The document outlines the requirements for a property project report due on Tuesday May 12 at 5:30pm with a 1 point deduction for each hour late. The 10-20 page printed report should include exterior and interior photos, maps of Riyadh and the neighborhood from Google Earth, the land and building history, financial analysis using the cost, sales, and income approaches to determine the highest and best use and concluded value with reconciliation. Leverage analysis is also required assuming a 70% loan over 20 years at 5% interest to calculate leverage ratios. Data sources are provided.