Section – 1.General Information
1.1 INTRODUCTION
1.2 Description of Works
1.3 Design Criteria
1.4 List of Material and Supplier/Manufacturer
Section – 2. Technical Descriptions
2.1. Unplasticized Polyvinyl Chloride Pipes (uPVC)
2.1a. Unplasticized Polyvinyl Chloride Pipes (Class III)
2.1a.1 Approval
2.1a.1 Technical Data Sheets
2.1a.1 Catalogue
2.1b. Unplasticized Polyvinyl Chloride Pipes (Class IV)
2.1b.1 Approval
2.1b.2 Technical Data Sheets
2.1b.3 Catalogue
2.2. Reinforced Thermosetting Resin Plastic (RTRP)
2.2.1 Approval
2.2.2 Technical Data Sheets
2.2.3 Catalogue
2.3. Structural Fiber Glass Manhole
2.3.1 Approval
2.3.2 Technical Data Sheets
2.3.3 Catalogue
2.4. Manhole Cover and Frame
2.4.1 Approval
2.4.2 Technical Data Sheets
2.4.3 Catalogue
2.5. Lift Station
2.5a Submersible pump
2.5a.1 Approval
2.5a.2 Technical Data Sheets
TABLE OF CONTENTS
2. 5a.3 Catalogue
2.5b. Ventilation System
2.5b.1 Approval
2.5b.2 Technical Data Sheets
2. 5b.3 Catalogue
2.5c. Dismantling Piece
2.5c.1 Approval
2.5c.2 Technical Data Sheets
2. 5c.3 Catalogue
2.5d. Check Valve
2.5d.1 Approval
2.5d.2 Technical Data Sheets
2. 5d.3 Catalogue
2.5e. FRP Ladder
2.5d.1 Approval
2.5d.2 Technical Data Sheets
2. 5d.3 Catalogue
2.5f. Remote Terminal Unites (RTU)
2.5f.1 Approval
2.5f.2 Technical Data Sheets
2.5f.3 Catalogue
Section –3. Operation and Maintenance information
3.1 Remote Terminal Units (RTU)
3.2 Master Equipment List
3.3 List of Special Tools
3.4 Submersible Pump
3.5 Ventilation System
3.6 Preventive Maintenance Log Forms
Recommended Monthly Operational Duties
Section – 4 AS Built Drawings

More Related Content

Viewers also liked

N-glycosylation of ICAM-2 is required for ICAM-2- mediated complete suppressi...
N-glycosylation of ICAM-2 is required for ICAM-2- mediated complete suppressi...N-glycosylation of ICAM-2 is required for ICAM-2- mediated complete suppressi...
N-glycosylation of ICAM-2 is required for ICAM-2- mediated complete suppressi...Enrique Moreno Gonzalez
 
perry-technology-brochure
perry-technology-brochureperry-technology-brochure
perry-technology-brochureRobert Perry
 
Educación artística
Educación artísticaEducación artística
Educación artísticajimmy_melo
 
Evernote installation - Windows Desktop & Mac
Evernote installation - Windows Desktop & MacEvernote installation - Windows Desktop & Mac
Evernote installation - Windows Desktop & Macr0450033
 
PERSONAL_DETAIL_CV_Up-dated
PERSONAL_DETAIL_CV_Up-datedPERSONAL_DETAIL_CV_Up-dated
PERSONAL_DETAIL_CV_Up-datedkulube teboho
 
Solving Business Problems with JS++
Solving Business Problems with JS++Solving Business Problems with JS++
Solving Business Problems with JS++Roger Poon
 
Anatomia, Fisiologia, NEFROLOGIA por Carlos M. Montaño Pérez
Anatomia, Fisiologia, NEFROLOGIA por Carlos M. Montaño PérezAnatomia, Fisiologia, NEFROLOGIA por Carlos M. Montaño Pérez
Anatomia, Fisiologia, NEFROLOGIA por Carlos M. Montaño PérezCarlos M. Montaño
 

Viewers also liked (8)

N-glycosylation of ICAM-2 is required for ICAM-2- mediated complete suppressi...
N-glycosylation of ICAM-2 is required for ICAM-2- mediated complete suppressi...N-glycosylation of ICAM-2 is required for ICAM-2- mediated complete suppressi...
N-glycosylation of ICAM-2 is required for ICAM-2- mediated complete suppressi...
 
Plan de clase pap
Plan de clase papPlan de clase pap
Plan de clase pap
 
perry-technology-brochure
perry-technology-brochureperry-technology-brochure
perry-technology-brochure
 
Educación artística
Educación artísticaEducación artística
Educación artística
 
Evernote installation - Windows Desktop & Mac
Evernote installation - Windows Desktop & MacEvernote installation - Windows Desktop & Mac
Evernote installation - Windows Desktop & Mac
 
PERSONAL_DETAIL_CV_Up-dated
PERSONAL_DETAIL_CV_Up-datedPERSONAL_DETAIL_CV_Up-dated
PERSONAL_DETAIL_CV_Up-dated
 
Solving Business Problems with JS++
Solving Business Problems with JS++Solving Business Problems with JS++
Solving Business Problems with JS++
 
Anatomia, Fisiologia, NEFROLOGIA por Carlos M. Montaño Pérez
Anatomia, Fisiologia, NEFROLOGIA por Carlos M. Montaño PérezAnatomia, Fisiologia, NEFROLOGIA por Carlos M. Montaño Pérez
Anatomia, Fisiologia, NEFROLOGIA por Carlos M. Montaño Pérez
 

Similar to Sanitary Water

How to view the material certificate part 1
How to view the material certificate part 1How to view the material certificate part 1
How to view the material certificate part 1Mohamed Farouk
 
Tunnel_lining_design_guide_The_British_T.pdf
Tunnel_lining_design_guide_The_British_T.pdfTunnel_lining_design_guide_The_British_T.pdf
Tunnel_lining_design_guide_The_British_T.pdfHugoPaulin1
 
Pontofocal-textos-regulamentos-chn 785-suppl_1
 Pontofocal-textos-regulamentos-chn 785-suppl_1 Pontofocal-textos-regulamentos-chn 785-suppl_1
Pontofocal-textos-regulamentos-chn 785-suppl_1André Paredes
 
Hydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control ChannelsHydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control ChannelsGustavo Ariza Trelles
 
Norsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdfNorsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdfSugunaSrinivasan2
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATSMary Calkins
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design141jdf
 
Inspeccion Tanque ASME.pdf
Inspeccion Tanque ASME.pdfInspeccion Tanque ASME.pdf
Inspeccion Tanque ASME.pdfHaugSA
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectignitetribes
 
Common Mistakes: Plan Review & Inspection
Common Mistakes: Plan Review & InspectionCommon Mistakes: Plan Review & Inspection
Common Mistakes: Plan Review & InspectionMeghan Knudson
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDFWorldofAllLyrics
 
Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Panji Krisnamurti
 
2 appendix ii technical conditions, requirements and ma (1)
2 appendix ii   technical conditions, requirements and ma (1)2 appendix ii   technical conditions, requirements and ma (1)
2 appendix ii technical conditions, requirements and ma (1)SERPETBOL.LTDA
 

Similar to Sanitary Water (20)

Report
ReportReport
Report
 
Piping materials v imp
Piping materials   v impPiping materials   v imp
Piping materials v imp
 
Report1
Report1Report1
Report1
 
How to view the material certificate part 1
How to view the material certificate part 1How to view the material certificate part 1
How to view the material certificate part 1
 
Tunnel_lining_design_guide_The_British_T.pdf
Tunnel_lining_design_guide_The_British_T.pdfTunnel_lining_design_guide_The_British_T.pdf
Tunnel_lining_design_guide_The_British_T.pdf
 
Pontofocal-textos-regulamentos-chn 785-suppl_1
 Pontofocal-textos-regulamentos-chn 785-suppl_1 Pontofocal-textos-regulamentos-chn 785-suppl_1
Pontofocal-textos-regulamentos-chn 785-suppl_1
 
Hydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control ChannelsHydraulic Design of Flood Control Channels
Hydraulic Design of Flood Control Channels
 
Handbook1
Handbook1Handbook1
Handbook1
 
Norsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdfNorsok M-001 Material Selection.pdf
Norsok M-001 Material Selection.pdf
 
02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS02 QUALITY CONTROL TEST REPORTS FORMATS
02 QUALITY CONTROL TEST REPORTS FORMATS
 
API_510_for_Exam.pdf
API_510_for_Exam.pdfAPI_510_for_Exam.pdf
API_510_for_Exam.pdf
 
38785106 api-tank-design
38785106 api-tank-design38785106 api-tank-design
38785106 api-tank-design
 
Inspeccion Tanque ASME.pdf
Inspeccion Tanque ASME.pdfInspeccion Tanque ASME.pdf
Inspeccion Tanque ASME.pdf
 
Sample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_projectSample wbs for_upstream_epcic_project
Sample wbs for_upstream_epcic_project
 
Common Mistakes: Plan Review & Inspection
Common Mistakes: Plan Review & InspectionCommon Mistakes: Plan Review & Inspection
Common Mistakes: Plan Review & Inspection
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 
Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3Method Statement Kota Kasablanka 3
Method Statement Kota Kasablanka 3
 
Ufgs 33 11 23
Ufgs 33 11 23Ufgs 33 11 23
Ufgs 33 11 23
 
Astm d1785
Astm d1785Astm d1785
Astm d1785
 
2 appendix ii technical conditions, requirements and ma (1)
2 appendix ii   technical conditions, requirements and ma (1)2 appendix ii   technical conditions, requirements and ma (1)
2 appendix ii technical conditions, requirements and ma (1)
 

Sanitary Water

  • 1. TABLE OF CONTENTS Section – 1.General Information 1.1 INTRODUCTION 1.2 Description of Works 1.3 Design Criteria 1.4 List of Material and Supplier/Manufacturer Section – 2. Technical Descriptions 2.1. Unplasticized Polyvinyl Chloride Pipes (uPVC) 2.1a. Unplasticized Polyvinyl Chloride Pipes (Class III) 2.1a.1 Approval 2.1a.1 Technical Data Sheets 2.1a.1 Catalogue 2.1b. Unplasticized Polyvinyl Chloride Pipes (Class IV) 2.1b.1 Approval 2.1b.2 Technical Data Sheets 2.1b.3 Catalogue 2.2. Reinforced Thermosetting Resin Plastic (RTRP) 2.2.1 Approval 2.2.2 Technical Data Sheets 2.2.3 Catalogue 2.3. Structural Fiber Glass Manhole 2.3.1 Approval 2.3.2 Technical Data Sheets 2.3.3 Catalogue 2.4. Manhole Cover and Frame 2.4.1 Approval 2.4.2 Technical Data Sheets 2.4.3 Catalogue 2.5. Lift Station 2.5a Submersible pump 2.5a.1 Approval 2.5a.2 Technical Data Sheets
  • 2. TABLE OF CONTENTS 2. 5a.3 Catalogue 2.5b. Ventilation System 2.5b.1 Approval 2.5b.2 Technical Data Sheets 2. 5b.3 Catalogue 2.5c. Dismantling Piece 2.5c.1 Approval 2.5c.2 Technical Data Sheets 2. 5c.3 Catalogue 2.5d. Check Valve 2.5d.1 Approval 2.5d.2 Technical Data Sheets 2. 5d.3 Catalogue 2.5e. FRP Ladder 2.5d.1 Approval 2.5d.2 Technical Data Sheets 2. 5d.3 Catalogue 2.5f. Remote Terminal Unites (RTU) 2.5f.1 Approval 2.5f.2 Technical Data Sheets 2.5f.3 Catalogue Section –3. Operation and Maintenance information 3.1 Remote Terminal Units (RTU) 3.2 Master Equipment List 3.3 List of Special Tools 3.4 Submersible Pump 3.5 Ventilation System 3.6 Preventive Maintenance Log Forms Recommended Monthly Operational Duties Section – 4 AS Built Drawings