance, Rehabilitation, Up grading, Retrofitting, Spare Parts Management, Transformer Life Management Network Analysis & Consultancy Technical due diligence and technical audits. Network studies including load flows, short circuits, insulation coordination & harmonic analysis. Metering Services Automatic Remote Metering, Pre-payment metering Specialized Tools Software tool for Stability Studies, Protection coordination tool, Tools for Distribution & Transmission networks. Customer Support, Training Support in all power transmission and distribution problems, hotline, customized training programs.
  • 12. Success Stories – Hydro Power Ghazi Barotha Hydro Power Station Tarbela Hydro Electric Power Station
  • 13. Success Story - Dubai Electric & Water Authority (DEWA) DEWA Grid Station Projects - First Order 5 High Voltage 132 kV Grid Stations DEWA Grid Station Projects - Repeat Orders 13 High Voltage 132 kV Grid Stations Emirates Mall Largest Shopping Mall of UAE Dubai Investment Park Dubai Festival City Dubai Sports City Burj Dubai Tower Expected World Tallest Building
  • 14. Siemens Building Management Solutions Security Products Access control, Intrusion detection, CCTV, Smart Card Technology Fire Safety Products Fire protection and detection HVAC Products Valves, Actuators, Sensors, Thermostats, Controllers etc Building Management System (BMS) Room Management & Energy Services Data Darbar, Lahore OSRAM Lighting Products Wide range of lighting products and lighting system components Zaver Pearl Continental Hotel, Gwadar
  • 15.
  • 16.
  • 17. Siemens Local Manufacturing Capabilities Transformers Switchboards Switch Gear Eqpt. Traffic Control System Railway Signaling Eqpt. Motors DG Sets Control Panels
  • 18. Siemens Local Capacity Enhancement Special Application Transformers Factory Rating ~ 220kV/160MVA
  • 19. Siemens Local Capacity Enhancement Digital Microwave Radio System Optic Fiber Transmission Equipment Desktop Computers & Servers Carrier Telephone Industries (CTI) Islamabad is now a Siemens Pakistan’s Subsidiary
  • 20. Siemens Process Industries Solutions Telemetry and SCADA Process Control and Automation Process Instrumentation Management Information Systems (MIS) Pakistan Cement Maple Leaf Cement Attock Cement Gulf Cement Co. Specialized Services Instrumentation & Control Systems Project Boiler Control System Process Control System
  • 21. Siemens Automation & Drives Solutions Low Voltage Three Phase Induction Motors Medium Voltage Three Phase Induction Motors Gear Motors Brake Motors Explosion Proof Motors Special Design Motors Textile Machine Motors Hollow Shaft Motors Single Phase Motors Fan Motors Exporting to: Siemens Motors won Consumer Choice Award in 2007
  • 22. Siemens Automation & Drives Solutions Industrial Automation System Control & Distribution Products Process Instrumentation Products Power Factor Relays UPS (0.7 to 400KVA ratings) Pumps for Special Applications Large Drives and Standard Drives Discharge Reactors Exporting to:
  • 23. Siemens On Call, Logistics & Maintenance Solutions Operation & Maintenance Service (Industrial, Power Plants & Utilities) Repair, Overhauling & Maintenance of Motors & Alternators Spare Parts Management Condition Monitoring (Thermography, Vibration analysis, NDI & Oil analysis) For all your engineering solutions, Contact our Call Centre at Karachi: 111-066-077 PLC based Alarm Annunciation and Control System for two compressors in National Refinery Ltd. Dual Feeder System Maple Leaf Cement Operations & Maintenance contract of Kohat Tunnel
  • 24. Siemens Business Driven by Engineering Capabilities Local Engineering Capabilities are the cornerstone of our success
  • 25.
  • 26.
  • 27. Success Story – DCL Cogeneration Project in Karachi 94 MW Combined Cycle Power Plant 3 Million Gallons per day Desalination Capacity
  • 28. Success Story - K III Greater Water Supply Project Project Dhabeji & NEK Pump Houses Customer Karachi Water & Sewerage Board Contract Type EPC – Turnkey Contract Pumping Capacity 140 MGD (Total Design Capacity) Early Completion of the project by TWO months Civil Work Mechanical Work Electrical Work
  • 29. Success Story - New Murree Bulk Water Supply Project A view of New Murree Bulk Water Supply Project Turnkey Project (Under Execution) Treatment Plant Site
  • 30.
  • 31. Mega City of Pakistan Karachi identified amongst Mega Cities of the world
  • 32. Mega Trends & Siemens Strengths
  • 33. Mega Trends & Siemens Strengths
  • 34. Mega Trends & Siemens Strengths
  • 35. Siemens Transportation Solutions Rail Automation Traction Power Supply System Mass Transit Systems Electrical & Diesel Electric Locomotives Passenger Coaches Electrical Multiple Units
  • 36.
  • 37. One Mega City – One Siemens Traffic Signals Airports Water Plant Power Plant Sport Venues Residential Complex Broadcasting Center Hospital Hotels/Hospitality Railways Transmission & Distribution Waste Water & Sewerage Plant
  • 38.
  • 39. Siemens Solar Energy Solutions Solar Energy powering Roadside Emergency Communication System on M-1 & M-3 Motorway. Electrification of a house in Sukkur via Solar Energy. Solar Powered Cathodic Protection System in Chakwal
  • 40. Alternative Energy- Wind Siemens Pakistan and New Park Energy Ltd. (NPEL) have signed a Contract for the supply of electrical part on turnkey basis for NPEL 50MW Wind Power Project near Gharo. Siemens Pakistan shall provide the entire electrical system for the Wind Power Projects and its related civil works on turnkey basis. Most of the electrical equipment required by the Wind Power Projects is already being manufactured by Siemens Pakistan locally.
  • 41.
  • 42. Siemens Medical Solutions Diagnostic Imaging Modalities & Solutions Radiation Therapy Systems Image Management Systems Managed Healthcare Services Clinical & Administrative Solutions Operation Theatre Solutions Telemedicine & Teleradiology Siemens Medical Solutions Siemens Medical Solutions Cardiac Workflow
  • 43. Some of our Landmark Projects in Healthcare Sector Children Hospital, Quetta Turnkey Project National Institute of Child Health, Karachi MRI System Tabba Heart Institute, Karachi Complete Cardiac Workflow Haniifa Sulaiman Oncology Building(SIUT), Karachi Complete Oncology Solutions Armed Forces Institute of Cardiology, Rawalpindi Cardiac Workflow - Dual Source CT Scanner for CT based Angiography HEALTHCARE HOSPITAL Diagnostic Imaging Solutions Healthcare Hospital, Karachi Children Hospital, Lahore Imaging Solutions for Radiology Pakistan Institute of Medical Sciences, Islamabad Cardiac Workflow - Dual Source CT Scanner for CT based Angiography National Institute of Cardiovascular Disease, Karachi Cardiac Workflow - Dual Source CT Scanner for CT based Angiography
  • 44.
  • 45. Human Capital in Siemens Pakistan More than 4,000 * employees Including over 750 professional engineers Siemens Leadership Framework Business Excellence through Leadership Excellence * Average Figure
  • 46. Siemens Apprentice Training Program Siemens Pakistan has well established state-of-the-art Apprentice Training Centre, where young men are exposed to latest technology and trained for the industry. The three year course imparts training on Electrical & Mechanical trades and pays stipend to the trainees.
  • 47. WHY SIEMENS?? WHY SIEMENS?
  • 48. Global Resources Local Presence Siemens Strength Our comprehensive portfolio of products, systems and services allows us to offer virtually any type of solution that customer requires, using a single source.
  • 49. Siemens in Pakistan Head Office & Industrial Complex Regional Offices Sales Offices Subsidiary Company
  • 50. 1922 – Siemens first office in Lahore 1870 - 1 st telegraph line from London to Calcutta 1932 - Cable laying project in Karachi 1953 - Siemens Pakistan Engineering Co. founded as Private Limited Company. 1957 - Switchboards production commenced 1963 - Siemens became Public Limited Company. Factory for Motors & Transformers - 1963 1976 - Diesel Generating Sets introduced Power Transformers production started~30MVA - 1981 1985 - Railway signaling equipment assembly started Extension in Power Transformer rating~60MVA - 1987 1993 - Pakistan 1 st Digital Mobile Telephony Network 412 MW Rousch Combined Cycle Power Plant - 1996 1998 - Become first Value Added Reseller of SAP Export order for 132 kV fully automated substation for DEWA Dubai - 2000 2002 - Launched 1.1 MVA DG Sets highest rating in the country Signed agreement for first desalination plant in Karachi - 2003 Launched new line of Low Voltage Switchgear System of family SIVACON 8PT - 2004 2005 - Acquired CTI Secured contract for Operation & Management of KESC - 2005 Siemens Pakistan pioneered to manufacture 220 kV/160 MVA Auto Transformer in Pakistan - 2006 Siemens History, Progress & Success Dubai Sports City Project - 2006 Launched Home Appliances - 2000
  • 51. Some of our Landmark Projects in Pakistan Defense Housing Authority, Lahore Phase-V Underground Electrification MCB Tower, tallest building of Pakistan Complete Electrification / Illumination of the project Bagh-e-Quaid, Karachi Electrification / Illumination of Tomb and Park ICI Shaikhupura Electrical & Instrumentation Works OGDC, Qadirpur Capacity Enhancement Project Civil, ME & I Procurement & Construction Punjab Industrial Estate Underground Electrification of Sundar Industrial Estate
  • 52. Some of our Landmark Projects in Pakistan Urban Traffic Control Project (Phase-I) Government of Sindh Japan Power Generation Ltd IPP Project, Lahore Project Management, Turnkey Construction (EM & Civil) TELENOR Mobile Network Project Management & Turnkey Solution Project for Improvement of Financial Reporting and Auditing (PIFRA) Turnkey ERP Solution, 127 Locations, 1144 Users, about 3 million employee records, LAN & WAN Solution Pehur High Level Canal Project, Tarbela Turnkey Mechanical, E&I Solution, SCADA & Telemetry LAN / WAN Project CBR (34 Locations), NADRA, Habib Bank, Karachi University Bosicor 30,000 BPD Refinery Project Civil, Electrical, Mechanical and Instrumentation works Quaid-e-Azam International Airport, Karachi Airfield Lighting (AFL) System
  • 53. WHY SIEMENS?? SIEMENS as corporate citizen!
  • 54.
  • 55. Siemens as Responsible Corporate Citizen (CSR) Caring for Environment
  • 56. Siemens Awarding Gold Medals & Scholarships We provide scholarships for education in the fields of Medicine, Engineering and Business studies. Siemens Gold Medal for students achieving top positions in the field of Engineering is setting the standards for excellence and helping to motivate Engineering students to put in their best efforts to receive this coveted prize.
  • 57.  
  • 58. Thank you The information provided in this presentation contains general descriptions or characteristics of performance which in case of actual use may not always apply as described or which may change as a result of further development of the products. An obligation to provide the respective products/services and their characteristics shall only exist if expressly agreed in the terms of contract. Availability and technical specifications are subject to change without notice. The trademarks and pictures used are owned by Siemens AG or their respective owners.