1
Profile
2
UI/UX Design
3
Identity Design
4
Playing Cards Design
Graphic and UI/UX Designer with 2 years of
professional experience. 6 years of
educational background with Bachelors and
Masters degree in Graphic Design.
June 2017 - Dec 2018
Graphic Designer and UI/UX Designer
Unplugged India (Bangalore , India)
- Responsible for daily design work.
- Created wireframes and page design for multiple client websites.
- Created a h volume of layout , graphic , branding and identity design.
- Frequently integrated photographic, typographic and graphic elements.
- Participated in the discussions for projects with clients
January 2015
Graphic Design Intern
Aarohana Upcycled Hand-woven - NGO (Pune , India)
- Created Identity for the NGO.
- Created visual language of the brand.
- Designed illustration explaining how the NGO works.
- Designed brand collaterals
June 2014 - August 2014
Graphic Design Intern
Forbes Marshall (Pune, India)
-Designed packaging for the spare parts.
- Created vector graphics of the machines used in the factory.
Jan 2019 - Dec 2019
Masters in Graphic Design
Florence Design Academy. Florence, Italy
One year of study abroad in Florence, Italy. Explored
graphic design in a new culture and place. Studied
wordpress and also learnt basics of 3DS max
software along with other graphic design projects.
As well as Business Management and History of
Design.
Adobe Illustrator
Adobe Photoshop
Adobe Indesign
Adobe Premiere Pro
Adobe After effects
Wordpress
Detail Oriented
Visual Communication
Creativity
Time management
Problem Solving
Team Work
Planning
July 2013 - December 2017
Bachelors in Graphic Design - MIT Institute
of Design. Pune, India
4 and a half years long intensive course in Graphic
Design and UI/UX Design. Course started with basic
principles in design , introduction to Graphic Design.
Followed with, the course was focused on Graphic De-
sign projects, Typography (Designing Font) , Branding,
Advertising and Marketing, Web design , UI/UX design,
Story Writing , Copywriting and also Photography.
Worked on several live projects given by the institute
during the course time.
designer work experience
education
skills
professional skills
About Client -
Pioneer in developing state of the art home
automation products, enabling people
around the world to stay connected to what
means most to them.
Mobile App Screens
Home Automation app design -
Fueblabs
Intro Screen
Home Screen
Project -
UI Design of a home automation app -
Fueblabs.
Smart home application.
Designed an app user interface using
minimalistic vector graphics with
pastel colours. Rounded corners and
large no.of white space used. Users can
freely edit and control the
relevant buttons of the home for easy
operations ; users can also manually set
some automated home activities to set
up various
scenarious.
Fueblabs smart phone application brings
convenience of appliances of a home
into a single screen, along with custom
control options including preset, user
modes, mood settings and more…
Icons Designed -
Light
Easy way to control
wind speed
Icon Style 1 -
Icon Style 2 -
By directly controlling the home
throught smart phone , user can
more directly control the intensity ,
colour and scene of the light.
User can directly control the wind
speed while selecting the mode of
the Fan.
Font
Roboto
Colour
Visual Assets
Regular Medium
AaABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890-/,.:’”
#2f66af
#00000
Basic pastels shades used in Icon Design
#ecf7fd
#2fb8eb
#afaeae
IPad Screens -
Website Design
About Client -
Brigade is a leading property developer in
South India. Our Projects extend across
several major cities in South India including
Apartments and Villas in Bangalore, Chennai,
Chikmagalur, Hyderabad, Kochi, Mangalore
and Mysore. Explore Apartments in Banga-
lore, Apartments in Chennai and Hyderabad.
Brigade Group is headquartered in
Bangalore, with branch offices in several
cities in South India and a representative
office in Dubai. Brigade Group has also
established a strong stamp into the commer-
cial space by building some of the biggest
malls in Bangalore City. Brigade Group has a
uniquely diverse multi-domain portfolio that
covers property development, property
management services, hospitality and
education.
Project -
To design a website for upcoming project of
Brigade Group named - Brigade Meadows.
The layout of the websited is designed in
such a way that it will emphasis images of
the actual project and give a glance of the
township 9Brigade Meadows) in one look.
Clear layout used for the text which will make
user easy to read and understand. Simple
navigation designed to make the user
understand the information easily about the
project.
Brigade Meadows - At Brigade Meadows,
you will lead a life of utter comfort. Here you
will experience the joys of living in a
community, blessed with families from
various walks of life.
Website Design for -
Brigade , Bangalore
Home page
Menu
Enquiry form
Home page design is mainly
focusing on the actual image of
the Brigade Meadows project.
Hamburger icon Font
Intro
Roboto
Visual Assets
AaABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890-/,.:’”
AaABCDEFGHIJKLMNOPQRSTUVWXYZ
abcdefghijklmnopqrstuvwxyz
1234567890-/,.:’”
Colour
#2181b4
#9b1b4d#533278
About Page
Gallery Page Amenities Page
Location page
Floor Plan Pop-up Project Status page
Project(a) Overview Page Project(b) Overview Page
Dashboard Design
About Client -
For over twenty years, ACUVUE Brand has
been dedicated to bringing the benefits of
vision care to people around the globe.
ACUVUE Brand transformed vision
correction in 1988 with the world’s first soft
disposable contact lenses, we’ve
passionately pursued new technologies and
the highest quality standards. And we’re
proud that ACUVUE® lenses are worn by
more people than any other brand.
As part of Johnson & Johnson Vision Care,
Inc., it’s our responsibility to live up to the
principles that guide us, as expressed by Our
Credo. It’s why we’re committed to making
the best vision care affordable and why we
never rest in finding innovative new ways to
help people around the world see better.
Project -
To design a data analysis dashboard for
ACUVUE.
The dashboard designed displays the com-
petitive insights of the brand.
Data Analysis Dashboard -
Acuvue
Ideology -
The layout of the UI designed is kept clear and simple. The fonts used are elegant and easy to read.
Relevant images are used in the background as a design element in the UI.
The graphs of the analysis are designed simple and easy to understand and mainly easy to read.
Colours are used in the design of graphs to emphasis the difference between the competitve
brands.
Opening Page
Other screen designs
About Client -
Nabler - Enterprises and media agencies
analyze digital data to understand customer
behavior and enable revenue driving
decisions.Founded in 2004, with offices in
Charlotte and Bangalore, we have advised
some of the top 100 global brands and
Fortune 500 firms. We enable marketers to
take advanced data-driven decisions and
boost the effectiveness and success of their
digital properties.
Creating a smart and watertight brand
identity system for Creating a smart and wa-
tertight brand identity system for Nabler.Nxt,
the next step forward in Data Analytics.
Building on the X in NXT, many thoughts are
represented in the monogram-like approach
taken to carve out a simple, identifiable,
thought-driven X. The shapes of the main
mark represent sync, strength, speed,
stability and steadfastness..
Logo Design -
Nabler.NXT
The Objective-
The Approach-
Nabler.NXT
Moodboard - Designed Motif -
Grid
Letter X
designed for
the identity
Forward Arrow -
Looking to move forward
to understand & solve
problems.
Up Arrow -
Creating positive business
growth.
Meeting Point -
The coming together of all
four ambitions, only with
Nabler.Nxt
Backward Arrow -
Nabler working backwards
to address client demands
for next-gen, cutting-edge &
relevant problem solving.
Down Arrow -
Symbolizes deep-diving,
penetrative thinking &
associated applications.
Brand Values -
Motif of letter X used
E HIBIT
CONFLU
E PLORE
FLE IBLE
Logo
Visual element of
the brand.
Falcon
About Falcon -
Falcon is a Web monitoring app developed
by Nabler.NXT
Project -
To design a logo inspired by the bird Falcon.
The main ideology and keyword used to de-
sign the logo was ‘Fast’
Logo Design -
Falcon
Identity designed -
Word Mark
Motif
Font
Sansation Regular
Colour
#ff8500 #ff0000#8a8584
The goal was to design playing cards by
taking inspiration from the works of
Leonardo Da Vinci. The purpose of the
project was to celebrate Da Vinci’s
500th Death Anniversary.
I designed Playing Cards deck by using
Leonardo’s art works. The artwork’s
are vectorised and clipmasked in the shapes
- Spade , Heart , Diamond , Clubs.
The background of the card is designed
using leonardo’s sketches.
The potrait of Leonardo Da Vinci on the pack-
aging is also vectorised and the
font used to write his name is the font of his
own handwritting.
Playing Cards-
Leonardo Da Vinci
Card - Queen
(Monalisa painting of
Leonardo da vinci)
Common back side of the card
Card - Spade A
(Helicopter rawing of
Leonardo da vinci)
Card - Clubs King
Card - Diamonds A
Card - Hearts Jack
Shantanu kulkarni-Graphic and UIUX Designer
Shantanu kulkarni-Graphic and UIUX Designer

Shantanu kulkarni-Graphic and UIUX Designer

  • 2.
  • 3.
    Graphic and UI/UXDesigner with 2 years of professional experience. 6 years of educational background with Bachelors and Masters degree in Graphic Design. June 2017 - Dec 2018 Graphic Designer and UI/UX Designer Unplugged India (Bangalore , India) - Responsible for daily design work. - Created wireframes and page design for multiple client websites. - Created a h volume of layout , graphic , branding and identity design. - Frequently integrated photographic, typographic and graphic elements. - Participated in the discussions for projects with clients January 2015 Graphic Design Intern Aarohana Upcycled Hand-woven - NGO (Pune , India) - Created Identity for the NGO. - Created visual language of the brand. - Designed illustration explaining how the NGO works. - Designed brand collaterals June 2014 - August 2014 Graphic Design Intern Forbes Marshall (Pune, India) -Designed packaging for the spare parts. - Created vector graphics of the machines used in the factory. Jan 2019 - Dec 2019 Masters in Graphic Design Florence Design Academy. Florence, Italy One year of study abroad in Florence, Italy. Explored graphic design in a new culture and place. Studied wordpress and also learnt basics of 3DS max software along with other graphic design projects. As well as Business Management and History of Design. Adobe Illustrator Adobe Photoshop Adobe Indesign Adobe Premiere Pro Adobe After effects Wordpress Detail Oriented Visual Communication Creativity Time management Problem Solving Team Work Planning July 2013 - December 2017 Bachelors in Graphic Design - MIT Institute of Design. Pune, India 4 and a half years long intensive course in Graphic Design and UI/UX Design. Course started with basic principles in design , introduction to Graphic Design. Followed with, the course was focused on Graphic De- sign projects, Typography (Designing Font) , Branding, Advertising and Marketing, Web design , UI/UX design, Story Writing , Copywriting and also Photography. Worked on several live projects given by the institute during the course time. designer work experience education skills professional skills
  • 4.
    About Client - Pioneerin developing state of the art home automation products, enabling people around the world to stay connected to what means most to them. Mobile App Screens Home Automation app design - Fueblabs Intro Screen
  • 5.
    Home Screen Project - UIDesign of a home automation app - Fueblabs. Smart home application. Designed an app user interface using minimalistic vector graphics with pastel colours. Rounded corners and large no.of white space used. Users can freely edit and control the relevant buttons of the home for easy operations ; users can also manually set some automated home activities to set up various scenarious. Fueblabs smart phone application brings convenience of appliances of a home into a single screen, along with custom control options including preset, user modes, mood settings and more…
  • 6.
    Icons Designed - Light Easyway to control wind speed Icon Style 1 - Icon Style 2 - By directly controlling the home throught smart phone , user can more directly control the intensity , colour and scene of the light. User can directly control the wind speed while selecting the mode of the Fan.
  • 7.
  • 8.
  • 10.
    Website Design About Client- Brigade is a leading property developer in South India. Our Projects extend across several major cities in South India including Apartments and Villas in Bangalore, Chennai, Chikmagalur, Hyderabad, Kochi, Mangalore and Mysore. Explore Apartments in Banga- lore, Apartments in Chennai and Hyderabad. Brigade Group is headquartered in Bangalore, with branch offices in several cities in South India and a representative office in Dubai. Brigade Group has also established a strong stamp into the commer- cial space by building some of the biggest malls in Bangalore City. Brigade Group has a uniquely diverse multi-domain portfolio that covers property development, property management services, hospitality and education. Project - To design a website for upcoming project of Brigade Group named - Brigade Meadows. The layout of the websited is designed in such a way that it will emphasis images of the actual project and give a glance of the township 9Brigade Meadows) in one look. Clear layout used for the text which will make user easy to read and understand. Simple navigation designed to make the user understand the information easily about the project. Brigade Meadows - At Brigade Meadows, you will lead a life of utter comfort. Here you will experience the joys of living in a community, blessed with families from various walks of life. Website Design for - Brigade , Bangalore
  • 11.
    Home page Menu Enquiry form Homepage design is mainly focusing on the actual image of the Brigade Meadows project. Hamburger icon Font Intro Roboto Visual Assets AaABCDEFGHIJKLMNOPQRSTUVWXYZ abcdefghijklmnopqrstuvwxyz 1234567890-/,.:’” AaABCDEFGHIJKLMNOPQRSTUVWXYZ abcdefghijklmnopqrstuvwxyz 1234567890-/,.:’” Colour #2181b4 #9b1b4d#533278
  • 12.
    About Page Gallery PageAmenities Page Location page
  • 13.
    Floor Plan Pop-upProject Status page Project(a) Overview Page Project(b) Overview Page
  • 15.
    Dashboard Design About Client- For over twenty years, ACUVUE Brand has been dedicated to bringing the benefits of vision care to people around the globe. ACUVUE Brand transformed vision correction in 1988 with the world’s first soft disposable contact lenses, we’ve passionately pursued new technologies and the highest quality standards. And we’re proud that ACUVUE® lenses are worn by more people than any other brand. As part of Johnson & Johnson Vision Care, Inc., it’s our responsibility to live up to the principles that guide us, as expressed by Our Credo. It’s why we’re committed to making the best vision care affordable and why we never rest in finding innovative new ways to help people around the world see better. Project - To design a data analysis dashboard for ACUVUE. The dashboard designed displays the com- petitive insights of the brand. Data Analysis Dashboard - Acuvue
  • 16.
    Ideology - The layoutof the UI designed is kept clear and simple. The fonts used are elegant and easy to read. Relevant images are used in the background as a design element in the UI. The graphs of the analysis are designed simple and easy to understand and mainly easy to read. Colours are used in the design of graphs to emphasis the difference between the competitve brands. Opening Page Other screen designs
  • 21.
    About Client - Nabler- Enterprises and media agencies analyze digital data to understand customer behavior and enable revenue driving decisions.Founded in 2004, with offices in Charlotte and Bangalore, we have advised some of the top 100 global brands and Fortune 500 firms. We enable marketers to take advanced data-driven decisions and boost the effectiveness and success of their digital properties. Creating a smart and watertight brand identity system for Creating a smart and wa- tertight brand identity system for Nabler.Nxt, the next step forward in Data Analytics. Building on the X in NXT, many thoughts are represented in the monogram-like approach taken to carve out a simple, identifiable, thought-driven X. The shapes of the main mark represent sync, strength, speed, stability and steadfastness.. Logo Design - Nabler.NXT The Objective- The Approach- Nabler.NXT
  • 22.
    Moodboard - DesignedMotif - Grid Letter X designed for the identity
  • 23.
    Forward Arrow - Lookingto move forward to understand & solve problems. Up Arrow - Creating positive business growth. Meeting Point - The coming together of all four ambitions, only with Nabler.Nxt Backward Arrow - Nabler working backwards to address client demands for next-gen, cutting-edge & relevant problem solving. Down Arrow - Symbolizes deep-diving, penetrative thinking & associated applications.
  • 25.
    Brand Values - Motifof letter X used E HIBIT CONFLU E PLORE FLE IBLE
  • 26.
  • 29.
    Falcon About Falcon - Falconis a Web monitoring app developed by Nabler.NXT Project - To design a logo inspired by the bird Falcon. The main ideology and keyword used to de- sign the logo was ‘Fast’ Logo Design - Falcon
  • 30.
    Identity designed - WordMark Motif Font Sansation Regular Colour #ff8500 #ff0000#8a8584
  • 32.
    The goal wasto design playing cards by taking inspiration from the works of Leonardo Da Vinci. The purpose of the project was to celebrate Da Vinci’s 500th Death Anniversary. I designed Playing Cards deck by using Leonardo’s art works. The artwork’s are vectorised and clipmasked in the shapes - Spade , Heart , Diamond , Clubs. The background of the card is designed using leonardo’s sketches. The potrait of Leonardo Da Vinci on the pack- aging is also vectorised and the font used to write his name is the font of his own handwritting. Playing Cards- Leonardo Da Vinci
  • 33.
    Card - Queen (Monalisapainting of Leonardo da vinci) Common back side of the card Card - Spade A (Helicopter rawing of Leonardo da vinci) Card - Clubs King Card - Diamonds A Card - Hearts Jack