Steps procedure for safe v 12
A. slabs
1-Import (SAFE.F2K.File) …………selected story of etabs.
2-Modify materials (FC, FY).
3-Modify reinforcement bar size.
4-Modify properties of (slab, beams, walls and columns).
5-Run /automatic slab mesh.
6-Draw/strips
7-Run analysis and design.
8-Show slab design
A.Foundation
1-Import (SAFE.F2K.File) …………selected base story of etabs.
2-Modify materials (FC, FY).
3-Modify reinforcement bar size.
4-Define (footing or mat) thickness.
5-Define subgrade soil factor.
6-Draw (footing or mat)
7-Run /automatic slab mesh.
8-Draw/strips
9-Run analysis and design.
10- Check punching for active depth.
11- Check ground stress for bearing capacity.
12- Show slab design.

safe proceture.pdf

  • 1.
    Steps procedure forsafe v 12 A. slabs 1-Import (SAFE.F2K.File) …………selected story of etabs. 2-Modify materials (FC, FY). 3-Modify reinforcement bar size. 4-Modify properties of (slab, beams, walls and columns). 5-Run /automatic slab mesh. 6-Draw/strips 7-Run analysis and design. 8-Show slab design A.Foundation 1-Import (SAFE.F2K.File) …………selected base story of etabs. 2-Modify materials (FC, FY). 3-Modify reinforcement bar size. 4-Define (footing or mat) thickness. 5-Define subgrade soil factor. 6-Draw (footing or mat) 7-Run /automatic slab mesh. 8-Draw/strips 9-Run analysis and design. 10- Check punching for active depth. 11- Check ground stress for bearing capacity. 12- Show slab design.