Proposal

Brief

In this unit I have been put in a group of four to create a 5 minute music video. Our group has
each been given a role so that we will be organized and get everything done according to the
deadlines. We can pick any song that does not have a music video to it or got a music video
the music cannot be produced by an extremely well known artist such as Beyonce. Our
chosen target audience is mainly people aged 15 – 20 years therefore we have to focus on
certain aspects that we can imply in the video to meet their expectations. Our lecturer will
give us deadlines in which we will have to follow in order to get everything finished. We are
planning to finish the whole project which includes the music video and the paperwork by the
12th of December. Shortly after we will have to create the DVD covers and the
advertisements for them which will all have to be done by the 30th of January. By February
6th we would have had to complete our blogging moreover by the end of march we should
have finished our evaluations.


                                      Initial thinking
Research findings

Dub-step is a genre of electronic dance music that originated in south London, England. Its
overall sound has been described as "tightly coiled productions with overpowering bass lines
and reverberant drum patterns, clipped samples, and occasional vocals.To summarize from
the information that we picked up from our research documents we discovered that the
majority of the target audience preferred to listen to music videos that are loud, has special
effects and with a high tempo. This is because it brings more excitement for the viewer as
there is a lot of visual within the music video. This helped the group a lot as it allowed us to
choose a genre where the tempo is high (ranges of 138-142 beats per min) and the music is
rather loud.It was in 2001 that Dubstep made itself onto the club scene through
experimentation from DJ‟s who were mixing the genre of Grime with electric dance to create
a two step beat. By 2003 Dubstep had gained so much popularity that it was beginning to be
aired on BBC 1 radio and featured in many music magazines such as The Wire and it became
one of the fastest growing music genres of the time. The influence of Dubstep has grown
substantially over the past few years as in 2007 when Brittney spears used Dubstep in her
song „Freak show‟. Dubstep has continued to grow and many new and popular songs are
remixed into a Dubstep version, like the song that my group will make a video for.
We did research on the key codes and conventions that make the genre what it actually is
such as the sound, camerawork, special effects and how they edit the video. Moreover we
also looked at the type of locations/Mise-en-scene and sound effects. From researching on
our genre that there is no specific costume that a cast has to wear depending on what storyline
that is chosen for the music video. We concluded that with a dub-step video we had to be
creative with our storyline and think of the type of costumes that is suitable for the storyline.
Overall our research showed that we had to ponder on the setting, costume and the camera
angles and positions in the video.
Initial ideas
Anthony
0:28-1:08                                                   3:10
        Shot of the back of a guy in a bedroom as he               Close up shot of the main character
        starts putting on his jacket, puts hood up
                                                                   signing the lyrics
        Close up of him tying his trainers and a close up
        of him putting on his watch which is gold and
        full of diamonds (looks tacky)
        Close up shot drinks out of half full bottle of
        beer and drinks from a bottle of vodka he finds
        on the floor in his room
1:34                                                        3:04
        Mid Shot of guy walking down street at night               POV shot the camera is swaying and vibrating
                                                                   with the bass of the song, and then he throws
                                                                   up in the street
1:42                                                        3:21
        Shot of guy going past in hoodie on bmx                    Still a POV shot a group of guys in hoodies
                                                                   walk up to the character and surround
                                                                   him.
2.05                                                        4:18
        shouting at him and threatening him. He then               he slowly wakes up outside a bus stop, its
        gets punched in the face and knocked out                   morning brushes himself off and gets on a bus
                                                                   like nothing happened
211
        he slowly wakes up outside a bus stop, its
        morning brushes himself off and gets on a bus
        like nothing happened
3.24
        Close up shot of the main character signing the
        lyrics

2:27
        Guy walks into an alley and finds another guy
        Close up shot of the new man giving the main
        character a small bag with white powder
        (cocaine)

2:30
        Shot of main character in a toilet snorting
        cocaine and then stumbling out



Summary
Focusing on our questionnaire from our audience research, his idea was to explore how dub-
step uses there special effects and why it is done in a certain way. Anthony came up with an
idea to have a special affect in the video where the main cast is moving at normal pace while
everything else is moving extremely quickly. He thought that this special effect will give the
audience a feeling that the main cast is confused and drunk in addition another special affect
that he thought of was when the main cast looks up to the sky the sky should be spinning
around.Again this will give the audience the idea that the main cast is dizzy and is on a verge
of collapsing.MoreoverAnthony also thought that it would be good to start the music video
with the main cast being positioned in a dark alleyway at night which will instantly give an
atmosphere of danger.
Me
0:28-1:08                                                3:10
       Establishing shot of a bar                               Close of up cast throwing up in the toilets.
       Close up of casts face (looks tacky) wearing             Close up of the casts face
       hoodie and tracksuit
       Close up shot drinks out of half full bottle of
       beer and drinks from a bottle of vodka he finds
       on the floor in his room



1:34                                                     3:30
       Medium Shot of cast stumbling down street                Medium shot of cast stumbling out of the bar
       due to being drunk                                       Hear police sirens in the background to signify
                                                                danger
1:42                                                     3:50
       The background speeds up very quickly to                 A POV shot a group of guys in hoodies slowly
       signify dizziness.                                       walking up to the character with hoodies on
                                                                and surrounds him.
1:47                                                     4:18
       Medium shot of Group of boys in hoodies                  Long shot of cast lying down holding his
       collide with the main cast and everything slows          stomach
       down.                                                    Hear sirens in the background
                                                                Blackout
1:58
       Tension between the cast and the group of
       guys as they stare at each other. One of the
       group members starts shouting.
2:05
       Close up of main characters face as he draws
       his attention away from the gang. (slowly)

2:11
       Close up of cast singing the lyrics
       Medium shot of background of street lights as
       background quickens again


2:30
       Shot from the back of cast as he finds his way
       to a bar


Summary
Inspired by the fact that our audience liked male genders in a music video, I thought it would
be good to follow what the audience thought and pick out a male cast for our music video.
Since our music video involves dangers and horrors that we see on the streets which are
mainly to do with males, I thought it would be a good idea to get other males to participate in
our video. My plan was to get a group of males to act as if they are a gang, with each wearing
a hoodie and a tracksuit to make it look more realistic. My idea was that while everything
around the main cast is going extremely fast he would bump into one member of the gang
and everything goes in slow motion as the main cast turns his head to see who he bumped
into. I thought that this would create a lot of tension.
Zayd

0:28-1:08                                                3:10
       Establishing shot of location (North London)             Medium shot of boy getting attacked by boys.
       Medium shot of characteras he walks through              Background noise (police sirens)
       alleyway
       Establishing shot of the bar that the character
       enters
       Close up of drink half empty



1:34                                                     3:04
       Medium shot of character walking out of the              Medium shot of character lying on the ground
       bar and walking on                                       hurt.
                                                                Close up of characters face as the character is
                                                                on the ground
1:45                                                     3:21
       Medium shot of different people rushing                  Establishing shot of location
       around the streets                                       Long shot of people walking on

1:50                                                     3:50
       Close-up shots and medium shots of wild                  Blackout
       animals from the zoo
       Contrast the wild animals with the people
4:18
       Close-up of character’s face while character is
       singing

2:05
       Medium shot a group of boys
       Medium shot of main character

2:11
       Long shot of main character bumping into one
       of the boys in the gang.
       Close up of boys face


2:30
       Close-up of a wild animal to express that the
       boy is behaving like a wild animal.
       Close up of boy

Summary
The music that we had chosen had the lyrics “Out here in this jungle”. This gave him an idea
of comparing the horrors of the streets to the actual jungle. Due to the fact that the streets can
be wild at times, he thought that it would be great to go to London zoo and shoot some wild
animals and compare it to the wildness of the streets. This will give the audience the idea that
we are trying to say that the people around the streets are as wild as the animals.
Sagar

0:28-1:08                                                 3:10
        Establishing shot of location (North London)             Establishing shot of a dark alleyway as the
        Close upof character(looking very rough)                 main character enters.
        Establishing shot of the bar that the character          Close-up of main characters feet as he is
        enters                                                   stmbling




1:34                                                      3:04
        Medium shot of character entering a bar                  Medium shot of main character vomiting on
        Medium shot of character getting drunk                   the floor due to drunkness

1:45                                                      3:21
        Special effect of everything spinning to show            Long shot of group boys attacking the main
        that the characters head is spinning                     character.
                                                                 Medium shot of character lying on the ground
1:50                                                      3:50
        Close-up of characters face                              Blackout
        Medium shot of character walking out of the
        bar
4:18
        Medium shot of character walking in the
        streets

2:05
        Close-up of character singing the lyrics of the
        song

2:11
        Main character looks at a group of boys and
        they look at him (motion is very slow)

2:30
        Main character contines walking on singing the
        lyrics – Medium shot
Final idea
Our final ideas are a development of what the group thought initially. We
decided to keep the whole idea. However we thought it would also be good to
go to the London Zoo and film some wild animals. This will give the
impression that the streets are just like the jungle and some of people behave
like wild animals on the streets. We decided to stick with Anthony‟s ideas that
the music video will start in the alleyway as the cast is drunk dressed in a
hoodie and tracksuit to symbolise how rough the streets are and the dangers that
lie ahead. We also had to think about what kind of special affects we were going
to add to the film since it is a dub step film and we would like to follow the key
codes and conventions of this genre. We thought as a group that we have to
make the film look as wild as possible so the fast background with everything
speeding up with just the cast walking in slow motion is a very good technique
that we would like to do. I also had an idea that the group was very happy with
which was that at one point the cast should look up to the sky and everything
will just start spinning. This will allow the audience to remember that he is
drunk however the cast will think that he is the only sane person in the world.
We will be shooting a lot of London‟s lights to express where the location is
and also hooting other people with hoodies which we thought it would be better
to let other people join the video. I thought that this is good because at a certain
point the cast will bump into them and slowly turn his head to see who he
bumped into then we will view at the people he bumped into with close-up
shots. This will give the audience an insight to what the characters are feeling
and also thinking moreover the close-up shots will create a lot of tension. The
ending is something we still have not figured out yet however it is most likely
favoured that we will end the music video with the police siren and then the
music video slowly fades away with a black out.
Production Team Roles

Planning(Inc related Misc Prod Paperwork)

Everybody – Textual Analysis
            Questionnaire


David – Front Sleeve first draft
        Questionnaire

Sagar – Music information first draft
Questionnaire

Anthony – Proposal
          Questionnaire


Construction (Inc related Misc Prod Paperwork)

David- Meeting form
Risk assessment
         Permission of access form
Consent form
Copyright clearance
Front of sleeve first final (Print Construction)
Textual Analysis

Sagar - Print Research(Forms and conventions)
Music information leaflet final (Print Construction)


Anthony- Advertisement final (Print Construction)
         Script development
         Project Schedule

Zayd- Music information leafletfinal
      Questionnaire analysis
      Textual Analysis

Proposal.docx 2

  • 1.
    Proposal Brief In this unitI have been put in a group of four to create a 5 minute music video. Our group has each been given a role so that we will be organized and get everything done according to the deadlines. We can pick any song that does not have a music video to it or got a music video the music cannot be produced by an extremely well known artist such as Beyonce. Our chosen target audience is mainly people aged 15 – 20 years therefore we have to focus on certain aspects that we can imply in the video to meet their expectations. Our lecturer will give us deadlines in which we will have to follow in order to get everything finished. We are planning to finish the whole project which includes the music video and the paperwork by the 12th of December. Shortly after we will have to create the DVD covers and the advertisements for them which will all have to be done by the 30th of January. By February 6th we would have had to complete our blogging moreover by the end of march we should have finished our evaluations. Initial thinking Research findings Dub-step is a genre of electronic dance music that originated in south London, England. Its overall sound has been described as "tightly coiled productions with overpowering bass lines and reverberant drum patterns, clipped samples, and occasional vocals.To summarize from the information that we picked up from our research documents we discovered that the majority of the target audience preferred to listen to music videos that are loud, has special effects and with a high tempo. This is because it brings more excitement for the viewer as there is a lot of visual within the music video. This helped the group a lot as it allowed us to choose a genre where the tempo is high (ranges of 138-142 beats per min) and the music is rather loud.It was in 2001 that Dubstep made itself onto the club scene through experimentation from DJ‟s who were mixing the genre of Grime with electric dance to create a two step beat. By 2003 Dubstep had gained so much popularity that it was beginning to be aired on BBC 1 radio and featured in many music magazines such as The Wire and it became one of the fastest growing music genres of the time. The influence of Dubstep has grown substantially over the past few years as in 2007 when Brittney spears used Dubstep in her song „Freak show‟. Dubstep has continued to grow and many new and popular songs are remixed into a Dubstep version, like the song that my group will make a video for. We did research on the key codes and conventions that make the genre what it actually is such as the sound, camerawork, special effects and how they edit the video. Moreover we also looked at the type of locations/Mise-en-scene and sound effects. From researching on our genre that there is no specific costume that a cast has to wear depending on what storyline that is chosen for the music video. We concluded that with a dub-step video we had to be creative with our storyline and think of the type of costumes that is suitable for the storyline. Overall our research showed that we had to ponder on the setting, costume and the camera angles and positions in the video.
  • 2.
    Initial ideas Anthony 0:28-1:08 3:10 Shot of the back of a guy in a bedroom as he Close up shot of the main character starts putting on his jacket, puts hood up signing the lyrics Close up of him tying his trainers and a close up of him putting on his watch which is gold and full of diamonds (looks tacky) Close up shot drinks out of half full bottle of beer and drinks from a bottle of vodka he finds on the floor in his room 1:34 3:04 Mid Shot of guy walking down street at night POV shot the camera is swaying and vibrating with the bass of the song, and then he throws up in the street 1:42 3:21 Shot of guy going past in hoodie on bmx Still a POV shot a group of guys in hoodies walk up to the character and surround him. 2.05 4:18 shouting at him and threatening him. He then he slowly wakes up outside a bus stop, its gets punched in the face and knocked out morning brushes himself off and gets on a bus like nothing happened 211 he slowly wakes up outside a bus stop, its morning brushes himself off and gets on a bus like nothing happened 3.24 Close up shot of the main character signing the lyrics 2:27 Guy walks into an alley and finds another guy Close up shot of the new man giving the main character a small bag with white powder (cocaine) 2:30 Shot of main character in a toilet snorting cocaine and then stumbling out Summary Focusing on our questionnaire from our audience research, his idea was to explore how dub- step uses there special effects and why it is done in a certain way. Anthony came up with an idea to have a special affect in the video where the main cast is moving at normal pace while everything else is moving extremely quickly. He thought that this special effect will give the audience a feeling that the main cast is confused and drunk in addition another special affect that he thought of was when the main cast looks up to the sky the sky should be spinning around.Again this will give the audience the idea that the main cast is dizzy and is on a verge of collapsing.MoreoverAnthony also thought that it would be good to start the music video with the main cast being positioned in a dark alleyway at night which will instantly give an atmosphere of danger.
  • 3.
    Me 0:28-1:08 3:10 Establishing shot of a bar Close of up cast throwing up in the toilets. Close up of casts face (looks tacky) wearing Close up of the casts face hoodie and tracksuit Close up shot drinks out of half full bottle of beer and drinks from a bottle of vodka he finds on the floor in his room 1:34 3:30 Medium Shot of cast stumbling down street Medium shot of cast stumbling out of the bar due to being drunk Hear police sirens in the background to signify danger 1:42 3:50 The background speeds up very quickly to A POV shot a group of guys in hoodies slowly signify dizziness. walking up to the character with hoodies on and surrounds him. 1:47 4:18 Medium shot of Group of boys in hoodies Long shot of cast lying down holding his collide with the main cast and everything slows stomach down. Hear sirens in the background Blackout 1:58 Tension between the cast and the group of guys as they stare at each other. One of the group members starts shouting. 2:05 Close up of main characters face as he draws his attention away from the gang. (slowly) 2:11 Close up of cast singing the lyrics Medium shot of background of street lights as background quickens again 2:30 Shot from the back of cast as he finds his way to a bar Summary Inspired by the fact that our audience liked male genders in a music video, I thought it would be good to follow what the audience thought and pick out a male cast for our music video. Since our music video involves dangers and horrors that we see on the streets which are mainly to do with males, I thought it would be a good idea to get other males to participate in our video. My plan was to get a group of males to act as if they are a gang, with each wearing a hoodie and a tracksuit to make it look more realistic. My idea was that while everything around the main cast is going extremely fast he would bump into one member of the gang and everything goes in slow motion as the main cast turns his head to see who he bumped into. I thought that this would create a lot of tension.
  • 4.
    Zayd 0:28-1:08 3:10 Establishing shot of location (North London) Medium shot of boy getting attacked by boys. Medium shot of characteras he walks through Background noise (police sirens) alleyway Establishing shot of the bar that the character enters Close up of drink half empty 1:34 3:04 Medium shot of character walking out of the Medium shot of character lying on the ground bar and walking on hurt. Close up of characters face as the character is on the ground 1:45 3:21 Medium shot of different people rushing Establishing shot of location around the streets Long shot of people walking on 1:50 3:50 Close-up shots and medium shots of wild Blackout animals from the zoo Contrast the wild animals with the people 4:18 Close-up of character’s face while character is singing 2:05 Medium shot a group of boys Medium shot of main character 2:11 Long shot of main character bumping into one of the boys in the gang. Close up of boys face 2:30 Close-up of a wild animal to express that the boy is behaving like a wild animal. Close up of boy Summary The music that we had chosen had the lyrics “Out here in this jungle”. This gave him an idea of comparing the horrors of the streets to the actual jungle. Due to the fact that the streets can be wild at times, he thought that it would be great to go to London zoo and shoot some wild animals and compare it to the wildness of the streets. This will give the audience the idea that we are trying to say that the people around the streets are as wild as the animals.
  • 5.
    Sagar 0:28-1:08 3:10 Establishing shot of location (North London) Establishing shot of a dark alleyway as the Close upof character(looking very rough) main character enters. Establishing shot of the bar that the character Close-up of main characters feet as he is enters stmbling 1:34 3:04 Medium shot of character entering a bar Medium shot of main character vomiting on Medium shot of character getting drunk the floor due to drunkness 1:45 3:21 Special effect of everything spinning to show Long shot of group boys attacking the main that the characters head is spinning character. Medium shot of character lying on the ground 1:50 3:50 Close-up of characters face Blackout Medium shot of character walking out of the bar 4:18 Medium shot of character walking in the streets 2:05 Close-up of character singing the lyrics of the song 2:11 Main character looks at a group of boys and they look at him (motion is very slow) 2:30 Main character contines walking on singing the lyrics – Medium shot
  • 6.
    Final idea Our finalideas are a development of what the group thought initially. We decided to keep the whole idea. However we thought it would also be good to go to the London Zoo and film some wild animals. This will give the impression that the streets are just like the jungle and some of people behave like wild animals on the streets. We decided to stick with Anthony‟s ideas that the music video will start in the alleyway as the cast is drunk dressed in a hoodie and tracksuit to symbolise how rough the streets are and the dangers that lie ahead. We also had to think about what kind of special affects we were going to add to the film since it is a dub step film and we would like to follow the key codes and conventions of this genre. We thought as a group that we have to make the film look as wild as possible so the fast background with everything speeding up with just the cast walking in slow motion is a very good technique that we would like to do. I also had an idea that the group was very happy with which was that at one point the cast should look up to the sky and everything will just start spinning. This will allow the audience to remember that he is drunk however the cast will think that he is the only sane person in the world. We will be shooting a lot of London‟s lights to express where the location is and also hooting other people with hoodies which we thought it would be better to let other people join the video. I thought that this is good because at a certain point the cast will bump into them and slowly turn his head to see who he bumped into then we will view at the people he bumped into with close-up shots. This will give the audience an insight to what the characters are feeling and also thinking moreover the close-up shots will create a lot of tension. The ending is something we still have not figured out yet however it is most likely favoured that we will end the music video with the police siren and then the music video slowly fades away with a black out.
  • 7.
    Production Team Roles Planning(Increlated Misc Prod Paperwork) Everybody – Textual Analysis Questionnaire David – Front Sleeve first draft Questionnaire Sagar – Music information first draft Questionnaire Anthony – Proposal Questionnaire Construction (Inc related Misc Prod Paperwork) David- Meeting form Risk assessment Permission of access form Consent form Copyright clearance Front of sleeve first final (Print Construction) Textual Analysis Sagar - Print Research(Forms and conventions) Music information leaflet final (Print Construction) Anthony- Advertisement final (Print Construction) Script development Project Schedule Zayd- Music information leafletfinal Questionnaire analysis Textual Analysis