The document lists the trainings and projects of an individual. It details IP rotation training attended in China in 2011. It also lists various trainings provided between 2011-2013 in Tanzania and Botswana on IPMW configuration, planning and implementation. The document outlines 16 projects conducted between 2011-2014 related to IPMW planning, design, implementation and delivery for telecom operators in Tanzania, Botswana, Mozambique, Comoros Islands and Sao Tome and Principe. The projects involved modernization, capacity upgrades, backbone implementations and trials.
Network Engineer with more than 5 years experience in deploying, configuring troubleshooting Networks. Involves in Pre-Sales, Design and up to Post Sales of Network equipments
Network Engineer with more than 5 years experience in deploying, configuring troubleshooting Networks. Involves in Pre-Sales, Design and up to Post Sales of Network equipments
1. Trainings Attended:
IP rotation Training in Shenzhen China (Huawei University)
(July-August 15th 2011)
Trainings Offered:
Airtel Tanzania: IPMW Configuration and System maintenance: Dar-es-Salaam Tanzania
(December 5th-9th 2011)
Botswana Transmission Implementation Team: IPMW Planning and Implementation
(January 2013-Febraury 2013)
Vodacom Tanzania Transmission Implementation Team: IPMW Delivery Strategies
(July 1st 2013 – July 31st 2013)
PROECTS DONE:
Airtel Tanzania Modernization Project; (Technical solution Design, Implementation and
Delivery)
(March 2014 to July 2014)
Vodacom Tanzania IPMW Swap project; (Solution design, Implementation and delivery
of 506 IPMW links.)
(May 21st 2013 to April 2014)
Tigo Tanzania Optical multiplexing Project; Solution implementation and delivery.
(August 2013 to October 2013)
Mascom Botswana capacity expansion project; design of 65 IPMW links
(April 2013-December 2013)
Comoros Islands 3G Transmission project; link design and LLD planning.
(February 2013)
Sao Tome and Principe 3G capacity upgrade project; link design and LLD planning.
(February 2013)
Vodacom Mozambique IPMW 2+2 capacity upgrade project implementation and
delivery ;( March 2013-May 15th 2013)
Microwave planning for Botswana Government-Savute Backbone link-Botswana
(September 2012-December 2012)
IP-Microwave Planning and design for 184 links, implementation, delivery and PAC for
Mascom Wireless-Botswana
(March 2012 to November 2012).
IP Microwave planning and implementation for BTC Botswana backbone 2+2 project.
(August 2012 to December 2012)
IP-Microwave planning and implementation for Orange Botswana LTE trial project. (June
2012- July 2012 and January 2013-February 2013)
IP-Microwave planning and implementation for 4G-Wireless operator-Tanzania
(November 2011-to January 2012)
Implementation and commissioning of Airtel IPMW Modernization project-Airtel
Tanzania
2. (August 2011- to February 2012)
Safaricom IP Microwave Trial in Kiboswa-Kenya
(May 2011- to August 2011)