SlideShare a Scribd company logo
TSX : RMX | OTCQX : RBYCF
Corporate Presentation
May 2018
Building Long-Term Shareholder Value
TSX : RMX | OTCQX : RBYCF
Cautionary Statement regarding Forward-Looking Statements and other Cautionary Notes
This corporate presentation contains statements that constitute “forward-looking statements” and “forward looking information” (collectively, “forward-looking statements”) within the meaning of applicable
Canadian and United States securities legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “believes”, “intends”, “may”, “will”, “should”,
“plans”, “anticipates”, “potential”, “expects”, “estimates”, “forecasts”, “budget”, “likely”, “goal” and similar expressions or statements that certain actions, events or results may or may not be achieved or
occur in the future. In some cases, forward-looking information may be stated in the present tense, such as in respect of current matters that may be continuing, or that may have a future impact or effect.
Forward-looking statements reflect our current expectations and assumptions, and are subject to a number of known and unknown risks, uncertainties and other factors which may cause our actual results,
performance or achievements to be materially different from any anticipated future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements
include, but are not limited to statements regarding the anticipated timing of the filing of the NI 43-101 Technical Report, observations from the 2018 infill drilling and underground development samples from
test mining, impact of the data from the 5,000 m of drilling completed in the fourth quarter of 2017 and activities from the 2018 Exploration Program on the 2018 Mineral Resource Estimate, the potential
advancement of the Phoenix Gold Project to a viable commercial operation, the potential value of the Company’s tax loss pools, the potential to improve the quantities and classification of the 2018 Mineral
Resource Estimate, the impact of the new 2018 geological model and information on the Company’s understanding of the F2 Gold Deposit and evaluation of mining methods for the Phoenix Gold Project, the
additional exploration work required to further improve and reconcile the geological model for the F2 Gold Deposit, the anticipated timing of the reactivation of the Phoenix Gold Project’s mill, the further
steps necessary to potentially improve upon the 2018 Mineral Resource Estimates, including targeted infill and step-out drilling to potentially convert Inferred Resources to Indicated Resources, using the results
from the bulk sampling program for reconciliation and validation purposes, the evaluation of the McFinley Deposit and other close proximity targets for potential inclusion in a future Mineral Resources
Estimate, and follow-up drilling of the F2 Gold Deposit at depth and along strike.
Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and represent management’s best judgment based on facts and assumptions that
management considers reasonable. If such opinions and estimates prove to be incorrect, actual and future results may be materially different than expressed in the forward-looking statements.
Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Rubicon to be materially different from any
future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: possible variations in mineralization, grade or recovery or throughput
rates; uncertainty of mineral resources, inability to realize exploration potential, mineral grades and mineral recovery estimates; actual results of current exploration activities; actual results of reclamation
activities; uncertainty of future operations, delays in completion of exploration plans for any reason including insufficient capital, delays in permitting, and labour issues; conclusions of future economic or
geological evaluations; changes in project parameters as plans continue to be refined; failure of equipment or processes to operate as anticipated; accidents and other risks of the mining industry; delays and
other risks related to operations; timing and receipt of regulatory approvals; the ability of Rubicon and other relevant parties to satisfy regulatory requirements; the ability of Rubicon to comply with its
obligations under material agreements including financing agreements; the availability of financing for proposed programs and working capital requirements on reasonable terms; the ability of third-party service
providers to deliver services on reasonable terms and in a timely manner; risks associated with the ability to retain key executives and key operating personnel; cost of environmental expenditures and
potential environmental liabilities; dissatisfaction or disputes with local communities or First Nations or Aboriginal Communities; failure of plant, equipment or processes to operate as anticipated; market
conditions and general business, economic, competitive, political and social conditions; our ability to generate sufficient cash flow from operations or obtain adequate financing to fund our capital expenditures
and working capital needs and meet our other obligations; the volatility of our stock price, and the ability of our common stock to remain listed and traded on the TSX.
Cautionary Statements Regarding Forward-Looking
Statements and Cautionary Notes
2
TSX : RMX | OTCQX : RBYCF
Forward-looking statements contained herein are made as of the date of this corporate presentation and Rubicon disclaims any obligation to update any forward-looking statements, whether as a result of
new information, future events or results or otherwise, except as required by applicable securities laws. Readers are advised to carefully review and consider the risk factors identified in the Company’s
annual information form dated March 22, 2018 under the heading “Risk Factors” and in other continuous disclosure documents of the Company filed at www.sedar.com for a discussion of the factors that
could cause Rubicon’s actual results, performance and achievements to be materially different from any anticipated future results, performance or achievements expressed or implied by the forward-looking
statements. Readers are further cautioned that the foregoing list of assumptions and risk factors is not exhaustive and it is recommended that prospective investors consult the more complete discussion of
Rubicon’s business, financial condition and prospects that is included in this corporate presentation. The forward-looking statements contained herein are expressly qualified by this cautionary statement.
Qualified Person
The content of this corporate presentation relating to geology and exploration has been read and approved by George Ogilvie, P.Eng., President, CEO, and Director, who is a Qualified Person as defined by
NI 43-101.
Cautionary Note to U.S. Readers Regarding Estimates of Measured, Indicated and Inferred Resources
This corporate presentation uses the terms “Measured” and “Indicated” Mineral Resources and “Inferred” Mineral Resources. The Company advises U.S. investors that while these terms are recognized and
required by Canadian securities administrators, they are not recognized by the SEC. The estimation of “Measured” and “Indicated” Mineral Resources involves greater uncertainty as to their existence and
economic feasibility than the estimation of Proven and Probable Reserves. The estimation of “Inferred” resources involves far greater uncertainty as to their existence and economic viability than the
estimation of other categories of resources. It cannot be assumed that all or any part of a “Measured”, “Inferred” or “Indicated” mineral resource will ever be upgraded to a higher category.
Under Canadian rules, estimates of “inferred mineral resources” may not form the basis of feasibility studies, pre-feasibility studies or other economic studies, except in prescribed cases, such as in a
preliminary economic assessment under certain circumstances. The SEC normally only permits issuers to report mineralization that does not constitute “reserves” as in-place tonnage and grade without
reference to unit measures. Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally
produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that any part or all of a “measured”, “indicated” or “inferred” mineral resource exists or
is economically or legally mineable. Information concerning descriptions of mineralization and resources contained herein may not be comparable to information made public by U.S. companies subject to
the reporting and disclosure requirements of the SEC.
Cautionary Statements Regarding Forward-Looking
Statements and Cautionary Notes
3
TSX : RMX | OTCQX : RBYCF
Corporate Vision
Three-pronged approach to build long-term shareholder value
4
Potentially building a mid-tier gold Company:
1. Advancement of the Phoenix Gold Project to commercial
production;
2. Organic growth opportunities with exploration targets
within 2 km of the Phoenix Gold Project; and
3. Exploring our vast Red Lake Properties land package.
TSX : RMX | OTCQX : RBYCF
Capital Structure and Shareholder Info
Strong balance sheet and institutional support
Balance Sheet and Capital Structure
Approximate cash balance***: ~C$24 M
Nominal long-term debt outstanding
(December 31, 2020):
C$12.0 M
Lease liabilities C$2.5 M
Shares outstanding: 65,853,092
Options outstanding: 4,199,703
Institutional
Investors
70.72%
George
Ogilvie
0.72%
CPPIB
Credit
15.19%
Retail
8.24%
Royal
Gold
5.13%
Equity ownership breakdown*
5
Analyst Coverage
BMO Andrew Mikitchook
TD Securities Daniel Earle
Laurentian Bank Ryan Hanley
Mackie Research Stuart McDougall
Market Data (April 27, 2018)**
RMX share price: C$1.24
Market capitalization: C$81.7 M
Avg. 30-day daily trading volume
(TSX & OTC markets)
27,463
*Numbers may not add due to rounding
**Source: TSX and OTC markets, as of April 27, 2018
***Including equity financing, which closed on February 26, 2018
Institutional shareholders include:
Mackenzie Financial Ninepoint Partners
Donald Smith & Co. Greywolf
Sentry Investments Sun Valley Gold
Franklin Templeton RBIM
(475,940 shares)
TSX : RMX | OTCQX : RBYCF
• Head frame and hoist
commissioned
• 9 km of U/G development;
Shaft completed to 730 m
below surface
200-person camp
Tailings management
facility completed
• Surface roads, earth and civil works in place
• Power line and substation on site
6
Infrastructure and Permits in Place
>C$770 million spent on infrastructure and development
Item: Capital spent/Tax pools (C$)
Mill construction ~$150 M
Surface construction ~$95 M
Underground exploration,
development, sampling, etc.
~$525 M
Total $770 M
Tax loss pools (April 2018)
$687 M
$387M – Phoenix Gold Project
$300M – can be used externally
6
• 1,250 tpd mill
• 91.5% recoveries during 2015
• Substantially permitted
TSX : RMX | OTCQX : RBYCF 7
Conceptual Asset Values Mitigate Downside Risk
Assets carry conceptual values comparable to the Company’s market cap
7
Red Lake Properties (28,266 ha):
Based on precedent land transactions in Red Lake,
Rubicon’s Red Lake Properties could have a
conceptual value of between C$30-50 M
Hard assets and equipment at site:
More than ~C$300 M of equipment and hard assets
could potentially have a resale value of ~C$30 M
Tax loss pools and end working capital:
Potential value of C$10-15 M
Red Lake Properties
Hard assets and
equipment
Financial assets
Rubicon current market
capitalization: C$81.7 M
TSX : RMX | OTCQX : RBYCF 8
Exploration at the Phoenix Gold Project:
• New Geological Structural Interpretation
• 2018 Mineral Resource Estimate demonstrates
material growth versus 2016 estimates
• Test mining activities underway
TSX : RMX | OTCQX : RBYCF
Steps to Bring Confidence Back to the
Phoenix Gold Project
9
• Hired reputable consultant and peer reviewer from the start: Golder Associates and T.
Maunula & Associates have been working with Rubicon since early 2017.
• Focus on structural geology: 3,500 m structural oriented drilling, 10,000 m historical core re-
logged, and extensive underground mapping shows discrepancies with the 2016 geological model.
• 2017 infill and step out drilling showing higher grades compared to 2016 block
model: 25,000 m drilled in 2017 and 20,000 m planned for 2018
• Structural Interpretation shows better continuity: Simplified interpretation allows for the
evaluation of bulk mining methods
• 2018 Mineral Resource Estimate demonstrates significant growth
• 25,000-30,000 tonnes of test mining/bulk sampling in 2018: To further refine and
potentially validate 2018 Mineral Resource Estimate; Processing slated for mid-2018
• Potential to significantly enhance the quantities and classifications of the 2018
Mineral Resource Estimate
TSX : RMX | OTCQX : RBYCF
Historical drill holes
HiTi Basalt Units
Ultramafic Flow Units
High-grade domain
D1 N-S structures
D2 E-W structures
Quartz-Breccia Zones
(higher grade)
Riedel veins system
(orientations):
R’ veins
R veins
P veins
D2 dextral transpresion
2013 Structural
Interpretation
2016 Structural
Interpretation
2018 Structural
Interpretation
Structural Interpretation10
Comparison of structural interpretations of the F2 Gold Deposit
10
• Riedel vein system:
System of mineralized
quartz-actinolite veins that
appear to be primary
structural controls on gold
mineralization at the F2
Gold Deposit
• More continuity of gold
mineralization within the
HiTi Basalt Units (main host
rock) compared to the 2016
geological model
• Evaluating bulk mining
methods: Test mining
sublevel longhole method
on current test stopes
North
(mine-grid)
(10) Refer to endnote #10
TSX : RMX | OTCQX : RBYCF
Structural Interpretation10
Conceptual diagram of F2 Gold Deposit local geology
11
50 m
Historic
McFinley
Deposit area
Hanging
Wall Basalt
West Limb
Basalt
F2 Basalt
610-metre
level
305-metre level
HiTi Basalt Units
Drill hole intersecting
Ultramafic Flow Units
Drill hole intersecting
Felsic Intrusive Units
Underground
development
Drill hole intersecting
HiTi Basalt Units
• Three HiTi Basalt lenses:
• Zone 1 (domain): F2 Basalt
• Zone 2 (domain): West Limb Basalt, and
Hanging Wall Basalt (larger zone at depth)
• Mineralization encountered at 1,600 m
below surface: Deeper F2 Gold Deposit is
sparsely drilled; further exploration work
required to better understand the geology at
depth
• Structural Interpretation will continue to be
refined, enhanced, and supported with data
and observations collected from the 2018
Exploration Program
Section view
looking north
(10) Refer to endnote #10
TSX : RMX | OTCQX : RBYCF 12
Material Growth in 2018 Mineral Resources11
Consideration for potential bulk mining methods
Resource
Category
Quantity
(000'tonnes)
Grade
(g/t Au)
Contained
Gold Ounces
Measured (M) 188 6.80 41,000
Indicated (I) 1,186 6.30 240,000
M + I 1,374 6.37 281,000
Inferred 3,884 6.00 749,000
2018 Mineral Resource Estimate – April 30, 2018*
@ 3.0 g/t Au Cut-off
• 113% increase in M+I Resources*;
80% increase in Inferred Resources*;
improved grades: Mainly attributed
to a re-interpretation of geological
and structural controls on
mineralization along with recognizing
the potential for larger scale mining
which resulted in broader mineral
domains
• Golder (lead) & T. Maunula (peer
reviewer): More than 12 months of
collaboration with Rubicon
• Encouraging results: Initial
observations from test mining
consistent with 2018 Mineral
Resources; too early to draw
conclusions
• Effective date for this Mineral Resource is April 30, 2018
• Mineral Resource Estimate uses a break-even economic cut-off grade of 3.0 g/t Au based on assumptions
of a gold price of US$1,300 per ounce, an exchange rate of US$/C$ 0.77, mining cash costs of C$97/t,
processing costs of C$20/t, G&A of C$5/t, sustaining capital C$10/t, refining, transport and royalty costs
of C$53/oz, and average gold recoverability of 92%
• Mineral Resources are not Mineral Reserves and do not demonstrate economic viability
• There is no certainty that all or any part of this Mineral Resource will be converted into Mineral Reserve
• All figures are rounded to reflect the relative accuracy of the estimates and totals may not add correctly
*There is no certainty that the Inferred Mineral Resources will be converted to the Measured and Indicated Mineral Resource categories, that the
Measured and Indicated Mineral Resources will be converted to the Proven and Probable Mineral Reserve categories and there is no certainty that
the updated Mineral Resource statement will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic
viability; the estimate of Mineral Resources in the updated Mineral Resource statement may be materially affected by environmental, permitting,
legal, title, taxation, socio-political, marketing, or other relevant issues.
(11) Refer to endnote #11
TSX : RMX | OTCQX : RBYCF 13
Material Growth in 2018 Mineral Resources11
Increased tonnes, grade and ounces at all cut-offs and categories
Quantity (000’ tonnes) Grade (g/t Au) Contained Gold Ounces
2018 20162 Change 2018 20162 Change 2018 20162 Change
3.0 g/t Au
Measured (M) 188 0 N/A 6.80 0 N/A 41,000 0 N/A
Indicated (I) 1,186 719 65% 6.30 5.71 10.3% 240,000 132,000 81.8%
Total M+I 1,374 719 91% 6.37 5.71 11.6% 281,000 132,000 112.9%
Inferred 3,884 2,491 56% 6.00 5.18 15.8% 749,000 415,000 80.5%
3.5 g/t Au
Measured (M) 155 0 N/A 7.54 0 N/A 38,000 0 N/A
Indicated (I) 964 601 60% 7.01 6.19 13% 217,000 120,000 81%
Total M+I 1,119 601 86% 7.08 6.19 14.4% 255,000 120,000 113%
Inferred 3,146 1,959 61% 6.64 5.71 16.3% 672,000 360,000 87%
4.0 g/t Au
Measured (M) 129 0 N/A 8.29 0 N/A 35,000 0 N/A
Indicated (I) 779 492 58% 7.78 6.73 16% 195,000 106,000 84%
Total M+I 909 492 85% 7.86 6.73 17% 230,000 106,000 117%
Inferred 2,556 1,519 68% 7.31 6.28 16% 601,000 307,000 96%
Comparison between 2018* and 2016** Estimated Quantities
at Reported Cut-Off Grades
(11) Refer to endnote #11
*There is no certainty that the Inferred Mineral Resources will be converted to the Measured and Indicated Mineral Resource categories, that the
Measured and Indicated Mineral Resources will be converted to the Proven and Probable Mineral Reserve categories and there is no certainty that
the updated Mineral Resource statement will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic
viability; the estimate of Mineral Resources in the updated Mineral Resource statement may be materially affected by environmental, permitting,
legal, title, taxation, socio-political, marketing, or other relevant issues.
**2016 Estimates are no longer current and should not be relied upon.
TSX : RMX | OTCQX : RBYCF 14
Material Growth in 2018 Mineral Resources
Potential to enhance quantities and classifications
• 24,000 m of infill/step-out
drilling: To Potentially improve the
classification of Inferred Resources;
potential to grow resources from
Exploration Target
• Model reconciliation based on
25,000-30,000t bulk sampling: To
increase confidence and validate a
future Mineral Resource Estimate
• Evaluating McFinley and Close
Proximity Targets: Evaluating data
from historical McFinley Deposit
and Close Proximity Targets, which
could possibly included in any
future Mineral Resource Estimate
• F2 Gold Deposit open at depth
and along strike: High-grade
intercepts at 1,600 m, below
current bottom of 2018 Mineral
Resource Estimate
2018 Mineral Resource Block Model Diagram Zone 2
(Hanging Wall and West Limb Basalts)
Section View Looking West (Mine-Grid)
TSX : RMX | OTCQX : RBYCF
2018 Exploration Program
Phoenix Gold Project underground diagram looking north
15
Surface
Fresh air
raise
337-metre loading pocket
685-metre loading pocket
Crusher station
Shaft
610-metre haulage level
305-metre haulage level
Diagram looking north (not to scale)
Conveyer system
Ore and
waste
passes
Main F2 Gold Deposit
Completed development Drilling platforms
More than 9km of
U/G development
Conceptual ramp
to surface
2018 Exploration Program:
25,000-30,000t of test mining
between the 122- and 244-
metre levels; up to 4,000 m of
bazooka drilling at the stope
faces
2017 Exploration Program
COMPLETED:
• 3,500 m of structural N-S
oriented drilling
• 10,000 m of historical core
re-logging for structure
• 25,000 m of oriented
infill/step out drilling
2018 Exploration Program:
20,000 m of infill/step-out
drilling at the 305-, 610- and
685-metre levels;
Building exploration drift at
610-metre level
Planned development
TSX : RMX | OTCQX : RBYCF
122-metre level
244-metre level
305-metre level
183-metre level
161 test stope
977 test stope
015 test stope
Existing underground
development
60 m
2018 planned
test stopes
Previously mined
test stopes
997 mined test stope
030 mined test stope
994 mined test stope
2018 Test Mining – Conceptual Diagram9
Between 25,000-30,000 tonnes planned starting mid-2018
Long section looking west
• 10,000 tonnes of mineralized
material currently on surface
(7,000 tonnes from #977 test
stope; 3,000 tonnes of low-
grade material)
• Test stopes are previously
well developed and drilled,
allowing the Company to
take advantage of sunk
capital for reduced costs and
timelines
Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the
beginning of this presentation with respect of the Company’s Qualified Person.
(9) Refer to endnote #9
16
TSX : RMX | OTCQX : RBYCF
Anticipated 2018 Exploration Program Timeline
17
2018 Exploration Program:
20,000 m of infill and step-out drilling
Structural Interpretation
Exploratory development
in the main F2 Gold Deposit
Test mining, bulk sampling,
and bazooka drilling
2018 Mineral Resource Estimate
Results from bulk sampling;
Decision on feasibility study
2018
H1 H2
Structural Interpretation will
continue to be refined with data
from test stoping and drilling
~10,000t of material
stockpiled on surface
Significant expansion of Mineral Resources;
potential for further expansion and improvement
in classifications; NI-43-101 to be filed mid-June
TSX : RMX | OTCQX : RBYCF 18
Long-Term Organic Growth Potential:
• Close proximity targets
• Red Lake Regional properties
TSX : RMX | OTCQX : RBYCF
Cochenour (G)
Red Lake Gold Mines (G)
Phoenix Gold Project (RMX)
D2 Structures
Red Lake, ON
N
RMX claims: 28,776 hectares ~40% of claims in Red Lake
Goldcorp (G) claims
Ultramafic units
F2 folds
Gold projects in active exploration
Existing gold mines
RMX prospective exploration targets
Slate Bay
(RMX)
DMC
(RMX)
Adams Lake
(RMX)
East Bay
(RMX)
Prolific Red Lake Gold District:
Camp has produced more than 29 million ounces of gold
19
Rahill-Bonanza (PG/G)
H.G. Young (G)
Hasaga (PG)
McCuaig
(RMX)
TSX : RMX | OTCQX : RBYCF
Recent Land Transactions in Red Lake
Rubicon owns a sizeable land package in Red Lake
Date Property
Size
(ha)
Seller Buyer Sale price* Price/ha
Additional
info
Nov 2017 McCuaig (40%) 50 Golden Tag Rubicon C$0.7 M C$14,630/ha
Land
transaction
Mar 2017
Derlak (near
Madsen)
219 Orefinders Pure Gold C$1.2 M C$5,465/ha
Land
transaction
Dec 2015
Buffalo claims
(near Hasaga)
513 Pure Gold
Premier
Gold
~C$5.0 M C$9,747/ha
Land
transaction;
Pure Gold
gets 1.0%
NSR
Nov 2015 Springpole 32,448 Gold Canyon
First Mining
Finance
~C$56.2 M C$1,732/ha
Company
acquisition;
MRE
Jun 2014
Newman-
Madsen
>807
Sabina Gold
& Silver
Pure Gold ~C$2.8 M C$3,463/ha
Land
transaction
Mar 2014 Madsen 4,193
Claude
Resources
Pure Gold ~C$8.8 M C$2,087/ha
Asset
transaction
500 tpd mill,
MRE
Rubicon Red Lake Exploration Land Package
(excluding Phoenix Gold Project claim)
28,266 ha
Source: Company reports and Rubicon estimates 20
*Total consideration of cash and share
values at the time of acquisition
TSX : RMX | OTCQX : RBYCF
1000 m
244-metre level
exploration drift
Shaft
Island Zone
CARZ
Northern
Peninsula
F2 Gold Deposit
McFinleyCamp
F2 North
• 5-6 close proximity targets within 2 km of the Phoenix Gold Project
• All are potentially accessible from underground
• In-house modelling of the mineralized zones and generate
conceptual tonnes and grade for the zones; rank each zone as to
potential to fit in pipeline
• Build “Rubicon Red Lake” model to look at bigger picture
(structural and lithological model)
• Evaluating the resource potential of Historic McFinley,
Northern Peninsula, CARZ, and Island Zone
21
Close Proximity Targets
Potential LOM incremental feed of the Phoenix Gold Project
Long section looking north west
McFinley
Deep
TSX : RMX | OTCQX : RBYCF
Main F2 Gold
Deposit
Shaft
Historic
McFinley
Deposit
“B Zone”
Structure
“C Zone”
Structure
244-17-C02:
2.66 g/t Au over 0.5 m
1.05 g/t Au over 0.6 m
244-17-C03:
4.87 g/t Au over 0.4 m
2.31 g/t Au over 0.5 m
244-17-C03:
3.60 g/t Au over 0.5 m
1.53 g/t Au over 0.9 m
Scale: 200 m
Drill hole
U/G development
Close Proximity Targets – McFinley Deep
Plan View
22
Historic McFinley Deposit (2002)1
Inferred: 66,801 oz Au
(303,006 tonnes grading 6.86 g/t Au)
1Not compiled according to NI 43-101
TSX : RMX | OTCQX : RBYCF
Close Proximity Targets – McFinley Deep
Cross Sections of “B” and “C” Zone Structures
23
244-17-C02:
2.66 g/t Au over 0.5 m
1.05 g/t Au over 0.6 m
244-17-C03:
3.60 g/t Au over 0.5 m
1.53 g/t Au over 0.9 m
Historic McFinley
Deposit
122-metre level
183-metre level
244-metre level
305-metre level
122-metre level
183-metre level
244-metre level
305-metre level
244-17-C03:
4.87 g/t Au over 0.4 m
2.31 g/t Au over 0.5 m
Drill hole
U/G development
Potential gold-bearing structure
Historic McFinley Deposit (2002)1
Inferred: 66,801 oz Au
(303,006 tonnes grading 6.86 g/t Au)
1Not compiled according to NI 43-101
TSX : RMX | OTCQX : RBYCF
685-17-C04:
3.66 g/t Au over 0.4 m
2.93 g/t Au over 0.7 m
3.48 g/t Au over 1.0 m
5.55 g/t Au over 0.7 m
More than 550 m
deep from the
bottom of the
historic McFinley
Deposit mineral
resource
Scale: 200 m
Drill hole
U/G development
122-metre
level
183-metre
level
244-metre
level
305-metre
level
610-metre
level
685-metre
level
Main F2
Gold
Deposit
Shaft
Close Proximity Targets – McFinley Deep
Potential LOM incremental feed of the Phoenix Gold Project
Historic McFinley Deposit (2002)
Inferred: 66,801 oz Au
(303,006 tonnes grading 6.86 g/t Au)
• Drilling intersected gold-
bearing quartz veins and
sulphides through four
zones, similar to the
lithological sequence in
the historic McFinley
Deposit
• Drill hole ended in HiTi
basalts, suggesting that
mineralization remains
open to the west (mine
grid)
Isometric view looking northwest
24
TSX : RMX | OTCQX : RBYCF
Close Proximity Targets
Northern Peninsula, CARZ & Island Zone
25
• Historical high-grade intercepts along strike and
adjacent to the F2 Gold Deposit warrant follow up
drilling
• Compiling dataset and evaluating mineral
resource potential for eventual drill program
Select historical high-grade intercepts:
Island Zone (not true widths)
• PZ-23: 70.1 g/t Au over 3.1 m
• PZ-12: 28.7 g/t Au over 1.4 m
• PZ-47: 22.2 g/t Au over 1.7 m
• PZ-25: 15.8 g/t Au over 3.5 m
• PZ-03: 15.5 g/t Au over 4.8 m
• PZ-02: 15.0 g/t Au over 2.8 m
Carbonate Zone (“CARZ”)(not true widths)
• PR-15-11: 24.17 g/t Au over 2.00 m
• PR-15-11: 4.88 g/t Au over 10.50 m (incl. 6.43 g/t Au over 7.00 m)
• PR-15-16: 8.48 g/t Au over 3.25 m (incl. 11.10 g/t Au over 2.25 m)
• PR-15-19: 8.43 g/t Au over 1.05 m
• PR-15-19: 2.30 g/t Au over 12.00 m (incl. 5.76 g/t Au over 2.00 m)
• PR-15-06: 10.77 g/t Au over 2.65 m
• PR-15-09: 7.84 g/t Au over 1.50 m
Plan view
F2 North
TSX : RMX | OTCQX : RBYCF
Red Lake Regional Properties
Highly-prospective exploration targets
26
• Several highly-prospective
grassroots exploration targets
• Potential exploration work will
commence if the Phoenix Gold
Project’s advancement is on
the right path
• Targets were evaluated and
prioritized by an exploration
consultant with +20 years of
experience in Red Lake
3# Sidace
1# McCuaig
2# East Bay
4# Slate Bay
TSX : RMX | OTCQX : RBYCF
Key Takeaways to the Rubicon Story
Advanced exploration. Red Lake. High-grade gold potential
27
1. Encouraging drill results and Structural Interpretation: Data and
observations collected to-date demonstrate discrepancies with the 2016
estimates; potential to evaluate bulk mining methods with the Structural
Interpretation;
2. Significant growth in 2018 Mineral Resources: Overall increase in
grade, tonnes, and ounces; potential for further improvement in
quantities, classification, and confidence with 2018 Exploration drilling
and test mining activities;
3. Mitigated Risk: conceptual resale value of assets are comparable to the
market capitalization of the company, potentially mitigating downside
risk; and
4. Exploration upside potential: excellent potential with McFinley Deep
and Close Proximity targets and vast land package in a prolific high-
grade gold camp.
TSX : RMX | OTCQX : RBYCF
Appendices
28
TSX : RMX | OTCQX : RBYCF 29
Material Growth in 2018 Mineral Resources11
Potential to enhance quantities and classifications
2018 Mineral Resource Block Model Diagram
– Plan View, 244-Metre Level
2018 Mineral Resource Block Model Diagram Zone 1
– Section View Looking West (Mine-Grid)
(11) Refer to endnote #11
TSX : RMX | OTCQX : RBYCF
History of Mineral Resource Estimates
Historical estimates are not current and should no be relied upon
GEOEX – Amended2,6
(2011)
AMC3,6
(2011)
SRK4,6
(2013)
SRK5,6,7
(2016)
Grade
(g/t Au)
17.3 (inferred, capped) 14.5 (indicated)
17.0 (inferred)
8.5 (indicated)
9.3 (inferred)
6.7 (indicated)
6.3 (inferred)
Ounces 3.1 M (inferred) 0.5 M (indicated)
2.3 M (inferred)
1.1 M (indicated)
2.2 M (inferred)
0.1 M (indicated)
0.3 M (inferred)
Tonnes (t) 5.500 M (inferred) 1.028 M (indicated)
4.230 M (inferred)
4.120 M (indicated)
7.452 M (inferred)
0.492 M (indicated)
1.519 M (inferred)
Grade
interpolation
polygonal inverse distance
cubed
ordinary kriging ordinary kriging
Grade capping 10-5-2 oz
(311-155.5-62.2 g/t Au)
270 g/t Au 200 g/t Au (Main)
150 g/t (HW), 30 g/t (Ext)
10–120 g/t Au (HG domains)
5–45 g/t Au (LG domains)
Cut-off grade
(g/t Au)
5.0 5.0 4.0 4.0
Metres drilled at
F2 Gold Deposit
166,886 m 259,000 m +
2,000t bulk sample
355,611 m 450,175 m + trial stoping
Metrics from PEA
Grade to the mill
(g/t Au)
n/a 13.9 8.1 n/a
Average stope
width
n/a 2.0 m 7.8 m n/a
Overall dilution n/a 18% 44% n/a
30
(2) Refer to endnote #2, (3) Refer to endnote #3, (4) Refer to endnote #4, (5) Refer to endnote #5, (6) Refer to endnote #6 (7) Refer to endnote #7
Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at
the beginning of this presentation with respect of the Company’s Qualified Person.
TSX : RMX | OTCQX : RBYCF
Structural Interpretation10
Conceptual diagram of F2 Gold Deposit local geology; Plan View
31
N
50 m
Shaft
West Limb
BasaltHanging Wall
Basalt
F2 Basalt
Historic McFinley
Deposit area
HiTi Basalt Units
Drill hole intersecting
Ultramafic Flow Units
Drill hole intersecting
Felsic Intrusive Units
Underground
development
Drill hole intersecting
HiTi Basalt Units
Remains open
along strike
Remains open
along strike
(10) Refer to endnote #10
TSX : RMX | OTCQX : RBYCF
West Limb
Basalt Zone
Hanging
Wall Zone
Main F2 Gold Deposit
Shaft
015 test stope
977 test stope
994 mined test stope
997 mined test stope
N
Existing underground
development
50 m
2018 planned
test stopes
Previously mined
test stopes
030 mined
test stope
2018 Test Mining – Conceptual Diagram9
Testing various mining methods
Plan view of the 244-metre level
• Test stopes located in the upper-
portion of the main F2 Gold
Deposit mineralized envelope
• Mining methods tested include
mechanized cut-and-fill and
sublevel longhole
Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the
beginning of this presentation with respect of the Company’s Qualified Person.
(9) Refer to endnote #9
32
TSX : RMX | OTCQX : RBYCF
685-metre level
685-17-10:
4.77 g/t Au over 0.9 m
3.02 g/t Au over 8.0 m
(incl. 9.53 over 0.8 m)
23.39 g/t Au over 2.0 m
(incl. 46.73 g/t Au over 1.0 m)
2016 Mineral Resource
block model grades
1-3 g/t Au
5-10 g/t Au
>10 g/t Au
3-5 g/t Au
Scale: 100 m
Drill hole
U/G development
2017 highlight
drill intercepts
5-10 g/t Au
>10 g/t Au
3-5 g/t Au
1-3 g/t Au
Diagram 9: Infill and step-out drilling cross section (looking north)
Section (3) Infill and step-out drill hole 685-17-09, 685-17-10, and 685-17-11
685-17-09:
14.25 g/t Au over 1.8 m
(incl. 61.51 g/t Au over 0.4 m)
3.87 g/t Au over 1.1 m
685-17-11:
8.58 g/t Au over 1.0 m
5.82 g/t Au over 1.0 m
1.46 g/t Au over 1.3 m
2.51 g/t Au over 1.1 m
Preliminary Observations1
Diagram from February 20, 2018 news release
33
TSX : RMX | OTCQX : RBYCF
1. For more information regarding 2017 Exploration program drilling results, please refer to the news releases dated
September 18, 2017, November 16, 2017, December 14, 2017, and February 20, 2018, which are available on our website at
www.rubiconminerals.com.
2. For more information regarding the amended inferred mineral resource and geological potential estimates prepared by
Geoex Ltd. please refer to the news release dated March 31, 2011, which is available on our website at
www.rubiconminerals.com and the Technical Report dated April 11, 2011 available on under Rubicon’s profile in SEDAR at
www.sedar.com.
3. For more information regarding the 2011 PEA study prepared by AMC Mining Consultants, please refer to the news release
dated June 29, 2011, which is available on our website at www.rubiconminerals.com and the Technical Report dated August
11, 2011 available on under Rubicon’s profile in SEDAR at www.sedar.com.
4. For more information regarding the 2013 PEA study prepared by SRK Consulting (Canada) Inc., please refer to the news
release dated June 25, 2013, which is available on our website at www.rubiconminerals.com and the Amended & Restated
Technical Report dated February 28, 2014 available under Rubicon’s profile in SEDAR at www.sedar.com.
5. For more information regarding the 2016 SRK mineral resource estimate prepared by SRK Consulting (Canada) Inc., please
refer to the news release dated January 11, 2016, which is available on our website at www.rubiconminerals.com and the
Technical Report filed on February 25, 2016 available under Rubicon’s profile at www.sedar.com.
6. Mineral resources are not mineral reserves and have not demonstrated economic viability. All figures are rounded to reflect
the relative accuracy of the estimate. Samples have been capped where appropriate.
7. Underground mineral resources reported at a cut-off grade of 4.0 g/t Au of gold per tonne assuming a gold price of
US$1,125/oz. and a gold recovery of 92.5%.
8. For more information regarding the first trial stope reconciliation, please refer to the news release dated November 3,
2015, which is available on our website at www.rubiconminerals.com.
9. For more information regarding 2018 Exploration program please refer to the news release dated January 23, 2018 which is
available on our website at www.rubiconminerals.com.
10. For more information regarding the Structural Interpretation, please refer to the news release dated March 12, 2018 which
is available on our website at www.rubiconminerals.com.
11. For more information regarding the 2018 Mineral Resource Estimate, please refer to the news release dated April 30, 2018
which is available on our website at www.rubiconminerals.com.
34
Endnotes
TSX : RMX | OTCQX : RBYCF 35
TSX : RMX | OTCQX : RBYCF
For more information, please contact:
Allan Candelario, CFA
Director, Investor Relations and Corporate Development
416-766-2804
acandelario@rubiconminerals.com
36

More Related Content

What's hot

Rubicon Minerals April 2018 Corporate Presentation
Rubicon Minerals April 2018 Corporate PresentationRubicon Minerals April 2018 Corporate Presentation
Rubicon Minerals April 2018 Corporate Presentation
Rubicon Minerals Corporation
 
Rubicon Minerals Updated January 2019 Corporate Presentation
Rubicon Minerals Updated January 2019 Corporate PresentationRubicon Minerals Updated January 2019 Corporate Presentation
Rubicon Minerals Updated January 2019 Corporate Presentation
Rubicon Minerals Corporation
 
Rubicon Minerals December 2018 Corporate Presentation
Rubicon Minerals December 2018 Corporate PresentationRubicon Minerals December 2018 Corporate Presentation
Rubicon Minerals December 2018 Corporate Presentation
Rubicon Minerals Corporation
 
2018 Rubicon Minerals Red Lake Community Information Session
2018 Rubicon Minerals Red Lake Community Information Session2018 Rubicon Minerals Red Lake Community Information Session
2018 Rubicon Minerals Red Lake Community Information Session
Rubicon Minerals Corporation
 
Rubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate PresentationRubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals Corporation
 
Rubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate PresentationRubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals Corporation
 
Rubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate PresentationRubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals Corporation
 
Rubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate PresentationRubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals Corporation
 
Rubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate PresentationRubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals Corporation
 
Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals Corporation
 
2021 06 02_-_ero_-_corporate_presentation_vf
2021 06 02_-_ero_-_corporate_presentation_vf2021 06 02_-_ero_-_corporate_presentation_vf
2021 06 02_-_ero_-_corporate_presentation_vf
Adnet Communications
 
Rubicon Minerals 2018 Fact Sheet
Rubicon Minerals 2018 Fact SheetRubicon Minerals 2018 Fact Sheet
Rubicon Minerals 2018 Fact Sheet
Rubicon Minerals Corporation
 
Rubicon Minerals June 2018 Fact Sheet
Rubicon Minerals June 2018 Fact SheetRubicon Minerals June 2018 Fact Sheet
Rubicon Minerals June 2018 Fact Sheet
Rubicon Minerals Corporation
 
Plateau Energy Metals June 2020 Presentation
Plateau Energy Metals June 2020 PresentationPlateau Energy Metals June 2020 Presentation
Plateau Energy Metals June 2020 Presentation
Plateau Energy Metals Inc.
 
American Lithium to Acquire Plateau Energy Metals Creating a Leading, Diversi...
American Lithium to Acquire Plateau Energy Metals Creating a Leading, Diversi...American Lithium to Acquire Plateau Energy Metals Creating a Leading, Diversi...
American Lithium to Acquire Plateau Energy Metals Creating a Leading, Diversi...
Bianca Pisciola
 
2019 AGM Presentation
2019 AGM Presentation2019 AGM Presentation
2019 AGM Presentation
Adnet Communications
 
April Corporate Presentation
April Corporate PresentationApril Corporate Presentation
April Corporate Presentation
Romarco Minerals Inc.
 
Q1 Exploration Technical Session
Q1 Exploration Technical SessionQ1 Exploration Technical Session
Q1 Exploration Technical Session
Adnet Communications
 
Pan American SIlver AGM Presentation
Pan American SIlver AGM PresentationPan American SIlver AGM Presentation
Pan American SIlver AGM Presentation
csandovalduran
 
Site Visit Presentation_vF2 (website).pdf
Site Visit Presentation_vF2 (website).pdfSite Visit Presentation_vF2 (website).pdf
Site Visit Presentation_vF2 (website).pdf
Adnet Communications
 

What's hot (20)

Rubicon Minerals April 2018 Corporate Presentation
Rubicon Minerals April 2018 Corporate PresentationRubicon Minerals April 2018 Corporate Presentation
Rubicon Minerals April 2018 Corporate Presentation
 
Rubicon Minerals Updated January 2019 Corporate Presentation
Rubicon Minerals Updated January 2019 Corporate PresentationRubicon Minerals Updated January 2019 Corporate Presentation
Rubicon Minerals Updated January 2019 Corporate Presentation
 
Rubicon Minerals December 2018 Corporate Presentation
Rubicon Minerals December 2018 Corporate PresentationRubicon Minerals December 2018 Corporate Presentation
Rubicon Minerals December 2018 Corporate Presentation
 
2018 Rubicon Minerals Red Lake Community Information Session
2018 Rubicon Minerals Red Lake Community Information Session2018 Rubicon Minerals Red Lake Community Information Session
2018 Rubicon Minerals Red Lake Community Information Session
 
Rubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate PresentationRubicon Minerals August 2017 Corporate Presentation
Rubicon Minerals August 2017 Corporate Presentation
 
Rubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate PresentationRubicon Minerals October 2017 Corporate Presentation
Rubicon Minerals October 2017 Corporate Presentation
 
Rubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate PresentationRubicon Minerals November 2017 Corporate Presentation
Rubicon Minerals November 2017 Corporate Presentation
 
Rubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate PresentationRubicon Minerals September 2017 Corporate Presentation
Rubicon Minerals September 2017 Corporate Presentation
 
Rubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate PresentationRubicon Minerals January 2018 Corporate Presentation
Rubicon Minerals January 2018 Corporate Presentation
 
Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017Rubicon Minerals 2017 AGM Presentation - June 2017
Rubicon Minerals 2017 AGM Presentation - June 2017
 
2021 06 02_-_ero_-_corporate_presentation_vf
2021 06 02_-_ero_-_corporate_presentation_vf2021 06 02_-_ero_-_corporate_presentation_vf
2021 06 02_-_ero_-_corporate_presentation_vf
 
Rubicon Minerals 2018 Fact Sheet
Rubicon Minerals 2018 Fact SheetRubicon Minerals 2018 Fact Sheet
Rubicon Minerals 2018 Fact Sheet
 
Rubicon Minerals June 2018 Fact Sheet
Rubicon Minerals June 2018 Fact SheetRubicon Minerals June 2018 Fact Sheet
Rubicon Minerals June 2018 Fact Sheet
 
Plateau Energy Metals June 2020 Presentation
Plateau Energy Metals June 2020 PresentationPlateau Energy Metals June 2020 Presentation
Plateau Energy Metals June 2020 Presentation
 
American Lithium to Acquire Plateau Energy Metals Creating a Leading, Diversi...
American Lithium to Acquire Plateau Energy Metals Creating a Leading, Diversi...American Lithium to Acquire Plateau Energy Metals Creating a Leading, Diversi...
American Lithium to Acquire Plateau Energy Metals Creating a Leading, Diversi...
 
2019 AGM Presentation
2019 AGM Presentation2019 AGM Presentation
2019 AGM Presentation
 
April Corporate Presentation
April Corporate PresentationApril Corporate Presentation
April Corporate Presentation
 
Q1 Exploration Technical Session
Q1 Exploration Technical SessionQ1 Exploration Technical Session
Q1 Exploration Technical Session
 
Pan American SIlver AGM Presentation
Pan American SIlver AGM PresentationPan American SIlver AGM Presentation
Pan American SIlver AGM Presentation
 
Site Visit Presentation_vF2 (website).pdf
Site Visit Presentation_vF2 (website).pdfSite Visit Presentation_vF2 (website).pdf
Site Visit Presentation_vF2 (website).pdf
 

Similar to Rubicon Minerals May 2018 Corporate Presentation

Rubicon Minerals November 2018 Corporate Presentation
Rubicon Minerals November 2018 Corporate PresentationRubicon Minerals November 2018 Corporate Presentation
Rubicon Minerals November 2018 Corporate Presentation
Rubicon Minerals Corporation
 
Rubicon Minerals January 2019 Corporate Presentation
Rubicon Minerals January 2019 Corporate PresentationRubicon Minerals January 2019 Corporate Presentation
Rubicon Minerals January 2019 Corporate Presentation
Rubicon Minerals Corporation
 
Rubicon Minerals January 2019 fact sheet
Rubicon Minerals January 2019 fact sheetRubicon Minerals January 2019 fact sheet
Rubicon Minerals January 2019 fact sheet
Rubicon Minerals Corporation
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day Presentation
PretiumR
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019
PretiumR
 
Osisko Gold Royalties - 2018 AGM Presentation
Osisko Gold Royalties - 2018 AGM PresentationOsisko Gold Royalties - 2018 AGM Presentation
Osisko Gold Royalties - 2018 AGM Presentation
Osisko Gold Royalties Ltd
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining Conference
PretiumR
 
Osisko Gold Royalties - Q2 2018 Results
Osisko Gold Royalties - Q2 2018 ResultsOsisko Gold Royalties - Q2 2018 Results
Osisko Gold Royalties - Q2 2018 Results
Osisko Gold Royalties Ltd
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
yamanagold2016
 
Osisko Gold Royalties Corporate Presentation
Osisko Gold Royalties Corporate PresentationOsisko Gold Royalties Corporate Presentation
Osisko Gold Royalties Corporate Presentation
Osisko Gold Royalties Ltd
 
Osisko Gold Royalties - Q4 and Year 2018 Results
Osisko Gold Royalties - Q4 and Year 2018 ResultsOsisko Gold Royalties - Q4 and Year 2018 Results
Osisko Gold Royalties - Q4 and Year 2018 Results
Osisko Gold Royalties Ltd
 
Fourth Quarter 2016 and Full Year Results Presentation
Fourth Quarter 2016 and Full Year Results PresentationFourth Quarter 2016 and Full Year Results Presentation
Fourth Quarter 2016 and Full Year Results Presentation
yamanagold2016
 
Osisko Gold Royalties - Q3 2018 Results
Osisko Gold Royalties - Q3 2018 ResultsOsisko Gold Royalties - Q3 2018 Results
Osisko Gold Royalties - Q3 2018 Results
Osisko Gold Royalties Ltd
 
Osisko Gold Royalties - Q2 2017 Results Conference Call
Osisko Gold Royalties - Q2 2017 Results Conference CallOsisko Gold Royalties - Q2 2017 Results Conference Call
Osisko Gold Royalties - Q2 2017 Results Conference Call
Osisko Gold Royalties Ltd
 
October 2018 ir presentation
October 2018 ir presentationOctober 2018 ir presentation
October 2018 ir presentation
guygold2016
 

Similar to Rubicon Minerals May 2018 Corporate Presentation (15)

Rubicon Minerals November 2018 Corporate Presentation
Rubicon Minerals November 2018 Corporate PresentationRubicon Minerals November 2018 Corporate Presentation
Rubicon Minerals November 2018 Corporate Presentation
 
Rubicon Minerals January 2019 Corporate Presentation
Rubicon Minerals January 2019 Corporate PresentationRubicon Minerals January 2019 Corporate Presentation
Rubicon Minerals January 2019 Corporate Presentation
 
Rubicon Minerals January 2019 fact sheet
Rubicon Minerals January 2019 fact sheetRubicon Minerals January 2019 fact sheet
Rubicon Minerals January 2019 fact sheet
 
Pretivm Investors Day Presentation
Pretivm Investors Day PresentationPretivm Investors Day Presentation
Pretivm Investors Day Presentation
 
31st Annual ROTH Conference 2019
31st Annual ROTH Conference 201931st Annual ROTH Conference 2019
31st Annual ROTH Conference 2019
 
Osisko Gold Royalties - 2018 AGM Presentation
Osisko Gold Royalties - 2018 AGM PresentationOsisko Gold Royalties - 2018 AGM Presentation
Osisko Gold Royalties - 2018 AGM Presentation
 
BMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining ConferenceBMO Capital Markets 28th Global Metals & Mining Conference
BMO Capital Markets 28th Global Metals & Mining Conference
 
Osisko Gold Royalties - Q2 2018 Results
Osisko Gold Royalties - Q2 2018 ResultsOsisko Gold Royalties - Q2 2018 Results
Osisko Gold Royalties - Q2 2018 Results
 
BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference BMO Capital Markets Global Metals & Mining Conference
BMO Capital Markets Global Metals & Mining Conference
 
Osisko Gold Royalties Corporate Presentation
Osisko Gold Royalties Corporate PresentationOsisko Gold Royalties Corporate Presentation
Osisko Gold Royalties Corporate Presentation
 
Osisko Gold Royalties - Q4 and Year 2018 Results
Osisko Gold Royalties - Q4 and Year 2018 ResultsOsisko Gold Royalties - Q4 and Year 2018 Results
Osisko Gold Royalties - Q4 and Year 2018 Results
 
Fourth Quarter 2016 and Full Year Results Presentation
Fourth Quarter 2016 and Full Year Results PresentationFourth Quarter 2016 and Full Year Results Presentation
Fourth Quarter 2016 and Full Year Results Presentation
 
Osisko Gold Royalties - Q3 2018 Results
Osisko Gold Royalties - Q3 2018 ResultsOsisko Gold Royalties - Q3 2018 Results
Osisko Gold Royalties - Q3 2018 Results
 
Osisko Gold Royalties - Q2 2017 Results Conference Call
Osisko Gold Royalties - Q2 2017 Results Conference CallOsisko Gold Royalties - Q2 2017 Results Conference Call
Osisko Gold Royalties - Q2 2017 Results Conference Call
 
October 2018 ir presentation
October 2018 ir presentationOctober 2018 ir presentation
October 2018 ir presentation
 

Recently uploaded

一比一原版(uvic毕业证书)加拿大维多利亚大学毕业证如何办理
一比一原版(uvic毕业证书)加拿大维多利亚大学毕业证如何办理一比一原版(uvic毕业证书)加拿大维多利亚大学毕业证如何办理
一比一原版(uvic毕业证书)加拿大维多利亚大学毕业证如何办理
ufomhev
 
Therus network compañía de Liderazgo y banca digital
Therus network  compañía de Liderazgo y banca digitalTherus network  compañía de Liderazgo y banca digital
Therus network compañía de Liderazgo y banca digital
Rafael Mauro Duarte Morel
 
PPMB_Cove Fund 75_DIGITAL_2023_3-16 (3).pdf
PPMB_Cove Fund 75_DIGITAL_2023_3-16 (3).pdfPPMB_Cove Fund 75_DIGITAL_2023_3-16 (3).pdf
PPMB_Cove Fund 75_DIGITAL_2023_3-16 (3).pdf
kboyd6
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
CollectiveMining1
 
YieldStreet-Alternative-Income-Fund-Annual-Report-12-31-2023.pdf
YieldStreet-Alternative-Income-Fund-Annual-Report-12-31-2023.pdfYieldStreet-Alternative-Income-Fund-Annual-Report-12-31-2023.pdf
YieldStreet-Alternative-Income-Fund-Annual-Report-12-31-2023.pdf
kboyd6
 
Corporate Presentation Probe June 19, 2024.pdf
Corporate Presentation Probe June 19, 2024.pdfCorporate Presentation Probe June 19, 2024.pdf
Corporate Presentation Probe June 19, 2024.pdf
Probe Gold
 
一比一原版格罗宁根大学毕业证(RUG毕业证书)学历如何办理
一比一原版格罗宁根大学毕业证(RUG毕业证书)学历如何办理一比一原版格罗宁根大学毕业证(RUG毕业证书)学历如何办理
一比一原版格罗宁根大学毕业证(RUG毕业证书)学历如何办理
gyucof
 
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
nupyb
 
Protecting Privacy in CDR Analysis: Best Practices from Experts
Protecting Privacy in CDR Analysis: Best Practices from ExpertsProtecting Privacy in CDR Analysis: Best Practices from Experts
Protecting Privacy in CDR Analysis: Best Practices from Experts
Milind Agarwal
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
Probe Gold
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd
 
Corporate Presentation Probe June 19, 2024.pdf
Corporate Presentation Probe June 19, 2024.pdfCorporate Presentation Probe June 19, 2024.pdf
Corporate Presentation Probe June 19, 2024.pdf
Probe Gold
 
REVA_IOI_Gain Fund-CASH_11-14-23_digital.pdf
REVA_IOI_Gain Fund-CASH_11-14-23_digital.pdfREVA_IOI_Gain Fund-CASH_11-14-23_digital.pdf
REVA_IOI_Gain Fund-CASH_11-14-23_digital.pdf
kboyd6
 
Voyager Space_Management Presentation_Final
Voyager Space_Management Presentation_FinalVoyager Space_Management Presentation_Final
Voyager Space_Management Presentation_Final
kboyd6
 
Cove Multifamily Income Fund 28 LLC IOI 3.3.2021 (1).pdf
Cove Multifamily Income Fund 28 LLC IOI 3.3.2021 (1).pdfCove Multifamily Income Fund 28 LLC IOI 3.3.2021 (1).pdf
Cove Multifamily Income Fund 28 LLC IOI 3.3.2021 (1).pdf
kboyd6
 
一比一原版(Carleton毕业证)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证)加拿大卡尔顿大学毕业证如何办理一比一原版(Carleton毕业证)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证)加拿大卡尔顿大学毕业证如何办理
ybjk9iyd
 
Cadre Direct Access Fund II - Institutional Investor Teaser Q1 2024.pdf
Cadre Direct Access Fund II - Institutional Investor Teaser Q1 2024.pdfCadre Direct Access Fund II - Institutional Investor Teaser Q1 2024.pdf
Cadre Direct Access Fund II - Institutional Investor Teaser Q1 2024.pdf
kboyd6
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
LHelferty
 
Solaris Resources - June 2024 - FINAL-Public.pdf
Solaris Resources - June 2024 - FINAL-Public.pdfSolaris Resources - June 2024 - FINAL-Public.pdf
Solaris Resources - June 2024 - FINAL-Public.pdf
JacquelineWagenaar1
 

Recently uploaded (19)

一比一原版(uvic毕业证书)加拿大维多利亚大学毕业证如何办理
一比一原版(uvic毕业证书)加拿大维多利亚大学毕业证如何办理一比一原版(uvic毕业证书)加拿大维多利亚大学毕业证如何办理
一比一原版(uvic毕业证书)加拿大维多利亚大学毕业证如何办理
 
Therus network compañía de Liderazgo y banca digital
Therus network  compañía de Liderazgo y banca digitalTherus network  compañía de Liderazgo y banca digital
Therus network compañía de Liderazgo y banca digital
 
PPMB_Cove Fund 75_DIGITAL_2023_3-16 (3).pdf
PPMB_Cove Fund 75_DIGITAL_2023_3-16 (3).pdfPPMB_Cove Fund 75_DIGITAL_2023_3-16 (3).pdf
PPMB_Cove Fund 75_DIGITAL_2023_3-16 (3).pdf
 
Collective Mining | Corporate Presentation - June 2024
Collective Mining  | Corporate Presentation - June 2024Collective Mining  | Corporate Presentation - June 2024
Collective Mining | Corporate Presentation - June 2024
 
YieldStreet-Alternative-Income-Fund-Annual-Report-12-31-2023.pdf
YieldStreet-Alternative-Income-Fund-Annual-Report-12-31-2023.pdfYieldStreet-Alternative-Income-Fund-Annual-Report-12-31-2023.pdf
YieldStreet-Alternative-Income-Fund-Annual-Report-12-31-2023.pdf
 
Corporate Presentation Probe June 19, 2024.pdf
Corporate Presentation Probe June 19, 2024.pdfCorporate Presentation Probe June 19, 2024.pdf
Corporate Presentation Probe June 19, 2024.pdf
 
一比一原版格罗宁根大学毕业证(RUG毕业证书)学历如何办理
一比一原版格罗宁根大学毕业证(RUG毕业证书)学历如何办理一比一原版格罗宁根大学毕业证(RUG毕业证书)学历如何办理
一比一原版格罗宁根大学毕业证(RUG毕业证书)学历如何办理
 
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
一比一原版(UAL毕业证)伦敦艺术大学毕业证如何办理
 
Protecting Privacy in CDR Analysis: Best Practices from Experts
Protecting Privacy in CDR Analysis: Best Practices from ExpertsProtecting Privacy in CDR Analysis: Best Practices from Experts
Protecting Privacy in CDR Analysis: Best Practices from Experts
 
Corporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdfCorporate Presentation Probe June 2024.pdf
Corporate Presentation Probe June 2024.pdf
 
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
Osisko Gold Royalties Ltd - Corporate Presentation, June 12, 2024
 
Corporate Presentation Probe June 19, 2024.pdf
Corporate Presentation Probe June 19, 2024.pdfCorporate Presentation Probe June 19, 2024.pdf
Corporate Presentation Probe June 19, 2024.pdf
 
REVA_IOI_Gain Fund-CASH_11-14-23_digital.pdf
REVA_IOI_Gain Fund-CASH_11-14-23_digital.pdfREVA_IOI_Gain Fund-CASH_11-14-23_digital.pdf
REVA_IOI_Gain Fund-CASH_11-14-23_digital.pdf
 
Voyager Space_Management Presentation_Final
Voyager Space_Management Presentation_FinalVoyager Space_Management Presentation_Final
Voyager Space_Management Presentation_Final
 
Cove Multifamily Income Fund 28 LLC IOI 3.3.2021 (1).pdf
Cove Multifamily Income Fund 28 LLC IOI 3.3.2021 (1).pdfCove Multifamily Income Fund 28 LLC IOI 3.3.2021 (1).pdf
Cove Multifamily Income Fund 28 LLC IOI 3.3.2021 (1).pdf
 
一比一原版(Carleton毕业证)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证)加拿大卡尔顿大学毕业证如何办理一比一原版(Carleton毕业证)加拿大卡尔顿大学毕业证如何办理
一比一原版(Carleton毕业证)加拿大卡尔顿大学毕业证如何办理
 
Cadre Direct Access Fund II - Institutional Investor Teaser Q1 2024.pdf
Cadre Direct Access Fund II - Institutional Investor Teaser Q1 2024.pdfCadre Direct Access Fund II - Institutional Investor Teaser Q1 2024.pdf
Cadre Direct Access Fund II - Institutional Investor Teaser Q1 2024.pdf
 
UnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press ReleaseUnityNet World Environment Day Abraham Project 2024 Press Release
UnityNet World Environment Day Abraham Project 2024 Press Release
 
Solaris Resources - June 2024 - FINAL-Public.pdf
Solaris Resources - June 2024 - FINAL-Public.pdfSolaris Resources - June 2024 - FINAL-Public.pdf
Solaris Resources - June 2024 - FINAL-Public.pdf
 

Rubicon Minerals May 2018 Corporate Presentation

  • 1. TSX : RMX | OTCQX : RBYCF Corporate Presentation May 2018 Building Long-Term Shareholder Value
  • 2. TSX : RMX | OTCQX : RBYCF Cautionary Statement regarding Forward-Looking Statements and other Cautionary Notes This corporate presentation contains statements that constitute “forward-looking statements” and “forward looking information” (collectively, “forward-looking statements”) within the meaning of applicable Canadian and United States securities legislation. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “believes”, “intends”, “may”, “will”, “should”, “plans”, “anticipates”, “potential”, “expects”, “estimates”, “forecasts”, “budget”, “likely”, “goal” and similar expressions or statements that certain actions, events or results may or may not be achieved or occur in the future. In some cases, forward-looking information may be stated in the present tense, such as in respect of current matters that may be continuing, or that may have a future impact or effect. Forward-looking statements reflect our current expectations and assumptions, and are subject to a number of known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements to be materially different from any anticipated future results, performance or achievements expressed or implied by the forward-looking statements. Forward-looking statements include, but are not limited to statements regarding the anticipated timing of the filing of the NI 43-101 Technical Report, observations from the 2018 infill drilling and underground development samples from test mining, impact of the data from the 5,000 m of drilling completed in the fourth quarter of 2017 and activities from the 2018 Exploration Program on the 2018 Mineral Resource Estimate, the potential advancement of the Phoenix Gold Project to a viable commercial operation, the potential value of the Company’s tax loss pools, the potential to improve the quantities and classification of the 2018 Mineral Resource Estimate, the impact of the new 2018 geological model and information on the Company’s understanding of the F2 Gold Deposit and evaluation of mining methods for the Phoenix Gold Project, the additional exploration work required to further improve and reconcile the geological model for the F2 Gold Deposit, the anticipated timing of the reactivation of the Phoenix Gold Project’s mill, the further steps necessary to potentially improve upon the 2018 Mineral Resource Estimates, including targeted infill and step-out drilling to potentially convert Inferred Resources to Indicated Resources, using the results from the bulk sampling program for reconciliation and validation purposes, the evaluation of the McFinley Deposit and other close proximity targets for potential inclusion in a future Mineral Resources Estimate, and follow-up drilling of the F2 Gold Deposit at depth and along strike. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made and represent management’s best judgment based on facts and assumptions that management considers reasonable. If such opinions and estimates prove to be incorrect, actual and future results may be materially different than expressed in the forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of Rubicon to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such factors include, among others: possible variations in mineralization, grade or recovery or throughput rates; uncertainty of mineral resources, inability to realize exploration potential, mineral grades and mineral recovery estimates; actual results of current exploration activities; actual results of reclamation activities; uncertainty of future operations, delays in completion of exploration plans for any reason including insufficient capital, delays in permitting, and labour issues; conclusions of future economic or geological evaluations; changes in project parameters as plans continue to be refined; failure of equipment or processes to operate as anticipated; accidents and other risks of the mining industry; delays and other risks related to operations; timing and receipt of regulatory approvals; the ability of Rubicon and other relevant parties to satisfy regulatory requirements; the ability of Rubicon to comply with its obligations under material agreements including financing agreements; the availability of financing for proposed programs and working capital requirements on reasonable terms; the ability of third-party service providers to deliver services on reasonable terms and in a timely manner; risks associated with the ability to retain key executives and key operating personnel; cost of environmental expenditures and potential environmental liabilities; dissatisfaction or disputes with local communities or First Nations or Aboriginal Communities; failure of plant, equipment or processes to operate as anticipated; market conditions and general business, economic, competitive, political and social conditions; our ability to generate sufficient cash flow from operations or obtain adequate financing to fund our capital expenditures and working capital needs and meet our other obligations; the volatility of our stock price, and the ability of our common stock to remain listed and traded on the TSX. Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes 2
  • 3. TSX : RMX | OTCQX : RBYCF Forward-looking statements contained herein are made as of the date of this corporate presentation and Rubicon disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws. Readers are advised to carefully review and consider the risk factors identified in the Company’s annual information form dated March 22, 2018 under the heading “Risk Factors” and in other continuous disclosure documents of the Company filed at www.sedar.com for a discussion of the factors that could cause Rubicon’s actual results, performance and achievements to be materially different from any anticipated future results, performance or achievements expressed or implied by the forward-looking statements. Readers are further cautioned that the foregoing list of assumptions and risk factors is not exhaustive and it is recommended that prospective investors consult the more complete discussion of Rubicon’s business, financial condition and prospects that is included in this corporate presentation. The forward-looking statements contained herein are expressly qualified by this cautionary statement. Qualified Person The content of this corporate presentation relating to geology and exploration has been read and approved by George Ogilvie, P.Eng., President, CEO, and Director, who is a Qualified Person as defined by NI 43-101. Cautionary Note to U.S. Readers Regarding Estimates of Measured, Indicated and Inferred Resources This corporate presentation uses the terms “Measured” and “Indicated” Mineral Resources and “Inferred” Mineral Resources. The Company advises U.S. investors that while these terms are recognized and required by Canadian securities administrators, they are not recognized by the SEC. The estimation of “Measured” and “Indicated” Mineral Resources involves greater uncertainty as to their existence and economic feasibility than the estimation of Proven and Probable Reserves. The estimation of “Inferred” resources involves far greater uncertainty as to their existence and economic viability than the estimation of other categories of resources. It cannot be assumed that all or any part of a “Measured”, “Inferred” or “Indicated” mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of “inferred mineral resources” may not form the basis of feasibility studies, pre-feasibility studies or other economic studies, except in prescribed cases, such as in a preliminary economic assessment under certain circumstances. The SEC normally only permits issuers to report mineralization that does not constitute “reserves” as in-place tonnage and grade without reference to unit measures. Under U.S. standards, mineralization may not be classified as a “reserve” unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time the reserve determination is made. U.S. investors are cautioned not to assume that any part or all of a “measured”, “indicated” or “inferred” mineral resource exists or is economically or legally mineable. Information concerning descriptions of mineralization and resources contained herein may not be comparable to information made public by U.S. companies subject to the reporting and disclosure requirements of the SEC. Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes 3
  • 4. TSX : RMX | OTCQX : RBYCF Corporate Vision Three-pronged approach to build long-term shareholder value 4 Potentially building a mid-tier gold Company: 1. Advancement of the Phoenix Gold Project to commercial production; 2. Organic growth opportunities with exploration targets within 2 km of the Phoenix Gold Project; and 3. Exploring our vast Red Lake Properties land package.
  • 5. TSX : RMX | OTCQX : RBYCF Capital Structure and Shareholder Info Strong balance sheet and institutional support Balance Sheet and Capital Structure Approximate cash balance***: ~C$24 M Nominal long-term debt outstanding (December 31, 2020): C$12.0 M Lease liabilities C$2.5 M Shares outstanding: 65,853,092 Options outstanding: 4,199,703 Institutional Investors 70.72% George Ogilvie 0.72% CPPIB Credit 15.19% Retail 8.24% Royal Gold 5.13% Equity ownership breakdown* 5 Analyst Coverage BMO Andrew Mikitchook TD Securities Daniel Earle Laurentian Bank Ryan Hanley Mackie Research Stuart McDougall Market Data (April 27, 2018)** RMX share price: C$1.24 Market capitalization: C$81.7 M Avg. 30-day daily trading volume (TSX & OTC markets) 27,463 *Numbers may not add due to rounding **Source: TSX and OTC markets, as of April 27, 2018 ***Including equity financing, which closed on February 26, 2018 Institutional shareholders include: Mackenzie Financial Ninepoint Partners Donald Smith & Co. Greywolf Sentry Investments Sun Valley Gold Franklin Templeton RBIM (475,940 shares)
  • 6. TSX : RMX | OTCQX : RBYCF • Head frame and hoist commissioned • 9 km of U/G development; Shaft completed to 730 m below surface 200-person camp Tailings management facility completed • Surface roads, earth and civil works in place • Power line and substation on site 6 Infrastructure and Permits in Place >C$770 million spent on infrastructure and development Item: Capital spent/Tax pools (C$) Mill construction ~$150 M Surface construction ~$95 M Underground exploration, development, sampling, etc. ~$525 M Total $770 M Tax loss pools (April 2018) $687 M $387M – Phoenix Gold Project $300M – can be used externally 6 • 1,250 tpd mill • 91.5% recoveries during 2015 • Substantially permitted
  • 7. TSX : RMX | OTCQX : RBYCF 7 Conceptual Asset Values Mitigate Downside Risk Assets carry conceptual values comparable to the Company’s market cap 7 Red Lake Properties (28,266 ha): Based on precedent land transactions in Red Lake, Rubicon’s Red Lake Properties could have a conceptual value of between C$30-50 M Hard assets and equipment at site: More than ~C$300 M of equipment and hard assets could potentially have a resale value of ~C$30 M Tax loss pools and end working capital: Potential value of C$10-15 M Red Lake Properties Hard assets and equipment Financial assets Rubicon current market capitalization: C$81.7 M
  • 8. TSX : RMX | OTCQX : RBYCF 8 Exploration at the Phoenix Gold Project: • New Geological Structural Interpretation • 2018 Mineral Resource Estimate demonstrates material growth versus 2016 estimates • Test mining activities underway
  • 9. TSX : RMX | OTCQX : RBYCF Steps to Bring Confidence Back to the Phoenix Gold Project 9 • Hired reputable consultant and peer reviewer from the start: Golder Associates and T. Maunula & Associates have been working with Rubicon since early 2017. • Focus on structural geology: 3,500 m structural oriented drilling, 10,000 m historical core re- logged, and extensive underground mapping shows discrepancies with the 2016 geological model. • 2017 infill and step out drilling showing higher grades compared to 2016 block model: 25,000 m drilled in 2017 and 20,000 m planned for 2018 • Structural Interpretation shows better continuity: Simplified interpretation allows for the evaluation of bulk mining methods • 2018 Mineral Resource Estimate demonstrates significant growth • 25,000-30,000 tonnes of test mining/bulk sampling in 2018: To further refine and potentially validate 2018 Mineral Resource Estimate; Processing slated for mid-2018 • Potential to significantly enhance the quantities and classifications of the 2018 Mineral Resource Estimate
  • 10. TSX : RMX | OTCQX : RBYCF Historical drill holes HiTi Basalt Units Ultramafic Flow Units High-grade domain D1 N-S structures D2 E-W structures Quartz-Breccia Zones (higher grade) Riedel veins system (orientations): R’ veins R veins P veins D2 dextral transpresion 2013 Structural Interpretation 2016 Structural Interpretation 2018 Structural Interpretation Structural Interpretation10 Comparison of structural interpretations of the F2 Gold Deposit 10 • Riedel vein system: System of mineralized quartz-actinolite veins that appear to be primary structural controls on gold mineralization at the F2 Gold Deposit • More continuity of gold mineralization within the HiTi Basalt Units (main host rock) compared to the 2016 geological model • Evaluating bulk mining methods: Test mining sublevel longhole method on current test stopes North (mine-grid) (10) Refer to endnote #10
  • 11. TSX : RMX | OTCQX : RBYCF Structural Interpretation10 Conceptual diagram of F2 Gold Deposit local geology 11 50 m Historic McFinley Deposit area Hanging Wall Basalt West Limb Basalt F2 Basalt 610-metre level 305-metre level HiTi Basalt Units Drill hole intersecting Ultramafic Flow Units Drill hole intersecting Felsic Intrusive Units Underground development Drill hole intersecting HiTi Basalt Units • Three HiTi Basalt lenses: • Zone 1 (domain): F2 Basalt • Zone 2 (domain): West Limb Basalt, and Hanging Wall Basalt (larger zone at depth) • Mineralization encountered at 1,600 m below surface: Deeper F2 Gold Deposit is sparsely drilled; further exploration work required to better understand the geology at depth • Structural Interpretation will continue to be refined, enhanced, and supported with data and observations collected from the 2018 Exploration Program Section view looking north (10) Refer to endnote #10
  • 12. TSX : RMX | OTCQX : RBYCF 12 Material Growth in 2018 Mineral Resources11 Consideration for potential bulk mining methods Resource Category Quantity (000'tonnes) Grade (g/t Au) Contained Gold Ounces Measured (M) 188 6.80 41,000 Indicated (I) 1,186 6.30 240,000 M + I 1,374 6.37 281,000 Inferred 3,884 6.00 749,000 2018 Mineral Resource Estimate – April 30, 2018* @ 3.0 g/t Au Cut-off • 113% increase in M+I Resources*; 80% increase in Inferred Resources*; improved grades: Mainly attributed to a re-interpretation of geological and structural controls on mineralization along with recognizing the potential for larger scale mining which resulted in broader mineral domains • Golder (lead) & T. Maunula (peer reviewer): More than 12 months of collaboration with Rubicon • Encouraging results: Initial observations from test mining consistent with 2018 Mineral Resources; too early to draw conclusions • Effective date for this Mineral Resource is April 30, 2018 • Mineral Resource Estimate uses a break-even economic cut-off grade of 3.0 g/t Au based on assumptions of a gold price of US$1,300 per ounce, an exchange rate of US$/C$ 0.77, mining cash costs of C$97/t, processing costs of C$20/t, G&A of C$5/t, sustaining capital C$10/t, refining, transport and royalty costs of C$53/oz, and average gold recoverability of 92% • Mineral Resources are not Mineral Reserves and do not demonstrate economic viability • There is no certainty that all or any part of this Mineral Resource will be converted into Mineral Reserve • All figures are rounded to reflect the relative accuracy of the estimates and totals may not add correctly *There is no certainty that the Inferred Mineral Resources will be converted to the Measured and Indicated Mineral Resource categories, that the Measured and Indicated Mineral Resources will be converted to the Proven and Probable Mineral Reserve categories and there is no certainty that the updated Mineral Resource statement will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability; the estimate of Mineral Resources in the updated Mineral Resource statement may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. (11) Refer to endnote #11
  • 13. TSX : RMX | OTCQX : RBYCF 13 Material Growth in 2018 Mineral Resources11 Increased tonnes, grade and ounces at all cut-offs and categories Quantity (000’ tonnes) Grade (g/t Au) Contained Gold Ounces 2018 20162 Change 2018 20162 Change 2018 20162 Change 3.0 g/t Au Measured (M) 188 0 N/A 6.80 0 N/A 41,000 0 N/A Indicated (I) 1,186 719 65% 6.30 5.71 10.3% 240,000 132,000 81.8% Total M+I 1,374 719 91% 6.37 5.71 11.6% 281,000 132,000 112.9% Inferred 3,884 2,491 56% 6.00 5.18 15.8% 749,000 415,000 80.5% 3.5 g/t Au Measured (M) 155 0 N/A 7.54 0 N/A 38,000 0 N/A Indicated (I) 964 601 60% 7.01 6.19 13% 217,000 120,000 81% Total M+I 1,119 601 86% 7.08 6.19 14.4% 255,000 120,000 113% Inferred 3,146 1,959 61% 6.64 5.71 16.3% 672,000 360,000 87% 4.0 g/t Au Measured (M) 129 0 N/A 8.29 0 N/A 35,000 0 N/A Indicated (I) 779 492 58% 7.78 6.73 16% 195,000 106,000 84% Total M+I 909 492 85% 7.86 6.73 17% 230,000 106,000 117% Inferred 2,556 1,519 68% 7.31 6.28 16% 601,000 307,000 96% Comparison between 2018* and 2016** Estimated Quantities at Reported Cut-Off Grades (11) Refer to endnote #11 *There is no certainty that the Inferred Mineral Resources will be converted to the Measured and Indicated Mineral Resource categories, that the Measured and Indicated Mineral Resources will be converted to the Proven and Probable Mineral Reserve categories and there is no certainty that the updated Mineral Resource statement will be realized. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability; the estimate of Mineral Resources in the updated Mineral Resource statement may be materially affected by environmental, permitting, legal, title, taxation, socio-political, marketing, or other relevant issues. **2016 Estimates are no longer current and should not be relied upon.
  • 14. TSX : RMX | OTCQX : RBYCF 14 Material Growth in 2018 Mineral Resources Potential to enhance quantities and classifications • 24,000 m of infill/step-out drilling: To Potentially improve the classification of Inferred Resources; potential to grow resources from Exploration Target • Model reconciliation based on 25,000-30,000t bulk sampling: To increase confidence and validate a future Mineral Resource Estimate • Evaluating McFinley and Close Proximity Targets: Evaluating data from historical McFinley Deposit and Close Proximity Targets, which could possibly included in any future Mineral Resource Estimate • F2 Gold Deposit open at depth and along strike: High-grade intercepts at 1,600 m, below current bottom of 2018 Mineral Resource Estimate 2018 Mineral Resource Block Model Diagram Zone 2 (Hanging Wall and West Limb Basalts) Section View Looking West (Mine-Grid)
  • 15. TSX : RMX | OTCQX : RBYCF 2018 Exploration Program Phoenix Gold Project underground diagram looking north 15 Surface Fresh air raise 337-metre loading pocket 685-metre loading pocket Crusher station Shaft 610-metre haulage level 305-metre haulage level Diagram looking north (not to scale) Conveyer system Ore and waste passes Main F2 Gold Deposit Completed development Drilling platforms More than 9km of U/G development Conceptual ramp to surface 2018 Exploration Program: 25,000-30,000t of test mining between the 122- and 244- metre levels; up to 4,000 m of bazooka drilling at the stope faces 2017 Exploration Program COMPLETED: • 3,500 m of structural N-S oriented drilling • 10,000 m of historical core re-logging for structure • 25,000 m of oriented infill/step out drilling 2018 Exploration Program: 20,000 m of infill/step-out drilling at the 305-, 610- and 685-metre levels; Building exploration drift at 610-metre level Planned development
  • 16. TSX : RMX | OTCQX : RBYCF 122-metre level 244-metre level 305-metre level 183-metre level 161 test stope 977 test stope 015 test stope Existing underground development 60 m 2018 planned test stopes Previously mined test stopes 997 mined test stope 030 mined test stope 994 mined test stope 2018 Test Mining – Conceptual Diagram9 Between 25,000-30,000 tonnes planned starting mid-2018 Long section looking west • 10,000 tonnes of mineralized material currently on surface (7,000 tonnes from #977 test stope; 3,000 tonnes of low- grade material) • Test stopes are previously well developed and drilled, allowing the Company to take advantage of sunk capital for reduced costs and timelines Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the beginning of this presentation with respect of the Company’s Qualified Person. (9) Refer to endnote #9 16
  • 17. TSX : RMX | OTCQX : RBYCF Anticipated 2018 Exploration Program Timeline 17 2018 Exploration Program: 20,000 m of infill and step-out drilling Structural Interpretation Exploratory development in the main F2 Gold Deposit Test mining, bulk sampling, and bazooka drilling 2018 Mineral Resource Estimate Results from bulk sampling; Decision on feasibility study 2018 H1 H2 Structural Interpretation will continue to be refined with data from test stoping and drilling ~10,000t of material stockpiled on surface Significant expansion of Mineral Resources; potential for further expansion and improvement in classifications; NI-43-101 to be filed mid-June
  • 18. TSX : RMX | OTCQX : RBYCF 18 Long-Term Organic Growth Potential: • Close proximity targets • Red Lake Regional properties
  • 19. TSX : RMX | OTCQX : RBYCF Cochenour (G) Red Lake Gold Mines (G) Phoenix Gold Project (RMX) D2 Structures Red Lake, ON N RMX claims: 28,776 hectares ~40% of claims in Red Lake Goldcorp (G) claims Ultramafic units F2 folds Gold projects in active exploration Existing gold mines RMX prospective exploration targets Slate Bay (RMX) DMC (RMX) Adams Lake (RMX) East Bay (RMX) Prolific Red Lake Gold District: Camp has produced more than 29 million ounces of gold 19 Rahill-Bonanza (PG/G) H.G. Young (G) Hasaga (PG) McCuaig (RMX)
  • 20. TSX : RMX | OTCQX : RBYCF Recent Land Transactions in Red Lake Rubicon owns a sizeable land package in Red Lake Date Property Size (ha) Seller Buyer Sale price* Price/ha Additional info Nov 2017 McCuaig (40%) 50 Golden Tag Rubicon C$0.7 M C$14,630/ha Land transaction Mar 2017 Derlak (near Madsen) 219 Orefinders Pure Gold C$1.2 M C$5,465/ha Land transaction Dec 2015 Buffalo claims (near Hasaga) 513 Pure Gold Premier Gold ~C$5.0 M C$9,747/ha Land transaction; Pure Gold gets 1.0% NSR Nov 2015 Springpole 32,448 Gold Canyon First Mining Finance ~C$56.2 M C$1,732/ha Company acquisition; MRE Jun 2014 Newman- Madsen >807 Sabina Gold & Silver Pure Gold ~C$2.8 M C$3,463/ha Land transaction Mar 2014 Madsen 4,193 Claude Resources Pure Gold ~C$8.8 M C$2,087/ha Asset transaction 500 tpd mill, MRE Rubicon Red Lake Exploration Land Package (excluding Phoenix Gold Project claim) 28,266 ha Source: Company reports and Rubicon estimates 20 *Total consideration of cash and share values at the time of acquisition
  • 21. TSX : RMX | OTCQX : RBYCF 1000 m 244-metre level exploration drift Shaft Island Zone CARZ Northern Peninsula F2 Gold Deposit McFinleyCamp F2 North • 5-6 close proximity targets within 2 km of the Phoenix Gold Project • All are potentially accessible from underground • In-house modelling of the mineralized zones and generate conceptual tonnes and grade for the zones; rank each zone as to potential to fit in pipeline • Build “Rubicon Red Lake” model to look at bigger picture (structural and lithological model) • Evaluating the resource potential of Historic McFinley, Northern Peninsula, CARZ, and Island Zone 21 Close Proximity Targets Potential LOM incremental feed of the Phoenix Gold Project Long section looking north west McFinley Deep
  • 22. TSX : RMX | OTCQX : RBYCF Main F2 Gold Deposit Shaft Historic McFinley Deposit “B Zone” Structure “C Zone” Structure 244-17-C02: 2.66 g/t Au over 0.5 m 1.05 g/t Au over 0.6 m 244-17-C03: 4.87 g/t Au over 0.4 m 2.31 g/t Au over 0.5 m 244-17-C03: 3.60 g/t Au over 0.5 m 1.53 g/t Au over 0.9 m Scale: 200 m Drill hole U/G development Close Proximity Targets – McFinley Deep Plan View 22 Historic McFinley Deposit (2002)1 Inferred: 66,801 oz Au (303,006 tonnes grading 6.86 g/t Au) 1Not compiled according to NI 43-101
  • 23. TSX : RMX | OTCQX : RBYCF Close Proximity Targets – McFinley Deep Cross Sections of “B” and “C” Zone Structures 23 244-17-C02: 2.66 g/t Au over 0.5 m 1.05 g/t Au over 0.6 m 244-17-C03: 3.60 g/t Au over 0.5 m 1.53 g/t Au over 0.9 m Historic McFinley Deposit 122-metre level 183-metre level 244-metre level 305-metre level 122-metre level 183-metre level 244-metre level 305-metre level 244-17-C03: 4.87 g/t Au over 0.4 m 2.31 g/t Au over 0.5 m Drill hole U/G development Potential gold-bearing structure Historic McFinley Deposit (2002)1 Inferred: 66,801 oz Au (303,006 tonnes grading 6.86 g/t Au) 1Not compiled according to NI 43-101
  • 24. TSX : RMX | OTCQX : RBYCF 685-17-C04: 3.66 g/t Au over 0.4 m 2.93 g/t Au over 0.7 m 3.48 g/t Au over 1.0 m 5.55 g/t Au over 0.7 m More than 550 m deep from the bottom of the historic McFinley Deposit mineral resource Scale: 200 m Drill hole U/G development 122-metre level 183-metre level 244-metre level 305-metre level 610-metre level 685-metre level Main F2 Gold Deposit Shaft Close Proximity Targets – McFinley Deep Potential LOM incremental feed of the Phoenix Gold Project Historic McFinley Deposit (2002) Inferred: 66,801 oz Au (303,006 tonnes grading 6.86 g/t Au) • Drilling intersected gold- bearing quartz veins and sulphides through four zones, similar to the lithological sequence in the historic McFinley Deposit • Drill hole ended in HiTi basalts, suggesting that mineralization remains open to the west (mine grid) Isometric view looking northwest 24
  • 25. TSX : RMX | OTCQX : RBYCF Close Proximity Targets Northern Peninsula, CARZ & Island Zone 25 • Historical high-grade intercepts along strike and adjacent to the F2 Gold Deposit warrant follow up drilling • Compiling dataset and evaluating mineral resource potential for eventual drill program Select historical high-grade intercepts: Island Zone (not true widths) • PZ-23: 70.1 g/t Au over 3.1 m • PZ-12: 28.7 g/t Au over 1.4 m • PZ-47: 22.2 g/t Au over 1.7 m • PZ-25: 15.8 g/t Au over 3.5 m • PZ-03: 15.5 g/t Au over 4.8 m • PZ-02: 15.0 g/t Au over 2.8 m Carbonate Zone (“CARZ”)(not true widths) • PR-15-11: 24.17 g/t Au over 2.00 m • PR-15-11: 4.88 g/t Au over 10.50 m (incl. 6.43 g/t Au over 7.00 m) • PR-15-16: 8.48 g/t Au over 3.25 m (incl. 11.10 g/t Au over 2.25 m) • PR-15-19: 8.43 g/t Au over 1.05 m • PR-15-19: 2.30 g/t Au over 12.00 m (incl. 5.76 g/t Au over 2.00 m) • PR-15-06: 10.77 g/t Au over 2.65 m • PR-15-09: 7.84 g/t Au over 1.50 m Plan view F2 North
  • 26. TSX : RMX | OTCQX : RBYCF Red Lake Regional Properties Highly-prospective exploration targets 26 • Several highly-prospective grassroots exploration targets • Potential exploration work will commence if the Phoenix Gold Project’s advancement is on the right path • Targets were evaluated and prioritized by an exploration consultant with +20 years of experience in Red Lake 3# Sidace 1# McCuaig 2# East Bay 4# Slate Bay
  • 27. TSX : RMX | OTCQX : RBYCF Key Takeaways to the Rubicon Story Advanced exploration. Red Lake. High-grade gold potential 27 1. Encouraging drill results and Structural Interpretation: Data and observations collected to-date demonstrate discrepancies with the 2016 estimates; potential to evaluate bulk mining methods with the Structural Interpretation; 2. Significant growth in 2018 Mineral Resources: Overall increase in grade, tonnes, and ounces; potential for further improvement in quantities, classification, and confidence with 2018 Exploration drilling and test mining activities; 3. Mitigated Risk: conceptual resale value of assets are comparable to the market capitalization of the company, potentially mitigating downside risk; and 4. Exploration upside potential: excellent potential with McFinley Deep and Close Proximity targets and vast land package in a prolific high- grade gold camp.
  • 28. TSX : RMX | OTCQX : RBYCF Appendices 28
  • 29. TSX : RMX | OTCQX : RBYCF 29 Material Growth in 2018 Mineral Resources11 Potential to enhance quantities and classifications 2018 Mineral Resource Block Model Diagram – Plan View, 244-Metre Level 2018 Mineral Resource Block Model Diagram Zone 1 – Section View Looking West (Mine-Grid) (11) Refer to endnote #11
  • 30. TSX : RMX | OTCQX : RBYCF History of Mineral Resource Estimates Historical estimates are not current and should no be relied upon GEOEX – Amended2,6 (2011) AMC3,6 (2011) SRK4,6 (2013) SRK5,6,7 (2016) Grade (g/t Au) 17.3 (inferred, capped) 14.5 (indicated) 17.0 (inferred) 8.5 (indicated) 9.3 (inferred) 6.7 (indicated) 6.3 (inferred) Ounces 3.1 M (inferred) 0.5 M (indicated) 2.3 M (inferred) 1.1 M (indicated) 2.2 M (inferred) 0.1 M (indicated) 0.3 M (inferred) Tonnes (t) 5.500 M (inferred) 1.028 M (indicated) 4.230 M (inferred) 4.120 M (indicated) 7.452 M (inferred) 0.492 M (indicated) 1.519 M (inferred) Grade interpolation polygonal inverse distance cubed ordinary kriging ordinary kriging Grade capping 10-5-2 oz (311-155.5-62.2 g/t Au) 270 g/t Au 200 g/t Au (Main) 150 g/t (HW), 30 g/t (Ext) 10–120 g/t Au (HG domains) 5–45 g/t Au (LG domains) Cut-off grade (g/t Au) 5.0 5.0 4.0 4.0 Metres drilled at F2 Gold Deposit 166,886 m 259,000 m + 2,000t bulk sample 355,611 m 450,175 m + trial stoping Metrics from PEA Grade to the mill (g/t Au) n/a 13.9 8.1 n/a Average stope width n/a 2.0 m 7.8 m n/a Overall dilution n/a 18% 44% n/a 30 (2) Refer to endnote #2, (3) Refer to endnote #3, (4) Refer to endnote #4, (5) Refer to endnote #5, (6) Refer to endnote #6 (7) Refer to endnote #7 Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the beginning of this presentation with respect of the Company’s Qualified Person.
  • 31. TSX : RMX | OTCQX : RBYCF Structural Interpretation10 Conceptual diagram of F2 Gold Deposit local geology; Plan View 31 N 50 m Shaft West Limb BasaltHanging Wall Basalt F2 Basalt Historic McFinley Deposit area HiTi Basalt Units Drill hole intersecting Ultramafic Flow Units Drill hole intersecting Felsic Intrusive Units Underground development Drill hole intersecting HiTi Basalt Units Remains open along strike Remains open along strike (10) Refer to endnote #10
  • 32. TSX : RMX | OTCQX : RBYCF West Limb Basalt Zone Hanging Wall Zone Main F2 Gold Deposit Shaft 015 test stope 977 test stope 994 mined test stope 997 mined test stope N Existing underground development 50 m 2018 planned test stopes Previously mined test stopes 030 mined test stope 2018 Test Mining – Conceptual Diagram9 Testing various mining methods Plan view of the 244-metre level • Test stopes located in the upper- portion of the main F2 Gold Deposit mineralized envelope • Mining methods tested include mechanized cut-and-fill and sublevel longhole Please refer to the Cautionary Statements Regarding Forward-Looking Statements and Cautionary Notes at the beginning of this presentation with respect of the Company’s Qualified Person. (9) Refer to endnote #9 32
  • 33. TSX : RMX | OTCQX : RBYCF 685-metre level 685-17-10: 4.77 g/t Au over 0.9 m 3.02 g/t Au over 8.0 m (incl. 9.53 over 0.8 m) 23.39 g/t Au over 2.0 m (incl. 46.73 g/t Au over 1.0 m) 2016 Mineral Resource block model grades 1-3 g/t Au 5-10 g/t Au >10 g/t Au 3-5 g/t Au Scale: 100 m Drill hole U/G development 2017 highlight drill intercepts 5-10 g/t Au >10 g/t Au 3-5 g/t Au 1-3 g/t Au Diagram 9: Infill and step-out drilling cross section (looking north) Section (3) Infill and step-out drill hole 685-17-09, 685-17-10, and 685-17-11 685-17-09: 14.25 g/t Au over 1.8 m (incl. 61.51 g/t Au over 0.4 m) 3.87 g/t Au over 1.1 m 685-17-11: 8.58 g/t Au over 1.0 m 5.82 g/t Au over 1.0 m 1.46 g/t Au over 1.3 m 2.51 g/t Au over 1.1 m Preliminary Observations1 Diagram from February 20, 2018 news release 33
  • 34. TSX : RMX | OTCQX : RBYCF 1. For more information regarding 2017 Exploration program drilling results, please refer to the news releases dated September 18, 2017, November 16, 2017, December 14, 2017, and February 20, 2018, which are available on our website at www.rubiconminerals.com. 2. For more information regarding the amended inferred mineral resource and geological potential estimates prepared by Geoex Ltd. please refer to the news release dated March 31, 2011, which is available on our website at www.rubiconminerals.com and the Technical Report dated April 11, 2011 available on under Rubicon’s profile in SEDAR at www.sedar.com. 3. For more information regarding the 2011 PEA study prepared by AMC Mining Consultants, please refer to the news release dated June 29, 2011, which is available on our website at www.rubiconminerals.com and the Technical Report dated August 11, 2011 available on under Rubicon’s profile in SEDAR at www.sedar.com. 4. For more information regarding the 2013 PEA study prepared by SRK Consulting (Canada) Inc., please refer to the news release dated June 25, 2013, which is available on our website at www.rubiconminerals.com and the Amended & Restated Technical Report dated February 28, 2014 available under Rubicon’s profile in SEDAR at www.sedar.com. 5. For more information regarding the 2016 SRK mineral resource estimate prepared by SRK Consulting (Canada) Inc., please refer to the news release dated January 11, 2016, which is available on our website at www.rubiconminerals.com and the Technical Report filed on February 25, 2016 available under Rubicon’s profile at www.sedar.com. 6. Mineral resources are not mineral reserves and have not demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate. Samples have been capped where appropriate. 7. Underground mineral resources reported at a cut-off grade of 4.0 g/t Au of gold per tonne assuming a gold price of US$1,125/oz. and a gold recovery of 92.5%. 8. For more information regarding the first trial stope reconciliation, please refer to the news release dated November 3, 2015, which is available on our website at www.rubiconminerals.com. 9. For more information regarding 2018 Exploration program please refer to the news release dated January 23, 2018 which is available on our website at www.rubiconminerals.com. 10. For more information regarding the Structural Interpretation, please refer to the news release dated March 12, 2018 which is available on our website at www.rubiconminerals.com. 11. For more information regarding the 2018 Mineral Resource Estimate, please refer to the news release dated April 30, 2018 which is available on our website at www.rubiconminerals.com. 34 Endnotes
  • 35. TSX : RMX | OTCQX : RBYCF 35
  • 36. TSX : RMX | OTCQX : RBYCF For more information, please contact: Allan Candelario, CFA Director, Investor Relations and Corporate Development 416-766-2804 acandelario@rubiconminerals.com 36