PROJECT
MANAGEMENT
I N T E R V E N T I O N P L A N
P R E S E N T E D B Y :
TABLE OF CONTENTS
01
06
02
07
03
08
04
09
05
10
CASE STUDY
DELIVERY ROADMAP
PROBLEM STATEMENT
KEY PROGRAM
MANAGEMENT ACTIVITIES
INITIAL HYPOTHESIS
EXPECTED CHALLENGES
PROPOSED FRAMEWORK
RESOLUTION STRATEGIES
SOLUTION APPROACH
CONCLUSION
CASE STUDY
Client aims to establish a business-driven PMO to tackle project delays and budget
overruns. Current PM lacks advisory skills and fails to align methodology with client
expectations, prompting the need for a new project manager. Previous manager's
shortcomings include inadequate methodology and stakeholder engagement. Client
also requests an additional team member and PMP training. Intervention plan
focuses on revising methodology, enhancing advisory capacity, and implementing
robust reporting mechanisms for improved project outcomes and stakeholder
satisfaction.
PROBLEM STATEMENT
Ineffective Project Management Support
The PMO's inability to offer sufficient assistance results in
project delays, exceeding budgets, and a disconnect from
organizational objectives.
1.
Project Schedule Disruptions
Projects overseen by the PMO frequently encounter delays,
impacting delivery schedules and overall project success
2.
Financial Resource Mismanagement
Inadequate budget oversight leads to surpassing allocated
funds, causing unexpected expenses and financial strain
on the organization
3.
Strategic Misalignment
With a focus on risk management, PMO projects lack
alignment with organizational goals, emphasizing the need
for better coordination and goal synchronization.
4.
Inadequate Stakeholder Engagement
Insufficient communication and involvement with
stakeholders impede project progress, resulting in unclear
expectations and dissatisfaction among stakeholders
5.
INITIAL HYPOTHESIS
Advisory Skills Enhancement
By providing comprehensive training and
mentorship in advisory skills, the PMO can
improve its ability to offer expert guidance
and strategic direction to project teams, thus
facilitating better decision-making and
problem-solving
Methodology Alignment
Aligning project management
methodologies with organizational
objectives through process
improvements and standardization can
enhance project efficiency, effectiveness,
and overall alignment with strategic goals
Stakeholder Engagement
Improving stakeholder engagement
involves implementing effective
communication strategies and feedback
mechanisms to foster stronger
relationships and ensure alignment
Resource Management
By refining resource management
processes like allocation, tracking
utilization, and planning capacity, the
PMO ensures projects are on budget
and schedule
Team Competency Development
Investing in comprehensive training
programs and professional development
opportunities can enhance the skills and
competencies of the PMO team, enabling
them to perform their roles effectively and
contribute to project success
PROPOSED FRAMEWORK
Overcoming Obstacles
Offers strategies to address challenges effectively,
improving project management proficiency.
Structured PM Approach
Provides a systematic method to assess current
PMO organizational processes, identifying areas for
enhancement.
Standardized Practices
Establishes consistent approaches aligned with
industry standards, fostering reliability and efficiency
Benchmarking Alignment
Ensures conformity with industry best practices and PMP
benchmarks, enhancing organizational performance.
Continuous Improvement
Facilitates ongoing refinement of processes to adapt
to evolving needs and maintain competitiveness
1.
2.
3.
4.
5.
SOLUTION APPROACH
1. Assessment and Planning:
 Conduct a thorough assessment of current project management practices and capabilities.
 Develop a detailed plan with clear objectives and timelines for improvement initiatives.
2. Capability Enhancement:
 Implement targeted interventions to enhance project management skills and methodologies.
 Introduce tools and technologies to improve project efficiency and effectiveness.
3. Resource Optimization:
 Evaluate and optimize resource allocation across projects.
 Implement strategies to maximize resource utilization and minimize waste.
4. Competency Development:
 Provide training and certification programs to enhance the skills of project management teams.
 Foster a culture of continuous learning and skill development.
5. Continuous Improvement:
 Establish feedback mechanisms to monitor progress and identify areas for further improvement.
 Regularly review and update project management processes based on lessons learned and feedback.
DELIVERY ROADMAP
Initiation 1 2
4 5
3
 Define project purpose,
scope, and key stakeholders.
 Gain stakeholder buy-in and
formal project launch.
Planning
 Assess current practices and capabilities.
 Identify strengths, weaknesses,
opportunities, and threats.
 Define objectives, KPIs, and detailed
implementation plan.
 Assign roles and responsibilities.
Execution
Monitoring and
Controlling Closure
 Implement improvement
initiatives.
 Enhance skills, methodologies,
and resource utilization.
 Provide training and support.
 Monitor progress and address
issues
 Regularly monitor performance
against objectives.
 Track progress, identify
variances, and take corrective
actions.
 Conduct reviews and adjust the
plan as needed.
 Evaluate outcomes and
celebrate successes.
 Document lessons learned and
best practices.
 Formalize project closure and
transition remaining activities.
4
Establishing the Program Management Office
Defining Roles and Responsibilities
Developing a Communication Plan
Monitoring Project Performance
Implementing Continuous Improvement
1.
2.
3.
4.
5.
KEY PROGRAM MANAGEMENT ACTIVITIES:
• Create a centralized PgMO to oversee improvement initiatives.
• Determine the structure, processes, and governance framework.
• Clearly define roles for PgMO members, project managers, and
stakeholders.
• Ensure accountability and streamline decision-making.
• Create a comprehensive plan to keep stakeholders informed.
• Determine Communication Frequency, Channels, and Key
Messages, Implement RACI Framework.
• Establish mechanisms for monitoring project progress.
• Regularly review performance against objectives and KPIs
• Foster a culture of continuous improvement within the PgMO.
• Encourage feedback and adapt processes based on lessons
learned.
Providing Resource Management
Conducting Risk Management
Facilitating Stakeholder Engagement
Ensuring Quality Assurance
Managing Change
6.
7.
8.
9.
10.
KEY PROGRAM MANAGEMENT ACTIVITIES:
• Allocate resources effectively to support project implementation.
• Optimize resource utilization to maximize efficiency.
• Identify and assess project risks.
• Develop strategies to mitigate risks and minimize their impact.
• Engage stakeholders throughout the project lifecycle.
• Solicit feedback and address concerns to ensure alignment
• Establish quality assurance processes to maintain project
standards.
• Conduct regular quality reviews and audits
• Implement change management processes to address
resistance.
• Communicate changes effectively and facilitate transition
EXPECTED CHALLENGES
01
Resistance to Change
Employees may resist new
practices due to fear or
uncertainty, necessitating effective
change management strategies.
02
03
04
05
06
Limited Resources
Budget, personnel, and time
constraints may hinder initiatives,
requiring careful resource
allocation and prioritization
Stakeholder Alignment
Ensuring agreement among
stakeholders with diverse interests
demands effective communication
and negotiation efforts
Skill Gap
Addressing project management
skill deficiencies may require
targeted training programs and
competency development initiatives
Cultural Shift
Changing organizational culture to
adopt new practices may face
resistance, necessitating patience
and leadership
Sustaining Momentum
Maintaining enthusiasm and
commitment over time demands
ongoing motivation, recognition,
and progress reinforcement
RESOLUTION STRATEGIES
04
Enhance project management
competencies through targeted training
programs, ensuring team readiness for
success
Skill Development
05
Encourage innovation and continuous
improvement by fostering an open and
transparent organizational culture
Cultural Transformation
06
Maintain enthusiasm and commitment
through regular communication, celebration
of successes, and reinforcement of project
management values
Sustaining Momentum
01
Implement structured processes to
address resistance and facilitate smooth
transitions during new practice adoption
Effective Change
Management
02
Maximize efficiency by strategically
allocating and utilizing available resources
to support project objectives
Resource Optimization
03
Foster collaboration and buy-in by
engaging stakeholders throughout the
project lifecycle and ensuring alignment
with goals
Stakeholder Engagement
CONCLUSION
In conclusion, effectively navigating intercultural dynamics is essential for successful
collaboration with clients from diverse backgrounds. By recognizing and respecting cultural
differences, businesses can foster stronger relationships, enhance communication, and
achieve mutual understanding. Embracing cultural diversity promotes innovation, creativity,
and global competitiveness, ultimately leading to greater success in today's interconnected
world.
THANK YOU
F O R Y O U R A T T E N T I O N

More Related Content

Similar to Project Management Related - Idea Presenation Work - Case Study

SAP Organization Change Management
SAP Organization Change ManagementSAP Organization Change Management
SAP Organization Change ManagementFred Asher, Ph.D.
 
The 5 Critical Elements to Creating a Project Management Center of Excellence
The 5 Critical Elements to Creating a Project Management Center of ExcellenceThe 5 Critical Elements to Creating a Project Management Center of Excellence
The 5 Critical Elements to Creating a Project Management Center of ExcellenceFlevy.com Best Practices
 
Creating a Training Program and Learning Culture
Creating a Training Program and Learning CultureCreating a Training Program and Learning Culture
Creating a Training Program and Learning CultureBizLibrary
 
MoP Quick Guide
MoP Quick GuideMoP Quick Guide
MoP Quick GuideMaven
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkejlp12
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceSusan Schanta
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessRuffin Veal and Associates, Inc.
 
project management 1.docx
project management 1.docxproject management 1.docx
project management 1.docxMARYJULDULAGAN
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary Amr Miqdadi
 
P3O - The Value Adding PMO - from Strategy to Projects
P3O - The Value Adding PMO - from Strategy to ProjectsP3O - The Value Adding PMO - from Strategy to Projects
P3O - The Value Adding PMO - from Strategy to ProjectsTony Vynckier
 
Building and sustaining total quality organizations
Building and sustaining total quality organizationsBuilding and sustaining total quality organizations
Building and sustaining total quality organizationsLizzette Danan
 
APWASpring2015 presentation-Final
APWASpring2015 presentation-FinalAPWASpring2015 presentation-Final
APWASpring2015 presentation-FinalZahid Khan, PE, PMP
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]OyetadeTobi
 

Similar to Project Management Related - Idea Presenation Work - Case Study (20)

PMO's and the CxO webinar, 6 June 2023
PMO's and the CxO webinar, 6 June 2023PMO's and the CxO webinar, 6 June 2023
PMO's and the CxO webinar, 6 June 2023
 
SAP Organization Change Management
SAP Organization Change ManagementSAP Organization Change Management
SAP Organization Change Management
 
The 5 Critical Elements to Creating a Project Management Center of Excellence
The 5 Critical Elements to Creating a Project Management Center of ExcellenceThe 5 Critical Elements to Creating a Project Management Center of Excellence
The 5 Critical Elements to Creating a Project Management Center of Excellence
 
Creating a Training Program and Learning Culture
Creating a Training Program and Learning CultureCreating a Training Program and Learning Culture
Creating a Training Program and Learning Culture
 
MoP Quick Guide
MoP Quick GuideMoP Quick Guide
MoP Quick Guide
 
PMP Training - 01 introduction to framework
PMP Training - 01 introduction to frameworkPMP Training - 01 introduction to framework
PMP Training - 01 introduction to framework
 
PM Academy Credentials
PM Academy Credentials PM Academy Credentials
PM Academy Credentials
 
PMO Success Blueprint.pdf
PMO Success Blueprint.pdfPMO Success Blueprint.pdf
PMO Success Blueprint.pdf
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program Assurance
 
Strategic Initiatives
Strategic InitiativesStrategic Initiatives
Strategic Initiatives
 
Project Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition SuccessProject Management vs. Program Management: Strategies for Transition Success
Project Management vs. Program Management: Strategies for Transition Success
 
project management 1.docx
project management 1.docxproject management 1.docx
project management 1.docx
 
Pmo
PmoPmo
Pmo
 
Christine Haefner Resume PC
Christine Haefner Resume PCChristine Haefner Resume PC
Christine Haefner Resume PC
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary
 
PPM Global survey (with outputs)
PPM Global survey (with outputs)PPM Global survey (with outputs)
PPM Global survey (with outputs)
 
P3O - The Value Adding PMO - from Strategy to Projects
P3O - The Value Adding PMO - from Strategy to ProjectsP3O - The Value Adding PMO - from Strategy to Projects
P3O - The Value Adding PMO - from Strategy to Projects
 
Building and sustaining total quality organizations
Building and sustaining total quality organizationsBuilding and sustaining total quality organizations
Building and sustaining total quality organizations
 
APWASpring2015 presentation-Final
APWASpring2015 presentation-FinalAPWASpring2015 presentation-Final
APWASpring2015 presentation-Final
 
Project management [module 1]
Project management [module 1]Project management [module 1]
Project management [module 1]
 

Recently uploaded

Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Hasting Chen
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxmohammadalnahdi22
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )Pooja Nehwal
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...NETWAYS
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyPooja Nehwal
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrSaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrsaastr
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesPooja Nehwal
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfakankshagupta7348026
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024eCommerce Institute
 

Recently uploaded (20)

Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
Re-membering the Bard: Revisiting The Compleat Wrks of Wllm Shkspr (Abridged)...
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptxMohammad_Alnahdi_Oral_Presentation_Assignment.pptx
Mohammad_Alnahdi_Oral_Presentation_Assignment.pptx
 
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
WhatsApp 📞 9892124323 ✅Call Girls In Juhu ( Mumbai )
 
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
OSCamp Kubernetes 2024 | A Tester's Guide to CI_CD as an Automated Quality Co...
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night EnjoyCall Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
Call Girl Number in Khar Mumbai📲 9892124323 💞 Full Night Enjoy
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStrSaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
SaaStr Workshop Wednesday w: Jason Lemkin, SaaStr
 
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara ServicesVVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
VVIP Call Girls Nalasopara : 9892124323, Call Girls in Nalasopara Services
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdf
 
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
Andrés Ramírez Gossler, Facundo Schinnea - eCommerce Day Chile 2024
 

Project Management Related - Idea Presenation Work - Case Study

  • 1. PROJECT MANAGEMENT I N T E R V E N T I O N P L A N P R E S E N T E D B Y :
  • 2. TABLE OF CONTENTS 01 06 02 07 03 08 04 09 05 10 CASE STUDY DELIVERY ROADMAP PROBLEM STATEMENT KEY PROGRAM MANAGEMENT ACTIVITIES INITIAL HYPOTHESIS EXPECTED CHALLENGES PROPOSED FRAMEWORK RESOLUTION STRATEGIES SOLUTION APPROACH CONCLUSION
  • 3. CASE STUDY Client aims to establish a business-driven PMO to tackle project delays and budget overruns. Current PM lacks advisory skills and fails to align methodology with client expectations, prompting the need for a new project manager. Previous manager's shortcomings include inadequate methodology and stakeholder engagement. Client also requests an additional team member and PMP training. Intervention plan focuses on revising methodology, enhancing advisory capacity, and implementing robust reporting mechanisms for improved project outcomes and stakeholder satisfaction.
  • 4. PROBLEM STATEMENT Ineffective Project Management Support The PMO's inability to offer sufficient assistance results in project delays, exceeding budgets, and a disconnect from organizational objectives. 1. Project Schedule Disruptions Projects overseen by the PMO frequently encounter delays, impacting delivery schedules and overall project success 2. Financial Resource Mismanagement Inadequate budget oversight leads to surpassing allocated funds, causing unexpected expenses and financial strain on the organization 3. Strategic Misalignment With a focus on risk management, PMO projects lack alignment with organizational goals, emphasizing the need for better coordination and goal synchronization. 4. Inadequate Stakeholder Engagement Insufficient communication and involvement with stakeholders impede project progress, resulting in unclear expectations and dissatisfaction among stakeholders 5.
  • 5. INITIAL HYPOTHESIS Advisory Skills Enhancement By providing comprehensive training and mentorship in advisory skills, the PMO can improve its ability to offer expert guidance and strategic direction to project teams, thus facilitating better decision-making and problem-solving Methodology Alignment Aligning project management methodologies with organizational objectives through process improvements and standardization can enhance project efficiency, effectiveness, and overall alignment with strategic goals Stakeholder Engagement Improving stakeholder engagement involves implementing effective communication strategies and feedback mechanisms to foster stronger relationships and ensure alignment Resource Management By refining resource management processes like allocation, tracking utilization, and planning capacity, the PMO ensures projects are on budget and schedule Team Competency Development Investing in comprehensive training programs and professional development opportunities can enhance the skills and competencies of the PMO team, enabling them to perform their roles effectively and contribute to project success
  • 6. PROPOSED FRAMEWORK Overcoming Obstacles Offers strategies to address challenges effectively, improving project management proficiency. Structured PM Approach Provides a systematic method to assess current PMO organizational processes, identifying areas for enhancement. Standardized Practices Establishes consistent approaches aligned with industry standards, fostering reliability and efficiency Benchmarking Alignment Ensures conformity with industry best practices and PMP benchmarks, enhancing organizational performance. Continuous Improvement Facilitates ongoing refinement of processes to adapt to evolving needs and maintain competitiveness 1. 2. 3. 4. 5.
  • 7. SOLUTION APPROACH 1. Assessment and Planning:  Conduct a thorough assessment of current project management practices and capabilities.  Develop a detailed plan with clear objectives and timelines for improvement initiatives. 2. Capability Enhancement:  Implement targeted interventions to enhance project management skills and methodologies.  Introduce tools and technologies to improve project efficiency and effectiveness. 3. Resource Optimization:  Evaluate and optimize resource allocation across projects.  Implement strategies to maximize resource utilization and minimize waste. 4. Competency Development:  Provide training and certification programs to enhance the skills of project management teams.  Foster a culture of continuous learning and skill development. 5. Continuous Improvement:  Establish feedback mechanisms to monitor progress and identify areas for further improvement.  Regularly review and update project management processes based on lessons learned and feedback.
  • 8. DELIVERY ROADMAP Initiation 1 2 4 5 3  Define project purpose, scope, and key stakeholders.  Gain stakeholder buy-in and formal project launch. Planning  Assess current practices and capabilities.  Identify strengths, weaknesses, opportunities, and threats.  Define objectives, KPIs, and detailed implementation plan.  Assign roles and responsibilities. Execution Monitoring and Controlling Closure  Implement improvement initiatives.  Enhance skills, methodologies, and resource utilization.  Provide training and support.  Monitor progress and address issues  Regularly monitor performance against objectives.  Track progress, identify variances, and take corrective actions.  Conduct reviews and adjust the plan as needed.  Evaluate outcomes and celebrate successes.  Document lessons learned and best practices.  Formalize project closure and transition remaining activities. 4
  • 9. Establishing the Program Management Office Defining Roles and Responsibilities Developing a Communication Plan Monitoring Project Performance Implementing Continuous Improvement 1. 2. 3. 4. 5. KEY PROGRAM MANAGEMENT ACTIVITIES: • Create a centralized PgMO to oversee improvement initiatives. • Determine the structure, processes, and governance framework. • Clearly define roles for PgMO members, project managers, and stakeholders. • Ensure accountability and streamline decision-making. • Create a comprehensive plan to keep stakeholders informed. • Determine Communication Frequency, Channels, and Key Messages, Implement RACI Framework. • Establish mechanisms for monitoring project progress. • Regularly review performance against objectives and KPIs • Foster a culture of continuous improvement within the PgMO. • Encourage feedback and adapt processes based on lessons learned.
  • 10. Providing Resource Management Conducting Risk Management Facilitating Stakeholder Engagement Ensuring Quality Assurance Managing Change 6. 7. 8. 9. 10. KEY PROGRAM MANAGEMENT ACTIVITIES: • Allocate resources effectively to support project implementation. • Optimize resource utilization to maximize efficiency. • Identify and assess project risks. • Develop strategies to mitigate risks and minimize their impact. • Engage stakeholders throughout the project lifecycle. • Solicit feedback and address concerns to ensure alignment • Establish quality assurance processes to maintain project standards. • Conduct regular quality reviews and audits • Implement change management processes to address resistance. • Communicate changes effectively and facilitate transition
  • 11. EXPECTED CHALLENGES 01 Resistance to Change Employees may resist new practices due to fear or uncertainty, necessitating effective change management strategies. 02 03 04 05 06 Limited Resources Budget, personnel, and time constraints may hinder initiatives, requiring careful resource allocation and prioritization Stakeholder Alignment Ensuring agreement among stakeholders with diverse interests demands effective communication and negotiation efforts Skill Gap Addressing project management skill deficiencies may require targeted training programs and competency development initiatives Cultural Shift Changing organizational culture to adopt new practices may face resistance, necessitating patience and leadership Sustaining Momentum Maintaining enthusiasm and commitment over time demands ongoing motivation, recognition, and progress reinforcement
  • 12. RESOLUTION STRATEGIES 04 Enhance project management competencies through targeted training programs, ensuring team readiness for success Skill Development 05 Encourage innovation and continuous improvement by fostering an open and transparent organizational culture Cultural Transformation 06 Maintain enthusiasm and commitment through regular communication, celebration of successes, and reinforcement of project management values Sustaining Momentum 01 Implement structured processes to address resistance and facilitate smooth transitions during new practice adoption Effective Change Management 02 Maximize efficiency by strategically allocating and utilizing available resources to support project objectives Resource Optimization 03 Foster collaboration and buy-in by engaging stakeholders throughout the project lifecycle and ensuring alignment with goals Stakeholder Engagement
  • 13. CONCLUSION In conclusion, effectively navigating intercultural dynamics is essential for successful collaboration with clients from diverse backgrounds. By recognizing and respecting cultural differences, businesses can foster stronger relationships, enhance communication, and achieve mutual understanding. Embracing cultural diversity promotes innovation, creativity, and global competitiveness, ultimately leading to greater success in today's interconnected world.
  • 14. THANK YOU F O R Y O U R A T T E N T I O N