Form and function should be one,
                                  joined in a spiritual union.
                                                    Frank Lloyd Wright




A BETTER TOMORROW
made possible




Publications Department/
Creative Services (EAST)
OUR SERVICES are available
to any office nationwide

                             E
                                      arth Tech’s Capital District Publications/Creative Services Department, located in Richmond
                                      and Alexandria, actively supports all locally managed projects, whether contract work or
                                      marketing/business development.

                             As a support services department, Richmond Publications/Creative Services manages administrative
                             (documentation) work flow; schedules and carries out word processing/formatting, editing, and graphic
                             support; provides administrative QA/QC services; and handles document production, copying, color
                             copying, and binding. Additional services include photographic scanning, CD-ROM creation/copying,
                             document transfer via Internet, Internet research, graphic design/layout, and creative services. These
                             services are also available to all other Earth Tech offices worldwide.

                             Publications                                                        Creative Services
                             The Publications Department supports all                            The Creative Services Department supports all graphic
                             documentation that is produced in the Richmond office,              design projects including: presentations, handouts,
                             from letter correspondence and report development                   brochures, marketing material, cover design, project
                             to multi-volume production projects. The department                 graphic design, invitations, and tradeshow support.
                             handles all color copying/printing as well as binding               They also direct Earth Tech’s Corporate Branded
                             (GBC/spiral and 3-ring) and production. Regular                     Merchandise Program, TEAM GEAR.
                             work flow can include 5-10 concurrent jobs requiring
                             graphic design/layout, word processing, editing, QA/QC,
                             proofreading, peer review, technical review, multiple
                                                                                                  A BETTER DOCUMENT
                             copies, multiple volumes, color copies, and binding.                 made possible
                             The Richmond-Publications Style Guide is available upon request through the Publications Manager.
HOW we can help you

                                                                                                SOFTWARE                 PROJECT SUPPORT                     DOCUMENTATION                   GRAPHIC DESIGN
                                                                                                » Microsoft Word         » Word Processing                   » Correspondence                » Presentations
                                                                                                » Microsoft Excel        » Editing (Style/Grammar)           » Environmental                 » Marketing Materials
                                                                                                » Microsoft PowerPoint       & Proofreading                      Management Services         » Handouts
                                                                                                » Microsoft Access       »   Graphic Design; Cover               Program
                                                                                                                                                                                             » Covers
                                                                                                                             Creation; Creative              »   Environmental Site
                                                                                                » Microsoft Project          Services; Print Production          Assessments                 » CD Graphics
                                                                                                » Adobe Acrobat          »   Photo Scanning; Research        »   SH&E Documentation          » Informational/Organizational
                                                                                                » Adobe InDesign             & Licensing                     »                                   Graphics




                W
                                                                                                                                                                 Management Plans
                            e produce a large volume of documents, presentations, and           » Adobe Photoshop        »   CD-ROM Creation/                »   Operation & Maintenance
                                                                                                                                                                                             »   Banners/Tradeshow Graphics

                            proposals for all of Earth Tech, including groups not based         » Adobe Illustrator          Archiving                           (O&M) Manuals               »   Catalogs
                                                                                                » Quark                  »   Document Production             »   Quality Assurance Plans     »   Direct Mailers
                            in the Richmond office. Multiple projects are underway                                       »
                                                                                                » Dreamweaver                Marketing Support               »   Site Characterization       »   Proposal Graphics
                            simultaneously. With this in mind, please allow plenty of lead                                   (Proposals/SOQs/                                                    (figures, charts, tables)
                                                                                                » Flash                      Presentations)
                                                                                                                                                                 Reports (SCRs)
                                                                                                                                                                                             »
                time when submitting work. Even
                                                                                                                         »                                   »   Spill Prevention, Control       Custom Graphics
                if you are not in a position to submit
                                                                                                                             File Transfer (Intranet, FTP,       & Countermeasures Plans     »   Brochures
                your document, it is helpful to inform    COMMUNICATION                                                  »
                                                                                                                             E-mail)                             (SPCCs)
                                                                                                                                                                                             »   Information Packets
                                                                                                                             Internet Research               »
                the Publications staff of pending         is the key                                                     »   Color Printing
                                                                                                                                                                 Site Assessments and
                                                                                                                                                                 Closure Reports
                                                                                                                                                                                                 for Public Relations

                projects, especially those that are                                                                      »   Corporate                       »   Training Manuals (various
                                                                                                                             Communications Liaison              types)
                likely to require special services (e.g., oversized color copies, significant
                amount of straight typing, etc.). Communication is the key component
                                                                                                                                                             »   Water/Wastewater Facility
                                                                                                                                                                 Program
                in getting a document scheduled and successfully completed on time.                                                                          »   Work Plans
                                                                                                                                                             »   Proposals
                If you need assistance before or after normal working hours, arrangements                                                                    »   Statement of
                                                                                                                                                                 Qualifications (SOQs)
                must be made with the Publications Manager. Generally, we can accommodate
                such needs when provided with sufficient notice. The key is scheduling; the
                                                                                                                                                             »   254s/255s/330s
                                                                                                                                                             »   Facility Response Plans
                sooner you can schedule “special requests” with the Publications Manager,                                                                        (FRP)
                the better.
WHO we are




                                        S                                                                           M
                                               tephen Daley has a B.A. in History from The University of Mary                ary Ruffin has an M.A. in English from Virginia Commonwealth
                                               Washington and more than 12 years of publishing/research/                     University and more than 20 years of writing and editing
                                               graphic design experience. He oversees a department that                      experience, including legal proofreading and trade
                                               designs and produces high-quality plans, documentation,                       journal publishing. She has served as Editor for technical
                                        proposals, and covers. As department manager, Stephen works                 communications such as environmental and engineering reports,
                                        closely with project managers, department managers, and division            work plans, management plans,
                                        managers to finalize project presentations and documentation.               health   and   safety    plans,     and          PUBLICATIONS
                                                                                                                    operations and maintenance manuals
                                        Stephen has been involved in an eclectic                                    since joining Earth Tech in 1994.                       editor
STEPHEN daley                           variety of projects ranging from being
                                        a representative/creative consultant
                                                                                PUBLICATIONS                        During the editing process, Mary works closely with the authors (project
                                                                                                                                                                                                     MARY ruffin
Publications Manager/                   on a SixSigma project for our parent    manager                             managers, engineers, and scientists) to develop a clear understanding of
                                                                                                                                                                                                     Publications Editor
                                                                                                                                                                                                     Richmond, Virginia
Creative Services (East) Manager
Richmond, Virginia                      company to working with one of                                              the document’s required content and intended use. She then reviews the
                                        Earth Tech’s first extranet projects. Other projects have included SH&E     document for grammar, clarity, and style and makes recommendations to            Phone :: 804.515.8359
Phone :: 804.515.8358                                                                                                                                                                                Fax ::    804.515.8307
Fax ::    804.515.8307
                                        programs, tradeshow support, newsletters, public hearing support, and       improve readibility and quality when necessary. Mary regularly interfaces with   E-mail :: mary.ruffin@earthtech.com
E-mail :: stephen.daley@earthtech.com   creative consultation on numerous proposals and initiatives. Stephen also   other Publications staff to handle document production, including assembly,
                                        serves as the director of the Corporate Fulfillment/Branded Merchandise     printing, and binding for multi-volume deliverables. Currently, she is seeking
                                        Program known as TEAM GEAR.                                                 to establish a working relationship with Earth Tech’s new Quality Director.
A                                                                                     S
                                                  drienne Culler has a B.A. in English from The University of Mary                     ara Daugherity has been a member of support staff in the
                                                  Washington and more than 6 years of experience in graphic design.                    Publications Department for 2 years. She has a B.A. in
                                                  She supports the Publications and Marketing Departments in the                       Journalism from Evangel University. She works as a Publications
                                                  production of proposals, reports, manuals, and presentations.                        Assistant for the Richmond office. She organizes and implements
                                          Using Photoshop, Illustrator, and InDesign she designs covers, JV                     production of various projects, often simultaneously. Her skills include
                                          logos, and other custom graphics for proposals, SOQs, and brochures.                  formatting reports, tables, charts,

                                          Adrienne works with Corporate
                                                                                                                                and photodocumentation, as well as
                                                                                                                                internet research and proposal support.
                                                                                                                                                                              PUBLICATIONS
                                          Communications to design and ensure            GRAPHIC                                                                                   assistant
ADRIENNE culler                           quality control of regional advertising and
                                          marketing materials. She designs the TEAM
                                                                                         designer                               In addition to her production and word
                                                                                                                                processing duties, Sara manages the work flow from the Richmond staff
                                                                                                                                                                                                           SARA daugherity
Graphic Designer                          GEAR catalog as well as some of its merchandise and works as a special liaison        (i.e., schedules time for tasks, communicates with PMs, etc.).             Publications Assistant
Alexandria, Virginia                                                                                                                                                                                       Richmond, Virginia
                                          for special orders. She is also responsible for CD-ROM creation and copying;
Phone :: 703.706.0146                     photo research and licensing; scanning; retouching; and when necessary, field                                                                                    Phone :: 804.515.8360
Fax ::    703.549.9134                                                                                                                                                                                     Fax ::    804.515.8307
E-mail :: adrienne.culler@earthtech.com   photography. She is available to save and/or convert documents and graphics into                                                                                 E-mail :: sara.daugherity@earthtech.com
                                          different file formats. When necessary, she falls back on her degree in English and
                                          assists with editing, proofreading, and rewrites for style and grammar. She’s also
                                          trained in Web design including HTML coding, Dreamweaver, and Flash.
A BETTER TOMORROW
made possible

Publications Brochure

  • 1.
    Form and functionshould be one, joined in a spiritual union. Frank Lloyd Wright A BETTER TOMORROW made possible Publications Department/ Creative Services (EAST)
  • 2.
    OUR SERVICES areavailable to any office nationwide E arth Tech’s Capital District Publications/Creative Services Department, located in Richmond and Alexandria, actively supports all locally managed projects, whether contract work or marketing/business development. As a support services department, Richmond Publications/Creative Services manages administrative (documentation) work flow; schedules and carries out word processing/formatting, editing, and graphic support; provides administrative QA/QC services; and handles document production, copying, color copying, and binding. Additional services include photographic scanning, CD-ROM creation/copying, document transfer via Internet, Internet research, graphic design/layout, and creative services. These services are also available to all other Earth Tech offices worldwide. Publications Creative Services The Publications Department supports all The Creative Services Department supports all graphic documentation that is produced in the Richmond office, design projects including: presentations, handouts, from letter correspondence and report development brochures, marketing material, cover design, project to multi-volume production projects. The department graphic design, invitations, and tradeshow support. handles all color copying/printing as well as binding They also direct Earth Tech’s Corporate Branded (GBC/spiral and 3-ring) and production. Regular Merchandise Program, TEAM GEAR. work flow can include 5-10 concurrent jobs requiring graphic design/layout, word processing, editing, QA/QC, proofreading, peer review, technical review, multiple A BETTER DOCUMENT copies, multiple volumes, color copies, and binding. made possible The Richmond-Publications Style Guide is available upon request through the Publications Manager.
  • 3.
    HOW we canhelp you SOFTWARE PROJECT SUPPORT DOCUMENTATION GRAPHIC DESIGN » Microsoft Word » Word Processing » Correspondence » Presentations » Microsoft Excel » Editing (Style/Grammar) » Environmental » Marketing Materials » Microsoft PowerPoint & Proofreading Management Services » Handouts » Microsoft Access » Graphic Design; Cover Program » Covers Creation; Creative » Environmental Site » Microsoft Project Services; Print Production Assessments » CD Graphics » Adobe Acrobat » Photo Scanning; Research » SH&E Documentation » Informational/Organizational » Adobe InDesign & Licensing » Graphics W Management Plans e produce a large volume of documents, presentations, and » Adobe Photoshop » CD-ROM Creation/ » Operation & Maintenance » Banners/Tradeshow Graphics proposals for all of Earth Tech, including groups not based » Adobe Illustrator Archiving (O&M) Manuals » Catalogs » Quark » Document Production » Quality Assurance Plans » Direct Mailers in the Richmond office. Multiple projects are underway » » Dreamweaver Marketing Support » Site Characterization » Proposal Graphics simultaneously. With this in mind, please allow plenty of lead (Proposals/SOQs/ (figures, charts, tables) » Flash Presentations) Reports (SCRs) » time when submitting work. Even » » Spill Prevention, Control Custom Graphics if you are not in a position to submit File Transfer (Intranet, FTP, & Countermeasures Plans » Brochures your document, it is helpful to inform COMMUNICATION » E-mail) (SPCCs) » Information Packets Internet Research » the Publications staff of pending is the key » Color Printing Site Assessments and Closure Reports for Public Relations projects, especially those that are » Corporate » Training Manuals (various Communications Liaison types) likely to require special services (e.g., oversized color copies, significant amount of straight typing, etc.). Communication is the key component » Water/Wastewater Facility Program in getting a document scheduled and successfully completed on time. » Work Plans » Proposals If you need assistance before or after normal working hours, arrangements » Statement of Qualifications (SOQs) must be made with the Publications Manager. Generally, we can accommodate such needs when provided with sufficient notice. The key is scheduling; the » 254s/255s/330s » Facility Response Plans sooner you can schedule “special requests” with the Publications Manager, (FRP) the better.
  • 4.
    WHO we are S M tephen Daley has a B.A. in History from The University of Mary ary Ruffin has an M.A. in English from Virginia Commonwealth Washington and more than 12 years of publishing/research/ University and more than 20 years of writing and editing graphic design experience. He oversees a department that experience, including legal proofreading and trade designs and produces high-quality plans, documentation, journal publishing. She has served as Editor for technical proposals, and covers. As department manager, Stephen works communications such as environmental and engineering reports, closely with project managers, department managers, and division work plans, management plans, managers to finalize project presentations and documentation. health and safety plans, and PUBLICATIONS operations and maintenance manuals Stephen has been involved in an eclectic since joining Earth Tech in 1994. editor STEPHEN daley variety of projects ranging from being a representative/creative consultant PUBLICATIONS During the editing process, Mary works closely with the authors (project MARY ruffin Publications Manager/ on a SixSigma project for our parent manager managers, engineers, and scientists) to develop a clear understanding of Publications Editor Richmond, Virginia Creative Services (East) Manager Richmond, Virginia company to working with one of the document’s required content and intended use. She then reviews the Earth Tech’s first extranet projects. Other projects have included SH&E document for grammar, clarity, and style and makes recommendations to Phone :: 804.515.8359 Phone :: 804.515.8358 Fax :: 804.515.8307 Fax :: 804.515.8307 programs, tradeshow support, newsletters, public hearing support, and improve readibility and quality when necessary. Mary regularly interfaces with E-mail :: mary.ruffin@earthtech.com E-mail :: stephen.daley@earthtech.com creative consultation on numerous proposals and initiatives. Stephen also other Publications staff to handle document production, including assembly, serves as the director of the Corporate Fulfillment/Branded Merchandise printing, and binding for multi-volume deliverables. Currently, she is seeking Program known as TEAM GEAR. to establish a working relationship with Earth Tech’s new Quality Director.
  • 5.
    A S drienne Culler has a B.A. in English from The University of Mary ara Daugherity has been a member of support staff in the Washington and more than 6 years of experience in graphic design. Publications Department for 2 years. She has a B.A. in She supports the Publications and Marketing Departments in the Journalism from Evangel University. She works as a Publications production of proposals, reports, manuals, and presentations. Assistant for the Richmond office. She organizes and implements Using Photoshop, Illustrator, and InDesign she designs covers, JV production of various projects, often simultaneously. Her skills include logos, and other custom graphics for proposals, SOQs, and brochures. formatting reports, tables, charts, Adrienne works with Corporate and photodocumentation, as well as internet research and proposal support. PUBLICATIONS Communications to design and ensure GRAPHIC assistant ADRIENNE culler quality control of regional advertising and marketing materials. She designs the TEAM designer In addition to her production and word processing duties, Sara manages the work flow from the Richmond staff SARA daugherity Graphic Designer GEAR catalog as well as some of its merchandise and works as a special liaison (i.e., schedules time for tasks, communicates with PMs, etc.). Publications Assistant Alexandria, Virginia Richmond, Virginia for special orders. She is also responsible for CD-ROM creation and copying; Phone :: 703.706.0146 photo research and licensing; scanning; retouching; and when necessary, field Phone :: 804.515.8360 Fax :: 703.549.9134 Fax :: 804.515.8307 E-mail :: adrienne.culler@earthtech.com photography. She is available to save and/or convert documents and graphics into E-mail :: sara.daugherity@earthtech.com different file formats. When necessary, she falls back on her degree in English and assists with editing, proofreading, and rewrites for style and grammar. She’s also trained in Web design including HTML coding, Dreamweaver, and Flash.
  • 6.