SlideShare a Scribd company logo
Setraco Nig.Ltd.
1st Bi-Monthly Project Report
Of
EDO- State ( Auchi )
Prepared By: Checked By:
Engr. Amaresh Dhibar Engr. Pedro Chami
Technical Office Engineer Project Manager
Approved By:
Engr. Zakhia Akl
Regional Manager
EDO- State consist of Three different Project Named-
CONSTRUCTION OF JATTU - AFOWA - IYORA - AKPANA - AYOGWIRI
ROAD (11+772 KM) INCLUDING ONE BRIDGE OF 1X15 M SPAN IN EDO
STATE.
 CONSTRUCTION OF AYOGWIRI-APANA-IMIEKBA-IMIEKIBU ROAD
(18+730 KM) WITH ONE BRIDGE OF 3X20M SPAN INCLUDING IGBODOR-
OKPEKPE-SPUR ROAD (7+56O KM) WITH ONE BRIDGE OF 2X20M SPAN.
 CONSTRUCTION OF EKPERI-ANEGBETTE ROAD (30+100 KM) WITH
TWO BRIDGES 3X15 M SPAN & 4X15 M SPAN.
Setraco Nig.Ltd.
PROJECTS LENGTH
OF
ROAD
CLIENT CONSULTANT BRIDGES
Jattu Road 11+772 Km
EDO STATE GOVERNMENT
OF NIGERIA ,EDO STATE
MINISTRY OF WORKS,
BENIN , EDO STATE.
CYPRESS KONSULT
LIMITED
1 NBR.1X15 M
SPAN
Ayogwiri
&
okpekpe
Road
18+730 Km
&
7+560 Km
CYPRESS KONSULT
LIMITED
1 NBR. 3X20M
SPAN
&
1 NBR. 2X20
M SPAN
Ekperi-
Anegbette
Road
30+100 KM NOBA NIG. LTD.
1 NBR 3X15M
SPAN
&
1 NBR 4X15 M
SPAN
Setraco Nig.Ltd.
Setraco Nig.Ltd.
PROJECT
CONTRACT
TYPE
DATE OF
AWARD
COMMENCE
MENT OF
WORK
CONTRACT SUM IN
MILLION NAIRA ( N )
DURATION
IN
WEEKSORIGINAL REVISED
Jattu
Road
Item Rate Dec. 2009 12thJan.2010 2717.72 3029.83 72
Ayogwiri
&
okpekpe
Road
Item Rate
Dec. 2009 28thDec.2009 6162.98 6793.74 72
Ekperi-
Anegbett
e Road
Item Rate
Dec.2009 14th Jan.2010 7667.71 7927.84 120
Setraco Nig.Ltd.
Engr. Pedro Chami
Project Manager
Engr. Zakhia Akl
Regional Manager
Carlos Haddad
Commercial Admn.
Engr. George Badder
Site Engineer
Wiliam Tayar
Road-superintendent
Nidal Abu Hadir
Foreman- E/M
Elias Harb
Foreman-
Asphalt
Simon Wakim
Foreman-Road
Moutaz Mansour
Snr. Foreman-
Concrete
Ahmed Sabsabi
Foreman-Concrete
K.B.Arya
Lab S/v
George nouhiely
Snr. Store Keeper
Engr. Amaresh Dhibar
Tech. Office Engineer
Jad Chahada
Sr. Plant Engineer
Wachan
Kuskar
Mech. S/V
Mahmoud mulla
Mech. S/V
Yusuf Wetwet
Camp Manager
Setraco Nig.Ltd.
JATTU
CH0+000
APANA
CH11+772
IMIEKEBU
AYOGWIRI
Setraco Nig.Ltd.
JATTU AYOGWIRI
CH0+000
IMIEKIEBU
CH0+18+786
IGODOR
CH-0+000
SPOUR
CH-7+563
APANA
IMIEKBA
Setraco Nig.Ltd.
EKPERI
CH 0+000
ANEGBETTE
CH-30+100
BRIDGE
CH18+197
BRIDGE
CH19+100
EKPERI-ANEGBETTE ROAD
Activity
Chainage
ColorID
Site Clearing
0+000 – 11+772
Sub- Grade
0+000 – 8+110
8+256-11+772
Setraco Nig.Ltd.
JATTU
CH0+000
APANA
CH11+772
IMIEKEBU
AYOGWIRI
Activity Chainage Color ID
Site Clearing 0+000-11+772
Activity
Chainage
ColorID
Site Clearing
0+000 – 11+772
Sub- Grade
0+000 – 8+110
8+256-11+772
Setraco Nig.Ltd.
JATTU
CH0+000
APANA
CH11+772
IMIEKEBU
AYOGWIRI
Activity Chainage Color ID
Site Clearing 0+000-11+772
Sub- Grade
0+000-8+110
8+256 -11+772
&
Activity
Chainage
ColorID
Site Clearing
0+000 – 11+772
Sub- Grade
0+000 – 8+110
8+256-11+772
Setraco Nig.Ltd.
JATTU
CH0+000
APANA
CH11+772
IMIEKEBU
AYOGWIRI
Activity Chainage Color ID
Site Clearing 0+000-11+772
Sub- Grade
0+000-8+110
8+256 - 11+772
&
Sub- Base
0+000-8+110
&
8+256 -11+772
Activity
Chainage
ColorID
Site Clearing
0+000 – 11+772
Sub- Grade
0+000 – 8+110
8+256-11+772
Setraco Nig.Ltd.
JATTU
CH0+000
APANA
CH11+772
IMIEKEBU
AYOGWIRI
Activity Chainage Color ID
Site Clearing 0+000-11+772
Sub- Grade
0+000-8+110
8+256 - 11+772
&
Sub- Base
0+000-8+110
&
8+256 - 11+772
Base
0+000-8+110
&
8+256 - 11+772
Activity
Chainage
ColorID
Site Clearing
0+000 – 11+772
Sub- Grade
0+000 – 8+110
8+256-11+772
Setraco Nig.Ltd.
JATTU
CH0+000
APANA
CH11+772
IMIEKEBU
AYOGWIRI
Activity Chainage Color ID
Site Clearing 0+000-11+772
Sub- Grade
0+000-8+110
8+256 -11+772
&
Sub- Base
0+000-8+110
&
8+256 - 11+772
Base
0+000-8+110
&
8+256 - 11+772
Wearing
Course
0+000-8+100
&
8+375 -11+772
Activity
Chainage
ColorID
Site Clearing
0+000 – 11+772
Sub- Grade
0+000 – 8+110
8+256-11+772
Setraco Nig.Ltd.
JATTU
CH0+000
APANA
CH11+772
IMIEKEBU
AYOGWIRI
Activity Chainage Color ID
Site Clearing 0+000-11+772
Sub- Grade
0+000-8+110
8+256 -11+772
&
Sub- Base
0+000-8+110
&
8+256 - 11+772
Base
0+000-8+110
&
8+256 -11+772
Wearing
Course
0+000-8+100
&
8+375= 11+772
Surface
Dressing
0+000-8+100
&
8+375 - 11+772
Activity
Chainage
ColorID
Site Clearing
0+000 – 11+772
Sub- Grade
0+000 – 8+110
8+256-11+772
Setraco Nig.Ltd.
JATTU
CH0+000
APANA
CH11+772
IMIEKEBU
AYOGWIRI
Description Chainage Color ID
U- drain
( 75x75x10)cm
0+070-0+267,0+269-
1+064, 6+797-7+703,
11+138-11+770
Side
LHS
U- drain
( 75x75x10)cm
RHS
5+675-6+198, 6+797-
7+702, 11+138-11+378
U- drain
( 75x90x10)cm
LHS & RHS 7+700-8+010
V- drain
( 140x60x50x10)cm
LHS & RHS
8+010- 8+105,
8+382-8+600,
9+945-10+370
Activity
Chainage
ColorID
Site Clearing
0+000 – 11+772
Sub- Grade
0+000 – 8+110
8+256-11+772
Setraco Nig.Ltd.
JATTU
CH0+000
APANA
CH11+772
IMIEKEBU
AYOGWIRI
Description Chainage Color ID
Ring Culvert
Size
1X.9 m
4+592, 9+900,
10+700
10+150, 3+315,
2+425
Ring Culvert 2X.9 m 7+700
Ring Culvert
1X1.2 mRing Culvert
2X1.2 m
6+175, 9+000, 11+150, 5+475,
3+814, 1+343, 1+200, 0+265
Setraco Nig.Ltd.
JATTU
AYOGWIRI
CH0+000
IMIEKIEBU
CH0+18+786
IGODOR
CH-0+000
SPOUR
CH-7+563
APANA
IMIEKBA
Activity Chainage Color ID
Site Clearing
Ayogwiri-: 0+000-18+725
&
Okpekpe:- 0+000-4+350
Setraco Nig.Ltd.
JATTU
AYOGWIRI
CH0+000
IMIEKIEBU
CH0+18+786
IGODOR
CH-0+000
SPOUR
CH-7+563
APANA
IMIEKBA
Activity Chainage Color ID
Site Clearing
Ayogwiri-: 0+000-18+725
&
Okpekpe:- 0+000-4+350
Sub-Grade
0+000-11+750
&
12+175-12+975
Setraco Nig.Ltd.
JATTU
AYOGWIRI
CH0+000
IMIEKIEBU
CH0+18+786
IGODOR
CH-0+000
SPOUR
CH-7+563
APANA
IMIEKBA
Activity Chainage Color ID
Site Clearing
Ayogwiri-: 0+000-18+725
&
Okpekpe:- 0+000-4+350
Sub-Grade
0+000-11+750
&
12+175-12+975
Sub-Base 0+000-10+500
Setraco Nig.Ltd.
JATTU
AYOGWIRI
CH0+000
IMIEKIEBU
CH0+18+786
IGODOR
CH-0+000
SPOUR
CH-7+563
APANA
IMIEKBA
Activity Chainage Color ID
Site Clearing
Ayogwiri-: 0+000-18+725
&
Okpekpe:- 0+000-4+350
Sub-Grade
0+000-11+750
&
12+175-12+975
Sub-Base 0+000-10+500
Base 0+000-9+700
Setraco Nig.Ltd.
JATTU
AYOGWIRI
CH0+000
IMIEKIEBU
CH0+18+786
IGODOR
CH-0+000
SPOUR
CH-7+563
APANA
IMIEKBA
Activity Chainage Color ID
Site Clearing
Ayogwiri-: 0+000-18+725
&
Okpekpe:- 0+000-4+350
Sub-Grade
0+000-11+750
&
12+175-12+975
Sub-Base 0+000-10+500
Base 0+000-9+700
Wearing
Course
0+000-9+680
Setraco Nig.Ltd.
JATTU
AYOGWIRI
CH0+000
IMIEKIEBU
CH0+18+786
IGODOR
CH-0+000
SPOUR
CH-7+563
APANA
IMIEKBA
Activity Chainage Color ID
Site Clearing
Ayogwiri-: 0+000-18+725
&
Okpekpe:- 0+000-4+350
Sub-Grade
0+000-11+750
&
12+175-12+975
Sub-Base 0+000-10+500
Base 0+000-9+700
Wearing
Course
0+000-9+680
Surface
Dressing
0+000-9+680
Setraco Nig.Ltd.
JATTU
AYOGWIRI
CH0+000
IMIEKIEBU
CH0+18+786
IGODOR
CH-0+000
SPOUR
CH-7+563
APANA
IMIEKBA
AYOGWIRI-IMIEKIBU
ROAD
Description Side Chainage Color ID
U- drain
( 75x75x10)cm
LHS
0+025-0+118, 2+843-
3+174, 3+203-3+323,
3+343- 3+653
U- drain
( 75x75x10)cm
RHS
0+025-0+114, 2+795-
3+321, 3+345-3+681
V- drain
( 140x60x50x10)cm
LHS 1+188- 1+448, 1+758-
2+089, 4+547- 4+643,
5+488- 5+735
V- drain
( 140x60x50x10)cm
RHS
1+260- 1+465, 1+758-
2+031, 2+580- 2+683,
4+548- 4+641,
5+488- 5+749, 4+510-
4+539, 9+095- 9+185.
U- drain
( 75x90x10)cm
1+448- 1+752LHS
Setraco Nig.Ltd.
JATTU
AYOGWIRI
CH0+000
IMIEKIEBU
CH0+18+786
IGODOR
CH-0+000
SPOUR
CH-7+563
APANA
IMIEKBA
AYOGWIRI-IMIEKIBU
ROAD
Description Size Chainage Color ID
Ring Culvert
1x.9 m
0+975, 1+760, 4+950,
7+640, 8+100, 3+185
Ring Culvert 2x.9 m
3+075
Ring Culvert 1x1.2 m 1+200, 5+325
Ring Culvert 2x1.2 m 2+175, 8+380,
3+328
Box Culvert 1x2x2 m
4+548, 5+475
Setraco Nig.Ltd.
EKPERI
CH 0+000
ANEGBETTE
CH-30+100
BRIDGE
CH18+167
BRIDGE
CH19+100
EKPERI-ANEGBETTE ROAD
Activity
Chainage
Color ID
Site
Clearing
0+750-19+159
Setraco Nig.Ltd.
EKPERI
CH 0+000
ANEGBETTE
CH-30+100
BRIDGE
CH18+167
BRIDGE
CH19+100
EKPERI-ANEGBETTE ROAD
Activity
Chainage
Color ID
Site
Clearing
0+750-19+159
Sub-grade
0+800-18+175
&
18+220- 19+025
Setraco Nig.Ltd.
EKPERI
CH 0+000
ANEGBETTE
CH-30+100
BRIDGE
CH18+167
BRIDGE
CH19+100
EKPERI-ANEGBETTE ROAD
Activity
Chainage
Color ID
Site
Clearing
0+750-19+159
Sub-grade
0+800-18+175
&
18+220- 19+025
Sub-Base
0+800-7+950
Setraco Nig.Ltd.
EKPERI
CH 0+000
ANEGBETTE
CH-30+100
BRIDGE
CH18+167
BRIDGE
CH19+100
EKPERI-ANEGBETTE ROAD
Activity
Chainage
Color ID
Site
Clearing
0+750-19+159
Sub-grade
0+800-18+175
&
18+220- 19+025
Sub-Base
0+800-7+950
Base
0+800-5+925
Setraco Nig.Ltd.
EKPERI
CH 0+000
ANEGBETTE
CH-30+100
BRIDGE
CH18+167
BRIDGE
CH19+100
EKPERI-ANEGBETTE ROAD
Activity
Chainage
Color ID
Site
Clearing
0+750-19+159
Sub-grade
0+800-18+175
&
18+220- 19+025
Sub-Base
0+800-7+950
Base
0+800-5+925
Wearing Course
0+800-5+403
Setraco Nig.Ltd.
EKPERI
CH 0+000
ANEGBETTE
CH-30+100
BRIDGE
CH18+167
BRIDGE
CH19+100
EKPERI-ANEGBETTE ROAD
Activity
Chainage
Color ID
Site
Clearing
0+750-19+159
Sub-grade
0+800-18+175
&
18+220- 19+025
Sub-Base
0+800-7+950
Base
0+800-5+925
Wearing Course
0+800-5+403
Surface Dressing
0+800-5+403
Setraco Nig.Ltd.
EKPERI
CH 0+000
ANEGBETTE
CH-30+100
BRIDGE
CH18+167
BRIDGE
CH19+100
EKPERI-ANEGBETTE ROAD
Description
Chainage
Color ID
Ring Culvert
8+063, 14+840
Size 1X.9m
Ring Culvert
1X.9/2m
12+910
Ring Culvert
1X1.2m
6+513, 9+710,
13+425, 15+400,
15+825, 16+175
Ring Culvert
1/2X1.2m
2+475
Ring Culvert
2X1.2m
11+500,
14+175
Box Culvert
2X2X2m
7+400
Box Culvert
2X2.4X2.4m
3+500, 18+500,
18+675, 18+850
Setraco Nig.Ltd.
Date as on 1st sep’11
Setraco Nig.Ltd.
Date as on 1st sep’11
Setraco Nig.Ltd.
Date as on 1st sep’11
Setraco Nig.Ltd.
79.89%
31.07%
34.14%
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 70.00% 80.00% 90.00%
% OF COMPLETION
P
R
O
J
E
C
T
Ekperi Ayogwiri Jattu
Setraco Nig.Ltd.
Side Drain
Site Clearing
Sub-Grade
Sub-Base
Base
Surface Dressing
Wearing Coarse
47.74%
100%
100%
100%
97.66%
96.04%
97.70%
41.25%
71.10%
49.40%
41.17%
36.45%
35.70%
36.81%
0%
71.73%
63.30%
24.49%
23.32%
15.34%
15.10%
% OF COMPLETION
A
C
T
I
V
I
T
Y
Ekperi Ayogwiri Jattu
Setraco Nig.Ltd.
0
500
1000
1500
2000
2500
3000
Feb'10
March'10
April"10
May'10
June'10
July'10
Aug'10
Sep'10
Oct'10
Nov'10
Dec'10
Jan'11
Feb'11
March'11
April"11
May'11
June'11
July'11
Aug'11
T
u
r
n
o
v
e
r
M
i
l
l
i
o
n
Month of Progress
JATTU- AKPANA ROAD PROJECT
Cum. Forcasted Turnover Cum. Executed Turnover
Setraco Nig.Ltd.
0
500
1000
1500
2000
2500
Feb'10
March'10
April"10
May'10
June'10
July'10
Aug'10
Sep'10
Oct'10
Nov'10
Dec'10
Jan'11
Feb'11
March'11
April"11
May'11
June'11
July'11
Aug'11
T
u
r
n
o
v
e
r
M
i
l
l
i
o
n
Month of Progress
AYOGWIRI-OKPEKPE- IMIEKIBU ROAD PROJECT
Cum. Forcasted Turnover Cum. Executed Turnover
Setraco Nig.Ltd.
0
500
1000
1500
2000
2500
3000
3500
Feb'10
March'10
April"10
May'10
June'10
July'10
Aug'10
Sep'10
Oct'10
Nov'10
Dec'10
Jan'11
Feb'11
March'11
April"11
May'11
June'11
July'11
Aug'11
T
u
r
n
o
v
e
r
M
i
l
l
i
o
n
Month of Progress
EKPERI-ANEGBETTE ROAD PROJECT
Cum. Forcasted Turnover Cum. Executed Turnover
Setraco Nig.Ltd.
Jattu
Ayogw
iri
Ekperi
Cerified
Amount
2425.37 2626.64 3989.92
Executed
Turnover
2420.44 2110.76 2706.21
0.00
500.00
1000.00
1500.00
2000.00
2500.00
3000.00
3500.00
4000.00
4500.00
Million
Jattu Ayogwiri Ekperi
Adv. Payment
in
MN
647.076 856.45 1825.65
Previously
Certified
in
MN
2386.19 2321.54 3856.38
Retention
Money
in
MN
144.28 212.32 330.25
Contract Sum
in
MN
3029.83 6793.74 7927.84
Setraco Nig.Ltd.
Setraco Nig.Ltd.
Cut to fill @ 9+950- 10+075
Site clearance and earth work
Borrow to fill @ Ch- 10+375-11+050
Setraco Nig.Ltd.
Site clearance and earth work
Remove Unsuitable @ Ch- 7+900-8+025 Cut to spoil @ 8+000 – 8+225
Setraco Nig.Ltd.
Pavement and surfacing work
Stone Base laying @ 9+187 – 11+200Sub-Base Base laid @6+450 – 8+150
Setraco Nig.Ltd.
Pavement and surfacing work
Laying Mc1 @ Ch- 6+910-8+110 laying Mc1 at shoulder @ 8+375 – 11+200
Setraco Nig.Ltd.
Pavement and surfacing work
Laying S-125 at shoulder @ 8+375 – 11+200 Surface dressing @ 8+375 – 11+200
Setraco Nig.Ltd.
Pavement and surfacing work
Finish Road SurfaceLaying of Asphalt @ 8+375 – 11+200
Setraco Nig.Ltd.
Concrete work
U- drain ( 75x75x10) cm and Precast slab Precast Kerb wall fixing
Setraco Nig.Ltd.
Concrete work
Pile cap & abutment with wing wall casting
@ Bride 8+232
Cyclopean Concrete below pile cap
@ Bridge 8+232
Setraco Nig.Ltd.
Concrete work
Deck slab Concreting
@ Bridge 8+232
Head wall with wing wall casting
@ Bride 8+232
Setraco Nig.Ltd.
Setraco Nig.Ltd.
Massive Earth cutting @ Ch- 11+300- 12+577
Setraco Nig.Ltd.
Casting of Ring culvert @ Ch- 1+200
Setraco Nig.Ltd.
Compaction of subgrade Ch-0+350 -1+650 Remove unsuitable.
Setraco Nig.Ltd.
Sub-base Ch-0+000 -0+825 Laying of asphalt @ ch- 0+000- 1+370.
Setraco Nig.Ltd.
U-drain (75x90x10) @ ch- 1+580- 1+760 Stone pitching @ch-3+075
Setraco Nig.Ltd.
Precast kerb fixing @ ch- 0+500- 0+783 Culvert 2X2 m @ch-4+547.7
Setraco Nig.Ltd.
Casting of V-drain (140x60x50x10) cm Stone Base laying @ ch-7+000- 8+400
Setraco Nig.Ltd.
Setraco Nig.Ltd.
Subgrade preparationSite clearing @ ch- 0+750 – 8+475
Setraco Nig.Ltd.
Lateritic Base Laying of MC1 & surface dressing.
Setraco Nig.Ltd.
Casting of Precast Beam Laying of Asphalt.
Setraco Nig.Ltd.
Pile cap in progress.Drilled Piling @Ch 18+197 Bridge
Setraco Nig.Ltd.
Construction of Cross beam Abutment and retaining wall at Bridge
Setraco Nig.Ltd.
Launching of precast Beam at Bridge@ Ch-18+197 & 19+099
Setraco Nig.Ltd.
Fixing of precast slab and casting of Deck slab at Bridge@ Ch-18+197 & 19+099
Setraco Nig.Ltd.
Box and Ring culvert
Setraco Nig.Ltd.
Dredged Sand filling from Ch-18+220 – 19+025
Setraco Nig.Ltd.
Setraco Nig.Ltd.
Bush-Bar Under construction at Life camp Emulsion plant under construction
Setraco Nig.Ltd.

More Related Content

Similar to Setraco EDO State project presentation

ACA Industrial Tool Capabilities & Client Presentation
ACA Industrial Tool Capabilities & Client PresentationACA Industrial Tool Capabilities & Client Presentation
ACA Industrial Tool Capabilities & Client Presentation
acaindustrialtool
 
for LinkedIN
for LinkedINfor LinkedIN
for LinkedIN
Kristina ?alyt?
 
UPDATED TRUNKLINE DRAFT FINAL DRAWINGS PART 1.pdf
UPDATED TRUNKLINE DRAFT FINAL DRAWINGS PART 1.pdfUPDATED TRUNKLINE DRAFT FINAL DRAWINGS PART 1.pdf
UPDATED TRUNKLINE DRAFT FINAL DRAWINGS PART 1.pdf
AishaSaeed54
 
INDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.pptINDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.ppt
DeepakDayal11
 
Beauty clinic (Business Loan) urdu
Beauty clinic (Business Loan) urduBeauty clinic (Business Loan) urdu
Beauty clinic (Business Loan) urdu
kmjahanger
 
Signature global millennia2 sector 37D gurgaon 8010730143
Signature global millennia2 sector 37D gurgaon 8010730143Signature global millennia2 sector 37D gurgaon 8010730143
Signature global millennia2 sector 37D gurgaon 8010730143
Huda affordable Housing Gurgaon
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
ANANDA DS
 
Company profile 2015 rev.4
Company profile 2015   rev.4Company profile 2015   rev.4
Company profile 2015 rev.4
Arthit Somkam
 
CCE-NEW (1).pdf
CCE-NEW (1).pdfCCE-NEW (1).pdf
CCE-NEW (1).pdf
LTtthnh1
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
SaketChandra4
 
Measured Drawings
Measured DrawingsMeasured Drawings
Measured Drawings
Pengeneee Peng
 
Inesa, produse LED , catalog Romania - COTRACO ROM srl si Urban Intelligence
Inesa, produse LED , catalog Romania - COTRACO ROM srl si Urban IntelligenceInesa, produse LED , catalog Romania - COTRACO ROM srl si Urban Intelligence
Inesa, produse LED , catalog Romania - COTRACO ROM srl si Urban Intelligence
Peter Szabo
 
Kac progress report
Kac progress reportKac progress report
Kac progress report
Rahul Rao
 
BPP Vetted Contracts For October 2012
BPP Vetted Contracts For October 2012BPP Vetted Contracts For October 2012
BPP Vetted Contracts For October 2012
Government of Ekiti State, Nigeria
 

Similar to Setraco EDO State project presentation (14)

ACA Industrial Tool Capabilities & Client Presentation
ACA Industrial Tool Capabilities & Client PresentationACA Industrial Tool Capabilities & Client Presentation
ACA Industrial Tool Capabilities & Client Presentation
 
for LinkedIN
for LinkedINfor LinkedIN
for LinkedIN
 
UPDATED TRUNKLINE DRAFT FINAL DRAWINGS PART 1.pdf
UPDATED TRUNKLINE DRAFT FINAL DRAWINGS PART 1.pdfUPDATED TRUNKLINE DRAFT FINAL DRAWINGS PART 1.pdf
UPDATED TRUNKLINE DRAFT FINAL DRAWINGS PART 1.pdf
 
INDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.pptINDCON PRESENTATION LNT.ppt
INDCON PRESENTATION LNT.ppt
 
Beauty clinic (Business Loan) urdu
Beauty clinic (Business Loan) urduBeauty clinic (Business Loan) urdu
Beauty clinic (Business Loan) urdu
 
Signature global millennia2 sector 37D gurgaon 8010730143
Signature global millennia2 sector 37D gurgaon 8010730143Signature global millennia2 sector 37D gurgaon 8010730143
Signature global millennia2 sector 37D gurgaon 8010730143
 
Footing-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdfFooting-Biaxial_pdf-a.pdf
Footing-Biaxial_pdf-a.pdf
 
Company profile 2015 rev.4
Company profile 2015   rev.4Company profile 2015   rev.4
Company profile 2015 rev.4
 
CCE-NEW (1).pdf
CCE-NEW (1).pdfCCE-NEW (1).pdf
CCE-NEW (1).pdf
 
CE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptxCE Confr Presentation 08 Oct 2022.pptx
CE Confr Presentation 08 Oct 2022.pptx
 
Measured Drawings
Measured DrawingsMeasured Drawings
Measured Drawings
 
Inesa, produse LED , catalog Romania - COTRACO ROM srl si Urban Intelligence
Inesa, produse LED , catalog Romania - COTRACO ROM srl si Urban IntelligenceInesa, produse LED , catalog Romania - COTRACO ROM srl si Urban Intelligence
Inesa, produse LED , catalog Romania - COTRACO ROM srl si Urban Intelligence
 
Kac progress report
Kac progress reportKac progress report
Kac progress report
 
BPP Vetted Contracts For October 2012
BPP Vetted Contracts For October 2012BPP Vetted Contracts For October 2012
BPP Vetted Contracts For October 2012
 

Setraco EDO State project presentation