SUMMARY OF ISO9001 AUDIT
CHEMETALL COMPANY
BBT-T-300, 17.06.2015
SUMMARY OF ISO9001 AUDIT
GENERAL VIEW
BBT-T-300,17-06-2015 Page 2
Audit area ISO9001 statistics view
–1 Major Finding
–More than 15 Minor Findings
–Between 5 and 15 Minor Findings
–Less than 5 Minor Findings
Audit Evaluation
1 1
4
1
7.Process & production4.QMS 6.Resource 8.Measurement
FindingFrequency
ISO Items
Requirement
fulfilled Recommendation Finding Finding Deviation
Process critical
deviation
A B C D E F
Process
requirements
fulfilled; continuous
review can be
proven.
Process requirements
fulfilled; Some
improvement
opportunities have been
identified.
Process requirements
fulfilled;
Links, input / output not
completely defined or
some other minor fault.
Process
requirements not
completely fulfilled;
Potential negative
effect on process /
product quality.
Process requirements
not fulfilled;
Measured negative
effect on process /
product quality.
Process requirements not
fulfilled;
Requirements / properties of
the product is not ensured.
2 4 1
A B C D E F
Audit leading by
Participants
Zhu Jiaxin(BBT-543)
1.Masud (BBT-T-300)
2.Hu Jiancheng(BBT-T-31)
3.Gao Guangrui(BBT-732)
4.Wu Xiaolin(BBT-541)
Chemetall Company
SUMMARY OF ISO9001 AUDIT
AUDIT OUTCOMES
BBT-T-300,17-06-2015 Page 3
Status Audit Found Ref. Item 7.5.2 Validation of process for
production
There is a product process flow diagram for every products, and it is easy to get onsite, meanwhile make sure
production to realize, but during the audit, a kind of flow diagram of pretreatment liquid is wrong, and needto
be optimized right now. For flow diagram, the sequence of feeding raw material should be fixed, not wrote on
production sheet by manual or any operator.
Visual view:
Corrective action
taken By:
Zhu Cheng
Chengzhu@chemetall-cn.com
Due Date 30.6.2015
Feeding raw materials not tothe sequence Temp big deviation 0-80°C
F
SUMMARY OF ISO9001 AUDIT
AUDIT OUTCOMES
BBT-T-300,17-06-2015 Page 4
Status Audit Found Ref. Item 4.2.3 Control of the document
According tothe ISO requirements, Organizations must ensure the changes and the current version status
before using it as well as documents remain legible and readily identifiable.
Documents control Procedure CCM/QP-4.2.3-01 is available. During the audit, there are so many documents
found that are out of control. Document are wrote by different departments which is not involved to quality
system & not released by quality department.
Visual view:
Corrective action
taken By:
Feng Qingqing
qingqingfeng@chemetall-cn.com
Due Date 30.6.2015
E
Documents not release by quality side and
don’t have the version status
SUMMARY OF ISO9001 AUDIT
AUDIT OUTCOMES
BBT-T-300,17-06-2015 Page 5
Status Audit Found Ref. Item 7.5.5 Control of the production
According tothe ISO requirement organization shall preserve the product during internal processing and
delivery tothe intended destination in order to maintain conformity to requirement. Preservation shall
included identification,packaging,storage and protection.
For the PT raw materials requirement temp is 10-30⁰C but in the warehouse monitoring of thetemp is not
stable. Only one temp record gauge is available in the warehouse which is don’t have calibration label ,no
hygrometer and records. There are also some power and caustic soda flakes in warehouse, so it is necessary
to control temperature and humidity.
Production finished goods and incoming goods together are storage together without proper identification &
Traceability. Not clearly mentioned the requirement of the max. and minimum stock capacity of product.
Visual view:
Corrective action
taken By:
Zhu Cheng
Chengzhu@chemetall-cn.com
Due Date 30.6.2015
E
Monitoring temp is not stables and humidity
is not in measurement
Product and
incoming good
are not storage
properly
SUMMARY OF ISO9001 AUDIT
AUDIT OUTCOMES
BBT-T-300,17-06-2015 Page 6
Status Audit Found Ref. Item 7.4.1 Purchasing process
According tothe ISO requirement, Organization shall ensure that purchased product conforms to specified
purchase requirements. Supplier and purchased product shall be dependent upon the effect of the
purchased product and shall evaluate and select suppliers based ontheir ability to supply product in
accordance withthe organization requirement.
During the audit for the purchasing process found that phosphoric acid(2J-2/806) is out of safety stock and
don’t evaluated for arrival leading time of raw materials. Monthly basis checking of goods has been
implemented but after checking don’t have the evaluation or action plan for the order of incoming goods.
Corrective action
taken By:
Lu Xueying
xueyinglu@chemetall-cn.com
Due Date 30.6.2015
E
Safety stocks is out of tolerance but no
effective realization
No evaluation results and
action
SUMMARY OF ISO9001 AUDIT
AUDIT OUTCOMES
BBT-T-300,17-06-2015 Page 7
Status Audit Found Ref. Item 8.3 Control of the non-
conforming product
According tothe ISO requirement, Organization shall ensure that product which does not conform to product
requirements is identified and controlled to prevent its unintended use or delivery as well as also mentioned
related responsibilities and authorities for dealing withthe product.
During the audit found that , in warehouse don’t have the specific area and specific process for the control of
the non-conformities and no responsibilities that’s take actionto eliminate the detected non-conformity.
Corrective action
taken By:
Feng Qingqing
qingqingfeng@chemetall-cn.com
Due Date 30.6.2015
E
Status Audit Found Ref. Item 7.5.3 Identification and
traceability
1.Identication and traceability for the products and raw materials was not good and traceability don’t have the
unique format and color which can verified the different condition of the product. Inthe warehouse storage
identification is not control by the any proper system as well as in warehouse no implement of KANBANto
monitor the status of the warehouse .
Corrective action
taken By:
Zhu Cheng
Chengzhu@chemetall-cn.com
Due Date 30.6.2015
D
SUMMARY OF ISO9001 AUDIT
AUDIT OUTCOMES
BBT-T-300,17-06-2015 Page 8
Status Audit Found Ref. Item 6.2 Training & awareness
According tothe ISO requirement, Organization shall determine necessary competence for personal
performing work and evaluate the effectiveness of the actions taken. All records of education,training,skill
should be properly stored and protected.
During the audit found that for the phosphating process dosing sequence has been updated and relevance
activity has been updated but don’t have the proper training evidence relevance tothe process quality
objectives .Don’t mentioned the operator working scope and operator qualification approval as well asthe
operator training plan regarding tothe work needs.
Corrective action
taken By:
Feng Qingqing
qingqingfeng@chemetall-cn.com
Due Date 30.6.2015
D
THANKYOU FORYOUR ATTENTION.
Page 9BBT-T-300,17-06-2015

More Related Content

What's hot

Presentation on ISO 15189 documentation
Presentation on ISO 15189 documentationPresentation on ISO 15189 documentation
Presentation on ISO 15189 documentation
Global Manager Group
 
Guidance on BRC food issue 8 documentation requirements
Guidance on BRC food issue 8 documentation requirementsGuidance on BRC food issue 8 documentation requirements
Guidance on BRC food issue 8 documentation requirements
Global Manager Group
 
ISO/IEC 17025 2017 Check List
ISO/IEC 17025 2017 Check ListISO/IEC 17025 2017 Check List
ISO/IEC 17025 2017 Check List
Mohamed Salama Elimam
 
Audit
AuditAudit
Excipient Auditing
Excipient AuditingExcipient Auditing
Excipient Auditing
John E. Osani
 
Quality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water SystemsQuality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water Systems
Institute of Validation Technology
 
Training BRC Certification
Training BRC CertificationTraining BRC Certification
Training BRC Certification
himu_kamrul
 
Quality Systems Approach to Pharmaceutical cGMP
Quality Systems Approach to Pharmaceutical cGMPQuality Systems Approach to Pharmaceutical cGMP
Quality Systems Approach to Pharmaceutical cGMP
Reddy N
 
Pharmacology
Pharmacology Pharmacology
Pharmacology
Prajakta Shinde
 
Communicating Quality Standards
Communicating Quality StandardsCommunicating Quality Standards
Communicating Quality Standards
dkonrad
 
Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485
WQA APAC
 
GMP-VENDORS SELECTION
GMP-VENDORS SELECTIONGMP-VENDORS SELECTION
GMP-VENDORS SELECTION
Swathi Nambiar
 
Iso 17025 laboratory_documents
Iso 17025 laboratory_documentsIso 17025 laboratory_documents
Iso 17025 laboratory_documents
Prabath De Silva
 
Second Party Audit and External Third Party Audit
Second Party Audit and External Third Party AuditSecond Party Audit and External Third Party Audit
Second Party Audit and External Third Party Audit
ShantanuThakre3
 
An analysis incoming quality control of material in manufacturing company l...
An analysis incoming quality control of material in manufacturing company   l...An analysis incoming quality control of material in manufacturing company   l...
An analysis incoming quality control of material in manufacturing company l...
Steve Sapp
 
Gmp Auditor Training Course
Gmp Auditor   Training CourseGmp Auditor   Training Course
Gmp Auditor Training Course
piyush64173
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceutical
ganpat420
 
Chapter 6
Chapter 6Chapter 6
Chapter 6
Aanchal Khurana
 
BRC manual documents free download
BRC manual documents free downloadBRC manual documents free download
BRC manual documents free download
Global Manager Group
 
GMP Inspection Process: The role of the inspector
GMP Inspection Process: The role of the inspectorGMP Inspection Process: The role of the inspector

What's hot (20)

Presentation on ISO 15189 documentation
Presentation on ISO 15189 documentationPresentation on ISO 15189 documentation
Presentation on ISO 15189 documentation
 
Guidance on BRC food issue 8 documentation requirements
Guidance on BRC food issue 8 documentation requirementsGuidance on BRC food issue 8 documentation requirements
Guidance on BRC food issue 8 documentation requirements
 
ISO/IEC 17025 2017 Check List
ISO/IEC 17025 2017 Check ListISO/IEC 17025 2017 Check List
ISO/IEC 17025 2017 Check List
 
Audit
AuditAudit
Audit
 
Excipient Auditing
Excipient AuditingExcipient Auditing
Excipient Auditing
 
Quality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water SystemsQuality Facilities HVAC and Water Systems
Quality Facilities HVAC and Water Systems
 
Training BRC Certification
Training BRC CertificationTraining BRC Certification
Training BRC Certification
 
Quality Systems Approach to Pharmaceutical cGMP
Quality Systems Approach to Pharmaceutical cGMPQuality Systems Approach to Pharmaceutical cGMP
Quality Systems Approach to Pharmaceutical cGMP
 
Pharmacology
Pharmacology Pharmacology
Pharmacology
 
Communicating Quality Standards
Communicating Quality StandardsCommunicating Quality Standards
Communicating Quality Standards
 
Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485Dokumen wajib dalam iso 13485
Dokumen wajib dalam iso 13485
 
GMP-VENDORS SELECTION
GMP-VENDORS SELECTIONGMP-VENDORS SELECTION
GMP-VENDORS SELECTION
 
Iso 17025 laboratory_documents
Iso 17025 laboratory_documentsIso 17025 laboratory_documents
Iso 17025 laboratory_documents
 
Second Party Audit and External Third Party Audit
Second Party Audit and External Third Party AuditSecond Party Audit and External Third Party Audit
Second Party Audit and External Third Party Audit
 
An analysis incoming quality control of material in manufacturing company l...
An analysis incoming quality control of material in manufacturing company   l...An analysis incoming quality control of material in manufacturing company   l...
An analysis incoming quality control of material in manufacturing company l...
 
Gmp Auditor Training Course
Gmp Auditor   Training CourseGmp Auditor   Training Course
Gmp Auditor Training Course
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceutical
 
Chapter 6
Chapter 6Chapter 6
Chapter 6
 
BRC manual documents free download
BRC manual documents free downloadBRC manual documents free download
BRC manual documents free download
 
GMP Inspection Process: The role of the inspector
GMP Inspection Process: The role of the inspectorGMP Inspection Process: The role of the inspector
GMP Inspection Process: The role of the inspector
 

Similar to PR_Summary of the supplier audit at chemetall company _ 17.05 .017

Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Shashi Kumar
 
Iso Process Audit Training
Iso Process Audit TrainingIso Process Audit Training
Iso Process Audit Training
srmortensen
 
Auditing in QA and Engineering department.pptx
Auditing in QA and Engineering department.pptxAuditing in QA and Engineering department.pptx
Auditing in QA and Engineering department.pptx
NishiLadhawala
 
1st technical dinner meeting
1st technical dinner meeting1st technical dinner meeting
1st technical dinner meeting
fatimah-h
 
Robert
RobertRobert
Robert
Robert Bates
 
Quality audit- Quality audit is the process of systematic examination of a qu...
Quality audit- Quality audit is the process of systematic examination of a qu...Quality audit- Quality audit is the process of systematic examination of a qu...
Quality audit- Quality audit is the process of systematic examination of a qu...
Sanchit Dhankhar
 
Implementation Tracking – Project Part II
Implementation Tracking – Project Part IIImplementation Tracking – Project Part II
Implementation Tracking – Project Part II
Dennis J Morgan
 
Corrective Action_.pptx
Corrective Action_.pptxCorrective Action_.pptx
Corrective Action_.pptx
VasudevanGovindaraj1
 
A7 Audit Checklists
A7 Audit ChecklistsA7 Audit Checklists
A7 Audit Checklists
M.A. MOHIDEEN
 
BSCI SummaryAuditReport
BSCI SummaryAuditReportBSCI SummaryAuditReport
BSCI SummaryAuditReport
CS Silicone Co. Lucy Chen
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safety
manik980318
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
PRANJAY PATIL
 
Qms & iatf presentation1
Qms & iatf presentation1Qms & iatf presentation1
Qms & iatf presentation1
Krishna Kant Pandey
 
Auditing of capsule, sterile production and packaging
Auditing of capsule, sterile production and packaging Auditing of capsule, sterile production and packaging
Auditing of capsule, sterile production and packaging
MittalRohit2
 
Quality audit
Quality auditQuality audit
Quality audit
PradeepDake
 
Lifecycle approach to process validation.pptx
Lifecycle approach to process validation.pptxLifecycle approach to process validation.pptx
Lifecycle approach to process validation.pptx
Neeraj Kumar Rai
 
Stored Biospecimen QC/QA Trends 2015
Stored Biospecimen QC/QA Trends 2015Stored Biospecimen QC/QA Trends 2015
Stored Biospecimen QC/QA Trends 2015
Akshay Kalla
 
ISO 9000 & TQM.pptx
ISO 9000 & TQM.pptxISO 9000 & TQM.pptx
ISO 9000 & TQM.pptx
Praveen Kumar
 
Iso 9001: 2008 Revisions & Changes
Iso 9001: 2008 Revisions & ChangesIso 9001: 2008 Revisions & Changes
Iso 9001: 2008 Revisions & Changes
bkerkstra
 
Quality audit slideshare
Quality audit slideshare Quality audit slideshare
Quality audit slideshare
chaitrali1995
 

Similar to PR_Summary of the supplier audit at chemetall company _ 17.05 .017 (20)

Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
Outcomes of FDA Audit. Brief about how FDA audit was conducted and the observ...
 
Iso Process Audit Training
Iso Process Audit TrainingIso Process Audit Training
Iso Process Audit Training
 
Auditing in QA and Engineering department.pptx
Auditing in QA and Engineering department.pptxAuditing in QA and Engineering department.pptx
Auditing in QA and Engineering department.pptx
 
1st technical dinner meeting
1st technical dinner meeting1st technical dinner meeting
1st technical dinner meeting
 
Robert
RobertRobert
Robert
 
Quality audit- Quality audit is the process of systematic examination of a qu...
Quality audit- Quality audit is the process of systematic examination of a qu...Quality audit- Quality audit is the process of systematic examination of a qu...
Quality audit- Quality audit is the process of systematic examination of a qu...
 
Implementation Tracking – Project Part II
Implementation Tracking – Project Part IIImplementation Tracking – Project Part II
Implementation Tracking – Project Part II
 
Corrective Action_.pptx
Corrective Action_.pptxCorrective Action_.pptx
Corrective Action_.pptx
 
A7 Audit Checklists
A7 Audit ChecklistsA7 Audit Checklists
A7 Audit Checklists
 
BSCI SummaryAuditReport
BSCI SummaryAuditReportBSCI SummaryAuditReport
BSCI SummaryAuditReport
 
Presentation on Occupational Health & Safety
Presentation on Occupational Health & SafetyPresentation on Occupational Health & Safety
Presentation on Occupational Health & Safety
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Qms & iatf presentation1
Qms & iatf presentation1Qms & iatf presentation1
Qms & iatf presentation1
 
Auditing of capsule, sterile production and packaging
Auditing of capsule, sterile production and packaging Auditing of capsule, sterile production and packaging
Auditing of capsule, sterile production and packaging
 
Quality audit
Quality auditQuality audit
Quality audit
 
Lifecycle approach to process validation.pptx
Lifecycle approach to process validation.pptxLifecycle approach to process validation.pptx
Lifecycle approach to process validation.pptx
 
Stored Biospecimen QC/QA Trends 2015
Stored Biospecimen QC/QA Trends 2015Stored Biospecimen QC/QA Trends 2015
Stored Biospecimen QC/QA Trends 2015
 
ISO 9000 & TQM.pptx
ISO 9000 & TQM.pptxISO 9000 & TQM.pptx
ISO 9000 & TQM.pptx
 
Iso 9001: 2008 Revisions & Changes
Iso 9001: 2008 Revisions & ChangesIso 9001: 2008 Revisions & Changes
Iso 9001: 2008 Revisions & Changes
 
Quality audit slideshare
Quality audit slideshare Quality audit slideshare
Quality audit slideshare
 

PR_Summary of the supplier audit at chemetall company _ 17.05 .017

  • 1. SUMMARY OF ISO9001 AUDIT CHEMETALL COMPANY BBT-T-300, 17.06.2015
  • 2. SUMMARY OF ISO9001 AUDIT GENERAL VIEW BBT-T-300,17-06-2015 Page 2 Audit area ISO9001 statistics view –1 Major Finding –More than 15 Minor Findings –Between 5 and 15 Minor Findings –Less than 5 Minor Findings Audit Evaluation 1 1 4 1 7.Process & production4.QMS 6.Resource 8.Measurement FindingFrequency ISO Items Requirement fulfilled Recommendation Finding Finding Deviation Process critical deviation A B C D E F Process requirements fulfilled; continuous review can be proven. Process requirements fulfilled; Some improvement opportunities have been identified. Process requirements fulfilled; Links, input / output not completely defined or some other minor fault. Process requirements not completely fulfilled; Potential negative effect on process / product quality. Process requirements not fulfilled; Measured negative effect on process / product quality. Process requirements not fulfilled; Requirements / properties of the product is not ensured. 2 4 1 A B C D E F Audit leading by Participants Zhu Jiaxin(BBT-543) 1.Masud (BBT-T-300) 2.Hu Jiancheng(BBT-T-31) 3.Gao Guangrui(BBT-732) 4.Wu Xiaolin(BBT-541) Chemetall Company
  • 3. SUMMARY OF ISO9001 AUDIT AUDIT OUTCOMES BBT-T-300,17-06-2015 Page 3 Status Audit Found Ref. Item 7.5.2 Validation of process for production There is a product process flow diagram for every products, and it is easy to get onsite, meanwhile make sure production to realize, but during the audit, a kind of flow diagram of pretreatment liquid is wrong, and needto be optimized right now. For flow diagram, the sequence of feeding raw material should be fixed, not wrote on production sheet by manual or any operator. Visual view: Corrective action taken By: Zhu Cheng Chengzhu@chemetall-cn.com Due Date 30.6.2015 Feeding raw materials not tothe sequence Temp big deviation 0-80°C F
  • 4. SUMMARY OF ISO9001 AUDIT AUDIT OUTCOMES BBT-T-300,17-06-2015 Page 4 Status Audit Found Ref. Item 4.2.3 Control of the document According tothe ISO requirements, Organizations must ensure the changes and the current version status before using it as well as documents remain legible and readily identifiable. Documents control Procedure CCM/QP-4.2.3-01 is available. During the audit, there are so many documents found that are out of control. Document are wrote by different departments which is not involved to quality system & not released by quality department. Visual view: Corrective action taken By: Feng Qingqing qingqingfeng@chemetall-cn.com Due Date 30.6.2015 E Documents not release by quality side and don’t have the version status
  • 5. SUMMARY OF ISO9001 AUDIT AUDIT OUTCOMES BBT-T-300,17-06-2015 Page 5 Status Audit Found Ref. Item 7.5.5 Control of the production According tothe ISO requirement organization shall preserve the product during internal processing and delivery tothe intended destination in order to maintain conformity to requirement. Preservation shall included identification,packaging,storage and protection. For the PT raw materials requirement temp is 10-30⁰C but in the warehouse monitoring of thetemp is not stable. Only one temp record gauge is available in the warehouse which is don’t have calibration label ,no hygrometer and records. There are also some power and caustic soda flakes in warehouse, so it is necessary to control temperature and humidity. Production finished goods and incoming goods together are storage together without proper identification & Traceability. Not clearly mentioned the requirement of the max. and minimum stock capacity of product. Visual view: Corrective action taken By: Zhu Cheng Chengzhu@chemetall-cn.com Due Date 30.6.2015 E Monitoring temp is not stables and humidity is not in measurement Product and incoming good are not storage properly
  • 6. SUMMARY OF ISO9001 AUDIT AUDIT OUTCOMES BBT-T-300,17-06-2015 Page 6 Status Audit Found Ref. Item 7.4.1 Purchasing process According tothe ISO requirement, Organization shall ensure that purchased product conforms to specified purchase requirements. Supplier and purchased product shall be dependent upon the effect of the purchased product and shall evaluate and select suppliers based ontheir ability to supply product in accordance withthe organization requirement. During the audit for the purchasing process found that phosphoric acid(2J-2/806) is out of safety stock and don’t evaluated for arrival leading time of raw materials. Monthly basis checking of goods has been implemented but after checking don’t have the evaluation or action plan for the order of incoming goods. Corrective action taken By: Lu Xueying xueyinglu@chemetall-cn.com Due Date 30.6.2015 E Safety stocks is out of tolerance but no effective realization No evaluation results and action
  • 7. SUMMARY OF ISO9001 AUDIT AUDIT OUTCOMES BBT-T-300,17-06-2015 Page 7 Status Audit Found Ref. Item 8.3 Control of the non- conforming product According tothe ISO requirement, Organization shall ensure that product which does not conform to product requirements is identified and controlled to prevent its unintended use or delivery as well as also mentioned related responsibilities and authorities for dealing withthe product. During the audit found that , in warehouse don’t have the specific area and specific process for the control of the non-conformities and no responsibilities that’s take actionto eliminate the detected non-conformity. Corrective action taken By: Feng Qingqing qingqingfeng@chemetall-cn.com Due Date 30.6.2015 E Status Audit Found Ref. Item 7.5.3 Identification and traceability 1.Identication and traceability for the products and raw materials was not good and traceability don’t have the unique format and color which can verified the different condition of the product. Inthe warehouse storage identification is not control by the any proper system as well as in warehouse no implement of KANBANto monitor the status of the warehouse . Corrective action taken By: Zhu Cheng Chengzhu@chemetall-cn.com Due Date 30.6.2015 D
  • 8. SUMMARY OF ISO9001 AUDIT AUDIT OUTCOMES BBT-T-300,17-06-2015 Page 8 Status Audit Found Ref. Item 6.2 Training & awareness According tothe ISO requirement, Organization shall determine necessary competence for personal performing work and evaluate the effectiveness of the actions taken. All records of education,training,skill should be properly stored and protected. During the audit found that for the phosphating process dosing sequence has been updated and relevance activity has been updated but don’t have the proper training evidence relevance tothe process quality objectives .Don’t mentioned the operator working scope and operator qualification approval as well asthe operator training plan regarding tothe work needs. Corrective action taken By: Feng Qingqing qingqingfeng@chemetall-cn.com Due Date 30.6.2015 D
  • 9. THANKYOU FORYOUR ATTENTION. Page 9BBT-T-300,17-06-2015