PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :02
Sr no
LOCATION
MARKED
LENGTH in
mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE
(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH in
mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE
(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 141 AH 395.98 AB -1 AH -0.01
2 BC 140 CF 395.97 BC 139 CF 395.97 BC 1 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 141 CN 2794 GH -1 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 139 NP 1
4 PQ 140 PQ 141 PQ -1
5 QM 140 QM 140 QM 0
6 MK 140 MK 140 MK 0
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2500 EM 0
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-2 TYPE -1
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations
0
18.59 18.74 18.57 18.74
Checked by:
0
18.59 18.74 18.57
0.02
18.74 0.02
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION FOR CIVIL WORKS
DATE: 19/04/2015
FOUNDATION NO :03
Sr no
LOCATION
MARKED
LENGTH in
mm
Location
Diagonaly
LENGTH in
mm
TOP OF
CONCRETE
(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH in
mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH in
mm
Location
Diagonaly
LENGTH in
mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.97 AB 0 AH 0
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 141 IQ 395.97 AD -1 IQ 0
4 DF 140 KN 395.97 DF 139 KN 395.96 DF 1 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 140 QM 0
6 MK 140 MK 140 MK 0
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2499 DL 1
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2500 EM 0
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-3 TYPE -1
Checked by:
Deviations
18.125 18.275 18.105 18.275
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS
18.125 18.275 18.105 18.275
00.02
0.02 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :04
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH in
mm
Diagonal
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 141 CE -1
1 IL 140 IL 139 IL 1
2 LN 140 LN 141 LN -1
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 140 QM 0
6 MK 140 MK 140 MK 0
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2499 DL 1
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2500 EM 0
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-4 TYPE -1
Checked by:
Deviations
17.547 17.697 17.527 17.697
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS
17.547 17.697 17.527 17.697
00.02
0.02 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :05
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Diagonal
LENGTH in
mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH in
mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 141 AH 395.98 AB -1 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 139 IQ 395.97 AD 1 IQ 0
4 DF 140 KN 395.97 DF 141 KN 395.96 DF -1 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 139 CN 2794 GH 1 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 141 CE -1
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 139 NP 1
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 140 QM 0
6 MK 140 MK 140 MK 0
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2501 DL -1
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2501 BJ -1
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2500 EM 0
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-5 TYPE -1
Checked by:
Deviations
16.968 17.118 16.948 17.118
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS
16.968 17.118 16.958 17.118
00.02
0.01 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :06
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH in
mm
Diagonal
LENGTH in
mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 139 EH 1
8 CE 140 CE 141 CE -1
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 140 QM 0
6 MK 140 MK 139 MK 1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2499 EM 1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-6 TYPE -1
Checked by:
Deviations
16.374 16.524 16.364 16.524
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS
16.374 16.524 16.354 16.524
00.01
0.02 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :07
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH in
mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Diagonal
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 141 QM -1
6 MK 140 MK 139 MK 1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2499 EM 1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-31 TYPE -3
Checked by:
Deviations
15.796 15.946 15.776 15.946
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS
15.796 15.946 15.786 15.946
00.02
0.01 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :08
Sr no
LOCATION
MARKED
LENGTH in
mm
Location
Diagonaly
LENGTH in
mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH in
mm
Diagonal
LENGTH in
mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH in
mm
Location
Diagonaly
LENGTH in
mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 141 EH -1
8 CE 140 CE 139 CE 1
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 140 QM 0
6 MK 140 MK 140 MK 0
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2501 EM -1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-8 TYPE -1
Checked by:
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS
15.218 15.198
15.218 15.198
15.368
15.368
15.368
15.368
0.02
0.02
Deviations
0
0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :10
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Diagonal
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 139 QM 1
6 MK 140 MK 141 MK -1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2501 EM -1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-10 TYPE -1
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations
13.733 13.883 13.633 13.883
Checked by:
0.1 0
13.733 13.883 13.633 13.883 0.1 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :11
SR, NO
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Diagonal
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 141 QM -1
6 MK 140 MK 139 MK 1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2499 EM 1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-11 TYPE -1
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations
13.158 13.308 13.138 13.308
Checked by:
0.02 0
13.158 13.308 13.138 13.308 0.02 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :12
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Diagonal
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 139 EH 1
8 CE 140 CE 141 CE -1
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 140 QM 0
6 MK 140 MK 139 MK 1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2499 EM 1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-12 TYPE -1
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations
12.602 12.752 12.582 12.752
Checked by:
0.02 0
12.602 12.752 12.572 12.752 0.03 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :13
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Diagonal
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 141 QM -1
6 MK 140 MK 139 MK 1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2499 EM 1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-13 TYPE -1
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations
12.035 12.185 12.015 12.185
Checked by:
0.02 0
12.035 12.185 12.025 12.185 0.01 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :14
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH in
mm
Diagonal
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 141 QM -1
6 MK 140 MK 139 MK 1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2499 EM 1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-14TYPE -1
Checked by:
Deviations
0.02 0
0.01 0
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS
11.482 11.632 11.462 11.632
11.482 11.632 11.472 11.632
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOUNDATION NO :15
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Diagonal
LENGTH in
mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 141 QM -1
6 MK 140 MK 139 MK 1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2499 EM 1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-15 TYPE -1
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations
10.915 11.065 10.895 11.065
Checked by:
0.02 0
10.915 11.065 10.895 11.065 0.02 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOOTING NO :16
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH in
mm
Diagonal
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 141 QM -1
6 MK 140 MK 139 MK 1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2499 EM 1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-16 TYPE -1
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations
10.349 10.499 10.329 10.499
Checked by:
0.02 0
10.349 10.499 10.329 10.499 0.02 0
PROJECT NAME: BULK LIQUID STOREGE TERMINAL FACILITY PHASE II
SUBJECT : FINAL INSPECTION SUBMISSION
DATE: 19/04/2015
FOOTING NO :17
Sr no
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRETE(
RL) IN Mtr.
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Diagonal
LENGTH
in mm
TOP OF
CONCRETE
ANCHOR
BOLT TOP
LEVEL
LOCATION
MARKED
LENGTH
in mm
Location
Diagonaly
LENGTH
in mm
TOP OF
CONCRET
E(RL) IN
Mtr.
ANCHOR
BOLT TOP
LEVEL
1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01
2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0
3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0
4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01
5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0
6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0
7 EH 140 EH 140 EH 0
8 CE 140 CE 140 CE 0
1 IL 140 IL 140 IL 0
2 LN 140 LN 140 LN 0
3 NP 140 NP 140 NP 0
4 PQ 140 PQ 140 PQ 0
5 QM 140 QM 141 QM -1
6 MK 140 MK 139 MK 1
7 KJ 140 KJ 140 KJ 0
8 JI 140 JI 140 JI 0
9 AI 2500 AI 2500 AI 0
10 DL 2500 DL 2500 DL 0
11 FN 2500 FN 2500 FN 0
12 BJ 2500 BJ 2500 BJ 0
13 GP 2500 GP 2500 GP 0
14 CK 2500 CK 2500 CK 0
15 EM 2500 EM 2499 EM 1
16 HQ 2500 HQ 2500 HQ 0
Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C :
PR-17 TYPE -1
DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations
9.781 9.931 9.581 9.931
Checked by:
0.2 0
9.781 9.931 9.761 9.931 0.02 0

Protocol for Anchor bolt.xlsx

  • 1.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :02 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE (RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE (RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 141 AH 395.98 AB -1 AH -0.01 2 BC 140 CF 395.97 BC 139 CF 395.97 BC 1 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 141 CN 2794 GH -1 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 139 NP 1 4 PQ 140 PQ 141 PQ -1 5 QM 140 QM 140 QM 0 6 MK 140 MK 140 MK 0 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2500 EM 0 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-2 TYPE -1 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations 0 18.59 18.74 18.57 18.74 Checked by: 0 18.59 18.74 18.57 0.02 18.74 0.02
  • 2.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION FOR CIVIL WORKS DATE: 19/04/2015 FOUNDATION NO :03 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE (RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.97 AB 0 AH 0 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 141 IQ 395.97 AD -1 IQ 0 4 DF 140 KN 395.97 DF 139 KN 395.96 DF 1 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 140 QM 0 6 MK 140 MK 140 MK 0 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2499 DL 1 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2500 EM 0 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-3 TYPE -1 Checked by: Deviations 18.125 18.275 18.105 18.275 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS 18.125 18.275 18.105 18.275 00.02 0.02 0
  • 3.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :04 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 141 CE -1 1 IL 140 IL 139 IL 1 2 LN 140 LN 141 LN -1 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 140 QM 0 6 MK 140 MK 140 MK 0 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2499 DL 1 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2500 EM 0 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-4 TYPE -1 Checked by: Deviations 17.547 17.697 17.527 17.697 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS 17.547 17.697 17.527 17.697 00.02 0.02 0
  • 4.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :05 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 141 AH 395.98 AB -1 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 139 IQ 395.97 AD 1 IQ 0 4 DF 140 KN 395.97 DF 141 KN 395.96 DF -1 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 139 CN 2794 GH 1 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 141 CE -1 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 139 NP 1 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 140 QM 0 6 MK 140 MK 140 MK 0 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2501 DL -1 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2501 BJ -1 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2500 EM 0 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-5 TYPE -1 Checked by: Deviations 16.968 17.118 16.948 17.118 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS 16.968 17.118 16.958 17.118 00.02 0.01 0
  • 5.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :06 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 139 EH 1 8 CE 140 CE 141 CE -1 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 140 QM 0 6 MK 140 MK 139 MK 1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2499 EM 1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-6 TYPE -1 Checked by: Deviations 16.374 16.524 16.364 16.524 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS 16.374 16.524 16.354 16.524 00.01 0.02 0
  • 6.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :07 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 141 QM -1 6 MK 140 MK 139 MK 1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2499 EM 1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-31 TYPE -3 Checked by: Deviations 15.796 15.946 15.776 15.946 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS 15.796 15.946 15.786 15.946 00.02 0.01 0
  • 8.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :08 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 141 EH -1 8 CE 140 CE 139 CE 1 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 140 QM 0 6 MK 140 MK 140 MK 0 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2501 EM -1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-8 TYPE -1 Checked by: DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS 15.218 15.198 15.218 15.198 15.368 15.368 15.368 15.368 0.02 0.02 Deviations 0 0
  • 10.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :10 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 139 QM 1 6 MK 140 MK 141 MK -1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2501 EM -1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-10 TYPE -1 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations 13.733 13.883 13.633 13.883 Checked by: 0.1 0 13.733 13.883 13.633 13.883 0.1 0
  • 11.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :11 SR, NO LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 141 QM -1 6 MK 140 MK 139 MK 1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2499 EM 1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-11 TYPE -1 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations 13.158 13.308 13.138 13.308 Checked by: 0.02 0 13.158 13.308 13.138 13.308 0.02 0
  • 12.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :12 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 139 EH 1 8 CE 140 CE 141 CE -1 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 140 QM 0 6 MK 140 MK 139 MK 1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2499 EM 1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-12 TYPE -1 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations 12.602 12.752 12.582 12.752 Checked by: 0.02 0 12.602 12.752 12.572 12.752 0.03 0
  • 13.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :13 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 141 QM -1 6 MK 140 MK 139 MK 1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2499 EM 1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-13 TYPE -1 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations 12.035 12.185 12.015 12.185 Checked by: 0.02 0 12.035 12.185 12.025 12.185 0.01 0
  • 14.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :14 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 141 QM -1 6 MK 140 MK 139 MK 1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2499 EM 1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-14TYPE -1 Checked by: Deviations 0.02 0 0.01 0 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS 11.482 11.632 11.462 11.632 11.482 11.632 11.472 11.632
  • 15.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOUNDATION NO :15 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 141 QM -1 6 MK 140 MK 139 MK 1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2499 EM 1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-15 TYPE -1 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations 10.915 11.065 10.895 11.065 Checked by: 0.02 0 10.915 11.065 10.895 11.065 0.02 0
  • 16.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOOTING NO :16 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 141 QM -1 6 MK 140 MK 139 MK 1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2499 EM 1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-16 TYPE -1 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations 10.349 10.499 10.329 10.499 Checked by: 0.02 0 10.349 10.499 10.329 10.499 0.02 0
  • 17.
    PROJECT NAME: BULKLIQUID STOREGE TERMINAL FACILITY PHASE II SUBJECT : FINAL INSPECTION SUBMISSION DATE: 19/04/2015 FOOTING NO :17 Sr no LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRETE( RL) IN Mtr. ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Diagonal LENGTH in mm TOP OF CONCRETE ANCHOR BOLT TOP LEVEL LOCATION MARKED LENGTH in mm Location Diagonaly LENGTH in mm TOP OF CONCRET E(RL) IN Mtr. ANCHOR BOLT TOP LEVEL 1 AB 140 AH 395.97 AB 140 AH 395.98 AB 0 AH -0.01 2 BC 140 CF 395.97 BC 140 CF 395.97 BC 0 CF 0 3 AD 140 IQ 395.97 AD 140 IQ 395.97 AD 0 IQ 0 4 DF 140 KN 395.97 DF 140 KN 395.96 DF 0 KN 0.01 5 FG 140 AQ 2794 FG 140 AQ 2794 FG 0 AQ 0 6 GH 140 CN 2794 GH 140 CN 2794 GH 0 CN 0 7 EH 140 EH 140 EH 0 8 CE 140 CE 140 CE 0 1 IL 140 IL 140 IL 0 2 LN 140 LN 140 LN 0 3 NP 140 NP 140 NP 0 4 PQ 140 PQ 140 PQ 0 5 QM 140 QM 141 QM -1 6 MK 140 MK 139 MK 1 7 KJ 140 KJ 140 KJ 0 8 JI 140 JI 140 JI 0 9 AI 2500 AI 2500 AI 0 10 DL 2500 DL 2500 DL 0 11 FN 2500 FN 2500 FN 0 12 BJ 2500 BJ 2500 BJ 0 13 GP 2500 GP 2500 GP 0 14 CK 2500 CK 2500 CK 0 15 EM 2500 EM 2499 EM 1 16 HQ 2500 HQ 2500 HQ 0 Sign of Civil engineer : Sign of civil Q.C : Sign of Mechanical Q.C : PR-17 TYPE -1 DIMENSIONS AS PER DRAWINGS ACTUAL DIMENSIONS Deviations 9.781 9.931 9.581 9.931 Checked by: 0.2 0 9.781 9.931 9.761 9.931 0.02 0