CHERMSIDE AMBULANCE CENTRE
REDEVELOPMENT PROJECT
520 Hamilton Road, Chermside, Brisbane, Queensland
Prononcé


Although of modest budget and size the
redevelopment of the Chermside Ambulance
Centre emulates the complex highly serviced
projects that are the heart of my experience. It is also
reflects the amalgam that is my project, construction
and design management proficiency.
Project Description and Involvement


                                                         Engaged as the Client Government Department’s
This project involved the extension and upgrade of       Principal Consultant my role was Client-side Project
an active Ambulance Centre. The Centre is                and Building Design Manger responsible for the
adjacent a major hospital and health precinct.           project’s overall project management and building
Serving not only this expanding precinct the             design development and documentation. I was also
Ambulance Centre provides coverage for a growing         the Superintendent’s Representative under the
residential and working population related to a          contract responsible its formation and
nearby growing retail suburban shopping district.        administration.


The aim of the project was to increase the Plant         I was accountable to the Client Government
(vehicle) capacity and Station (support facilities)      Department and was part of the Project Control
size, improve existing Plant and Station amenity and     Group. As the Centre had a Local Area Committee
provide additional community well-being in terms of      (LAC), was to remain occupied and operational
a Baby Capsule Fitting service whilst maintaining        during construction and was a test site for several
existing services, capacity and capability 24/7 during   new ‘green’ and sustainable development
construction.                                            innovations to Centre amenity I was also
                                                         accountable to community stakeholders, Service
                                                         command, union and safety representatives and
                                                         operations facility managers.
By first managing the design process architectural document drawings…...



Design Management




 Perspective                            Site Plan
Project Drawings




Floor Plan - Lower   Floor Plan - Ground
Project Drawings




Ceiling Plan       Roof Plan
Project Drawings




Staging Plan – Lower Level   Staging Plan – Ground Level
Project Drawings




Elevations         Elevations
Project Drawings




Sections           Sections
Project Drawings




Sections           Sections
Project Drawings




Sections           Sections
Project Drawings




Details            Details
Project Drawings




Interiors          Interiors
Project Drawings




Window Schedule    Door Schedule
Project Drawings




Signage            Landscape
and co-ordinated consultant’s designs and drawings…...



Consultant’s Drawings




 sample civil drawing                  sample civil drawing
Consultant’s Drawings




sample structural drawing   sample structural drawing
Consultant’s Drawings




sample mechanical drawing   sample mechanical drawing
Consultant’s Drawings




sample electrical drawing   sample electrical drawing
Consultant’s Drawings




sample hydraulic drawing   sample hydraulic drawing
Consultant’s Drawings




sample fire drawing   sample fire drawing
were used to form Contract………………



Contract Documents




      Contract                     Specification
and get building certification………………



Certification Documents




    Certificate of Classification      Fire Services Assessment
so that via management of the construction process



Hamilton Road Elevation

This turned into………                    This
South West Elevation

This turned into………   This
West Elevation

This turned into………   This
North East Elevation

This turned into………   This
Internal View

This turned into………   This
Internal View

This turned into………   This
Internal View

This turned into………   This
Internal View

This turned into………   This
Internal View

This turned into………   This
Internal View

This turned into………   This
controlled by tools such as the………….


Project Management
Program developed        ‘S’ used in monitoring
for the project          builder’s progress
Project Management
and Construction Reports authored

                           Construction Documentation and Cost Plan Report                                                                                                                   Quality Information
                           Chermside Ambulance Centre Redevelopment                                                                                                                          Document        Construction Documentation and Cost Plan Report
                           520 Hamilton Road, Chermside, Brisbane, QLD
                                                                                                                                                                                             Ref             1007.00

                           Prepared for                                                                                                                                                      Date            08 August 2010
                           Department of Community Safety
                                                                                                                                                                                             Prepared by     Rhys Llewellyn
                           on behalf of
                                                                                                                                                                                             Reviewed by     Josh Wallace
                           Queensland Ambulance Station

                           Prepared by                                                                                                                                                       Revision History
                           Haysom Architects
                           Croft Lane (off Chester Street), PO Box 2127, Fortitude Valley QLD 4006, Australia                                                                                                                                                       Authorised
                           T +61 7 3852 6900 F +61 7 3852 6299 www.haysomarchitects.com.au                                                                                                                 Revision
                                                                                                                                                                                             Revision                   Details
                           ABN 38 0999 737 710                                                                                                                                                             Date
                                                                                                                                                                                                                                                   Name/Position          Signature
                                                                                                                                                                                                                                                   Rhys Llewellyn
                           In association with                                                                                                                                               01            09/08/2010   Version V1.0
                                                                                                                                                                                                                                                   Project Leader
                           Opus International Consultants (Australia) Pty Ltd
                           Property Technologies Pty Ltd
                           Turner & Townsend Pty Limited


                           08 August 2010


                           1007.00



                           © Haysom Architects 38 099 737 710

                           The information contained in this document produced by Haysom Architects is solely for the use of the Client identified on the cover sheet for
                           the purpose for which it has been prepared and Haysom Architects undertakes no duty to or accepts any responsibility to any third party who
                           may rely upon this document.

                           All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or
                           transmitted in any form without the written permission of Haysom Architects.




                           Chermside Ambulance Centre Redevelopment
                           Construction Documentation and Cost Plan Report
                           Macintosh HD:Design Directors:Samples:1007.00 QAS Chermside Ambulance Station:3.0 Client:3.06 Reports:Construction Document Report:Construction Document Report.doc
                           Revision 01 Date : 26/09/2012                                                                                                                          Status ; Draft




Construction Reports      Construction Reports
to produce the desired…………


Project Outcome

           Completed Project
fin

More Related Content

Similar to QAS Chermside Redevelopment

alan_morrison_resume (15)
alan_morrison_resume (15)alan_morrison_resume (15)
alan_morrison_resume (15)Alan Morrison
 
StateReview Services Overview
StateReview Services OverviewStateReview Services Overview
StateReview Services Overview
Otten Consulting Group, Inc.
 
Integrated Efficient Sustainable Design
Integrated Efficient Sustainable DesignIntegrated Efficient Sustainable Design
Integrated Efficient Sustainable Design
eomari
 
T&T Draft Brochure Rev Dark
T&T Draft Brochure Rev DarkT&T Draft Brochure Rev Dark
T&T Draft Brochure Rev Dark
bmehmet
 
Grey Fox Consulting Brochure
Grey Fox Consulting BrochureGrey Fox Consulting Brochure
Grey Fox Consulting BrochureGreyfox05
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplantfinance26
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplantfinance26
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplantfinance26
 
E profile
E profileE profile
E profile
James Martin
 
Sestak Management Services
Sestak Management ServicesSestak Management Services
Sestak Management Services
tomsestak
 
Global Energy Group Brochure
Global Energy Group BrochureGlobal Energy Group Brochure
Global Energy Group BrochureAndyCaldwell
 
Updated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa TsemtsidisUpdated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa TsemtsidisCosta Tsemtsidis
 

Similar to QAS Chermside Redevelopment (13)

alan_morrison_resume (15)
alan_morrison_resume (15)alan_morrison_resume (15)
alan_morrison_resume (15)
 
Resume
ResumeResume
Resume
 
StateReview Services Overview
StateReview Services OverviewStateReview Services Overview
StateReview Services Overview
 
Integrated Efficient Sustainable Design
Integrated Efficient Sustainable DesignIntegrated Efficient Sustainable Design
Integrated Efficient Sustainable Design
 
T&T Draft Brochure Rev Dark
T&T Draft Brochure Rev DarkT&T Draft Brochure Rev Dark
T&T Draft Brochure Rev Dark
 
Grey Fox Consulting Brochure
Grey Fox Consulting BrochureGrey Fox Consulting Brochure
Grey Fox Consulting Brochure
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
 
xel_062006_kingplant
xel_062006_kingplantxel_062006_kingplant
xel_062006_kingplant
 
E profile
E profileE profile
E profile
 
Sestak Management Services
Sestak Management ServicesSestak Management Services
Sestak Management Services
 
Global Energy Group Brochure
Global Energy Group BrochureGlobal Energy Group Brochure
Global Energy Group Brochure
 
Updated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa TsemtsidisUpdated CV 29th August 2016 Costa Tsemtsidis
Updated CV 29th August 2016 Costa Tsemtsidis
 

QAS Chermside Redevelopment

  • 1. CHERMSIDE AMBULANCE CENTRE REDEVELOPMENT PROJECT 520 Hamilton Road, Chermside, Brisbane, Queensland
  • 2. Prononcé Although of modest budget and size the redevelopment of the Chermside Ambulance Centre emulates the complex highly serviced projects that are the heart of my experience. It is also reflects the amalgam that is my project, construction and design management proficiency.
  • 3. Project Description and Involvement Engaged as the Client Government Department’s This project involved the extension and upgrade of Principal Consultant my role was Client-side Project an active Ambulance Centre. The Centre is and Building Design Manger responsible for the adjacent a major hospital and health precinct. project’s overall project management and building Serving not only this expanding precinct the design development and documentation. I was also Ambulance Centre provides coverage for a growing the Superintendent’s Representative under the residential and working population related to a contract responsible its formation and nearby growing retail suburban shopping district. administration. The aim of the project was to increase the Plant I was accountable to the Client Government (vehicle) capacity and Station (support facilities) Department and was part of the Project Control size, improve existing Plant and Station amenity and Group. As the Centre had a Local Area Committee provide additional community well-being in terms of (LAC), was to remain occupied and operational a Baby Capsule Fitting service whilst maintaining during construction and was a test site for several existing services, capacity and capability 24/7 during new ‘green’ and sustainable development construction. innovations to Centre amenity I was also accountable to community stakeholders, Service command, union and safety representatives and operations facility managers.
  • 4. By first managing the design process architectural document drawings…... Design Management Perspective Site Plan
  • 5. Project Drawings Floor Plan - Lower Floor Plan - Ground
  • 7. Project Drawings Staging Plan – Lower Level Staging Plan – Ground Level
  • 16. and co-ordinated consultant’s designs and drawings…... Consultant’s Drawings sample civil drawing sample civil drawing
  • 17. Consultant’s Drawings sample structural drawing sample structural drawing
  • 18. Consultant’s Drawings sample mechanical drawing sample mechanical drawing
  • 19. Consultant’s Drawings sample electrical drawing sample electrical drawing
  • 20. Consultant’s Drawings sample hydraulic drawing sample hydraulic drawing
  • 21. Consultant’s Drawings sample fire drawing sample fire drawing
  • 22. were used to form Contract……………… Contract Documents Contract Specification
  • 23. and get building certification……………… Certification Documents Certificate of Classification Fire Services Assessment
  • 24. so that via management of the construction process Hamilton Road Elevation This turned into……… This
  • 25. South West Elevation This turned into……… This
  • 26. West Elevation This turned into……… This
  • 27. North East Elevation This turned into……… This
  • 28. Internal View This turned into……… This
  • 29. Internal View This turned into……… This
  • 30. Internal View This turned into……… This
  • 31. Internal View This turned into……… This
  • 32. Internal View This turned into……… This
  • 33. Internal View This turned into……… This
  • 34. controlled by tools such as the…………. Project Management Program developed ‘S’ used in monitoring for the project builder’s progress
  • 35. Project Management and Construction Reports authored Construction Documentation and Cost Plan Report Quality Information Chermside Ambulance Centre Redevelopment Document Construction Documentation and Cost Plan Report 520 Hamilton Road, Chermside, Brisbane, QLD Ref 1007.00 Prepared for Date 08 August 2010 Department of Community Safety Prepared by Rhys Llewellyn on behalf of Reviewed by Josh Wallace Queensland Ambulance Station Prepared by Revision History Haysom Architects Croft Lane (off Chester Street), PO Box 2127, Fortitude Valley QLD 4006, Australia Authorised T +61 7 3852 6900 F +61 7 3852 6299 www.haysomarchitects.com.au Revision Revision Details ABN 38 0999 737 710 Date Name/Position Signature Rhys Llewellyn In association with 01 09/08/2010 Version V1.0 Project Leader Opus International Consultants (Australia) Pty Ltd Property Technologies Pty Ltd Turner & Townsend Pty Limited 08 August 2010 1007.00 © Haysom Architects 38 099 737 710 The information contained in this document produced by Haysom Architects is solely for the use of the Client identified on the cover sheet for the purpose for which it has been prepared and Haysom Architects undertakes no duty to or accepts any responsibility to any third party who may rely upon this document. All rights reserved. No section or element of this document may be removed from this document, reproduced, electronically stored or transmitted in any form without the written permission of Haysom Architects. Chermside Ambulance Centre Redevelopment Construction Documentation and Cost Plan Report Macintosh HD:Design Directors:Samples:1007.00 QAS Chermside Ambulance Station:3.0 Client:3.06 Reports:Construction Document Report:Construction Document Report.doc Revision 01 Date : 26/09/2012 Status ; Draft Construction Reports Construction Reports
  • 36. to produce the desired………… Project Outcome Completed Project
  • 37. fin