The shooting schedule outlines 7 days of filming:
Day 1 involves an online meeting to review the script and shooting plan, lasting 6 hours with a lunch break. An email will be sent out at 6pm with the schedule.
Day 2 is a "gorilla style" shoot outdoors with a minimal crew. Shooting will start early, from 6-11am, to get permissions and avoid crowds.
Day 3 takes place in an indoor studio to film interior house scenes with the full crew recreating a home set. Shooting will be from 9am-5pm with a lunch break.
Day 4 continues similar to Day 3, aiming to get all needed shots to arrange footage for the next day. An email