Broadwind’s Product Offerings
© 2016 Broadwind Energy, Inc. All rights reserved. 2
Industrial Manufacturer with expertise in heavy weldments, precision gearing
and other energy and infrastructure applications
Tower Production
© 2016 Broadwind Energy, Inc. All rights reserved. 3
Design capacity ~500 towers per year; Investing $7M to
reduce bottlenecks and improve capacity
• Leading wind tower
manufacturer in U.S.
• Have produced ~3000 >1MW
towers for all major OEM’s in
U.S.
• Manitowoc, WI plant capacity
~350 towers
• Abilene, TX plant capacity
~150 towers
• Superior safety record
2013 2014 2015
Revenue 159.5$ 184.9$ 170.9$
Op. Inc. 19.6 18.1 4.7
EBITDA 24.8 22.3 9.5
© 2016 Broadwind Energy, Inc. All rights reserved. 4
0
100
200
300
400
500
2012 2013 2014 2015
Towers Sold
Tower Production Challenges
• Tower production increasing each year; design capacity ~500 towers
• 2015 production suffered from supply chain issues and production
challenges – back on track in 2016
• Taking action to resolve production variability issue
• Organizational Changes
• Process Changes
• Capital Investments
Wind Market Update
2/26/16 © 2016 Broadwind Energy, Inc. All rights reserved. 5
U.S. Market Outlook, 2015-2021e (GW)
•Longest planning horizon
in industry history
•Eliminates costly
start/stop inefficiencies
•Economics/ potential CPP
become installation
drivers as PTC expires
•Shift toward direct buys
by corporations
5-Year PTC extension adds ~16GW of additional installations into forecast
for 2017-2021
Gearing
© 2016 Broadwind Energy, Inc. All rights reserved. 6
• 90+ year history
• Competencies in wind gearing, oil &
gas, mining, steel and other industrial
applications
• Completed 3-year restructuring in 2014:
well positioned for rebound in oil & gas
and mining
• Increasing penetration into wind gearing
market following sale of Services
2013 2014 2015
Revenue 43.2$ 42.3$ 29.6$
Op. Inc. (17.9) (9.4) (8.2)
EBITDA (3.6) (0.9) (2.1)
Consolidated Financial Results
2/26/16 © 2016 Broadwind Energy, Inc. All rights reserved. 7
2015 Results
• Sales down 12%; Towers and Weldments -8%, Gearing -30%
• Gross margin, profit and EPS declines all due primarily to Towers
production challenges and weaker Gearing volumes from oil & gas and
mining customers
• One-time costs associated with difficult contract : $10 million
2013 2014 2015
Revenue-$ Millions 198.5$ 225.8$ 199.2$
Gross Profit-$ Millions 14.6 19.7 7.9
-% (ex. Restructuring) 9.7% 8.7% 4.0%
Operating Expense-$ Millions 23.1 21.2 19.8
-% (ex. Restructuring) 11.1% 9.3% 9.4%
Operating Income(Loss)-$ Millions (8.5) (1.5) (11.9)
Non-GAAP Adj. EBITDA-$ Millions 12.9 11.9 (0.4)
EPS, Continuing Operations (0.41) (0.12) (0.83)
Full Year
Strong Balance Sheet - $ Thousands
© 2016 Broadwind Energy, Inc. All rights reserved. 8
2014 2015
Cash + Equiv. 20,164 12,698
Accounts Receivable 17,043 9,784
Inventory 31,144 24,219
PPE 58,529 51,906
Other Assets 19,739 11,301
Total Assets 146,619 109,908
Accounts Payable 17,547 13,822
Customer Deposits 22,397 9,940
Debt + Capital
Leases
3,957 5,846
Other Liabilities 14,388 12,808
Total Liabilities 58,239 42,416
Equity 88,380 67,492
• $10M credit line undrawn at
12/31/15
• $5.8M of debt and capital
leases; $2.6M is New Markets
Tax Credit financing
• Operating Working Capital
sufficient ~7% of sales at
12/31/15
• $200M NOL carry-forward not
on balance sheet
Investment Thesis
•Wind energy demand is growing and planning horizon is best in
history
•BWEN stock depressed due to 2015 production execution misses
in Abilene tower plant
•Fixes in place/underway to support consistent execution
•Strong balance sheet – negative net debt
•Market cap of ~$40 million – significantly less than net book value
© 2016 Broadwind Energy, Inc. All rights reserved. 9
Click to edit Master title style
 Click to edit Master text styles
– Second level
• Third level
– Fourth level
» Fifth level
Broadwind Energy is committed to helping
customers maximize performance of their
energy and infrastructure investments—
quicker, easier and smarter.
10
© 2016 Broadwind Energy, Inc. All rights reserved.

More Related Content

What's hot

SAAEA NAEE 2013 Presentation
SAAEA NAEE 2013 PresentationSAAEA NAEE 2013 Presentation
SAAEA NAEE 2013 Presentation
Nigeria Alternative Energy Expo
 
Siqens GmbH
Siqens GmbHSiqens GmbH
Siqens GmbH
CleantechInnovate
 
Molly Reynolds presentation on Amendments in the Senate and House
Molly Reynolds presentation on Amendments in the Senate and HouseMolly Reynolds presentation on Amendments in the Senate and House
Molly Reynolds presentation on Amendments in the Senate and House
Kevin R. Kosar
 
OKELLO SOLAR BOILER (1)
OKELLO SOLAR BOILER (1)OKELLO SOLAR BOILER (1)
OKELLO SOLAR BOILER (1)Okello Ejedio
 
JLL Grand Rapids - Skyline 2019
JLL Grand Rapids - Skyline 2019JLL Grand Rapids - Skyline 2019
JLL Grand Rapids - Skyline 2019
Harrison West
 
Wind major players
Wind major playersWind major players
Wind major playerskarthik451
 
Corporate Lean examples
Corporate Lean examplesCorporate Lean examples
Corporate Lean examples
. .
 
U.S. EIA's Drilling Productivity Report - August 2016
U.S. EIA's Drilling Productivity Report - August 2016U.S. EIA's Drilling Productivity Report - August 2016
U.S. EIA's Drilling Productivity Report - August 2016
Marcellus Drilling News
 
Control Room business and strategic
Control Room business and strategic Control Room business and strategic
Control Room business and strategic
Yashvinder Singh Thakur
 
The Major Tight Oil Basins - March 2020
The Major Tight Oil Basins - March 2020The Major Tight Oil Basins - March 2020
The Major Tight Oil Basins - March 2020
ShaleProfile
 
Resultados mayo 2010
Resultados mayo 2010Resultados mayo 2010
Resultados mayo 2010
Robert Guaman
 
U.S. EIA's Drilling Productivity Report - September 2016
U.S. EIA's Drilling Productivity Report - September 2016U.S. EIA's Drilling Productivity Report - September 2016
U.S. EIA's Drilling Productivity Report - September 2016
Marcellus Drilling News
 
U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015
Marcellus Drilling News
 

What's hot (15)

SAAEA NAEE 2013 Presentation
SAAEA NAEE 2013 PresentationSAAEA NAEE 2013 Presentation
SAAEA NAEE 2013 Presentation
 
Siqens GmbH
Siqens GmbHSiqens GmbH
Siqens GmbH
 
Molly Reynolds presentation on Amendments in the Senate and House
Molly Reynolds presentation on Amendments in the Senate and HouseMolly Reynolds presentation on Amendments in the Senate and House
Molly Reynolds presentation on Amendments in the Senate and House
 
OKELLO SOLAR BOILER (1)
OKELLO SOLAR BOILER (1)OKELLO SOLAR BOILER (1)
OKELLO SOLAR BOILER (1)
 
JLL Grand Rapids - Skyline 2019
JLL Grand Rapids - Skyline 2019JLL Grand Rapids - Skyline 2019
JLL Grand Rapids - Skyline 2019
 
Wind major players
Wind major playersWind major players
Wind major players
 
Corporate Lean examples
Corporate Lean examplesCorporate Lean examples
Corporate Lean examples
 
Dha Energy
Dha EnergyDha Energy
Dha Energy
 
U.S. EIA's Drilling Productivity Report - August 2016
U.S. EIA's Drilling Productivity Report - August 2016U.S. EIA's Drilling Productivity Report - August 2016
U.S. EIA's Drilling Productivity Report - August 2016
 
Control Room business and strategic
Control Room business and strategic Control Room business and strategic
Control Room business and strategic
 
The Major Tight Oil Basins - March 2020
The Major Tight Oil Basins - March 2020The Major Tight Oil Basins - March 2020
The Major Tight Oil Basins - March 2020
 
Audi SS 2015_05.21.15_ENb
Audi SS 2015_05.21.15_ENbAudi SS 2015_05.21.15_ENb
Audi SS 2015_05.21.15_ENb
 
Resultados mayo 2010
Resultados mayo 2010Resultados mayo 2010
Resultados mayo 2010
 
U.S. EIA's Drilling Productivity Report - September 2016
U.S. EIA's Drilling Productivity Report - September 2016U.S. EIA's Drilling Productivity Report - September 2016
U.S. EIA's Drilling Productivity Report - September 2016
 
U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015U.S. EIA's Drilling Productivity Report - August 2015
U.S. EIA's Drilling Productivity Report - August 2015
 

Similar to Sidoti conference 3.31.16

May 2015 investor deck ld micro final
May 2015 investor deck ld micro finalMay 2015 investor deck ld micro final
May 2015 investor deck ld micro final
broadwind
 
May 2015 investor deck ld micro final
May 2015 investor deck ld micro finalMay 2015 investor deck ld micro final
May 2015 investor deck ld micro finalbroadwind
 
May 2015 investor deck b riley final
May 2015 investor deck b  riley finalMay 2015 investor deck b  riley final
May 2015 investor deck b riley final
broadwind
 
Q414 investor call slides final
Q414 investor call slides finalQ414 investor call slides final
Q414 investor call slides final
broadwind
 
Bekaert
BekaertBekaert
Stepping stones for floating foundations r02
Stepping stones for floating foundations r02Stepping stones for floating foundations r02
Stepping stones for floating foundations r02
BVG Associates
 
Capital Power 2015 Annual Meeting Presentation
Capital Power 2015 Annual Meeting PresentationCapital Power 2015 Annual Meeting Presentation
Capital Power 2015 Annual Meeting Presentation
Capital Power
 
4 q11 conf call presentation eng_final
4 q11 conf call presentation eng_final4 q11 conf call presentation eng_final
4 q11 conf call presentation eng_finalMagnesita_ri
 
1 q12 results presentation
1 q12 results presentation1 q12 results presentation
1 q12 results presentationMagnesitaRI
 
CRC_Alcoa_F._myedits
CRC_Alcoa_F._myeditsCRC_Alcoa_F._myedits
CRC_Alcoa_F._myeditsKasey Marenco
 
DG Year End Presentation
DG Year End PresentationDG Year End Presentation
DG Year End Presentation
envgeog
 
Summary of trends in the U.S. wind energy market - Aaron smith nrel
Summary of trends in the U.S. wind energy market - Aaron smith nrelSummary of trends in the U.S. wind energy market - Aaron smith nrel
Summary of trends in the U.S. wind energy market - Aaron smith nrel
SustainableEnergyAut
 
Dlg key bank 9 13
Dlg key bank 9 13Dlg key bank 9 13
Dlg key bank 9 13
Jeremy Brahm
 
Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Tom Evans
 
Bwen q3 inevestor call slides draft 4 10 28-14
Bwen q3 inevestor call slides draft 4 10 28-14Bwen q3 inevestor call slides draft 4 10 28-14
Bwen q3 inevestor call slides draft 4 10 28-14
broadwind
 
Alcoa inc final
Alcoa inc finalAlcoa inc final
Alcoa inc final
Raza Khan
 
Alcoa Inc_Final
Alcoa Inc_FinalAlcoa Inc_Final
Alcoa Inc_FinalRaza Khan
 
1
11

Similar to Sidoti conference 3.31.16 (20)

May 2015 investor deck ld micro final
May 2015 investor deck ld micro finalMay 2015 investor deck ld micro final
May 2015 investor deck ld micro final
 
May 2015 investor deck ld micro final
May 2015 investor deck ld micro finalMay 2015 investor deck ld micro final
May 2015 investor deck ld micro final
 
May 2015 investor deck b riley final
May 2015 investor deck b  riley finalMay 2015 investor deck b  riley final
May 2015 investor deck b riley final
 
Q414 investor call slides final
Q414 investor call slides finalQ414 investor call slides final
Q414 investor call slides final
 
Bekaert
BekaertBekaert
Bekaert
 
Stepping stones for floating foundations r02
Stepping stones for floating foundations r02Stepping stones for floating foundations r02
Stepping stones for floating foundations r02
 
Capital Power 2015 Annual Meeting Presentation
Capital Power 2015 Annual Meeting PresentationCapital Power 2015 Annual Meeting Presentation
Capital Power 2015 Annual Meeting Presentation
 
4 q11 conf call presentation eng_final
4 q11 conf call presentation eng_final4 q11 conf call presentation eng_final
4 q11 conf call presentation eng_final
 
1 q12 results presentation
1 q12 results presentation1 q12 results presentation
1 q12 results presentation
 
Q2 2013 conferencecall
Q2 2013 conferencecallQ2 2013 conferencecall
Q2 2013 conferencecall
 
CRC_Alcoa_F._myedits
CRC_Alcoa_F._myeditsCRC_Alcoa_F._myedits
CRC_Alcoa_F._myedits
 
Suncore
SuncoreSuncore
Suncore
 
DG Year End Presentation
DG Year End PresentationDG Year End Presentation
DG Year End Presentation
 
Summary of trends in the U.S. wind energy market - Aaron smith nrel
Summary of trends in the U.S. wind energy market - Aaron smith nrelSummary of trends in the U.S. wind energy market - Aaron smith nrel
Summary of trends in the U.S. wind energy market - Aaron smith nrel
 
Dlg key bank 9 13
Dlg key bank 9 13Dlg key bank 9 13
Dlg key bank 9 13
 
Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06Gm report nylex consumer 2008 06
Gm report nylex consumer 2008 06
 
Bwen q3 inevestor call slides draft 4 10 28-14
Bwen q3 inevestor call slides draft 4 10 28-14Bwen q3 inevestor call slides draft 4 10 28-14
Bwen q3 inevestor call slides draft 4 10 28-14
 
Alcoa inc final
Alcoa inc finalAlcoa inc final
Alcoa inc final
 
Alcoa Inc_Final
Alcoa Inc_FinalAlcoa Inc_Final
Alcoa Inc_Final
 
1
11
1
 

More from broadwind

Q2 2016 ern call slides
Q2 2016 ern call slidesQ2 2016 ern call slides
Q2 2016 ern call slides
broadwind
 
Q4 2015 ern call slides final
Q4 2015 ern call slides finalQ4 2015 ern call slides final
Q4 2015 ern call slides final
broadwind
 
Q3 2015 Investor Call Slides
Q3 2015 Investor Call Slides Q3 2015 Investor Call Slides
Q3 2015 Investor Call Slides
broadwind
 
Aegis Growth Conference Investor Presentation October 2015
Aegis Growth Conference Investor Presentation October 2015Aegis Growth Conference Investor Presentation October 2015
Aegis Growth Conference Investor Presentation October 2015
broadwind
 
Q215 investor call slides final
Q215 investor call slides finalQ215 investor call slides final
Q215 investor call slides final
broadwind
 
Q115 investor call slides draft 5 4.28.15
Q115 investor call slides draft 5 4.28.15Q115 investor call slides draft 5 4.28.15
Q115 investor call slides draft 5 4.28.15
broadwind
 
Dec 2014 investor deck
Dec 2014 investor deckDec 2014 investor deck
Dec 2014 investor deck
broadwind
 
BWEN Q3 Slides
BWEN Q3 SlidesBWEN Q3 Slides
BWEN Q3 Slides
broadwind
 
Q2 2014 Investor Teleconference Presentation
Q2 2014 Investor Teleconference PresentationQ2 2014 Investor Teleconference Presentation
Q2 2014 Investor Teleconference Presentation
broadwind
 
Q2 2014 Investor Teleconference Presentation
Q2 2014 Investor Teleconference PresentationQ2 2014 Investor Teleconference Presentation
Q2 2014 Investor Teleconference Presentationbroadwind
 

More from broadwind (11)

Energy
EnergyEnergy
Energy
 
Q2 2016 ern call slides
Q2 2016 ern call slidesQ2 2016 ern call slides
Q2 2016 ern call slides
 
Q4 2015 ern call slides final
Q4 2015 ern call slides finalQ4 2015 ern call slides final
Q4 2015 ern call slides final
 
Q3 2015 Investor Call Slides
Q3 2015 Investor Call Slides Q3 2015 Investor Call Slides
Q3 2015 Investor Call Slides
 
Aegis Growth Conference Investor Presentation October 2015
Aegis Growth Conference Investor Presentation October 2015Aegis Growth Conference Investor Presentation October 2015
Aegis Growth Conference Investor Presentation October 2015
 
Q215 investor call slides final
Q215 investor call slides finalQ215 investor call slides final
Q215 investor call slides final
 
Q115 investor call slides draft 5 4.28.15
Q115 investor call slides draft 5 4.28.15Q115 investor call slides draft 5 4.28.15
Q115 investor call slides draft 5 4.28.15
 
Dec 2014 investor deck
Dec 2014 investor deckDec 2014 investor deck
Dec 2014 investor deck
 
BWEN Q3 Slides
BWEN Q3 SlidesBWEN Q3 Slides
BWEN Q3 Slides
 
Q2 2014 Investor Teleconference Presentation
Q2 2014 Investor Teleconference PresentationQ2 2014 Investor Teleconference Presentation
Q2 2014 Investor Teleconference Presentation
 
Q2 2014 Investor Teleconference Presentation
Q2 2014 Investor Teleconference PresentationQ2 2014 Investor Teleconference Presentation
Q2 2014 Investor Teleconference Presentation
 

Recently uploaded

Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
Sysco_Investors
 
New Tax Regime User Guide Flexi Plan Revised (1).pptx
New Tax Regime User Guide Flexi Plan Revised (1).pptxNew Tax Regime User Guide Flexi Plan Revised (1).pptx
New Tax Regime User Guide Flexi Plan Revised (1).pptx
RajkumarRajamanikam
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
Philip Rabenok
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
CyberAgent, Inc.
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
CollectiveMining1
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
CollectiveMining1
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
Valentina Ottini
 

Recently uploaded (8)

Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024Investor Day 2024 Presentation Sysco 2024
Investor Day 2024 Presentation Sysco 2024
 
New Tax Regime User Guide Flexi Plan Revised (1).pptx
New Tax Regime User Guide Flexi Plan Revised (1).pptxNew Tax Regime User Guide Flexi Plan Revised (1).pptx
New Tax Regime User Guide Flexi Plan Revised (1).pptx
 
Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24Osisko Development - Investor Presentation - June 24
Osisko Development - Investor Presentation - June 24
 
cyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdfcyberagent_For New Investors_EN_240424.pdf
cyberagent_For New Investors_EN_240424.pdf
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 
Snam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial PresentationSnam 2023-27 Industrial Plan - Financial Presentation
Snam 2023-27 Industrial Plan - Financial Presentation
 

Sidoti conference 3.31.16

  • 1. Sidoti Conference March 31, 2016 © 2016 Broadwind Energy, Inc. All rights reserved. 1
  • 2. Broadwind’s Product Offerings © 2016 Broadwind Energy, Inc. All rights reserved. 2 Industrial Manufacturer with expertise in heavy weldments, precision gearing and other energy and infrastructure applications
  • 3. Tower Production © 2016 Broadwind Energy, Inc. All rights reserved. 3 Design capacity ~500 towers per year; Investing $7M to reduce bottlenecks and improve capacity • Leading wind tower manufacturer in U.S. • Have produced ~3000 >1MW towers for all major OEM’s in U.S. • Manitowoc, WI plant capacity ~350 towers • Abilene, TX plant capacity ~150 towers • Superior safety record 2013 2014 2015 Revenue 159.5$ 184.9$ 170.9$ Op. Inc. 19.6 18.1 4.7 EBITDA 24.8 22.3 9.5
  • 4. © 2016 Broadwind Energy, Inc. All rights reserved. 4 0 100 200 300 400 500 2012 2013 2014 2015 Towers Sold Tower Production Challenges • Tower production increasing each year; design capacity ~500 towers • 2015 production suffered from supply chain issues and production challenges – back on track in 2016 • Taking action to resolve production variability issue • Organizational Changes • Process Changes • Capital Investments
  • 5. Wind Market Update 2/26/16 © 2016 Broadwind Energy, Inc. All rights reserved. 5 U.S. Market Outlook, 2015-2021e (GW) •Longest planning horizon in industry history •Eliminates costly start/stop inefficiencies •Economics/ potential CPP become installation drivers as PTC expires •Shift toward direct buys by corporations 5-Year PTC extension adds ~16GW of additional installations into forecast for 2017-2021
  • 6. Gearing © 2016 Broadwind Energy, Inc. All rights reserved. 6 • 90+ year history • Competencies in wind gearing, oil & gas, mining, steel and other industrial applications • Completed 3-year restructuring in 2014: well positioned for rebound in oil & gas and mining • Increasing penetration into wind gearing market following sale of Services 2013 2014 2015 Revenue 43.2$ 42.3$ 29.6$ Op. Inc. (17.9) (9.4) (8.2) EBITDA (3.6) (0.9) (2.1)
  • 7. Consolidated Financial Results 2/26/16 © 2016 Broadwind Energy, Inc. All rights reserved. 7 2015 Results • Sales down 12%; Towers and Weldments -8%, Gearing -30% • Gross margin, profit and EPS declines all due primarily to Towers production challenges and weaker Gearing volumes from oil & gas and mining customers • One-time costs associated with difficult contract : $10 million 2013 2014 2015 Revenue-$ Millions 198.5$ 225.8$ 199.2$ Gross Profit-$ Millions 14.6 19.7 7.9 -% (ex. Restructuring) 9.7% 8.7% 4.0% Operating Expense-$ Millions 23.1 21.2 19.8 -% (ex. Restructuring) 11.1% 9.3% 9.4% Operating Income(Loss)-$ Millions (8.5) (1.5) (11.9) Non-GAAP Adj. EBITDA-$ Millions 12.9 11.9 (0.4) EPS, Continuing Operations (0.41) (0.12) (0.83) Full Year
  • 8. Strong Balance Sheet - $ Thousands © 2016 Broadwind Energy, Inc. All rights reserved. 8 2014 2015 Cash + Equiv. 20,164 12,698 Accounts Receivable 17,043 9,784 Inventory 31,144 24,219 PPE 58,529 51,906 Other Assets 19,739 11,301 Total Assets 146,619 109,908 Accounts Payable 17,547 13,822 Customer Deposits 22,397 9,940 Debt + Capital Leases 3,957 5,846 Other Liabilities 14,388 12,808 Total Liabilities 58,239 42,416 Equity 88,380 67,492 • $10M credit line undrawn at 12/31/15 • $5.8M of debt and capital leases; $2.6M is New Markets Tax Credit financing • Operating Working Capital sufficient ~7% of sales at 12/31/15 • $200M NOL carry-forward not on balance sheet
  • 9. Investment Thesis •Wind energy demand is growing and planning horizon is best in history •BWEN stock depressed due to 2015 production execution misses in Abilene tower plant •Fixes in place/underway to support consistent execution •Strong balance sheet – negative net debt •Market cap of ~$40 million – significantly less than net book value © 2016 Broadwind Energy, Inc. All rights reserved. 9
  • 10. Click to edit Master title style  Click to edit Master text styles – Second level • Third level – Fourth level » Fifth level Broadwind Energy is committed to helping customers maximize performance of their energy and infrastructure investments— quicker, easier and smarter. 10 © 2016 Broadwind Energy, Inc. All rights reserved.