Preliminary Quality Assurance Evaluation
Hotel Name: Maldives Resort & Spa Rangali Island
Facility ID: 42026
InnCode: MLEHI
General Manager: Carsten Schieck Assumed Position: 2003-07-18
Asst. General Manager: Assumed Position:
Management Company: Hilton Hotels Corporation Consultant: Reinaldo Ruiz
Previous Eval: 07/18/2011 Regular Acceptable 82.95% Current Eval: 12/2/2011 Regular
Quality Assurance Index Score ( 3829.05 / 4000.00 ) 95.73%
(X) Lowest Multiplier (See Chart Below) 100.00%
(=) Final Score: 95.73% Outstanding
Multipliers (Scoring Caps)
Overall Graded Issues 100.00%
Overall Service SALT (Prev Score 78.30% ) 100.00%
Guest Room/Suite Deficiency or Room Failures 100.00%
Failed Main Area 100.00%
Failed Sub Area 100.00%
2+ Failed Sub Areas (Common Main Area) 100.00%
Overall Guest Room Cleanliness (Prev Score 75.10% ) 100.00%
Balanced Scorecard Summary
Cleanliness Condition Standards
98.78% 92.51% 95.96%
Previous Scorecard Summary
Cleanliness Condition Standards
98.98% 92.29% 81.82%
Point Value By
Area
Points
Remaining By
Area Previous Scores
Current Sub
Area Score
Current Main
Area Score
BRAND STANDARDS 1000 959.60 81.82% 95.96%
1) Brand Standards 500 479.80 73.74% 95.96%
2) Service Delivery Standards 500 479.80 89.90% 95.96%
Commercial Facilities 1000 955.90 96.89% 95.59%
1) Business Center 100 100.00 100.00% 100.00%
2) Corridors/Elevators/Stairwells 500 500.00 100.00% 100.00%
3) Exterior Components 500 493.70 99.58% 98.74%
4) Gift Shop 100 99.00 99.50% 99.00%
5) Heart of the House 100 84.00 89.00% 84.00%
6) Lobby/Entrance/Reg Area 500 500.00 99.37% 100.00%
7) Public Restrooms 250 246.80 99.36% 98.72%
8) Recreation Facilities 250 232.40 94.88% 92.96%
Food and Beverage Facilities 1000 983.55 95.75% 98.36%
1) Kitchens 250 242.00 88.86% 96.80%
2) Lounge Facilities 250 246.80 97.93% 98.72%
3) Meeting Facilities 250 250.00 100.00% 100.00%
4) Prefunction Space 250 250.00 100.00% 100.00%
5) Restaurant Facilities 500 494.75 98.11% 98.95%
Guest Rooms 1000 930.00 94.26% 93.00%
1) Guest Bathrooms 500 493.00 98.60% 98.60%
2) Guest Rooms 500 437.00 89.92% 87.40%
3) Individual Guest Room Failure 500 500.00 100.00% 100.00%
Scoring Criteria
Outstanding = 90.00 -
100%
Acceptable = 80.00 -
89.99%
Acceptable = 75.00 -
79.99%
Unacceptable = 74.99% &
below
Progress = Approved
Renovation Plan
V 2.0.6C

More Related Content

Similar to Q&a report november 2011 conrad rangali

Eleventy Marketing Intelligence presentation
Eleventy Marketing Intelligence presentationEleventy Marketing Intelligence presentation
Eleventy Marketing Intelligence presentation
Jeff Birkner
 
Financial Analysis Assignment.docx
Financial Analysis Assignment.docxFinancial Analysis Assignment.docx
Financial Analysis Assignment.docx
write4
 
Service Operation
Service OperationService Operation
Service Operation
ntombi tuge
 
Top of FormSIC                                                .docx
Top of FormSIC                                                .docxTop of FormSIC                                                .docx
Top of FormSIC                                                .docx
edwardmarivel
 
Rehoboth Beach, DE - Funding the Ocean Outfall Project
Rehoboth Beach, DE - Funding the Ocean Outfall ProjectRehoboth Beach, DE - Funding the Ocean Outfall Project
Rehoboth Beach, DE - Funding the Ocean Outfall Project
rehobothbeachde
 
2. intro. to six sigma
2. intro. to six sigma2. intro. to six sigma
2. intro. to six sigma
Hakeem-Ur- Rehman
 
completion certificate
completion certificatecompletion certificate
completion certificate
Dario Trupina
 

Similar to Q&a report november 2011 conrad rangali (8)

Eleventy Marketing Intelligence presentation
Eleventy Marketing Intelligence presentationEleventy Marketing Intelligence presentation
Eleventy Marketing Intelligence presentation
 
Financial Analysis Assignment.docx
Financial Analysis Assignment.docxFinancial Analysis Assignment.docx
Financial Analysis Assignment.docx
 
Service Operation
Service OperationService Operation
Service Operation
 
Top of FormSIC                                                .docx
Top of FormSIC                                                .docxTop of FormSIC                                                .docx
Top of FormSIC                                                .docx
 
Rehoboth Beach, DE - Funding the Ocean Outfall Project
Rehoboth Beach, DE - Funding the Ocean Outfall ProjectRehoboth Beach, DE - Funding the Ocean Outfall Project
Rehoboth Beach, DE - Funding the Ocean Outfall Project
 
Synthetic Intelligence (2004)
Synthetic Intelligence (2004)Synthetic Intelligence (2004)
Synthetic Intelligence (2004)
 
2. intro. to six sigma
2. intro. to six sigma2. intro. to six sigma
2. intro. to six sigma
 
completion certificate
completion certificatecompletion certificate
completion certificate
 

More from markcancook.com.

Police check
Police checkPolice check
Police check
markcancook.com.
 
Al rawdha written references
Al rawdha written referencesAl rawdha written references
Al rawdha written referencesmarkcancook.com.
 
Al rawdha written references copy
Al rawdha written references   copyAl rawdha written references   copy
Al rawdha written references copymarkcancook.com.
 
Al Rawdha Written References
Al Rawdha Written ReferencesAl Rawdha Written References
Al Rawdha Written References
markcancook.com.
 
Mark Menus 2012
Mark Menus 2012Mark Menus 2012
Mark Menus 2012
markcancook.com.
 
Tapas Menu V3
Tapas Menu V3Tapas Menu V3
Tapas Menu V3
markcancook.com.
 
Vilu Restaurant October 2011
Vilu Restaurant October 2011Vilu Restaurant October 2011
Vilu Restaurant October 2011
markcancook.com.
 
Vilu Xmas Day 2011
Vilu Xmas Day 2011Vilu Xmas Day 2011
Vilu Xmas Day 2011
markcancook.com.
 
Sunset Menu Aug 2011
Sunset Menu Aug 2011Sunset Menu Aug 2011
Sunset Menu Aug 2011
markcancook.com.
 
Rangali Bar Menu Sept 2011 V9
Rangali Bar Menu Sept 2011 V9Rangali Bar Menu Sept 2011 V9
Rangali Bar Menu Sept 2011 V9
markcancook.com.
 
Mark Rowsell Turner Slide Show 2012
Mark Rowsell Turner Slide Show 2012Mark Rowsell Turner Slide Show 2012
Mark Rowsell Turner Slide Show 2012
markcancook.com.
 
Marco Food Write
Marco Food WriteMarco Food Write
Marco Food Write
markcancook.com.
 
Mariners 1
Mariners 1Mariners 1
Mariners 1
markcancook.com.
 

More from markcancook.com. (20)

HACCP certificate CDC
HACCP certificate CDCHACCP certificate CDC
HACCP certificate CDC
 
Police check
Police checkPolice check
Police check
 
cert iv
cert ivcert iv
cert iv
 
marco food write
marco food writemarco food write
marco food write
 
Mariners 1
Mariners 1Mariners 1
Mariners 1
 
Cert iv
Cert ivCert iv
Cert iv
 
Bahrain food write
Bahrain food writeBahrain food write
Bahrain food write
 
Al rawdha written references
Al rawdha written referencesAl rawdha written references
Al rawdha written references
 
Al rawdha written references copy
Al rawdha written references   copyAl rawdha written references   copy
Al rawdha written references copy
 
Mariners 2
Mariners 2Mariners 2
Mariners 2
 
Al Rawdha Written References
Al Rawdha Written ReferencesAl Rawdha Written References
Al Rawdha Written References
 
Mark Menus 2012
Mark Menus 2012Mark Menus 2012
Mark Menus 2012
 
Tapas Menu V3
Tapas Menu V3Tapas Menu V3
Tapas Menu V3
 
Vilu Restaurant October 2011
Vilu Restaurant October 2011Vilu Restaurant October 2011
Vilu Restaurant October 2011
 
Vilu Xmas Day 2011
Vilu Xmas Day 2011Vilu Xmas Day 2011
Vilu Xmas Day 2011
 
Sunset Menu Aug 2011
Sunset Menu Aug 2011Sunset Menu Aug 2011
Sunset Menu Aug 2011
 
Rangali Bar Menu Sept 2011 V9
Rangali Bar Menu Sept 2011 V9Rangali Bar Menu Sept 2011 V9
Rangali Bar Menu Sept 2011 V9
 
Mark Rowsell Turner Slide Show 2012
Mark Rowsell Turner Slide Show 2012Mark Rowsell Turner Slide Show 2012
Mark Rowsell Turner Slide Show 2012
 
Marco Food Write
Marco Food WriteMarco Food Write
Marco Food Write
 
Mariners 1
Mariners 1Mariners 1
Mariners 1
 

Q&a report november 2011 conrad rangali

  • 1. Preliminary Quality Assurance Evaluation Hotel Name: Maldives Resort & Spa Rangali Island Facility ID: 42026 InnCode: MLEHI General Manager: Carsten Schieck Assumed Position: 2003-07-18 Asst. General Manager: Assumed Position: Management Company: Hilton Hotels Corporation Consultant: Reinaldo Ruiz Previous Eval: 07/18/2011 Regular Acceptable 82.95% Current Eval: 12/2/2011 Regular Quality Assurance Index Score ( 3829.05 / 4000.00 ) 95.73% (X) Lowest Multiplier (See Chart Below) 100.00% (=) Final Score: 95.73% Outstanding Multipliers (Scoring Caps) Overall Graded Issues 100.00% Overall Service SALT (Prev Score 78.30% ) 100.00% Guest Room/Suite Deficiency or Room Failures 100.00% Failed Main Area 100.00% Failed Sub Area 100.00% 2+ Failed Sub Areas (Common Main Area) 100.00% Overall Guest Room Cleanliness (Prev Score 75.10% ) 100.00% Balanced Scorecard Summary Cleanliness Condition Standards 98.78% 92.51% 95.96% Previous Scorecard Summary Cleanliness Condition Standards 98.98% 92.29% 81.82% Point Value By Area Points Remaining By Area Previous Scores Current Sub Area Score Current Main Area Score BRAND STANDARDS 1000 959.60 81.82% 95.96% 1) Brand Standards 500 479.80 73.74% 95.96% 2) Service Delivery Standards 500 479.80 89.90% 95.96% Commercial Facilities 1000 955.90 96.89% 95.59% 1) Business Center 100 100.00 100.00% 100.00% 2) Corridors/Elevators/Stairwells 500 500.00 100.00% 100.00% 3) Exterior Components 500 493.70 99.58% 98.74% 4) Gift Shop 100 99.00 99.50% 99.00% 5) Heart of the House 100 84.00 89.00% 84.00% 6) Lobby/Entrance/Reg Area 500 500.00 99.37% 100.00% 7) Public Restrooms 250 246.80 99.36% 98.72% 8) Recreation Facilities 250 232.40 94.88% 92.96% Food and Beverage Facilities 1000 983.55 95.75% 98.36% 1) Kitchens 250 242.00 88.86% 96.80% 2) Lounge Facilities 250 246.80 97.93% 98.72% 3) Meeting Facilities 250 250.00 100.00% 100.00% 4) Prefunction Space 250 250.00 100.00% 100.00% 5) Restaurant Facilities 500 494.75 98.11% 98.95% Guest Rooms 1000 930.00 94.26% 93.00% 1) Guest Bathrooms 500 493.00 98.60% 98.60% 2) Guest Rooms 500 437.00 89.92% 87.40% 3) Individual Guest Room Failure 500 500.00 100.00% 100.00% Scoring Criteria Outstanding = 90.00 - 100% Acceptable = 80.00 - 89.99% Acceptable = 75.00 - 79.99% Unacceptable = 74.99% & below Progress = Approved Renovation Plan V 2.0.6C