The Central Ground Water Authority (CGWA) has issued new guidelines mandating the installation of digital water flow meters with telemetry on all groundwater extraction structures. All project proponents seeking or having a No Objection Certificate from CGWA must install tamper-proof digital water flow meters. This includes micro and small enterprises extracting less than 10 cubic meters per day. Non-compliance will be considered illegal groundwater extraction and will result in penalties or cancellation of the No Objection Certificate. The new rules aim to regulate and control groundwater development across India in accordance with CGWA's powers and previous notifications.
The twenty first webinar of Indian Association of Amusement Parks & Industries was a grand success.
The webinar was well attended by our members from all across the country.
We thank Mr. D Chakraborty – Sr. Scientist (Former), Central Ground Water Authority, Ministry of Jal Shakti, Govt. of India for the knowledgeable and excellent presentation.
Incorporated in the year 1999, IAAPI is India's Apex Body representing the Amusement, Leisure & Recreation Industry in India.
Topic: Law / NOC on Ground Water Utilization
Presenter: Mr. D Chakraborty – Sr. Scientist (Former), Central Ground Water Authority, Ministry of Jal Shakti, Govt. of India
Date & Time: 30/November/2020 1600-1750pm IST
YouTube: https://youtu.be/dnzpKYepgIo
IAAPI Website: www.iaapi.org
IAAPI Facebook: https://www.facebook.com/IAAPIHq/
IAAPI Twitter: https://twitter.com/IAAPI_HQ
IAAPI LinkedIn: https://www.linkedin.com/in/iaapi-hq/
PA DEP Policy for the Replacement or Restoration of Private Water Supplies Im...Marcellus Drilling News
Guidance document from the Pennsylvania Dept. of Environmental Protection for complying with new shale drilling laws. This document helps drillers comply with replacing or restoring private water wells following damage from shale drilling
Government of India, Ministry of Jal Shakti has updated that the due date for submission of applications for grant of 'No Objection Certificate' (NOC) for Ground Water withdrawal through the NOCAP portal of CGWA is hereby extended up to 31.03.2020.
For More Updates, Sign Up: https://lexbuddy.com/login.php
Follow Us: http://linkedin.com/company/lexcomply
LexComply - Compliance Management Software India
Comparison between water production proposals (CPE report summary)
1. Rehabilitation of old Lawaan WTP
2. Construction of new WTP
3. Bulk Water contract
Constraints:
1. Financial
2. Environmental
3. Time Savings
The twenty first webinar of Indian Association of Amusement Parks & Industries was a grand success.
The webinar was well attended by our members from all across the country.
We thank Mr. D Chakraborty – Sr. Scientist (Former), Central Ground Water Authority, Ministry of Jal Shakti, Govt. of India for the knowledgeable and excellent presentation.
Incorporated in the year 1999, IAAPI is India's Apex Body representing the Amusement, Leisure & Recreation Industry in India.
Topic: Law / NOC on Ground Water Utilization
Presenter: Mr. D Chakraborty – Sr. Scientist (Former), Central Ground Water Authority, Ministry of Jal Shakti, Govt. of India
Date & Time: 30/November/2020 1600-1750pm IST
YouTube: https://youtu.be/dnzpKYepgIo
IAAPI Website: www.iaapi.org
IAAPI Facebook: https://www.facebook.com/IAAPIHq/
IAAPI Twitter: https://twitter.com/IAAPI_HQ
IAAPI LinkedIn: https://www.linkedin.com/in/iaapi-hq/
PA DEP Policy for the Replacement or Restoration of Private Water Supplies Im...Marcellus Drilling News
Guidance document from the Pennsylvania Dept. of Environmental Protection for complying with new shale drilling laws. This document helps drillers comply with replacing or restoring private water wells following damage from shale drilling
Government of India, Ministry of Jal Shakti has updated that the due date for submission of applications for grant of 'No Objection Certificate' (NOC) for Ground Water withdrawal through the NOCAP portal of CGWA is hereby extended up to 31.03.2020.
For More Updates, Sign Up: https://lexbuddy.com/login.php
Follow Us: http://linkedin.com/company/lexcomply
LexComply - Compliance Management Software India
Comparison between water production proposals (CPE report summary)
1. Rehabilitation of old Lawaan WTP
2. Construction of new WTP
3. Bulk Water contract
Constraints:
1. Financial
2. Environmental
3. Time Savings
New Construction Stormwater Regulation in MinnesotaDan Schleck
Attorney Dan Schleck makes a presentation to the Builders Association of the Twin Cities (BATC) on new construction stormwater permitting and regulation in Minnesota
Old vs new CGWA guidelines comparison 2020Nikesh Banwade
THE presentation comprises of COMPARISON OF OLD GUIDELINES (2015), NOTIFIED GUIDELINES(2018) and REVISED GUIDELINES September 2020. Procedure for ground water NOC, Guidelines, Ground Water Withdrawal and compensation charges
CHANGES IN CUSTOMS BY UNION BUDGET 2017-18
From indirect tax perspective, Budget 2017-18 came with no major changes in Excise and Service tax as stated by FM Arun Jaitley in his budget speech. The changes made in Customs were of significant importance as Customs duties other than BCD (CVD, SAD etc.) shall not subsume in GST law and will continue to be levied even after GST which is now expected to come from 1 July, 2017.
Changes in Customs are explained in this sheet in two parts-Tariff and others.
Includes PEV best practices from various cities and states from Canada, the US and California. Also includes the results of the PEV readiness survey given to regional municipal staff.
Taxguru.in gst compliance calendar oct 21 important legal developmentstaxguru4
The refund under section 77 of CGST Act! Section 19 of IGST Act, 2017 can be claimed
before the expiry of two years from the date of payment of tax under the correct head, i.e. integrated tax paid in respect of subsequently held inter-State supply, or central and state tax in respect of subsequently held intra-State supply, as the case may be..
Read more athttps://taxguru.in/goods-and-service-tax/gst-compliance-calendar-oct-21-important-legal-developments.html
Digital Survey Kerala SOP - Standards Operational procedures - Uploaded by James Adhikaram land problem Solvers Kottayam 9447464502. Please like the presentation before download .The massive digital survey as part of the ‘Ente Bhoomi’ programme will begin in the state on November 1. The first phase will cover 200 revenue villages across all 14 districts. Ahead of the survey, people of these villages have been asked to cross-check details of their land available on the Ente Bhoomi portal www.entebhoomi.kerala.gov.in.
The 200 villages have been listed on the portal. Owners can register with the website and enter their survey number and sub-division number to view details. If details of one’s land are not available on the portal or in case of mistakes, a complaint can be raised through the portal itself. Copies of supporting documents should also be uploaded.
“The government is making a comprehensive database integrating the land-related data with the revenue, registration and survey departments. Before the new survey, people should ensure that their land details on the portal are error-free. They should also cooperate with the surveying officers. When finalised, the new survey map will become the authentic record of one’s land parcel,” said an officer in the survey department.
The survey will be launched by Chief Minister Pinarayi Vijayan on November 1. Survey Sabhas or ward-level meetings to educate people on the new survey are being conducted in the selected villages. The time of the survey will be intimated through various channels, local-level public meetings and notification through different media. Owners have to be present at the spot with the registration deed and Aadhaar card. NRKs or others who cannot be present can assign proxies.
Bushes and shrubs on the land borders should be cleared before the survey officers’ visit. Boundaries should be marked. It will be better to settle petty border disputes before the survey. Or else, the land holdings under dispute will be shown as a single unit on the new map until the issue is settled. The officers will show the draft map on their tab in case of doubts. The draft will later be made available on the Ente Bhoomi portal for corrections.
Public buildings to be marked
The government land will also be surveyed and public buildings will be marked. Topographical details like roads, canals, streams, ponds and backwaters will also be mapped. The final product will be a GIS database which will help in the total digitisation of land transfers and records maintained by survey, registration and revenue departments. It will also help in disaster management activities.
The new survey will cover 1,550 of the total 1,666 villages in Kerala in four years. Excluded are 95 villages where the digital resurvey was completed earlier and 21 where it is going on.
The largest tender by Solar Energy Corporation of India for Floating Solar for 150 MW is up for bidding.
The document is a summary of the tender document and covers the commercial & technical guidelines provided in the tender.
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
New Construction Stormwater Regulation in MinnesotaDan Schleck
Attorney Dan Schleck makes a presentation to the Builders Association of the Twin Cities (BATC) on new construction stormwater permitting and regulation in Minnesota
Old vs new CGWA guidelines comparison 2020Nikesh Banwade
THE presentation comprises of COMPARISON OF OLD GUIDELINES (2015), NOTIFIED GUIDELINES(2018) and REVISED GUIDELINES September 2020. Procedure for ground water NOC, Guidelines, Ground Water Withdrawal and compensation charges
CHANGES IN CUSTOMS BY UNION BUDGET 2017-18
From indirect tax perspective, Budget 2017-18 came with no major changes in Excise and Service tax as stated by FM Arun Jaitley in his budget speech. The changes made in Customs were of significant importance as Customs duties other than BCD (CVD, SAD etc.) shall not subsume in GST law and will continue to be levied even after GST which is now expected to come from 1 July, 2017.
Changes in Customs are explained in this sheet in two parts-Tariff and others.
Includes PEV best practices from various cities and states from Canada, the US and California. Also includes the results of the PEV readiness survey given to regional municipal staff.
Taxguru.in gst compliance calendar oct 21 important legal developmentstaxguru4
The refund under section 77 of CGST Act! Section 19 of IGST Act, 2017 can be claimed
before the expiry of two years from the date of payment of tax under the correct head, i.e. integrated tax paid in respect of subsequently held inter-State supply, or central and state tax in respect of subsequently held intra-State supply, as the case may be..
Read more athttps://taxguru.in/goods-and-service-tax/gst-compliance-calendar-oct-21-important-legal-developments.html
Digital Survey Kerala SOP - Standards Operational procedures - Uploaded by James Adhikaram land problem Solvers Kottayam 9447464502. Please like the presentation before download .The massive digital survey as part of the ‘Ente Bhoomi’ programme will begin in the state on November 1. The first phase will cover 200 revenue villages across all 14 districts. Ahead of the survey, people of these villages have been asked to cross-check details of their land available on the Ente Bhoomi portal www.entebhoomi.kerala.gov.in.
The 200 villages have been listed on the portal. Owners can register with the website and enter their survey number and sub-division number to view details. If details of one’s land are not available on the portal or in case of mistakes, a complaint can be raised through the portal itself. Copies of supporting documents should also be uploaded.
“The government is making a comprehensive database integrating the land-related data with the revenue, registration and survey departments. Before the new survey, people should ensure that their land details on the portal are error-free. They should also cooperate with the surveying officers. When finalised, the new survey map will become the authentic record of one’s land parcel,” said an officer in the survey department.
The survey will be launched by Chief Minister Pinarayi Vijayan on November 1. Survey Sabhas or ward-level meetings to educate people on the new survey are being conducted in the selected villages. The time of the survey will be intimated through various channels, local-level public meetings and notification through different media. Owners have to be present at the spot with the registration deed and Aadhaar card. NRKs or others who cannot be present can assign proxies.
Bushes and shrubs on the land borders should be cleared before the survey officers’ visit. Boundaries should be marked. It will be better to settle petty border disputes before the survey. Or else, the land holdings under dispute will be shown as a single unit on the new map until the issue is settled. The officers will show the draft map on their tab in case of doubts. The draft will later be made available on the Ente Bhoomi portal for corrections.
Public buildings to be marked
The government land will also be surveyed and public buildings will be marked. Topographical details like roads, canals, streams, ponds and backwaters will also be mapped. The final product will be a GIS database which will help in the total digitisation of land transfers and records maintained by survey, registration and revenue departments. It will also help in disaster management activities.
The new survey will cover 1,550 of the total 1,666 villages in Kerala in four years. Excluded are 95 villages where the digital resurvey was completed earlier and 21 where it is going on.
The largest tender by Solar Energy Corporation of India for Floating Solar for 150 MW is up for bidding.
The document is a summary of the tender document and covers the commercial & technical guidelines provided in the tender.
Similar to Public notice digital water flow meter (20)
Business Valuation Principles for EntrepreneursBen Wann
This insightful presentation is designed to equip entrepreneurs with the essential knowledge and tools needed to accurately value their businesses. Understanding business valuation is crucial for making informed decisions, whether you're seeking investment, planning to sell, or simply want to gauge your company's worth.
What are the main advantages of using HR recruiter services.pdfHumanResourceDimensi1
HR recruiter services offer top talents to companies according to their specific needs. They handle all recruitment tasks from job posting to onboarding and help companies concentrate on their business growth. With their expertise and years of experience, they streamline the hiring process and save time and resources for the company.
"𝑩𝑬𝑮𝑼𝑵 𝑾𝑰𝑻𝑯 𝑻𝑱 𝑰𝑺 𝑯𝑨𝑳𝑭 𝑫𝑶𝑵𝑬"
𝐓𝐉 𝐂𝐨𝐦𝐬 (𝐓𝐉 𝐂𝐨𝐦𝐦𝐮𝐧𝐢𝐜𝐚𝐭𝐢𝐨𝐧𝐬) is a professional event agency that includes experts in the event-organizing market in Vietnam, Korea, and ASEAN countries. We provide unlimited types of events from Music concerts, Fan meetings, and Culture festivals to Corporate events, Internal company events, Golf tournaments, MICE events, and Exhibitions.
𝐓𝐉 𝐂𝐨𝐦𝐬 provides unlimited package services including such as Event organizing, Event planning, Event production, Manpower, PR marketing, Design 2D/3D, VIP protocols, Interpreter agency, etc.
Sports events - Golf competitions/billiards competitions/company sports events: dynamic and challenging
⭐ 𝐅𝐞𝐚𝐭𝐮𝐫𝐞𝐝 𝐩𝐫𝐨𝐣𝐞𝐜𝐭𝐬:
➢ 2024 BAEKHYUN [Lonsdaleite] IN HO CHI MINH
➢ SUPER JUNIOR-L.S.S. THE SHOW : Th3ee Guys in HO CHI MINH
➢FreenBecky 1st Fan Meeting in Vietnam
➢CHILDREN ART EXHIBITION 2024: BEYOND BARRIERS
➢ WOW K-Music Festival 2023
➢ Winner [CROSS] Tour in HCM
➢ Super Show 9 in HCM with Super Junior
➢ HCMC - Gyeongsangbuk-do Culture and Tourism Festival
➢ Korean Vietnam Partnership - Fair with LG
➢ Korean President visits Samsung Electronics R&D Center
➢ Vietnam Food Expo with Lotte Wellfood
"𝐄𝐯𝐞𝐫𝐲 𝐞𝐯𝐞𝐧𝐭 𝐢𝐬 𝐚 𝐬𝐭𝐨𝐫𝐲, 𝐚 𝐬𝐩𝐞𝐜𝐢𝐚𝐥 𝐣𝐨𝐮𝐫𝐧𝐞𝐲. 𝐖𝐞 𝐚𝐥𝐰𝐚𝐲𝐬 𝐛𝐞𝐥𝐢𝐞𝐯𝐞 𝐭𝐡𝐚𝐭 𝐬𝐡𝐨𝐫𝐭𝐥𝐲 𝐲𝐨𝐮 𝐰𝐢𝐥𝐥 𝐛𝐞 𝐚 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐨𝐮𝐫 𝐬𝐭𝐨𝐫𝐢𝐞𝐬."
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraAvirahi City Dholera
The Tata Group, a titan of Indian industry, is making waves with its advanced talks with Taiwanese chipmakers Powerchip Semiconductor Manufacturing Corporation (PSMC) and UMC Group. The goal? Establishing a cutting-edge semiconductor fabrication unit (fab) in Dholera, Gujarat. This isn’t just any project; it’s a potential game changer for India’s chipmaking aspirations and a boon for investors seeking promising residential projects in dholera sir.
Visit : https://www.avirahi.com/blog/tata-group-dials-taiwan-for-its-chipmaking-ambition-in-gujarats-dholera/
Buy Verified PayPal Account | Buy Google 5 Star Reviewsusawebmarket
Buy Verified PayPal Account
Looking to buy verified PayPal accounts? Discover 7 expert tips for safely purchasing a verified PayPal account in 2024. Ensure security and reliability for your transactions.
PayPal Services Features-
🟢 Email Access
🟢 Bank Added
🟢 Card Verified
🟢 Full SSN Provided
🟢 Phone Number Access
🟢 Driving License Copy
🟢 Fasted Delivery
Client Satisfaction is Our First priority. Our services is very appropriate to buy. We assume that the first-rate way to purchase our offerings is to order on the website. If you have any worry in our cooperation usually You can order us on Skype or Telegram.
24/7 Hours Reply/Please Contact
usawebmarketEmail: support@usawebmarket.com
Skype: usawebmarket
Telegram: @usawebmarket
WhatsApp: +1(218) 203-5951
USA WEB MARKET is the Best Verified PayPal, Payoneer, Cash App, Skrill, Neteller, Stripe Account and SEO, SMM Service provider.100%Satisfection granted.100% replacement Granted.
Digital Transformation and IT Strategy Toolkit and TemplatesAurelien Domont, MBA
This Digital Transformation and IT Strategy Toolkit was created by ex-McKinsey, Deloitte and BCG Management Consultants, after more than 5,000 hours of work. It is considered the world's best & most comprehensive Digital Transformation and IT Strategy Toolkit. It includes all the Frameworks, Best Practices & Templates required to successfully undertake the Digital Transformation of your organization and define a robust IT Strategy.
Editable Toolkit to help you reuse our content: 700 Powerpoint slides | 35 Excel sheets | 84 minutes of Video training
This PowerPoint presentation is only a small preview of our Toolkits. For more details, visit www.domontconsulting.com
3.0 Project 2_ Developing My Brand Identity Kit.pptxtanyjahb
A personal brand exploration presentation summarizes an individual's unique qualities and goals, covering strengths, values, passions, and target audience. It helps individuals understand what makes them stand out, their desired image, and how they aim to achieve it.
Putting the SPARK into Virtual Training.pptxCynthia Clay
This 60-minute webinar, sponsored by Adobe, was delivered for the Training Mag Network. It explored the five elements of SPARK: Storytelling, Purpose, Action, Relationships, and Kudos. Knowing how to tell a well-structured story is key to building long-term memory. Stating a clear purpose that doesn't take away from the discovery learning process is critical. Ensuring that people move from theory to practical application is imperative. Creating strong social learning is the key to commitment and engagement. Validating and affirming participants' comments is the way to create a positive learning environment.
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...BBPMedia1
Marvin neemt je in deze presentatie mee in de voordelen van non-endemic advertising op retail media netwerken. Hij brengt ook de uitdagingen in beeld die de markt op dit moment heeft op het gebied van retail media voor niet-leveranciers.
Retail media wordt gezien als het nieuwe advertising-medium en ook mediabureaus richten massaal retail media-afdelingen op. Merken die niet in de betreffende winkel liggen staan ook nog niet in de rij om op de retail media netwerken te adverteren. Marvin belicht de uitdagingen die er zijn om echt aansluiting te vinden op die markt van non-endemic advertising.
What is the TDS Return Filing Due Date for FY 2024-25.pdfseoforlegalpillers
It is crucial for the taxpayers to understand about the TDS Return Filing Due Date, so that they can fulfill your TDS obligations efficiently. Taxpayers can avoid penalties by sticking to the deadlines and by accurate filing of TDS. Timely filing of TDS will make sure about the availability of tax credits. You can also seek the professional guidance of experts like Legal Pillers for timely filing of the TDS Return.
1. Government of India
Ministry of Jal Shakti
Department of Water Resources, River Development & Ganga Rejuvenation
Central Ground Water Authority
PUBLIC NOTICE
New Delhi, Dated 08.01.2021
Sub: Installation of Digital Water Flow Meter on Ground water abstraction structures
- reg.
Whereas the Central Government constituted the Central Ground Water Authority
(hereinafter referred to as the Authority) vide notification Number S.O. 38(E), dated 14th
January, 1997, followed by notification number S.O. 1124(E) dated 6th November, 2000
and S.O. 1121 (E) dated 13th May, 2010 of the Government of India in the Ministry of
Environment & Forests, for the purposes of regulation and control of ground water
development and management in the whole of India and to issue necessary regulatory
directions.
And whereas the Authority has issued ‘Guidelines to control and regulate ground water
extraction in India’ vide notification number 3289(E) dated 24th September, 2020, wherein
under Section 9 (i) “Installation of digital water flow meter (conforming to BIS/ IS standards)
having telemetry system in the abstraction structure(s) shall be mandatory for all users
seeking No Objection Certificate and intimation regarding their installation shall be
communicated to the CGWA within 30 days of grant of No Objection Certificate through the
web-portal.”
THIS IS TO BRING TO THE NOTICE OF ALL GROUND WATER USERS THAT:
All the project proponents/users drawing ground water and seeking/having NOC
shall have to mandatorily install tamper-proof digital water flow meters with telemetry
on all the ground water abstraction structures within their premises.
All the Micro and Small Enterprises drawing less than 10 cum/day shall also be
mandatorily required to install digital water flow meters on all the ground water
abstraction structures within their premises. Such enterprises shall be subjected to
randomised inspections.
2. The afore-mentioned conditions need to be strictly followed by all the users and any
ground water withdrawal without the installation of tamper-proof digital water
flow meters and telemetry (wherever applicable) shall be construed as illegal.
Non-compliance of these conditions shall invite a Penalty provision and/or
Environmental Compensation against the proponent for illegal withdrawal of ground
water as per the CGWA Guidelines and may result in cancellation/rejection of NOC
and sealing of ground water abstraction structures.
This issues with the approval of Chairman, CGWA.
Member
CGWA