OKABE CIA LTDA­ME 
BUSINESS PLAN 
September, 2014 
Gregory Harris 
Chief Operations Officer 
OKABE CIA LTDA­ME 
Rua Obidos 620 
Belem Para Brasil 66020­448 
Tel: 559132301094 
Email: gregoryharris@okbglobal.com 
Website: www.okbglobal.com 
CONFIDENTIAL 
No offering is made or intended by this document. Any offering of interests in OKABE CIA 
LTDA­ME 
will be made only in compliance with Federal and State securities laws. 
This document includes confidential and proprietary information of and regarding 
OKABE CIA LTDA­ME. 
This document is provided for informational purposes only. You 
may not use this document except for informational purposes, and you may not 
reproduce this document in whole or in part, or divulge any of its contents without the 
prior written consent of OKABE CIA LTDA­ME. 
By accepting this document, you agree to 
be bound by these restrictions and limitations.
OKB CLOUD 
COMPUTING 
THE OLD CONCEPT 
REGARDING NEW 
THINGS! 
LOSE YOUR SHOES BUT 
FIND YOURSERLF 
THE WORLD HAS CHANGED! 
WE DID THIS ! 
YOU WILL CHANGE TOO! 
ADVERTISING IS NOT A BOX IN A BLACKBOX
OKB CLOUD COMPUTING 
Introduction.......................................................... 
1­Excutive 
Sumary............................................. 
Method for success.................................... 
2­Business 
Description....................................... 
3­Vision 
statement............................................. 
4­Vision 
trigger................................................... 
5­Mission 
Statement:......................................... 
a) Overview................................................. 
b) Features.................................................. 
c) Methodology ......................................... 
Key actions................................................. 
Keys to Success......................................... 
7­Industry 
Analysis.............................................. 
8 ­Project 
Background........................................ 
9 ­Market 
Analysis.............................................. 
Disruptive force........................................... 
10­Analysis 
of Competitors................................ 
11­Business 
Operations...................................... 
12­Legal 
Structure............................................... 
13­Management 
Expertise ................................. 
14­Financial 
Information ..................................... 
15­Summary 
....................................................... 
16­SWOT 
Analises............................................ 
17­Additional 
Images........................................... 
OKB Cloud Computing Business Plan 
03 
04 
05 
05 
06 
06 
07 
07 
07 
07 
08 
09 
09 
10 
10 
11 
12 
12 
12 
13 
13 
14 
14 
15 
16
OKB CLOUD COMPUTING 
INTRODUCTION 
This letter of introduction is intended to outline the professionals involved in this great 
project, as well as give a brief introduction to the project, its timelines, goals, objectives, and 
expected returns. 
This project will be under the guidance of our very experienced and dynamic 
management team, made up of highly specialized and talented individuals, entrepreneurs, and 
pioneers in this industry. The CEO is Duane Lee, an experienced sales and marketing 
professional who has lived and worked globally, and been an integral part of projects with a 
development budget in the hundreds of millions of dollars. He works hand in hand with Deywe 
Okabe, President, and Chief Strategy Officer, and Gregory Harris, the Chief Operations Officer. 
Deywe is the founder of OKB Global, and the technology professional. Gregory has more than 
30 years’ experience in business development, client management, and financial services. 
Together, this team makes up a virtual dream team in this development. 
The focus of this project will be to provide safe, secure, fully featured applications, with 
flexible access, and programming interfaces, all while remaining competitively priced. We intend 
to be the leader in this industry, to have the very best applications available for our wide range of 
clientele. 
Thank you for taking the time to review this project, we are available to answer any and 
all questions you may have. We look forward to working with you. 
OKB Global project is focused on the rapidly emerging telecommunications and energy 
market in Brazil, with many favorable contributing factors to expedite development. 
Other factors for Belem Brazil areas of expansion is the impending need to reduce energy 
consumption and costs. OKB has plans to development our Solar energy division. We also 
desire to manage and increase exportation of numerous commodities. Our vision is to transform 
Belem port in to a duty free zone by encouraging government incentives with taxation reductions 
and exemptions. Pará states rapid development is due to the extraction of minerals such as iron, 
manganese, niobium, bauxite, copper, gold, aluminum and the formation of the (presal) program 
the extraction of oil. In November 2013, a report released by the IEA (International Energy 
Agency) provides that credit to the oil found in the presalt. 
Brazil will become one of the countries with the largest oil exports in the world. In the near 
future Brazil will be one of the most important energy producers. It is estimated that by 2035, oil 
production in Brazil will triple, putting Brazil in the sixth place of the largest oil producers. The 
Brazilian coast in our region has the perfect location and environment for the emergence of oil 
refineries. 
The OKB Global Cloud will simultaneously organize, manage and facilitate the existing 
soybean production which is the second largest in Brazil and has the largest cattle breeding 
farms. Production and exports of Brazil nuts and acai, farm raised fish are demanding the 
emergence of 20 new ports and 18 industrial hubs, The emergence of a new technology center 
to form a new bloc in the development of railways and maritime being strengthened by political 
favoritism and paving the way through the OKB Global cloud. 
OKB Cloud Computing Business Plan 
04
OKB CLOUD COMPUTING 
1. EXECUTIVE SUMMARY 
The goal of this BUSINESS PLAN is to present the IMPENDING UNDERLYING DEMAND 
for this project as well as stating all of the project's objectives. 
In today’s challenging economic climate, a growing number of organizations require more 
capable and flexible IT resources. All enterprises need to reduce costs. Cloud computing offer a 
tailor made product for everyone. The effects of a deep global recession have combined with 
recent advances in information technology to create the perfect environment for cloud 
computing. Cloud computing advertising has strengthened dramatically with the combination of 
an ever growing business dependence on cyber space, increasing demands on IT systems and 
a global mantra of budgetary prudence. 
OKB Global designed and is developing a hybrid cloud to facilitate a agile business 
platform. When a company experiences an unexpected spike in usage of an in­house 
server, the 
OKB Cloud Computing Business Plan 
workload can be passed off to the hybrid cloud. This 
way, your company avoids the additional cost of 
having to purchase new server hardware. In 
addition to being agile, the hybrid cloud is also 
scalable, which means it’s well suited for 
businesses with unpredictable peaks. 
Method for success 
1) Design and develop a super cloud with 30,000 
servers in four phases. 
2) Utilize storage area network (SAN) is a dedicated 
network that provides access to 
consolidated, block level data storage and SAN file 
systems or shared disk file systems. 
3) Utilize GR Cooling with containerized liquid 
coolant to reduce startup cost and lower operating cost with reduce energy requirements. 
4) Integrate the HP 240a Ecopod a highly efficient self contained data storage system. 
4) Retrofit OKB Cyber as pilot location Cidade Velha Belem Para Brasil. 
5) Design and develop a 10,000 m2 metroplex business complex on land to be purchased 
in Belem 
OKB Global through its global consortium and executive staff will contract consultants in 
every phase of development. Deywe Okabe and Gregory Harris formed a professional alliance 
and selected Duane Lee as Chief Executive Officer (CEO). Deywe Okabe will be President and 
Gregory Harris will be Chief Operating Officer (COO) We will develop this in several phases as 
follows. 
Phase 1.) 
a. Pilot location is Rua Obidos 620 Belem Brasil a 550m2 facility pilot will take 90 to 120 
days to renovate, retrofit and install equipment. 
Phase2.) Metroplex is to be constructed on raw land purchased upon funding, Av. 
Independência, 1856 Parque Verde Belem . 
b. acquire raw land, site preparation, obtain permits install infrastructure. 180 days 
c. Construction of metroplex. 12 months 
d. Install security, fire prevention equipment and deploy servers. 90 days 
05
OKB CLOUD COMPUTING 
The project will cost 
1.) Total cost of project is $175,000,000 
2.) See attached projections and assumptions attached 
2. Business Description 
OKABE CIA LtdaMe is a corporation in good standing since incorporating in 2000. 
Many underlying factors have evolved and provided the perfect environment for this unique 
advertising, printing and cyber enterprise to expand to a super cloud that will manage, organize 
and control the economic pulse of Northern Brasil. OKB Global project is focused on the rapidly 
emerging telecommunications and energy market in Brazil, with many favorable contributing 
factors to expedite development. Other leading factors for Belem Brazil areas expansion is the 
impending need to reduce energy consumption and costs. OKB has plans to development our 
Solar Energy Division which will produce cells to provide additional power reducing demand 
from the grid. Our solar division will also develop and manufacture solar packages for 
commercial and residential applications. We also desire to manage and increase exportation of 
numerous commodities. Our vision is to transform Belem port into a duty free zone by 
encouraging government incentives with taxation reductions and exemptions. Pará states rapid 
development is due to the extraction of minerals such as iron, manganese, niobium, bauxite, 
copper, gold, aluminum and the formation of the (presal) program for the extraction of oil. In 
November 2013, a report released by the IEA (International Energy Agency) provides that credit 
to the oil found in the pre salt. Brazil will become one of the countries with the largest oil exports 
in the world. In the near future, Brazil will be one of the most important energy producers in the 
world. It is estimated that by 2035, oil production in Brazil will triple, putting Brazil in the sixth 
place of the largest oil producers globally. The Brazilian coast line in our region has the perfect 
location and environment for the emergence of oil refineries. The OKB Global Cloud will 
simultaneously organize, manage and facilitate the existing soybean production which is the 
second largest in Brazil and has the largest cattle breeding farms. Production and exports of 
Brazil nuts and acai, farm raised fish are demanding the emergence of 20 new ports and 18 
industrial hubs, The emergence of a new technology center to form a new bloc for the 
development of railways and maritime, being strengthened by political favoritism and paving the 
way through the OKB Global cloud. OKB will be the largest telecommunications center in 
Norther Brasil with a state of the art and cutting edge equipment. The HP Ecopod will be the 
first of its kind in Brasil and has 2200 servers per unit and uses 4% of the energy of existing 
traditional units. OKB has no competition in Brasil North. 
3. Vision statement. 
OKB is a web­based, 
free data storage project paid for by advertising. Users do not need 
specialized qualifications to utilize, since their primary function is to store data and fotos; this 
means that businesses, individuals and government entities may have safe and secure data 
storage hosted in Brasil. “The mission of OKB Global is to provide people around the world to 
collect and develop storage content under a free storage program when they agree to accept 
free advertising from our association with Facebook and Twitter. OKB will provide the essential 
infrastructure and an organizational framework to support and development of all endeavors. 
OKB will have more the 60 million unique clients over the next 5 years. OKB will be the main 
competition to Google in Brasil. 
OKB Cloud Computing Business Plan 
06
OKB CLOUD COMPUTING 
4. Vision trigger 
With the rapid advancement of inexpensive smart phone, tablets and other smart devices. 
OKB is positioned to dominate and control all data storage for Personal, Universities, Business 
as well as Governmental Agencies and eliminated the use of USB storage devices in Brazil 
North. 
5. Mission Statement: 
OKB Global designed and is developing a hybrid cloud to facilitate a agile business 
platform. When a company experiences an unexpected spike in usage of an in house server, the 
workload can be passed off to the hybrid cloud. This way company avoids the additional cost of 
having to purchase new server hardware. In addition to being agile, the hybrid cloud is also 
scalable, which means it’s well suited for businesses with unpredictable peaks. 
OKB Global Information’s modular Tier4 data center specifically designed to be a world 
class cloud computing facility totally dedicated to absolute performance and security. 
a) Overview 
The OKB Global Information data center engineered using the latest design methodologies 
including zoned cooling, GR Cooling for reduce A/C requirements, zoned fire suppression that 
utilizes clean agents, and fully redundant power supply sources. The data center modular design 
characteristics allows OKB Global Information to grow the underlying infrastructure as client 
needs grow, ultimately providing a fully populated data center floor of nearly 10,000 square 
meters. Our combination of data center design and management best practices demonstrate our 
commitment to providing our customers with a data center that is truly world class and 
unparalleled in Brazil. 
OKB Cloud Computing Business Plan 
b) Features 
1) Scalability. The cloud allows 
companies to make fast and cost 
effective capacity adjustments 
2) Greater Business Agility. 
Cloud enables companies to 
react to shifting workplace and 
staffing in moments. 
3) Flexible pricing structures. 
Cloud providers offer customers 
creative and flexible pricing . 
4) Fast time to deployment. 
Cloud eliminates purchases 
enabling applications running 
quickly. 
5) Reduced system maintenance and management costs. Cloud requires less. 
6) Low­risk 
ability to start up or move or expand. Capacity and applications offer risk­free 
trials. 
7) Flexible staffing can lower operating expenses. Cloud enables companies to be 
07
OKB CLOUD COMPUTING 
nimble. 
8) Threat Protection. All files are secure with 2048 bit encryption. 
c) Methodology 
1) Design and develop a super cloud with 30,000 servers in four phases. 
2) Utilize storage area network (SAN) is a dedicated network that provides access to 
consolidated, block level data storage and SAN file systems or shared disk file systems. 
3) Utilize GR Cooling with containerized liquid coolant to reduce startup cost and lower 
operating cost with reduce energy requirements. 
4) Integrate the HP 240a Ecopod a highly efficient self contained data storage system. 
4) Retrofit OKB Cyber as pilot location Cidade Velha Belem Para Brasil. 
5) Design and develop a 12,000 m2 metroplex business complex on land to be purchased 
in Belem . 
6) Business Objectives 
OKB Global Information will 
create and provide a world class 
cloud data center in Belem to boost 
innovation and productivity across 
the Digital economy in Brazil. 
When business, universities, 
individuals and government agencies 
adopt cloud services, they are more 
productive, innovate better and 
operate with greater agility. As a 
nation, Brazil is well placed to take 
advantage of cloud computing for a 
range of reasons – including a stable 
socio economic system, a strong rule of law and a highly diverse and skilled Information and 
Communications Technology (ICT) sector. At the individual level there are few organizations 
across the economy that have implemented innovative cloud computing services. Brazil lags 
behind their counterparts in Organization for Economic Cooperation and Development (OECD) 
countries in the use of online technology. This places these organizations at a competitive 
disadvantage, which could be overcome through the use of cloud computing services. 
One reason for this has been insufficient access to the necessary infrastructure to support 
sophisticated cloud services. The relatively slow download or upload speeds in many parts of 
Brazil have limited the adoption of cloud services. OKB Global Information will change this and is 
a key enabler of the Digital economy more broadly. There are other reasons that cloud 
computing has not been adopted more generally in Brazil, including a lack of awareness of how 
to make best use of cloud computing and a lack of confidence that some organizations and 
individuals have in adopting cloud computing services. 
However, as the cloud services market continues to evolve, users and providers of cloud 
services must remain responsive to change. Likewise, OKB will continue to adapt its strategy in 
response to market and technological changes. 
1. Maximizing the value of cloud computing Goal: OKB Global Information will be a leader 
in the use of cloud services to achieve greater efficiency, generate greater value from ICT 
investment, deliver better services and support a more agile public sector. 
OKB Cloud Computing Business Plan 
08
OKB CLOUD COMPUTING 
Key actions: 
The Brazilian Internet Steering Committee (CGI.br) will enhance the guidance available to 
government decision makers on how to evaluate the benefits of cloud services and how to 
procure and manage them. 
OKB and the Brazil Digital Economy will establish information sharing initiatives to facilitate 
continual improvement based on a repository of case studies, reduced risk approaches and 
practical lessons to enable agencies to learn from each other. Brazil’s Digital economy is 
currently comprised of about 147,000 companies and is set to generate $490 billion in revenue 
by the end of 2014, according to a study by Softex Observatory. 
Keys to Success 
Competitive and flexible pricing 
Choose a storage solution that fits the 
nature of your data, whether it’s Standard 
Storage or Durable Reduced Availability 
(DRA) Storage. Like other Cloud Platform 
services, you pay just for what you use. 
• Scalability. The cloud allows 
companies to make fast and costeffective 
capacity adjustments, scaling up and down 
depending upon traffic, seasonality and 
business need. 
• Greater Business Agility. Cloud 
enables companies to react to shifting 
workplace and staffing demand. 
• Flexible pricing structures. Cloud 
providers offer customers creative and 
flexible pricing options, such as tiered alla­carte 
pricing, making it easier to tailor 
solutions to a business’s needs and match 
value.• 
Fast time to deployment. Cloud 
eliminates the need to purchase new systems 
and load new applications, or compete with 
other projects for IT resources, thereby enabling applications to be up and running more quickly. 
• Reduced system maintenance and management costs. Cloud requires less maintenance 
and management from IT, allowing resources to be reallocated to other projects in the business. 
• Lowrisk ability to start up or move or expand. Capacity and applications can be added 
without risking existing business plans. Additionally, some solution providers offer riskfree trials. 
• Flexible staffing can lower operating expenses. Cloud enables companies to be nimble 
with staffing plans using different strategies to optimize staff, including using lowercost locations 
such as off shoring or home shoring, but away from corporate, or using athome workers with 
flexible schedules and ability to work short hours rather than full days. 
Company's goal is to dominate our untapped advertising market as follows: We will Provide 
over 100 Gigabytes Data Storage service for free, obligating our clients to receive advertising on 
their smartphone, tablet, or PC, with the option to eliminate by electing prepaid or fixed payment 
option. 
OKB Cloud Computing Business Plan 
09
OKB CLOUD COMPUTING 
OKB Cloud Computing has the overall goal, provide the cloud computing services through 
Internet present a new vision for advertising space, providing Cloud Service for Schools, 
Universities, Hospitals, Commercial Establishment , Supermarkets, Handyman and Residential. 
OKB Global project is focused on the rapidly emerging telecommunications and energy 
market in Brazil, with many favorable contributing factors to expedite development. Other factors 
for Belem Brasil areas of expansion by reducing energy consumption and costs with the 
development our Solar energy division and increase exportation of numerous commodities. Our 
vision is to transform Belem port a duty free zone by encouraging government incentives with tax 
reductions and exemption. Pará states rapid development is due to the extraction of minerals 
such as iron, manganese, niobium, bauxite, copper, gold, aluminum and the formation of the 
(presal) program the extraction of oil. In 
November 2013, a report released by the IEA 
(International Energy Agency) provides that 
thanks to the oil found in the presalt, Brazil will 
become one of the countries with the largest oil 
exports in the world. In the near future, Brazil will 
be one of the most important energy producers 
in the world. It is estimated that in 2035, oil 
production in Brazil will triple, putting Brazil in the 
sixth place of the largest oil producers in the 
world. The Brazilian coast in our region has the 
perfect location and environment for emergence 
of oil refineries. The OKB Global Cloud will 
simultaneously organize and facilitate the 
existing soybean production which is the second largest in Brazil and has the largest cattle 
breeding. 
7­Industry 
Analysis 
As public cloud computing gains greater adoption across enterprises, there’s an increased 
level of spending occurring on infrastructure­related 
services including Infrastructure­as­a­Service( 
IaaS). Enterprises are prioritizing how to get cloud platforms integrated with legacy 
systems to make use of the years of data they have accumulated. From legacy Enterprise 
Resource Planning (ERP) to Customer Relationship Management (CRM) systems, integrating 
legacy systems of record to cloud­based 
platforms will accelerate through 2016. I’ve seen this in 
conversations with resellers and enterprise customers, and this trend is also reflected in 
Gartner’s latest report on public cloud computing adoption, Forecast Overview: Public Cloud 
Services, Worldwide, 2011­2016, 
4Q12 Update Published: 8 February 2013. 
Global spending on public cloud services is expected to grow 18.6% in 2012 to $110.3B, 
achieving a CAGR of 17.7% from 2011 through 2016. The total market is expected to grow from 
$76.9B in 2010 to $210B in 2016. The following is an analysis of the public cloud services 
market size and annual growth rates: 
8 ­Project 
Background 
In today’s challenging economic climate, a growing number of organizations require more 
capable and flexible IT resources; they also need to reduce costs. OKB will design, develop and 
implement a hybrid cloud data centre which is a combination of public and private clouds. 
Businesses in highly regulated industries (banking, universities and government agencies) with 
compliance requirements regarding data residency (“Internet Bill of Rights”) can leverage the 
OKB Cloud Computing Business Plan 
10
OKB CLOUD COMPUTING 
private cloud for those sensitive workloads, while relying on the costeffective hybred cloud for 
nonregulated operations. 
The effects of a deep global recession have combined with recent advances in information 
technology to create t perfect environment for cloud computing. cloud computing propaganda 
whose effects have increased dramatically by the combination of an evergrowing business 
dependence on cyber space, increasing demands on IT systems and a global demand for 
budgetary prudence. 
A growing number of cloud service providers are offering customers the potential to 
generate sizable, longterm costsavings, increase the capacity, agility and flexibility of their IT 
systems, and provide a muchneeded standard IT platform across their business. Their cloud 
computing efforts are being met with considerable success. The hybrid cloud lets business be 
more agile. When a company experiences an unexpected spike in usage of an inhouse server, 
the workload can be passed off to the hybred cloud. This way the company avoids the additional 
cost of having to purchase new server hardware. In addition to being agile, the hybrid cloud is 
also scalable, which means it’s well suited for businesses with unpredictable peaks. 
9 ­Market 
Analysis 
Cushman & Wakefield Report Takes a Deeper Look at the Brazilian Data Center 
Market 
Published Date : 5/6/2014 
MULTI­TENANT 
DATA CENTER MARKET 
Currently, there is less than 500,000 SF of operational data center space in Brazil and only 
three U. S.based data center providers in the country: Equinix (who acquired local provider 
ALOG), Level 3 Communications (via its acquisition of Global Crossing) and Verizon (via 
Terremark), according to the report. 
Key sub­markets 
include São Paulo and Rio de Janeiro. São Paulo represents the largest 
data center market in South America, accounting for 50 percent of capacity in Brazil – 
approximately 450,000 operational square feet. Financial institutions, multinational firms, and e 
commerce companies drive the demand here. Barueri, located near the stock exchange, is also 
emerging as the new data center centric area. 
OKB Global will implement the much needed cloud in Belem being a metropolis with the 
population of about 7 million people, 50 campuses, 10 000 schools, approximately 12,000 
business establishments, 32 000 lawyers, 22 industries, 600 vocational courses, 1 international 
airport, 20 large supermarkets, and with the reduction of costs of Internet and data centre 
servers would be the first step forward for already present future farms. Exports of Brazil nuts 
and acai, farm raised fish are demanding the emergence of new 20 ports and 18 industrial hubs, 
and emergence of a new technology center to form a new bloc in the exploitation of railways and 
maritime, being strengthened by political favoritism and paving the way through the OKB Global 
cloud.P 
roject Risk Management 
– Integrated Framework 
:“Risk is the possibility that an event will occur and adversely affect the achievement of 
objectives.” 
The types of risks (e.g., security, integrity, availability, and performance) are the same with 
systems in the cloud as they are with noncloud technology solutions. An organization’s level of 
OKB Cloud Computing Business Plan 
11
OKB CLOUD COMPUTING 
risk and risk profile will in most cases change if cloud solutions are adopted (depending on how 
and for what purpose the cloud solutions are used). This is due to the increase or decrease in 
likelihood and impact with respect to the risk events (inherent and residual) associated with the 
CSP that has been engaged for services. 
Some of the typical risks associated with cloud computing are: 
Disruptive force 
– Facilitating innovation (with increased speed) and the costsavings aspects of cloud 
computing can themselves be viewed as risk events for some organizations. By lowering the 
barriers of entry for new competitors, cloud computing could threaten or disrupt some business 
models, even rendering them obsolete in the future. For example, streaming media over the 
Internet was a technology solution that significantly reduced the sales of CDs and DVDs and the 
need for physical retail stores. Existing competitors that fully embrace the cloud might be able to 
bring new ideas and innovation into their markets faster. Since cloud computing solutions yield 
considerable shortterm cost savings due to reduced capital expenditures, an organization 
adopting the cloud might be able to extract better margins than its noncloud competitors. Thus, 
when an industry member adopts cloud solutions, other organizations in the industry could be 
forced to follow suit and adopt cloud computing. Residing in the same risk ecosystem as the 
CSP and other tenants of the cloud – When an organization adopts thirdpartymanaged cloud 
solutions, new dependency relationships with the CSP are created with respect to legal liability, 
the risk universe, incident escalation, incident response, and other areas. The actions of the CSP 
and fellow cloud tenants can impact the organization in various ways. Consider the following: 
• 
Legally, thirdparty cloud service providers and their customer organizations are distinct 
enterprises. 
However, if the CSP neglects or fails in its responsibilities, it could have legal implications 
for the CSP’s customer organizations. But if a cloud customer organization fails in its 
responsibilities, it is less likely there would be any legal implications to the CSP. 
• 
Cloud service providers and their customer organizations are likely to have separate 
enterprise risk management (ERM) programs to address their respective universe of perceived 
risks. Only in a minority of cases (involving very highdollar contracts) will CSPs attempt to 
integrate portions of their ERM programs with those of their customers. The universe of risks 
confronting an organization using thirdparty cloud computing is a combination of risks the 
individual organization faces along with a subset of the risks that its CSP is facing (discussed 
further in Section 5,“Approaching ERM in the Cloud Computing Paradigm”) 
10­Analysis 
of Competitors 
At this time OKB has no direct competition. Belem has immense need for the new and 
improved OKB Global cloud to deliver fast and reliable Internet, Cell Phone service, data storage 
and manage all telecommunication networks. 
11­Business 
Operations 
a. OKB will be manages as a SA Corporation 
b. OKB will integrate 14 HP 240a Ecopds 
OKB Cloud Computing Business Plan 
12
OKB CLOUD COMPUTING 
12­Legal 
Structure 
OKABE CIA Ltda­Me 
is a corporation in good standing since incorporating in 2000. 
13­Management 
Expertise 
OKB management team includes visionary industry pioneers and innovators. They are 
highly specialized and talented individuals who helped to launch the industry and continue to 
help shape its present and future course. The company’s principals have had previous success 
as entrepreneurs. The core team is well qualified to continue OKB Global ’s operations and 
expand upon its current expansion. 
Duane Lee 
Chief Executive Officer, Cloud Business Unit 
Now serving as OKB's CEO, Mr. Lee shares responsibility for the company's daytoday 
operations with Deywe Okabe, who now serves as President and Chief Strategy Office and 
Gregory Harris, the company's COO and director of special projects for OKB . 
Duane was appointed Group Executive – in 2014. 
Duane was previously with Top Notch International April 2004 present Consulting Co. in 
Panama / USA / Canada as Cofounder and director . 
Duane managed, set up and operated the marketing and sales departments of an exclusive 
island project called Isla Viveros on the Pearl Islands off the coast of Panama, with high end 
luxury homes, hotel, Jack Nicklaus Signature golf course, and deep water marina. We marketed 
and sold condos, private homes, and memberships to the exclusive private island resort. 
$300,000,000 project still under construction to this day. 
Duane was Project Manager for Malibu Beach Park and Resort. This was a $100,000,000 
development over 450 acres on the Pacific Ocean near Gorgona Panama. Residential homes, 
condos, hotel, restaurant, golf course, and commercial center. Responsible for all aspects of the 
project, primarily the oversight of the pre construction sales and marketing teams spread across 
the US, Canada, and Panama. 
Deywe Okabe 
President and and Chief Strategy Officer As President and Chief Strategy Officer for the 
OKB Cloud Business Unit, Deywe is responsible for our Public Cloud, Private Cloud, strategy 
and innovation, and global business opportunities. Mr. Okabe was CoFounder of OKB Cyber, a 
cloud and managed hosting provider .Mr. Okabe has been instrumental in defining and creating 
services organizations that improve the quality and reliability of the technology infrastructures 
businesses depend on for communications and commerce. 
Deywe is the founder of OKB Global, having been with the company since its beginning as 
a small Cyber Cafe and web hosting company back in 1998. Deywe started his company with his 
father at 19 years old, in his bedroom, during a time when the internet was still young an 
developing in Brasil . While attending Unama University in Belem Brasil, he grew the company 
into a high quality Cyber and Data Center Services Company utilizing its own network 
infrastructure and data center facilities. 
Gregory Harris 
Chief Operating Officer/Executive Vice President of Sales and Marketing 
OKB Cloud Computing Business Plan 
13
OKB CLOUD COMPUTING 
As COO for the OKB Cloud, Gregory is responsible for the day to day operations within the 
business, including business expansion and development. Gregory brings over 30 years 
experience in Business Development, Client Management, Sales and Marketing and expansion 
through his experience at Harris Investment Group. Gregory has previously held titles of 
President and Director of Harris Investment Group, in his many years of involvement with 
enterprise financial services. Mr Harris possesses the People management skills, supervising, 
staff training, ability to develop cost effective solutions to problems. Project management and 
strategic planning. Carrying out risk assessments on projects and issues. Being able to manage 
and supervise junior and senior staff. Proven ability to successfully increase domestic or global 
sales. 
Chief Financial Officer 
To be assigned, CFO is accountable for the administrative, financial, and risk management 
operations of the company, to include the development of a financial and operational strategy, 
metrics tied to that strategy, and the ongoing development and monitoring of control systems 
designed to preserve company assets and report accurate financial results. Principal 
accountabilities responsible for presenting and reporting accurate and timely historical financial 
information 
Vice President Design and Product Development 
Andre Hipolito Carvalho 
As Vice President of Design and Product Development for the OKB Cloud, Andre is 
responsible for the design and development of all Electrical Engineering and Solar Energy 
Products. Mr Carvalho brings a successful experience and credentials as a Company Executive, 
Commercial Manager. Project Manager. Coordination and approval of automation projects based 
on SCADA systems. Coordination and approval of factory and field acceptance tests. 
Professional experience in diversified areas of large industries like IT, logistic, operations, 
engineering, automation, instrumentation, maintenance and projects. Vast experience in 
programming languages, database, operating systems and Office package. Mr Carvalho has 
MBA in Oil & Gas – Funcefet – RJ – 2007 Automation and Control Engineering – PUC – MG – 
2001. Mr Carvalho have served in executive and manage positions with Siemens a major player 
in the general automation business, with an extensive customer portfolio, including Vale, Alcoa, 
Cosipa, Usiminas, Mannesmman, Gerdau, Usiminas, CSN and CSA, among others. 
14­Financial 
Information 
See financial sheet in page 21 
15­Summary 
OKB Global with its experienced professional management team, cutting edge technology 
and state of the art equipment are guaranteed to succeed in this perfect vacuum demanding our 
service. 
OKB Cloud Computing Business Plan 
14
OKB CLOUD COMPUTING 
OKB Cloud Computing Business Plan 15
OKB CLOUD COMPUTING 
OKB Proposed Data Center 
OKB Server Room 
Phase I pilot using SuperMicro with GR Cooling 
OKB Cloud Computing Business Plan 
16
OKB CLOUD COMPUTING 
Diesel Backup for Uninterruptible Service 
OKB Solar Integration 
OKB Cloud Computing Business Plan 
17
OKB CLOUD COMPUTING 
Server Equipment SuperMicro 
OKB will utilize the revolutionary SuperMicro FatTwin in all our facilities. 
Data Center Layout 
OKB Cloud Computing Business Plan 
18
OKB CLOUD COMPUTING 
OKB Phase II Intgration of HP 240a Ecopod 
OKB Cloud Computing Business Plan 
19
OKB CLOUD COMPUTING 
OKB Cloud Computing Business Plan 20
21

OKB Global Data Cemter Belem Brasil

  • 1.
    OKABE CIA LTDA­ME BUSINESS PLAN September, 2014 Gregory Harris Chief Operations Officer OKABE CIA LTDA­ME Rua Obidos 620 Belem Para Brasil 66020­448 Tel: 559132301094 Email: gregoryharris@okbglobal.com Website: www.okbglobal.com CONFIDENTIAL No offering is made or intended by this document. Any offering of interests in OKABE CIA LTDA­ME will be made only in compliance with Federal and State securities laws. This document includes confidential and proprietary information of and regarding OKABE CIA LTDA­ME. This document is provided for informational purposes only. You may not use this document except for informational purposes, and you may not reproduce this document in whole or in part, or divulge any of its contents without the prior written consent of OKABE CIA LTDA­ME. By accepting this document, you agree to be bound by these restrictions and limitations.
  • 2.
    OKB CLOUD COMPUTING THE OLD CONCEPT REGARDING NEW THINGS! LOSE YOUR SHOES BUT FIND YOURSERLF THE WORLD HAS CHANGED! WE DID THIS ! YOU WILL CHANGE TOO! ADVERTISING IS NOT A BOX IN A BLACKBOX
  • 3.
    OKB CLOUD COMPUTING Introduction.......................................................... 1­Excutive Sumary............................................. Method for success.................................... 2­Business Description....................................... 3­Vision statement............................................. 4­Vision trigger................................................... 5­Mission Statement:......................................... a) Overview................................................. b) Features.................................................. c) Methodology ......................................... Key actions................................................. Keys to Success......................................... 7­Industry Analysis.............................................. 8 ­Project Background........................................ 9 ­Market Analysis.............................................. Disruptive force........................................... 10­Analysis of Competitors................................ 11­Business Operations...................................... 12­Legal Structure............................................... 13­Management Expertise ................................. 14­Financial Information ..................................... 15­Summary ....................................................... 16­SWOT Analises............................................ 17­Additional Images........................................... OKB Cloud Computing Business Plan 03 04 05 05 06 06 07 07 07 07 08 09 09 10 10 11 12 12 12 13 13 14 14 15 16
  • 4.
    OKB CLOUD COMPUTING INTRODUCTION This letter of introduction is intended to outline the professionals involved in this great project, as well as give a brief introduction to the project, its timelines, goals, objectives, and expected returns. This project will be under the guidance of our very experienced and dynamic management team, made up of highly specialized and talented individuals, entrepreneurs, and pioneers in this industry. The CEO is Duane Lee, an experienced sales and marketing professional who has lived and worked globally, and been an integral part of projects with a development budget in the hundreds of millions of dollars. He works hand in hand with Deywe Okabe, President, and Chief Strategy Officer, and Gregory Harris, the Chief Operations Officer. Deywe is the founder of OKB Global, and the technology professional. Gregory has more than 30 years’ experience in business development, client management, and financial services. Together, this team makes up a virtual dream team in this development. The focus of this project will be to provide safe, secure, fully featured applications, with flexible access, and programming interfaces, all while remaining competitively priced. We intend to be the leader in this industry, to have the very best applications available for our wide range of clientele. Thank you for taking the time to review this project, we are available to answer any and all questions you may have. We look forward to working with you. OKB Global project is focused on the rapidly emerging telecommunications and energy market in Brazil, with many favorable contributing factors to expedite development. Other factors for Belem Brazil areas of expansion is the impending need to reduce energy consumption and costs. OKB has plans to development our Solar energy division. We also desire to manage and increase exportation of numerous commodities. Our vision is to transform Belem port in to a duty free zone by encouraging government incentives with taxation reductions and exemptions. Pará states rapid development is due to the extraction of minerals such as iron, manganese, niobium, bauxite, copper, gold, aluminum and the formation of the (presal) program the extraction of oil. In November 2013, a report released by the IEA (International Energy Agency) provides that credit to the oil found in the presalt. Brazil will become one of the countries with the largest oil exports in the world. In the near future Brazil will be one of the most important energy producers. It is estimated that by 2035, oil production in Brazil will triple, putting Brazil in the sixth place of the largest oil producers. The Brazilian coast in our region has the perfect location and environment for the emergence of oil refineries. The OKB Global Cloud will simultaneously organize, manage and facilitate the existing soybean production which is the second largest in Brazil and has the largest cattle breeding farms. Production and exports of Brazil nuts and acai, farm raised fish are demanding the emergence of 20 new ports and 18 industrial hubs, The emergence of a new technology center to form a new bloc in the development of railways and maritime being strengthened by political favoritism and paving the way through the OKB Global cloud. OKB Cloud Computing Business Plan 04
  • 5.
    OKB CLOUD COMPUTING 1. EXECUTIVE SUMMARY The goal of this BUSINESS PLAN is to present the IMPENDING UNDERLYING DEMAND for this project as well as stating all of the project's objectives. In today’s challenging economic climate, a growing number of organizations require more capable and flexible IT resources. All enterprises need to reduce costs. Cloud computing offer a tailor made product for everyone. The effects of a deep global recession have combined with recent advances in information technology to create the perfect environment for cloud computing. Cloud computing advertising has strengthened dramatically with the combination of an ever growing business dependence on cyber space, increasing demands on IT systems and a global mantra of budgetary prudence. OKB Global designed and is developing a hybrid cloud to facilitate a agile business platform. When a company experiences an unexpected spike in usage of an in­house server, the OKB Cloud Computing Business Plan workload can be passed off to the hybrid cloud. This way, your company avoids the additional cost of having to purchase new server hardware. In addition to being agile, the hybrid cloud is also scalable, which means it’s well suited for businesses with unpredictable peaks. Method for success 1) Design and develop a super cloud with 30,000 servers in four phases. 2) Utilize storage area network (SAN) is a dedicated network that provides access to consolidated, block level data storage and SAN file systems or shared disk file systems. 3) Utilize GR Cooling with containerized liquid coolant to reduce startup cost and lower operating cost with reduce energy requirements. 4) Integrate the HP 240a Ecopod a highly efficient self contained data storage system. 4) Retrofit OKB Cyber as pilot location Cidade Velha Belem Para Brasil. 5) Design and develop a 10,000 m2 metroplex business complex on land to be purchased in Belem OKB Global through its global consortium and executive staff will contract consultants in every phase of development. Deywe Okabe and Gregory Harris formed a professional alliance and selected Duane Lee as Chief Executive Officer (CEO). Deywe Okabe will be President and Gregory Harris will be Chief Operating Officer (COO) We will develop this in several phases as follows. Phase 1.) a. Pilot location is Rua Obidos 620 Belem Brasil a 550m2 facility pilot will take 90 to 120 days to renovate, retrofit and install equipment. Phase2.) Metroplex is to be constructed on raw land purchased upon funding, Av. Independência, 1856 Parque Verde Belem . b. acquire raw land, site preparation, obtain permits install infrastructure. 180 days c. Construction of metroplex. 12 months d. Install security, fire prevention equipment and deploy servers. 90 days 05
  • 6.
    OKB CLOUD COMPUTING The project will cost 1.) Total cost of project is $175,000,000 2.) See attached projections and assumptions attached 2. Business Description OKABE CIA LtdaMe is a corporation in good standing since incorporating in 2000. Many underlying factors have evolved and provided the perfect environment for this unique advertising, printing and cyber enterprise to expand to a super cloud that will manage, organize and control the economic pulse of Northern Brasil. OKB Global project is focused on the rapidly emerging telecommunications and energy market in Brazil, with many favorable contributing factors to expedite development. Other leading factors for Belem Brazil areas expansion is the impending need to reduce energy consumption and costs. OKB has plans to development our Solar Energy Division which will produce cells to provide additional power reducing demand from the grid. Our solar division will also develop and manufacture solar packages for commercial and residential applications. We also desire to manage and increase exportation of numerous commodities. Our vision is to transform Belem port into a duty free zone by encouraging government incentives with taxation reductions and exemptions. Pará states rapid development is due to the extraction of minerals such as iron, manganese, niobium, bauxite, copper, gold, aluminum and the formation of the (presal) program for the extraction of oil. In November 2013, a report released by the IEA (International Energy Agency) provides that credit to the oil found in the pre salt. Brazil will become one of the countries with the largest oil exports in the world. In the near future, Brazil will be one of the most important energy producers in the world. It is estimated that by 2035, oil production in Brazil will triple, putting Brazil in the sixth place of the largest oil producers globally. The Brazilian coast line in our region has the perfect location and environment for the emergence of oil refineries. The OKB Global Cloud will simultaneously organize, manage and facilitate the existing soybean production which is the second largest in Brazil and has the largest cattle breeding farms. Production and exports of Brazil nuts and acai, farm raised fish are demanding the emergence of 20 new ports and 18 industrial hubs, The emergence of a new technology center to form a new bloc for the development of railways and maritime, being strengthened by political favoritism and paving the way through the OKB Global cloud. OKB will be the largest telecommunications center in Norther Brasil with a state of the art and cutting edge equipment. The HP Ecopod will be the first of its kind in Brasil and has 2200 servers per unit and uses 4% of the energy of existing traditional units. OKB has no competition in Brasil North. 3. Vision statement. OKB is a web­based, free data storage project paid for by advertising. Users do not need specialized qualifications to utilize, since their primary function is to store data and fotos; this means that businesses, individuals and government entities may have safe and secure data storage hosted in Brasil. “The mission of OKB Global is to provide people around the world to collect and develop storage content under a free storage program when they agree to accept free advertising from our association with Facebook and Twitter. OKB will provide the essential infrastructure and an organizational framework to support and development of all endeavors. OKB will have more the 60 million unique clients over the next 5 years. OKB will be the main competition to Google in Brasil. OKB Cloud Computing Business Plan 06
  • 7.
    OKB CLOUD COMPUTING 4. Vision trigger With the rapid advancement of inexpensive smart phone, tablets and other smart devices. OKB is positioned to dominate and control all data storage for Personal, Universities, Business as well as Governmental Agencies and eliminated the use of USB storage devices in Brazil North. 5. Mission Statement: OKB Global designed and is developing a hybrid cloud to facilitate a agile business platform. When a company experiences an unexpected spike in usage of an in house server, the workload can be passed off to the hybrid cloud. This way company avoids the additional cost of having to purchase new server hardware. In addition to being agile, the hybrid cloud is also scalable, which means it’s well suited for businesses with unpredictable peaks. OKB Global Information’s modular Tier4 data center specifically designed to be a world class cloud computing facility totally dedicated to absolute performance and security. a) Overview The OKB Global Information data center engineered using the latest design methodologies including zoned cooling, GR Cooling for reduce A/C requirements, zoned fire suppression that utilizes clean agents, and fully redundant power supply sources. The data center modular design characteristics allows OKB Global Information to grow the underlying infrastructure as client needs grow, ultimately providing a fully populated data center floor of nearly 10,000 square meters. Our combination of data center design and management best practices demonstrate our commitment to providing our customers with a data center that is truly world class and unparalleled in Brazil. OKB Cloud Computing Business Plan b) Features 1) Scalability. The cloud allows companies to make fast and cost effective capacity adjustments 2) Greater Business Agility. Cloud enables companies to react to shifting workplace and staffing in moments. 3) Flexible pricing structures. Cloud providers offer customers creative and flexible pricing . 4) Fast time to deployment. Cloud eliminates purchases enabling applications running quickly. 5) Reduced system maintenance and management costs. Cloud requires less. 6) Low­risk ability to start up or move or expand. Capacity and applications offer risk­free trials. 7) Flexible staffing can lower operating expenses. Cloud enables companies to be 07
  • 8.
    OKB CLOUD COMPUTING nimble. 8) Threat Protection. All files are secure with 2048 bit encryption. c) Methodology 1) Design and develop a super cloud with 30,000 servers in four phases. 2) Utilize storage area network (SAN) is a dedicated network that provides access to consolidated, block level data storage and SAN file systems or shared disk file systems. 3) Utilize GR Cooling with containerized liquid coolant to reduce startup cost and lower operating cost with reduce energy requirements. 4) Integrate the HP 240a Ecopod a highly efficient self contained data storage system. 4) Retrofit OKB Cyber as pilot location Cidade Velha Belem Para Brasil. 5) Design and develop a 12,000 m2 metroplex business complex on land to be purchased in Belem . 6) Business Objectives OKB Global Information will create and provide a world class cloud data center in Belem to boost innovation and productivity across the Digital economy in Brazil. When business, universities, individuals and government agencies adopt cloud services, they are more productive, innovate better and operate with greater agility. As a nation, Brazil is well placed to take advantage of cloud computing for a range of reasons – including a stable socio economic system, a strong rule of law and a highly diverse and skilled Information and Communications Technology (ICT) sector. At the individual level there are few organizations across the economy that have implemented innovative cloud computing services. Brazil lags behind their counterparts in Organization for Economic Cooperation and Development (OECD) countries in the use of online technology. This places these organizations at a competitive disadvantage, which could be overcome through the use of cloud computing services. One reason for this has been insufficient access to the necessary infrastructure to support sophisticated cloud services. The relatively slow download or upload speeds in many parts of Brazil have limited the adoption of cloud services. OKB Global Information will change this and is a key enabler of the Digital economy more broadly. There are other reasons that cloud computing has not been adopted more generally in Brazil, including a lack of awareness of how to make best use of cloud computing and a lack of confidence that some organizations and individuals have in adopting cloud computing services. However, as the cloud services market continues to evolve, users and providers of cloud services must remain responsive to change. Likewise, OKB will continue to adapt its strategy in response to market and technological changes. 1. Maximizing the value of cloud computing Goal: OKB Global Information will be a leader in the use of cloud services to achieve greater efficiency, generate greater value from ICT investment, deliver better services and support a more agile public sector. OKB Cloud Computing Business Plan 08
  • 9.
    OKB CLOUD COMPUTING Key actions: The Brazilian Internet Steering Committee (CGI.br) will enhance the guidance available to government decision makers on how to evaluate the benefits of cloud services and how to procure and manage them. OKB and the Brazil Digital Economy will establish information sharing initiatives to facilitate continual improvement based on a repository of case studies, reduced risk approaches and practical lessons to enable agencies to learn from each other. Brazil’s Digital economy is currently comprised of about 147,000 companies and is set to generate $490 billion in revenue by the end of 2014, according to a study by Softex Observatory. Keys to Success Competitive and flexible pricing Choose a storage solution that fits the nature of your data, whether it’s Standard Storage or Durable Reduced Availability (DRA) Storage. Like other Cloud Platform services, you pay just for what you use. • Scalability. The cloud allows companies to make fast and costeffective capacity adjustments, scaling up and down depending upon traffic, seasonality and business need. • Greater Business Agility. Cloud enables companies to react to shifting workplace and staffing demand. • Flexible pricing structures. Cloud providers offer customers creative and flexible pricing options, such as tiered alla­carte pricing, making it easier to tailor solutions to a business’s needs and match value.• Fast time to deployment. Cloud eliminates the need to purchase new systems and load new applications, or compete with other projects for IT resources, thereby enabling applications to be up and running more quickly. • Reduced system maintenance and management costs. Cloud requires less maintenance and management from IT, allowing resources to be reallocated to other projects in the business. • Lowrisk ability to start up or move or expand. Capacity and applications can be added without risking existing business plans. Additionally, some solution providers offer riskfree trials. • Flexible staffing can lower operating expenses. Cloud enables companies to be nimble with staffing plans using different strategies to optimize staff, including using lowercost locations such as off shoring or home shoring, but away from corporate, or using athome workers with flexible schedules and ability to work short hours rather than full days. Company's goal is to dominate our untapped advertising market as follows: We will Provide over 100 Gigabytes Data Storage service for free, obligating our clients to receive advertising on their smartphone, tablet, or PC, with the option to eliminate by electing prepaid or fixed payment option. OKB Cloud Computing Business Plan 09
  • 10.
    OKB CLOUD COMPUTING OKB Cloud Computing has the overall goal, provide the cloud computing services through Internet present a new vision for advertising space, providing Cloud Service for Schools, Universities, Hospitals, Commercial Establishment , Supermarkets, Handyman and Residential. OKB Global project is focused on the rapidly emerging telecommunications and energy market in Brazil, with many favorable contributing factors to expedite development. Other factors for Belem Brasil areas of expansion by reducing energy consumption and costs with the development our Solar energy division and increase exportation of numerous commodities. Our vision is to transform Belem port a duty free zone by encouraging government incentives with tax reductions and exemption. Pará states rapid development is due to the extraction of minerals such as iron, manganese, niobium, bauxite, copper, gold, aluminum and the formation of the (presal) program the extraction of oil. In November 2013, a report released by the IEA (International Energy Agency) provides that thanks to the oil found in the presalt, Brazil will become one of the countries with the largest oil exports in the world. In the near future, Brazil will be one of the most important energy producers in the world. It is estimated that in 2035, oil production in Brazil will triple, putting Brazil in the sixth place of the largest oil producers in the world. The Brazilian coast in our region has the perfect location and environment for emergence of oil refineries. The OKB Global Cloud will simultaneously organize and facilitate the existing soybean production which is the second largest in Brazil and has the largest cattle breeding. 7­Industry Analysis As public cloud computing gains greater adoption across enterprises, there’s an increased level of spending occurring on infrastructure­related services including Infrastructure­as­a­Service( IaaS). Enterprises are prioritizing how to get cloud platforms integrated with legacy systems to make use of the years of data they have accumulated. From legacy Enterprise Resource Planning (ERP) to Customer Relationship Management (CRM) systems, integrating legacy systems of record to cloud­based platforms will accelerate through 2016. I’ve seen this in conversations with resellers and enterprise customers, and this trend is also reflected in Gartner’s latest report on public cloud computing adoption, Forecast Overview: Public Cloud Services, Worldwide, 2011­2016, 4Q12 Update Published: 8 February 2013. Global spending on public cloud services is expected to grow 18.6% in 2012 to $110.3B, achieving a CAGR of 17.7% from 2011 through 2016. The total market is expected to grow from $76.9B in 2010 to $210B in 2016. The following is an analysis of the public cloud services market size and annual growth rates: 8 ­Project Background In today’s challenging economic climate, a growing number of organizations require more capable and flexible IT resources; they also need to reduce costs. OKB will design, develop and implement a hybrid cloud data centre which is a combination of public and private clouds. Businesses in highly regulated industries (banking, universities and government agencies) with compliance requirements regarding data residency (“Internet Bill of Rights”) can leverage the OKB Cloud Computing Business Plan 10
  • 11.
    OKB CLOUD COMPUTING private cloud for those sensitive workloads, while relying on the costeffective hybred cloud for nonregulated operations. The effects of a deep global recession have combined with recent advances in information technology to create t perfect environment for cloud computing. cloud computing propaganda whose effects have increased dramatically by the combination of an evergrowing business dependence on cyber space, increasing demands on IT systems and a global demand for budgetary prudence. A growing number of cloud service providers are offering customers the potential to generate sizable, longterm costsavings, increase the capacity, agility and flexibility of their IT systems, and provide a muchneeded standard IT platform across their business. Their cloud computing efforts are being met with considerable success. The hybrid cloud lets business be more agile. When a company experiences an unexpected spike in usage of an inhouse server, the workload can be passed off to the hybred cloud. This way the company avoids the additional cost of having to purchase new server hardware. In addition to being agile, the hybrid cloud is also scalable, which means it’s well suited for businesses with unpredictable peaks. 9 ­Market Analysis Cushman & Wakefield Report Takes a Deeper Look at the Brazilian Data Center Market Published Date : 5/6/2014 MULTI­TENANT DATA CENTER MARKET Currently, there is less than 500,000 SF of operational data center space in Brazil and only three U. S.based data center providers in the country: Equinix (who acquired local provider ALOG), Level 3 Communications (via its acquisition of Global Crossing) and Verizon (via Terremark), according to the report. Key sub­markets include São Paulo and Rio de Janeiro. São Paulo represents the largest data center market in South America, accounting for 50 percent of capacity in Brazil – approximately 450,000 operational square feet. Financial institutions, multinational firms, and e commerce companies drive the demand here. Barueri, located near the stock exchange, is also emerging as the new data center centric area. OKB Global will implement the much needed cloud in Belem being a metropolis with the population of about 7 million people, 50 campuses, 10 000 schools, approximately 12,000 business establishments, 32 000 lawyers, 22 industries, 600 vocational courses, 1 international airport, 20 large supermarkets, and with the reduction of costs of Internet and data centre servers would be the first step forward for already present future farms. Exports of Brazil nuts and acai, farm raised fish are demanding the emergence of new 20 ports and 18 industrial hubs, and emergence of a new technology center to form a new bloc in the exploitation of railways and maritime, being strengthened by political favoritism and paving the way through the OKB Global cloud.P roject Risk Management – Integrated Framework :“Risk is the possibility that an event will occur and adversely affect the achievement of objectives.” The types of risks (e.g., security, integrity, availability, and performance) are the same with systems in the cloud as they are with noncloud technology solutions. An organization’s level of OKB Cloud Computing Business Plan 11
  • 12.
    OKB CLOUD COMPUTING risk and risk profile will in most cases change if cloud solutions are adopted (depending on how and for what purpose the cloud solutions are used). This is due to the increase or decrease in likelihood and impact with respect to the risk events (inherent and residual) associated with the CSP that has been engaged for services. Some of the typical risks associated with cloud computing are: Disruptive force – Facilitating innovation (with increased speed) and the costsavings aspects of cloud computing can themselves be viewed as risk events for some organizations. By lowering the barriers of entry for new competitors, cloud computing could threaten or disrupt some business models, even rendering them obsolete in the future. For example, streaming media over the Internet was a technology solution that significantly reduced the sales of CDs and DVDs and the need for physical retail stores. Existing competitors that fully embrace the cloud might be able to bring new ideas and innovation into their markets faster. Since cloud computing solutions yield considerable shortterm cost savings due to reduced capital expenditures, an organization adopting the cloud might be able to extract better margins than its noncloud competitors. Thus, when an industry member adopts cloud solutions, other organizations in the industry could be forced to follow suit and adopt cloud computing. Residing in the same risk ecosystem as the CSP and other tenants of the cloud – When an organization adopts thirdpartymanaged cloud solutions, new dependency relationships with the CSP are created with respect to legal liability, the risk universe, incident escalation, incident response, and other areas. The actions of the CSP and fellow cloud tenants can impact the organization in various ways. Consider the following: • Legally, thirdparty cloud service providers and their customer organizations are distinct enterprises. However, if the CSP neglects or fails in its responsibilities, it could have legal implications for the CSP’s customer organizations. But if a cloud customer organization fails in its responsibilities, it is less likely there would be any legal implications to the CSP. • Cloud service providers and their customer organizations are likely to have separate enterprise risk management (ERM) programs to address their respective universe of perceived risks. Only in a minority of cases (involving very highdollar contracts) will CSPs attempt to integrate portions of their ERM programs with those of their customers. The universe of risks confronting an organization using thirdparty cloud computing is a combination of risks the individual organization faces along with a subset of the risks that its CSP is facing (discussed further in Section 5,“Approaching ERM in the Cloud Computing Paradigm”) 10­Analysis of Competitors At this time OKB has no direct competition. Belem has immense need for the new and improved OKB Global cloud to deliver fast and reliable Internet, Cell Phone service, data storage and manage all telecommunication networks. 11­Business Operations a. OKB will be manages as a SA Corporation b. OKB will integrate 14 HP 240a Ecopds OKB Cloud Computing Business Plan 12
  • 13.
    OKB CLOUD COMPUTING 12­Legal Structure OKABE CIA Ltda­Me is a corporation in good standing since incorporating in 2000. 13­Management Expertise OKB management team includes visionary industry pioneers and innovators. They are highly specialized and talented individuals who helped to launch the industry and continue to help shape its present and future course. The company’s principals have had previous success as entrepreneurs. The core team is well qualified to continue OKB Global ’s operations and expand upon its current expansion. Duane Lee Chief Executive Officer, Cloud Business Unit Now serving as OKB's CEO, Mr. Lee shares responsibility for the company's daytoday operations with Deywe Okabe, who now serves as President and Chief Strategy Office and Gregory Harris, the company's COO and director of special projects for OKB . Duane was appointed Group Executive – in 2014. Duane was previously with Top Notch International April 2004 present Consulting Co. in Panama / USA / Canada as Cofounder and director . Duane managed, set up and operated the marketing and sales departments of an exclusive island project called Isla Viveros on the Pearl Islands off the coast of Panama, with high end luxury homes, hotel, Jack Nicklaus Signature golf course, and deep water marina. We marketed and sold condos, private homes, and memberships to the exclusive private island resort. $300,000,000 project still under construction to this day. Duane was Project Manager for Malibu Beach Park and Resort. This was a $100,000,000 development over 450 acres on the Pacific Ocean near Gorgona Panama. Residential homes, condos, hotel, restaurant, golf course, and commercial center. Responsible for all aspects of the project, primarily the oversight of the pre construction sales and marketing teams spread across the US, Canada, and Panama. Deywe Okabe President and and Chief Strategy Officer As President and Chief Strategy Officer for the OKB Cloud Business Unit, Deywe is responsible for our Public Cloud, Private Cloud, strategy and innovation, and global business opportunities. Mr. Okabe was CoFounder of OKB Cyber, a cloud and managed hosting provider .Mr. Okabe has been instrumental in defining and creating services organizations that improve the quality and reliability of the technology infrastructures businesses depend on for communications and commerce. Deywe is the founder of OKB Global, having been with the company since its beginning as a small Cyber Cafe and web hosting company back in 1998. Deywe started his company with his father at 19 years old, in his bedroom, during a time when the internet was still young an developing in Brasil . While attending Unama University in Belem Brasil, he grew the company into a high quality Cyber and Data Center Services Company utilizing its own network infrastructure and data center facilities. Gregory Harris Chief Operating Officer/Executive Vice President of Sales and Marketing OKB Cloud Computing Business Plan 13
  • 14.
    OKB CLOUD COMPUTING As COO for the OKB Cloud, Gregory is responsible for the day to day operations within the business, including business expansion and development. Gregory brings over 30 years experience in Business Development, Client Management, Sales and Marketing and expansion through his experience at Harris Investment Group. Gregory has previously held titles of President and Director of Harris Investment Group, in his many years of involvement with enterprise financial services. Mr Harris possesses the People management skills, supervising, staff training, ability to develop cost effective solutions to problems. Project management and strategic planning. Carrying out risk assessments on projects and issues. Being able to manage and supervise junior and senior staff. Proven ability to successfully increase domestic or global sales. Chief Financial Officer To be assigned, CFO is accountable for the administrative, financial, and risk management operations of the company, to include the development of a financial and operational strategy, metrics tied to that strategy, and the ongoing development and monitoring of control systems designed to preserve company assets and report accurate financial results. Principal accountabilities responsible for presenting and reporting accurate and timely historical financial information Vice President Design and Product Development Andre Hipolito Carvalho As Vice President of Design and Product Development for the OKB Cloud, Andre is responsible for the design and development of all Electrical Engineering and Solar Energy Products. Mr Carvalho brings a successful experience and credentials as a Company Executive, Commercial Manager. Project Manager. Coordination and approval of automation projects based on SCADA systems. Coordination and approval of factory and field acceptance tests. Professional experience in diversified areas of large industries like IT, logistic, operations, engineering, automation, instrumentation, maintenance and projects. Vast experience in programming languages, database, operating systems and Office package. Mr Carvalho has MBA in Oil & Gas – Funcefet – RJ – 2007 Automation and Control Engineering – PUC – MG – 2001. Mr Carvalho have served in executive and manage positions with Siemens a major player in the general automation business, with an extensive customer portfolio, including Vale, Alcoa, Cosipa, Usiminas, Mannesmman, Gerdau, Usiminas, CSN and CSA, among others. 14­Financial Information See financial sheet in page 21 15­Summary OKB Global with its experienced professional management team, cutting edge technology and state of the art equipment are guaranteed to succeed in this perfect vacuum demanding our service. OKB Cloud Computing Business Plan 14
  • 15.
    OKB CLOUD COMPUTING OKB Cloud Computing Business Plan 15
  • 16.
    OKB CLOUD COMPUTING OKB Proposed Data Center OKB Server Room Phase I pilot using SuperMicro with GR Cooling OKB Cloud Computing Business Plan 16
  • 17.
    OKB CLOUD COMPUTING Diesel Backup for Uninterruptible Service OKB Solar Integration OKB Cloud Computing Business Plan 17
  • 18.
    OKB CLOUD COMPUTING Server Equipment SuperMicro OKB will utilize the revolutionary SuperMicro FatTwin in all our facilities. Data Center Layout OKB Cloud Computing Business Plan 18
  • 19.
    OKB CLOUD COMPUTING OKB Phase II Intgration of HP 240a Ecopod OKB Cloud Computing Business Plan 19
  • 20.
    OKB CLOUD COMPUTING OKB Cloud Computing Business Plan 20
  • 21.